Loading...
HomeMy WebLinkAboutLFMP 15E; DOS COLINAS; Zone 15 Local Facilities Management Plan; 2011-10-19 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES MANAGEMENT PLAN AMENDMENT ZONE 15 (E) Prepared For: City of Carlsbad Planning Department 1635 Faraday Avenue Carlsbad, California 92008 Prepared By: Ladwig Design Group Inc. Hunsaker and Associates Linscott Law & Greenspan Approved by City Council on: • Planning Commission Resolution No. 6828, October 19, 2011 • City Council Resolution No. 2011-285, January 10, 2012 PAGE LEFT BLANK FOR 2 SIDED PRINTING Zone 15 LFMP Page i October 19, 2011 INDIVIDUALS RESPONSIBLE FOR THE PREPARATION OF AMENDMENT (E) CONSULTANTS: Ladwig Design Group Inc 2234 Faraday Avenue Carlsbad, CA 92008 Bob Ladwig Hunsaker and Associates 9707 Waples Street San Diego, CA 92121 Ray Martin Mary Beth Murray Lindscott Law & Greenspan 1565 Hotel Circle South, Suite 310 San Diego, CA 92108 John Keating Walter Musial CITY OF CARLSBAD: Don Neu – Planning Director Shannon Werneke – Associate Planner Jeremy Riddle, Associate Engineer SPONSORING LAND OWNER: John Rimbach – West Senior Living R/E, LLC 5796 Armada Drive. Suite 300 Carlsbad, CA 92008 Zone 15 LFMP Page ii October 19, 2011 Local Facilities Management Plan Zone 15 APPROVED BY: Planning Commission Resolution #2972, February 7, 1990 City Council Resolution #90-101, April 10, 1990 **** Local Facilities Management Plan Amendment LFMP 15(A) Boundary Change APPROVED BY: Planning Commission Resolution #4171, September 3, 1997 City Council Resolution 97-647, October 21, 1997 **** Local Facilities Management Plan Amendment LFMP 15(B) Land Use Change APPROVED BY: Planning Commission Resolution #4291, July 1, 1998 City Council Resolution #98-337, November 17, 1999 **** Local Facilities Management Plan Amendment LFMP 15(C) APPROVED BY: Planning Commission Resolution#5750, October 29, 2004 City Council Resolution 2004-386, December 7, 2004 Local Facilities Management Plan Amendment LFMP 15 (D) Application Withdrawn Local Facilities Management Plane Amendment (E) Planning Commission Resolution # 6828, October 19, 2011 City Council Resolution #2011-285, January 10, 2012 Zone 15 LFMP Page iii October 19, 2011 TABLE OF CONTENTS I. EXECUTIVE SUMMARY ...............................................................................................1 II. INTRODUCTION............................................................................................................20 III. BUILD OUT PROJECTIONS ........................................................................................31 IV. PHASING PROJECTIONS ............................................................................................42 V. ZONE 15 REQUIREMENTS FOR PUBLIC FACILITIES AND SERVICES .........53 CITY ADMINISTRATIVE FACILITIES ........................................................54 Performance Standard .................................................................................54 Facility Planning and Adequacy Analysis ...................................................54 Mitigation ....................................................................................................59 Financing .....................................................................................................59 LIBRARY FACILITIES .....................................................................................61 Performance Standard .................................................................................61 Facility Planning and Adequacy Analysis ...................................................61 Mitigation ....................................................................................................66 Financing .....................................................................................................66 WASTEWATER TREATMENT CAPACITY .................................................70 Performance Standard .................................................................................70 Facility Planning and Adequacy Analysis ...................................................70 Mitigation ....................................................................................................75 Financing .....................................................................................................75 PARK FACILITIES ............................................................................................77 Performance Standard .................................................................................77 Facility Planning and Adequacy Analysis ...................................................77 Mitigation ....................................................................................................83 Potential Additional Sources of Park Acreage ............................................83 Financing .....................................................................................................83 DRAINAGE FACILITIES ..................................................................................86 Performance Standard .................................................................................86 Facility Planning and Adequacy Analysis ...................................................86 Mitigation ....................................................................................................88 Financing .....................................................................................................90 CIRCULATION FACILITIES...........................................................................91 Performance Standard .................................................................................91 Facility Planning and Adequacy Analysis ...................................................91 Mitigation ....................................................................................................96 Financing ...................................................................................................123 Zone 15 LFMP Page iv October 19, 2011 TABLE OF CONTENTS (continued) FIRE FACILITIES ............................................................................................124 Performance Standard ...............................................................................124 Facility Planning and Adequacy Analysis .................................................124 Mitigation ..................................................................................................126 Financing ...................................................................................................138 OPEN SPACE FACILITIES ............................................................................130 Performance Standard ...............................................................................130 Facility Planning and Adequacy Analysis .................................................130 Mitigation ..................................................................................................135 Financing ...................................................................................................135 SCHOOL FACILITIES ....................................................................................136 Performance Standard ...............................................................................136 Facility Planning and Adequacy Analysis .................................................136 Mitigation ..................................................................................................138 Financing ...................................................................................................138 SEWER COLLECTION SYSTEM .................................................................140 Performance Standard ...............................................................................140 Facility Planning and Adequacy Analysis .................................................140 Mitigation/Financing .................................................................................142 WATER FACILITIES .....................................................................................143 Performance Standard ...............................................................................143 Facility Planning and Adequacy Analysis .................................................143 Mitigation ..................................................................................................146 Financing ...................................................................................................148 VI. FACILITY FINANCING (Revised 2004 – Amendment C) .......................................148 Facility Financing Summary ................................................................................153 Zone 15 LFMP Page v October 19, 2011 LIST OF EXHIBITS NO. TYPE TITLE PAGE 1 Map Zone 15 Location Map ................................................... 3 2 Table Zone 15 Existing Public Facilities Summary Sheet ................. 4 3 Table Zone 15 Build Out Public Facilities Summary Chart ............... 5 4 Table General Conditions for Zone 15 ....................................... 6 5 Table Special Conditions For Zone 15 ........................................ 8 5A Map Development Areas ...................................................... 25 6 Table Zone 15 Property Owners List ........................................ 26 7 Map Major Land Owners ..................................................... 28 8 Map General Plan Designations ............................................. 29 9 Map Zoning ..................................................................... 30 10 Map Constraints Map .......................................................... 33 11 Table Build Out Projections ................................................... 