HomeMy WebLinkAbout2856 WHIPTAIL LOOP; ; CB163285; Recycle(city of
Carlsbad
WASTE MANAGEMENT
PLAN
B-59
DeveloDment Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Owner: 1-rv-iJ4/ cc),vqi2/'10 Contractor: jdy1,&4/ 0_A1tQVf74J
Job Address:_
2f$1v A1rnAPji la)e Phone Number:_Q9 73;7 cs"
Permit C. / Estimated Cost of Project: $_7,975,809.00
Type of Project: ,Z'New Construction 0 Remodel or 1.1. 0 Residential 0 Commercial 0 Demolition
(check all that apply) 0 Other W.
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per cALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
0 Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
,EII plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table I - Estimated Waste (To be filled out prior to permit issuance - refer to example on Page 2.)
MATERIALS lbs. of waste to betaken to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt/ Concrete
Brick! Masonry
Cardboard
Drywall
Landscape Debris
Lumler / Wood
Metals
Mixed Waste
Trash / Garbage
Other.
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled
to the best of my knowledge, is true and correct.
or 3-ft/If
Date
Official Use Only
El Plan Approved 0 Plan Denied 0 Project Valuation Approved
Reviewed / Approved by:
Page 1 of 2 REV.01-2017
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to
LANDFILL
lbs. of waste
RE-USED or RECYCLED
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
Asphalt/ Concrete 351,000 A-i Concrete
Brick! Masonry
Cardboard 8,300 Waste Management
Drywall
Landscape Debris 42,500 Waste Management
Lumber! Wood 4,280 39,680 Waste Management
Metals 3,940 50,320 Waste Management
Mixed Waste 134,300 . Waste Management
Trash / Garbage 73,060 Waste Management
Other: 15,120 Waste Management
TOTAL lbs.: 230,700 / 115.35 tons 491,800 / 245.91 tons
Actual Percentage Re-Used or Recycled 68 %
Official Use Only
65% Goal Achieved 065% Goal Not Achieved 0 Alternative Compliance Achieved Penalty Paid $__________________
Reviewed / Approved by:_____________________________________
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt/Concrete 0 3000 AC I-MuUmn Co.
Brick/Masonry 50 WM / Re-v.cea SyLolz ov-sI.te
Cardboard 0 150 ABC. FfagUmol Co.
Drywall 0 50 ABC 1-tcluUmol Co.
Landscape Debris o 120 '1ul&ied . Re-I.Lsea o-sfte
Lumber! Wood 500 0 Wcste Ma1geii,tevt
Metals 300 200 WM / ABC f-tautlI.g
Mixed Waste 1500 0 WM
Trash! Garbage 300 0 WM
Other: Pool. 4itvLte 0 900 w..ced as Crushed Bce ow-sfte
TOTAL lbs.: 27-00 5,37-0
Percentage to be Re-Used or Recycled 67 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
5370 X 100 = 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
Construction Waste Management Reprts Carlsbad Oaks North Lot it
2856 Whiptail Loop W. Carlsbad
Total Recycled: 1245.91
Total Percent Recycled/Diverted: 680/6
Total (tons) Diverted from WM: 70.41
Total (tons) Diverted from AC: 175.5
Total sent to Landfill by WM: 115.35
Total sent to Landfill by AC: 0
11
Construction Waste Management Reports: Carlsbad Oaks North Lot 17
2856 Whiptail Loop
Date: Tons of C&D Waste: Type: Landfill: % Diverted: Total Diverted (tons): Hauler/Recycler:
5/22/2017 16.63 Residual 16.63 0% 0.00 Waste Management
7/31/2017 . 1.92 Co-Mingled 0.23 88% 1.69 Waste Management
7/7/2017 2.56 Residual 2.56 0% 0.00 Waste Management
8/11/2017 2.61 Co-Mingled 0.31 88% 2.30 Waste Management
10/18/2017 2.61 Co-Mingled 0.26 90% 2.35 Waste Management
11/16/2017 2.37 Co-Mingled 0.24 90% 2.13 Waste Management
12/1/2017 1.52 Co-Mingled 0.15 90% 1.37 Waste Management
12/5/2017 2.11 Co-Mingled . 0.21 90% 1.90 Waste Management
