Loading...
HomeMy WebLinkAbout2827 WHIPTAIL LOOP; ; CBC2017-0254; RecycleCOW of Carlsbad WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Contractor: 1FL? 7vt5ru!'on yab1 Y-I Job-Address. QA AA/ Phone Number: (CO(r )MC - Estimated Cost of Project: $_IOj 22, O Type of Project: New Construction 0 Remodel or T.I. E] Residential ErCommercial Demolition (check all that apply) 0 Other Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon - approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) 0 Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area X 2 lbs. = lbs. of allowable waste. I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 - Estimated Waste (To be filled out prior to permit issuance - refer to example on Page 2.) MATERIALS lbs. of waste to betaken to LANDFILL lbs. of waste to be RE-USED or RECYCLED Waste Hauling Company or Re-Use Method Asphalt/ Concrete Brick! Masonry Cardboard Drywall Landscape Debris Lumber! Wood Metals Mixed Waste Trash / Garbage Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled % I certify that the information provided herein, to the best of my knowledge, is true and correct. SJ1t i4cIfr Contractor or Owner (print name) - /____________________ tractor or Owner (signature) Date Official Use Only O Plan Approved 0 Plan Denied 0 Project Valuation Approved Reviewed / Approved by:________________________________ Page 1 of2 REV.01-2017 Table 2 -Actual Waste (To be completed after construction.) MATERIALS +b. of waste taken to LANDFILL lbs. of waste RE-USED or RECYCLED Waste Hauling Company or Re-Use Method (complete only if different than Table 1) Asphalt/ Concrete _____ 1p 9 7e,) V6 5ee 441eck cpreA c wt - Brick/ Masonry Cardboard Drywall Landscape Debris Lumber! Wood Metals Mixed Waste j9 c;3.7( 7rnJ Dco Trash / Garbage 1&.5 12'j; ______ T(Ont,r L?ldUI( Other: 5 Jag 15( t GIM TOTAL lbs.: rs ee 446$4 5p'8JeP Actual Percentage Re-Used or Recycled '((9 % Official Use Only 65% Goal Achieved J 65% Goal Not Achieved []Alternative Compliance Achieved Penalty Paid $ Reviewed / Approved by:____________________________________________ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to LANDFILL lbs. of waste to be RE-USED or RECYCLED Waste Hauling Company or Re-Use Method Asphalt/Concrete 0 3000 AC H-c__cLi'tcC-o. Brick/Masonry 100 950 WM /Re-Rec rcA o-ste Cardboard 0 150 ABC- H-ci_LIc Co. Drywall 0 50 _-&vLI C-o. Landscape Debris 0 120 MLLkece-ic.ceo o-sfte Lumber/Wood 500 0 vcse Meev± Metals 300 200 V/M / ABC. Mixed Waste 1500 0 WM Trash / Garbage 300 0 WM Other: POOL uite 0 900 d 2s Crts'iecceOL't-f:e TOTAL lbs.: 200 5,30 Percentage to be Re-Used or Recycled 6 7% Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) 5370 X 100 67% Re-Used or Recycled (2700+ 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2 TFW CONSTRUCTION/DEVELOPMENT, INC. 0 General Contractor: TFW Construction Project Name: Lot 24 Primary Contact: Justin McKellar Project Type: New Construction Address: 7460 Mission Valley Rd, Suite 200 Address: 2827 Whiptail Loop W San Diego, CA 92108 Carlsbad, CA Phone Number: 619.562.0157 Original Date: 12/11/2018 Loads Date Material Type A) Estimated Salvage Reuse or B) Estimated Disposal (Trash) C) Estimated Total Debris Quantity Recycle Percent Diverted Hauler Certified Recycling Facility or Disposal