34 12 Table Existing Land Use ....................................................... 35 13 Table Developing Land Uses .................................................. 36 14 Table Residential Build Out Projections ..................................... 39 15 Table Non-Residential Build Out Projections ............................... 40 16 Table Build Out Population Projections ..................................... 41 19 Table Zone 15 Residential Phasing ........................................... 43 20 Table Exhibit Eliminated (Amendment B) 21 Table Zone 15 Non-Residential Phasing .................................... 45 22 Table City Wide Residential/Non-Residential Phasing ................... 46 23 Map City Administrative Facilities .......................................... 55 24 Table City Administrative Phasing Projections ............................ 58 25 Table City Administrative Financing Matrix ............................... 60 26 Map Library Facilities ......................................................... 62 27 Table Library Phasing Projections ........................................... 67 28 Table Library Financing Matrix .............................................. 69 29 Map Wastewater Facilities .................................................... 71 30 Table Encina WPCF Capacity Analysis ..................................... 70 31 Table Carlsbad Sewer Service District Projections ........................ 74 32 Table Wastewater Financing Matrix ......................................... 76 33 Map Park Districts ............................................................. 78 34 Map Park Locations ........................................................... 80 35 Table Park Phasing Projections ............................................... 82 36 Table Park Financing Matrix .................................................. 85 Zone 15 LFMP Page vi October 19, 2011 LIST OF EXHIBITS (continued) NO. TYPE TITLE PAGE 41 Map Existing and Proposed Circulation (Figures 1-15, Amend. C) .. 108 42 (Map) Table 1 Replaced with Circulation Phasing ................................. 102 43 (Map) Table 2 Replaced with Build Out Traffic Generation ...................... 103 44 (Map) Table 3 Replaced with Signal 12 Intersection Operation .................. 104 45 (Map) Table 4 Replaced with Street Segment Operation .......................... 105 46 (Map) Table 5 Replaced with Traffic Mitigation Summary ....................... 106 49 Map Existing Fire Response Time ........................................ 125 50 Map Proposed Fire Response Time ....................................... 127 51 Table Fire Financing Matrix ................................................. 129 52 Map Open Space Locations ................................................. 131 53 Table Open Space Inventory ................................................. 132 54 Map School District Locations ............................................. 137 55 Map Sewer District Boundaries ............................................ 139 62 Table Facility Financing Summary ......................................... 153 Zone 15 LFMP Page 1 October 19, 2011 I. EXECUTIVE SUMMARY The purpose of this document is to provide a plan for identifying the public facilities that will be needed to accommodate development within the Zone 15 area of the City of Carlsbad, as shown on Exhibit 1 on page 3. The Local Facilities Management Plan (LFMP) for Zone 15 was prepared pursuant to the City's Growth Management Program, as outlined in Chapter 21.90 of the Carlsbad Municipal Code. The plan incorporates and implements the 1986 Citywide Facilities and Improvements Plan.1 This document is the fourth amendment to the Zone 15 LFMP. The original Zone 15 LFMP was adopted by the City of Carlsbad on April 10, 1990. The first amendment (A) was adopted on October 21, 1997, and a second amendment (B) was adopted on November 17, 1999. Since the second amendment of the Zone 15 LFMP was approved, a number of land use, development and demographic changes have occurred. These changes result in reduced residential development between the anticipated development and the findings and special conditions for sewer, water, drainage and circulation. In order to maintain consistency between the development requirements for Zone 15 and the changing land uses, this LFMP Amendment (E) supersedes the previously approved Zone 15 LFMP Amendment (C). . (Note – Amendment (D) was withdrawn). The primary purpose of Amendment (C) was to revise the previous Zone 15 LFMP Special Conditions to reflect a General Plan Amendment and Zone Change for the development of Cantarini and Holly Springs projects. The Dos Colinas (E) project changes an area west of College Boulevard originally anticipated to be a single family residential to a senior project. The revisions (E) consider the conditions that have been satisfied by other development, and are no longer applicable due to other land use changes and for which the timing of need has changed. In addition, the finance plan was revised as a part of LFMP Amendment (E) to provide additional details regarding the financing of the necessary public facilities within Zone 15. The Introduction section provides details regarding the land use changes and the justification for preparation of this Amendment (E). Finance Overview During the preparation of this Zone 15 LFMP Amendment (E) it was determined that no single financing mechanism can satisfy the complex infrastructure requirements of this zone and or the northeast quadrant. However, a combination of financing techniques can ensure conformance of future facilities as development occurs. A common set of goals for the financing of the major facilities can be stated as follows: 1. Provide feasible financing techniques to ensure that all facilities are provided in conformance with the adopted performance standards. 1 The 1986 CFIP was adopted by City Council on September 23, 1986 (CC Resolution No. 8797). Zone 15 LFMP Page 2 October 19, 2011 2. Provide for the implementation of financing techniques that consider the financial limitations associated with the high costs of infrastructure construction. 3. Provide for financing options that consider the needs of both the City and the property owners. This plan identifies which public facilities are needed as growth occurs to ensure compliance with the adopted performance standards. A complete finance plan accompanies LFMP Amendment (C) which is applicable to this Amendment (E) and provides a description of the facility improvements to be made, timing of improvements, cost estimates, and funding sources. Zone 15 Requirements for Public Facilities Development assumptions used to estimate the demand for public facilities generated by development in Zone 15 are based on the eleven adopted Performance Standards in the Growth Management Program. Exhibit 2 on page 4 shows the current status of each facility with respect to the Performance Standard, given the existing amount of development within the Zone. Because there is currently a limited amount of development within Zone 15, the public facility demands are presently minimal and all Performance Standards are currently being met with the exception of drainage facilities. Rick Engineering Company – in a Rancho Carlsbad Channel and Basin Project report prepared for the City of Carlsbad dated June 30, 1998, recommended, in order to minimize the 100 year flooding within Rancho Carlsbad Mobile Home Park (RCMHP), four upstream detention facilities and improvements to Agua Hedionda and Calavera Creeks be completed. Development in LFMP Zone 15 is conditioned to provide one of the four detention facilities, Basin BJ. Basin BJ was approved as part of College Boulevard in a separate EIR (98-02, SCH No. 99111082) and will be constructed along with Reach A of College Boulevard. The City recently prepared (July 3, 2008) a comprehensive update to the Carlsbad Drainage Master Plan which provides a program to address the ultimate solution to the Agua Hedionda Channel through the Rancho Carlsbad Mobile Home Park. Exhibit 3 on page 5 provides a summary of public facilities adequacy through build out of Zone 15. Zone 15 LFMP Page 3 October 19, 2011 Zone 15 LFMP Page 4 October 19, 2011 EXHIBIT 2 ZONE 15 Existing Public Facilities Summary Sheet LFMP 15(E) Facility Conformance With Adopted Performance Standard City Administrative Yes, existing facilities meet the adopted performance standard. Library Yes, existing facilities meet the adopted performance standard. Wastewater Treatment Capacity Yes, existing facilities meet the adopted performance standard. Parks Yes, Park District 2 (northeast quadrant) currently meets the adopted performance standard. Drainage No, existing drainage facilities do not meet the adopted performance standard. Circulation Yes, existing circulation facilities meet the adopted performance standard. Fire Yes, existing fire facilities meet the adopted performance standard. Open Space Yes, existing open space meets the adopted performance standard. Schools Yes, existing school facilities meet the adopted performance standard. Sewer Collection Yes, existing sewer collection facilities meet the adopted performance standard. Water Distribution Yes, existing water distribution facilities meet the adopted performance standard. Zone 15 LFMP Page 5 October 19, 2011 EXHIBIT 3 ZONE 15 Build Out Public Facilities Summary Chart LFMP 15(E) Facility Conformance With Adopted Performance Standard City Administrative Existing and planned facilities will meet the adopted performance standard through build out. Library Existing and planned facilities will meet the adopted performance standard through build out. Wastewater Treatment Facilities Existing and planned facilities will meet the adopted performance standard