HomeMy WebLinkAboutStatewide Stripes Inc; 2016-12-23; PWM17-49GSRECORDED REQUESTED BY
CITY OF CARLSBAD
AND WHEN RECORDED PLEASE
MAIL TO:
City Clerk
City of Carlsbad
1200 Carlsbad Village Drive
Carlsbad, California 92008
DOC# 2017-0106100
llllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll
Mar 07, 2017 03:43PM
OFFICIAL RECORDS
Ernest J. Dronenburg, Jr.,
SAN DIEGO COUNTY RECORDER
FEES: $0.00
PAGES 1
Space above this line for Recorder's use.
PARCEL NO: N/A -------------------
NOTICE OF COMPLETION
Notice is hereby given that:
1. The undersigned is owner of the interest or estate stated below in the property hereinafter described.
2. The full name of the undersigned is City of Carlsbad, a municipal corporation.
3. The full address of the undersigned is 1200 Carlsbad Village Drive, Carlsbad, California 92008.
4. The nature of the title of the undersigned is: In fee.
5. A work or improvement on the property hereinafter described was completed on Feb. 9, 2017.
6. The name of the contractor for such work or improvement is Statewide Stripes Inc.
7. The property on which said work or improvement was completed is in the City of Carlsbad, County of
San Diego, State of California, and is described as follows: PWM17-49GS, Cassia Road
Thermoplastic Legends and Legend Striping.
8. The street address of said property is Cassia Road in the City of Carlsbad.
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, California,
92008; the City Manager of said City on fe~24 , 20__l::J_, accepted the above
described work as completed and ordered that a Notice of Completion be filed.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on ~ \ , 20 \1. at Carlsbad, California.
Word\Masters\Forms\Notice of Completion (City) 3/9/98
CITY OF CARLSBAD
ACCEPTANCE OF PUBLIC IMPROVEMENTS
COMPLETION OF PUBLIC IMPROVEMENTS
The contractor has constructed the improvements required for Project No. PWM17-49GS,
Cassia Road Thermoplastic Legends and Legend Striping, and has requested that the City of
Carlsbad accept the public improvements. City forces have inspected the public improvements
and found them to be satisfactory. The public improvements consist of:
IMPROVEMENTS VALUE
Thermoplastic Legends and Striping $5,722.25
PUBLIC WORKS DIRECTOR CERTIFICATION OF COMPLETION OF IMPROVEMENTS
CITY MANAGER'S ACCEPTANCE OF PUBLIC IMPROVEMENTS
The construction of the above described public improvements is deemed complete and hereby
accepted. The City Clerk is hereby authorized to record the Notice of Completion and release
the bonds in accordance with State Law and City Ordinances.
The City of Carlsbad is hereby directed to commence maintaining the above described
improvements.
APPROVED AS TO FORM:
CELIA BREWER, City Attorney
By:---:'~L..--::-:---:----~t City Attorney
Word\Masters\Forms\Acceptance of Public Improvements (City)
Date
319198
PWM17-49GS
INDEMNITY. The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and
hold harmless the City, and its officers and employees, from all claims, loss, damage, injury and liability of
every kind, nature and description, directly or indirectly arising from or in connection with the performance
of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable
law, rules or regulations including those related to safety and health; and from any and all claims, loss,
damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the
nature of the work covered by the Contract, except for loss or damage caused by the sole or active
negligence or willful misconduct of the City. The expenses of defense include all costs and expenses
including attorneys' fees for litigation, arbitration, or other dispute resolution method.
JURISDICTION. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for
resolution of any disputes between the parties arising out of this agreement is San Diego County,
California.
Start Work: Contractor agrees to start within five (5) working days after receipt of Notice to Proceed.
Completion: Contractor agrees to complete work within fifteen (15) working days after receipt of Notice to
Proceed.
CONTRACTOR'S INFORMATION.
Statewide Stripes, Inc.
