Loading...
HomeMy WebLinkAbout2017-01-18; Planning Commission; ; SDP 16-12 – HARDING VETERANS HOUSING The City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION Item No. Application complete date: September 8, 2016 P.C. AGENDA OF: January 18, 2017 Project Planner: Austin Silva Project Engineer: David Rick SUBJECT: SDP 16-12 – HARDING VETERANS HOUSING – Request for approval of a Site Development Plan to allow for the demolition of three residential units and the construction of a three- story, 26-unit (25 income restricted and one manager’s unit) apartment building designated for veterans, including development standards modifications, at 3606 Harding Street, in the Residential-Density Multiple Zone and within Local Facilities Management Zone 1. The City Planner has determined that this project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment and is, therefore, exempt from the requirement for the preparation of environmental documents pursuant to Section 15194 (Affordable Housing) of the State CEQA Guidelines. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7222 APPROVING Site Development Plan SDP 16-12 based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND The subject .54 acre site is located on the east side of Harding Street, just north of Magnolia Avenue. The site is comprised of two parcels that will be merged into one lot under the Adjustment Plat process. Three residential units are located on the two parcels and will be demolished to accommodate the proposed apartment building. Table A below includes the General Plan Land Use designations, zoning and current land uses of the project site and surrounding properties. TABLE A – SURROUNDING LAND USES Location General Plan Land Use Designation Zoning Current Land Use Site R-30 RD-M Residential North R-30 RD-M Residential South R-30 RD-M Residential East T-C (Transportation Corridor) T-C (Transportation Corridor) Interstate 5 West R-15 RD-M Residential The applicant, Affirmed Housing Group, is proposing to construct a three-story, 26-unit apartment project that 25 of the units will be for veterans in the very low (50% of area median) and extremely low (30% of area median) income bracket, with one manager’s unit. A portion of the units will provide permanent supportive housing for homeless veterans. The residents will have access to dedicated on-site services, including services intended to improve housing retention, health, education and employment/career opportunities. A dedicated property manager will work with the veterans on an individual case plan, offer 2 SDP 16-12 – HARDING VETERANS HOUSING January 18, 2017 Page 2 assistance in applying for benefits, and provide linkages to other community services. Affirmed Housing Group has partnered with Interfaith Community to be the service provider, which will help ensure delivery of the services offered. The proposed three-story apartment building will take on a Santa Barbara architecture style with Spanish colonial elements such as arched doorways, low-pitched mansard style tile roofs, tall windows, black metal railings, decorative ceramic tiles and precast detailing. The first floor will contain the lobby, an office, parking, and two apartment units. The second and third floors each will have 12 apartment units and an office/amenity space for the residents. Outdoor amenities will include a courtyard with seating areas, a built-in barbeque with a counter and raised planters for gardening. A breakdown of the unit types and sizes are shown in Table B below. TABLE B – UNIT TYPES # of Bedrooms Square Feet # of Units Plan A Studio 421 10 Plan B 1 522 9 Plan C 2 757 5 Plan D 3 1,001 2 III. ANALYSIS The proposed project