Loading...
HomeMy WebLinkAboutSDP 16-07; OLIVENHAIN MUNICIPAL WATER DISTRICT; STORM WATER QUALITY MANAGEMENT PLAN; 2020-10-15E-35 CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR “OLIVENHAIN MUNICIPAL WATER DISTRICT” (NEW AND REMODELED ADMINISTRATION AND OPERATIONS FACILITIES) SDP AMENDMENT 16-07 DWG 502-9A GR2017-0019 ENGINEER OF WORK: ARIC GNESA, P.E. C68339 PREPARED FOR: OLIVENHAIN MUNICIPAL WATER DISTRICT 1966 OLIVENHAIN ROAD ENCINITAS, CA 92024 (760) 753-6466 PREPARED BY: INFRASTRUCTURE ENGINEERING CORPORATION 14271 DANIELSON STREET POWAY, CA 92064 (858) 413-2400 DATE:October 15, 2020 AMENDED 10/15/20 E-35 Table of Contents CERTIFICATION PAGE ............................................................................................................. 1 PROJECT VICINITY MAP.......................................................................................................... 2 FORM E-34 – STORM WATER STANDARD QUESTIONNAIRE ............................................... 3 SITE INFORMATION CHECKLIST ............................................................................................ 8 FORM E-36 – STANDARD PROJECT REQUIREMENT CHECKLIST ......................................21 SUMMARY OF PDP STRUCTURAL BMPS ..............................................................................25 ATTACHMENTS ATTACHMENT 1: BACKUP FOR PDP POLLUTANT CONTROL BMPS Attachment 1a: DMA Exhibit Attachment 1b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1c: Harvest and Use Feasibility Screening (when applicable) Attachment 1d: Categorization of Infiltration Feasibility Condition (when applicable) Attachment 1e: Pollutant Control BMP Design Worksheets / Calculations ATTACHMENT 2: BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design ATTACHMENT 3: STRUCTURAL BMP MAINTENANCE THRESHOLDS AND ACTIONS ATTACHMENT 4: SINGLE SHEET BMP (SSBMP) EXHIBIT ATTACHMENT 5: OPERATION AND MAINTENANCE PLAN E-35 Page 1 CERTIFICATION PAGE Project Name: OMWD Building Expansion Project ID: SDP Amendment 16-07 I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of San Diego RWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. C68839 Engineer of Work's Signature, P.E. Number Aric Gnesa Print Name Infrastructure Engineering Corporation Company 10/15/2020 Date E-35 Page 2 PROJECT VICINITY MAP E-35 Page 3 FORM E-34 – STORM WATER STANDARD QUESTIONNAIRE E-34 Page 1 of 4 REV 02/16 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STORM WATER STANDARDS QUESTIONNAIRE E-34 INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP’s) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to ‘STANDARD PROJECT’ requirements or be subject to ‘PRIORITY DEVELOPMENT PROJECT’ (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: PROJECT ID: The project is (check one):  New Development  Redevelopment The total proposed disturbed area is: ________ ft2 (________) acres The total proposed newly created and/or replaced impervious area is: ________ ft2 (________) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID: ___________________________ SWQMP #: __________________________ Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the City. E-34 Page 2 of 4 REV. 02/16 STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a “development project”, please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered “yes” to the above question, provide justification below then Go to step 5, mark the third box stating “my project is not a ‘development project’ and not subject to the requirements of the BMP manual” and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If you answered “no” to the above question, the project is a ‘development project’, go to Step 2. STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1.Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a)Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; b)Designed and constructed to be hydraulically disconnected from paved streets or roads; c)Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2.Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3.Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? If you answered “yes” to one or more of the above questions, provide discussion/justification below, then Go to step 5, mark the second box stating “my project is EXEMPT from PDP …” and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered “no” to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 3 of 4 REV. 02/16 STEP 3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1.Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2.Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4.Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6.Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7.Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? “Discharging Directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9.Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO’s that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10.Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11.Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040) If you answered “yes” to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, Go to step 4. If your project is a new project, Go to step 5, check the first box stating “My project is a PDP …” and complete applicant information. If you answered “no” to all of the above questions, your project is a ‘STANDARD PROJECT’, ‘’Go to step 5, check the second box stating “My project is a ‘STANDARD PROJECT’…” and complete applicant information. E-34 Page 4 of 4 REV. 02/16 STEP 4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = __________________________ sq. ft. Total proposed newly created or replaced impervious area (B) = _________________________sq. ft. Percent impervious area created or replaced (B/A)*100 = __________% If you answered “yes”, the structural BMP’s required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating “My project is a PDP …” and complete applicant information. If you answered “no,” the structural BMP’s required for PDP apply to the entire development. Go to step 5, check the check the first box stating “My project is a PDP …” and complete applicant information. STEP 5 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. My project is a ‘STANDARD PROJECT’ OR EXEMPT from PDP and must only comply with ‘STANDARD PROJECT’ stormwater requirements of the BMP Manual. As part of these requirements, I will submit a “Standard Project Requirement Checklist Form E-36” and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if ‘STANDARD PROJECT’ stormwater requirements apply. My Project is NOT a ‘development project’ and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Assessor’s Parcel Number(s): ___________________________________________ Applicant Name: Applicant Title: _____________________________________________ _____________________________________________ Applicant Signature: Date: _____________________________________________ _____________________________________________ *Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only City Concurrence: YES NO By: Date: Project ID: E-35 Page 8 SITE INFORMATION CHECKLIST Project Summary Information Project Name Olivenhain Municipal Water District – New and Remodeled Operations & Administration Facilities Project ID SDP 16-07 Project Address 1966 Olivenhain Road Encinitas, CA 92024 Assessor's Parcel Number(s) (APN(s)) 255-040-59 (formerly 255-031-03 and 255-040- 56, combined per Adj. Plat 16-06) Project Watershed (Hydrologic Unit) Carlsbad 904 Parcel Area 10.54 Acres (459,053 SF) Existing Impervious Area (subset of Parcel Area) 5.30 Acres (230,930 Square Feet) Area to be disturbed by the project (Project Area) 2.37 Acres (103,049 Square Feet) Project Proposed Impervious Area (subset of Project Area) 1.40 Acres (61,115 Square Feet) Project Proposed Pervious Area (subset of Project Area) 0.96 Acres (41,934 Square Feet) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. E-35 Page 9 Description of Existing Site Condition and Drainage Patterns Current Status of the Site (select all that apply): ☒Existing development ☐Previously graded but not built out ☐Agricultural or other non-impervious use ☐Vacant, undeveloped/natural Description / Additional Information: Project site occurs on an existing developed parcel: North of OMWD driveway: Existing OMWD administrative offices. South of OMWD driveway: Existing OMWD operations facility; commercial lease on the eastern one-third to agricultural food products store. Existing Land Cover Includes (select all that apply): ☒Vegetative Cover ☒Non-Vegetated Pervious Areas ☒Impervious Areas Description / Additional Information: North of OMWD driveway: impervious pavements and building roofs with few landscape areas. South of OMWD driveway: impervious pavements and building roofs; pervious areas are mostly non-vegetated. Underlying Soil belongs to Hydrologic Soil Group (select all that apply): ☐NRCS Type A ☐NRCS Type B ☒NRCS Type C ☒NRCS Type D Approximate Depth to Groundwater (GW): ☐GW Depth < 5 feet ☐5 feet < GW Depth < 10 feet ☒10 feet < GW Depth < 20 feet ☐GW Depth > 20 feet E-35 Page 10 Existing Natural Hydrologic Features (select all that apply): ☐Watercourses ☐Seeps ☐Springs ☐Wetlands ☒None Description / Additional Information: The project site has no natural hydrologic features. The entire site has been graded previously and is currently developed. E-35 Page 11 Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: The project site is bounded by Olivenhain Road on the north, Rancho Santa Fe Road on the east, Encinitas Creek on the south and private property on the west. The project site occurs on two portions of a merged parcel owned by Olivenhain Municipal Water District (OMWD). Prior to the lot merge, the parcels were divided by Old Olivenhain Road, which is now vacated as a public road and serves as the OMWD driveway. North of OMWD driveway: The topography slopes downward from northwest to southeast at less than 5% slope, concentrating in the paved roadway (OMWD driveway) and flowing east to the intersection of OMWD driveway and Rancho Santa Fe Road. There are no drainage facilities along the OMWD driveway other than asphalt concrete berm and a Portland cement cross gutter at the Rancho Santa Fe Road intersection. To the north and east, Olivenhain Road and Rancho Santa Fe Road, respectively, are improved with curb and gutter and there is no off- site runoff that enters the project site. South of OMWD driveway: The topography slopes downward from northwest to southeast.  The existing, paved access road leading to the existing South Side Operations Building captures the runoff from the western, approximately two-thirds of the south parcel and directs it to two, existing bioretention basins. These basins are located on the west and east sides of the existing Operations Building. The emergency overflow outlets from the basins are piped via an underground storm drain to a headwall structure at the south property line, east of the Operations Building. The discharge eventually surface flows to Encinitas Creek.  The remaining, eastern, one-third of the south parcel drains south across the lot via sheet flow toward the south property line. There are no existing storm drain improvements on the eastern portion of the south parcel. E-35 Page 12 Description of Proposed Site Development and Drainage Patterns Project Description / Proposed Land Use and/or Activities: The project will consist of the primary components: Construction of a new building for administrative offices, a Board meeting room and lobby; Reconfiguration of existing paved areas for a new parking lot; Construction of paving, curb and gutter improvements for the OMWD driveway (private); Removal of existing paving, reconfiguration of existing landscape areas and construction of new landscape improvements. The project will be phased in order to provide temporary access to OMWD offices during construction and for the construction of the east wing of the permanent building (Schedule B Improvements). The building pad for the ultimate building configuration will be graded during the first phase of the project. Other project components will consist of: Relocation of an existing emergency generator and electrical switchboard; Relocation of existing cellular communication facilities and appurtenant electrical services; Renovation of the interior of existing buildings; Demolition of an existing vehicle wash bay and above ground fueling station. The existing land uses are commercial for administrative office spaces (north of OMWD driveway) and commercial south of OMWD driveway. The proposed land uses will remain the same as the existing land uses. Construction of the project will result in an overall decrease in impervious cover, approximately 30,872 square feet (0.71 acres). List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): building roofs; walkways; parking spaces and drive lanes; street paving, new and replacement (OMWD driveway). E-35 Page 13 List/describe proposed pervious features of the project (e.g., landscape areas): landscaping around the proposed building improvements and where existing paving will be removed; permeable pavements in new or reconfigured parking areas; permeable pavement in pedestrian walkway areas to replace existing impervious paving. Does the project include grading and changes to site topography? ☒Yes ☐No Description / Additional Information: Grading is required to construct the new building pad for the building addition, for the reconfiguration of existing parking areas, and for construction of the roundabout at the west end of the OMWD driveway. The greatest change will be the placement of approximately 2 to 3 feet of engineered fill (above existing grades) for the proposed building pad north of the existing OMWD driveway and for construction of the driveway roundabout. Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)? ☒Yes ☐No Description / Additional Information: The project will not change the prevailing, existing drainage patterns or runoff concentration points. The OMWD driveway will remain as a subarea boundary between the north and south portions of the site. The proposed drainage gradients will be flatter and flow paths will be longer than existing conditions as a result of building pad construction. Surface runoff will be captured by proposed inlets and piped to the proposed hydromodification basins and eventually to the existing runoff concentration points. Runoff from existing roofs will be dispersed to landscaped areas. Runoff from new roofs will be captured by proposed rain barrels before discharging as surface flow to downstream hydromodification basins. The existing sidewalk underdrain that discharges to Rancho Santa Fe Road 160 feet north of OMWD driveway will remain. A new sidewalk underdrain and curb outlet is proposed at the east end of OMWD driveway, north side, about 30 feet west of Rancho Santa Fe Road. E-35 Page 14 Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): ☒ On-site storm drain inlets ☐ Interior floor drains and elevator shaft sump pumps ☐ Interior parking garages ☐ Need for future indoor & structural pest control ☒ Landscape/Outdoor Pesticide Use ☐ Pools, spas, ponds, decorative fountains, and other water features ☐ Food service ☒ Refuse areas ☐ Industrial processes ☐ Outdoor storage of equipment or materials ☐ Vehicle and Equipment Cleaning ☐ Vehicle/Equipment Repair and Maintenance ☐ Fuel Dispensing Areas ☐ Loading Docks ☒ Fire Sprinkler Test Water ☒ Miscellaneous Drain or Wash Water ☒ Plazas, sidewalks, and parking lots E-35 Page 15 Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): Runoff from the project area concentrates at two locations: Runoff from the north side of OMWD driveway concentrates at the intersection of the OMWD driveway and Rancho Santa Fe Road and will comingle with off-site flows in RSF Road. These flows will travel approximately 250 feet south along existing curb and gutter to an existing curb inlet and public storm drain in RSF Road, then will ultimately discharge on the north bank of Encinitas Creek. Runoff from the western two-thirds of the south side of OMWD driveway flows in the existing paved driveway leading to the South Side Operations Building and eventually flows into two existing bioretention basins which discharge at the south property line. Runoff from the eastern one-third of the south parcel which is not tributary to the existing bioretention basins sheet flows over the south property line and onto the north overbank area of Encinitas Creek. From Encinitas Creek, flows continue west approximately 5,300 feet where they cross beneath El Camino Real, then continue north approximately 8,600 feet where they enter Batiquitos Lagoon and ultimately another 13,400 feet to the Pacific Ocean shoreline (total travel length of 5.2 