Destination 1 11/16/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos) 2 11/20/2017 Construction & Demolition (C&D) 5.76 0.64 6.4 90% Waste Management EDCO (San Marcos) 3 11/25/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos) 4 11/7/2017 Trash 0.00 4.43 4.43 0% Waste Management Palomar Landfill 5 12/6/2017 Construction & Demolition (C&D) 5.87 0.652 6.52 90% Waste Management EDCO (San Marcos) 6 12/19/2018 Construction & Demolition (C&D) 5.58 0.62 6.2 90% Waste Management EDCO (San Marcos) 7 12/1/2017 Trash 0.00 6.43 6.43 0% Waste Management Palomar Landfill 8 1/8/2018 Construction & Demolition (C&D) 3.29 0.370 3.66 90% Waste Management EDCO (San Marcos) 9 1/17/2018 Construction & Demolition (C&D) 3.33 0.37 3.7 90% Waste Management EDCO (San Marcos) 10 1/2/2018 Trash 0.00 6.48 6.48 0% Waste Management Palomar Landfill 11 1/31/2018 Trash 0.00 7.5 7.5 0% Waste Management Palomar Landfill 12 2/13/2018 Construction & Demolition (C&D) 6.30 0,7 7 90% Waste Management EDCO (San Marcos) 13 2/21/2018 Construction & Demolition (C&D) 3.46 0.38016 3.84 90% Waste Management EDCO (San Marcos) 14 3/17/2018 Construction & Demolition (C&D) 7.50 0.833 8.33 90% Waste Management EDCO (San Marcos) 15 4/3/2018 Construction & Demolition (C&D) 1.97 0.59 2.56 77% Waste Management EDCO (San Marcos) 16 4/7/2018 Trash 0.00 5.93 5.93 0% Waste Management Palomar Landfill 17 4/18/2018 Trash 0.00 4.69 4.69 0% Waste Management Palomar Landfill 18 5/1/2018 Construction & Demolition (C&D) 6.21 1.8561 8.07 77% Waste Management EDCO (San Marcos) 19 5/16/2018 Trash 0.00 7,54 7.54 0% Waste Management Palomar Landfill 20 5/24/2018 Trash 0.00 4.8 4.8 0% Waste Management Palomar Landfill Loads Date Material Type A) Estimated Salvage Reuse or B) Estimated Disposal (Trash) C) Estimated Total Debris Quantity Recycle Percent Diverted Hauler Certified Recycling Facility or Disposal Destination 21 6/1/2018 Construction & Demolition (C&D) 2.96 0.936 3.9 76% Waste Management EDCO (San Marcos) 22 6/14/2018 Trash 0.00 5.43 5.43 0% Waste Management Palomar Landfill 23 7/2/2018 Trash 0.00 8.03 8.03 0% Waste Management Palomar Landfill 24 7/20/2018 Trash 0.00 4.83 4.83 0% Waste Management Palomar Landfill 25 8/15/2018 Trash 0.00 8.03 8.03 0% Waste Management Palomar Landfill 26 8/24/2018 Trash 0.00 3.75 3.75 0% Waste Management Palomar Landfill 27 9/27/2018 Trash 0.00 4.07 4.07 0% Waste Management Palomar Landfill 28 11/5/2018 Trash 0,00 4.94 4.94 0% Waste Management Palomar Landfill 29 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout 30 10/4/2017 Structural Concrete Wash Out Material 10.43 0 10.43 100% American Washout American Concrete Washout 31 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout 32 10/16/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout 33 10/17/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout 34 11/15/2017 Structural Concrete Wash Out Material 7.07 0 7.07 100% American Washout American Concrete Washout 35 11/22/2017 Structural Concrete Wash Out Material 3.03 0 3.03 100% American Washout American Concrete Washout 36 1/29/2018 Structural Concrete Wash Out Material 10.78 0 10.78 100% American Washout American Concrete Washout 37 3/7/2018 Structural Concrete Wash Out Material 2.02 0 2.02 100% American Washout American Concrete Washout 38 On-going Site Concrete