12/11/2017 3.2 Co-Mingled. 0.32 90% 2.88 Waste Management
12/22/2017 2.76 . Co-Mingled 0.28 90% 2.48 Waste Management
12/12/2017 4.62 Residual 4.62 0% 0.00 Waste Management
12/14/2017 5.47 Residual 5.47 0% fl10.00 Waste Management
12/22/2017 10.35 Residual 10.35 0% 0.00 Waste Management
1/3/2018 5.13 Residual 5.13 0% 0.00 Waste Management
2/9/2018 3.66 Co-Mingled 0.37 90% 3.29 Waste Management
2/13/2018 4.09 Co-Mingled 0.41 90% 3.68 Waste Management
2/26/2018 3.6 Co-Mingled 0.36 90% 3.24 Waste Management
2/5/2018 4 Residual 4.00 0% 0.00 Waste Management
3/21/2018 2.81 Co-Mingled 0.28 90% 2.53 Waste Management
3/1/2018 6.28 Green Waste 0.00 100% 6.28 Waste Management
3/1/2018 5.44 Green Waste 0.00 100% 5.44 Waste Management
3/1/2018 3.01 Green Waste 0.00 100% 3.01 Waste Management
3/5/2018 3.95 Residual 3.95 0% 0.00 Waste Management
3/9/2018 1.64 Green Waste 0.00 . 100% . 1.64 Waste Management
3/28/2018 4.88 Green Waste 0.00 . . 100% 4.88 Waste Management
4/3/2018 7.94 Co-Mingled 1.83 77% 6.11 Waste Management
4/19/2018 2.51 Co-Mingled 0.58 77% 1:93 Waste Management
4/3/2018 3.5 Residual 3.50 0% 0.00 Waste Management
4/23/2018 8.3 Residual 8.30 0% 0.00 Waste Management
5/7/2018 3.67 Co-Mingled 0.84 77% 2.83 Waste Management
5/23/2018 3.95 Co-Mingled 0.91 . 77% 3.04 Waste Management
5/11/2018 6.08 : Residual 6.08 0% 0.00 Waste Management
5/31/2018 8.31 Residual 8.31 0% . 0.00 Waste Management
6/25/2018 3.35 Co-Mingled 0.77 77% 2.58 . Waste Management
6/25/2018 8.34 Residual 8.34 0% 0.00 Waste Management
7/19/2018 3.4 Co-Mingled 0.58 83% 2.82 Waste Management
7/26/2018 4.99 Residual 4.99 0% 0.00 Waste Management
7/26/2018 8.81 Residual 8.81 0% 0.00 Waste Management
8/22/2018 5.39 Residual 5.39 0% 0.00. Waste Management
0.00
Total Tons Waste: 185.76
Total Recycled: 70.41
Total to Landfill 115.35
Total Percent Recycled/Diverted: 38%
,
%-, N r-Jul
Construction Waste Management 09/11/2018 16:13:42
Monthly Project Recycling Report
WASTE MANAGEMENT
Project: 2856 WHIPTALE LOOP E (HAMANN CONSTRUCTION) Target Diversion: 50.0%
Est. End Date: 6/30/2019 Actual Diversion: 37.9%
Address: f26 WHIP TALE LOOPJ
CARLSBAD, CA 92010
Project MSNCMA: San Diego-Carlsbad-San Marcos, CA
WM Account Manager: Karrie Crawford
Project Size:
Floor Count:
Building Type:
LEEDS Certification Type: Not Applicable
Material Totals:
Material Target % Actual % Total Qty Diverted Qty Residual Qty
Green Waste NaN% ?i00.0% 21.25 21.25 0
Residual NaN% 0.0% 106.43 0 106.43
Co-Mingled NaN% 84.6% 58.08 49.15 8.93
Total 37.9% 185.76 10.40 115.36
Ticket Details:
Ticket bate From: (All)
Ticket bate To: (All)
Diverted Residual
Ticket Month Ticket Date Ticket Destination Facility Hauler Material UOM Total Qty Qty Act % Qty
MAY 2017 5/22/2017 855811 Palomar Landfill Residual Tons 16.63 0 0.0% 16.63
MAY 2017 Total: 16.63 0 0.0% 16.63
JULY 2017
JULY 2017
7/31/2017
7/7/2017
877466
870273
EDCO (SAN MARCOS)
Palomar Landfill
Co-Mingled
Residual
Tons
Tons
1.92
2.56
1.69
0
88.0%
0.0%
0.23
2.56
JULY2017 Total: 4.48 1.69 37.7% 2.79
AUGUST 2017 8/11/2017 881676 EDCO (SAN MARCOS) Co-Mingled Tons 2.61 2.3 88.1% 0.31
AUGUST 2017 Total: . 2.61 2.3 88.1% 0.31
OCTOBER 2017 10/18/2017 903470 EDCO (SAN MARCOS) Co-Mingled Tons 2.61 2.35 90.0% 0.26
OCTOBER 2017 Total: 2.61 2.35 90.0% 0.26
NOVCMBER 201711/16/2017 913517 EDCO (SAN MARCOS) Co Mingiod Tons 2.37 2.13 89.9% 0.24
NOVEMBER 2017Total: 2.37 2.13 89.9% 0.24
DECEMBER 201712/1/2017 917913 EDCO (SAN MARCOS) Co-Mingled Tons 1.52 1.37 90.1% 0.15
Page 1
Please consider the environment before printing
WVARB
