HomeMy WebLinkAboutDEV 2017-0229; Versum Materials Channel Stabilization; FINAL SOILS REPORT; 2019-11-11II PLANNING I
~YSTEMS
LAND USE/COASTAL PLANNING
LANDSCAPE ARCHITECTURE • LA3900
POLICY AND PROCESSING
ENVJRONMENTAL MITIGATION
TRANSMITTAL LETTER
To: Mike Bailey Date: 11/12/19 ----~-------------CITY OF CARLSBAD
Construction Management & Inspection Dept
1635 Faraday Ave.
Carlsbad, CA 92008
From: Paul J. Klukas ·
PLANNING SYSTEMS
1530 Faraday Ave. #100
Carlsbad, CA 92008
Via: Hand Delivery
Project: Versum Materials Swale Repairs
Description: 1. Report of Materials Testing ResLilts, Group Delta, dated 11/11/19
2. Report of Compaction Test Results, Group Delta, dated 11/11/19
Remarks: Bill Elkins at Versum Materials asked me to drop these· off for you.
cc: Bill Elkins ECE VED
NOV 13 2019
LANO DEVELOPMENT
ENGINEERING
1530 FARADAY AVENUE• SUITE 100 • CARLSBAD, CA 92008 • (760) 931-0780 • FAX (760) 931-5744 • info@planningsystcms.net
GR □UPDELTA
November 11, 2019
Capstone Construction Company, LLC
1291 Pacific Oaks Place, #117
Escondido, California 92029
Attention:
SUBJECT:
Mr. Havins:
Mr. Darrell Havins
REPORT OF MATERIALS TESTING RESULTS
Versum Materials -Swale Repair
Capstone Construction Company, LLC
This letter confirms that Group Delta Consultants performed materials testing and observation
services during construction of the Versum Materials Swale Repair project between August 12th
and November 7th, 2019. The purpose of our services was to provide sufficient observation and
testing so that we could develop professional opinions as to whether the work was performed
in accordance with the construction materials aspects of the approved plans.
To the best of our knowledge, the work requiring material sampling and testing for the cable
concrete and storm drain headwalls was performed is in conformance with the approved plans
and construction documents.
The conclusions and professional opinions presented herein are based on our observations and
testing performed between August 12th and November 7th, 2019. No representations are made
as to the quality and extent of materials not observed or tested. Our services were performed
using the degree of care and skill ordinarily exercised, under similar circumstances, by
reputable consultants practicing in this or similar localities. No warranty, express or implied, is
made as to the conclusions included in this report. Although our inspections did not reveal
obvious deficiencies, we do not guarantee the contractors work, nor do the services we
provided relieve the contractor of responsibility in the event of subsequently discovered
defects in his work.
9245 Activity Road, Suite 103, San Diego, CA 92126 TEL: (858) 536-1000
Anaheim -Irvine -Ontario -San Diego -Torrance
www.GroupDelta.com
Report of Materials Testing Resu lts
Versum Materials -Swale Repair
Capstone Construction Company, LLC
GDC Project No. SD618
November 11, 2019
Page 2
We appreciate this opportunity to be of professional service. Feel free to contact the office
with any questions or comments, or if you need anything else.
GROUP DELTA CONSULTANTS y~
Taylor Latimer, PE 82035
Project Engineer
Di stribution: Mr. Darrell Havins (Darrell@Capstoneco.net)
Mr. Bill Elkins (William.Elkins@versummaterials.com)
GROUP DEL T .l\
REFERENCES
American Society for Testing and Materials (2006). Annual Book of ASTM Standards, Section 4,
Construction, Volume 04.08 Soil and Rock {I); Volume 04.09 Soil and Rock (If);
Geosynthetics, ASTM, West Conshohocken, PA.
Group Delta Consultants (2017A). Report of Geotechnical Investigation, Versum Materials -
Swale Repair, 1969 Palomar Oaks Way, Carlsbad, California 92011, Project No. SD535,
Document No. 17-0087, dated July 26. ·
Group Delta Consultants (2017B). Technical Memorandum, Versum Materials, Swale Repair,
Subgrade of Concrete Brow Ditch, Project No. SD535, dated August 21.
O'Day Consultants (2018). Versum Materials, Channel Stabilization, Grading Plans, Sheets 1
through 7, signed December 7.
GR□UPDELT..l\
CONCRETE
GROUP DEL TA CONSULTANTS, INC.