Wash Out Material 45.46 0 45 100% A-i Pumperete Superior Ready Mix 39 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel 40 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel 41 8/30/2018 Rock 225.00 0 225 100% Joseph Trucking JEB Sand & Gravel 42 12/26/2018 Rock 90.00 0 90 100% Joseph Trucking JEB Sand & Gravel 43 12/27/2018 Rock 45.00 0 45 100% Joseph Trucking JEB Sand & Gravel 44 12/26/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel TgTA:orrs 756 L 82 i 1 j P-ercentlRecycle 90% Lot 24 TFW CONSTRUCTION/DEVELOPMENT, INC. General Contractor: TFW Construction Project Name: Lot 24 Primary Contact: Justin McKellar Project Type: New Construction Address: 7460 Mission Valley Rd, Suite 200 Address: 2827 Whiptail Loop W San Diego, CA 92108 Carlsbad, CA Phone Number: 619.562.0157 Original Date: 12/11/2018 Loads Date Material Type A) Estimated Salvage Reuse or B) Estimated Disposal (Trash) C) Estimated Total Debris Quantity Recycle Percent Diverted Hauler Certified Recycling Facility or Disposal Destination 1 11/16/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos) 2 11/20/2017 Construction & Demolition (C&D) 5.76 0.64 6.4 90% Waste Management EDCO (San Marcos) 3 11/25/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos) 4 11/7/2017 Trash 0.00 4.43 4.43 0% Waste Management Palomar Landfill 5 12/6/2017 Construction & Demolition (C&D) 5.87 0.652 6.52 90% Waste Management EDCO (San Marcos) 6 12/19/2018 Construction & Demolition (C&D) 5,58 0.62 6.2 90% Waste Management EDCO (San Marcos) 7 12/1/2017 Trash 0.00 6.43 6.43 0% Waste Management Palomar Landfill 8 1/8/2018 Construction & Demolition (C&D) 3.29 0.370 3.66 90% Waste Management EDCO (San Marcos) 9 1/17/2018 Construction & Demolition (C&D) 3.33 0.37 3.7 90% Waste Management EDCO (San Marcos) 10 1/2/2018 Trash 0.00 6.48 6.48 0% Waste Management Palomar Landfill 11 1/31/2018 Trash 0.00 7.5 7.5 0% Waste Management Palomar Landfill 12 2/13/2018 Construction & Demolition (C&D) 6.30 0.7 7 90% Waste Management EDCO (San Marcos) 13 2/21/2018 Construction & Demolition (C&D) 3.46 0.38016 3.84 90% Waste Management EDCO (San Marcos) 14 3/17/2018 Construction & Demolition (C&D) 7.50 0.833 8.33 90% Waste Management EDCO (San Marcos) 15 4/3/2018 Construction & Demolition (C&D) 1.97 0.59 2.56 77% Waste Management EDCO (San Marcos) 16 4/7/2018 Trash 0.00 5.93 5.93 0% Waste Management Palomar Landfill 17 4/18/2018 Trash 0.00 4.69 4.69 0% Waste Management Palomar Landfill 18 5/1/2018 Construction & Demolition (C&D) 6.21 1.8561 8.07 77% Waste Management EDCO (San Marcos) 19 5/16/2018 Trash 0.00 7.54 7.54 0% Waste Management Palomar Landfill 20 5/24/2018 Trash 0.00 4.8 4.8 0% Waste Management Palomar Landfill Loads Date Material Type A) Estimated Salvage Reuse or B) Estimated Disposal (Trash) C) Estimated Total Debris Quantity Recycle Percent Diverted Hauler - - Certified Recycling Facility or Disposal Destination 21 6/1/2018 Construction & Demolition (C&D) 2.96 0.936 3.9 76% Waste Management EDCO (San Marcos) 22 6/14/2018 Trash 0.00 5.43 5.43 0% Waste Management Palomar Landfill 23 7/2/2018 Trash 0.00 8.03 8.03 0% Waste Management Palomar Landfill 24 7/20/2018 Trash 0.00 4.83 4.83 0% Waste Management Palomar Landfill 25 8/15/2018 Trash 0.00 8,03 8.03 0% Waste Management Palomar Landfill 26 8/24/2018 Trash 