WASTE MANAGEM E NT
Construction Waste Management
Monthly Project Recycling Report
09/11/2018 16:13:42
Project: 2856 WHIPTALE LOOP E (HAMANN CONSTRUCTION) Target Diversion: 50.0%
Est. End Date: 6/30/2019 Actual Diversion: 37.9%
Diverted Residual
Ticket Month Ticket Date Ticket Destination Facility Hauler Material UOM Total Qty Qty Act % Qty
DECEMBER 201712/5/2017 918554 EDCO (SAN MARCOS) Co-Mingled Tons 2.11 1.9 90.0% 0.21
DECEMBER 201712/11/2017 920322 EDCO (SAN MARCOS) Co-Mingled Tons 3.2 2.88 00.0% 0.32
DECEMBER 201712/22/2017 925175 EDCO (SAN MARCOS) Cu-Mingled Tons 2.70 2.40 09.9% 0.20
DECEMBER 201712/12/2017 920706 Palomar Landfill Residual Tons 4.62 0 0.0% 4.62
DECEMBER 201712/14/2017 923029 Palomar Landfill Residual Tons 5.47 0 0.0% 5.47
DECEMBER 201712/22/2017 925176 Palomar Landfill Residual Tons 10.35 0 0.0% 10.35
DECEMBER 2017Total: 30.03 8.63 28.7% 21.40
JANUARY 2018 1/3/2018 926879 Palomar Landfill Residual Tons 5.13 0 0.0% 5.13
JANUARY 2018 Total: 5.13 0 0.0% 5.13
FEBRUARY 2018 2/9/2018 939497 EDCO (SAN MARCOS) Co-Mingled Tons 3.66 3.29 89.9% 0.37
FEBRUARY 2018 2/13/2018 940227 EDCO (SAN MARCOS) Co-Mingled Tons 4.09 3.68 90.0% 0.41
FEBRUARY 2018 2/26/2018 044456 EDCO (SAN MARCOS) Co-Mingled Tons 3.6 3.24 00.0% 0.36
FEBRUARY 2018 2/5/2018 937533 Palomar Landfill Residual Tons 4 0 0.0% 4
FEBRUARY 2018 Total: 15.35 10.21 66.5% 5.14
MARCH 2018 3/21/2018 951422 EDCO (SAN MARCOS) Co-Mingled Tons 2.81 2.53 90.0% 0.28
MARCH 2018 3/1/2018 945140 Palomar Landfill Green Waste Tons 6.28 6.28 100.0% 0
MARCH 2018 3/1/2018 945141 Palomar Landfill Green Waste Tons 5.44 5.44 100.0% 0
MARCH 2018 3/1/2018 945142 Palomar Landfill Green Waste Tons 301 3.01 100.0% 0
MARCH 2018 3/5/2018 946395 Palomar Landfill Residual Tons 3.95 0 0.0% 3.95
MARCH 2018 3/9/2018 947686 Palomar Landfill Green Waste Tons 1.64 1.64 100.0% 0
MARCH 2018 3/28/2018 953699 Palomar Landfill Green Waste Tons 4.88 4.88 100.0% 0
MARCH 2018 Total: 28.01 23.78 84.9% 4.23
APRIL 2018 4/3/2018 955701 EDCO (SAN MARCOS) Co-Mingled Tons 7.94 6.11 77.0% 1.83
APRIL 2018 4/19/2018 961558 EDCO (SAN MARCOS) Co-Mingled Tons 2.51 1.93 76.9% 0.58
APRIL 2018 4/3/2018 955583 Palomar Landfill Residual Tons 3.5 0 0.0% 3.5
APRIL 2018 4/23/2018 961820 Palomar Landfill Residual Tons 8.3 0 0.0% 8.3
APRIL 2018 Total: 22.25 8.04 36.1% 14.21
MAY 2018 5/7/2018 966551 EDCO (SAN MARCOS) Co-Mingled Tons 3.67 2.83 77.1% 0.84
MAY 2018 5/23/2018 972802 EDCO (SAN MARCOS) Co-Mingled Tons 3.95 3.04 77.0% 0.91
MAY 2018 5/11/2018 968524 Palomar Landfill Residual Tons 6.08 0 0.0% 6.08
MAY 2018 5/31/2018 975053 Palomar Landfill Residual Tons 8.31 0 0.0% 8.31
MAY 2018 Total: 22.01 5.87 26.7% 16.14
JUNE 2018 6/25/2018 982891 EDCO (SAN MARCOS) Co-Mingled Tons 3.35 2.58 77.0% 0.77
JUNE 2018 6/25/2018 982892 Palomar Landfill Residual Tons 8.34 0 0.0% 8.34
JUNE 2018 Total: 11.69 2.58 22.1% 9.11
JULY 2018 7/19/2018 990442 EDCO (SAN MARCOS) Co-Mingled Tons 3.4 2.82 82.9% 0.58
JULY 2018 7/26/2018 994200 Palomar Landfill Residual Tons 4.99 0 0.0% 4.99
JULY2018 7/26/2018 994199 Palomar Landfill Residual Tons 8.81 0 0.0% 8.81
Page 2
Please consider the environment before printing
WVA#ie
WASTE MANAGEMENT
ConStruction Waste Management
Monthly Project Recycling Report
09/11/2018 16:13:42
Project: 2856 WHIPTALE LOOP E (HAMANN CONSTRUCTION) Target Diversion: 50.0%
Est. End Date: 6/30/2019 Actual Diversion: 37.9%
Diverted Residual
Ticket Month Ticket Date Ticket Destination Facility Hauler Material UOM Total Qty Qty Act % Qty
JULY 2018 Total: 17.20 2.82 16.4% 14.38
