HomeMy WebLinkAbout2827 WHIPTAIL LOOP; ; CBC2017-0254; RecycleCOW of
Carlsbad
WASTE MANAGEMENT
PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Contractor: 1FL? 7vt5ru!'on
yab1 Y-I
Job-Address. QA AA/ Phone Number: (CO(r )MC -
Estimated Cost of Project: $_IOj 22, O
Type of Project: New Construction 0 Remodel or T.I. E] Residential ErCommercial Demolition
(check all that apply) 0 Other
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
- approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
0 Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1 - Estimated Waste (To be filled out prior to permit issuance - refer to example on Page 2.)
MATERIALS lbs. of waste to betaken to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt/ Concrete
Brick! Masonry
Cardboard
Drywall
Landscape Debris
Lumber! Wood
Metals
Mixed Waste
Trash / Garbage
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled %
I certify that the information provided herein, to the best of my knowledge, is true and correct.
SJ1t i4cIfr
Contractor or Owner (print name) -
/____________________ tractor or Owner (signature) Date
Official Use Only
O Plan Approved 0 Plan Denied 0 Project Valuation Approved
Reviewed / Approved by:________________________________
Page 1 of2 REV.01-2017
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS +b. of waste taken to
LANDFILL
lbs. of waste
RE-USED or RECYCLED
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
Asphalt/ Concrete
_____
1p 9 7e,) V6 5ee 441eck cpreA c wt -
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber! Wood
Metals
Mixed Waste j9 c;3.7( 7rnJ Dco
Trash / Garbage 1&.5 12'j; ______ T(Ont,r L?ldUI(
Other: 5 Jag 15( t GIM
TOTAL lbs.: rs ee 446$4 5p'8JeP
Actual Percentage Re-Used or Recycled '((9 %
Official Use Only
65% Goal Achieved J 65% Goal Not Achieved []Alternative Compliance Achieved Penalty Paid $
Reviewed / Approved by:____________________________________________
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt/Concrete 0 3000 AC H-c__cLi'tcC-o.
Brick/Masonry 100 950 WM /Re-Rec rcA o-ste
Cardboard 0 150 ABC- H-ci_LIc Co.
Drywall 0 50 _-&vLI C-o.
Landscape Debris 0 120 MLLkece-ic.ceo o-sfte
Lumber/Wood 500 0 vcse Meev±
Metals 300 200 V/M / ABC.
Mixed Waste 1500 0 WM
Trash / Garbage 300 0 WM
Other: POOL uite 0 900 d 2s Crts'iecceOL't-f:e
TOTAL lbs.: 200 5,30
Percentage to be Re-Used or Recycled 6 7%
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
5370 X 100 67% Re-Used or Recycled
(2700+ 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
TFW CONSTRUCTION/DEVELOPMENT, INC. 0
General Contractor: TFW Construction Project Name: Lot 24
Primary Contact: Justin McKellar Project Type: New Construction
Address: 7460 Mission Valley Rd, Suite 200 Address: 2827 Whiptail Loop W
San Diego, CA 92108 Carlsbad, CA
Phone Number: 619.562.0157 Original Date: 12/11/2018
Loads Date Material Type
A) Estimated
Salvage Reuse or B) Estimated
Disposal (Trash)
C) Estimated Total
Debris Quantity
Recycle
Percent
Diverted Hauler Certified Recycling Facility or Disposal
Destination
1 11/16/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos)
2 11/20/2017 Construction & Demolition (C&D) 5.76 0.64 6.4 90% Waste Management EDCO (San Marcos)
3 11/25/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos)
4 11/7/2017 Trash 0.00 4.43 4.43 0% Waste Management Palomar Landfill
5 12/6/2017 Construction & Demolition (C&D) 5.87 0.652 6.52 90% Waste Management EDCO (San Marcos)