through build out. Parks Park District 2 (northeast) will meet the adopted performance standard with the proposed mitigation measures through build out. Drainage Drainage facilities will meet the adopted performance standard with the proposed mitigation measures through build out. Circulation Circulation facilities will meet the adopted performance standard with the proposed mitigation measures through build out. Fire Existing fire facilities will meet the adopted performance standard through build out. Open Space Existing open space will meet the adopted performance standard for existing and approved projects. Schools Existing and planned school facilities will meet the adopted performance standard through build out. Sewer Collection Sewer facilities will meet the adopted performance standard with the proposed mitigation measures through build out. Water Distribution Water facilities will meet the adopted performance standard with the proposed mitigation measures through build out. Zone 15 LFMP Page 6 October 19, 2011 EXHIBIT 4 General Conditions for Zone 15 LFMP 15(E) 1. All development within Zone 15 shall conform to the provisions of Section 21.90 of the Carlsbad Municipal Code and to the provisions and conditions of this Local Facilities Management Plan. 2. All development within Zone 15 shall be required to pay a public facilities fee pursuant to the standards adopted by the City Council on July 28, 1987, and as amended from time to time and all other applicable fees. Development in Zone 15 shall also be responsible for any additional fees to be incorporated into this plan that are found to be necessary to enable facilities to meet the adopted performance standard. 3. The City of Carlsbad shall monitor all facilities in Zone 15 pursuant to Subsections 21.90.130(c), (d) and (e) of the Carlsbad Municipal Code. 4. All development in Zone 15 shall be in conformance with the adopted Citywide Facilities and Improvements Plan as adopted by City Council Resolution 8797 on September 23, 1986. 5. Periodic amendment to the Zone 15 Local Facilities Management Plan is anticipated to incorporate newly acquired data, to amend conditions and upgrade standards as determined through the required monitoring program. Amendment to this Plan may be initiated by action of the Planning Commission, City Council or property owners at any time. 6. If a public facility or service is found not to be in conformance with an adopted performance standard during the yearly monitoring, or at any other time, the matter will be immediately brought before the City Council. If the City Council determines that a non-conformance does exist then no future building or development permits shall be issued unless an amendment to the CFIP or the LFMP for this zone is approved by the City Council which addresses those facility shortfalls and brings those facilities into conformance with the adopted performance standards. Currently drainage performance standards do not meet standards. City engineering is actively pursuing a remedy and is in the permit process with the appropriate agencies for permits. 7. After adoption of this LFMP by the City Council, no building permits will be allowed unless the performance standards are complied with. Zone 15 LFMP Page 7 October 19, 2011 EXHIBIT 4 General Conditions for Zone 15 LFMP 15(E) (Continued) 8. Approval of this LFMP does not constitute prior environmental review for projects within Zone 15. All future projects within Zone 15 shall undergo environmental review per Title 19 of the Carlsbad Municipal Code. Any mitigation measures determined during a project's environmental review shall be complied with in their entirety unless findings of overriding consideration are made by the City Council. 9. Approval of this plan does not constitute prior discretionary review for projects within Zone 15. All future projects shall undergo review per Title 21 of the Carlsbad Municipal Code. The plan establishes the maximum allowable number of residential units for facilities planning purposes only. The plan does not guarantee any specific residential density. 10. Approval of any discretionary permit within Zone 15 shall be contingent upon the provision of adequate public facilities to satisfy the Public Facilities Element of the General Plan. At this time a Community Facilities District (CFD) has been formed to finance the construction of several Citywide facilities necessary to serve new development. If the subject Zone 15 property is not a participant within that district, the required General Plan consistency finding cannot be made. Therefore, no discretionary approvals, building permits, grading permits, final maps or other development permits will be issued or approved unless the subject property annexes into the CFD or an alternate financing mechanism is provided by the developer and approved by the City Council to finance the facilities legally applicable to Zone 15 that are included in the Community Facilities District. The following activities are exempt from this: grading, minor planning entitlements or minor construction as a part of ongoing agricultural operations, minor subdivisions and lot line adjustments for financing purposes or a Planned Community Master Plan or a Specific Plan. Any exemption is solely at the City's discretion. Zone 15 LFMP Page 8 October 19, 2011 EXHIBIT 5 Special Conditions for Zone 15 LFMP 15(E) (Amendment (D) Withdrawn) The following Special Conditions apply specifically to development in Zone 15 and must be complied with in addition to the General Conditions for Zone 15. The Special Conditions are also listed separately under the analysis discussion of each facility. As previously discussed, the facility requirements (Amendment (E) have changed for only four facilities – Circulation, Sewer, Drainage and Water. The revisions as provided in the previous LFMP Amendment (C) did not include changes to other facility chapters, except the Circulation, Sewer, Drainage and Water chapters. The Circulation chapter was revised to reflect the slowed regional growth, the completion of many improvements and changes to land uses. The special conditions for Circulation facilities were also modified as necessary to ensure that the required level of service for circulation element roadways would be met. The Sewer chapter was up-dated to reflect the completion and operation of facilities in sewer basin 15A and 15B. The Water chapter reflects refinement of needed facilities in service pressure zones along with water master plan facilities. The Circulation chapter was up-dated to reflect the need for Reach A of College Boulevard and Reach 4A of Cannon Road. The Drainage chapter for Amendment (E) was up-dated to reflect the details of the BJ Detention Facility, the College Boulevard Bridge at Agua Hedionda Creek and to acknowledge the City approval of the Carlsbad Drainage Master Plan on July 3, 2008. Cost estimate within the finance section for Amendment (E) were up-dated to reflect current unit prices and to reflect portions of Cannon reach 4A being constructed by CUSD. City Administrative Facilities No special conditions. Library No special conditions. Wastewater Treatment Capacity The following action shall be pursued jointly by each sewer district to ensure adequate wastewater treatment capacity through build out: Zone 15 LFMP Page 9 October 19, 2011 A. Monitor Encina treatment plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. Parks A. All development shall comply with Chapter 20.44 (Dedication of Land for Recreational Facilities) of the Carlsbad Municipal Code for impacts to Park District 2. Drainage A. All future development in Zone 15 will be required to construct any future Zone 15 storm drain facilities identified in the July 2008 Drainage Master Plan. Any facilities necessary to accommodate future development must be guaranteed prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first in Zone 15. (Note: Facility identification below taken from July 2008 Drainage Master Plan). B. Prior to the recordation of any final map, grading permit or building permit (whichever occurs first), for any specific project within Zone 15, the developers of that project are required to: 1. Pay the required drainage area fees established in the current Drainage Master Plan and; 2. Execute an agreement to pay any drainage area fees established in the forthcoming revised Drainage Master Plan. C. Prior to the recordation of the first final map, issuance of grading permit or building permit, whichever occurs first within Zone 15, the developers are required to financially guarantee Zone 15’s proportional share of the following to the satisfaction of the City Engineer: 1. Sediment detention basin “BJ-1” to be installed in Zone 15 upstream of College Boulevard along with a 4’ x 7’ box culvert under College Boulevard and an un- lined channel within basin “BJ-1”. 2. Provide a mechanism for the maintenance of the “BJ-1” sediment detention basin. 3. Remove the existing headwall of the 78” RCP in College Boulevard (BL-L) and connect to Agua Hedionda Creek just downstream of the proposed bridge. 4. Bridge on College Boulevard at Agua Hedionda Creek (BL-L). Zone 15 LFMP Page 10 October 19, 2011 5. Drainage project BR a 66 inch culvert under College Boulevard North of Bridge BL-L to drain an un-named creek coming from Cantarini and Holly Springs Development. D. Concurrent with the development of property within Development Area 1 (Exhibit 5A on Page 25) of Zone 15, the following shall be constructed to the satisfaction of the City Engineer: 1. Detention basin “BJ-1” including a 4’ x 7’ Box Culvert under College Boulevard and unlined channel within basin “BJ-1.” 2. Connection of the existing 78” RCP in College Boulevard to the new bridge at Agua Hedionda Creek just downstream of the proposed bridge. 