miles) List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)/Stressor(s) TMDLs Encinitas Creek Selenium None. TMDL req’d list, est. completion: 2019 Encinitas Creek Toxicity None. TMDL req’d list, est. completion: 2019 E-35 Page 16 Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6): Pollutant Not Applicable to the Project Site Anticipated from the Project Site Also a Receiving Water Pollutant of Concern Sediment ☐☒☐ Nutrients ☐☒☒ Heavy Metals ☐☒☒ Organic Compounds ☐☒☐ Trash & Debris ☐☒☐ Oxygen Demanding Substances ☐☒☐ Oil & Grease ☐☒☒ Bacteria & Viruses ☒☐☐ Pesticides ☐☒☒ From the Carlsbad WMA Water Quality Improvement Plan, the Priority Water Quality Condition identifies toxicity for Encinitas Creek; Indicator Bacteria for the Pacific Ocean Shoreline for the San Marcos Hydrologic Area (at Cottonwood Creek, which is not in the flow path to the ocean). Highest Priority Water Quality Conditions are not identified in the WQIP for Encinitas Creek, Batiquitos Lagoon or the Pacific Ocean shoreline at Batiquitos Lagoon. Receiving Water Pollutants of Concern, based on toxicity as a pollutant stressor, are identified in the table above. E-35 Page 17 Hydromodification Management Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? ☒ Yes, hydromodification management flow control structural BMPs required. ☐ No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. ☐ No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. ☐ No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description / Additional Information (to be provided if a 'No' answer has been selected above): E-35 Page 18 Critical Coarse Sediment Yield Areas* *This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? ☒ Yes ☐ No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? ☐ 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite ☐ 6.2.2 Downstream Systems Sensitivity to Coarse Sediment ☐ 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite ☒ No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? ☐ No critical coarse sediment yield areas to be protected based on verification of GLUs onsite ☐ Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 8 of the SWQMP. ☐ Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion / Additional Information: Based on the Google Earth kmz file available on Project Clean Water website, a potential critical coarse sediment yield area (CCSYA) exists on the south side of OMWD driveway, but the area is located outside of the grading/work limits. Onsite conveyance does not exist that would deliver sediment from the potential CCSYA to Encinitas Creek because the potential CCSYA is tributary to the two, existing bioretention basins that are located on the south side of OMWD driveway. Refer to Attachment 2b. E-35 Page 19 Flow Control for Post-Project Runoff* *This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. POC 1: intersection of Rancho Santa Fe Road and OMWD driveway. Flows to Encinitas Creek via existing, public storm drain in Rancho Santa Fe Road. POC 2: along existing driveway to South Side Operations Building, near entrance to the easterly, existing bioretention basin on the south parcel. Discharges at south parcel property line via existing basin emergency outlet storm drain and eventually flows to Encinitas Creek. Note: POC 1 and POC 2 eventually combine off-site in Encinitas Creek. The combined total, post-project discharge is less than the pre-project discharge due to the removal of impervious surfaces proposed by the project. Has a geomorphic assessment been performed for the receiving channel(s)? ☒ No, the low flow threshold is 0.1Q2 (default low flow threshold) ☐ Yes, the result is the low flow threshold is 0.1Q2 ☐ Yes, the result is the low flow threshold is 0.3Q2 ☐ Yes, the result is the low flow threshold is 0.5Q2 If a geomorphic assessment has been performed, provide title, date, and preparer: Discussion / Additional Information: (optional) The post-project peak discharge is less than the pre-project peak discharge. E-35 Page 20 Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. Site constraints include Type C and D soils and limited hydraulic head (or fall) for partial infiltration basin outlets. Borehole percolation testing performed at the site reveals variability in observed infiltration rates, with the lowest observed infiltration rates in Type C soils. Infiltration rates in mapped Type D soils were observed to be higher than in mapped Type C soils. Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. E-35 Page 21 FORM E-36 – STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Page 1 of 3 REV 02/16 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Project Name: Project ID: DWG No. or Building Permit No.: Source Control BMPs All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 Yes No N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage Yes No N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-3 not implemented: SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-5 not implemented: E-36 Page 2 of 3 REV. 02/16 Source Control Requirement Applied? SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). On-site storm drain inlets Interior floor drains and elevator shaft sump pumps Interior parking garages Need for future indoor & structural pest control Landscape/Outdoor Pesticide Use Pools, spas, ponds, decorative fountains, and other water features Food service Refuse areas Industrial processes Outdoor storage of equipment or materials Vehicle and Equipment Cleaning Vehicle/Equipment Repair and Maintenance Fuel Dispensing Areas Loading Docks Fire Sprinkler Test Water Miscellaneous Drain or Wash Water Plazas, sidewalks, and parking lots Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No No No No No No No No No No N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A For “Yes” answers, identify the additional BMP per Appendix E.1. Provide justification for “No” answers. E-36 Page 3 of 3 REV. 02/16 Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following.  "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion / justification is not required.  "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided.  "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Design Requirement Applied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features  Yes  No  N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation  Yes  No  N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area  Yes  No  N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction  Yes  No  N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion  Yes  No  N/A Discussion/justification if SD-5 not implemented: SD-6 Runoff Collection  Yes  No  N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species  Yes  No  N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation  Yes  No  N/A Discussion/justification if SD-8 not implemented: E-35 Page 25 SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). E-35 Page 26 Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. Structural BMPs will be implemented for pollutant and hydromodification control based on the site’s partial infiltration capability, as determined through borehole infiltration tests, and the following. •The site soils are mostly Group D with some Group C. However, borehole infiltration test results indicate that the prior placement of fill may have influenced the infiltration tests as the Group C soils in the eastern portion of the site have less infiltration capacity than soils mapped as Group D. An average of the infiltration test results is used in determining the design infiltration rate. •Biofiltration with partial retention basins will be implemented where possible because of the high pollutant removal efficiency for the receiving water pollutants of concern, the need for hydromodification control, and for integration with landscape improvements. Constraints include setbacks from building foundations or utilities. BMPs 1, 4, and 5 are designed per the BMP sizing factors in the 2016 Model BMP Design Manual. BMP 6 was recently added and is sized per the May 2018 Model BMP Design Manual as approved by the City. •Permeable pavements will be used to reduce imperviousness and the design capture volume (DCV) for hydromodification control. They will be used in lieu of new impervious pavements and to replace existing impervious pavements, where feasible. Permeable pavements will provide some treatment via filtration through, and detention storage in the aggregate sublayers. Permeable pavements will be used in parking spaces and in courtyards and walkways and will be located in low-sediment generating drainage management areas (DMAs) to reduce the potential for clogging. Permeable pavements will include an underdrain (in Group C and D Soils) to reduce the potential for pavement subgrade failure. •Street tree BMPs (tree wells) will be used along the south side of OMWD (private drive) to provide biofiltration where insufficient space exists for a biofiltration with partial retention basin BMP. The design is a modified version of San Diego County Design Standard GS-1.4, Tree Well with Open Tree Space. •A cistern will intercept roof runoff from a new roof area and provide detention storage and flow control ahead of downstream hydromodification basin. Additional discussion is provided in the Structural BMP Summary Information sheets that follow. E-35 Page 27 Structural BMP Summary Information Structural BMP ID No.: 1 Dwg.: 502-9A Sheet No.: 14 Type of structural BMP: ☐ Retention by harvest and use (HU-1) ☐ Retention by infiltration basin (INF-1) ☐ Retention by bioretention (INF-2) ☐ Retention by permeable pavement (INF-3) ☒ Partial retention by biofiltration with partial retention (PR-1) ☐ Biofiltration (BF-1) ☐ Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) ☐ Detention pond or vault for hydromodification management ☐ Other (describe in discussion section below) Purpose: ☐ Pollutant control only ☐ Hydromodification control only ☒ Combined pollutant control and hydromodification control ☐ Pre-treatment/forebay for another structural BMP ☐ Other (describe in discussion section below) Discussion (as needed): This basin will treat new pavement and landscape areas northwest of existing Building A in DMA A2. Existing building roof areas (DMA A2A) will be diverted to BMP 6. E-35 Page 30 Structural BMP Summary Information Structural BMP ID No.: 4 Dwg.: 502-9A Sheet No.: 15 Type of structural BMP: ☐Retention by harvest and use (HU-1) ☐Retention by infiltration basin (INF-1) ☐Retention by bioretention (INF-2) ☐Retention by permeable pavement (INF-3) ☒Partial retention by biofiltration with partial retention (PR-1) ☐Biofiltration (BF-1) ☐Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) ☐Detention pond or vault for hydromodification management ☐Other (describe in discussion section below) Purpose: ☐Pollutant control only ☐Hydromodification control only ☒Combined pollutant control and hydromodification control ☐Pre-treatment/forebay for another structural BMP ☐Other (describe in discussion section below) Discussion (as needed): This basin will treat new roof, pavement and landscape areas in DMAs A5, A6, A7, A10, A10A, A10B, and A11. This basin has elevation constraints for the outlet and, therefore, 12 inches of biofiltration soil media is proposed. Existing Building “X” will be removed as part of the project to allow space for construction of the basin. E-35 Page 31 Structural BMP Summary Information Structural BMP ID No.: 5 Dwg.: 502-9A Sheet No.: 13 Type of structural BMP: ☐Retention by harvest and use (HU-1) ☐Retention by infiltration basin (INF-1) ☐Retention by bioretention (INF-2) ☐Retention by permeable pavement (INF-3) ☒Partial retention by biofiltration with partial retention (PR-1) ☐Biofiltration (BF-1) ☐Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) ☐Detention pond or vault for hydromodification management ☐Other (describe in discussion section below) Purpose: ☐Pollutant control only ☐Hydromodification control only ☒Combined pollutant control and hydromodification control ☐Pre-treatment/forebay for another structural BMP ☐Other (describe in discussion section below) Discussion (as needed): This basin will treat new roof, pavement and landscape areas from DMAs B1B and B2, on the east side of new Building D, and existing roof area DMA B1A. E-35 Page 32 Structural BMP Summary Information Structural BMP ID No.: 6 Dwg.: 502-9A Sheet No.: 16 Type of structural BMP: ☐Retention by harvest and use (HU-1) ☐Retention by infiltration basin (INF-1) ☐Retention by bioretention (INF-2) ☐Retention by permeable pavement (INF-3) ☒Partial retention by biofiltration with partial retention (PR-1) ☐Biofiltration (BF-1) ☐Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) ☐Detention pond or vault for hydromodification management ☐Other (describe in discussion section below) Purpose: ☐Pollutant control only ☐Hydromodification control only ☒Combined pollutant control and hydromodification control ☐Pre-treatment/forebay for another structural BMP ☐Other (describe in discussion section below) Discussion (as needed): This basin is designed per the May 2018 Model BMP Design Manual, per City approval due to its recent addition to the project, and will provide hydromodification for: •off-site DMA C4C (existing paving) to satisfy the hydromodification requirement for DMA A8 which cannot be routed to a basin due to elevation constraints; •existing roof areas in DMAs A2A and A4A to satisfy hydromodification requirements for the new roof in DMA A2B (note: DMAs A2A and A4A currently drain to an existing storm drain which will be intercepted and re-routed to BMP 6); and •new pavements and landscaping in DMA C4A. •DMAs A4 , captured from a cistern and routed to BMP 6 Existing parking lot AC paving in DMA C4C will be removed to allow space for construction of the basin. E-35 Page 33 Structural BMP Summary Information Structural BMP ID No.: 31, 32, 33, 34 Dwg.: 502-9A Sheet No.: 15, 16 Type of structural BMP: ☐Retention by harvest and use (HU-1) ☐Retention by infiltration basin (INF-1) ☐Retention by bioretention (INF-2) ☐Retention by permeable pavement (INF-3) ☐Partial retention by biofiltration with partial retention (PR-1) ☒Biofiltration (BF-1) ☐Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) ☐Detention pond or vault for hydromodification management ☐Other (describe in discussion section below): Flow-thru treatment control Purpose: ☒Pollutant control only ☐Hydromodification control only ☐Combined pollutant control and hydromodification control ☐Pre-treatment/forebay for another structural BMP ☐Other (describe in discussion section below) Discussion (as needed): Street trees in DMA A8 will provide pollutant control via biofiltration in the structural soil zone and detention storage in the structural soil zone. The design is in general accordance with the simple sizing method for infiltration BMPs and San Diego County Design Standard GS-1.04b (modified). An underdrain will be installed beneath the structural soil layer per the landscape architect’s recommendations. This DMA has elevation constraints and street trees are considered the only feasible BMP along the roadside of OMWD (private drive). Hydromodification for DMA A8 will be satisfied by BMP 6 which will provide hydromodification for an equivalent area of off-site pavement (DMA C4C) and existing roof areas DMA A2A and DMA A4A. E-35 Page 34 Structural BMP Summary Information Structural BMP ID No.: 35 Dwg.: 502-9A Sheet No.: 14 Type of structural BMP: ☐Retention by harvest and use (HU-1) ☐Retention by infiltration basin (INF-1) ☐Retention by bioretention (INF-2) ☐Retention by permeable pavement (INF-3) ☐Partial retention by biofiltration with partial retention (PR-1) ☐Biofiltration (BF-1) ☐Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) ☐Detention pond or vault for hydromodification management ☒Other (describe in discussion section below): Cistern Purpose: ☐Pollutant control only ☒Hydromodification control only ☐Combined pollutant control and hydromodification control ☐Pre-treatment/forebay for another structural BMP ☐Other (describe in discussion section below) Discussion (as needed): DMA A4 has limited space for a hydromodification basin. A cistern in DMA A4 will capture roof runoff from DMA A4B and provide detention storage and flow control upstream of biofiltration with partial retention basin BMP 6. A1-1 ATTACHMENT 1 – BACKUP FOR PDP POLLUTANT CONTROL BMPS Check which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Attachment 1a DMA Exhibit (Required) See DMA Exhibit Checklist on the back of this Attachment cover sheet. (24”x36” Exhibit typically required) ☒Included Attachment 1b Tabular Summary of DMAs Showing DMA ID matching DMA Exhibit, DMA Area, and DMA Type (Required)* *Provide table in this Attachment OR on DMA Exhibit in Attachment 1a ☐Included on DMA Exhibit in Attachment 1a ☒Included as Attachment 1b, separate from DMA Exhibit Attachment 1c Form I-7, Harvest and Use Feasibility Screening Checklist (Required unless the entire project will use infiltration BMPs) Refer to Appendix B.3-1 of the BMP Design Manual to complete Form I-7. ☒Included ☐Not included because the entire project will use infiltration BMPs Attachment 1d Form I-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest and use BMPs) Refer to Appendices C and D of the BMP Design Manual to complete Form I-8. ☒Included ☐Not included because the entire project will use harvest and use BMPs Attachment 1e Pollutant Control BMP Design Worksheets / Calculations (Required) Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines ☒Included A1-2 Use this checklist to ensure the required information has been included on the DMA Exhibit: The DMA Exhibit must identify: ☒ Underlying hydrologic soil group ☒ Approximate depth to groundwater ☒ Existing natural hydrologic features (watercourses, seeps, springs, wetlands) ☒ Critical coarse sediment yield areas to be protected (if present) ☒ Existing topography and impervious areas ☒ Existing and proposed site drainage network and connections to drainage offsite ☒ Proposed grading ☒ Proposed impervious features ☒ Proposed design features and surface treatments used to minimize imperviousness ☒ Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e., drains to BMP, self-retaining, or self-mitigating) ☒ Structural BMPs (identify location and type of BMP) A1-3 ATTACHMENT 1a – DMA EXHIBIT APN 255-031-03APN 255-040-56APN 255-040-59APN 255-040-56RANC H O S A N T A F E R O A DOMWD DRIVEWAYOLIVENHAIN ROADTO SOUTHSIDEOPERATIONS BUILDING SOIL T Y P E " D " SOIL T Y P E " C "NODE61NODE 28POC 1NODE 35POC 2POTENTIAL CRITICAL COARSE SEDIMENTYIELD AREA. SOURCE: PROJECT CLEANWATER, GOOGLE KMZ, 2016.