is subject to the following ordinances, standards and policies: A. General Plan; B. Residential-Density Multiple (RD-M) Zone (C.M.C. Chapter 21.24); C. Parking Ordinance (C.M.C. Chapter 21.44); D. Site Development Plan (C.M.C. Chapter 21.53.120); E. Inclusionary Housing Ordinance (C.M.C. Chapter 21.85); F. Growth Management (C.M.C. Chapter 21.90) The recommendation for approval of this project was developed by analyzing the project's consistency with the applicable regulations and policies. The project's compliance with each of the above regulations is discussed in detail in the sections below. A. General Plan R-30 – Residential Land Use Designation Table C below includes the project site’s gross and net acreage, the number of dwelling units allowed by the General Plan’s Growth Management Control Point (GMCP) density and the proposed projects number of dwelling units and density. TABLE C – DENSITY Gross Acres Net Acres DUs Allowed at GMCP Density (25 du/ac) DUs Proposed and Project Density .54 .54 13.5 26 units at 48 du/ac SDP 16-12 – HARDING VETERANS HOUSING January 18, 2017 Page 3 The proposed 26-unit apartment project will be deducting 12.5 units from the city’s Excess Dwelling Unit Bank because it exceeds the maximum density. Program 2.2 of the Housing Element states “Flexibility in Development Standards of the General Plan describes how the Planning Division may recommend waiving or modifying certain development standards to encourage the development of low-income housing.” The city offers offsets to assist in the development of affordable housing which may include density increases and standards modifications. Housing Element By providing an affordable apartment project with 100% of the units designated as affordable to very low and extremely low income households, the proposed project helps achieve the city’s affordable housing goals as set forth in the Housing Element of the General Plan. Per the Regional Housing Needs Assessment (RHNA), the City of Carlsbad is expected to produce 912 housing units for very low income households for the reporting period of January 1, 2010 to December 31, 2020. As of the latest Housing Element Progress Report for 2015, 35 units for very low income households have been permitted with 877 units remaining. The proposed 26-unit affordable apartment project will reduce the amount of remaining units and help the city achieve its affordable housing goals. Further compliance with the General Plan is outlined in Table D below. TABLE D – GENERAL PLAN COMPLIANCE ELEMENT GOAL/POLICY PROPOSED USES & IMPROVEMENTS COMPLY Land Use Goal 2-G.3: Promote infill development that makes efficient use of limited land supply, while ensuring compatibility and integration with existing uses. Ensure that infill properties develop with uses and development intensities supporting a cohesive development pattern. The applicant is proposing to redevelop an infill site that is underutilized as it relates to density. The proposed three- story building will be adjacent to an existing three story building and will provide a buffer between the freeway and single-family residential uses to the west. Yes Housing Goal 10-G.3: Sufficient new, affordable housing opportunities in all quadrants of the city to meet the needs of current lower and moderate income households and those with special needs, and a fair share proportion of future lower and moderate income households. The proposed project will provide 26 affordable housing units dedicated to special needs (homeless) veterans who are in the very low to extremely low income level bracket for the San Diego County area median income. Yes Housing Policy 10-P.19: Adhere to City Council