3. Bridge on College Boulevard at Agua Hedionda Creek facility BL-L. 4. Drainage project BR-a 66 inch culvert under College Boulevard. E. Phasing – Cannon Road Reach 3 and College Boulevard Reaches B and C have been completed. College Boulevard Reach A (El Camino Real to Cannon Road) may be phased and could be constructed either from the north end at Cannon Road or the south end at the bridge at Agua Hedionda Creek. Drainage improvements could be constructed in 2 phases and coordinated with the phased College Boulevard improvements. Detention basin “BJ-1” and the relocation of the Rancho Carlsbad RV and Garden Site could be constructed with the northerly portion of College Boulevard and the Agua Hedionda Bridge 66” and 78” RCP connection with the southerly portion of College Boulevard. Drainage Project B (Agua Hedionda Creek dredging through Rancho Carlsbad) and Project BN (Calavera Creek flood control improvements) are being processed by the City. Construction is anticipated in 2012-2013. Circulation These special conditions have been divided into four categories directly corresponding to the four development areas within Zone 15. These areas are depicted on Exhibit 5A on page 25. A. The construction of improvements is based on the projected demand of development in the zone and the surrounding region. The construction schedule may be modified without amendment to this plan. However, any deletions or additions to the improvements will require amending this LFMP. B. The funding for the construction of College Boulevard will be guaranteed as provided by the Zone 15 Finance Plan. The alignment has been established and the EIR certified (EIR No 98-02, as SCH No. 99111082). Zone 15 LFMP Page 11 October 19, 2011 C. Cannon Road – Reach 4A (East from College Boulevard. All of Reach 4, from College Boulevard easterly to the City of Oceanside was included in the EIR for Calavera Hills Phase II (EIR No. 98-02 as SCH No. 99111082). Because of public testimony during the public hearings, Reach 4 was divided in 2 reaches. Reach 4A went from College Boulevard easterly approximately 900 feet to provide access to the Carlsbad Unified School District property north of Cannon Road and to the Rancho Carlsbad Homeowner’s property (BJ Basin parcel) south of Cannon Road. Note: A portion of Reach 4A (modified) is currently under construction (April 2011) as part of the development of Sage Creek High School. Reach 4B (the remainder of Reach 4 to Oceanside) was not approved or the alignment certified as part of the final EIR 98-02. Reach 4B will be studied in conjunction with Oceanside at some undetermined date in the future. D. Prior to recordation of the first final map, issuance of grading permit or building permit, whichever occurs first, within each of the specifically identified four development areas of Zone 15, a financing program guaranteeing construction of the following circulation improvements shall be approved. 1. DEVELOPMENT AREA 1 a. College Boulevard 1. Prior to the approval of the first final map within the Development Area 1 of Zone 15, the participating owners’ must develop and agree to the formation of a comprehensive financing program that guarantees the construction of full width improvements of College Boulevard between Cannon Road and El Camino Real. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map. 2. Prior to the approval of the first building permit (see phasing exception in paragraph 3 below) within Development Area 1, the following public improvements must be completed and operational: Complete the connection of College Boulevard from Cannon Road and El Camino Real. This would include the following elements: Zone 15 LFMP Page 12 October 19, 2011 • Full width grading to major arterial standards. • Two center travel lanes including a raised median and left turn pockets. • Construction of full width bridge over Agua Hedionda Creek. • Full intersection improvements to Cannon Road and College Boulevard including appropriate lane transitions to the southern leg of College Boulevard. 3. Phasing – In addition to the above financing mechanisms and in conjunction with specific tentative map conditions, the City Engineer may approve phasing of improvements for College Boulevard to allow for approval of developer requested grading and building permits for a certain number of residential units prior to the full completion of College Boulevard, Reach A. For single entry development no more than 25 units may be constructed as approved by the City Engineer and Fire Marshall south of the intersection of cannon Road and College Boulevard, or north of the Agua Hedionda Creek Bridge. 4. Relocation of Rancho Carlsbad RV and Garden site – An acceptable site for relocation of the Rancho Carlsbad RV and Garden site currently east of College Blvd. requires a conditional use permit (CUP) or equivalent permit to the satisfaction of the Planning Director for the relocation. A secured agreement with the City for the construction of the RV and Garden site is required (see Planning Commission Resolution No. 5753 – Condition No. 46 for CT-00-18 for reference). b. Cannon Road – Reach 4A 1. Prior to the approval of the first final map or other development permit within Development Area 1 of Zone 15, the participating property owners must develop and agree to the formation of a comprehensive financing program that guarantees the construction of the core improvements to Cannon Road (Reach 4A) from College Boulevard easterly 900 feet more or less. The core improvements consist of full width grading, two 18-ft paved lanes, median curbs, drainage facilities required to protect the roadbed, and transition improvements to full City standard intersection improvements at the intersection with College Boulevard. CUSD has currently completed partial improvements to Cannon Road Reach 4.1. A financing program guarantee must include the completion of Reach 4A to major arterial standards. CUSD has also dedicated the full width right of way for Reach 4A. CUSD has currently completed partial improvements to Zone 15 LFMP Page 13 October 19, 2011 Cannon Road Reach 4A. A financing program guarantee must include the completion of Reach 4A to major arterial standards. CUSD has also dedicated the full width right-of-way for Reach 4A. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, Transnet and Traffic Impact fees or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map or other development permits. Note: A portion of Reach 4A of Cannon Road has been approved by Carlsbad staff and is currently (April 2011) under construction as part of Sage Creek High School. A portion of right-of-way for Reach 4A right-of-way has been dedicated by the school district. The remaining right-of-way was irrevocably offered for dedication that can be accepted once the remaining improvements of Reach 4A are constructed. c. El Camino Real 1. Concurrent with development, completion of half street improvements for El Camino Real to prime arterial standards including landscaped median from Rancho Carlsbad Drive to the northwesterly boundary of Development Area 4. This condition applies to the frontage of the property being developed, if any. 2. DEVELOPMENT AREA 2 a. College Boulevard 1. Prior to the approval of the first final map within the Development Area 2 of Zone 15, the participating property owners’ must develop and agree to the formation of a comprehensive financing program that guarantees the construction of full width improvements of College Boulevard between Cannon Road and El Camino Real. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map. Zone 15 LFMP Page 14 October 19, 2011 b. Cannon Road – Reach 4A 1. Prior to the approval of the first final map or other development permit within Development Area 2 of Zone 15, the participating property owners must develop and agree to the formation of a comprehensive financing program that guarantees the construction of the core improvements to Cannon Road (Reach 4A) from College Boulevard easterly 900 feet more or less. The core improvements consist of full width grading, two 18-ft paved lanes, median curbs, drainage facilities required to protect the roadbed, and transition improvements to full City standard intersection improvements at the intersection with College Boulevard. The financing program guarantee must also address the acquisition of the right-of-way (ROW) for the road, slope and drainage easement in addition to the design, construction and environmental mitigation measures. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, Transnet and Traffic Impact fees or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map or other development permits. 2. The following public improvements must be completed and operational, concurrent with development: • Full width grading to major arterial standards. • Two center travel lanes including raised median and left turn pockets. • Intersection improvements to Cannon Road and College Boulevard including appropriate lane transition. • Frontage improvements along the south side of Cannon Road Reach 4A. Note: A portion of Reach 4A of Cannon Road has been approved by Carlsbad staff and is currently (April 2011) under construction as part of Sage Creek High School. A portion of right-of-way for Reach 4A has been dedicated by the school district. The remaining right-of-way was irrevocably offered for dedication that can be accepted once the remaining improvements of Reach 4A are constructed. Zone 15 LFMP Page 15 October 19, 2011 3. DEVELOPMENT AREA 3 a. El Camino Real 1. Concurrent with development, completion of half street improvements for El Camino Real to prime arterial standards including landscaped median along the frontage of the developing property between Development Area 4 and Cougar Drive. (completed) 2. Prior to final map approval or issuance of a building permit the developing property owner shall pay their fair share contribution for the installation of the El Camino Real improvements pursuant to the requirements of the El Camino Real median reimbursement agreement dated May 6, 1988. 