6 12/19/2018 Construction & Demolition (C&D) 5.58 0.62 6.2 90% Waste Management EDCO (San Marcos)
7 12/1/2017 Trash 0.00 6.43 6.43 0% Waste Management Palomar Landfill
8 1/8/2018 Construction & Demolition (C&D) 3.29 0.370 3.66 90% Waste Management EDCO (San Marcos)
9 1/17/2018 Construction & Demolition (C&D) 3.33 0.37 3.7 90% Waste Management EDCO (San Marcos)
10 1/2/2018 Trash 0.00 6.48 6.48 0% Waste Management Palomar Landfill
11 1/31/2018 Trash 0.00 7.5 7.5 0% Waste Management Palomar Landfill
12 2/13/2018 Construction & Demolition (C&D) 6.30 0,7 7 90% Waste Management EDCO (San Marcos)
13 2/21/2018 Construction & Demolition (C&D) 3.46 0.38016 3.84 90% Waste Management EDCO (San Marcos)
14 3/17/2018 Construction & Demolition (C&D) 7.50 0.833 8.33 90% Waste Management EDCO (San Marcos)
15 4/3/2018 Construction & Demolition (C&D) 1.97 0.59 2.56 77% Waste Management EDCO (San Marcos)
16 4/7/2018 Trash 0.00 5.93 5.93 0% Waste Management Palomar Landfill
17 4/18/2018 Trash 0.00 4.69 4.69 0% Waste Management Palomar Landfill
18 5/1/2018 Construction & Demolition (C&D) 6.21 1.8561 8.07 77% Waste Management EDCO (San Marcos)
19 5/16/2018 Trash 0.00 7,54 7.54 0% Waste Management Palomar Landfill
20 5/24/2018 Trash 0.00 4.8 4.8 0% Waste Management Palomar Landfill
Loads Date Material Type
A) Estimated
Salvage Reuse or B) Estimated
Disposal (Trash)
C) Estimated Total
Debris Quantity Recycle
Percent
Diverted Hauler Certified Recycling Facility or Disposal
Destination
21 6/1/2018 Construction & Demolition (C&D) 2.96 0.936 3.9 76% Waste Management EDCO (San Marcos)
22 6/14/2018 Trash 0.00 5.43 5.43 0% Waste Management Palomar Landfill
23 7/2/2018 Trash 0.00 8.03 8.03 0% Waste Management Palomar Landfill
24 7/20/2018 Trash 0.00 4.83 4.83 0% Waste Management Palomar Landfill
25 8/15/2018 Trash 0.00 8.03 8.03 0% Waste Management Palomar Landfill
26 8/24/2018 Trash 0.00 3.75 3.75 0% Waste Management Palomar Landfill
27 9/27/2018 Trash 0.00 4.07 4.07 0% Waste Management Palomar Landfill
28 11/5/2018 Trash 0,00 4.94 4.94 0% Waste Management Palomar Landfill
29 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout
30 10/4/2017 Structural Concrete Wash Out Material 10.43 0 10.43 100% American Washout American Concrete Washout
31 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout
32 10/16/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout
33 10/17/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout
34 11/15/2017 Structural Concrete Wash Out Material 7.07 0 7.07 100% American Washout American Concrete Washout
35 11/22/2017 Structural Concrete Wash Out Material 3.03 0 3.03 100% American Washout American Concrete Washout
36 1/29/2018 Structural Concrete Wash Out Material 10.78 0 10.78 100% American Washout American Concrete Washout
37 3/7/2018 Structural Concrete Wash Out Material 2.02 0 2.02 100% American Washout American Concrete Washout
38 On-going Site Concrete Wash Out Material 45.46 0 45 100% A-i Pumperete Superior Ready Mix
39 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel
40 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel
41 8/30/2018 Rock 225.00 0 225 100% Joseph Trucking JEB Sand & Gravel
42 12/26/2018 Rock 90.00 0 90 100% Joseph Trucking JEB Sand & Gravel
43 12/27/2018 Rock 45.00 0 45 100% Joseph Trucking JEB Sand & Gravel
44 12/26/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel
TgTA:orrs 756 L 82 i
1 j P-ercentlRecycle 90%
Lot 24 TFW CONSTRUCTION/DEVELOPMENT, INC.