Policy Statement 43 when considering allocation of “excess dwelling units” for the purpose of allowing development to exceed the Growth Management Control Point (GMCP) density, as discussed in Section 10.3 (Resources Available). With The 26-unit apartment project will have 25 housing units available to very low and extremely low income households. Furthermore, the project site is located in an area that is in close proximity to public transit, employment opportunities and commercial support services. Yes SDP 16-12 – HARDING VETERANS HOUSING January 18, 2017 Page 4 ELEMENT GOAL/POLICY PROPOSED USES & IMPROVEMENTS COMPLY limited exception, the allocation of excess dwelling units will require provision of housing affordable to lower income households. Public Safety Policy 6-P.28: Encourage physical planning and community design practices that deter crime and promote safety. The project has been designed to prevent crime and has incorporated design review recommendations from the Police Department. For example the courtyard common area is located in an area that provides maximum surveillance from windows and balconies of the units on the second and third floors. Additionally, the parking area will be gated and secured 24 hours a day. Yes Noise Goal 5-G.2: Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Policy 5.P.2: Require a noise study analysis be conducted for all discretionary development proposals located where projected noise exposure would be other than “normally acceptable.” A noise study was prepared by Ldn Consulting Inc. (May 5, 2016) and determined that a Sound Transmission Class (STC) rating of 39 will be needed for the glass window assemblies and a STC rating of 34 for all glass door assemblies adjacent to Interstate 5 to reduce the interior noise levels below 45 dBA CNEL. The remainder of the units, set back from the freeway, will need glass assemblies having an STC rating of 36. Yes Circulation Policy 3-P.5: Require developers to construct or pay their fair share towards improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. The applicant will be required to pay traffic impact fees prior to issuance of building permit that will go towards future road improvements. Yes B. Residential-Density Multiple Zone (C.M.C. Chapter 21.24) The proposed project is required to comply with all applicable land use and development standards of the Carlsbad Municipal Code (C.M.C.) including the Residential Density-Multiple Family Zone (C.M.C. Chapter 21.24) and Site Development Plan (C.M.C. Chapter 21.53.120), which is discussed in more detail in Sections C and D, respectively. Table E below summarizes compliance with the RD-M Zoning. SDP 16-12 – HARDING VETERANS HOUSING January 18, 2017 Page 5 TABLE E – RD-M COMPLIANCE R-DM Standards Required Proposed Comply Setbacks Front: 20’ Interior Sides: 5’ Rear: 10’ Front: 20’ Interior Side (north): 8' Interior Side (south): 8’ Rear: 16’ Yes Lot Coverage 60% max 52% Yes Building Height 35’ with minimum 3:12 roof pitch or 24’ if less than a 3:12 roof pitch 35’ w/4:12 roof pitch Yes C. Parking (C.M.C. Chapter 21.44) The required parking for the proposed 26-unit apartment project is shown in Table F below. The applicant is requesting a development standards modification to provide less than the required amount of parking. The requested parking reduction is supported by a parking study prepared by Kimley-Horn (August 25, 2016). The recommendation from the parking study was based upon data collected at Su Casa Por Cortez apartments at 620 Melba Road in Encinitas and the North River Club Apartments at 4250 North River Road in Oceanside and research from an Affordable Housing Parking Study commissioned