4. DEVELOPMENT AREA 4 a. College Boulevard 1. College Boulevard between El Camino Real and the northern boundary of Development Area 4 shall be constructed to full width arterial standards. (Completed) b. College Boulevard 1. Prior to recording a final map or the issuance of a grading permit or building permit, the applicant shall enter into a secured financial agreement in a form acceptable to the City Council that will secure its fair share of the cost of College Boulevard between the northern boundary of Development Area 4 to Cannon Road. 2. Note: A portion of Reach 4A of Cannon Road has been approved by Carlsbad staff and is currently (April 2011) under construction as part of Sage Creek High School. A portion of the right-of-way for Reach 4A has been dedicated by the school district. The remaining right-of-way was irrevocably offered for dedication that can be accepted once the remaining improvements of Reach 4A are constructed c. Cannon Road – Reach 4A 1. Prior to the approval of the first final map or other development permit within Development Area 4 of Zone 15, the participating Zone 15 LFMP Page 16 October 19, 2011 property owners must develop and agree to the formation of a comprehensive financing program that guarantees the construction of full width improvements of Cannon Road (Reach 4A) from College Boulevard easterly 900 feet more or less. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, Transnet and Traffic Impact fees or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map or other development permits. Note: A portion of Reach 4A of Cannon Road has been approved by Carlsbad staff and is currently (April 2011) under construction as part of Sage Creek High School. A portion of the right-of-way for Reach 4A has been dedicated by the school district. The remaining right-of-way was irrevocably offered for dedication that can be accepted once the remaining improvements of Reach 4A are constructed. d. El Camino Real 1. Construction of half street improvements for El Camino Real to prime arterial standards including landscaped median along the frontage of the developing property. 2. Construction of median from the northwestern boundary of Development Area 4 to the existing improvements south of Rancho Carlsbad Drive. 3. Construction of transition improvements on the east side of El Camino Real from the northwestern boundary of Development Area 4 northerly to a distance determined by the City Engineer. Fire No special conditions. Open Space A. All future development within this zone shall be required to show how it contributes to meeting the open space performance standard above and beyond meeting all other City standards and development regulations and that the development does not preclude the provision of performance standard open space at build out of Zone 15. Zone 15 LFMP Page 17 October 19, 2011 B. Open space compliance will be monitored annually and as individual projects are reviewed within this zone. Prior to the approval of any development within this zone, the Planning Director shall be required to find that the development does not preclude the provision of performance standard open space at build out of Zone 15. Schools The special condition for school facilities is as follows: A. Prior to the approval of any final map or the issuance of any permits within Zone 15, the applicant for the final map or permit shall submit evidence to the City that impacts to school facilities have been mitigated in conformance with the City's Growth Management Plan to the extent permitted by applicable state law for legislative approvals. If the mitigation involves a financing scheme such as a Mello-Roos Community Facilities District which is inconsistent with the City's Growth Management Plan including City Council Policy Statement No. 38, the developer shall submit disclosure documents for approval by the City Manager and City Attorney which shall disclose to future owners in the project, to the maximum extent possible, the existence of the tax and that the school district is the taxing agency responsible for the financing district. Sewer Collection The original Zone 15 LFMP (April 10, 1990) required a financial guarantee for construction of the South Agua Hedionda Interceptor Sewer system. Thereafter, much of the system was constructed by other developments, including the Kelly Ranch. In September 2002, the City Council adopted Resolution No. 2002-279 approving the Engineer's Report and introducing Ordinance No. NS-642 increasing the fees for Sewer Benefit Areas C, D, E, and F (South Agua Hedionda Interceptor Sewer). As part of "The Terraces" project (CT 96-02), which is located in Development Area 4 of LFMP Zone 15, the Terraces project Developer designed and constructed the South Agua Hedionda Interceptor Sewer, Trunk 1E ("SAHT1E"), which serves proposed development in the LFMP Zone 15 area. Construction of SAHT1E was completed in 2003. As of the date of this Local Facilities Management Plan Amendment (LFMP 15 (E), all agency permits have been approved for the Cannon Road Pump Station and construction is complete and is fully operational. A. All development in Zone 15 is required to pay the appropriate sewer connection fees and sewer benefit area fees prior to issuance of any building permit. Zone 15 LFMP Page 18 October 19, 2011 B. Sewer Benefit Area D 1. SAHT2B and SAHT2C are both constructed and in operation. The remaining un-developed properties in Sewer Benefit Area D will be required to construct/finance connections to the existing SAHT2B and SAHT2C trunk lines. C. Sewer Benefit Area E 1. A portion of SAHT1E was constructed as part of the Terraces project (dwg 361- 6E). The remaining un-developed properties in Sewer Benefit Area E will be required to extend the remaining portion of SAHT1E and construct/finance connections to the existing SAHT1E trunk line. Water Distribution A. All future development in Zone 15 shall be subject to requirements of the 2003 CMWD Water Master Plan Update and the Water Reclamation Master Plan as determined by the City Engineer. Any potable and recycled water facilities necessary to accommodate future development must be guaranteed prior to the recordation of a final map, issuance of a grading permit or building permit, whichever occurs first for any project in Zone 15. B. Water facilities for Zone 15 shall be provided at the time of development to the satisfaction of CMWD. C. Prior to or commensurate with installation of Zone 15 water facilities, CMWD shall determine that sufficient water facilities are in place to serve Zone 15. D. All development within Zone 15 shall pay the appropriate water fees established by CMWD. WATER DISTRIBUTION SYSTEM (Potable Water) A. Service Area A (375 Zone Water) The following water facilities will be required as a condition to the approval of development within Service Area A and B to the satisfaction of the City: 1. Construct a potable 12” water main in College Boulevard from Sunny Creek Road northerly to “A” Street, easterly in “A” Street to the east boundary of Cantarini, also, northerly from “A” Street through the Cantarini project to Zone 15 LFMP Page 19 October 19, 2011 “C”Street to the intersection of College Boulevard, then northerly in College Boulevard to the existing 12” line at Cannon Road. B. Service Area B (490 Zone Water) 1. Construct a potable 36” water main in College Boulevard from Sunny Creek Road northerly to “A” Street, easterly in “A” Street to the easterly boundary of Cantarini. 2. Development easterly of Cantarini will extend the 36” line up to Maerkel Reservoir. 3. Construct a 16” water main in College Boulevard from the 36” at “A” Street northerly to a 16” main at Cannon Road. WATER DISTRIBUTION SYSTEM (Reclaimed Water) A. Service Area 384 Zone 1. Construct a recycled 12” main in College Boulevard from an existing main at Sunny Creek Road northerly to an existing 12” main at Cannon Road. 2. Construct a 12” main in “A” Street from College Boulevard easterly to the East line of Cantarini. Development east of Cantarini will extend the 12” main as needed. Note: Private development may be required to construct a booster/pump station to provide reclaimed water where necessary. Zone 15 LFMP Page 20 October 19, 2011 II. INTRODUCTION This Local Facilities Management Plan amendment is part of the latest phase of Carlsbad's overall Growth Management Program for Zone 15. Phase One of the Growth Management Program was completed with the adoption of the 1986 Citywide Facilities and Improvements Plan (1986 CFIP). For purposes of public facilities analysis the 1986 CFIP separated the City into 25 Local Facilities Management Zones as shown on Exhibit 1 on page 3. Zone 15 is divided into several development areas as shown on Exhibit 5A on Page 25. These development areas include a large Open Space designated area, a Habitat Conservation Area, the Rancho Carlsbad Mobile Home Park, the “Terraces” at Sunny Creek, (Development Areas 1 through 4). The Open Space area currently contains a general plan designation of OS (Open Space). This area will remain as open space. The Habitat Conservation Area was formally known as The Highlands which was approved for 740 dwelling units. Due to the expiration of the tentative map and existing environmental issues, this area is now intended to be used for habitat mitigation. The Rancho Carlsbad Mobile Home Park contains 504 units. Development Area 1 was originally anticipated to be developed with a mix of ½ and 1 acre residential lots and open space consistent with SP 191 – Sunny Creek