GR □UP DEL TA ENGINEERS AND GEOLOGISTS
9245 ACTIVITY ROAD, SUITE 103
SAN DIEGO, CALIFORNIA 92126
WWW.GROUPDEL TA.COM
Client Versum Materials
Attn: Bill Elkins Approval No.: _________ _
Address: 1969 Palomar Oaks Way Permit No.: ----------
Carlsbad, CA 92011 Client Job No.: ----------
COMPRESSION TEST REPORT
Project Name: Versum Materials -Channel Stabilization Group Delta Project No.: SD618 Sample Date: August 12, 2019
Location in Structure: Cable Concrete Molds
SAMPLING INFORMATION
Actual Spec
Slump, ASTM C143 (inches): 3½ 4 +-1
Percent Air, ASTM C231 (%): --
Unit Weight, ASTM C138 (pct): --
Air Temperature (°F): 77° F
Mix Temperature, ASTM C1064 (°F): 90° F
Specimens were fabricated in accordance with ASTM C31
Material: 0 Concrete O Grout O Mortar O Other --------Specified Strength 4000 psi @ 28 days
Sampled By: A. Herrera ACI No: 101400 ----------------------
Concrete Supplier: Cemex #4383A Mix No: 1577747 ----------
Truck No: 67297 Ticket No.: 28553063 Load No:
Time Batched: 11 :09 AM Time Sampled: 12:35 PM Time Difference:
Water Added: 0 gal.
Sampled from: 0 Chute
Set No: 1 of 1
0 Hose D 0th~
10 yds of
-------
Specimens were tested in accordance with ASTM C39
-15
1 :26
total yds
0 YES O NO O SEE "REMARKS" BELOW 0 YES ONO
TESTING INFORMATION Received By: J. Estes Tested By: J. Estes --------
Cylinder Identification: 7577-1 7577-2 7577-3 7577-4 7577-5
Date Sampled: 8/12/19 8/12/19 8/12/19 8/12/19 8/12/19
Date Received: 8/13/19 8/13/19 8/13/19 8/13/19 8/13/19
Date Tested: 8/19/19 9/9/19 9/9/19 9/9/19
Age in Days: 7 28 28 28 H
Diameter (in.): 4.00 4.00 4.00 4.00
Cross Sect. Area (in.2): 12.57 12.57 12.57 12.57
Maximum Load (lbs.): 47,220 56,580 55,040 58,060
Compr. Strength (psi): 3,760 4,500 4,380 4,620
Fracture Type: 2 2 2 2
Notes: Unless otherwise indicated, tests were performed in general accordance with the following ASTM standards: C39, C138, C143, C173, C1064, C1231.
"«<»>" denotes test strength below the minimum required at the specified age.
The Material 0 WAS □ WAS NOT □ SEE "REMARKS"
SAMPLED AND TESTED IN ACCORDANCE WITH
THE REQUIREMENTS OF THE PERMITTED DOCUMENTS.
The Material Tested 0 MET □ DID NOT MEET
THE REQUIREMENTS OF THE PERMITTED DOCUMENTS.
REMARKS: These results apply only to the specific items tested. This report shall not be reproduced (except in full) without the prior written consent of Group Delta Consultants.
cc: Project Architect:
Structural Engineer:
Construction Manager:
Project Inspector: Bill Elkins, Versum September 9, 2019
Project Engineer: Report Date
Taylor Latimer, Project Engineer
Page of 1 GDC Revision Number 3 (10/1/16)
Print Engineer Name I Title
GROUP DELTA CONSULTANTS, INC.