by the City of San Diego in December of 20111. The two sites were selected because they share similar characteristics of the subject site, including being within walking distance to goods and services, and have housing reserved for households making less than 50% of the area median income (Su Casa Por Cortez) and less than 30% of the area median income (North River Club Apartments). TABLE F – PARKING COMPLIANCE Unit Type/Number of Unit Parking Ratio Spaces Required Spaces Provided Comply Studio/1 bedroom (19) 1.5 spaces/unit 28.5 24 No (Standards Modification is requested) 2 plus bedrooms (7) 2 space unit 14 Guest parking .25 space/unit 6.5 Total= 49 D. Site Development Plan (C.M.C. Chapter 21.53) Section 21.53.120 of the Zoning Ordinance requires that a Site Development Plan (SDP) be processed for an affordable housing project. The SDP for affordable housing projects may allow less restrictive development standards than specified in the underlying zone or elsewhere, provided that the project is in conformity with the General Plan and adopted policies and goals of the city, and it would have no detrimental effect on public health, safety and welfare. Affirmed Housing Group is requesting modified development standards for the proposed affordable apartment project. The modifications include an increase in allowed density from 30 dwelling units per acre to 48 dwelling units per acre, a reduction in the required parking from 49 spaces to 24 spaces, and an allowance of parking in the front yard setback. The proposed standards modifications allow for additional site area for the development of the affordable apartment units that will be geared towards homeless veterans and veterans in the very low to extremely low income bracket. SDP 16-12 – HARDING VETERANS HOUSING January 18, 2017 Page 6 The project’s consistency with the General Plan is discussed in Section A of this report, and the modification to development standards will not have a detrimental effect on public health, safety, or welfare for the following reasons:  An increase in the allowed density from 30 dwelling units per acres to 48 dwelling units is necessary to make the project financially feasible for the developer, as the units will be subsidized in order to allow for households that meet the very low and extremely low income levels to live within the proposed project. The site is an appropriate location for this type of development and density as it is in close proximity to commercial/retail, professional offices, social and community services, and public transportation.  The proposal to allow one standard and one accessible parking space to be located within the front yard setback is supported in order to meet American with Disabilities Act (ADA) requirements. One accessible parking space must be provided on-site for access to the office and lobby. The parking garage will not be accessible to visitors because the security gate will be closed 24 hours a day. The standard parking space allows visitors who aren’t using the accessible parking space to park off-street when visiting the office or residents.  The proposal to reduce the required parking spaces from 49 to 24 is supported by the parking study prepared by Kimley-Horn (August 26, 2016). The development will serve homeless veterans and veterans in the very low to extremely low income bracket. These population groups are less likely to have access to a vehicle for economic reasons. Field observations of affordable housing sites in the area with similar access to goods and services show a reduced need for parking compared to market rate residential developments. Based on these observations, Kimley-Horn suggests a parking