Specific Plan and the Carlsbad Habitat Management Plan (HMP) east of College Boulevard and traditional single family west of College Boulevard. The Dos Colinas project west of College Boulevard is proposing a senior project with congregate care provisions including cottage/independent living units, apartment and Alzheimer care units. Currently there are two approved projects in Development Area #1 – Holly Springs CT-00-21 and Cantarini CT-00-18 Development Area 4 is proposed to be developed with a commercial/retail project on the 17 acre site at the northwest corner of College Boulevard and El Camino Real. Residential development (The Terraces) is located on the northeast corner of College Boulevard and El Camino Real. Future development of the remaining areas has not been approved at this time. However, since the general plan identifies these areas as residential and open space, the Zone 15 LFMP assumes development to occur at a reduced density for properties in the Sunny Creek specific plan (SP-191) area and at the Growth Control Point for the remaining areas. The growth control point for Residential Low Medium (RLM) within the boundaries of SP-191 is 2.88 dwelling units per net developable acre. Outside of SP-191 the growth control point for RLM is 3.2 dwelling units per acre. Development area 2 is a parcel anticipated to be developed with drainage basin BJ-1 when College Boulevard is constructed and an affordable apartment on 4+ acres across from the proposed CUSD High School site along Cannon Road 4A. Development area 3 is mostly developed and no known future plans are available. As mentioned in the Executive Summary, this Amendment (E) is the fourth amendment (Amendment (D) was withdrawn) to the Zone 15 LFMP. A General Plan Amendment (GPA) was submitted with a Tentative Parcel Map for conditional residential development, (professional care facilities) within Development Area 1. The proposed land use changes for Dos Colinas include a change from RLM to RM and open space and zoning changes from LC Zone to RDM and open space. The land use changes, in conjunction with slower than anticipated growth citywide and within Zone 15 are the primary reasons prompting the need to review and modify the Zone 15 LFMP. The Zone 15 LFMP (E) Amendment will ensure that Zone 15 LFMP Page 21 October 19, 2011 the impacts created by the GPA will not result in an increase in the demand for public facilities within Zone 15. The GPA that is part of the Dos Colinas application includes a senior housing development of 58 cottages, 166 independent living units, 81 assisted living units (305 units total) on Parcel RM-3. Zone 15 Amendment (C) parcels RLM 3, 4, and 7 west of College Boulevard have been combined with this Amendment (E) into parcel RM-3 for the 305 unit Dos Colinas project. The revision to the Zone 15 LFMP includes updating the build out projections for residential development within Zone 15. The build out land use designations are based on the General Plan Amendment processed concurrently with this LFMP Amendment (RLM to RM). As a part of the build out projections, the LFMP phases or estimates the zone's development on a yearly basis until build out is reached. Phasing is done to predict future facilities demands. The adequacy of public facilities is analyzed according to this demand. The analysis includes an inventory of existing and proposed facilities, a phasing schedule that establishes the timing for the provision of facilities in relationship to demand, and a financing plan that establishes methods of funding needed facilities. Since the plan is a regulatory document, each facility section contains conditions to ensure that facilities will conform to the adopted performance standards. Mandatory compliance with the plan and conditions will assure the adequacy of facilities within Zone 15. As mentioned previously, the individual facility chapters, except Circulation, Sewer, Water and Drainage have not been revised with this LFMP Amendment. Exhibit 1 on page 3 indicates where Zone 15 is located within the City. Exhibit 2 on page 4 provides a summary of existing public facilities adequacy for Zone 15 and Exhibit 3 on page 5 provides a summary of public facilities adequacy through build out for Zone 15. Development Assumptions The primary growth management consideration with this LFMP amendment is that the future development will not increase the demand on public facilities beyond that anticipated in the original Zone 15 LFMP. A large portion of Zone 15, known as the Carlsbad Highlands was originally approved for 740 dwelling units, will not be developed. In fact, this area is now used for habitat mitigation land. In addition, the State Wildlife Conservation Board purchased 98.88 acres of the former Holly Springs Ltd. Ownership on May 22, 2002 for open space conservation. Therefore, the magnitude and character of impacts from the development of this area will be substantially less than what was originally anticipated in the original Zone 15 LFMP. The second Zone 15 amendment (LFMP-15-B) approved a transfer of 229 units from the excess dwelling unit bank for the existing Terraces project in Zone 15 adjacent to El Camino Real and College Boulevard leaving a remaining balance of 511 units (740-229=511), which have been added to the excess dwelling unit bank. Zone 15 LFMP Page 22 October 19, 2011 With the State acquisition of 98.88 acres from Holly Springs for open space (Parcel RLM-2C) there are another 200 units in the excess dwelling unit bank. In addition Holly Springs Parcels RLM-2 and RLM-2A will generate 266 additional units when recorded and Cantarini parcels RLM-3A and RLM-4A will generate an additional 215 units when recorded. Clustering 80 units from Holly Springs and Cantarini for the Cantarini multi-family/affordable housing on Parcel RMH-1 will reduce the available excess units. As a result of the above described reduced development and unit transfers in Zone 15 pursuant to LFMP 15 (C), the result is a net decrease of dwelling units. (200+266+215-80=601). The excess units from Cantarini and Holly Springs will be added to the excess dwelling unit bank. The Dos Colinas Amendment (E) will have a net effect of potentially allowing 115 additional units for parcel RM-3. Dos Colinas proposes a General Plan Land Use designation of Residential Medium (RM) which has a mean density of 6 times 41.07 net acres excluding College Boulevard for a potential dwelling unit allocation at growth management control point of 246 units. The existing General Plan, RLM, allows up to 131 units at the GMCP; therefore, if RM-3 were to be developed with a single family residential subdivision a total of 246 single family units could potentially be developed. A. PLAN OVERVIEW This LFMP Amendment provides a revised list of the special conditions necessary to ensure that public facilities necessary for development within the zone will be provided concurrent with their need. The plan is divided into seven parts as follows: I -Executive Summary: Summarizes the plan and highlights all conditions proposed by the plan. II -Introduction: Provides an introduction to the format and content of the plan. III -Build Out Projections: Projects the ultimate amount of development in Zone 15, along with itemizing existing, developing, and future land uses. IV -Phasing: Attempts to project how and when development will be phased in Zone 15. V -Analysis of Public Facilities Requirements: Provides a complete description and analysis of when and how each facility will be provided and financed based on build out projections and phasing assumptions. VI -Finance: Provides a summary of the financial alternatives available to fund each facility and a discussion of the LFMP's impact on City finances. VII -Appendices\References: Provides the technical materials used in preparation of this plan. Zone 15 LFMP Page 23 October 19, 2011 The most detailed part of the plan is Part V. This part is divided into eleven separate sections, one for each facility. Each section provides a detailed analysis of the facility. If a facility is not conforming with the adopted performance standard, there will be a discussion describing this situation, a description of mitigation or alternatives, and a financing discussion. Each facility section will conclude with adequacy findings. Adequacy findings summarize whether or not the public facility conforms with the adopted performance standard. B. OVERVIEW OF MANAGEMENT ZONE 15 Management Zone 15 is located in the northeast quadrant of Carlsbad as shown on Exhibit 1 on page 3. It is bounded by Zone 14 to the north/northwest, El Camino Real to the west, Zones 16 and 5 to the south, the City of Oceanside and the City of Vista to the east. Zone 15 is approximately 1,197 net acres in size. Exhibit 6 on page 26 lists the property owners within Zone 15 and Exhibit 7 on page 28 shows the location of their holdings. (Major Land Owners). Primarily a residential area, Carlsbad's existing General Plan calls for residential land uses ranging in density from Low (0-1.5 dwelling units/acre) to High (15-23 dwelling units/acre). Nonresidential land uses within Zone 15 consist of general plan open space (OS), local shopping center (L), commercial (C), and planned industrial (PI). The General Plan Amendment for Dos Colinas processed concurrently with the LFMP 15 (E) Amendment will adjust the boundaries of the RLM (Medium low density residential) to RM (residential medium) and adjust OS (open space). The new General Plan Designations, within Zone 15 are shown on Exhibit 8 on page 29. One Specific Plan has been approved within Zone 15. The Sunny Creek Specific Plan (SP-191) encompasses approximately 307 acres entirely within Zone 15. This plan established a 2.0 du/acre average density and general guidelines, but did not approve specific