0.00 3.75 3.75 0% Waste Management Palomar Landfill 27 9/27/2018 Trash 0.00 4.07 4.07 0% Waste Management Palomar Landfill 28 11/5/2018 Trash 0.00 4.94 4.94 0% Waste Management Palomar Landfill 29 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout 30 10/4/2017 Structural Concrete Wash Out Material 10.43 0 10.43 100% American Washout American Concrete Washout 31 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout 32 10/16/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout 33 10/17/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout 34 11/15/2017 Structural Concrete Wash Out Material 7.07 0 7.07 100% American Washout American Concrete Washout 35 11/22/2017 Structural Concrete Wash Out Material 3.03 0 3.03 100% American Washout American Concrete Washout 36 1/29/2018 Structural Concrete Wash Out Material . 10.78 0 10.78 100% American Washout American Concrete Washout 37 3/7/2018 Structural Concrete Wash Out Material 2.02 0 2.02 100% American Washout American Concrete Washout 38 On-going Site Concrete Wash Out Material 45.46 0 45 100% A-i Pumperete Superior Ready Mix 39 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel 40 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel 41 8/30/2018 Rock 225.00 0 225 100% Joseph Trucking JEB Sand & Gravel 42 12/26/2018 Rock 90.00 0 90 100% Joseph Trucking JEB Sand & Gravel 43 12/27/2018 Rock 45.00 0 45 100% Joseph Trucking JEB Sand & Gravel 44 12/26/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel tOJI1ONS 756 96 82 90%7 Construction Waste Management 12/05/2018 15:59:37 Monthly Project Recycling Report WASTE MANAGt M [NT Project: 2827 WHIPTALE LOOP (TFW CONSTRUCTION) Target Diversion: 50.0% Est. End Date: 1/31/2019 Actual Diversion: 39.9% Address: Project MSA/CMA: WM Account Manager: Project Size: Floor Count: Building Type: 2827 WHIPTALE LOOP CARLSBAD, CA 92010 San Diego-Carlsbad-San Marcos, CA Karrie Crawford LEED® Certification Type: Not Applicable Material Totals: Material Target % Actual % Total Qty Diverted Qty Residual Qty Co-Mingled NaN% 87.4% 72.88 63.71 9.17 Residual NaN% 0.0% 86.88 0 86.88 Total 39.9% 159.76 63.71 96.05 Ticket Details: Ticket Date From: (All) Ticket Date To: (All) Diverted Residual Ticket Month Ticket Date Ticket Destination Facility Hauler Material UOM Total Qty Qty Act % Qty NOVEMBER 201711/16/2017 913516 EDCO (SAN MARCOS) Co-Mingled Tons 6.35 5.72 90.1% 0.63 NOVEMBER 201711/20/2017 914348 EDCO (SAN MARCOS) Co-Mingled Tons 6.4 5.76 90.0% 0.64 NOVEMBER 201711/25/2017 915450 EDCO (SAN MARCOS) Co-Mingled Tons 6.35 5.72 90.1% 0.63 NOVEMBER 201711/7/2017 910022 Palomar Landfill Residual Tons 4.43 0 0.0% 4.43 NOVEMBER 20177otal: 23.53 17.20 73.1% 6.33 DECEMBER 201712/6/2017 918862 EDCO (SAN MARCOS) Co-Mingled Tons 6.52 5.87 90.0% 0.65 DECEMBER 201712/19/2017 924287 EDCO (SAN MARCOS) Co-Mingled Tons 6.2 5.58 90.0% 0.62 DECEMBER 201712/1/2017 917858 Palomar Landfill Residual Tons 6.43 0 0.0% 6.43 DECEMBER 2017Total: 19.15 11.45 59.8% 7.70 JANUARY 2018 1/8/2018 928956 EDCO (SAN MARCOS) Co-Mingled Tons 3.66 3.29 89.9% 0.37 JANUARY 2018 1/17/2018 931852 EDCO (SAN MARCOS) Co-Mingled Tons 3.7 3.33 90.0% 0.37 JANUARY 2018 1/2/2018 926784 Palomar Landfill Residual Tons 6.48 0 0.0% 6.48 JANUARY 2018 1/31/2018 936077 Palomar Landfill Residual Tons 7.5 0 0.0% 7.5 JANUARY 2018 