GR □UP DEL TA ENGINEERS AND GEOLOGISTS
9245 ACTIVITY ROAD, SUITE 103
SAN DIEGO, CALIFORNIA 92126
WWW.GROUPDELTA.COM
Client Versum Materials
Attn: Bill Elkins Approval No.: ________ _
Address: 1969 Palomar Oaks Way Permit No.: ----------
Carlsbad, CA 92011 Client Job No.: ----------
COMPRESSION TEST REPORT
Project Name: Versum Materials -Channel Stabilization Group Delta Project No.: SD618 Sample Date: August 28, 2019
Location in Structure: Cable Concrete Molds
SAMPLING INFORMATION Material: 0 Concrete D Grout D Mortar D Other --------
Actual Spec Specified Strength 4000 psi @ 28 days
Sampled By: _____ A_. _H_e_r_re_r_a ____ ACI No: ____ 1_01_4_0_0 ___ _
Slump, ASTM C143 (inches): 4 4 +-1 Concrete Supplier: Cemex #4383A Mix No: 15777 4 7 ----------Percent Air, ASTM C231 (%): --Truck No: 36868 Ticket No.: 28586024 Load No:
Unit Weight, ASTM C138 (pct): --Time Batched: 11 :18 AM Time Sampled: 12:15 PM Time Difference: 0:57
Air Temperature (°F): 73° F Water Added: 0 gal. Set No: 1 of 1 8 yds of 8 total yds --Mix Temperature, ASTM C1064 (°F): 90° F Sampled from: 0 Chute D Hose D Other
Specimens were fabricated in accordance with ASTM C31 Specimens were tested in accordance with ASTM C39
[2J YES O NO O SEE "REMARKS" BELOW [2J YES O NO
TESTING INFORMATION Received By: J. Estes Tested By: J. Estes --------
Cylinder Identification: 7582-1 7582-2 7582-3 7582-4 7582-5
Date Sampled: 8/28/19 8/28/19 8/28/19 8/28/19 8/28/19
Date Received: 8/29/19 8/29/19 8/29/19 8/29/19 8/29/19
Date Tested: 9/4/19 9/25/19 9/25/19 9/25/19
Age in Days: 7 28 28 28 H
Diameter (in.): 4.00 4.00 4.00 4.00
Cross Sect. Area (in.\ 12.57 12.57 12.57 12.57
Maximum Load (lbs.): 44,230 56,870 57,520 57,000
Compr. Strength (psi): 3,520 4,530 4,580 4,540
Fracture Type: 5 3 5 2
Notes: Unless otherwise indicated, tests were performed in general accordance with the following ASTM standards: C39, C138, C143, C173, C1064, C1231.
"«<»>" denotes test strength below the minimum required at the specified age.
The Material [2J WAS O WAS NOT O SEE "REMARKS" The Material Tested [2J MET O DID NOT MEET
SAMPLED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMITTED DOCUMENTS.
THE REQUIREMENTS OF THE PERMITTED DOCUMENTS.
REMARKS: These results apply only to the specific items tested. This report shall not be reproduced (except in full) without the prior written consent of Group Delta Consultants.
cc: Project Architect:
Structural Engineer:
Construction Manager:
Project Inspector: Bill Elkins, Versum September 25, 2019
Project Engineer: Report Date
Taylor Latimer, Project Engineer
Page 1 of 1 GDC Revision Number 3 (10/1/16)
Print Engineer Name / Title
GROUP DELTA CONSULTANTS, INC.
GR□UP DEL TA ENGINEERS AND GEOLOGISTS
9245 ACTIVITY ROAD, SUITE 103
SAN DIEGO, CALIFORNIA 92 126
WWW.GROUPDELTA.COM
Client Versum Materials
Attn: Bill Elkins Approval No.: ________ _
Address: 1969 Palomar Oaks Way Permit No.: ---------Carlsbad, CA 92011 C Ii en t Job No.: ----------
COMPRESSION TEST REPORT
Project Name: Versum Materials -Channel Stabilization Group Delta Project No.: SD618 Sample Date: October 10, 2019
Location in Structure: Headwalls, v-ditch on east side, Sta. 0+00
SAMPLING INFORMATION Material: 0 Concrete D Grout D Mortar D Other --------
Actual Spec Specified Strength 3250 psi @ 28 days
Sampled By: _____ J_a_s_o_n_S_. ____ ACI No: ____ 0_1_6_37_5_1_8 __ _
Slump, ASTM C143 (inches): 3.5 4 Concrete Supplier: Robertsons Mix No: RS400N31
Percent Air, ASTM C231 (%): --Truck No: 1306 Ticket No.: 4895976 Load No:
Unit Weight, ASTM C138 (pct): --Time Batched: 1 :00 PM Time Sampled: 2:07 PM Time Difference: 1:07 ----Air Temperature (°F): 68° F Water Added: 0 gal. Set No: 1 of 1 5 yds of 5 total yds - -Mix Temperature, ASTM C1064 (°F): 73° F < 90°F Sampled from: 0 Chute D Hose D Other
Specimens were fabricated in accordance with ASTM C31 Specimens were tested in accordance with ASTM C39
0 YES O NO O SEE "REMARKS" BELOW 0 YES ONO
TESTING INFORMATION Received By: J. Estes Tested By: J. Estes --------
Cylinder Identification: 7644-1 7644-2 7644-3 7644-4 7644-5
Date Sampled: 10/10/19 10/10/19 10/10/19 10/10/19 10/10/19
Date Received: 10/11/19 10/11/19 10/11/19 10/11/19 10/11/19
Date Tested: 10/17/19 11/7/19 11/7/19 11/7/19
Age in Days: 7 28 28 28 H
Diameter (in.): 4.00 4.00 4 .00 4.00
Cross Sect. Area (in.2): 12.57 12.57 12.57 12.57
Maximum Load (lbs.): 40,800 50,020 49,000 51 ,010
Compr. Strength (psi): 3,250 3,980 3,900 4,060
Fracture Type: 1 5 3 3
Notes: Unless otherwise indicated, tests were performed in general accordance with the following ASTM standards: C39, C138, C143, C173, C1064, C1231.