AUGUST 2018 8/22/2018 3159 Palomar Landfill Residual Tons 5.39 0 0.0% 5.39
AUGUST 2018 Total: 5.39 0 0.0% 5.39
Total: 185.76 70.40 37.9% 115.36
Page 3
Please consider the environment before printing
Construction A-I Concrete Reports: Carlsbad Oaks North Lot 17
2856 Whiptail Loop
Date: Tons of C&D Waste: Type: % Diverted: Tota' Diverted (tons): Haulér/Recycler: Invoice #:
6/27/2017 9 Concrete 100% 9.00 A-I Concrete 17-221
8/29/2017 18 Concrete 100% 18.00 A-I Concrete 17-323
9/1/2017 4.5 Concrete 100% 4.50 A-I Concrete 17-175B
9/6/2017 18 Concrete 100% 18.00 A-I Concrete 17-334
9/9/2017 22.5 Concrete 100% 22.50 A-I Concrete 17-345
9/27/2017 4.5 Concrete 100% . 4.50 A-I Concrete 17-374
11/1/2017 9 Concrete 100% 9.00 A-I Concrete 17-456
11/20/2017 13.5 Concrete 100% 13.50 A-1 Concrete 17-492
1/5/2018 4.5. Concrete 100% 450 A-I Concrete 18-012
1/30/2018 4.5 Concrete 100% 4.50 A-I Concrete 18-051
2/22/2018 4.5 Concrete 100% 4.50 A-I Concrete 18-091
3/15/2018 4.5 Concrete 100% . 4.50 A-I Concrete 18-122
4/10/2018 9 Concrete 100%. 9.00 . A-I Concrete 18-168
4/27/2018 4.5 Concrete 100% 4.50 . A-I Concrete 18-202•
5/15/2018 . 9 Concrete 100% 9.00 . A-I Concrete 18-251
5/29/2018 13.5 Concrete 100% 13.50 A-I Concrete 18-283
6/6/2018 9 Concrete 100% 9.00 A-I Concrete S 18-298
6/13/2018 .4.5 Concrete 100% 4.50 A-I Concrete 18-313
6/19/2018 9 Concrete 100% 9.00 A-I Concrete 18-327
0.00
0.00 .
0.00 . .
Total Tons Waste: 175.5
Total Recycled: 175.5
Total Percent Recycled/Diverted: 100%
Total not Recycled 0
/'—Ng?
DATE INVOICE C
A-I CONCRETE PUMPING, INC.
BOOM, BIG ROCK & PEA GRAVEL PUMPS
P. 0.. Box 1885 • Poway, CA 92074
OFFICE (619) 441-9852 • FAX (858) 292-7867
LIC # waannot
BILL TO: 0'/X L/?J'L-
JOB ADDRESS: 28(_J/,')rn'L Lzwo&'
Hose: J Yardage: Arrived toYard:
On Job: Mix Go: Map:
Driver Signature: Start Pour:
Job Description: Finish Pow:
Leave Job:
Trailer Pump Rental:
Indudes1ss'of ho.e Arrived to Yard:
Operator Hours,
Oiler Hours: (_A.._?L _-
Yardage:
$IOper C
Z t
- Hose: $2 per foot e1t5r 150'
CiMoves
Ci Fuel Surcharge
TOTAL: ' 9O
TERMS: Net cash. Positively no discount All accounts due and payable on 10th of monih following date ci service. Past
duo accounts subject to 1-112% monthly penalty and all costs of collection, Including attorneyfees.
NOTE: Exceptions and Claims shall bodoomod waived unlossmade bra in writing within 2 days after receipt of cervices.
Cosnaanv assumes no reaoanaftflhlv_at.' dames. Instda cuth of aroeevtlr lies, We are not responsible for delays
caucod by Improper scheduling in trucks. changes in graduation of aggregate or incorrect batching of concrete. You are
further notified that If bills for labor, services, equipment or materials furnished or which will be furnished are not paid, the
propertywhlchis being improved and the improvement thereon may be subject to mechanic liens. Customer must furnish
water on the site and e place to clean out In the event of equipment failure, we assume no responsibility for concrete,
standby time, labor or any other change." .To assumcall risks andilablilliosfor and to indornnifyLoccorand L0000r'cagonts
against an claims, actions, suits, penalties, and expensesand iiabiillles,lncludingattomey'sfees, whether or not covered
by insurance. for (l)loos or damage to the equipment; (ii) injurlesor deatiw of any persons: and (iii)demagc to any property,
.however arising or Incurod from or incident to the use, operation or possession of the Equipment, unless such claims,
actions, suits, penalties, expensesor liabilities are caused solely by the Intentional conductof the Lessor or its agents.