Total: 21.34 6.62 31.0% 14.72 Page 1 Please consider the environment before printing /\ Construction Waste Management 12/05/2018 15:59:37 Monthly Project Recycling Report WASTE MANAGE ME NT Project: 2827 WHIPTALE LOOP (TFW CONSTRUCTION) Target Diversion: 50.0% Est. End Date: 1/31/2019 Actual Diversion: 39.9% Diverted Residual Ticket Month Ticket Date Ticket Destination Facility Hauler Material UOM Total Qty Qty Act % Qty FEBRUARY 2018 2/13/2018 940017 EDCO (SAN MARCOS) Co-Mingled Tons 7 6.3 90.0% 0.7 FEBRUARY 2018 2/21/2018 942751 EDCO (SAN MARCOS) Co-Mingled Tons 3.84 3.46 90.1% 0.38 FEBRUARY 2018 Total: 10.84 9.76 90.0% 1.08 MARCH 2018 3/17/2018 950703 EDCO (SAN MARCOS) Co-Mingled Tons 8.33 7.5 90.0% 0.83 MARCH 2018 Total: 8.33 7.5 90.0% 0.83 - APRIL 2018 4/3/2018 955697 EDCO (SAN MARCOS) Co-Mingled Tons 2.56 1.97 77.0% 0.59 APRIL 2018 4/7/2018 957627 Palomar Landfill Residual Tons 5.93 0 0.0% 5.93 APRIL 2018 4/18/2018 960498 Palomar Landfill Residual Tons 4.69 0 0.0% 4.69 APRIL 2018 Total: 13.18 1.97 14.9% 11.21 MAY 2018 5/1/2018 964455 EDCO (SAN MARCOS) Co-Mingled Tons 8.07 6.21 77.0% 1.86 MAY 2018 5/16/2018 970085 Palomar Landfill Residual Tons 7.54 0 0.0% 7.54 MAY 2018 5/24/2018 973065 Palomar Landfill Residual Tons 4.8 0 0.0% 4.8 MAY 2018 Total: 20.41 6.21 30.4% 14.20 JUNE 2018 6/1/2018 975260 EDCO (SAN MARCOS) Co-Mingled Tons 3.9 3 76.9% 0.9 JUNE 2018 6/14/2018 979299 Palomar Landfill Residual Tons 5.43 0 0.0% 5.43 JUNE 2018 Total: 9.33 3 32.2% 6.33 JULY 2018 7/2/2018 985486 Palomar Landfill Residual Tons 8.03 0 0.0% 8.03 JULY 2018 7/20/2018 991900 Palomar Landfill Residual Tons 4.83 0 0.0% 4.83 JULY 2018 Total: 12.86 0 0.0% 12.86 AUGUST 2018 8/15/2018 430 Palomar Landfill Residual Tons 8.03 0 0.0% 8.03 AUGUST 2018 8/24/2018 4107 Palomar Landfill Residual Tons 3.75 0 0.0% 3.75 AUGUST 2018 Total: 11.78 0 0.0% 11.78 SEPTEMBER 9/27/2018 15994 Palomar Landfill Residual Tons 4.07 0 0.0% 4.07 2018 SEPTEMBER Total: 4.07 0 0.0% 4.07 2018 NOVEMBER 201811/5/2018 26893 Palomar Landfill Residual Tons 4.94 0 0.0% 4.94 NOVEMBER 2018Total: 4.94 0 0.0% 4.94 Total: 159.76 63.71 39.9% 96.05 Page 2 Please consider the environment before printing Ac ct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. I Business: No.: 1, American Concrete Washouts Physical Address Billing Address Contact: Kyle 760-802-4318 Attention: Accounts Payable Street: Carlsbad Oaks North Street: P0 BOX 880 City, St ZIP: Carlsbad, CA City, St ZIP: BONSALL, CA 92003-0880 Phone #1: Office 760-631-0588 Phone #1: Fax 760-631-1755 Phone #2: Phone #2: 6D-6RR 6VC-DRF-noFS email: schneidercont@ATT.net email: Code Description Rate Bill to: None Regular $0.00 Billing Group: 2 Regular Account Type: Contract Late Fees: Yes Start: 9/12/17 End: Suspend Start: Suspend End: Tax District: Tax Exempt No.: Balance: $0.00 Pay By: Balance COD: No PO#: Dumpster: Teleroute Activity: 9/14/17 to 3/7/18 09/14/17 6:26AM Work Order Started Placement: Oaks North 09/14/17 6:33AM Work Order Paused Placement: Oaks North 09/14/17 7:42AM Work Order Started Placement: Oaks North 09/14/17 7:43AM Work Order Picture Placement: Oaks North 09/14/17 7:43AM Work Order Picture Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 2 09/14/17 7:43AM Work Order Note Placement: Oaks North Note: RL200 down 09/14/17 7:43AM 09/29/17 9:10AM 