"«<>»" denotes test strength below the minimum required at the specified age.
The Material 0 WAS O WAS NOT O SEE "REMARKS" The Material Tested 0 MET O DID NOT MEET
SAMPLED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMITTED DOCUMENTS.
THE REQUIREMENTS OF THE PERMITTED DOCUMENTS.
REMARKS: These results apply only to the specific items tested. This report shall not be reproduced (except in full) without the prior written consent of Group Delta Consultants.
cc: Project Architect:
Structural Engineer:
Construction Manager:
Project Inspector:
Project Engineer:
Page of 1
Bill Elkins, Versum
GDC Revision Number 3 (10/1/16)
November 11, 2019
Report Date
Taylor Latimer, Project Engineer
Print Engineer Name I Title
GR□UP DEL TA
November 11, 2019
Capstone Con struction Company, LLC
1291 Pacific Oaks Place, #117
Escondido, California 92029
Attention:
SUBJ ECT:
Mr. Havins:
Mr. Darrell Havins
REPORT OF COMPACTION TEST RESULTS
Versum Materials -Swale Repair
Capstone Construction Company, LLC
We have prepared this compaction report summar121ng the results of the testing and
observation services provided by Group Delta Consultants during earthwork construction
operations of the Versum Materials Swale Repair project. Our geotechnical services for this
phase of the project were provided between July 11, 2019 and October 1, 2019.
1.0 PURPOSE AND SCOPE OF SERVICES
I
Our field persoh nel were provided for the subject project in order to test and observe remedial
earthwork, fill placement and the compaction operations, and subgrade preparation. These
observations and tests assisted us in developing professional opinions regarding whether or not
the geotechnical aspects of earthwork construction were conducted in general accordance with
our geotechnical recommendations and the project plans (Appendix A). Our se rvices did not
include supervision or direction of the actual work of the contractor, their employees, or
agents. Our services did include the following:
• As-needed consultation throughout the project.
• Performing field and laboratory tests on fill materials in order to support geotechnical
recommendations and conclusions. The laboratory test results are summarized in
Appendix B. The field density test results are shown in Appendix C.
• Preparation of daily field reports summarizing the day's activity with regard to
earthwork, and documenting the hours spent in the field by our technicians.
• Preparation of this report which summarizes site preparation, the field and laboratory
test results, fill placement, and the compaction operations.
9245 Activity Road, Suite 103, San Diego, CA 92126 TEL: (858) 536-1000
Anaheim -Irvine -Ontario -San Diego -Torrance
www.GroupDelta.com
Report of Compaction Test Results
Versum Materials - Swale Repair
Capstone Construction Company, LLC
2.0 SITE DESCRIPTION
Project No. SD618
November 11, 2019
Page 2
The site is a drainage located to the south of the Versum Materials building located at 1969
Palomar Oaks Way in Carlsbad, Califonia, as shown in Figure 1. The drainage is formed by
sloping ground, generalized by two slopes, ascending to the south and north. The southern
slope continues out of the property limits, while the northern slope ranges in height from
approximately five to ten feet up to the existing improvement grade. The slope inclination
varied slightly but averaged about a 2:1 {horizontal to vertical) inclination. Prior to construction,
the site was covered with low vegetation. The bottom of the drainage consisted of a concrete
lined swale. The geotechnical conditions at the site were described in detail in the referenced
geotechnical report (Appendix A).