ratio of 0.5 space per studio/one bedroom unit, and one space per unit for two and three bedroom units. This recommendation would require 17 parking spaces for the proposed affordable apartment project. The parking study is attached to the report for additional information. E. Inclusionary Housing Ordinance For residential development of seven or more units, not less than 15 percent of the total units approved shall be constructed and restricted both as to occupancy and affordability to lower-income households. The proposed project will provide 100 percent of the apartment units as affordable to persons in the very low and extremely low income brackets. The developer will be required to enter into an Affordable Housing Agreement with the city to provide and deed restrict 25 dwelling units as affordable to lower- income households for 55 years. This meets and exceeds the intent and purpose of the Inclusionary Housing Ordinance. F. Growth Management The proposed project is located within Local Facilities Management Zone 1 in the northwest quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table G below. SDP 16-12 – HARDING VETERANS HOUSING January 18, 2017 Page 7 TABLE G – GROWTH MANAGEMENT COMPLIANCE STANDARD IMPACTS COMPLIANCE City Administration 91.96 sq. ft. Yes Library 49.04 sq. ft. Yes Waste Water Treatment 26 EDUs Yes Parks 0.18 acre Yes Drainage 2.1 cfs Yes Circulation 156 ADT Yes Fire Station No. 1 Yes Open Space 0 acres N/A Schools Carlsbad (E=.71/M=.21/HS = .19) Yes Sewer Collection System 26 EDUs Yes Water 6,500 GPD Yes The unit yield of the property at the R-30 GMCP (du/ac) is 13.5 dwelling units and 26 units are proposed. The proposed project is 12.5 units above the GMCP for R-30 properties. These units will be deducted from the City’s Excess Dwelling Unit Bank. IV. ENVIRONMENTAL REVIEW The project qualifies as a CEQA Guidelines Section 15194 (Affordable Housing) Statutory Exemption. The project meets the criteria set forth in Section 15192 (Threshold Requirements for Exemptions for Agricultural Housing, Affordable Housing, and Residential Infill Projects) and Section 15194 (Affordable Housing Exemption), is less than five acres in size, the project consists of less than 50 units and is located within an incorporated city with a population of at least 2,500 persons per square mile and a total population of at least 25,000 persons, the project site has been previously developed for qualified urban uses, the project consists of the construction, conversion, or use of residential housing consisting of 100 or fewer units that are affordable to low-income households, and the developer of the project provides sufficient legal commitments to the City of Carlsbad to ensure the continued availability and use of the housing units for lower income households for a period of at least 55 years, at monthly housing costs deemed to be “affordable rent” for very low and extremely low income households, as determined pursuant to Section 50053 of the Health and Safety Code. A Notice of Exemption will be filed by the City Planner upon final project approval. ATTACHMENTS: 1. Planning Commission Resolution No. 7222 2. Location Map 3. Disclosure Statement 4. Parking Study prepared by Kimley Horn (August 25, 2016) 5. Reduced Exhibits 6. Exhibits “A” – “T” dated January 18, 2017 MAGNOLIA AV H A R D I N G S T VILLAGECRCHESTNUT AVJ E F F E R S O N S TPALM AVA D A M S S T CAMELLIA PLAVOCADO LN M A D I S O N S T V I L LAGE DR P I OP I C OD R SDP 16-12Harding Veterans Housing SITE MAP JPALOMARAIRPORTRD E L C AMREALL A COS TA AV C A R L S B A D B LCARLSBADVILLAGEDREL C AMINOREAL MELRO S E DRAVIARAPY RANCHOS ANTAFERDC OLLE GEBL!"