General Contractor: TFW Construction Project Name: Lot 24
Primary Contact: Justin McKellar Project Type: New Construction
Address: 7460 Mission Valley Rd, Suite 200 Address: 2827 Whiptail Loop W
San Diego, CA 92108 Carlsbad, CA
Phone Number: 619.562.0157 Original Date: 12/11/2018
Loads Date Material Type
A) Estimated
Salvage Reuse or B) Estimated
Disposal (Trash)
C) Estimated Total
Debris Quantity Recycle
Percent
Diverted Hauler Certified Recycling Facility or Disposal
Destination
1 11/16/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos)
2 11/20/2017 Construction & Demolition (C&D) 5.76 0.64 6.4 90% Waste Management EDCO (San Marcos)
3 11/25/2017 Construction & Demolition (C&D) 5.72 0.62865 6.35 90% Waste Management EDCO (San Marcos)
4 11/7/2017 Trash 0.00 4.43 4.43 0% Waste Management Palomar Landfill
5 12/6/2017 Construction & Demolition (C&D) 5.87 0.652 6.52 90% Waste Management EDCO (San Marcos)
6 12/19/2018 Construction & Demolition (C&D) 5,58 0.62 6.2 90% Waste Management EDCO (San Marcos)
7 12/1/2017 Trash 0.00 6.43 6.43 0% Waste Management Palomar Landfill
8 1/8/2018 Construction & Demolition (C&D) 3.29 0.370 3.66 90% Waste Management EDCO (San Marcos)
9 1/17/2018 Construction & Demolition (C&D) 3.33 0.37 3.7 90% Waste Management EDCO (San Marcos)
10 1/2/2018 Trash 0.00 6.48 6.48 0% Waste Management Palomar Landfill
11 1/31/2018 Trash 0.00 7.5 7.5 0% Waste Management Palomar Landfill
12 2/13/2018 Construction & Demolition (C&D) 6.30 0.7 7 90% Waste Management EDCO (San Marcos)
13 2/21/2018 Construction & Demolition (C&D) 3.46 0.38016 3.84 90% Waste Management EDCO (San Marcos)
14 3/17/2018 Construction & Demolition (C&D) 7.50 0.833 8.33 90% Waste Management EDCO (San Marcos)
15 4/3/2018 Construction & Demolition (C&D) 1.97 0.59 2.56 77% Waste Management EDCO (San Marcos)
16 4/7/2018 Trash 0.00 5.93 5.93 0% Waste Management Palomar Landfill
17 4/18/2018 Trash 0.00 4.69 4.69 0% Waste Management Palomar Landfill
18 5/1/2018 Construction & Demolition (C&D) 6.21 1.8561 8.07 77% Waste Management EDCO (San Marcos)
19 5/16/2018 Trash 0.00 7.54 7.54 0% Waste Management Palomar Landfill
20 5/24/2018 Trash 0.00 4.8 4.8 0% Waste Management Palomar Landfill
Loads Date Material Type
A) Estimated
Salvage Reuse or B) Estimated
Disposal (Trash)
C) Estimated Total
Debris Quantity Recycle
Percent
Diverted Hauler
- - Certified Recycling Facility or Disposal
Destination
21 6/1/2018 Construction & Demolition (C&D) 2.96 0.936 3.9 76% Waste Management EDCO (San Marcos)
22 6/14/2018 Trash 0.00 5.43 5.43 0% Waste Management Palomar Landfill
23 7/2/2018 Trash 0.00 8.03 8.03 0% Waste Management Palomar Landfill
24 7/20/2018 Trash 0.00 4.83 4.83 0% Waste Management Palomar Landfill
25 8/15/2018 Trash 0.00 8,03 8.03 0% Waste Management Palomar Landfill
26 8/24/2018 Trash 0.00 3.75 3.75 0% Waste Management Palomar Landfill
27 9/27/2018 Trash 0.00 4.07 4.07 0% Waste Management Palomar Landfill
28 11/5/2018 Trash 0.00 4.94 4.94 0% Waste Management Palomar Landfill
29 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout
30 10/4/2017 Structural Concrete Wash Out Material 10.43 0 10.43 100% American Washout American Concrete Washout
31 10/4/2017 Structural Concrete Wash Out Material 8.08 0 8.08 100% American Washout American Concrete Washout
32 10/16/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout
33 10/17/2017 Structural Concrete Wash Out Material 6.06 0 6.06 100% American Washout American Concrete Washout
34 11/15/2017 Structural Concrete Wash Out Material 7.07 0 7.07 100% American Washout American Concrete Washout
35 11/22/2017 Structural Concrete Wash Out Material 3.03 0 3.03 100% American Washout American Concrete Washout
36 1/29/2018 Structural Concrete Wash Out Material . 10.78 0 10.78 100% American Washout American Concrete Washout
37 3/7/2018 Structural Concrete Wash Out Material 2.02 0 2.02 100% American Washout American Concrete Washout
38 On-going Site Concrete Wash Out Material 45.46 0 45 100% A-i Pumperete Superior Ready Mix
39 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel
40 9/18/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel
41 8/30/2018 Rock 225.00 0 225 100% Joseph Trucking JEB Sand & Gravel
42 12/26/2018 Rock 90.00 0 90 100% Joseph Trucking JEB Sand & Gravel
43 12/27/2018 Rock 45.00 0 45 100% Joseph Trucking JEB Sand & Gravel
44 12/26/2018 Rock 75.00 0 75 100% Joseph Trucking JEB Sand & Gravel
tOJI1ONS 756 96 82
90%7
Construction Waste Management 12/05/2018 15:59:37
Monthly Project Recycling Report
WASTE MANAGt M [NT
Project: 2827 WHIPTALE LOOP (TFW CONSTRUCTION) Target Diversion: 50.0%
Est. End Date: 1/31/2019 Actual Diversion: 39.9%
Address:
Project MSA/CMA:
WM Account Manager:
Project Size:
Floor Count:
Building Type:
2827 WHIPTALE LOOP
CARLSBAD, CA 92010
San Diego-Carlsbad-San Marcos, CA
Karrie Crawford
LEED® Certification Type: Not Applicable
Material Totals:
Material Target % Actual % Total Qty Diverted Qty Residual Qty
Co-Mingled NaN% 87.4% 72.88 63.71 9.17
Residual NaN% 0.0% 86.88 0 86.88
Total 39.9% 159.76 63.71 96.05
Ticket Details:
Ticket Date From: (All)
Ticket Date To: (All)
Diverted Residual
Ticket Month Ticket Date Ticket Destination Facility Hauler Material UOM Total Qty Qty Act % Qty
NOVEMBER 201711/16/2017 913516 EDCO (SAN MARCOS) Co-Mingled Tons 6.35 5.72 90.1% 0.63
NOVEMBER 201711/20/2017 914348 EDCO (SAN MARCOS) Co-Mingled Tons 6.4 5.76 90.0% 0.64
NOVEMBER 201711/25/2017 915450 EDCO (SAN MARCOS) Co-Mingled Tons 6.35 5.72 90.1% 0.63
NOVEMBER 201711/7/2017 910022 Palomar Landfill Residual Tons 4.43 0 0.0% 4.43
NOVEMBER 20177otal: 23.53 17.20 73.1% 6.33
DECEMBER 201712/6/2017 918862 EDCO (SAN MARCOS) Co-Mingled Tons 6.52 5.87 90.0% 0.65
DECEMBER 201712/19/2017 924287 EDCO (SAN MARCOS) Co-Mingled Tons 6.2 5.58 90.0% 0.62
DECEMBER 201712/1/2017 917858 Palomar Landfill Residual Tons 6.43 0 0.0% 6.43
DECEMBER 2017Total: 19.15 11.45 59.8% 7.70
JANUARY 2018 1/8/2018 928956 EDCO (SAN MARCOS) Co-Mingled Tons 3.66 3.29 89.9% 0.37
JANUARY 2018 1/17/2018 931852 EDCO (SAN MARCOS) Co-Mingled Tons 3.7 3.33 90.0% 0.37
JANUARY 2018 1/2/2018 926784 Palomar Landfill Residual Tons 6.48 0 0.0% 6.48
JANUARY 2018 1/31/2018 936077 Palomar Landfill Residual Tons 7.5 0 0.0% 7.5
JANUARY 2018 Total: 21.34 6.62 31.0% 14.72
Page 1
Please consider the environment before printing
/\ Construction Waste Management 12/05/2018 15:59:37
Monthly Project Recycling Report
WASTE MANAGE ME NT
Project: 2827 WHIPTALE LOOP (TFW CONSTRUCTION) Target Diversion: 50.0%
Est. End Date: 1/31/2019 Actual Diversion: 39.9%
Diverted Residual
Ticket Month Ticket Date Ticket Destination Facility Hauler Material UOM Total Qty Qty Act % Qty
FEBRUARY 2018 2/13/2018 940017 EDCO (SAN MARCOS) Co-Mingled Tons 7 6.3 90.0% 0.7