09/29/17 9:10AM 09/29/17 9:10AM 09/29/17 9:10AM 09/29/17 10:25AM 09/29/17 10:25AM Note: 197 09/29/17 10:25AM Work Order Completed Work Order Started Work Order Paused Work Order Started Work Order Paused Work Order Started Work Order Cntr Chg Work Order Picture Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North 09/29/17 10:26AM Work Order Picture Placement: Oaks North 09/29/17 10:26AM Work Order Completed Placement: Oaks North 09/29/17 10:26AM Work Order Started Placement: Oaks North 09/29/17 10:26AM Work Order Cntr Chg Placement Oaks North Note: 231 09/29/17 10:26AM Work Order Picture Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 3 09/29/17 10:27AM Work Order Picture Placement: Oaks North 09/29/17 10:43AM Work Order Picture Placement: Oaks North 09/29/17 10:45AM Work Order Note Placement: Oaks North Note: vac 50 gallons 09/29/17 10:46AM Work Order Note Placement: Oaks North Note: bin 200 to soft to take 09/29/17 10:49AM Work Order Completed Placement: Oaks North 10/04/17 10:20AM Work Order Started Placement: Oaks North 10/04/17 10:20AM Work Order Picture Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No.4 10/04/17 10:31AM Work Order Picture Placement: Oaks North 10/04/17 10:40AM Work Order Picture Placement: Oaks North 10/04/17 10:49AM Work Order Picture Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 5 10/04/17 10:49AM Landfill Placement: Oaks North Ticket#: s Tip Weight: 8.08t0n ' Note: 197r1 10/04/17 10:50AM Work Order Note Placement: Oaks North Note: 197r1 up/down 300 gal push 150 gal 70 % 10/04/17 12:35PM Work Order Picture Placement: Oaks North 10/04/17 12:35PM Work Order Picture Placement: Oaks North 10/04/17 12:35PM Work Order Picture Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 6 10/04/17 12:44PM Work Order Picture Placement: Oaks North 10/04/17 12:45PM Work Order Note Placement: Oaks North Note: 231 rl up/down 300 gal pushed 200 gal 60% 10/04/17 2:19PM Work Order Picture Placement: Oaks North 10/04/17 2:20PM Work Order Picture Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 7 10/04/17 2:20PM 10/04/17 2:22PM 10/04/17 2:22PM Ticket#: s Tip Weight: 1 0.43t0n 10/04/17 2:22PM Work Order Completed Work Order Started Landfill Work Order Picture Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North 10/04/17 2:23PM Work Order Note Placement: Oaks North Note: 200r1 up 0 gal 100% 10/04/17 2:27PM Work Order Completed Placement: Oaks North 10/04/17 2:28PM Work Order Started Placement: Oaks North 10/04/17 2:29PM Landfill Placement: Oaks North Ticket#: s Tip Weight: 8.08ton 10/04/17 2:29PM Work Order Note Placement: Oaks North Note: 231r1 up/down 300 gal pushed 200 gal 60% 10/04/17 2:30PM Work Order Picture Placement: Oaks North Aèt #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 8 10/04/17 2:30PM Work Order Picture Placement: Oaks North 10/04/17 10/16/17 10/16/17 10/16/17 10/16/17 2:30PM 2:20PM 2:20PM 2:44PM 2:45PM Work Order Completed Work Order Paused Work Order Started Work Order Started Work Order Picture Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North 10/16/17 2:58PM Note: vac 300 gallons 10/16/17 2:58PM Ticket#: s Tip Weight: 6.06ton Work Order Note Landfill Placement: Oaks North Placement: Oaks North 10/16/17 2:58PM Work Order Completed Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 9 10/17/17 