3.0 GRADING AND IMPROVEMENT OPERATIONS
The geotechnical aspects of the grading and improvement operations included remedial
grading, fill placement, and subgrade preparation. The grading and improvement operations
are described in greater detail below.
3.1 Remedial Earthwork: Earthwork was conducted in general accordance with the
geotechnical recommendations presented in the referenced report. Deleterious
material and loose soils were removed across the entire site. The existing slopes were
cut using appropriate construction equipment to create adequate benching for
placement of fill soils. The excavated material was then placed and compacted within
the benches. The laboratory test results for the soils used for fill are shown in Appendix
B. The locations and results of the compaction tests are presented in Appendix C.
3.2 Fill Soils: The maximum densities and optimum moisture contents of the various fill
soils were determined in the laboratory using ASTM D1557 as a guideline. The on-site fill
soils generated from excavations generally consisted of clayey sand {SC) and lean clay
{CL). Due to the flexible nature of the finish surface improvements, the Expansion Index
of the fill material was not a concern. The various materials used for fill at the site are
described in Appendix B.
3.3 Fill Placement: In-place moisture and density tests were conducted during fill
placement in general accordance with ASTM D6938. The locations and results of the
compaction tests are presented in Appendix C. Note that the test elevations were based
on available field survey information provided by the grading contractor and should only
be considered rough estimates. The estimated locations and elevations should not be
used for preparing cross sections, or for the purpose of after-the-fact evaluating of the
sequence of fill placement.
~ GR□UP D EL TL\
Report of Compaction Test Results
Versum Materials -Swale Repair
Capstone Construction Company, LLC
4.0 GEOTECHNICAL EVALUATION AND CONCLUSIONS
Project No. 5D618
November 11, 2019
Page 3
Based on the observations and tests we have conducted to date, it is our professional opinion
that the geotechnical aspects of the improvement operations were conducted in general
accordance with the intent of our geotechnical recommendations and the project plans. Our
conclusions are based on obse rvations and tests performed between July 11, 2019 and October
1, 2019. No representations are made to the quality and extent of materials that we have not
observed.
4.1 Compaction: In the areas we tested and observed it is our professional opinion that
fill soils were placed in substantial accordance with the minimum compaction criterion
of 90 percent of the maximum dry density based on ASTM D1557. The results of our
compaction testing and the minimum relative compaction percentage requirements are
presented in Appendix C.
4.2 Finish Subgrade : The compacted fill was cut to planned finish subgrade elevations
and 2:1 slope inclinations. Cable concrete was placed and secured, per plan, using a
cement slurry.
5.0 LIMITATIONS
Our services were performed using the degree of care and skill ordinarily exercised, under
similar circumstances, by reputable soils engineers and geologists practicing in this or similar
localities. No warranty, express or implied, is made as to the conclusions and professional
advice included in this report.
We appreciate this opportunity to be of professional service. Feel free to contact the office with
any questions or comments, or if you need anything else.
GROUP DELTA CONSULTANTS
j/~
Taylor Latimer, P.E. 82035
Project Engineer
Distribution: Mr. Darrell Havins (Darrell@Capstoneco.net)
Mr. Bill Elkins (William.Elkins@versummaterials.com)
GRCUPDELTA
Approximate limits
of swale repair.
REFERENCE: Google Earth (2016), Satelite imagery dated 11/8/16.
N
A
NO SCALE
A GROUP DELTA
GROUP DELTA CONSULTANTS, INC,
ENGINEERS ANO GEOLOGISTS
9245 ACTIVITY ROAD, SUITE 103
SAN DIEGO, CA 92126 {8581 SJG-1000
CAPSTONECONSTRUCTIONCOMPAN't',llC f-~~-~1
REPORT OF COMPACTION TEST RESULTS
HILLCRffiMEDICALCENTER·PHASEI
SITE LOCATION MAP
APPENDIX A
REFERENCES
American Society for Testing and Materials (2006). Annual Book of ASTM Standards, Section 4,
Construction, Volume 04.08 Soil and Rock (!}; Volume 04.09 Soil and Rock (II};
Geosynthetics, ASTM, West Conshohocken, PA.
Group Delta Consultants (2017A). Report of Geotechnical Investigation, Versum Materials -
Swale Repair, 1969 Palomar Oaks Way, Carlsbad, California 92011, Project No. SD535,
Document No. 17-0087, dated July 26 .