FEBRUARY 2018 2/21/2018 942751 EDCO (SAN MARCOS) Co-Mingled Tons 3.84 3.46 90.1% 0.38
FEBRUARY 2018 Total: 10.84 9.76 90.0% 1.08
MARCH 2018 3/17/2018 950703 EDCO (SAN MARCOS) Co-Mingled Tons 8.33 7.5 90.0% 0.83
MARCH 2018 Total: 8.33 7.5 90.0% 0.83 - APRIL 2018 4/3/2018 955697 EDCO (SAN MARCOS) Co-Mingled Tons 2.56 1.97 77.0% 0.59
APRIL 2018 4/7/2018 957627 Palomar Landfill Residual Tons 5.93 0 0.0% 5.93
APRIL 2018 4/18/2018 960498 Palomar Landfill Residual Tons 4.69 0 0.0% 4.69
APRIL 2018 Total: 13.18 1.97 14.9% 11.21
MAY 2018 5/1/2018 964455 EDCO (SAN MARCOS) Co-Mingled Tons 8.07 6.21 77.0% 1.86
MAY 2018 5/16/2018 970085 Palomar Landfill Residual Tons 7.54 0 0.0% 7.54
MAY 2018 5/24/2018 973065 Palomar Landfill Residual Tons 4.8 0 0.0% 4.8
MAY 2018 Total: 20.41 6.21 30.4% 14.20
JUNE 2018 6/1/2018 975260 EDCO (SAN MARCOS) Co-Mingled Tons 3.9 3 76.9% 0.9
JUNE 2018 6/14/2018 979299 Palomar Landfill Residual Tons 5.43 0 0.0% 5.43
JUNE 2018 Total: 9.33 3 32.2% 6.33
JULY 2018 7/2/2018 985486 Palomar Landfill Residual Tons 8.03 0 0.0% 8.03
JULY 2018 7/20/2018 991900 Palomar Landfill Residual Tons 4.83 0 0.0% 4.83
JULY 2018 Total: 12.86 0 0.0% 12.86
AUGUST 2018 8/15/2018 430 Palomar Landfill Residual Tons 8.03 0 0.0% 8.03
AUGUST 2018 8/24/2018 4107 Palomar Landfill Residual Tons 3.75 0 0.0% 3.75
AUGUST 2018 Total: 11.78 0 0.0% 11.78
SEPTEMBER 9/27/2018 15994 Palomar Landfill Residual Tons 4.07 0 0.0% 4.07 2018
SEPTEMBER Total: 4.07 0 0.0% 4.07 2018
NOVEMBER 201811/5/2018 26893 Palomar Landfill Residual Tons 4.94 0 0.0% 4.94
NOVEMBER 2018Total: 4.94 0 0.0% 4.94
Total: 159.76 63.71 39.9% 96.05
Page 2
Please consider the environment before printing
Ac ct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. I
Business: No.: 1, American Concrete Washouts
Physical Address Billing Address
Contact: Kyle 760-802-4318 Attention: Accounts Payable
Street: Carlsbad Oaks North Street: P0 BOX 880
City, St ZIP: Carlsbad, CA City, St ZIP: BONSALL, CA 92003-0880
Phone #1: Office 760-631-0588 Phone #1: Fax 760-631-1755
Phone #2: Phone #2: 6D-6RR 6VC-DRF-noFS
email: schneidercont@ATT.net email:
Code Description Rate Bill to: None
Regular $0.00 Billing Group: 2 Regular
Account Type: Contract Late Fees: Yes
Start: 9/12/17 End:
Suspend Start: Suspend End:
Tax District:
Tax Exempt No.: Balance: $0.00
Pay By: Balance COD: No
PO#:
Dumpster:
Teleroute Activity: 9/14/17 to 3/7/18
09/14/17 6:26AM Work Order Started Placement: Oaks North
09/14/17 6:33AM Work Order Paused Placement: Oaks North
09/14/17 7:42AM Work Order Started Placement: Oaks North
09/14/17 7:43AM Work Order Picture Placement: Oaks North
09/14/17 7:43AM Work Order Picture Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 2
09/14/17 7:43AM Work Order Note Placement: Oaks North
Note: RL200 down
09/14/17 7:43AM
09/29/17 9:10AM
09/29/17 9:10AM
09/29/17 9:10AM
09/29/17 9:10AM
09/29/17 10:25AM
09/29/17 10:25AM
Note: 197
09/29/17 10:25AM
Work Order Completed
Work Order Started
Work Order Paused
Work Order Started
Work Order Paused
Work Order Started
Work Order Cntr Chg
Work Order Picture
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
09/29/17 10:26AM Work Order Picture Placement: Oaks North
09/29/17 10:26AM Work Order Completed Placement: Oaks North
09/29/17 10:26AM Work Order Started Placement: Oaks North
09/29/17 10:26AM Work Order Cntr Chg Placement Oaks North
Note: 231
09/29/17 10:26AM Work Order Picture Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 3