- __ie
DATE IN VOICE C
A-I CONCRETE PUMPING, UN(
a.. BOOM, BIG ROCK a PEA GRAVEL PUMI
P. 0. Box 1885 • Poway, CA 92074
OFFICE (619) 441-9852 • FAX (858) 292-78t 1240 LIC # 839006
BILL TO: Ja-zn d'ne'a
JLO. [-AtLtIJ P.O. NO. CHECK 0
40
WA DDlSS:2jc5 LL)teJa PI-I.PJ _*9
1iose: Yardage: Arrived toYard: I_ap: Mix Co..Go Map: On Job.
Driver Signature Start Pour
I Job Description: Finish Pour.
15O'f hose tAnlvedto
CoNtRK1E :rUMPINO, ENCJ s.. ,.. e..
Oiler Hours:
Yardage:
Slo per yard LG Hose:
$2 per foot after 150'
O Moves
O Fuel Surcharge
TOTAL:_[ 1060
TERMS: Net cash. Positively no discount. All accounts due and payable on 10th of ,rionth following dale or servicr
due accounts subject to 1.1/2% monthlypenatty and all costs of collection, including attorney fees.
NOTE: Exceptions and Claims shall be doomed waived uniessmade to uslnwrlting within 2 days after receipt else Company .saum.a_no r.Wnneih7llñr_for damage_lnAhat eirb M nrnn.vtv_lies. We am not responsible br
caused by Improper scheduling in trucks, changes in graduation of aggregate or incorrect batching of concrete. 'V
further notified that if Itillo for labor, soMcoo, oquipmontor materials furnished or which will be furnished are not PS
property which is being improved and the lmprovementthereon may be subjectto mechanic liens. Customer must'
water on the site and a place to clean out. In the event of equipment failure, we assume no responsibility for eel
standby time, lobster anyotherchangea.To assume all risksandliaOiilties for and to Indemnify Lessor and Lessor's
against all claims, actions, suits, penalties, and expenses and liabilities, including attorneys foes, whether or not ii
byinsurance.for (i)loss ordamage to the equipment; (ii)injuriesor deaths c5 any persons, and (iii)damage b any Fir
however arising or incured from or incident to the use. operation or possession of (lie tquiprncnt, u:tiess sw:h
actions, suits. penalties, expenses or liabilities are caused solely by the intentional conuuct of the Lessor Ot ItS
A-I CONCRETE PUMPING, INC.
P0 BOX 1885
P0WAY, CA 92074
(619),441-9852
office@a1concretepumpinginc.com
INVOICE INVOICE #j2ii)
DATE /20j
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE 111111 11111
2856 Whiptail Loop W 563280 I
DATE ACTIVITY QTY RATE AMOUNT
06/27/2017 300 Washbox Rental 2 450.00 900.00
WASHBOX SERVICE 7 DAY-RENTAL
INCLUDES DELI VERY,PICKUP, DISPOSAL
& FUEL SURCHARGE L--
06/27/2017 PICKED UP2 LARGTONST
Thank you, we appreciate your business! BALANCE DUE $900.00
)3o0
1 -30
We also offer Washout Box Rentals
A-i CONCRETE PUMPING, INC.
P0 BOX 1865
POWAY, CA 92074
(619)441-9852
office@aloflcretepumpinginc.com
INVOICE INVOICE #-323
DATE QW2912017J
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE P0 # iIIII1llIIlIIll
2856 Whiptail Loop W. Lot 17 564500
DATE ACTIVITY OTY RATE AMOUNT
08129/2017 300 WashbOx Rental 4 450.00 1,800.00
WASHBOX SERVICE 7 DAY RENTAL_
INCLUDES DELIVERY[PICKUPDISPOSAL
& FUEL SURCHARGE
Thank you, you, we appreciate your business! BALANCE DUE $1v800-00
We also offer Washout Box Rentals
9/6/2017 Intuit QuickBooks
A-i CONCRETE PUMPING, INC.
P0 BOX 1885 NIL
POWAY, CA 92074 war (619)441-9852
office@a1concretepumpinginc.com
INVOICE INVOlCE#
DAT9Ic/017J
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE
2856 Whiptait Loop W 564501
DATE ACTIVITY OTY RATE AMOUNT
09/01/2017 300 Washbox Rental 1 450.00 450.00
WASHBOX SERVICE 7 DAY-RENTAL,.-
INCLUDES DELIVERYPICKUP, DISPOSAL
& FUELSURCHARGE
Thank you, we appreciate your business! BALANCE DUE $45000
73O
We also offer Washout Box Rentals
Ill
9/7/2017 Intuit QuickBooks
A-i CONCRETE PUMPING, INC.