(OFF-SITE EXISTAC PAVING)C2C1C2A6B3C3A3A2B4B1AA2AA4BA4CC4AC4BA8A11A5B2A7A4A10A9B1BA10AA10BA2BA4AA1C4CA4DA1ASCALE : 1" =20'-0" 502-9ALEGEND71TREATMENT CONTROLLOW IMPACT DESIGN (L.I.D.)SOURCE CONTROL20HYDROMODIFICATION & TREATMENT CONTROLHYDROMODIFICATION82XX5974**PERVIOUS CONC.PAVEMENTPERVIOUSINTERLOCKINGPAVERS2530222331SITE DESIGN345964*PRIOR TO THE RAINY SEASON (OCT 1 THROUGH APR 30)8081POROUS PAVING -GRASSSD-6BTC-102,350 SF.502-9A502-9A502-9A502-9A502-9A502-9A502-9A502-9A502-9A13-15SEMI-ANNUALLYSEMI-ANNUALLYSEMI-ANNUALLYSEMI-ANNUALLYSEMI-ANNUALLYQUARTERLYSD-6BTC-10SD-6BTC-101,706 SF.1,001 SF.BMP ID #BMP TYPESYMBOLSDBMP,CARLSBAD ORCASQA NO.QUANTITYDRAWING NO.SHEET NO.(S)INSPECTIONFREQUENCYMAINTENANCEFREQUENCY14, 1513BMP TABLEBIOFILTRATIONPR-1271 SF.QUARTERLYSEMI-ANNUALLY14WET VAULT(INCLUDES CISTERN)MP-50ROOF DRAIN TOLANDSCAPINGINLET FILTERVEGETATIVESWALEFT-1TC-30MP-52SD-1114 EA.7 EA.0 SF.ANNUALLYANNUALLYANNUALLYSEMI-ANNUALLY13-1513-15PERLANDSCAPE1313-15STREET TREESSD-14 EA.ANNUALLYANNUALLYSEMI-ANNUALLYANNUALLYANNUALLYANNUALLY1 EA.16 EA.GS-16SD-13NO DUMPINGDRAINS TO OCEANSTENCILSTRASHENCLOSURESDP 16-0712502-9ABIOFILTRATION3,282 SF.QUARTERLYSEMI-ANNUALLY15502-9ABIOFILTRATION676 SF.QUARTERLYSEMI-ANNUALLY13502-9ABIOFILTRATION1,885 SF.QUARTERLYSEMI-ANNUALLY16456502-9A14CISTERNHU-11 EA. / 660 GAL.ANNUALLYSEMI-ANNUALLY35PR-1PR-1PR-1 APN 255-031-03APN 255-040-56APN 255-040-59APN 255-040-56TO SOUTHS IDEOPERATIONS BU ILD INGNODE 35POC 2POTENTIAL CRITICAL COARSE SEDIMENTYIELD AREA. SOURCE: PROJECT CLEANWATER, GOOGLE KMZ, 2016.(OFF-SITE EXISTAC PAVING)C1C3A3A2A2AA4BA4CC4AC4BA4A9A10AA2BA4AC4CA4DSCALE : 1" =20'-0" 502-9ALEGENDSDP 16-0722 A1-6 ATTACHMENT 1b – TABULAR SUMMARY OF DMAs DMA Type Pervious (sf) Impervious  (sf) Total Area (sf) Total Area (ac) BMP A2 Landscape, Concrete, Permeable Pavers 5,111              659                 5,770              0.132              BMP 1, Biofilt. w/Partial Ret. A2B Roof ‐                  239                 239                 0.005              Drains to landscape A3 Permeable Paving, Concrete, Landscape 989                 344                 1,333              0.031              Self‐Retaining A4 Landscape, Concrete 3,074              1,309              4,383              0.101              BMP 6, Biofilt. w/Partial Ret. A4B Roof ‐                  1,070              1,070              0.025              BMP 6, Biofilt. w/Partial Ret., Cistern A4D Permeable Paving, Concrete 486                 322                 808                 0.019              Self‐Retaining A5 Roof, Landscape, Concrete 3,025              3,038              6,064              0.139              BMP 4, Biofilt. w/Partial Ret. A6 Roof, Landscape, Concrete 1,915              3,899              5,814              0.133              BMP 4, Biofilt. w/Partial Ret. A7 AC, Landscape 189                 9,937              10,125           0.232              BMP 4, Biofilt. w/Partial Ret. A8 Permeable Paving, AC, Landscape 2,554              12,860           15,413           0.354              BMP 31‐34, Street Trees A10 Roof, Pavement, Perm. Pavement, Landscape 1,897              2,931              4,828              0.111              BMP 4, Biofilt. w/Partial Ret. A10A Roof ‐                  1,086              1,086              0.025              BMP 4, Biofilt. w/Partial Ret. A11 Landscape 6,080              213                 6,293              0.144              BMP 4, Biofilt. w/Partial Ret. B1B Roof ‐                  1,887              1,887              0.043              BMP 5, Biofilt. w/Partial Ret. B2 Roof, Landscape, Concrete 4,739              1,805              6,544              0.150              BMP 5, Biofilt. w/Partial Ret. B3 Permeable Paving, AC, Landscape 2,971              6,907              9,878              0.227              BMP 22, Permeable Paving, Infiltration B4 Landscape 2,580              26                   2,606              0.060              Self‐Mitigating C1 Landscape 999                 ‐                  999                 0.023              Self‐Mitigating C2 Landscape 1,619              ‐                  1,619              0.037              Self‐Mitigating C3 Paving, Landscape 729                 7,546              8,276              0.190              Existing Bioretention Basin C4A Paving, Landscape 979                 4,951              5,930              0.136              BMP 6, Biofilt. w/Partial Ret. C4B Paving, Landscape 1,998              86                   2,084              0.048              BMP 6, Biofilt. w/Partial Ret. 41,934         61,115         103,049       2.37             DMA Type Pervious (sf) Impervious  (sf) Total Area (sf) Total Area (ac)BMP A1 Existing Roof ‐                  2,780              2,780              0.064              Existing Sand Filter A1A Existing Landscape 2,314              ‐                  2,314              0.053              Existing Sand Filter A2A Existing Roof ‐                  2,694              2,694              0.062              Drains to Basin 6 A4A Existing Roof ‐                  1,987              1,987              0.046              Drains to Basin 6 A4C Existing Concrete ‐                  342                 342                 0.008              Drains to landscape A9 Existing Landscape 2,415              ‐                  2,415              0.055              Not Disturbed A10B Existing Roof ‐                  1,451              1,451              0.033              BMP 4, Biofilt. w/Partial Ret. B1A Existing Roof ‐                  1,589              1,589              0.036              BMP 5, Biofilt. w/Partial Ret. C4C Existing AC ‐                  15,508           15,508           0.356              BMP 6, Biofilt. w/Partial Ret. 4,729           26,351         31,080         0.71             46,663         87,466         134,129       3.08             ATTACHMENT 1b ‐ DMA SUMMARY Total Considered:   Subtotal:   DMAs in Proposed Limit of Work DMAs ‐ Existing or Outside of Project Area Subtotal:   Page 1 of 1 A1-8 ATTACHMENT 1c – FORM I-7, HARVEST AND USE FEASIBILITY SCREENING CHECKLIST Appendix I: Forms and Checklists Harvest and Use Feasibility Checklist Form I-7 1.Is there a demand for harvested water (check all that apply) at the project site that is reliably present during the wet season? Toilet and urinal flushing Landscape irrigation Other:______________ 2.If there is a demand; estimate the anticipated average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. [Provide a summary of calculations here] 3.Calculate the DCV using worksheet B-2.1. DCV = __________ (cubic feet) 3a. Is the 36 hour demand greater than or equal to the DCV? Yes / No 3b. Is the 36 hour demand greater than 0.25DCV but less than the full DCV? Yes / No 3c. Is the 36 hour demand less than 0.25DCV? Yes Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. Harvest and use may be feasible. Conduct more detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or (optionally) the storage may need to be upsized to meet long term capture targets while draining in longer than 36 hours. Harvest and use is considered to be infeasible. Is harvest and use feasible based on further evaluation? Yes, refer to Appendix E to select and size harvest and use BMPs. No, select alternate BMPs. I-26 June 2015 A1-9 ATTACHMENT 1d – FORM I-8, CATEGORIZATION OF INFILTRATION FEASIBILITY CONDITION January 9, 2018 SCST No. 160105P3 Report No. 3 David Padilla, PE, QSD Project Manager Infrastructure Engineering Corporation 14271 Danielson Street Poway, California 92064 Subject: REVIEW OF GRADING PLANS AND INFILTRATION ASSESSMENT OLIVENHAIN MUNICIPAL WATER DISTRICT NEW AND REMODELED OPERATIONS AND ADMINISTRATION FACILITIES CARLSBAD, CALIFORNIA References: 1. Infrastructure Engineering Corporation (2018), Grading Plans and Civil Details, Olivenhain Municipal Water District, New and Remodeled Operations and Administration Facilities, Drawing No. 502-9A, January 8. 2._______ (2018), City of Carlsbad, Priority Development Project (PDP), Storm Water Quality Management Plan (SWQMP), Olivenhain Municipal Water District, New and Remodeled Operations and Administration Facilities, January 2. 3.SCST, Inc. (2016), Geotechnical Investigation, Olivenhain Municipal Water District (OMWD) Building D, 1966 Olivenhain Road, Encinitas, California, SCST No. 160105P3-1, March 3. Dear Dave: This letter confirms that SCST, Inc. reviewed the project grading plans and civil details and the infiltration assessment in the SWQMP, References 1 and 2. In our opinion, the project plans and details and the infiltration assessment forms I-8 and I-9 are prepared in accordance with the recommendations contained in the project geotechnical report, Reference 3. If you have any questions, please call me at (619) 280-4321. Respectfully submitted, SCST, INC. 6/30/19 Thomas B. Canady, PE 50057 Principal Engineer (1)Addressee via e-mail: dpadilla@iecorporation.com February 23, 2018 SCST No. 160105P3 Report No. 4 David Padilla, PE, QSD Project Manager Infrastructure Engineering Corporation 14271 Danielson Street Poway, California 92064 Subject: REVIEW OF GRADING PLAN, FOUNDATION PLAN AND SPECIFICATIONS OLIVENHAIN MUNICIPAL WATER DISTRICT NEW AND REMODELED OPERATIONS AND ADMINISTRATION FACILITIES CARLSBAD, CALIFORNIA References: 1. Infrastructure Engineering Corporation (2018), Grading Plan, Olivenhain Municipal Water District, New and Remodeled Operations and Administration Facilities, Drawing No. 502-9A, January 8. 2.SCST, Inc. (2016), Geotechnical Investigation, Olivenhain Municipal Water District Building D, 1966 Olivenhain Road, Encinitas, California, SCST No. 160105P3-1, March 3. 3.Wynn Engineering (2017), Foundation Plan, Olivenhain Municipal Water District, New and Remodeled Operations and Administration Facilities, 2nd Plan Check Submittal, December 6. Dear Dave: This letter confirms that SCST, Inc. (SCST) reviewed the project grading plan, foundation plan and specifications, References 1 and 3. In our opinion, the plans and specifications are prepared in accordance with the recommendations contained in the project geotechnical report, Reference 2. If you have any questions, please call me at (619) 280-4321. Respectfully submitted, SCST, INC. 6/30/19 Thomas B. Canady, PE 50057 Principal Engineer (1)Addressee via e-mail: dpadilla@iecorporation.com Appendix I: Forms and Checklists Categorization of Infiltration Feasibility Condition Form I-8 Part 1 - Full Infiltration Feasibility Screening Criteria Would infiltration of the full design volume be feasible from a physical perspective without any undesirable consequences that cannot be reasonably mitigated? Criteria Screening Question Yes No 1 Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches per hour? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 2 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. I-27 June 2015 Appendix I: Forms and Checklists Form I-8 Page 2 of 4 Criteria Screening Question Yes No 3 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water table, storm water pollutants or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 4 Can infiltration greater than 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams or increased discharge of contaminated groundwater to surface waters? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Part 1 Result * If all answers to rows 1 - 4 are “Yes” a full infiltration design is potentially feasible. The feasibility screening category is Full Infiltration If any answer from row 1-4 is “No”, infiltration may be possible to some extent but would not generally be feasible or desirable to achieve a “full infiltration” design. Proceed to Part 2 *To be completed using gathered site information and best professional judgment considering the definition of MEP in the MS4 Permit. Additional testing and/or studies may be required by Agency/Jurisdictions to substantiate findings I-28 June 2015 Appendix I: Forms and Checklists Form I-8 Page 3 of 4 Part 2 – Partial Infiltration vs. No Infiltration Feasibility Screening Criteria Would infiltration of water in any appreciable amount be physically feasible without any negative consequences that cannot be reasonably mitigated? Criteria Screening Question Yes No 5 Do soil and geologic conditions allow for infiltration in any appreciable rate or volume? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. 6 Can Infiltration in any appreciable quantity be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. I-29 June 2015 Appendix I: Forms and Checklists Form I-8 Page 4 of 4 Criteria Screening Question Yes No 7 Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. 8 Can infiltration be allowed without violating downstream water rights? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. Part 2 Result* If all answers from row 1-4 are yes then partial infiltration design is potentially feasible. The feasibility screening category is Partial Infiltration. If any answer from row 5-8 is no, then infiltration of any volume is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration. *To be completed using gathered site information and best professional judgment considering the definition of MEP in the MS4 Permit. Additional testing and/or studies may be required by Agency/Jurisdictions to substantiate findings I-30 June 2015 A1-10 ATTACHMENT 1e – POLLUTANT CONTROL BMP DESIGN WORKSHEETS / CALCULATIONS DMA:A1 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 2,780 0.064 0.057 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 2,780           0.064           0.057 Area Weighted C: 0.90 DMA:A1A Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 2,314 0.053 0.005 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 2,314           0.053           0.005 Area Weighted C: 0.10 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 Surface Surface Existing roof; outside of project limits. Existing landscape; outside of project limits. Page 1 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A2 & A2B Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 239 0.005 0.005 Paving (concrete, asphalt concrete)0.90 659 0.015 0.014 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 4,499 0.103 0.010 Permeable Pavement 0.10 612 0.014 0.001 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 6,009           0.138           0.030 Area Weighted C: 0.22 DMA:A2A Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 2,694 0.062 0.056 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 2,694           0.062           0.056 Area Weighted C: 0.90 Existing roof; outside of project limits. Surface Surface New roof, remodeled pavement and landscape. Page 2 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A3 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 344 0.008 0.007 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 25 0.001 0.000 Permeable Pavement 0.10 964 0.022 0.002 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 1,333           0.031           0.009 Area Weighted C: 0.31 DMA:A4 & A4B Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 1,070 0.025 0.022 Paving (concrete, asphalt concrete)0.90 1,309 0.030 0.027 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 3,074 0.071 0.007 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 5,453           0.125           0.056 Area Weighted C: 0.45 New pervious pavement, concrete pavement, landscape. New roof, remodeled pavement and landscape. Surface Surface Page 3 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A4A Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 1,987 0.046 0.041 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 1,987           0.046           0.041 Area Weighted C: 0.90 DMA:A4C Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 342 0.008 0.007 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 342               0.008           0.007 Area Weighted C: 0.90 Existing roof; outside of project limits. Existing pavement; outside of project limits. Surface Surface Page 4 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A4D Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 322 0.007 0.007 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 486 0.011 0.001 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 808               0.019           0.008 Area Weighted C: 0.42 DMA:A5 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 2,161 0.050 0.045 Paving (concrete, asphalt concrete)0.90 878 0.020 0.018 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 3,025 0.069 0.007 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 6,064           0.139           0.070 Area Weighted C: 0.50 Surface Surface New pervious pavement and concrete pavement. New roof, pavement and landscape. Page 5 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A6 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 2,672 0.061 0.055 Paving (concrete, asphalt concrete)0.90 1,227 0.028 0.025 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 1,915 0.044 0.004 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 5,814           0.133           0.085 Area Weighted C: 0.64 DMA:A7 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 9,937 0.228 0.205 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 189 0.004 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 10,125         0.232           0.206 Area Weighted C: 0.89 Surface Surface New roof, pavement and landscape. New pavement and landscape. Page 6 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A8 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 12,860 0.295 0.266 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 1,946 0.045 0.004 Permeable Pavement 0.10 608 0.014 0.001 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 15,413         0.354           0.272 Area Weighted C: 0.77 DMA:A9 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 2,415 0.055 0.006 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 2,415           0.055           0.006 Area Weighted C: 0.10 Existing landscape, outside of project limits. Surface Surface New pavement and landscape. Page 7 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A10 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 2,879 0.066 0.059 Paving (concrete, asphalt concrete)0.90 52 0.001 0.001 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 1,449 0.033 0.003 Permeable Pavement 0.10 448 0.010 0.001 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 4,828           0.111           0.065 Area Weighted C: 0.59 DMA:A10A Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 1,086 0.025 0.022 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 1,086           0.025           0.022 Area Weighted C: 0.90 New roof, pavement, permeable pavement, and landscape. Remodeled roof. Surface Surface Page 8 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:A10B Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 1,451 0.033 0.030 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 1,451           0.033           0.030 Area Weighted C: 0.90 DMA:A11 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 213 0.005 0.004 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 6,080 0.140 0.014 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 6,293           0.144           0.018 Area Weighted C: 0.13 Existing roof. New pavement and landscape. Surface Surface Page 9 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:B1A Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 1,589 0.036 0.033 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 1,589           0.036           0.033 Area Weighted C: 0.90 DMA:B1B Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 1,887 0.043 0.039 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 1,887           0.043           0.039 Area Weighted C: 0.90 Existing roof. Surface Surface New roof. Page 10 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:B2 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 201 0.005 0.004 Paving (concrete, asphalt concrete)0.77 1,604 0.037 0.028 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 4,359 0.100 0.010 Permeable Pavement 0.10 380 0.009 0.001 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 6,544           0.150           0.043 Area Weighted C: 0.29 DMA:B3 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 6,907 0.159 0.143 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 1,576 0.036 0.004 Permeable Pavement 0.10 1,395 0.032 0.003 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 9,878           0.227           0.150 Area Weighted C: 0.66 Surface Surface New roof, pavement, permeable pavement, and landscape.  Impervious area adjustment factor  (dispersion) for paving. New pavement, permeable pavement, and landscape. Page 11 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:B4 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 26 0.001 0.001 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 2,580 0.059 0.006 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 2,606           0.060           0.006 Area Weighted C: 0.11 DMA:C1 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 999 0.023 0.002 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 999               0.023           0.002 Area Weighted C: 0.10 Surface Surface Existing and remodeled landscape. New landscape. Page 12 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:C2 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 0 0.000 0.000 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 1,619 0.037 0.004 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 1,619           0.037           0.004 Area Weighted C: 0.10 DMA:C3 Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 7,546 0.173 0.156 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 729 0.017 0.002 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 8,276           0.190           0.158 Area Weighted C: 0.83 Surface Surface New landscape. Remodeled pavement and landscape. Page 13 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:C4A Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 4,951 0.114 0.102 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 979 0.022 0.002 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 5,930           0.136           0.105 Area Weighted C: 0.77 DMA:C4B Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 86 0.002 0.002 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 1,998 0.046 0.005 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 2,084           0.048           0.006 Area Weighted C: 0.13 Surface Surface Remodeled pavement and landscape. BMP 6, biofiltration w/partial retention. Page 14 of 15 Area Weighted Runoff Factors for Pollutant Control Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.1‐1 DMA:C4C Runoff  Factor Area (sf) Area (acres)C*A Roof 0.90 0 0.000 0.000 Paving (concrete, asphalt concrete)0.90 15,508 0.356 0.320 Unit Pavers (grouted)0.90 0 0.000 0.000 Decomposed Granite 0.30 0 0.000 0.000 Cobbles, Aggregate 0.30 0 0.000 0.000 Amended or Mulched Soils, Landscape 0.10 0 0.000 0.000 Permeable Pavement 0.10 0 0.000 0.000 Compacted Soil (e.g., unpaved parking)0.30 0 0.000 0.000 Natural (A Soil)0.10 0 0.000 0.000 Natural (B Soil)0.14 0 0.000 0.000 Natural (C Soil)0.23 0 0.000 0.000 Natural (D Soil)0.30 0 0.000 0.000 Σ = 15,508         0.356           0.320 Area Weighted C: 0.90 Existing pavement; outside of project limits. Surface Page 15 of 15 Impervious Area Dispersion Adjustment Factors Table B.2‐1:  Impervious Area Adjustment Factors ‐ Dispersion Pervious Area Ratio = Impervious Area/Pervious Area Hydrologic Soil Group <=1 2 3 4 A 0.00 0.00 0.23 0.36 B 0.00 0.27 0.42 0.53 C 0.34 0.56 0.67 0.74 D 0.86 0.93 0.97 1.00 DMA Soil Group Impervious Area (sf) Pervious Area (sf) Ratio:  Imp./Perv. Impervious Area Adjustment Factor Adjusted Runoff  Factor B2 D 1,805                  4,739                 0.38 0.86 0.77 Reference:  S.D. Model BMP Design Manual, Appendix B, Table B.2‐1:  Impervious Area Adjustment Factors that Account for  Dispersion. Page 1 of 1 DMA:A1 d= 0.60 inches  A= 2,780 sf 0.064 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  125 cubic‐feet 936 gallons DMA:A1A d= 0.60 inches  A= 2,314 sf 0.053 acres  C= 0.10 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  12 cubic‐feet 87 gallons DMA:A2 & A2B d= 0.60 inches  A= 6,009 sf 0.138 acres  C= 0.22 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  66 cubic‐feet 494 gallons 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  DCV = (3630 x C x d x A) – TCV ‐ RCV  Existing landscape area; outside of project limits; treated by existing sand media filter. Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  DCV = (3630 x C x d x A) – TCV ‐ RCV  Existing roof; outside of project limits; treated by existing sand media filter. 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  DCV = (3630 x C x d x A) – TCV ‐ RCV  New roof, remodeled pavement and landscape.  Drains to BMP 1, biofiltration w/partial  retention. Page 1 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:A2A d= 0.60 inches  A= 2,694 sf 0.062 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  121 cubic‐feet 907 gallons DMA:A3 d= 0.60 inches  A= 1,333 sf 0.031 acres  C= 0.31 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  21 cubic‐feet 155 gallons DMA:A4 & A4B d= 0.60 inches  A= 5,453 sf 0.125 acres  C= 0.45 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  123 cubic‐feet 918 gallons Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Existing roof; outside of project limits; drain to landscape. New permeable pavement and sidewalk; self‐retaining DMA. New roof; remodeled pavement and landscape.  Drains to BMP 6, biofiltration w/partial  retention and cistern. Area weighted runoff factor (Appendix B.1.1 and B.2.1)  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Page 2 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:A4A d= 0.60 inches  A= 1,987 sf 0.046 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  89 cubic‐feet 669 gallons DMA:A4C d= 0.60 inches  A= 342 sf 0.008 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  15 cubic‐feet 115 gallons DMA:A4D d= 0.60 inches  A= 808 sf 0.019 acres  C= 0.42 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  17 cubic‐feet 127 gallons Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  New permeable pavement; self‐retaining DMA. Existing pavement; outside of project limits; drain to landscape. 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Existing roof; outside of project limits; drain to landscape. Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Page 3 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:A5 d= 0.60 inches  A= 6,064 sf 0.139 acres  C= 0.50 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  152 cubic‐feet 1,134 gallons DMA:A6 d= 0.60 inches  A= 5,814 sf 0.133 acres  C= 0.64 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  186 cubic‐feet 1,392 gallons DMA:A7 d= 0.60 inches  A= 10,125 sf 0.232 acres  C= 0.89 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  451 cubic‐feet 3,370 gallons Area tributary to BMP (s)  Area tributary to BMP (s)  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Rain barrels volume reduction  85th percentile 24‐hr storm depth from Figure B.1‐1  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  New roof, pavement and landscape.  Drains to BMP 4, biofiltration w/partial retention. 85th percentile 24‐hr storm depth from Figure B.1‐1  Street trees volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  New roof, pavement and landscape.  Drains to BMP4, biofiltration w/partial retention. Remodeled pavement and landscape.  Drains to BMP 4, biofiltration w/partial retention. Page 4 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:A8 d= 0.60 inches  A= 15,413 sf 0.354 acres  C= 0.77 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  593 cubic‐feet 4,439 gallons DMA:A9 d= 0.60 inches  A= 2,415 sf 0.055 acres  C= 0.10 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  12 cubic‐feet 90 gallons DMA:A10 d= 0.60 inches  A= 4,828 sf 0.111 acres  C= 0.59 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  142 cubic‐feet 1,065 gallons New roof, pavement and landscape.  Drains to BMP 4, biofiltration w/partial retention. Existing landscape; outside of project limits. Rain barrels volume reduction  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Street trees volume reduction  Rain barrels volume reduction  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  85th percentile 24‐hr storm depth from Figure B.1‐1  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Remodeled pavement and landscape.  Drains to tree well BMPs 31 through 34.  This DMA is  offset by management of offsite area DMA C4C. 85th percentile 24‐hr storm depth from Figure B.1‐1  Page 5 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:A10A d= 0.60 inches  A= 1,086 sf 0.025 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  49 cubic‐feet 366 gallons DMA:A10B d= 0.60 inches  A= 1,451 sf 0.033 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  65 cubic‐feet 488 gallons DMA:A11 d= 0.60 inches  A= 6,293 sf 0.144 acres  C= 0.13 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  41 cubic‐feet 306 gallons Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Existing roof, drains to BMP 4, biofiltration w/partial retention. New pavement and landscape.  Drains to BMP 4, biofiltration w/partial retention. 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Remodeled roof, drains to BMP 4, biofiltration w/partial retention. Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Page 6 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:B1A d= 0.60 inches  A= 1,589 sf 0.036 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  72 cubic‐feet 535 gallons DMA:B1B d= 0.60 inches  A= 1,887 sf 0.043 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  85 cubic‐feet 635 gallons DMA:B2 d= 0.60 inches  A= 6,544 sf 0.150 acres  C= 0.29 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  95 cubic‐feet 710 gallons Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Existing roof; outside of project limits.  Drains to landscape. New roof.  Drains to BMP 5, biofiltration w/partial retention. Rain barrels volume reduction  85th percentile 24‐hr storm depth from Figure B.1‐1  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  New roof, pavement and landscape.  Drains to BMP 5, biofiltration w/partial retention. Area weighted runoff factor (Appendix B.1.1 and B.2.1)  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Page 7 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:B3 d= 0.60 inches  A= 9,878 sf 0.227 acres  C= 0.66 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  326 cubic‐feet 2,438 gallons DMA:B4 d= 0.60 inches  A= 2,606 sf 0.060 acres  C= 0.11 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  14 cubic‐feet 107 gallons DMA:C1 d= 0.60 inches  A= 960 sf 0.022 acres  C= 0.10 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  5 cubic‐feet 36 gallons Landscape slope area, self‐mitigating DMA. 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Existing and remodeled landscape, self‐mitigating DMA. 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  New pavement, permeable pavement, grass covered porous paving, and landscape.  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Page 8 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:C2 d= 0.60 inches  A= 1,619 sf 0.037 acres  C= 0.10 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  8 cubic‐feet 61 gallons DMA:C3 d= 0.60 inches  A= 8,276 sf 0.190 acres  C= 0.83 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  343 cubic‐feet 2,569 gallons DMA:C4A d= 0.60 inches  A= 5,930 sf 0.136 acres  C= 0.77 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  228 cubic‐feet 1,708 gallons Remodeled pavement and landscape.  