09/29/17 10:27AM Work Order Picture Placement: Oaks North
09/29/17 10:43AM Work Order Picture Placement: Oaks North
09/29/17 10:45AM Work Order Note Placement: Oaks North
Note: vac 50 gallons
09/29/17 10:46AM Work Order Note Placement: Oaks North
Note: bin 200 to soft to take
09/29/17 10:49AM Work Order Completed Placement: Oaks North
10/04/17 10:20AM Work Order Started Placement: Oaks North
10/04/17 10:20AM Work Order Picture Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No.4
10/04/17 10:31AM Work Order Picture Placement: Oaks North
10/04/17 10:40AM Work Order Picture Placement: Oaks North
10/04/17 10:49AM Work Order Picture Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 5
10/04/17 10:49AM Landfill Placement: Oaks North
Ticket#: s
Tip Weight: 8.08t0n '
Note: 197r1
10/04/17 10:50AM Work Order Note Placement: Oaks North
Note: 197r1 up/down 300 gal push 150 gal 70 %
10/04/17 12:35PM Work Order Picture Placement: Oaks North
10/04/17 12:35PM Work Order Picture Placement: Oaks North
10/04/17 12:35PM Work Order Picture Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 6
10/04/17 12:44PM Work Order Picture Placement: Oaks North
10/04/17 12:45PM Work Order Note Placement: Oaks North
Note: 231 rl up/down 300 gal pushed 200 gal 60%
10/04/17 2:19PM Work Order Picture Placement: Oaks North
10/04/17 2:20PM Work Order Picture Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 7
10/04/17 2:20PM
10/04/17 2:22PM
10/04/17 2:22PM
Ticket#: s
Tip Weight: 1 0.43t0n
10/04/17 2:22PM
Work Order Completed
Work Order Started
Landfill
Work Order Picture
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
10/04/17 2:23PM Work Order Note Placement: Oaks North
Note: 200r1 up 0 gal 100%
10/04/17 2:27PM Work Order Completed Placement: Oaks North
10/04/17 2:28PM Work Order Started Placement: Oaks North
10/04/17 2:29PM Landfill Placement: Oaks North
Ticket#: s
Tip Weight: 8.08ton
10/04/17 2:29PM Work Order Note Placement: Oaks North
Note: 231r1 up/down 300 gal pushed 200 gal 60%
10/04/17 2:30PM Work Order Picture Placement: Oaks North
Aèt #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 8
10/04/17 2:30PM Work Order Picture Placement: Oaks North
10/04/17
10/16/17
10/16/17
10/16/17
10/16/17
2:30PM
2:20PM
2:20PM
2:44PM
2:45PM
Work Order Completed
Work Order Paused
Work Order Started
Work Order Started
Work Order Picture
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
10/16/17 2:58PM
Note: vac 300 gallons
10/16/17 2:58PM
Ticket#: s
Tip Weight: 6.06ton
Work Order Note
Landfill
Placement: Oaks North
Placement: Oaks North
10/16/17 2:58PM Work Order Completed Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 9
10/17/17 11:30AM Work Order Started Placement: Oaks North
10/17/17 11:30AM Work Order Paused Placement: Oaks North
10/17/17 12:22PM Work Order Started Placement: Oaks North
10/17/17 12:22PM Work Order Picture Placement: Oaks North
10/17/17 12:37PM Work Order Cntr Chg Placement: Oaks North
Note: 171 R
10/17/17 12:38PM Work Order Picture Placement: Oaks North
10/17/17 12:38PM Work Order Picture Placement: Oaks North
10/17/17 12:43PM
Note: vac 300 gallons
10/17/17 12:43PM
Ticket#: s
Tip Weight: 606t0n
Work Order Note
Landfill
Placement: Oaks North
Placement: Oaks North
10/26/17 10:41AM
Note: 45
10/26/17 10:41AM
Note: 45 down
10/26/17
10/26/17
10/26/17
11/15/17
11/15/17
11/15/17
11/15/17