11:30AM Work Order Started Placement: Oaks North 10/17/17 11:30AM Work Order Paused Placement: Oaks North 10/17/17 12:22PM Work Order Started Placement: Oaks North 10/17/17 12:22PM Work Order Picture Placement: Oaks North 10/17/17 12:37PM Work Order Cntr Chg Placement: Oaks North Note: 171 R 10/17/17 12:38PM Work Order Picture Placement: Oaks North 10/17/17 12:38PM Work Order Picture Placement: Oaks North 10/17/17 12:43PM Note: vac 300 gallons 10/17/17 12:43PM Ticket#: s Tip Weight: 606t0n Work Order Note Landfill Placement: Oaks North Placement: Oaks North 10/26/17 10:41AM Note: 45 10/26/17 10:41AM Note: 45 down 10/26/17 10/26/17 10/26/17 11/15/17 11/15/17 11/15/17 11/15/17 10:41AM 10:43AM 10:43AM 11:02AM 11:02AM 1:07PM 1:07PM Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 10 10/17/17 12:43PM Work Order Completed Placement: Oaks North 10/26/17 10:39AM Work Order Started Placement: Oaks North 10/26/17 10:40AM Work Order Picture Placement: Oaks North 10/26/17 10:40AM Work Order Picture Placement: Oaks North Work Order Cntr Chg Work Order Note Work Order Completed Work Order Started Work Order Completed Work Order Paused Work Order Started Work Order Started Work Order Picture Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Work Order Picture Placement: Oaks North 11/15/17 1:08PM Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 11 11/15/17 1:08PM Note: 443r1 11/15/17 1:1 IPM Work Order Cntr Chg Work Order Picture Placement: Oaks North Placement: Oaks North Placement: Oaks North 11/15/17 1:08PM Work Order Note Note: 300ga1 push 50ga1 11/15/17 3:13PM Landfill Ticket#: s ,Tip Weight: 7.07ton ' 11/15/17 3:13PM Work Order Completed 11/22/17 9:31AM Work Order Paused 11/22/17 9:31AM Work Order Started 11/22/17 10:13AM Work Order Started 11/22/17 10:13AM Work Order Picture Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 12 11/22/17 10:14AM Work Order Note Placement: Oaks North Note: push 600ga1 11/22/17 11:10AM Landfill Placement: Oaks North Ticket#: s Tip Weight: 3.03ton / 11/22/17 11:10AM Work Order Completed Placement: Oaks North 11/22/17 11:13AM Work Order Started Placement: Oaks North 11/22/17 11:13AM Work Order Picture Placement: Oaks North 11/22/17 11:26AM Work Order Picture Placement: Oaks North 11/22/17 11:27AM Work Order Note Placement: Oaks North Note: vac 443 600 gal 25% 11/22/17 11:28AM Work Order Completed Placement: Oaks North 01/29/18 8:44AM Work Order Paused Placement: Oaks North 01/29/18 8:44AM Work Order Started Placement: Oaks North 01/29/18 10:06AM Work Order Started Placement: Oaks North 01/29/18 10:06AM Work Order Picture Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 14 01/29/18 10:23AM Extra +Trash in contain Placement: Oaks North 01/29/18 10:23AM Extra +Damage Placement: Oaks North 01/29/18 10:24AM Work Order Note Placement: Oaks North Note: hole in back door and plastic 01/29/18 11:28AM Landfill Placement: Oaks North Ticket: s Tip Weight: 10.78ton 01/29/18 11:28AM Work Order Completed Placement: Oaks North 02/28/18 8:50AM Work Order Started Placement: Oaks North 02/28/18 8:50AM Work Order Picture Placement: Oaks North 02/28/18 8:50AM Work Order Picture Placement: Oaks North 02/28/18 8:50AM Work Order Note Placement: Oaks North Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 15 Note: 442RL down 02/28/18 8:51AM 