^ SITE {City of Carlsbad DISCLOSURE STATEMENT P-1{A) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county , city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 1 0% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person James Silverwood Corp/Part Affirmed Housing Group Title President/CEO Title ---------------------------- Address 13520 Evening Creek Dr. N, Ste 160 Address 13520 Evening Creek Dr. N, Ste 160 2. OWNER (Not the owner's agent) P-1 (A) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person James Silverwood Title President/CEO Address 3520 Evening Creek Dr. N, Ste 160 San Diego, CA 92128 Corp/Part Affirmed Housing Group Title _____________________ _ Address 13520 Evening Creek Dr. N, Ste 160 San Diego, CA 92128 Page 1 of 2 Revised 07/10 r ~c:ity of Carsbad DISCLOSURE STATEMENT P-1(A) pe_ye!Q.PJ.fr!ef!.t Se rv[g;_es Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following Information MUST be disclosed at the time of application submittal. Your project cannot be reviewed untif this information is completed. Please print. - Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city ;;~nd county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person James Silverwood corp/Part Affirmed Housing Group Title President/CEO Title ---------------------------Address 13520 Evening Creek Dr. N, Ste 160 Address 13520 Evening Creek Dr. N, Ste 160 2. OWNER (Not the owner's agent) P~1(A) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in common, non-profrt, corporation, etc.). If the ownership includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Martin Kouma Corp/Part Affirmed Housing Group Title Owner Title ·---------------------------- Address 3630 Harding St Carlsbad, CA 92008 Address 13520 Evening Creek Dr. N, Ste 160 San Diego, CA 92128 Page 1 of2 Revised 07/10 N VICINITY MAP CHES N UT A VE N UE OAK A V E N U E CARL S B A D VI L L A G E D RI V E INTERSTATE 5HARD ING S TR E E T OAK SITE HARDING SITE DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 T1.1SHEET MAP N.T.S. VICINITY MAP & PROJECT INFORMATION PROJECT INFORMATION - HARDING SITE APN: 204-192-05 204-192-06 ADDRESS: 3606 & 3630 HARDING STREET CARLSBAD, CA 92008 ZONE: RD-M LAND USE: R-30 LOT SIZE: .54 ACRES PROPOSED UNITS: 26 PROPOSED DENSITY: 48 DU/AC PARKING STALLS PROPOSED: 24 SPACES FLOOR AREA: 35,433 SQUARE FEET UNIT BREAKDOWN A. 10 STUDIOS B. 9 ONE BEDROOMS C. 5 TWO BEDROOMS D. 2 THREE BEDROOMS DRAWING INDEX T1.1 VICINITY MAP & PROJECT INFORMATION A1.1 HARDING ENLARGED CONTEXT MAP A1.2 HARDING SITE PLAN A1.3 HARDING LEVEL TWO FLOOR PLAN A1.4 HARDING LEVEL THREE FLOOR PLAN A1.5 HARDING ROOF PLAN A1.6 HARDING BUILDING ELEVATIONS A1.7 HARDING BUILDING ELEVATIONS A1.8 HARDING PERSPECTIVE VIEW A1.9 HARDING PERSPECTIVE VIEW A2.1 UNIT PLANS A3.1 COLOR & MATERIALS C.1 TITLE SHEET C.2 EXISTING CONDITIONS C.3 PROPOSED CONDITIONS C.4 PROPOSED CONDITIONS L1.0 CONCEPTUAL LANDSCAPE PLAN L2.0 CONCEPTUAL WATER CONSERVATIONS PLAN L3.0 WATER SUPPLY PLAN L4.0 CONCEPTUAL MAINTENANCE RESPONSIBLITY EXHIBIT 72’ - 0”INCENTIVE REQUESTS: THE APPLICANT REQUESTS MODIFICATIONS TO THE DEVELOPMENT STANDARDS BASED ON CMC 21.53.120 FOR AFFORDABLE HOUSING PROJECTS AND CITY COUNCIL POLICY NO.43. THE CITY’S HOUSING POLICY TEAM REVIEWED THIS PROJECT ON DEC 7, 2015, AND WAS SUPPORTIVE OF THE PROPOSAL, AND IS SUPPORTING FINANCIAL ASSISTANCE TO FACILITATE DEVELOPMENT OF THE PROPOSED HOUSING. A PARKING REDUCTION IS REQUESTED AND THE APPLICANT HAS SUBMITTED PARKING AND TRAFFIC STUDIES TO SUPPORT THE PROPOSED NUMBER OF PARKING SPACES. ADDITIONALLY, THE APPLICANT HAS PROVIDED REDUCED DEMAND STUDIES AND POLICY FROM THE CITY OF SAN DIEGO RELATING TO SIMILAR PROJECTS. FINALLY THE APPLICANT REQUESTS PERMISSION