Group Delta Consultants (2017B). Technical Memorandum, Versum Materials, Swale Repair,
Subgrade of Concrete Brow Ditch, Project No. SD535, dated August 21.
O'Day Consultants (2018). Versum Materials, Channel Stabilization, Grading Plans, Sheets 1
through 7, signed December 7.
GROUP DEL T .l\
APPENDIX B
LABORATORY TESTING
Selected samples were tested using generally accepted standards. Laboratory testing was
conducted in a manner consistent with the level of care and skill ordinarily exercised by
members of the profession currently practicing under similar conditions in the same locality.
No warranty, express or implied, is made as to the correctness or serviceability of the test
results or the conclusions derived from these tests. Where a specific laboratory test method
has been referenced, such as ASTM, Caltrans, or AASHTO, the reference applies only to the
specified test method and not to associated test methods or practices, and the test method has
only been used as a guidance document for the performing the test, and not as a "Test
Standard." A brief description of the tests performed follows:
Classification: Soils were classified visually according to the Unified Soil Classification System as
established by the American Society of Civil Engineers in general accordance with the
procedures outlined in ASTM test method D2488.
Maximum Density/Optimum Moisture: The maximum density and optimum moisture of
selected fill soil samples were determined by using test method ASTM test method D1557. The
test results are summarized in Figure B-1.
Expansion Index: The expansion potentials of selected samples were estimated in general
accordance with the laboratory procedures outlined in ASTM test method D4829. The test
results are summarized in Figure B-2.
GR□UP DEL TL\.
MAXIMUM DENSITY & OPTIMUM MOI STUR E
(ASTM D1557)
Sample
Number Soil Description
1 Dark Grey-Brown Lean Clay (CL)
2 Brown Clayey Sand (SC)
3 Light Yellow-Gray Clayey Sand (SC)
~ GR□UP DELTA LABORATORY TEST RESULTS
Maximum Optimum
Density
[lb/ft3]
117.5
118.1
112.5
Moisture
[%]
10.4
10.7
14.0
Project No.: SD618
Document No.: 19-0196
Figure B-1
Sample
Number
El-1
El-2
EXPANSION INDEX
(ASTM D4829)
Type of Fill
Slope Re-Grading (Max #1)
Slope Re-Grading (Max #2)
Expansion Index
0 to 20
21 to 50
51 to 90
91 to 130
Above 130
Soil Description
Dark Grey-Brown Lean Clay (CL)
Brown Clayey Sand (SC)
Potential Expansion
Very Low
Low
Medium
High
Very High
A GR□UP CELT .L\ LABORATORY TEST RESULTS
Expansion
Index
52
35
Project No.: SD618
Document No.: 19-0196
Figure B-2
APPENDIX C
FIELD TEST RESULTS
The locations and results of the field density tests taken during the subject project are
presented in the following Plate C-1 and Figure C-1, respectively. Note that the elevations and
locations of the field tests were determined by hand level and pacing relative to survey data
provided by the grading contractor.
The following abbreviations were used to describe tests reported in this appendix.
NU= Nuclear Density Test
43 = Fill Density Test Sequence Number
GROUP DEL T .l\
43
,.,------------------------------------------,,oo J+OO 6+00
Approximate location of grading
field density test.
5+00
PARCEL A
PM 1235iJ
!