P0 BOX 1885
POWAY, CA 92074
(619) 441-9852
office@a1concretepumpinginc.com
INVOICE
BILL TO
Hamann ConStrUction
1000 Pioneer Way
El Cajon, CA 92020
INVOICE*_7-334)
DATE99o1zJ
TERMS DuS On receipt
Please detach top portion and return with your payment.
JOB SITE P0 #
2856 Whiptail Loop W Lot 17
DATE ACTIVITY OTY
09/06/2017 300 Washbox Rental 4
WASHBOX SERVICE 7.DAV RENTAL. -
INCLUDES DELI VERV PICKUP, DISP
& FUEL SURCHARGE
Thank you, we appreciate your business! BALANCE DUE
.IIlIIIIIIIIIIJIIII
564503
RATE AMOUNT
450.00 1,800.00
$1 ,800.00
We also offer Washout Box Rentals
A-I CONCRETE PUMPING, INC.
P0 BOX 1885
.POWAY, CA 92074
(619) 441-9852
otfice@alconcretepumpinginc.com
INVOICE
BILL TO
Hamahn Construction
1000 Pioneer Way
El Cajon, CA. 92020.
NIL
INVOICE
DATE(/09/20i7
TERMS Due on receipt
Please detach top portion and return with your payment.
JOB SITE . . PO# 1111111111111111111 2856 Whiptail Loop W
.. 3L9O Lot 17 565140
DATE ACTIVITY . OTY RATE AMOUNT
09/09/2017 300 Washbox Rental 5 450.00 2,250.00 WASHBOX SERVICE 7 DAY. RENTAL -
INCLUDES DELI VERY,PIIUP,OISP & FUEL SURCHARGE -
. 4 I 3L( a
............................................ ..................................................
......................................................
Thank you, we appreciate your business! . BALANCE DUE $2,250.00
We also offer Washout Box Rentals
A-i CONCRETE PUMPING, INC.
P0 BOX 1885
POWAY, CA 92074
(619)441-9852
otfice@a1concretepumpinginc.com
INVOICE
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
NIL
ttIktU{4UUlkIIUkUDDII
INVOICE
DATE.. 09/27/2017-J
TERMS Due On receipt
Please detach top portion and return with yourpayment.
JOB SITE PO#
2856 Whiptail Loop Lot 17
. 55142 '
DATE . ACTIVITY OTY RATE AMOUNT
09/27/2017 300 Washbox Rental 450.00 . 450.00. WASHBOX SERVICE 7 DAY RENTAL -
INCLUDES DELI VERY!PICKUPDISF'5AD & FUEL SURCHARGE
Thank you, we appreciate your business) . BALANCE DUE $450.00
We also offer Washout Box Rentals
A-i CONCRETE PUMPING, INC.
P0 BOX 1885
POWAY, CA '92074
(619) 441-9852
office@a1concretepumpinginc.com
INVOICE
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE PO#
2856 Whiptail Loop W Lot 17
DATE ACTIVITY OTY RATE AMOUNT
11/01/2017 300 Washbox Rental C2D 450.00 900.00
WASHBOX SERVICE 7 DAYRENTAL-
INCLUDES DELI VERVIPICKUP, DISPQit3 & FUEL SURCHARGE
Thank you, we appreciate your businessi BALANCE DUE ' $90000
)2o0
We also offer Washout Box Rentals
A-I CONCRETE PUMPING, INC.
P0 BOX 1885
POWAY, CA 92074
(619)441-9852
oftice@a1concretepumpinginc.com
INVOICE
567023
ium lull IN111 111111
tRlwlSlk..iluP.xl)1kI.
INVOICE # 17-492
DATE 11/20/2017'
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
11129/2017 Intuit Quick800ks
Please detach top portion and return with your payment.
JOB SITE • PO#.
2856 Whiptait Loop Lot 17
DATE ACTIVITY QTY
11/20/2017 300 Washbox Rental 13- -
WASHBOX SERVICE 7OAYRENTAL -
INCLUDES DELIVERY, PICKUP, DISPOSAL J
& FUEL SURCHARGE
Thank you, we appreciate your business BALANCE DUE
RATE AMOUNT
450.00 1,350.00
$1,350.00
We also offer Washout Box Rentals
A-i CONCRETE PUMPING, INC.
P0 BOX 1885
P0WAY, CA 92074
(619) 441-9852
offfce@a1concretepumpinginc.com
INVOICE
A&,
INVOICE #iiiL
DATELPI/05/2018_J
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
1/8/2018 Intuit QuickSooks
Please detach top portion and return with your payment.