development plans. The Sycamore Creek Specific Plan (SP-190) which encompassed approximately 59 acres was repealed on 11/17/98. The proposed land use zoning within Zone 15, is shown on Exhibit 9 on page 30. As Exhibit 9 shows, the land use zoning in Zone 15 is primarily residential. The zone is comprised of Residential Agricultural with minimum lot size of 10,000 square feet (R- A-10), Rural Residential Estate (R-E), Residential Mobile Home Park (RMHP), Single Family with minimum lot size of 20,000 square feet (R-1-20), the approved Holly Springs and Cantarini projects with R-1-0.5 Q Zoning, Residential Agricultural with minimum lot size of 2.5 acres (R-A-2.5), and Limited Control (L-C). The L-C zoning will ultimately be amended to be consistent with the general plan. A zoning designation of Residential Density Multiple (RD-M) is designated for a residential portion of Zone 15 LFMP Page 24 October 19, 2011 Development Areas 1 & 4 including the Dos Colinas senior site (RM-3) to allow for a small lot single family detached and multiple family development and several affordable housing projects. Nonresidential zoning includes Commercial (C-2) and Manufacturing with a Qualified Development Overlay (M-Q). The General Plan Land Use designations for Zone 15 are broken down into subarea. These subarea allow easier identification of public facilities demand and supply. These subareas are used consistently throughout this plan. Existing development in Zone 15 consists of a 504-unit “Rancho Carlsbad” mobile home park and golf course, the 250-unit “Terraces” residential development (172 single family units + 28 second dwelling units + 50 multi-family affordable units), and 17 single-family homes that are located throughout the zone. Zone 15 LFMP Page 25 October 19, 2011 Zone 15 LFMP Page 26 October 19, 2011 EXHIBIT 6 Zone 15 Property Owners List Ownerships APN 1. Holly Springs, Ltd. Attn: Susan Kelly P.O. Box 2484, Carlsbad, CA 92018 168-050-57, 58 2. Rancho Carlsbad HOA Attn: Barbara Bevis, President 5200 El Camino Real, Carlsbad, CA 92008 168-050-35-36 3. West Senior Living RE/LLC Attn: John Rimbach 5796 Armada Dr. #300 Carlsbad, CA 92008 209-060-68, 70, 71, 72 4. Kelly, Robert Patrick (Pat) 2770 Sunny Creek Road, Carlsbad, CA 92008 209-060-48 5. Noah Bowman 5380 El Camino Real, Carlsbad, CA 92008 209-060-54 6. Camino Carlsbad LLC c/o Elliot Feuerstein Mira Mesa Shopping Center West 8294 Mira Mesa Boulevard San Diego, CA 92126 209-060-53, 58 7. Lyall Enterprises, Inc. c/o Warren Lyall 15529 highway 76, Pauma Valley, CA 92061 209-060-61 8. Barlow, Timothy & Betty 3004 Sunny Creek Road, Carlsbad, CA 92008 209-060-23 9. Bepton & Dartford Investments, LLC 7449 Magellan Street, Carlsbad, CA 92009 c/o BENTEQ 209-060-65 10. Bent-West c/o David M. Bentley 7449 Magellan Street, Carlsbad, CA 92009 209-070-13 11. Mrs. Kato Kato Family Trust 3250 Sunny Creek Road, Carlsbad, CA 92008 209-070-04, 05, 08 12. Mandana Cal Co. Attn: Ali Shashani P.O. Box 18197, Irvine, CA 92623 209-040-27 209-070-03, 07 13. Dottie Hagaman Hagaman Family Trust 5320 Sunny Creek Road, Carlsbad, CA 92008 209-040-28 14. Sean S. Reusch 3130 Sunny Creek Road, Carlsbad, CA 92010 209-040-02 15. Grosse, Russell & Mary (William & Lisa Grosse) 5850 Sunny Creek Road, Carlsbad, CA 92010 209-040-44 Zone 15 LFMP Page 27 October 19, 2011 Ownerships APN 16. Coman, Chase 5855 Sunny Creek Road, Carlsbad, CA 92010 209-040-15 17. Hope Wrisley Wrisley Family Trust 4847 Flying Cloud Way, Carlsbad, CA 92008 209-040-35 18. Barber, Mabel Trust 2416 Sonora Court, Carlsbad, CA 92008 209-060-56, 57 19. Grosse, William & Lisa 5870 Sunny Creek Road, Carlsbad, CA 92008 209–040-45 20. Walmart Store 1301 SE 209-090-11 Street, Bentonville, AR 72716 21. State of California Department of Fish and Game Attn: Kim McKee 4449 Viewridge Avenue, San Diego, CA 92123 168-050-02, 29, 30, 31 22. Paul K. Tchang Trust 3573 Kenyon Street San Diego, CA 92110 168-050-32 23. Carlsbad Unified School District 801 Pine Avenue, Carlsbad, CA 92008 168-050-46 24. Carlsbad Municipal Water District 1635 Faraday Avenue, Carlsbad, CA 92008 169-230-02 169-500-05 168-050-08 25. Regents-UCSD Gilman Drive @ La Jolla Village Drive, San Diego, CA 92122 169-230-03, 04, 05, 07, 12, 18, 23, 28, 29 Zone 15 LFMP Page 28 October 19, 2011 Zone 15 LFMP Page 29 October 19, 2011 Zone 15 LFMP Page 30 October 19, 2011 Zone 15 LFMP Page 31 October 19, 2011 III. BUILD OUT PROJECTIONS To properly assess and plan for facilities to serve Zone 15, it is necessary to project the type and intensity of land use as the zone builds out. These build out projections define land use intensity and corresponding facilities demands. The build out projections for Zone 15 are based on the Sunny Creek Specific Plan (SP 191), and the Carlsbad General Plan. The buildout projections have been modified based on the current application for Dos Colinas. The methodology used in compiling these build out projections is consistent with that used in the 1986 CFIP. The methodology is briefly described as follows: A. GENERAL PLAN LAND USE General Plan Land Use Designations were originally plotted on a 1" = 200' base map. These designations were divided into subarea to aid in facility analysis. In addition, current data from the Cantarini and Holly Springs tentative maps were used. The gross acreage of each subarea was determined by planimeter measurement. Exhibit 11 on page 34 summarizes these acreage calculations. B. GENERALIZED CONSTRAINTS ANALYSIS Consistent with adopted City policies and ordinances, development constraints within each subarea were identified. No changes were made to Zone 15 parcels outside the Dos Colinas project. Constraints that may have existed on land that is developed or has land use approvals were not included in this analysis. Constraints fall into two basic categories: 1) full and 2) partial. Fully constrained areas cannot be used to calculate residential density and are considered undevelopable. Fifty percent of partially constrained residential areas can be used in residential density calculations. Since full development constraints occasionally overlap each other, for accounting purposes, constraints are organized in a hierarchy beginning at 'A' - major power line easement and ending in 'J' - slopes between 25% - 40%. When this occurs, only the area of the highest level constraint is calculated for build out projection purposes. It is recognized that underlying constraints exist and that these constraints as well as others will be defined by specific environmental review for individual development projects. Zone 15 LFMP Page 32 October 19, 2011 Full environmental constraints are as follows: A. Major (> 69 kv) power-line easements B. Proposed circulation element roadways C. Railroad track beds or R-O-W D. Slopes of 40% or more in grade E. Significant riparian, or woodland habitats F. Significant wetlands G. Floodways H. Permanent bodies of water I. Other significant environmental features as determined by the Environmental Review process. Partial Developmental Constraints include: J. Slopes between 25-40% in grade: only 1/2 of the area within slopes between 25-40% in grade can be used in residential density calculations. Also included in the constraints analysis is the programming of: K. Planned School Facilities: The approximate area and location of school facilities are indicated in the General Plan. The beneficial and efficient provision of these facilities requires a minimum area of land free of development constraints. Consistent with City and school district policy, the minimum acreage identified by the General Plan for school facilities was not used in the applicable subarea’s residential density calculations. C. EXISTING LAND USE Existing land uses within each subarea as of April 2011 were identified. Residential density as well as square footage and type of nonresidential structures were itemized. Exhibit 12 on page 35 below provides a detailed breakdown of existing land uses. Zone 15 LFMP Page 33 October 19, 2011 Zone 15 LFMP Page 34 October 19, 2011 EXHIBIT 11 ZONE 15 – LFMP BUILDOUT PROJECTIONS – CONSTRAINTS ANALYSIS General Plan Land Use Designation Gross Acres Acres of Development Constraints (4) Full Partial Schools Net Developable Acres Revised LFMP- 15-(E) Ownership as of July 2010 A B C D E F G H I Total J J/2 K RL-1 73.08 3.60 3.60 10.50 5.25 64.23 Kato RL-2 190.50 8.60 4.30 12.90 24.70 12.35 165.25 Mandana RL Total 263.58 0.00 0.00 0.00 12.20 0.00 0.00 4.30 0.00 0.00 16.50 35.20 17.60 0.00 229.48 RLM-1 263.12 5.30 7.80 1.50 14.60 34.50 17.25 231.27 State and TChang Trust RLM-2 74.76 0.36 4.70 6.87 11.93 10.23 5.11 57.72 Portion of Holly Springs RLM-2A 45.09 0.32 0.43 0.75 2.29 1.14 43.20 Holly Springs RLM 2B 15.00 0.14 0.14 4.07 2.03 12.83 CUSD RLM 2C 99.46 4.50 0.80 19.03 0.10 24.43 24.98 12.49 62.54 State & CMWD RLM-3A 14.60 1.18 0.35 1.53 1.11 0.56 12.51 BW RLM-3B 5.38 0.92 0.92 4.46 Rancho Carlsbad HOA BJ Site RLM-3C 12.55 0.93 0.40 1.33 11.22 Rcho Clsb HOA BJ site RLM-4A 133.92 1.07 4.82 18.41 24.30 19.16 9.58 100.04 Revised BW RLM-5 14.73 0.20 3.30 3.50 0.80 0.40 10.83 Camino Carlsbad RLM-6 11.94 0.30 0.30 2.00 1.00 10.64 Kelly RLM-7 6.48 0.46 0.20 0.90 1.56 0.70 0.35 4.57 (2) WSL RLM-8 10.97 0.56 7.7 8.26 2.71 Revised (3) WSL RLM-8A 3.20 0.55 1.38 1.93 1.27 WSL RLM-9A 18.45 0.64 1.60 0.90 3.14 3.00 1.50 13.81 Bepton/Dartford RLM-10 5.00 0.30 0.10 0.40 0.80 0.40 4.20 Barlow RLM-11 45.96 4.15 8.40 12.55 5.87 2.94 30.47 Lyall RLM-12 41.90 3.60 4.70 8.30 5.10 2.55 31.05 6 Owners RLM Total 822.51 0.00 16.47 0.00 29.68 27.83 18.41 27.38 0.10 0.00 119.87 114.61 57.30 645.34 RM-1 88.41 88.41 Rancho Carlsbad HOA RM-2 37.76 1.74 2.30 0.00 4.04 6.28 3.14 30.58 Terraces RM-3(1) 46.0 2.74 0.50 0.05 0 3.29 3.27 1.64 41.07 Dos Colinas West Senior Living RM Total 172.17 0.00 4.48 0.00 