10:41AM
10:43AM
10:43AM
11:02AM
11:02AM
1:07PM
1:07PM
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 10
10/17/17 12:43PM Work Order Completed Placement: Oaks North
10/26/17 10:39AM Work Order Started Placement: Oaks North
10/26/17 10:40AM Work Order Picture Placement: Oaks North
10/26/17 10:40AM Work Order Picture Placement: Oaks North
Work Order Cntr Chg
Work Order Note
Work Order Completed
Work Order Started
Work Order Completed
Work Order Paused
Work Order Started
Work Order Started
Work Order Picture
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Work Order Picture Placement: Oaks North 11/15/17 1:08PM
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 11
11/15/17 1:08PM
Note: 443r1
11/15/17 1:1 IPM
Work Order Cntr Chg
Work Order Picture
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
11/15/17 1:08PM Work Order Note
Note: 300ga1 push 50ga1
11/15/17 3:13PM Landfill
Ticket#: s
,Tip Weight: 7.07ton '
11/15/17 3:13PM Work Order Completed
11/22/17 9:31AM Work Order Paused
11/22/17 9:31AM Work Order Started
11/22/17 10:13AM Work Order Started
11/22/17 10:13AM Work Order Picture
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 12
11/22/17 10:14AM Work Order Note Placement: Oaks North
Note: push 600ga1
11/22/17 11:10AM Landfill Placement: Oaks North
Ticket#: s
Tip Weight: 3.03ton /
11/22/17 11:10AM Work Order Completed Placement: Oaks North
11/22/17 11:13AM Work Order Started Placement: Oaks North
11/22/17 11:13AM Work Order Picture Placement: Oaks North
11/22/17 11:26AM Work Order Picture Placement: Oaks North
11/22/17 11:27AM Work Order Note Placement: Oaks North
Note: vac 443 600 gal 25%
11/22/17 11:28AM Work Order Completed Placement: Oaks North
01/29/18 8:44AM Work Order Paused Placement: Oaks North
01/29/18 8:44AM Work Order Started Placement: Oaks North
01/29/18 10:06AM Work Order Started Placement: Oaks North
01/29/18 10:06AM Work Order Picture Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 14
01/29/18 10:23AM Extra +Trash in contain Placement: Oaks North
01/29/18 10:23AM Extra +Damage Placement: Oaks North
01/29/18 10:24AM Work Order Note Placement: Oaks North
Note: hole in back door and plastic
01/29/18 11:28AM Landfill Placement: Oaks North
Ticket: s
Tip Weight: 10.78ton
01/29/18 11:28AM Work Order Completed Placement: Oaks North
02/28/18 8:50AM Work Order Started Placement: Oaks North
02/28/18 8:50AM Work Order Picture Placement: Oaks North
02/28/18 8:50AM Work Order Picture Placement: Oaks North
02/28/18 8:50AM Work Order Note Placement: Oaks North
Acct #: 3470 Schneider Contracting Mon Dec 10, 2018 Page No. 15
Note: 442RL down
02/28/18 8:51AM
02/28/18 8:53AM
02/28/18 8:53AM
03/07/18 7:48AM
03/07/18 7:48AM
Work Order Completed
Work Order Started
Work Order Completed
Work Order Started
Work Order Picture
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
Placement: Oaks North
03/07/18 7:48AM Work Order Picture Placement: Oaks North
03/07/18 8:03AM Work Order Note Placement: Oaks North
Note: 442 up 200 gal 20%
03/07/18 9:27AM Landfill Placement: Oaks North
Ticket#: s
Tip Weight: 2.02ton
03/07/18 9:27AM Work Order Completed Placement: Oaks North
Justin Mckellar
From: Angela Yanez <office@a1concretepumpinginc.com>
Sent: Thursday, December 6, 2018 2:10 PM
To: Justin Mckellar
Subject: Re: Recycle Tickets Lot 24
Follow Up Flag: Follow up
Flag Status: Flagged
RE: 2827 Whiptail Loop W.
