Loading...
HomeMy WebLinkAboutCT 2016-0002; TOWN HOUSE; PRELIMINARY HYDROLOGY AND STORM WATER MANAGEMENT REPORT; 2016-11-09CITY OF CARLSBAD ENGINEERING DIVISION VINCENT L SAMPO-ROE 44173 ENGINEER OF WORK PRELIMINARY HYDROLOGY AND STORM WATER MANAGEMENT REPORT FOR TOWN HOUSE Na 44173 PREPARED BY: SAMPO ENGINEERING, INC. 171 SAXONY ROAD, SUITE 213 ENCINITAS, CA 92024 (760) 436-0660 Railyards Flats Standard Development Project Sampo Engmeermg, Inc. 11/9/2016 Introduction; The subject property is approximately 0 225 gross acres and is located at 2677 State Street m the City of Carlsbad The ptopafy has been previously developed as an automotive repair shop, asphalt concrete covers the majonty of the site and there is an existing garage on-site The subject property's storm water runoff sheet flows Westerly & Southwestarly from the State St Right of Way to the existmg storm dram inlet located on the westerly property line & Right of Way of the rear alley. The pipe exiting the mlet ties to the existing 66" RCP that runs South-North along the west side of the alley This project proposes to mamtam the histoncal drainage pattern The project proposes to construct a 4 story, mixed-use condomimum building on State Street, just North of the recently completed Railyard Lofls and campfire projects. This project proposes 8 luxury condominium umts and 1,600 sf of ground-level professional office space. With 18 residential parking spaces ova: an on-grade parking garage. Hydrology Sximmarv; A hydrology study utilizing the Rational Mrthod was performed for the existmg and proposed conditions and the results are as follows. The existmg condition is composed of 1 hydrologic basin that meludes the entire propaty The existmg drainage basm has a tnbutary area of 0.225 AC with a runoff coefficient of C=0.91 and an anticipated flow for the 100-year storm of 1 43 CPS. The proposed drainage basm, ova: the same area, produces a runoff coefficient of C=0.93 and an anticipated flow for the 100-year storm of 1 47 CPS, The total site impavious surface area is mcreased by 314 SP fixim the existmg condition Thus, the anticipated inarease in storm water runoff volume has beai calculated as 43 CP. A detention basm is proposed m the pariong garage m an effort to mitigate peak storm flows for the total site m the develops condition, refer to attadied calculations. Storm Water Quality SninmarY; The project has been determmed to be a "Standard Project" usmg the City of Carlsbad Storm Wato: Standards Questionnaire (E-34) and is therefore exempt fix)m priority project requirements. The development proposes to reduce the discharge of pollutants off^te by utilizing Source Control and Low Impact Development (LID) BMP's to the maximum extent practical. Storm water treatment will be done by installing krystar downspout filters on the roof downspouts and utilizmg a sand oil separator on ail runoff collected in the proposed parking garage trench drain All storm water runoff generated by the new structure will be collected, treated as outlmed above, detamed m a concrete vault m the parkmg garage before bemg released and conveyed to the 66" RCP public storm dram m the rear alley Rail3urds Plats Sampo Engmeermg, Inc. Standard Development Project 11/9/2016