JOB SITE P0 # JOB #
2856 Whiptall Loop W LOT 17
DATE ACTIVITY OTY
01/05/2018 300 Washbox Rental GD
WASHBOX SERVICE 7,DAYRENTAL------- INCLUDES DELIVERY,', PICKUP, DISPOSAL) & FUEL SURCHARGE
111111111111111111[gJJJL
RATE AMOUNT
450.00 450.00
Thank you, we appreciate your business! BALANCE DUE $450.00
We also offer Washout Box Rentals
- .........• . S L.:.....1J.flI.kL..1 414
A-i CONCRETE PUMPING, INC.
P0 BOX 1885
POWAY, CA 92074
(619) 441-9852
office@alconcrdtdpumpinginc.com
INVOICE
1 IILIJUIIIIi 4A 'F NAN"
v
MLI%A&)
INVOICE Li 8-051
DATE01/30/201,8
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE P0 # JOB #
2856 Whiptail Loop W LOT 17
DATE ACTIVITY QTY RATE AMOUNT
01/30/2018 300 Washbox Rental, 450.00 450.00
WASHBOX SERVICE 7 DAY-RENTAL--
INCLUDES DELI VERY,$CKUP, DISPOSAL)
& FUEL SURCHARGE 1LGJ
Thank you, we appreciate your business! BALANCE DUE $45000
2"?2. OL.
We also offer Washout Box Rentals
2/2312018 Intuit QuickBooks
A-i CONCRETE PUMPING, INC.
PO BOX 1885. A
P0WAY, CA 92074
(619) 441-9852
othce@aiconcretepumpinginc.com
INVOICE INVOICE# I -o91fl
I DATEi22/20i8fl
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE P0 # JOB #
2856 Whiptall Loop W LOT 17
DATE ACTIVITY . OTY RATE AMOUNT
0212212018 300 Washbox Rental 450.00. 45000
WASHBOX SERVICE 7DAY-RENTAL- -
. INCLUDES OELIVERY,t PICKUP, DISPOSAI
& FUEL SURCHARGEEXCH1 J
Thank you, We appreciate your business! BALANCE DUE
• $45000
13L10
We also offer Washout Box Rentals
.I..* III k I sI n I IQ .,IcclAnc&7eAt,l QQfl 7fl,.h 7AQ),. Ill
A-I PUMPCRETEP INC.
P0 BOX 1885
P0 WAY, CA 92074
(619)441-9852
office@alconcretepumpinginc.com
INVOICE . INVOICE #,51 -122
DATE-03/15/20-18,—
TERMS Due on receipt
BILL.TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020 ra
Please detach top portion and return with your payment.
JOB SITE PO#
2856 Whiptail Loop W LOT 17
DATE . ACTIVITY CITY FATE AMOUNT
03/15/2018 300 Washbox Rental 1 450.00 450.00 WASHBOX SERVICE2DAYRENTALJNCLUDES
DELIVERY, IICKUP, DISPOSAL & FUEL)
SURCHARGE DROP\J LG J
WE HAVE A NEW NAME. BALANCE DUE
PLEASE UPDATE OUR ACCOUNT
INFORMATION IN YOUR SYSTEM.
3 3 O.
*1 0
We also offer Washout Box Rentals
4/11/2018 Intuit QuickBooks
A-i PUMPCRETE, INC.
P0 BOX 1885
POWAYICA 92074
(619)441-9852
àffice@al concretepumpinginc.corn
INVOICE INVOICE 18-168
DATE-0-41.1 0/2018
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE P0 #
2856 Whfptail Loop W LOT 17
DATE ACTIVITY QTY
04/10/2018 300 Washbox Rental
WASHBOX SERVICE 7-DAY-RENTAL- INCLUDES
DELI VERYIPICKUP, DISPOSAL & FUEL'
SURCHARGE 9H2LGr
WE HAVE A NEW NAME. BALANCE DUE
PLEASE UPDATE OUR ACCOUNT
INFORMATION IN YOUR SYSTEM.
1111111111111111111 570922
- S.. - • ass •5 Is
RATE AMOUNT
450.00 900.00
$900.00
T 4;~31)0
We also offer Washout Box Rentals
Intuit QuickBooks 4/3012018
Al PUMPCRETE, INC.
P0 BOX 1885
POWAY, CA 92074
(619) 441.9852
office@alconcretepumpinglflc.com
INVOICE
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
ME 191 N
INVOICE E=
04/27/2018 DATE
TERMS Due on receipt
Please detach top portion and return with your payment.
JOB SITE P0 #
2856 Whiptail Loop W LOT 17
DATE ACTIVITY . OTY
04/27/2018 300 Washbox Rental c) WASHBOXSERVICE7 DAY RENTAi-INCLUDES DELIVERY,PICKUPI DISPOSAL & FUEL'
SURCHARGEj,—
WE HAVE A NEW NAME BALANCE DUE
PLEASE UPDATE OUR ACCOUNT
INFORMATION IN YOUR SYSTEM.