TO PROVIDE PARKING WITHIN THE FRONT SETBACK OF THE PROJECT SITE AS AN INCENTIVE UNDER CMC 21.53.120. PROJECT DIRECTORY OWNER/DEVELOPER AFFIRMED HOUSING 13520 EVENING CREEK DRIVE N., SUITE 160 SAN DIEGO, CA 92128 PHONE: (858) 679-2828 CONTACT: SYDNEY CORDOVA ARCHITECT DAHLIN GROUP ARCHITECTURE PLANNING 539 CEDROS AVENUE SOLANA BEACH, CA 92075 PHONE: (858) 350-0544 CONTACT: SEAN WHITACRE LANDSCAPE ARCHITECT IVY LANDSCAPE ARCHITECTURE PLANNING 1947 FERN STREET SAN DIEGO, CA 92102 PHONE: (619) 235-5360 CONTACT: MICHAEL VAIL CIVIL ENGINEER KETTLER LEWECK ENGINEERING 303 A STREET, SUITE 302 SAN DIEGO, CA 92101 PHONE: (619) 269-3444 CONTACT: LISA LEWECK DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 1 3 4 5 6 7 8 9 2 MULTI FAMILY RESIDENCIES SINGLE FAMILY RESIDENCE 6’ CONCRETE BLOCK WALL LOW CHAIN LINK FENCE LOW WOOD FENCE PRIVACY FENCE RETAINING CONCRETE WALL 100’ BOUNDARY FROM SITE PROPERTY LINE KEY 8 7 9 6 2 1 6 1 5 2 53 51 3 2 1 100’-0”56’-0”72’-0”95’ -0” 4’-0” 68’-0” 62’-0” HARDING STREET INTERSTATE 5 AVOCADOLANECAMELLIAPLACEN A1.1SHEET HARDING ENLARGED CONTEXT MAP 0 15 30 60 90 Scale: 1”=30’-0” 2’-0” 7’-0”2’-0” SITE AREA:23,653 SQ. FT. BUILDING FOOTPRINT: 12,374 SQ. FT. LOT COVERAGE 52% FLOOR AREAS: 1ST:12,374 SQ. FT. 2ND:11,517 SQ. FT. 3RD:11,542 SQ. FT. TOTAL:35,433 SQ. FT.HARDING STREETDAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 N A1.2SHEET HARDING SITE PLAN 0 4 8 16 32 Scale: 1/8”=1’-0” NOTES FROM HEALTH AND NOISE STUDIES: Based on Health and Noise studies produced by Ldn Consulting, inc. and dated 5.5.2016 the following elements shall be included in the proposed construction: Glazing on the Eastern half of the building (as diagramed in the report) shall meet a minimum STC reduction rating of 39 for windows and 37 for doors. All glazing on the Western portion shall meet a minimum STC reduction rating of 34. MERV 13 Filtration System shall be included for fresh air intake to reduce particulates. HARDING STREETSITE AREA:23,653 SQ. FT. BUILDING FOOTPRINT: 12,374 SQ. FT. LOT COVERAGE 52% FLOOR AREAS: 1ST:12,374 SQ. FT. 2ND:11,517 SQ. FT. 3RD:11,542 SQ. FT. TOTAL:35,433 SQ. FT. DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 N A1.3SHEET HARDING LEVEL TWO FLOOR PLAN 0 4 8 16 32 Scale: 1/8”=1’-0” NOTES FROM HEALTH AND NOISE STUDIES: Based on Health and Noise studies produced by Ldn Consulting, inc. and dated 5.5.2016 the following elements shall be included in the proposed construction: Glazing on the Eastern half of the building (as diagramed in the report) shall meet a minimum STC reduction rating of 39 for windows and 37 for doors. All glazing on the Western portion shall meet a minimum STC reduction rating of 34. MERV 13 Filtration System shall be included for fresh air intake to reduce particulates. HARDING STREETSITE AREA:23,653 SQ. FT. BUILDING FOOTPRINT: 12,374 SQ. FT. LOT COVERAGE 52% FLOOR AREAS: 1ST:12,374 SQ. FT. 2ND:11,517 SQ. FT. 3RD:11,542 SQ. FT. TOTAL:35,433 SQ. FT. DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 N A1.4SHEET HARDING LEVEL THREE FLOOR PLAN 0 4 8 16 32 Scale: 1/8”=1’-0” NOTES FROM HEALTH AND NOISE STUDIES: Based on Health and Noise studies produced by Ldn Consulting, inc. and dated 5.5.2016 the following elements shall be included in the proposed construction: Glazing on the Eastern half of the building (as diagramed in the report) shall meet a minimum STC reduction rating of 39 for windows and 37 for doors. All glazing on the Western portion shall meet a minimum STC reduction rating of 34. MERV 13 Filtration System shall be included for fresh air intake to reduce particulates. DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 N A1.5SHEET HARDING ROOF PLAN 0 4 8 16 32 