(name of Contractor)
788286
(Contractor's license number)
C 32,C-33,D-38, C-61, D42
(license class. and exp. date)
1000001334
(DIR registration number)
6/30/2017
(DIR registration exp. date)
Ill
Ill
Ill
Ill
Ill
Ill
CASSIA ROAD THERMOPLASTIC BIKE
STENCILS; CONT. NO. 6070
PO Box 600710
(street address)
San Diego, CA 92160
(city /state/zip)
858-560-6887
(telephone no.)
858-560-0158
(fax no.)
dave@statewidestripes. com
(e-mail address)
Page 3 of 6 City Attorney Approved 9/27/2016
PWM17-49GS
EXHIBIT A
LISTING OF SUBCONTRACTORS BY GENERAL CONTRACTOR
Set forth below is the full name and location of the place of business of each sub-contractor whom the
Contractor proposes to subcontract portions of the Project in excess of one-half of one percent of the total
bid, and the portion of the Project which will be done by each sub-contractor for each subcontract.
NOTE: The Contractor understands that if it fails to specify a sub-contractor for any portion of the Project
to be performed under the contract in excess of one-half of one percent of the bid, the contractor
shall be deemed to have agreed to perform such portion, and that the Contractor shall not be
permitted to sublet or subcontract that portion of the work, except in cases of public emergency or
necessity, and then only after a finding, reduced in writing as a public record of the Awarding
Authority, setting forth the facts constituting the emergency or necessity in accordance with the
provisions of the Subletting and Subcontracting Fair Practices Act (Section 4100 et seq. of the
California Public Contract Code).
If no subcontractors are to be employed on the project, enter the word "NONE."
SUBCONTRACTORS
Portion of Project to Business Name and Address DIR Registration License No., %of
be Subcontracted No. Classification & Total
Expiration Date Contract
Total% Subcontracted: _..:...l\\_D_n_/2..; __ _
The Contractor must perform no less than fifty percent (50%) of the work with its own forces.
CASSIA ROAD THERMOPLASTIC BIKE
STENCILS; CONT. NO. 6070 Page 5 of 6 City Attorney Approved 9/27/2016
PWM17-49GS
EXHIBIT B
Provide all labor, equipment and materials necessary to complete the itemized work below, as shown on
the construction drawings attached as Exhibit "C", in accordance with the Caltrans Standard Plans and the
Standard Specifications for Public Works Construction (Greenback).
JOB QUOTATION
ITEM UNIT QTY DESCRIPTION PRICE
NO.
Install eleven (11) new thermoplastic share the road. Bike
1 EA 11 stencils (sharrows) on Cassia Rd. between Nicole Drive $1,650.00
and Kalmia Circle. ($150 each)
2 EA 4
Install four (4) new thermoplastic bike Lane stencils east
and westbound on Cassia Road ($150 each) $600.00
Install thirty seven (32) Isosceles triangle yield legends.
3 EA 32 Ten (10) on Cassia Rd at Kalmia Cir., East, Twelve (12) $896.00
on Cassia Rd at Nicole Dr., Ten (10) on Cassia Rd at
Kalmia Circle West ($28 each)
Remove 575 linear feet of bike lane on asphalt roadway
4 LF 575 between Nicole Road and Kalmia Circle West on Cassia $1,006.25
Rd. by water blasting ($1.75/LF)
Remove three (3) stop legends on Cassia Rd., two (2) on
5 EA 3 Kalmia Circle, one (1) on Nicole Rd. at Cassia Rd. by $1,050.00
water blasting ($350 each)
Remove three (3) stop limit lines by water blasting ($175 $520.00
6 EA 3 each) one (1) on Cassia Rd at Kalmia Cir., East, one (1)
on Cassia Rd at Nicole Dr., one (1) on Cassia Rd at
Kalmia Circle West.
TOTAL* $5,722.25
*Includes taxes, fees, expenses and all other costs.