23OO
1111111111111111111 570923
....., sis ..s.s.. mu
RATE AMOUNT
450.00 450.00
$450.00
We also offer Washout Box Rentals
5115/2018
A-i PUMPCRETE, INC.
P0 BOX 1885
POWAY, CA 92074
(619) 441-9852
office@a1concretepumpinginc.com
INVOICE
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Intuit QuickBooks
J, ftqP
INVOICE # 18-251
DATE9I2018
TERMS Due on receipt
Please detach top portion and return with your payment.
JOB SITE PO#
2856 Whiptail Loop W LOT 17
DATE. ACTIVITY - QTY
05/15/2018 300 Washbox Rental
WASHBOX SERVICE 7 DAY RENTAL JNCLUDES
DELIVERY,PICKUP, —D-1-SP-O---S-A--L-& FUEL )
SURCHARGE - DROP 2 LG -
WE HAVE A NEW NAME. BALANCE DUE
PLEASE UPDATE OUR ACCOUNT
INFORMATION IN YOUR SYSTEM.
111111(111111Eli if 571648
-. — a., seeRs a 5 a •ie
RATE AMOUNT
450.00 900.00
$900.00
We also offer Washout Box Rentals
A-I PUMPCRETE, INC.
P0 BOX 1885
P0WAY, CA 92074
(619)441-9852
office@alconcretepumpinglnc.com
INVOICE
nP U\ IP CRETE, I
INVOICE #;-f 8--2-83)
DATE,p5I29i2T8
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE . PO#
2856 Whiptail Loop W LOT 17 111111111111 III III 571649
dos NMI ago some UU. 511
DATE ACTIVITY OTY
05/29/2018. 300 Washbox Rental 3 WASHBOX SERVICE7DAYRENTAL--lNCLUDES
DELIVERY, PICKUP. DISPOSAL & FUEL
SURCHARGE DROP G
RATE AMOUNT
450.00 1,350.00
WE HAVE A NEW NAME. BALANCE DUE 1 'afln PLEASE UPDATE OUR ACCOUNT W'
INFORMATION IN YOUR SYSTEM.
We also offer Washout Box Rentals
6/8/2018 Intuit QuickBooks
A-i PLJMPCRETE, INC.
P0 BOX 1885
POWAY, CA 92074
(619) 441-9852,
office@a1concretepumpinginc.com
INVOICE
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE P0 #
2856 Whiptall Loop W. Lot 17
DATE ACTIVITY OTY
06106/2018 300 Washbox Rental WASHBOX SERVICE7-DAY.RENTAL-iNCLUDES
DELIVERY,PICKUP, DISPOSAL & FUEL
SURCHARGa-EXcj2,fl
WE HAVE A NEW NAME. BALANCE DUE
PLEASE UPDATE OUR ACCOUNT
INFORMATION IN YOUR SYSTEM.,
/1,1111 alaw
INVOICE
DATE. 06/0612-61-8—')
TERMS Due on receipt
111111111111iflill,ijjJ
RATE AMOUNT
450.00 900.00
$900.00
We also offer Washout Box Rentals
A-i PUMPCRETE, INC.
P0 BOX 1885
POWAY, CA 92074
(619) 441-9852
othce@a1concretepumpinginc.com
INVOICE INVOICE#18-313
DATE 06/13/20 18'\
TERMS Due on receipt
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE PO# 11111 IllIlIlIllIll 2856 Whiptail Loop W. Lot 17 572425
DATE ACTIVITY QTY RATE AMOUNT
06/13/2018 300 Washbox Rental 1 450.00 450.00
WASHBOX SERVICE 7 DAY RENTALdNCLUDES
DELIVERY, PICKUP, DISPOSAL & FUEL)
SURCHARE
WE HAVE A NEW NAME. BALANCE DUE
PLEASE UPDATE OUR ACCOUNT $450.00
INFORMATION IN YOUR SYSTEM.
We also offer Washout Box Rentals
1111111111111111111 572422
•1 I -U 1•
RATE AMOUNT
450.00 900.00
A-i PUMPCRETE, INC.
P0 BOX 1885
P0 WAY, CA 92074
(619)441-9852
office@alconcretepumpinginc.com
INVOICE
BILL TO
Hamann Construction
1000 Pioneer Way
El Cajon, CA 92020
Please detach top portion and return with your payment.
JOB SITE P0 #
2856 Whiptail Loop W. Lot 17
DATE ACTIVITY OTY
06/19/2018 300 Washbox Rental
WASHBOX SERVICE 7 DAY RENTAL - INCLUDES
DELIVERY, PICKUP, ,DISPOSAL & FUEL
SURCHARGE -EXH(2)Wj
tJi\1PGRETE, N
INVOICE # 18-327
DATE 06/19/2018
TERMS Due on. receipt
WE HAVE A NEW NAME.
PLEASE UPDATE OUR ACCOUNT
INFORMATION IN YOUR SYSTEM.
BALANCE DUE $900.00
We also offer Washout Box Rentals