i
! [
2+00
PARCEL B
PM 12354
ex""""
N
A
0' 20' 40'
Approximate Scale
(24"x36")
/+00 0+(}()
PARCEL C
PM 12354
GiR□UP DEL TL\
CROUP DELTA CONSULTANTS, INC. ENGINEERS AND GEOLOGISTS 024.5ACTIVITY ROAD, SUITE 103 SAN OIEOO CAn:>1~6 858 £!16-1000 """""""' CA.PSTONE COt>JSTRUCTION COMPANY, LLC REPORT OF COMPACTION TEST RESULTS VER SUM MATERIALS SWALE REPAIR
SD618
19-0169
C-1
COMPACTION TEST LOCATION MAP
1,\. Project No. 5D618
GR□UP DEL TA DENSITY TEST RESULTS Document No. 19-0169 .---Figure C-1
Test Test Description/ Elevation Max Moisture Dry Max. Dry Relative Required Retest Test
No. Date Location [AMSL) No. Content Density Density Compaction Compaction Number Method
[ft] [%) [pcf) [pct] [%) [%)
1 07/18/19 Sta. 4+65 155 1 15.7 105.5 117.S 90 90 NU
2 07/18/19 Sta. 3+30 157 1 20.3 105.8 117.S 90 90 NU
3 07/18/19 Sta. 3+00 158 l 19.7 103.8 117.5 88 90 5 NU
4 07/22/19 Sta. 4+80 155 2 14.2 108.1 118.1 92 90 NU
5 07/22/19 Sta. 3+50 155 2 17.8 107.4 118.1 91 90 NU
6 07/22/19 Sta. 4+07 156.S 2 6.9 102.1 118.1 86 90 7 NU
7 07/23/19 Sta. 4+07 156.S 2 14.3 109.6 118.1 93 90 NU
8 07/23/19 Sta. 4+65 157 2 14.2 108.4 118.1 92 90 NU
9 07/23/19 Sta.5+00 157 2 14.3 106.6 118.1 90 90 NU
10 07/24/19 Sta.5+10 154.S 3 21.0 100.1 112.S 89 90 12 NU
11 07/24/19 Sta5+40 154.S 3 9.0 98.8 112.S 88 90 13 NU
12 07/2S/19 Sta.5+10 154.S 3 15.S 110.4 112.S 98 90 NU
13 07/25/19 Sta5+40 154.S 3 16.S 109.8 112.S 98 90 NU
14 07/25/19 Sta4+45 156 3 16.2 110.1 112.S 98 90 NU
15 07/25/19 StaS+OS 157 2 13.1 110.3 118.1 93 90 NU
16 07/25/19 Sta4+70 158 2 12.7 109.9 118.1 93 90 NU
17 07/26/19 Sta5+20 156.S 3 14.0 107.3 112.S 95 90 NU
18 07/26/19 Sta5+30 158.S 3 14.S 105.9 112.S 94 90 NU
19 07/26/19 Sta2+43 155 3 16.2 107.9 112.S 96 90 NU
20 07/29/19 Sta2+3S 155.S 3 17.1 105.8 112.S 94 90 NU
21 07/31/19 Stal +90 155 3 16.4 105.7 112.5 94 90 NU
22 08/01/19 Sta2+90 156 3 16.8 106.8 112.S 95 90 NU
23 08/01/19 Sta2+15 155.S 3 17.4 105.6 112.S 94 90 NU
24 08/05/19 Sta2+50 156 3 15.7 107.7 112.S 96 90 NU
25 08/08/19 Sta2+80 157 3 13.2 102.9 112.S 91 90 NU
26 08/08/19 Sta2+20 157 3 15.4 103.2 112.S 92 90 NU
27 08/08/19 Stal+45 156 3 13.9 106.0 112.S 94 90 NU
28 08/14/19 Sta5+55 south side 157 3 10.1 109.8 112.S 98 90 NU
29 08/14/19 Sta2+65 south side 158 3 18.7 105.S 112.5 94 90 NU
30 08/14/19 Sta2+05 south side 158 3 13.1 100.9 112.S 90 90 NU
31 08/14/19 Sta1+60 south side 157 3 14.1 98.4 112.S 87 90 33 NU
32 08/14/19 Sta1+16 south side 157 2 11.4 110.4 118.1 93 90 NU
33 08/16/19 Stal +60 south side 157 3 17.3 104.4 112.5 93 90 NU
34 08/16/19 Sta2+93 south side 160 3 16.9 104.8 112.5 93 90 NU
35 08/20/19 Sta2+15 south side 160.3 3 17.0 109.3 112.5 97 90 NU
36 08/20/19 Sta2+44 south side 160.9 3 14.0 100.9 112.S 90 90 NU
37 08/20/19 Sta3+00 south side 159.7 3 12.S 106.7 112.S 95 90 NU
38 08/29/19 Sta2+50, 10' from wall 156.8 2 12.0 113.3 118.1 96 90 NU
39 08/29/19 Sta2+20, 8' from wall 157.S 2 14.4 106.6 118.1 90 90 NU
40 08/29/19 Stal+80, 10' from wall 156.9 2 12.0 107.2 118.1 91 90 NU
41 09/11/19 Sta1+55 159 2 12.6 108.3 118.1 92 90 NU
42 09/11/19 Sta 1+40 157 2 12.5 107.7 118.1 91 90 NU
43 10/01/19 Sta 0+75 158 2 14.7 107.9 118.1 91 90 NU