100% of cementitious waste from 9 large washout boxes @ approx 45 tons was recycled at Superior
Ready Mix Plant #8 12117 Industry Rd Lakeside CA 92040.
Angela Yanez
Office Administrator
A-i PUMPCRETE, INC.
P0 Box 1885
Poway, CA 92074
0 (619) 441-9852
F (858) 292-7867
http://www.alconcretepumpinginc.com/
http://washboxrentals.com/
On 2018-12-06 9:02 am, Justin Mckellar wrote:
Angela,
Nice talking to you. The address is 2827 Whiptail Loop W. The work took place within the last 12 months.
Thank you,
1
5 s
'QNNEGQ.flABLEBtLiQF1J. IN BILL NO. pTRANSPOTAT1ON AGREEMENT DATE
- A 56 1806 / S ref
If
r
V111 BROXER#
Xl-( PH.
L JL 1RUCK45
UNDERLWI CARIER ( t
(\_) I TRAIL ER# . .
ADDBESS .........
__________________•...
.
SHIPPER V7 I RECEIVER - 1?
DDRESS . .• ADDRESS_______________________________________
ITWSTAT/ZIP . CE1WSTATE/ZP
oINr.OFóRsGIN
- _)__t____ P6INT0FDESflt4ATiON .
0 SUER TAG
WHEELER I 10 0 TRA4SFE
END DUMP 0 FLAT BED J jpjy 0 TONNAGE 0 PER LOAD 0 SIDE DUMP 0 MIXER I I SUPER 10 0 DBL OTtOMS 0 TRUCK & PUP 0 OTHER I RATE @ $ I VSRONG ARM .. . , sEMI-BoTtOM ............WATER:TRUCK .. . L
..V .
ORnNGIft 11ME OEt N
,
ME \ AcsSoRtALOl1R 7iNGffl ,7LTOWS____P
TrAR DRIVING ARRIVALTIMEAt END LOANG RUNNING11ME
NO.N4EGOrIASLE8ILL017UQNG
.. .E BILL NO. AND 11RANSPOR1ATION AGREEMENT
4 117- J7
1610 MELROSE WAY OFFICE: 760.758.3
3
1
8
BROKERN TRUCKING VISTA, CA 92081 FAX 760 758 3504 TRUCK# - A
dsOFAINYI
ULYINGCERIER
/ TRAILER N /
ADDRESS V PH CAN SIftPPEI% I RECEIVER COSWIIOR T '=' IA! LL8 I4 CONSIGNEE
OX
VI
NAME AND ADDRESS OF DEBITOR IF OThER THAN SHIPPERJCONSIGHOR
— -EuutP.EcT TYPE uj _______
. -
I )
13-PER LOAD
!JPU PflMMflflITV . - LOWDD - ucILtkoIPJG STAUIBY BREAKOOVID OR ARRIVE DEPART ARRIVE DEPART TU,E REASON FOR DELAY
VI I Am
ETTM, : r TUNS
CHARGES
ORIGINAL OriS!CN!EEONSIGNUR fAGENT OR DESITOR) SIB
' NON-NEGOTIABLE- BILL OF LADING AN . D TRANSPORTATION AGREEENT
JL.
TRUCKING 1610 MELROSE WAY OFFICE: 760.758.33 18
VtsTA;CA 92081 FA 760.758.3504
Pill
NON-NEGOTIABLE BILL-OFLADING BILL NO.
AND TRANSPORTATION AGREEMENT 1ATE A 2253294
CARRIER bCa4wt— /7 JOB j7 -J _)"v
ADDRESS
. BROKER#
CITY/STATE/Zip PH. TRUCK#. I ELYING.CARRIEN TRAILER #
[ADDRESS
- --
PH.
SHIPPER rr RECEIVER
ADDRESS DDRESS Z-zj
CITY/STATE/ZIP CITYISTATEZIP
POINT >R,, I POINT OF DESTINATION
Szollowsmil U SR TAG DENO DUMP FL AT B
rb
U 10-WHEELER U TRANSFER U SIDE DUMP U MIXER
U OTHER $
UtJPER10 U DBLBO1TOMS U TRUCK&PUP RATE @ U STRONG ARM 0 SEMI-BOTTOM (3i WATER TRUCK
'' S •• , s... • ••
_________________________
_
_
_
_
_
_
_
_
_
_
_
_
' _________________
.
I H6~