Drains to BMP 6, biofiltration w/partial retention. Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Remodeled pavement and landscape, tributary to existing bioretention basin.    This DMA is  offset by management of offsite area DMA C4C. Remodeled landscape, self‐mitigating DMA. 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Page 9 of 10 Worksheet B.2‐1:  Design Capture Volume Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.1 ‐ DCV DMA:C4B d= 0.60 inches  A= 4,343 sf 0.100 acres  C= 0.12 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  26 cubic‐feet 195 gallons DMA:C4C d= 0.60 inches  A= 15,508 sf 0.356 acres  C= 0.90 TCV= 0 cubic‐feet RCV= 0 cubic‐feet DCV=  698 cubic‐feet 5,220 gallons Existing pavement, outside of project limits.  Drains to BMP 6 to offset DMA A8 and DMA C3  which cannot drain to BMPs. BMP 6, biofiltration w/partial retention. 85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  85th percentile 24‐hr storm depth from Figure B.1‐1  Area tributary to BMP (s)  Area weighted runoff factor (Appendix B.1.1 and B.2.1)  Street trees volume reduction  Rain barrels volume reduction  Calculate DCV = (3630 x C x d x A) – TCV ‐ RCV  Page 10 of 10 BMP:1 DMA:  A2 & A2B 1 66 cu. ft. Partial Retention 2 0.40 in./hr. 3 36 hours 4 14 inches 5 0.40 in/in 6 36 inches 7 20 sq‐ft 8 0.10 in/in 9 27 cu. ft. 10 39 cu. ft. BMP Parameters 11 9 inches 12 18 inches 13 13 inches 14 0.20 in/in 15 5 in./hr. Baseline Calculations 16 6 hours 17 30 inches 18 18 inches 19 48 inches Option 1 ‐ Biofilter 1.5 times the DCV 20 59 cu. ft. 21 15 sq‐ft Option 2 ‐ Store 0.75 of remaining DCV in pores and ponding 22 29 cu. ft. 23 20 sq‐ft Footprint of the BMP 24 6,009 sq‐ft 25 0.22 26 40 sq‐ft 27 40 sq‐ft Total depth treated [Line 17 + Line 18] Adjusted runoff factor for the drainage area (refer to Appendix B.1 and B.2) Minimum BMP footprint [Line 24 x Line 25 x 0.03] Footprint of the BMP = Maximum [(minimum Line 21, Line 23), Line 26] Req'd biofiltered volume [1.5 x Line 10] Req'd footprint [Line 20 / Line 19] x 12 Req'd storage volume (surface + pores), [0.75 x Line 10] Req'd footprint [Line 22 / Line 18] x 12 Area draining to the BMP Media thickness [18 inches minimum] Media available pore space Media filtration rate to be used for sizing Allowable routing time for sizing Depth filtered during storm [Line 15 x Line 16] Note:   Line 7 is used to estimate the amount of volume retained by the BMP.  Update the assumed surface area in Line 7 until it is equivalent to the required biofiltration footprint (either Line 21 or Line 23). Worksheet B.5‐1:  Simple Sizing Method for Biofiltration BMPs Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.5 Aggregate storage above underdrain invert (12 inches, typical).  Use 0 inches for sizing  if the aggregate is not over the entire bottom suface area. Depth of detention storage [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] Remaining DCV after implementing retention BMPs Infiltration rate from Worksheet D.5‐1 if partial infiltration is feasible Allowable drawdown time for aggregate storage below the underdrain Depth of runoff that can be infiltrated [Line 2 x Line 3] Aggregate pore space Req'd depth of gravel below the underdrain [Line 4/Line 5] Assumed surface area of the biofiltration BMP Media retained pore space Volume retained by BMP [[Line 4 + (Line 12 x Line 8)]/12] x Line 7 DCV that requires biofiltration [Line 1 ‐ Line 9] Surface Ponding [6 inches minimum, 12 inches maximum] Page 1 of 1 BMP:4 DMA:  A10, A10A, A10B, A6, A7, A11, A5 1 1,086 cu. ft. Partial Retention 2 0.40 in./hr. 3 36 hours 4 14 inches 5 0.40 in/in 6 36 inches 7 231 sq‐ft 8 0.10 in/in 9 301 cu. ft. 10 785 cu. ft. BMP Parameters 11 9.00 inches 12 12.43 inches 13 13 inches 14 0.20 in/in 15 5 in./hr. Baseline Calculations 16 6 hours 17 30 inches 18 17 inches 19 47 inches Option 1 ‐ Biofilter 1.5 times the DCV 20 1,177 cu. ft. 21 303 sq‐ft Option 2 ‐ Store 0.75 of remaining DCV in pores and ponding 22 589 cu. ft. 23 423 sq‐ft Footprint of the BMP 24 35,661 sq‐ft 25 0.62 26 661 sq‐ft 27 661 sq‐ft Depth of runoff that can be infiltrated [Line 2 x Line 3] Worksheet B.5‐1:  Simple Sizing Method for Biofiltration BMPs Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.5 Remaining DCV after implementing retention BMPs Infiltration rate from Worksheet D.5‐1 if partial infiltration is feasible Allowable drawdown time for aggregate storage below the underdrain Allowable routing time for sizing Aggregate pore space Req'd depth of gravel below the underdrain [Line 4/Line 5] Assumed surface area of the biofiltration BMP Media retained pore space Volume retained by BMP [[Line 4 + (Line 12 x Line 8)]/12] x Line 7 DCV that requires biofiltration [Line 1 ‐ Line 9] Surface Ponding [6 inches minimum, 12 inches maximum] Media thickness [18 inches minimum] Aggregate storage above underdrain invert (12 inches, typical).  Use 0 inches for sizing  if the aggregate is not over the entire bottom suface area. Media available pore space Media filtration rate to be used for sizing Note:   Line 7 is used to estimate the amount of volume retained by the BMP.  Update the assumed surface area in Line 7 until it is equivalent to the required biofiltration footprint (either Line 21 or Line 23). Depth filtered during storm [Line 15 x Line 16] Depth of detention storage [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] Total depth treated [Line 17 + Line 18] Req'd biofiltered volume [1.5 x Line 10] Req'd footprint [Line 20 / Line 19] x 12 Req'd storage volume (surface + pores), [0.75 x Line 10] Req'd footprint [Line 22 / Line 18] x 12 Area draining to the BMP Adjusted runoff factor for the drainage area (refer to Appendix B.1 and B.2) Minimum BMP footprint [Line 24 x Line 25 x 0.03] Footprint of the BMP = Maximum [(minimum Line 21, Line 23), Line 26] Page 1 of 1 BMP:5 DMA:  B1A, B1B, B2 1 252 cu. ft. Partial Retention 2 0.40 in./hr. 3 36 hours 4 14 inches 5 0.40 in/in 6 36 inches 7 63 sq‐ft 8 0.10 in/in 9 85 cu. ft. 10 167 cu. ft. BMP Parameters 11 8.25 inches 12 18 inches 13 13 inches 14 0.20 in/in 15 5 in./hr. Baseline Calculations 16 6 hours 17 30 inches 18 17 inches 19 47 inches Option 1 ‐ Biofilter 1.5 times the DCV 20 250 cu. ft. 21 64 sq‐ft Option 2 ‐ Store 0.75 of remaining DCV in pores and ponding 22 125 cu. ft. 23 88 sq‐ft Footprint of the BMP 24 10,020 sq‐ft 25 0.50 26 150 sq‐ft 27 150 sq‐ft Depth of runoff that can be infiltrated [Line 2 x Line 3] Worksheet B.5‐1:  Simple Sizing Method for Biofiltration BMPs Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.5 Remaining DCV after implementing retention BMPs Infiltration rate from Worksheet D.5‐1 if partial infiltration is feasible Allowable drawdown time for aggregate storage below the underdrain Allowable routing time for sizing Aggregate pore space Req'd depth of gravel below the underdrain [Line 4/Line 5] Assumed surface area of the biofiltration BMP Media retained pore space Volume retained by BMP [[Line 4 + (Line 12 x Line 8)]/12] x Line 7 DCV that requires biofiltration [Line 1 ‐ Line 9] Surface Ponding [6 inches minimum, 12 inches maximum] Media thickness [18 inches minimum] Aggregate storage above underdrain invert (12 inches, typical).  Use 0 inches for sizing  if the aggregate is not over the entire bottom suface area. Media available pore space Media filtration rate to be used for sizing Note:   Line 7 is used to estimate the amount of volume retained by the BMP.  Update the assumed surface area in Line 7 until it is equivalent to the required biofiltration footprint (either Line 21 or Line 23). Depth filtered during storm [Line 15 x Line 16] Depth of detention storage [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] Total depth treated [Line 17 + Line 18] Req'd biofiltered volume [1.5 x Line 10] Req'd footprint [Line 20 / Line 19] x 12 Req'd storage volume (surface + pores), [0.75 x Line 10] Req'd footprint [Line 22 / Line 18] x 12 Area draining to the BMP Adjusted runoff factor for the drainage area (refer to Appendix B.1 and B.2) Minimum BMP footprint [Line 24 x Line 25 x 0.03] Footprint of the BMP = Maximum [(minimum Line 21, Line 23), Line 26] Page 1 of 1 BMP:6 DMA:  C4A, C4B, C4C, A2A, A4, A4A, A4B 1 1,285 cu. ft. Partial Retention 2 0.51 in./hr. 3 36 hours 4 18 inches 5 0.40 in/in 6 46 inches 7 285 sq‐ft 8 0.10 in/in 9 479 cu. ft. 10 806 cu. ft. BMP Parameters 11 14 inches 12 18 inches 13 15 inches 14 0.20 in/in 15 5 in./hr. Baseline Calculations 16 6 hours 17 30 inches 18 24 inches 19 54 inches Option 1 ‐ Biofilter 1.5 times the DCV 20 1,209 cu. ft. 21 271 sq‐ft Option 2 ‐ Store 0.75 of remaining DCV in pores and ponding 22 605 cu. ft. 23 307 sq‐ft Footprint of the BMP 24 33,656 sq‐ft 25 0.82 26 828 sq‐ft 27 828 sq‐ft Note:   Line 7 is used to estimate the amount of volume retained by the BMP.  Update the assumed surface area in Line 7 until it is equivalent to the required biofiltration footprint (either Line 21 or Line 23). Depth filtered during storm [Line 15 x Line 16] Depth of detention storage [Line 11 + (Line 12 x Line 14) + (Line 13 x Line 5)] Total depth treated [Line 17 + Line 18] Req'd biofiltered volume [1.5 x Line 10] Req'd footprint [Line 20 / Line 19] x 12 Req'd storage volume (surface + pores), [0.75 x Line 10] Req'd footprint [Line 22 / Line 18] x 12 Area draining to the BMP Adjusted runoff factor for the drainage area (refer to Appendix B.1 and B.2) Minimum BMP footprint [Line 24 x Line 25 x 0.03] Footprint of the BMP = Maximum [(minimum Line 21, Line 23), Line 26] Allowable routing time for sizing Aggregate pore space Req'd depth of gravel below the underdrain [Line 4/Line 5] Assumed surface area of the biofiltration BMP Media retained pore space Volume retained by BMP [[Line 4 + (Line 12 x Line 8)]/12] x Line 7 DCV that requires biofiltration [Line 1 ‐ Line 9] Surface Ponding [6 inches minimum, 12 inches maximum] Media thickness [18 inches minimum] Aggregate storage above underdrain invert (12 inches, typical).  Use 0 inches for sizing  if the aggregate is not over the entire bottom suface area. Media available pore space Media filtration rate to be used for sizing Depth of runoff that can be infiltrated [Line 2 x Line 3] Worksheet B.5‐1:  Simple Sizing Method for Biofiltration BMPs Reference:  S.D. Model BMP Design Manual, Appendix B, Section B.5 Remaining DCV after implementing retention BMPs Infiltration rate from Worksheet D.5‐1 if partial infiltration is feasible Allowable drawdown time for aggregate storage below the underdrain Page 1 of 1 A2-1 ATTACHMENT 2 – BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES Indicate which Items are Included behind this cover sheet: Attachment Sequence Contents Checklist Attachment 2a Hydromodification Management Exhibit (Required) ☒ Included See Hydromodification Management Exhibit Checklist on the back of this Attachment cover sheet. Attachment 2b Management of Critical Coarse Sediment Yield Areas (WMAA Exhibit is required, additional analyses are optional) See Section 6.2 of the BMP Design Manual. ☒ Exhibit showing project drainage boundaries marked on WMAA Critical Coarse Sediment Yield Area Map (Required) Optional analyses for Critical Coarse Sediment Yield Area Determination ☐ 6.2.1 Verification of Geomorphic Landscape Units Onsite ☐ 6.2.2 Downstream Systems Sensitivity to Coarse Sediment ☐ 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite Attachment 2c Geomorphic Assessment of Receiving Channels (Optional) See Section 6.3.4 of the BMP Design Manual. ☒ Not Performed ☐ Included Attachment 2d Flow Control Facility Design and Structural BMP Drawdown Calculations (Required) See Chapter 6 and Appendix G of the BMP Design Manual ☒ Included A2-2 ATTACHMENT 2a – HYDROMODIFICATION MANAGEMENT EXHIBIT A2-3 Use this checklist to ensure the required information has been included on the Hydromodification Management Exhibit: The Hydromodification Management Exhibit must identify: ☒Underlying hydrologic soil group ☒Approximate depth to groundwater ☒Existing natural hydrologic features (watercourses, seeps, springs, wetlands) ☒Critical coarse sediment yield areas to be protected (if present) ☒Existing topography ☒Existing and proposed site drainage network and connections to drainage offsite ☒Proposed grading ☒Proposed impervious features ☒Proposed design features and surface treatments used to minimize imperviousness ☒Point(s) of Compliance (POC) for Hydromodification Management ☒Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions) ☒Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail) RAN C H O S A N T A F E R O A D E3E10E11E5E4E20E22E210.540.79E1543471030181611525020E80.070.840.190.770.230.900.190.460.140.610.290.900.490.840.150.82E10.110.66E120.050.68E60.150.90OLIVENHAIN ROADSOIL T Y P E " D " SOI L T Y P E " C "POC 1POC 2EXISTING SAND FILTER404821100-YR PRE-DEVELOPMENTFLOODPLAIN PER LOMR DATED OCT27, 2017, CASE NO. 17-09-2475PE20.050.8135649440.110.63EXISTING CONDITION HYDROMODIFICATION MANAGEMENT MAPOLIVENHAIN M.W.D. BUILDING D EXPANSION3-ALEGEND:0.110.66 RANCHO SANTA FE R O A D E30E32E34E400.55XX2.56XX1.880.431.83XXOLIVENHAIN ROADSOIL TYPE "D"SOIL TYPE "C"SEEFIGURE3AEXISTINGBIORETENTION BASINEXISTINGBIORETENTION BASINNODE 50POC 2NODE 30POC 1100-YR PRE-DEVELOPMENTFLOODPLAIN PER LOMRDATED OCT 27, 2017, CASENO. 17-09-2475PLIMIT OF WORKSOIL TYPE "D" SOIL TYPE "C"OLIVENHAIN M.W.D. BUILDING D EXPANSION3-BEXISTING CONDITION HYDROMODIFICATION MANAGEMENT MAPLEGEND:0.110.66 A11A8A5A6B2B3A7C3A3A2A4A10A1RANCH O S A N T A F E R O A DOLIVENHAIN ROADOLIVENHAIN ROADA9B4B1BB1AA10AA10BA2BA2AA4AA4BA4C 0.061.000.031.000.041.000.150.350.230.730.230.980.140.130.350.850.190.920.040.100.020.100.130.210.060.100.061.000.051.000.031.000.0051.000.030.330.0081.000.070.370.031.000.110.660.041.000.130.700.140.550.060.114143161727103763142155601520252628354957581961515245POC 2SOIL TYPE " D " SOIL TYPE " C "100-YEAR POST-DEVELOPMENTFLOODPLAIN PER LOMRREQUEST REPORT DATEDNOVEMBER 2017100-YEAR PRE-DEVELOPMENTFLOODPLAIN PER LOMR DATED OCT 27,2017 , CASE NO. 17-09-2475PC4A0.140.850.020.30B518BMP 1BMP 5BMP 4C4C(OFF-SITE EXISTAC PAVING)C4BSLOPE AREAC2SLOPE AREAC2SLOPE AREAC1A1A0.050.100.361.00A4D0.020.520.050.14POC 13238394650370427175728030LEGEND:0.061.00PROPOSED CONDITION HYDROMODIFICATION MANAGEMENT MAPOLIVENHAIN M.W.D. BUILDING D EXPANSION4 A2-5 ATTACHMENT 2b – MANAGEMENT OF CRITICAL COARSE SEDIMENT YIELD AREAS feetmeters1000300 A2-7 ATTACHMENT 2c – GEOMORPHIC ASSESSMENT OF RECEIVING CHANNELS (Not Performed) A2-8 ATTACHMENT 2d – FLOW CONTROL FACILITY DESIGN AND STRUCTURAL BMP DRAWDOWN CALCULATIONS BASINSBMP No. TypeReq'dArea(sf)Req'd V1 Storage(cf)Req'd V2 Storage(cf)Req'dStorageV1 + V2ProposedPond Area(sf)ProposedV1 Storage(cf)ProposedV2 Storage(cf)Proposed StorageV1 + V2% of Req'd StoragePondDepth(in)Freeboard(in)SoilMedia Depth (in)Agg.Storage Depth (in)Dia. Low Flow Orifice (in) Section 1Lined 21 191 159 115 274 224 120 177 297 109% 10 3 18 16 4/16Section DNo4 3,109 2,590 1,865 4,455 3,110 2,127 2,903 5,029 113% 10 3 12 18 10/16Section DNo5 547 455 328 783 604 340 550 890 114% 10 3 18 16 5/16Section DNo6 1,697 1,515 1,567 3,082 1,768 1,546 1,857 3,403 110% 12 3 18 18 3/4Section DNoNotes:8,594 9,620 112%1.  Bioretention section per City of Carlsbad BMP Design Manual, Appendix E, Table E.20 PL Plant List. 2.  No liner below the bottom of the aggregate storage layer.3.  BMP 6 sized using 2018 Model BMP Design Manual sizing factors.  Basins 1 through 5 sized using 2016 Model BMP Design Manual sizing factors.CISTERNSBMP No. TypeVolume(gal)Volume(cf) 535 660 880Notes:Total: 885.  