Scale: 1/8”=1’-0” 1 2 3 4 5 6 7 8 9 10 11 12 13 LOW SLOPE ROOF ‘S’ TILE ROOFING, 4:12 SLOPE, TYP. STUCCO BODY 1 FOAM DETAILING METAL RAILS VINYL WINDOWS ACCENT COLOR DECORATIVE LIGHT FIXTURE DECORATIVE CERAMIC TILE PRECAST DETAILING SINGLE COLOR CERAMIC TILE STOREFRONT SYSTEM GARAGE SCREENS KEYNOTES ELEVATOR SHAFTS WILL BE TALLER THAN THE 35’ HEIGHT LIMIT 2 11 SITE AREA:23,653 SQ. FT. BUILDING FOOTPRINT: 12,374 SQ. FT. LOT COVERAGE 52% FLOOR AREAS: 1ST:12,374 SQ. FT. 2ND:11,517 SQ. FT. 3RD:11,542 SQ. FT. TOTAL:35,433 SQ. FT. ELEVATOR SHAFTS WILL BE TALLER THAN THE 35’ HEIGHT LIMIT T.O. ROOF STRUCTURE T.O. GARDEN WALL 2’-6”T.O. FENCE PROPERTY LINET.O. ROOF STRUCTURE 6’-0”35’-0”PROPERTY LINESETBACK LINEPROPEPROPERTY LINESEE TYP. WALL SECTION SEE TYP. WALL SECTION SETBACK LINE2’SETBACK LINEPROPERTY LINESETBACK LINE35’-0”MAX. DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 A1.6SHEET HARDING BUILDING ELEVATIONS WEST ELEVATION SOUTH ELEVATION 0 4 8 16 32 Scale: 1/8”=1’-0” 3 3 2 2 6 6 7 7 8 8 5 5 4 4 13 111311 10 912 12 912 12 ELEVATOR SHAFTS WILL BE TALLER THAN THE 35’ HEIGHT LIMIT 1 2 3 4 5 6 7 8 9 10 11 12 13 LOW SLOPE ROOF ‘S’ TILE ROOFING, 4:12 SLOPE, TYP. STUCCO BODY 1 FOAM DETAILING METAL RAILS VINYL WINDOWS ACCENT COLOR DECORATIVE LIGHT FIXTURE DECORATIVE CERAMIC TILE PRECAST DETAILING SINGLE COLOR CERAMIC TILE STOREFRONT SYSTEM GARAGE SCREENS KEYNOTES DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 35’-0”A1.7SHEET HARDING BUILDING ELEVATIONS 0 4 8 16 32 Scale: 1/8”=1’-0” 1 2 3 4 5 6 7 8 9 10 11 12 13 LOW SLOPE ROOF ‘S’ TILE ROOFING, 4:12 SLOPE, TYP. STUCCO BODY 1 FOAM DETAILING METAL RAILS VINYL WINDOWS ACCENT COLOR DECORATIVE LIGHT FIXTURE DECORATIVE CERAMIC TILE PRECAST DETAILING SINGLE COLOR CERAMIC TILE STOREFRONT SYSTEM GARAGE SCREENS KEYNOTES T.O. FLOOR 3 [+83.87’] T.O. FLOOR 2 [+73.7’] T.O. SLAB [+/- 62.7’ TYP.] WALL SECTION T.O. ROOF (+97.2’) LOWEST POINT OF GRADE AT PERIMETER [+/- 62.2’]9’-1”10’-2”11’-6”6”35’-0”6’-0”T.O. FENCE T.O. ROOF STRUCTURE EAST ELEVATION NORTH ELEVATION 326754 13 9139 326754 13 111311 ELEVATOR SHAFTS WILL BE TALLER THAN THE 35’ HEIGHT LIMIT TYP. WALL SECTION (SEE RIGHT)T.O. GARDEN WALL 2’-6”T.O. FENCE T.O. ROOF STRUCTURE 6’-0”35’-0”T.O. GARDEN WALL 2’-6”ELEVATOR SHAFTS WILL BE TALLER THAN THE 35’ HEIGHT LIMIT SEE TYP. WALL SECTION PROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINE1111SETBACK LINESETBACK LINESETBACK LINESETBACK LINE2’ MAX 3-9”SEE TYP. WALL SECTION DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 0 24 8 16 Scale: 1/4”=1’-0” UNIT PLANS A2.1SHEET UNIT TYPE A - STUDIO 421 NET SQ. FT. UNIT TYPE C - TWO BEDROOM 757 NET SQ. FT. UNIT TYPE D - THREE BEDROOM 1,001 NET SQ. FT. UNIT TYPE B.1 - ONE BEDROOM 522 NET SQ. FT. UNIT TYPE B.2 - ONE BEDROOM 630 NET SQ. FT. DAHLIN GROUP ARCHITECTURE | PLANNING Carlsbad Veterans WWW.DAHLINGROUP.COM CARLSBAD, CA | AFFIRMED HOUSING 736-013 | DECEMBER 15, 2016 HARDING SITE SDP 16-12 PRIMARY BODY (STUCCO) OMEGA (DIAMOND WALL ONE COAT) SW 7562, ROMAN COLUMN EXTERIOR COLOR TRIM A (WOOD TRIM, FASCIAS, WOOD RAIL-INGS) SW 7034, STATUS BRONZE FOAM DETAILINGFOAM DETAILING WROUGHT IRON SW 7020 STATUS BRONZE METAL RAILS TRIM B (SIDING) SW 6097, STURDY BROWN ACCENT COLOR ‘S’ TILE ROOFING ROOF MIGARD TAN VINYL WINDOWS ARTO TILE SD 114-B5615C DECORATIVE CERAMIC TILE A3.1SHEET 3267854 13 1110912 10 13 1110912 1 2 3 4 5 6 7 8 9 10 11 12 13 LOW SLOPE ROOF ‘S’ TILE ROOFING, 4:12 SLOPE, TYP. STUCCO BODY 1 FOAM DETAILING METAL RAILS VINYL WINDOWS ACCENT COLOR DECORATIVE LIGHT FIXTURE DECORATIVE CERAMIC TILE PRECAST DETAILING SINGLE COLOR CERAMIC TILE STOREFRONT SYSTEM GARAGE SCREENS MATERIAL LIST ARTO TILE ARTILLO COTTODARK SINGLE COLOR CERAMIC TILE 99