02/28/18 8:53AM 02/28/18 8:53AM 03/07/18 7:48AM 03/07/18 7:48AM Work Order Completed Work Order Started Work Order Completed Work Order Started Work Order Picture Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North Placement: Oaks North 03/07/18 7:48AM Work Order Picture Placement: Oaks North 03/07/18 8:03AM Work Order Note Placement: Oaks North Note: 442 up 200 gal 20% 03/07/18 9:27AM Landfill Placement: Oaks North Ticket#: s Tip Weight: 2.02ton 03/07/18 9:27AM Work Order Completed Placement: Oaks North Justin Mckellar From: Angela Yanez <office@a1concretepumpinginc.com> Sent: Thursday, December 6, 2018 2:10 PM To: Justin Mckellar Subject: Re: Recycle Tickets Lot 24 Follow Up Flag: Follow up Flag Status: Flagged RE: 2827 Whiptail Loop W. 100% of cementitious waste from 9 large washout boxes @ approx 45 tons was recycled at Superior Ready Mix Plant #8 12117 Industry Rd Lakeside CA 92040. Angela Yanez Office Administrator A-i PUMPCRETE, INC. P0 Box 1885 Poway, CA 92074 0 (619) 441-9852 F (858) 292-7867 http://www.alconcretepumpinginc.com/ http://washboxrentals.com/ On 2018-12-06 9:02 am, Justin Mckellar wrote: Angela, Nice talking to you. The address is 2827 Whiptail Loop W. The work took place within the last 12 months. Thank you, 1 5 s 'QNNEGQ.flABLEBtLiQF1J. IN BILL NO. pTRANSPOTAT1ON AGREEMENT DATE - A 56 1806 / S ref If r V111 BROXER# Xl-( PH. L JL 1RUCK45 UNDERLWI CARIER ( t (\_) I TRAIL ER# . . ADDBESS ......... __________________•... . SHIPPER V7 I RECEIVER - 1? DDRESS . .• ADDRESS_______________________________________ ITWSTAT/ZIP . CE1WSTATE/ZP oINr.OFóRsGIN - _)__t____ P6INT0FDESflt4ATiON . 0 SUER TAG WHEELER I 10 0 TRA4SFE END DUMP 0 FLAT BED J jpjy 0 TONNAGE 0 PER LOAD 0 SIDE DUMP 0 MIXER I I SUPER 10 0 DBL OTtOMS 0 TRUCK & PUP 0 OTHER I RATE @ $ I VSRONG ARM .. . , sEMI-BoTtOM ............WATER:TRUCK .. . L ..V . ORnNGIft 11ME OEt N , ME \ AcsSoRtALOl1R 7iNGffl ,7LTOWS____P TrAR DRIVING ARRIVALTIMEAt END LOANG RUNNING11ME NO.N4EGOrIASLE8ILL017UQNG .. .E BILL NO. AND 11RANSPOR1ATION AGREEMENT 4 117- J7 1610 MELROSE WAY OFFICE: 760.758.3 3 1 8 BROKERN TRUCKING VISTA, CA 92081 FAX 760 758 3504 TRUCK# - A dsOFAINYI ULYINGCERIER / TRAILER N / ADDRESS V PH CAN SIftPPEI% I RECEIVER COSWIIOR T '=' IA! LL8 I4 CONSIGNEE OX VI NAME AND ADDRESS OF DEBITOR IF OThER THAN SHIPPERJCONSIGHOR — -EuutP.EcT TYPE uj _______ . - I ) 13-PER LOAD !JPU PflMMflflITV . - LOWDD - ucILtkoIPJG STAUIBY BREAKOOVID OR ARRIVE DEPART ARRIVE DEPART TU,E REASON FOR DELAY VI I Am ETTM, : r TUNS CHARGES ORIGINAL OriS!CN!EEONSIGNUR fAGENT OR DESITOR) SIB ' NON-NEGOTIABLE- BILL OF LADING AN . D TRANSPORTATION AGREEENT JL. TRUCKING 1610 MELROSE WAY OFFICE: 760.758.33 18 VtsTA;CA 92081 FA 760.758.3504 Pill NON-NEGOTIABLE BILL-OFLADING BILL NO. AND TRANSPORTATION AGREEMENT 1ATE A 2253294 CARRIER bCa4wt— /7 JOB j7 -J _)"v ADDRESS . BROKER# CITY/STATE/Zip PH. TRUCK#. I ELYING.CARRIEN TRAILER # [ADDRESS - -- PH. SHIPPER rr RECEIVER ADDRESS DDRESS Z-zj CITY/STATE/ZIP CITYISTATEZIP POINT >R,, I POINT OF DESTINATION Szollowsmil U SR TAG DENO DUMP FL AT B rb U 10-WHEELER U TRANSFER U SIDE DUMP U MIXER U OTHER $ UtJPER10 U DBLBO1TOMS U TRUCK&PUP RATE @ U STRONG ARM 0 SEMI-BOTTOM (3i WATER TRUCK '' S •• , s... • •• _________________________ _ _ _ _ _ _ _ _ _ _ _ _ ' _________________ . I H6~