BMP 2:  Required V1 ‐ Proposed V1 storage = 61 cf.CisternBiofiltration w/Partial Retention 3BMP SummaryBiofiltration w/Partial RetentionBiofiltration w/Partial RetentionBiofiltration w/Partial RetentionPage 1 Biofiltration Basin Area/Volume Calculations BMP 1 BMP 4 BMP 5 BMP 6 Area ‐ Basin Top (sf) (Includes Freeboard)271 3282 676 1885 Area ‐ Pond Surface (sf)  (Per BMP Sizing Sheets)224 3110 604 1768 Area ‐ Basin Bottom (sf)94 2561 385 1323 Area ‐ Bottom of Soil  Media (sf)126 2813 440 1464 Area ‐ Bottom of Gravel  (sf)65 2491 334 1257 Pond Depth (in)9.08 9 8.25 12 Soil Media Thick. (in)18 12.43 18 18 Agg. Layer Thick. (in)16 18 16 18 Freeboard (in)3 333 Porosity 0.40 0.40 0.40 0.40 Surface Volume, V1* (cf) 120 2127 340 1546 Subsurface Volume, V2*  (cf)177 2903 550 1857 Freeboard Volume (cf) 62 799 160 457 Volume ‐ Agg. Layer (cf)51 1591 206 816 Volume ‐ Soil Media (cf)126 1311 344 1041 Page 1 DMA:A1 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 2,780 0.064 0.064 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 2,780           0.064           0.064 Area Weighted Runoff Factor: 1.00 DMA:A1A Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 2,314 0.053 0.005 Landscape 0.10 0 0.000 0.000 Σ = 2,314           0.053           0.005 Area Weighted Runoff Factor: 0.10 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method Existing landscape; outside of project limits. Existing roof; outside of project limits. Page 1 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A2, A2B Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 239 0.005 0.005 Paving (concrete, asphalt concrete)1.00 659 0.015 0.015 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 612 0.014 0.003 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 4,499 0.103 0.010 Σ = 6,009           0.138           0.034 Area Weighted Runoff Factor: 0.24 DMA:A2A Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 2,694 0.062 0.062 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 2,694           0.062           0.062 Area Weighted Runoff Factor: 1.00 New roof, remodeled pavement and landscape. Existing roof; outside of project limits. Page 2 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A3 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 344 0.008 0.008 Pervious Concrete 0.10 964 0.022 0.002 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 25 0.001 0.000 Σ = 1,333           0.031           0.010 Area Weighted Runoff Factor: 0.33 DMA:A4, A4B Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 1,070 0.025 0.025 Paving (concrete, asphalt concrete)1.00 1,309 0.030 0.030 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 3,074 0.071 0.007 Σ = 5,453           0.125           0.062 Area Weighted Runoff Factor: 0.49 New pervious pavement, concrete pavement, landscape.  This DMA is offset by management of  existing area DMAs A1, A2A, A4A, A4C, A10B, B1A, C4C.  New roof, remodeled pavement and landscape. Page 3 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A4A Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 1,987 0.046 0.046 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 1,987           0.046           0.046 Area Weighted Runoff Factor: 1.00 DMA:A4C Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 342 0.008 0.008 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 342               0.008           0.008 Area Weighted Runoff Factor: 1.00 Existing roof, outside of project limits. Existing pavement, outside of project limits. Page 4 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A4D Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 322 0.007 0.007 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 486 0.011 0.002 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 808               0.019           0.010 Area Weighted Runoff Factor: 0.52 DMA:A5 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 2,161 0.050 0.050 Paving (concrete, asphalt concrete)1.00 878 0.020 0.020 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 3,025 0.069 0.007 Σ = 6,064           0.139           0.077 Area Weighted Runoff Factor: 0.55 New pervious pavement and concrete pavement.  This DMA is offset by management of existing area  DMAs A1, A2A, A4A, A4C, A10B, B1A, C4C.  New roof, pavement and landscape. Page 5 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A6 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 2,672 0.061 0.061 Paving (concrete, asphalt concrete)1.00 1,227 0.028 0.028 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 1,915 0.044 0.004 Σ = 5,814           0.133           0.094 Area Weighted Runoff Factor: 0.70 DMA:A7 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 9,937 0.228 0.228 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 189 0.004 0.000 Σ = 10,126         0.232           0.229 Area Weighted Runoff Factor: 0.98 New roof, pavement and landscape. New pavement and landscape. Page 6 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A8 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 12,860 0.295 0.295 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 608 0.014 0.003 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 1,946 0.045 0.004 Σ = 15,414         0.354           0.302 Area Weighted Runoff Factor: 0.85 DMA:A9 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 2,415 0.055 0.006 Σ = 2,415           0.055           0.006 Area Weighted Runoff Factor: 0.10 Reconfigured pavementt, new pavement and landscape.  This DMA is offset by management of  existing area DMAs A1, A2A, A4A, A4C, A10B, B1A, C4C.  Existing landscape, outside of project limits. Page 7 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A10 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 2,879 0.066 0.066 Paving (concrete, asphalt concrete)1.00 52 0.001 0.001 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 448 0.010 0.002 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 1,449 0.033 0.003 Σ = 4,828           0.111           0.073 Area Weighted Runoff Factor: 0.66 DMA:A10A Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 1,086 0.025 0.025 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers `1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 1,086           0.025           0.025 Area Weighted Runoff Factor: 1.00 New roof, pavement, landscape. Remodeled roof. Page 8 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:A10B Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 1,451 0.033 0.033 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 1,451           0.033           0.033 Area Weighted Runoff Factor: 1.00 DMA:A11 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 213 0.005 0.005 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 6,080 0.140 0.014 Σ = 6,293           0.144           0.019 Area Weighted Runoff Factor: 0.13 Existing roof. New pavement and landscape. Page 9 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:B1A Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 1,589 0.036 0.036 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 1,589           0.036           0.036 Area Weighted Runoff Factor: 1.00 DMA:B1B Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 1,887 0.043 0.043 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 1,887           0.043           0.043 Area Weighted Runoff Factor: 1.00 Existing roof. New roof. Page 10 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:B2 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 201 0.005 0.005 Paving (concrete, asphalt concrete)1.00 1,604 0.037 0.037 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 380 0.009 0.002 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 4,359 0.100 0.010 Σ = 6,544           0.150           0.053 Area Weighted Runoff Factor: 0.35 DMA:B3 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 6,907 0.159 0.159 Pervious Concrete 0.10 1,395 0.032 0.003 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 1,576 0.036 0.004 Σ = 9,878           0.227           0.165 Area Weighted Runoff Factor: 0.73 New roof, pavement, permeable pavement, landscape. New pavement, permeable pavement, landscape.  This DMA is offset by management of existing area  DMAs A1, A2A, A4A, A4C, A10B, B1A, C4C. Page 11 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:B4 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 26 0.001 0.001 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 2,580 0.059 0.006 Σ = 2,606           0.060           0.007 Area Weighted Runoff Factor: 0.11 DMA:C1 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 999 0.023 0.002 Σ = 999               0.023           0.002 Area Weighted Runoff Factor: 0.10 Existing and remodeled landscape. New landscape. Page 12 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:C2 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 0 0.000 0.000 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 1,619 0.037 0.004 Σ = 1,619           0.037           0.004 Area Weighted Runoff Factor: 0.10 DMA:C3 Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 7,546 0.173 0.173 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 729 0.017 0.002 Σ = 8,276           0.190           0.175 Area Weighted Runoff Factor: 0.92 New landscape. Remodeled pavement and landscape.  This DMA is offset by management of existing area DMAs A1,  A2A, A4A, A4C, A10B, B1A, C4C. Page 13 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:C4A Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 4,951 0.114 0.114 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 979 0.022 0.002 Σ = 5,930           0.136           0.116 Area Weighted Runoff Factor: 0.85 DMA:C4B Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 86 0.002 0.002 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 1,998 0.046 0.005 Σ = 2,084           0.048           0.007 Area Weighted Runoff Factor: 0.14 Remodeled pavement and landscape. BMP 6. Page 14 of 15 Area Weighted Runoff Factor for Hydromodification Sizing Factor Method Reference:  S.D. Model BMP Design Manual, Appendix B, Table G.2‐1:  Runoff Factors for Surfaces Draining to  BMPs for Hydromodification Sizing Factor Method DMA:C4C Surface Runoff  Factor Area (sf) Area (acres)C*A Roof 1.00 0 0.000 0.000 Paving (concrete, asphalt concrete)1.00 15,508 0.356 0.356 Pervious Concrete 0.10 0 0.000 0.000 Porous Asphalt 0.10 0 0.000 0.000 Grouted Unit Pavers 1.00 0 0.000 0.000 Solid Unit Pavers on Agg. Base, 3/16" Joints 0.20 0 0.000 0.000 Crushed Aggregate 0.10 0 0.000 0.000 Turf Block 0.10 0 0.000 0.000 Amended or Mulched Soils 0.10 0 0.000 0.000 Landscape 0.10 0 0.000 0.000 Σ = 15,508         0.356           0.356 Area Weighted Runoff Factor: 1.00 Existing pavement, outside of project limits. Page 15 of 15 Worksheet G.2‐1:  Sizing Factor WorksheetSite InformationProject Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area (sf):Assessor’s Parcel No.: Low Flow Threshold (*Q2):BMP Name: BMP Type:Areas Draining to BMP Sizing Factors Minimum BMP SizeArea (sf) Soil TypePre‐ProjectSlopeRunoff Factor (From Table G.2‐1)Surface AreaSurfaceVolumeSubsurfaceVolumeSurfaceArea(sf)SurfaceVolume(cf)SubsurfaceVolume(cf)A2‐Pave 659                 D flat concrete 1.00 0.1300 0.1083 0.078086                   71                   51                  A2‐LS 4,499             D flat landscape 0.10 0.1300 0.1083 0.078058                   49                   35                  A2‐Perm 612                 D flat permeable pavement 0.20 0.1300 0.1083 0.078016                   13                   10                  ‐                  ‐                  ‐                 A2B‐Roof 239                 D flat roof 1.00 0.1300 0.1083 0.078031                   26                   19                  ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 Total DMA Area:  6,009            Min. BMP Size:  191                 159                 115                Proposed BMP Size:  224                 133                 146                Table G.2‐2:  Unit Runoff Ratios Head on Low Flow Orifice (ft) Low Flow Orifice SizingUnit Runoff Ratio, Q2:  0.175cfs/ac Biofiltration w/Partial Retention, Biofiltration, Biofiltration w/Liner:  1.50               Low Flow Threshold (cfs): 0.0024Unit Runoff Ratio, Q10:  0.434cfs/ac Cistern, orifice head equal to 7/8 * cistern height:  ‐                 Max. Orifice Area (sq in): 0.0589Pre‐Dev. Q2:   0.024 cfsMax. Orifice Dia. (in): 0.274Pre‐Dev. Q10:   0.060 cfsMinimum 1/4" diameter, increment of 1/16":  Proposed Orifice Dia. (in):0.2500255‐040‐59BMP 1DMA Name Post Project Surface Type0.1Biofiltration w/Partial RetentionOMWD New & Remodeled Ops. & Admin.OMWDCarlsbadCarlsbadOceanside103,050Page 1 Project Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area:Parcel (APN): Low Flow Threshold:BMP Name BMP Type:Rain GaugeQ2 Sizing FactorDMA Area (ac)Orifice Flow ‐ %Q2Orifice AreaSoil Type Cover Slope (cfs/ac) (cfs) (in2)A2‐Pave OceansideDScrubFlat0.175 0.015 0.0000.01A2‐LS OceansideDScrubFlat0.175 0.103 0.0020.04A2‐Perm OceansideDScrubFlat0.175 0.014 0.0000.01ScrubA2B‐RoofOceansideDScrubFlat0.175 0.005 0.0000.00ScrubScrubScrubScrubScrubScrubScrubScrubScrubScrub0.002 0.06 0.27Tot. Allowable Orifice FlowTot. AllowableOrifice AreaMax Orifice Diameter(cfs)(in2)(in)0.002 0.050.25Actual Orifice Flow Actual Orifice AreaSelected Orifice Diameter(cfs)(in2)(in)Drawdown (Hrs) 25.8DMA NameOMWD Ops. & Admin.OMWD OceansideCarlsbadBMP Sizing Spreadsheet V2.0Carlsbad255‐040‐59BMP 1 Biofiltration w/ Partial Retention & Biofiltration w/o Impermeable Liner0.1Q2103,050Drawdown time exceeds 96 Hrs. Project must implement a vector control program.Pre‐developed Condition Worksheet G.2‐1:  Sizing Factor WorksheetSite InformationProject Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area (sf):Assessor’s Parcel No.: Low Flow Threshold (*Q2):BMP Name: BMP Type:Areas Draining to BMP Sizing Factors Minimum BMP SizeArea (sf) Soil TypePre‐ProjectSlopeRunoff Factor (From Table G.2‐1)Surface AreaSurfaceVolumeSubsurfaceVolumeSurfaceArea(sf)SurfaceVolume(cf)SubsurfaceVolume(cf)A6‐Roof 2,672             D flat roof 1.00 0.1300 0.1083 0.0780347                 289                 208                A6‐Pave 1,227             D flat AC and concrete paving 1.00 0.1300 0.1083 0.0780160                 133                 96                  A6‐LS 1,915             D flat landscape0.10 0.1300 0.1083 0.078025                   21                   15                  A7‐Pave 9,937             D flat AC and concrete paving 1.00 0.1300 0.1083 0.07801,292             1,076             775                A7‐LS 189                 D flat landscape0.10 0.1300 0.1083 0.07802                     2                     1                    A10‐Roof 2,879             D flat roof 1.00 0.1300 0.1083 0.0780374                 312                 225                A10‐Pave 52                   D flat concrete paving 1.00 0.1300 0.1083 0.07807                     6                     4                    A10‐LS 1,449             D flat landscape0.10 0.1300 0.1083 0.078019                   16                   11                  A10‐Perm 448                 D flat permeable pavers 0.20 0.1300 0.1083 0.078012                   10                   7                    A10A & 10B‐Roof 2,537             D flat roof 1.00 0.1300 0.1083 0.0780330                 275                 198                A11‐Pave 213                 D flat concrete paving 1.00 0.1300 0.1083 0.078028                   23                   17                  A11‐LS 6,080             D flat landscape0.10 0.1300 0.1083 0.078079                   66                   47                  A5‐Roof 2,161             D flat roof 1.00 0.1300 0.1083 0.0780281                 234                 169                A5‐Pave 878                 D flat concrete   1.00 0.1300 0.1083 0.0780114                 95                   68                  A5‐LS 3,025             D flat landscape0.10 0.1300 0.1083 0.078039                   33                   24                  ‐                  ‐                  ‐                 Total DMA Area:  35,662          Min. BMP Size:  3,108             2,590             1,865            Proposed BMP Size:  3,110             2,363             2,081            Table G.2‐2:  Unit Runoff Ratios Head on Low Flow Orifice (ft) Low Flow Orifice SizingUnit Runoff Ratio, Q2:  0.175cfs/ac Biofiltration w/Partial Retention, Biofiltration, Biofiltration w/Liner:  1.50               Low Flow Threshold (cfs): 0.0143Unit Runoff Ratio, Q10:  0.434cfs/ac Cistern, orifice head equal to 7/8 * cistern height:  ‐                 Max. Orifice Area (sq in): 0.3498Pre‐Dev. Q2:   0.143 cfsMax. Orifice Dia. (in): 0.667Pre‐Dev. Q10:   0.355 cfsMinimum 1/4" diameter, increment of 1/16":  Proposed Orifice Dia. (in):0.6250BMP 4 Biofiltration w/Partial RetentionDMA Name Post Project Surface TypeCarlsbad 103,050255‐040‐59 0.1OMWD New & Remodeled Ops. & Admin.CarlsbadOMWD OceansidePage 1 Project Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area:Parcel (APN): Low Flow Threshold:BMP Name BMP Type:Rain GaugeQ2 Sizing FactorDMA Area (ac)Orifice Flow ‐ %Q2Orifice AreaSoil Type Cover Slope (cfs/ac) (cfs) (in2)A6‐RoofOceansideDScrubFlat0.175 0.061 0.0010.03A6‐Pave OceansideDScrubFlat0.175 0.028 0.0000.01A6‐LS OceansideDScrubFlat0.175 0.044 0.0010.02A7‐Pave OceansideDScrubFlat0.175 0.228 0.0040.10A7‐LS OceansideDScrubFlat0.175 0.004 0.0000.00A10‐RoofOceansideDScrubFlat0.175 0.066 0.0010.03A10‐Pave OceansideDScrubFlat0.175 0.001 0.0000.00A10‐LS OceansideDScrubFlat0.175 0.033 0.0010.01A10‐Perm OceansideDScrubFlat0.175 0.010 0.0000.00A10A &10B‐RoofOceansideDScrubFlat0.175 0.058 0.0010.02A11‐Pave OceansideDScrubFlat0.175 0.005 0.0000.00A11‐LS OceansideDScrubFlat0.175 0.140 0.0020.06A5‐RoofOceansideDScrubFlat0.175 0.050 0.0010.02A5‐Pave OceansideDScrubFlat0.175 0.020 0.0000.01A5‐LS OceansideDScrubFlat0.175 0.069 0.0010.030.014 0.35 0.67Tot. Allowable Orifice FlowTot. AllowableOrifice AreaMax Orifice Diameter(cfs)(in2)(in)0.013 0.310.63Actual Orifice Flow Actual Orifice AreaSelected Orifice Diameter(cfs)(in2)(in)Drawdown (Hrs) 57.3Drawdown time exceeds 96 Hrs. Project must implement a vector control program.255‐040‐59 0.1Q2BMP 4 Biofiltration w/ Partial Retention & Biofiltration w/o Impermeable LinerDMA NamePre‐developed ConditionCarlsbad 103,050BMP Sizing Spreadsheet V2.0OMWD Ops. & Admin. CarlsbadOMWD Oceanside Worksheet G.2‐1:  Sizing Factor WorksheetSite InformationProject Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area (sf):Assessor’s Parcel No.: Low Flow Threshold (*Q2):BMP Name: BMP Type:Areas Draining to BMP Sizing Factors Minimum BMP SizeArea (sf) Soil TypePre‐ProjectSlopeRunoff Factor (From Table G.2‐1)Surface AreaSurfaceVolumeSubsurfaceVolumeSurfaceArea(sf)SurfaceVolume(cf)SubsurfaceVolume(cf)B1B ‐ Roof 1,887             D flat roof 1.00 0.1300 0.1083 0.0780245                 204                 147                ‐                  ‐                  ‐                 B2‐Roof 201                 D flat roof 1.00 0.1300 0.1083 0.078026                   22                   16                  B2‐Pave 1,604             D flat concrete 1.00 0.1300 0.1083 0.0780209                 174                 125                B2‐LS 4,359             D flat landscape 0.10 0.1300 0.1083 0.078057                   47                   34                  B2‐Perm 380                 D flat permeable pavers 0.20 0.1300 0.1083 0.078010                   8                     6                    ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 ‐                  ‐                  ‐                 Total DMA Area:  8,431            Min. BMP Size:  547                 455                 328                Proposed BMP Size:  604                 412                 374                Table G.2‐2:  Unit Runoff Ratios Head on Low Flow Orifice (ft) Low Flow Orifice SizingUnit Runoff Ratio, Q2:  0.175cfs/ac Biofiltration w/Partial Retention, Biofiltration, Biofiltration w/Liner:  1.50               Low Flow Threshold (cfs): 0.0034Unit Runoff Ratio, Q10:  0.434cfs/ac Cistern, orifice head equal to 7/8 * cistern height:  ‐                 Max. Orifice Area (sq in): 0.0827Pre‐Dev. Q2:   0.034 cfsMax. Orifice Dia. (in): 0.325Pre‐Dev. Q10:   0.084 cfsMinimum 1/4" diameter, increment of 1/16":  Proposed Orifice Dia. (in):0.3125DMA Name Post Project Surface TypeBMP 5 Biofiltration w/Partial RetentionCarlsbad 103,050255‐040‐59 0.1OMWD New & Remodeled Ops. & Admin.CarlsbadOMWD OceansidePage 1 Project Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area:Parcel (APN): Low Flow Threshold:BMP Name BMP Type:Rain GaugeQ2 Sizing FactorDMA Area (ac)Orifice Flow ‐ %Q2Orifice AreaSoil Type Cover Slope (cfs/ac) (cfs) (in2)B1B ‐ RoofOceansideDScrubFlat0.175 0.043 0.0010.02ScrubB2‐RoofOceansideDScrubFlat0.175 0.005 0.0000.00B2‐Pave OceansideDScrubFlat0.175 0.037 0.0010.02B2‐LS OceansideDScrubFlat0.175 0.100 0.0020.04B2‐Perm OceansideDScrubFlat0.175 0.009 0.0000.00ScrubScrubScrubScrubScrubScrubScrubScrubScrub0.003 0.08 0.32Tot. Allowable Orifice FlowTot. AllowableOrifice AreaMax Orifice Diameter(cfs)(in2)(in)0.003 0.080.31Actual Orifice Flow Actual Orifice AreaSelected Orifice Diameter(cfs)(in2)(in)Drawdown (Hrs) 44.5Drawdown time exceeds 96 Hrs. Project must implement a vector control program.255‐040‐59 0.1Q2BMP 5 Biofiltration w/ Partial Retention & Biofiltration w/o Impermeable LinerDMA NamePre‐developed ConditionCarlsbad 103,050BMP Sizing Spreadsheet V2.0OMWD Ops. & Admin. CarlsbadOMWD Oceanside Project Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area:Parcel (APN): Low Flow Threshold:BMP Name: BMP Type:BMP Native Soil Type:BMP Infiltration Rate (in/hr):HMP Sizing Factors Minimum BMP SizeDMA NameArea (sf)Pre Project Soil TypePre‐Project SlopePost Project Surface TypeArea Weighted Runoff Factor(Table G.2‐1)1Surface Area Surface Area (SF)C4A‐Pave 631 D Flat Concrete  1.00.07 44C4A‐LS 4,527 D Flat Landscape  0.10.07 32C4B‐Pave 86 D Flat Concrete  1.00.07 6C4B‐LS 1,998 D Flat Landscape  0.10.07 14C4C‐Pave (off‐site) 15,508 D Flat Concrete  1.00.07 1086A4A‐Roof 1,987 D Flat Roofs 1.00.07 13900A2A‐Roof 2,694 D Flat Roofs 1.00.07 18900A4‐Pave 1,309 D Flat Concrete  1.00.07 92A4‐LS 3,074 D Flat Landscape  0.10.07 2200A4B‐Roof 1,070 D Flat Roofs 1.00.07 750000BMP Tributary Area 32,884Minimum BMP Size 1697Proposed BMP Size*176812.00 in18.00 in6.00 in12 in3.0 in3.5Underdrain OffsetBioretention Soil Media DepthFilter CourseGravel Storage Layer DepthSurface Ponding DepthAreas Draining to BMPCarlsbad255‐040‐59DBMP Sizing Spreadsheet V3.00.025Biofiltration w/ Partial Retention0.1Q2103,050OceansideCarlsbadBMP 6OMWD New & RemodeledOMWD Project Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area:Parcel (APN): Low Flow Threshold:BMP Name BMP Type:Rain Gauge Unit Runoff Ratio DMA Area (ac)Orifice Flow ‐ %Q2Orifice AreaSoil Type Slope (cfs/ac) (cfs) (in2)C4A‐Pave Oceanside D Flat 0.571 0.014 0.0010.01C4A‐LS Oceanside D Flat 0.571 0.104 0.0060.08C4B‐Pave Oceanside D Flat 0.571 0.002 0.0000.00C4B‐LS Oceanside D Flat 0.571 0.046 0.0030.04C4C‐Pave (off‐site) Oceanside D Flat 0.571 0.356 0.0200.29A4A‐Roof Oceanside D Flat 0.571 0.046 0.0030.04A2A‐Roof Oceanside D Flat 0.571 0.062 0.0040.05A4‐Pave Oceanside D Flat 0.571 0.030 0.0020.02A4‐LS Oceanside D Flat 0.571 0.071 0.0040.06A4B‐Roof Oceanside D Flat 0.571 0.025 0.0010.023.750.043 0.61 0.88Max Orifice HeadMax Tot. Allowable Orifice FlowMax Tot. AllowableOrifice AreaMax Orifice Diameter(feet)(cfs)(in2)(in)0.029 0.031 0.440.750Average outflow during surface drawdownMax Orifice Outflow Actual Orifice AreaSelected Orifice Diameter(cfs) (cfs)(in2)(in)Drawdown (Hrs) 17.0BMP 6Pre‐developed ConditionNo Orifice Required for Infiltration FacilitiesDMA NameCarlsbadBMP Sizing Spreadsheet V3.0Carlsbad255‐040‐59OMWD New & RemodeledOMWD0.1Q2103,050OceansideBiofiltration w/ Partial RetentionDrawdown time exceeds 96 Hrs. Project must implement a vector control program. Worksheet G.2‐1:  Sizing Factor WorksheetSite InformationProject Name: Hydrologic Unit:Project Applicant: Rain Gauge:Jurisdiction: Total Project Area (sf):Assessor’s Parcel No.: Low Flow Threshold (*Q2):BMP Name: BMP Type:Areas Draining to BMP Sizing Factors Minimum BMP SizeArea (sf) Soil TypePre‐ProjectSlopeRunoff Factor (From Table G.2‐1)Surface AreaSurfaceVolumeSubsurfaceVolumeSurfaceArea(sf)SurfaceVolume(cf)SubsurfaceVolume(cf)A4B‐Roof 1,070            Dflat roof1.00 0.0000 0.2000 0.0000‐                 214                ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 ‐                 Total DMA Area:  1,070            Min. BMP Size:  ‐                 214                ‐                 Proposed BMP Size:  ‐                88 ‐                Table G.2‐2:  Unit Runoff RatiosHead on Low Flow Orifice (ft)Low Flow Orifice SizingUnit Runoff Ratio, Q2:  0.175cfs/acBiofiltration w/Partial Retention, Biofiltration, Biofiltration w/Liner:  ‐                 Low Flow Threshold (cfs): 0.0004Unit Runoff Ratio, Q10:  0.434cfs/acCistern, orifice head equal to 7/8 * cistern height:  3.67               Max. Orifice Area (sq in): 0.0067Pre‐Dev. Q2:   0.004 cfsMax. Orifice Dia. (in): 0.092Pre‐Dev. Q10:   0.011 cfsMinimum 1/4" diameter, increment of 1/16":  Proposed Orifice Dia. (in):0.2500DMA NamePost Project Surface TypeBMP 35CisternCarlsbad103,050255‐040‐590.1OMWD New & Remodeled Ops. & Admin.CarlsbadOMWD OceansidePage 1 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G.2.1 Unit Runoff Ratios Table G.2-2 presents unit runoff ratios for calculating pre-development Q2, to be used when applicable to determine the lower flow threshold for low flow orifice sizing for biofiltration with partial retention, biofiltration, biofiltration with impermeable liner, or cistern BMPs. There is no low flow orifice in the infiltration BMP or bioretention BMP. The unit runoff ratios are re-printed from the BMP Sizing Calculator methodology. Unit runoff ratios for "urban" and "impervious" cover categories were not transferred to this manual due to the requirement to control runoff to pre- development condition (see Chapter 6.3.3). How to use the unit runoff ratios: Obtain unit runoff ratio from Table G.2-2 based on the project's rainfall basin, hydrologic soil group, and pre-development slope (for redevelopment projects, pre-development slope may be considered if historic topographic information is available, otherwise use pre-project slope). Multiply the area tributary to the structural BMP (A, acres) by the unit runoff ratio (Q2, cfs/acre) to determine the pre-development Q2 to determine the lower flow threshold, to use for low flow orifice sizing. Table G.2-2: Unit Runoff Ratios for Sizing Factor Method Unit Runoff Ratios for Sizing Factor Method Rain Gauge Soil Cover Slope Q2 (cfs/acre) Q10 (cfs/ac) Lake Wohlford A Scrub Low 0.136 0.369 Lake Wohlford A Scrub Moderate 0.207 0.416 Lake Wohlford A Scrub Steep 0.244 0.47 Lake Wohlford B Scrub Low 0.208 0.414 Lake Wohlford B Scrub Moderate 0.227 0.448 Lake Wohlford B Scrub Steep 0.253 0.482 Lake Wohlford C Scrub Low 0.245 0.458 Lake Wohlford C Scrub Moderate 0.253 0.481 Lake Wohlford C Scrub Steep 0.302 0.517 Lake Wohlford D Scrub Low 0.253 0.48 Lake Wohlford D Scrub Moderate 0.292 0.516 G-25 June 2015 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors Unit Runoff Ratios for Sizing Factor Method Rain Gauge Soil Cover Slope Q2 (cfs/acre) Q10 (cfs/ac) Lake Wohlford D Scrub Steep 0.351 0.538 Oceanside A Scrub Low 0.035 0.32 Oceanside A Scrub Moderate 0.093 0.367 Oceanside A Scrub Steep 0.163 0.42 Oceanside B Scrub Low 0.08 0.365 Oceanside B Scrub Moderate 0.134 0.4 Oceanside B Scrub Steep 0.181 0.433 Oceanside C Scrub Low 0.146 0.411 Oceanside C Scrub Moderate 0.185 0.433 Oceanside C Scrub Steep 0.217 0.458 Oceanside D Scrub Low 0.175 0.434 Oceanside D Scrub Moderate 0.212 0.455 Oceanside D Scrub Steep 0.244 0.571 Lindbergh A Scrub Low 0.003 0.081 Lindbergh A Scrub Moderate 0.018 0.137 Lindbergh A Scrub Steep 0.061 0.211 Lindbergh B Scrub Low 0.011 0.134 Lindbergh B Scrub Moderate 0.033 0.174 Lindbergh B Scrub Steep 0.077 0.23 Lindbergh C Scrub Low 0.028 0.19 Lindbergh C Scrub Moderate 0.075 0.232 Lindbergh C Scrub Steep 0.108 0.274 Lindbergh D Scrub Low 0.05 0.228 Lindbergh D Scrub Moderate 0.104 0.266 Lindbergh D Scrub Steep 0.143 0.319 G-26 June 2015 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors Sizing Factors for Hydromodification Flow Control Biofiltration with Partial Retention and Biofiltration BMPs Designed Using Sizing Factor Method Lower Flow Threshold Soil Group Slope Rain Gauge A V1 V2 0.1Q2 B Moderate Lindbergh N/A N/A N/A 0.1Q2 B Steep Lindbergh N/A N/A N/A 0.1Q2 C Flat Lindbergh 0.145 0.1208 0.0870 0.1Q2 C Moderate Lindbergh 0.145 0.1208 0.0870 0.1Q2 C Steep Lindbergh 0.120 0.1000 0.0720 0.1Q2 D Flat Lindbergh 0.160 0.1333 0.0960 0.1Q2 D Moderate Lindbergh 0.160 0.1333 0.0960 0.1Q2 D Steep Lindbergh 0.115 0.0958 0.0690 0.1Q2 A Flat Oceanside N/A N/A N/A 0.1Q2 A Moderate Oceanside N/A N/A N/A 0.1Q2 A Steep Oceanside N/A N/A N/A 0.1Q2 B Flat Oceanside N/A N/A N/A 0.1Q2 B Moderate Oceanside N/A N/A N/A 0.1Q2 B Steep Oceanside N/A N/A N/A 0.1Q2 C Flat Oceanside 0.130 0.1083 0.0780 0.1Q2 C Moderate Oceanside 0.130 0.1083 0.0780 0.1Q2 C Steep Oceanside 0.110 0.0917 0.0660 0.1Q2 D Flat Oceanside 0.130 0.1083 0.0780 0.1Q2 D Moderate Oceanside 0.130 0.1083 0.0780 0.1Q2 D Steep Oceanside 0.065 0.0542 0.0390 0.1Q2 A Flat L Wohlford N/A N/A N/A 0.1Q2 A Moderate L Wohlford N/A N/A N/A 0.1Q2 A Steep L Wohlford N/A N/A N/A 0.1Q2 B Flat L Wohlford N/A N/A N/A 0.1Q2 B Moderate L Wohlford N/A N/A N/A 0.1Q2 B Steep L Wohlford N/A N/A N/A 0.1Q2 C Flat L Wohlford 0.110 0.0917 0.0660 0.1Q2 C Moderate L Wohlford 0.110 0.0917 0.0660 0.1Q2 C Steep L Wohlford 0.090 0.0750 0.0540 0.1Q2 D Flat L Wohlford 0.100 0.0833 0.0600 0.1Q2 D Moderate L Wohlford 0.100 0.0833 0.0600 0.1Q2 D Steep L Wohlford 0.075 0.0625 0.0450 Q2 = 2-year pre-project flow rate based upon partial duration analysis of long-term hourly rainfall records A = Surface area sizing factor for flow control G-41 June 2015 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors V1 = Surface volume sizing factor for flow control V2 = Subsurface volume sizing factor for flow control Definitions for "N/A" • Soil groups A and B: N/A in all elements (A, V1, V2) for soil groups A and B means sizing factors were not developed for biofiltration (i.e., with an underdrain) for soil groups A and B. If no underdrain is proposed, refer to Appendix G.2.3, Sizing Factors for Bioretention. If an underdrain is proposed, use project-specific continuous simulation modeling. G-42 June 2015 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors Sizing Factors for Hydromodification Flow Control Cistern Facilities Designed Using Sizing Factor Method Lower Flow Threshold Soil Group Slope Rain Gauge A V1 V2 0.3Q2 B Flat L Wohlford N/A 0.2600 N/A 0.3Q2 B Moderate L Wohlford N/A 0.2400 N/A 0.3Q2 B Steep L Wohlford N/A 0.1800 N/A 0.3Q2 C Flat L Wohlford N/A 0.1800 N/A 0.3Q2 C Moderate L Wohlford N/A 0.1800 N/A 0.3Q2 C Steep L Wohlford N/A 0.1400 N/A 0.3Q2 D Flat L Wohlford N/A 0.1400 N/A 0.3Q2 D Moderate L Wohlford N/A 0.1400 N/A 0.3Q2 D Steep L Wohlford N/A 0.1000 N/A 0.1Q2 A Flat Lindbergh N/A 0.1200 N/A 0.1Q2 A Moderate Lindbergh N/A 0.1000 N/A 0.1Q2 A Steep Lindbergh N/A 0.1000 N/A 0.1Q2 B Flat Lindbergh N/A 0.5400 N/A 0.1Q2 B Moderate Lindbergh N/A 0.7800 N/A 0.1Q2 B Steep Lindbergh N/A 0.3400 N/A 0.1Q2 C Flat Lindbergh N/A 0.3600 N/A 0.1Q2 C Moderate Lindbergh N/A 0.3600 N/A 0.1Q2 C Steep Lindbergh N/A 0.2400 N/A 0.1Q2 D Flat Lindbergh N/A 0.2600 N/A 0.1Q2 D Moderate Lindbergh N/A 0.2600 N/A 0.1Q2 D Steep Lindbergh N/A 0.1600 N/A 0.1Q2 A Flat Oceanside N/A 0.1600 N/A 0.1Q2 A Moderate Oceanside N/A 0.1400 N/A 0.1Q2 A Steep Oceanside N/A 0.1200 N/A 0.1Q2 B Flat Oceanside N/A 0.5100 N/A 0.1Q2 B Moderate Oceanside N/A 0.3400 N/A 0.1Q2 B Steep Oceanside N/A 0.2400 N/A 0.1Q2 C Flat Oceanside N/A 0.2600 N/A 0.1Q2 C Moderate Oceanside N/A 0.2600 N/A 0.1Q2 C Steep Oceanside N/A 0.2000 N/A 0.1Q2 D Flat Oceanside N/A 0.2000 N/A 0.1Q2 D Moderate Oceanside N/A 0.2000 N/A 0.1Q2 D Steep Oceanside N/A 0.1800 N/A 0.1Q2 A Flat L Wohlford N/A 0.1800 N/A G-52 June 2015 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-35 May 2018 G.2.1 Unit Runoff Ratios and Low Flow Control Orifice Design G.2.1.1 Unit Runoff Ratios Table G.2-2 presents unit runoff ratios for calculating pre-development Q2, to be used when applicable to determine the lower flow threshold for low flow control orifice sizing for biofiltration with partial retention, biofiltration, or cistern BMPs. There is no low flow control orifice in the infiltration BMP. The unit runoff ratios are updated from the previously reported BMP Sizing Calculator methodology ratios to account for changes in modeling methodologies. Unit runoff ratios for "urban" and "impervious" cover categories were not transferred to this manual due to the requirement to control runoff to pre-development condition (see Chapter 6.3.3). How to use the unit runoff ratios: Obtain unit runoff ratio from Table G.2-2 based on the project's rainfall basin, hydrologic soil group, and pre-development slope (for redevelopment projects, pre-development slope may be considered if historic topographic information is available, otherwise use pre-project slope). Multiply the area tributary to the structural BMP (A, acres) by the unit runoff ratio (Q2, cfs/acre) to determine the pre-development Q2 to determine the lower flow threshold, to use for low flow control orifice sizing. Table G.2-2: Unit Runoff Ratios for Sizing Factor Method Rain Gauge Soil Pre-Project Slope Q2 (cfs/acre) Q10 (cfs/acre) Lake Wohlford A Flat 0.256 0.518 Lake Wohlford A Moderate 0.275 0.528 Lake Wohlford A Steep 0.283 0.531 Lake Wohlford B Flat 0.371 0.624 Lake Wohlford B Moderate 0.389 0.631 Lake Wohlford B Steep 0.393 0.633 Lake Wohlford C Flat 0.490 0.729 Lake Wohlford C Moderate 0.495 0.733 Lake Wohlford C Steep 0.496 0.735 Lake Wohlford D Flat 0.548 0.784 Lake Wohlford D Moderate 0.554 0.788 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-36 May 2018 Rain Gauge Soil Pre-Project Slope Q2 (cfs/acre) Q10 (cfs/acre) Lake Wohlford D Steep 0.556 0.788 Oceanside A Flat 0.256 0.679 Oceanside A Moderate 0.277 0.694 Oceanside A Steep 0.285 0.700 Oceanside B Flat 0.377 0.875 Oceanside B Moderate 0.391 0.879 Oceanside B Steep 0.395 0.881 Oceanside C Flat 0.488 0.981 Oceanside C Moderate 0.497 0.985 Oceanside C Steep 0.499 0.986 Oceanside D Flat 0.571 0.998 Oceanside D Moderate 0.575 0.999 Oceanside D Steep 0.576 0.999 Lindbergh A Flat 0.057 0.384 Lindbergh A Moderate 0.073 0.399 Lindbergh A Steep 0.082 0.403 Lindbergh B Flat 0.199 0.496 Lindbergh B Moderate 0.220 0.509 Lindbergh B Steep 0.230 0.513 Lindbergh C Flat 0.335 0.601 Lindbergh C Moderate 0.349 0.610 Lindbergh C Steep 0.354 0.613 Lindbergh D Flat 0.429 0.751 Lindbergh D Moderate 0.437 0.753 Lindbergh D Steep 0.439 0.753 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-41 May 2018 G.2.3 Sizing Factors for Biofiltration with Partial Retention Table G.2-4 presents sizing factors for calculating the required surface area (A) for a biofiltration with partial retention BMP. The BMPs consist of four layers: •Ponding layer: 12-inches active storage, [minimum] 2-inches of freeboard above overflow relief •Media Layer: 18-inches of soil [bioretention soil media] •Filter Course: 6-inches •Storage layer: 18-inches of gravel at 40 percent porosity for A and B soils and 12-inches of gravel at 40 percent porosity for C and D soils. The underdrain offset for A and B soils shallbe 18-inches, for C soils it shall be 6-inches and for D soils it shall be 3-inches. •Overflow structure: San Diego Regional Standard Drawing Type I Catch Basin (D-29). For the purposes of hydromodification flow control other type of overflow structures are allowed. This BMP does not include an impermeable layer at the bottom of the facility to prevent infiltration into underlying soils, regardless of hydrologic soil group. If a facility is to be lined, the designer must use the sizing factors for biofiltration (Refer to Appendix G.2.4). Biofiltration with Partial Retention BMP Example Illustration How to use the sizing factors for flow control BMP Sizing: Obtain sizing factors from Table G.2-4 based on the project's lower flow threshold fraction of Q2, hydrologic soil group, pre-project slope, and rain gauge (rainfall basin). Multiply the area tributary to Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-42 May 2018 the structural BMP (A, square feet) by the area weighted runoff factor (C, unitless) (see Table G.2-1) by the sizing factors to determine the required surface area (A, square feet). Select a low flow control orifice for the underdrain that will discharge the lower flow threshold flow at the overflow riser elevation. Standard head (H) for this calculation (based on the standard detail) is 3.0 feet for A or B soils, 3.5 feet for C soils, or 3.75 feet for D soils. The civil engineer shall provide the necessary surface area of the BMP and the underdrain and orifice detail on the plans. Additional steps to use this BMP as a combined pollutant control and flow control BMP: The BMP sized using the sizing factors in Table G.2-4 meets both pollutant control and flow control requirements. Table G.2-4: Sizing Factors for Hydromodification Flow Control Biofiltration with Partial Retention BMPs Designed Using Sizing Factor Method Lower Flow Threshold Soil Group Pre- Project Slope Aggregate below low orifice invert (inches) Rain Gauge A 0.1Q2 A Flat 18 Lindbergh 0.080 0.1Q2 A Moderate 18 Lindbergh 0.080 0.1Q2 A Steep 18 Lindbergh 0.080 0.1Q2 B Flat 18 Lindbergh 0.065 0.1Q2 B Moderate 18 Lindbergh 0.065 0.1Q2 B Steep 18 Lindbergh 0.060 0.1Q2 C Flat 6 Lindbergh 0.050 0.1Q2 C Moderate 6 Lindbergh 0.050 0.1Q2 C Steep 6 Lindbergh 0.050 0.1Q2 D Flat 3 Lindbergh 0.050 0.1Q2 D Moderate 3 Lindbergh 0.050 0.1Q2 D Steep 3 Lindbergh 0.050 0.1Q2 A Flat 18 Oceanside 0.080 0.1Q2 A Moderate 18 Oceanside 0.075 0.1Q2 A Steep 18 Oceanside 0.075 0.1Q2 B Flat 18 Oceanside 0.070 Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-43 May 2018 Lower Flow Threshold Soil Group Pre- Project Slope Aggregate below low orifice invert (inches) Rain Gauge A 0.1Q2 B Moderate 18 Oceanside 0.070 0.1Q2 B Steep 18 Oceanside 0.070 0.1Q2 C Flat 6 Oceanside 0.070 0.1Q2 C Moderate 6 Oceanside 0.070 0.1Q2 C Steep 6 Oceanside 0.070 0.1Q2 D Flat 3 Oceanside 0.070 0.1Q2 D Moderate 3 Oceanside 0.070 0.1Q2 D Steep 3 Oceanside 0.070 0.1Q2 A Flat 18 L Wohlford 0.110 0.1Q2 A Moderate 18 L Wohlford 0.110 0.1Q2 A Steep 18 L Wohlford 0.105 0.1Q2 B Flat 18 L Wohlford 0.090 0.1Q2 B Moderate 18 L Wohlford 0.085 0.1Q2 B Steep 18 L Wohlford 0.085 0.1Q2 C Flat 6 L Wohlford 0.065 0.1Q2 C Moderate 6 L Wohlford 0.065 0.1Q2 C Steep 6 L Wohlford 0.065 0.1Q2 D Flat 3 L Wohlford 0.060 0.1Q2 D Moderate 3 L Wohlford 0.060 0.1Q2 D Steep 3 L Wohlford 0.060 Q2 = 2-year pre-project flow rate based upon partial duration analysis of long-term hourly rainfall records A = Surface area (at surface of the BMP before any ponding occurs) sizing factor for flow control Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-47 May 2018 G.2.5 Sizing Factors for "Cistern" BMP Table G.2-6 presents sizing factors for calculating the required volume (V) for a cistern BMP. In this context, a "cistern" is a detention facility that stores runoff and releases it at a controlled rate. A cistern can be a component of a harvest and use system, however the sizing factor method will not account for any retention occurring in the system. The sizing factors were developed assuming runoff is released from the cistern. The sizing factors presented in this section are to meet the hydromodification management performance standard only. The cistern BMP is based on the following assumptions: •Cistern configuration: The cistern is modeled as a 4-foot tall vessel. However, designerscould use other configurations (different cistern heights), as long as the lower outlet orifice is sized to properly restrict outflows and the minimum required volume is provided. •Cistern upper outlet: The upper outlet from the cistern would consist of a weir or other flow control structure with the overflow invert set at an elevation of 7/8 of the water height associated with the required volume of the cistern – V. For the assumed 4-foot water depth in the cistern associated with the sizing factor analysis, the overflow invert is assumed to be located at an elevation of 3.5 feet above the bottom of the cistern. The overflow weir would be sized to pass the peak design flow based on the tributary drainage area. How to use the sizing factors: Obtain sizing factors from Table G.2-6 based on the project's lower flow threshold fraction of Q2, hydrologic soil group, pre-project slope, and rain gauge (rainfall basin). Multiply the area tributary to the structural BMP (A, square feet) by the area weighted runoff factor (C, unitless) (see Table G.2-1) by the sizing factors to determine the required volume (V, cubic feet). Select a low flow control orifice that will discharge the lower flow threshold flow at the overflow elevation (i.e. when there is 3.5 feet of head over the lower outlet orifice or adjusted head as appropriate if the cistern overflow elevation is not 3.5 feet tall). The civil engineer shall provide the necessary volume of the BMP and the lower outlet orifice detail on the plans. Additional steps to use this BMP as a combined pollutant control and flow control BMP: A cistern could be a component of a full retention, partial retention, or no retention BMP depending on how the outflow is disposed. However, use of the sizing factor method for design of the cistern in a combined pollutant control and flow control system is not recommended. The sizing factor method for designing a cistern does not account for any retention or storage occurring in BMPs combined with the cistern (i.e., cistern sized using sizing factors may be larger than necessary because sizing factor method does not recognize volume losses occurring in other elements of a combined system). Furthermore, when the cistern is designed using the sizing factor method, the cistern outflow must be set to the low flow threshold flow for the drainage area, which may be inconsistent with requirements for other elements of a combined system. To optimize a system in Appendix G: Guidance for Continuous Simulation and Hydromodification Management Sizing Factors G-48 May 2018 which a cistern provides temporary storage for runoff to be either used onsite (harvest and use), infiltrated, or biofiltered, project-specific continuous simulation modeling is recommended. Refer to Sections 5.6 and 6.3.6. Table G.2-6: Sizing Factors for Hydromodification Flow Control Cistern BMPs Designed Using Sizing Factor Method Lower Flow Threshold Soil Group Pre-Project Slope Rain Gauge V 0.1Q2 A Flat Lindbergh 0.54 0.1Q2 A Moderate Lindbergh 0.51 0.1Q2 A Steep Lindbergh 0.49 0.1Q2 B Flat Lindbergh 0.19 0.1Q2 B Moderate Lindbergh 0.18 0.1Q2 B Steep Lindbergh 0.18 0.1Q2 C Flat Lindbergh 0.11 0.1Q2 C Moderate Lindbergh 0.11 0.1Q2 C Steep Lindbergh 0.11 0.1Q2 D Flat Lindbergh 0.09 0.1Q2 D Moderate Lindbergh 0.09 0.1Q2 D Steep Lindbergh 0.09 0.1Q2 A Flat Oceanside 0.26 0.1Q2 A Moderate Oceanside 0.25 0.1Q2 A Steep Oceanside 0.25 0.1Q2 B Flat Oceanside 0.16 0.1Q2 B Moderate Oceanside 0.16 0.1Q2 B Steep Oceanside 0.16 0.1Q2 C Flat Oceanside 0.14 0.1Q2 C Moderate Oceanside 0.14 0.1Q2 C Steep Oceanside 0.14 0.1Q2 D Flat Oceanside 0.12 A3-1 ATTACHMENT 3 – STRUCTURAL BMP MAINTENANCE INFORMATION Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Information Attachment: Preliminary Design/Planning/CEQA level submittal: Attachment 3 must identify: ☒Typical maintenance indicators and actions for proposed structural BMP(s) based on Section 7.7 of the BMP Design Manual Final Design level submittal: SEE OPERATION AND MAINTENANCE PLAN Attachment 3 must identify: ☒Specific maintenance indicators and actions for proposed structural BMP(s). This shall be based on Section 7.7 of the BMP Design Manual and enhanced to reflect actual proposed components of the structural BMP(s) ☒How to access the structural BMP(s) to inspect and perform maintenance ☒Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) ☒Manufacturer and part number for proprietary parts of structural BMP(s) when applicable ☒Maintenance thresholds for BMPs subject to siltation or heavy trash(e.g., silt level posts or other markings shall be included in all BMP components that will trap and store sediment, trash, and/or debris, so that the inspector may determine how full the BMP is, and the maintenance personnel may determine where the bottom of the BMP is . If required, posts or other markings shall be indicated and described on structural BMP plans.) ☒Recommended equipment to perform maintenance ☐When applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management. (NOT APPLICABLE) A3-2 Typical Maintenance Indicators and Actions for Proposed Structural BMP(s) Vegetated Infiltration or Filtration BMPs BMP: 1, 4, 5, 6 (Biofiltration w/Partial Retention) Typical Maintenance Indicators Maintenance Actions ☒Accumulation of sediment, litter, or debris Remove and properly dispose of accumulated materials, without damage to the vegetation. ☒Poor vegetation establishment Re-seed, re-plant, or re-establish vegetation per original plans. ☒Overgrown vegetation Mow or trim as appropriate, but not less than the design height of the vegetation per original plans when applicable (e.g. a vegetated swale may require a minimum vegetation height). ☒Erosion due to concentrated irrigation flow Repair/re-seed/re-plant eroded areas and adjust the irrigation system. ☒Erosion due to concentrated storm water runoff flow Repair/re-seed/re-plant eroded areas and make appropriate corrective measures such as adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. ☐Standing water in vegetated swales Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, loosening or replacing top soil to allow for better infiltration, or minor re-grading for proper drainage. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. ☒Standing water in bioretention, biofiltration with partial retention, or biofiltration areas, or flow-through planter boxes for longer than 96 hours following a storm event* Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, clearing underdrains (where applicable), or repairing/replacing clogged or compacted soils. A3-3 Typical Maintenance Indicators Maintenance Actions ☒Obstructed inlet or outlet structure Clear obstructions. ☒Damage to structural components such as weirs, inlet or outlet structures Repair or replace as applicable. * These BMPs typically include a surface ponding layer as part of their function which may take 96 hours to drain following a storm event. A3-4 Typical Maintenance Indicators and Actions for Proposed Structural BMP(s) Non-Vegetated Infiltration BMPs BMP: 22, 23, 25, 26, 27, 28, 29, 30, 80, 81 (Permeable Pavement) Typical Maintenance Indicators Maintenance Actions ☒Accumulation of sediment, litter, or debris in infiltration basin, pre-treatment device, or on permeable pavement surface Remove and properly dispose accumulated materials. ☐Standing water in infiltration basin without subsurface infiltration gallery for longer than 96 hours following a storm event Remove and replace clogged surface soils. ☐Standing water in subsurface infiltration gallery for longer than 96 hours following a storm event This condition requires investigation of why infiltration is not occurring. If feasible, corrective action shall be taken to restore infiltration (e.g. flush fine sediment or remove and replace clogged soils). BMP may require retrofit if infiltration cannot be restored. If retrofit is necessary, the [City Engineer] shall be contacted prior to any repairs or reconstruction. ☒Standing water in permeable paving area Flush fine sediment from paving and subsurface gravel. Provide routine vacuuming of permeable paving areas to prevent clogging. ☒Damage to permeable paving surface Repair or replace damaged surface as appropriate. * Note: When inspection or maintenance indicates sediment is accumulating in an infiltration BMP, the DMA draining to the infiltration BMP should be examined to determine the source of the sediment, and corrective measures should be made as applicable to minimize the sediment supply. A3-5 Typical Maintenance Indicators and Actions for Proposed Structural BMP(s) Non-Vegetated Filtration BMPs BMP: 59 – 64 (Inlet Filters) Typical Maintenance Indicators Maintenance Actions ☒Accumulation of sediment, litter, or debris Remove and properly dispose accumulated materials. ☒Obstructed inlet or outlet structure Clear obstructions. ☒Clogged filter media Remove and properly dispose filter media, and replace with fresh media. ☒Damage to components of the filtration system Repair or replace as applicable. * Note: For proprietary media filters, refer to the manufacturer's maintenance guide. A3-6 Typical Maintenance Indicators and Actions for Proposed Structural BMP(s) Detention BMPs BMP: 35 (Cisterns) Typical Maintenance Indicators Maintenance Actions ☒Erosion due to concentrated storm water runoff flow Repair eroded areas and energy dissipation devices at discharge outlets. ☒Accumulation of sediment, litter, or debris Remove and properly dispose of materials that accumulate inside the cistern. ☒Standing water Remove soil or debris from outlets. ☒Obstructed inlet Clear obstructions from inlet pipes or inlet filters/screens. ☒Damage to structural components such as pipes, inlet screens or outlets Repair or replace as applicable. A4-1 ATTACHMENT 4 – CITY STANDARD SINGLE SHEET BMP (SSBMP) EXHIBIT RANCHO SANTA FE ROADOM W D D R I V E W A Y OLIVENHAIN ROAD TO SO U T H SI D E OPER A TI O N S B UI L DI N G SOIL TYPE "D"SOIL TYPE "C"1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS OR THESE PLANS. 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION AND INSTALLATION. BMP NOTES: PARTY RESPONSIBLE FOR MAINTENANCE: NAME: OLIVENHAIN MUNICIPAL WATER DISTRICT PHONE NO. (760) 753-6466 CONTACT PLAN PREPARED BY: NAME: ROBERT WEBER PHONE NO. (858) 413-2400 CERTIFICATION COMPANY: INFRASTRUCTURE ENGINEERING CORP. SCALE : 1" =20'-0" 5. REFER TO MAINTENANCE AGREEMENT DOCUMENT. 6. SEE PROJECT SWMP FOR ADDITIONAL INFORMATION. SIGNATURE ADDRESS: 1966 OLIVENHAIN ROAD ENCINITAS, CA 92024 ADDRESS: 14271 DANIELSON STREET POWAY, CA. 92064 LEGEND CHAD WILLIAMS E N G I N E E R I N G C O R P O R A T I O N 32 C-32 BL DP RW 33 7 1 TREATMENT CONTROL LOW IMPACT DESIGN (L.I.D.) SOURCE CONTROL 20 HYDROMODIFICATION & TREATMENT CONTROL HYDROMODIFICATION 82 X X 59 74 ** PERVIOUS CONC. PAVEMENT PERVIOUS INTERLOCKING PAVERS 25 30 22 23 31 SITE DESIGN 34 59 64 *PRIOR TO THE RAINY SEASON (OCT 1 THROUGH APR 30) 80 81 POROUS PAVING - GRASS SD-6B TC-10 2,350 SF.502-9A 502-9A 502-9A 502-9A 502-9A 502-9A 502-9A 502-9A 502-9A 13-15 SEMI-ANNUALLY SEMI-ANNUALLY SEMI-ANNUALLY SEMI-ANNUALLY SEMI-ANNUALLYQUARTERLY SD-6B TC-10 SD-6B TC-10 1,706 SF. 1,001 SF. BMP ID #BMP TYPE SYMBOL SDBMP, CARLSBAD OR CASQA NO. QUANTITY DRAWING NO.SHEET NO.(S)INSPECTION FREQUENCY MAINTENANCE FREQUENCY 14, 15 13 BMP TABLE BIOFILTRATION PR-1 271 SF.QUARTERLY SEMI-ANNUALLY14 WET VAULT (INCLUDES CISTERN)MP-50 ROOF DRAIN TO LANDSCAPING INLET FILTER VEGETATIVE SWALE FT-1 TC-30 MP-52 SD-11 14 EA. 7 EA. 0 SF. ANNUALLY ANNUALLY ANNUALLYSEMI-ANNUALLY 13-15 13-15 PER LANDSCAPE 13 13-15 STREET TREES SD-1 4 EA.ANNUALLY ANNUALLY SEMI-ANNUALLY ANNUALLY ANNUALLY ANNUALLY 1 EA. 16 EA. GS-16 SD-13NO DUMPING DRAINS TO OCEANSTENCILS TRASH ENCLOSURE 502-9ABIOFILTRATION3,282 SF.QUARTERLY SEMI-ANNUALLY15 502-9ABIOFILTRATION676 SF.QUARTERLY SEMI-ANNUALLY13 502-9ABIOFILTRATION1,885 SF.QUARTERLY SEMI-ANNUALLY16 4 5 6 502-9A 14CISTERNHU-1 1 EA. / 660 GAL.ANNUALLYSEMI-ANNUALLY35 PR-1 PR-1 PR-1 A5-1 ATTACHMENT 5 – OPERATION AND MAINTENANCE PLAN