2.80 0.05 0.00 0.00 0.00 0.00 7.33 9.55 4.78 0.00 160.06 RMH-1 Total 8.08 0.36 0.30 0.66 0.85 0.43 6.99 Cantarini Multi Family RH-1 Total 2.18 2.18 Terraces Total Res. 1268.52 0.00 21.31 0.00 44.98 27.88 18.41 31.68 0.10 0.00 144.36 160.21 80.11 0.00 1044-05 RH/C/O-2 3.22 0.00 0.10 0.05 3.17 Barber L-1 18.80 1.20 1.20 0.00 0.00 17.60 Sunny Creek Plaza PI 3.67 0.41 0.41 1.30 0.65 2.61 Wrisley OS-1 17.33 0.60 4.80 5.40 0.30 0.15 11.78 Camino Carlsbad OS-2 157.95 46.80 9.50 16.80 73.10 45.80 22.90 61.95 CMWD/Regents OS-3 58.77 0.00 0.00 0.00 58.77 CMWD OS Total 234.05 0.00 0.00 0.00 47.40 0.00 0.00 14.30 16.80 0.00 78.50 46.10 23.05 0.00 132.50 Existing Major Arterial (8.20) (8.20) Existing Local Arterial (2.60) TOTAL ZONE 1528.26 0.00 22.54 0.00 92.79 27.88 18.41 45.98 16.90 0.00 224.47 207.11 103.89 0.00 1199.93 (1) RLM-3, RLM-4, RL and potion of RLM-9 have been combined and replaced by RM-3 = Dos Colinas (2) RLM-7 ADJUSTED to INCLUDE portion of RLM-9 and RLM-8. New boundary per adjustment plat 07-24 (parcel) (3) RLM-8 has been adjusted per adjustment plat 07-24. (4) Constraints A – Major Power Line easements E – Riparian I – Other Environmental Features B – Circulation F – Wetlands J – Slopes 25% to 40% C – Railroad ROW G – Floodway K – School Site Overlay D – Slopes > 40% H – Permanent Body of Water Zone 15 LFMP Page 35 October 19, 2011 EXHIBIT 12 Existing Land Use AS OF 1/1/98 Residential: General Plan Project Land Use Gross Subarea Acres Project Name Project # DU's RM-1 88.4 Rancho Carlsbad RMHP 96-01 504 RM-2 37.76 Terraces at Sunny CT 96-02 200(1) Creek RH-1 2.18 Terraces at Sunny CT 96-02 50 Creek (1) (1) There are 172 single family units, 28 second dwelling units and 50 affordable multifamily units in the Terraces at Sunny Creek. In addition to Rancho Carlsbad Mobile Park and the Terraces, there are 17 single family dwelling units scattered throughout the Zone. D. DEVELOPING LAND USE Developing Land Use is a category which defines the status or stage of a land use proposal or project in the development process. The development process begins when a development application is submitted to the City. Various procedures are followed depending on the type of application submitted. In all cases, applications are reviewed to ensure that all City standards are met and there is conformance with all previous discretionary approvals prior to finalizing the projects and issuing building permits. Once the project has received final occupancy, the development process ends and the Land Use is identified as an existing land use. Land use in the development process was identified by a review of the City of Carlsbad Planning Department development records. Two projects have received final approval (Holly Springs CT-00-21; 42 half acre lots and Cantarini CT-00-18; 105 half acre lots). A detailed itemization of developing land uses is provided in Exhibit 13 on page 36. After receiving tentative discretionary approval, a land use is considered approved. The approval is valid until the land use is developed and occupied or the tentative approval expires. Zone 15 LFMP Page 36 October 19, 2011 EXHIBIT 13 ZONE 15 – DEVELOPING LAND USE (As of May 2011) General Plan Land Use Subarea Gross Acres Project Number Developing Status Existing Application Submittal Tentative Approval Final Map Building Permits Total RL-1 73.08 SP191 (1) 1 RL-2 190.50 SP191 (1) RL TOTAL 263.58 0 0 0 0 0 1 RLM-1 263.12 RLM-2 74.76 CT 00-21 42 42 RLM-2A 45.09 CT 00-21 (INCL) RLM-2B 15.00 RLM-2C 99.46 RLM-3A 14.60 CT 00-18 RLM-3B 5.38 RHO CB RLM-3C (6) 12.55 PRE 02-15 RLM-4A 133.92 CT 00-18 105 105 RLM-5 14.73 1 RLM-6 11.94 2 RLM-7 6.48 1 RLM-8 10.97 2 RLM-8A 3.20 SP191 (1) RLM-9A 18.45 SP191 (1) RLM-10 5.00 SP 191 (1) 1 RLM-11 45.96 SP 191 (1) RLM-12 41.90 SP 191 (1) 6 RLM TOTAL 822.51 147 0 0 147 14 RM-1 88.41 0 504 RM-2 (5) 37.76 CT 96-02 200 RM-3 (7) 46.0 GPA-09-02 246 246 RM TOTAL 172.17 246 0 0 246 704 RMH-1 (TOTAL) 8.08 CT 00-18 80 80 RH-1 (2) (5) (TOTAL 2.18 CT 96-02 50 RH/C/O-2 (2) (TOTAL) 3.22 1 L-1(4) 18.80 0 TOTAL RESIDENTIAL 1268.52 246 227 0 0 663 771 RH/C/O-2 (3) 3.22 0 0 0 0 0 0 L-1 (4) 18.80 0 0 0 90,000 0 PI 3.67 0 0 0 0 0 0 OS-1 17.33 OS-2 157.95 (1) OS-3 58.77 (1) OS TOTAL 234.05 0.00 0 0 0 0 0 (1) TOTAL NON-RES 259.74 0.00 0 0 0 0 90,000 (1) NOTES: (1) SP 191 is the Sunny Creek Specific Plan. This plan established densities and general guidelines for development but did not approve any dwelling units. (2) One third of RH/C/O-2 net acreage is used for residential buildout projections. (3) Two thirds of the total RH/C/O-2 net acreage (2.15 acres) is used for non-residential buildout projections. (4) L-1 received approval for 175,000 of commercial area during the processing of the Sycamore Creek Specific Plan. However, the Zone 15 LFMP allows for a maximum of 305,530 square feet. The City Council (2002) has now determined this will be a mixed use site (assume 2/3 residential, 1/3 commercial). The Sycamore Creek Specific Plan – SP 190 – was rescinded per City Council Resolution # 98-337. (5) The Terraces - at Sunny Creek there is currently developed 172 single family units, 28 second dwelling units and 50 multi-family (affordable) units with units occupied. (6) 80 multi-family units being requested. No formal application has been filed. For planning purposes, 4.5± acres will be for development and 7.1± for open space per PRE-02-15. Previous approvals related to RM-1 stripped all dwelling units off this parcel. The project may require a density bonus and/or a GPA/ZC. (7) RM-3 is the proposed Dos Colinas (305 units) that are considered commercial dwelling units (professional care facility). The net developable acreage is 41.07 acres. The proposed land use is RM (4-8 units per acre) the net acreage times the control point of 6 will generate the potential for 246 units.. Zone 15 LFMP Page 37 October 19, 2011 E. BUILD OUT PROJECTIONS CALCULATIONS Residential and nonresidential build out projections as of April 2011 for Zone 15 are shown on Exhibit 14 and 15 on pages 39 and 40. Build out projections are calculated as follows: 1. Residential Build Out Projections The net developable acreage of each residential land use subarea is multiplied by the adopted Growth Management control point as shown below: General Plan Growth Management Land Use Designation Control * RL 1.0 RLM 3.2* RM 6.0 RMH 11.5 RH 19.0 *Note: This density factor was reduced to 2.88 units per acre in the Sunny Creek specific plan area (SP.191). The result provides the base residential dwelling unit build out projections for each subarea consistent with the passage of Proposition E on November 4, 1986. Both existing and approved dwelling units are subtracted from this yield to indicate the amount of future residential development in the zone. 2. Non-Residential Build Out Projections The net developable acreage of each nonresidential land use subarea is multiplied by either .3 or .4 as described below. The resultant figures provide an estimate of ultimate land use intensity as defined by building square footage for each subarea. This estimate is used for facility planning purposes. The Growth Management Program uses the .3 factor to estimate building square footage yields on either 1) unapproved and unimproved, vacant, unconstrained land or on 2) urbanized, underdeveloped, nonresidential sites. These urbanized, underdeveloped sites typically exhibit significant man-made constraints to development. Primary constraints are: a) compatibility with surrounding land uses and b) proper interfacing with existing infrastructure and public facilities. The .4 factor is used to estimate building square footage yields on unconstrained lots which have approved land use projects and have all infrastructure in place. The area identified as L-1 was previously approved for 175,000 square feet via the Sycamore Creek Specific Plan (SP 190). However, the City Council Zone 15 LFMP Page 38 October 19, 2011 determined that L-1 is to develop as a mixed use project. Accordingly 90,000 square feet of commercial and 190 units of multifamily is assumed. The nonresidential build out projection is currently 178,122 square feet. Due to changes to the nonresidential land use designations, the overall nonresidential build out projection has decreased by 657,307 square feet when compared to the nonresidential square footage identified in the Zone 15 LFMP originally approved in 1990. The .35 factor was used to estimate square footage for all other nonresidential areas. F. BUILD OUT POPULATION PROJECTION The build out population projection for Management Zone 15 was determined by applying a population generation rate of 2.3178 persons/dwelling unit. The build out population projections for Zone 15 are shown on Exhibit 16 on page 41. These build out population projections are used consistently throughout this plan for the purpose of predicting demand for public facilities. Zone 15 LFMP Page 39 October 19, 2011 EXHIBIT 14 ZONE 15 - LFMP RESIDENTIAL BUILDOUT PROJECTIONS (As of May 2011) General Plan Land Use Designation Net Developable Acres GMCP (1) Base Residential Buildout Projections Existing DU's Approved DU's Future DU's RL-1 (2) 64.23 1.00 64 1 63 RL-2 (2) 165.25 1.00 165 165 RL TOTAL 229.48 229 1 0 228 RLM-1 (3) 231.27 3.20 0 0 RLM-2 57.72 3.20 185 0 RLM-2A (2) (7) 43.20 2.88 124 42 42 RLM-2B(10) 12.83 0.00 0 0 RLM-2C (11) 62.54 0.00 0 0 RLM-3A (2) (7) 12.51 2.88 36 See 4A 0 RLM-3B 4.46 0.00 0 0 RLM-3C (9) 11.22 0.00 0 80 RLM-4A (2) (7) 100.04 2.88 288 105 105 RLM-5 10.83 3.20 35 1 34 RLM-6 10.64 3.20 34 2 32 RLM-7 4.57 3.20 14 14 RLM-8 2.71 3.20 9 2 7 RLM-8A 1.27 3.20 4 4 RLM-9A (2) 13.81 2.88 40 40 RLM-10 (2) 4.20 2.88 12 1 11 RLM-11 (2) (14) 30.47 2.88 88 88 RLM-12 (2) 31.05 2.88 89 7 82 RLM TOTAL 645.34 958 13 147 539 RM-1 (9) 88.41 6.00 504 504 0 RM-2 (4) 30.58 200 200 0 RM-3 (12) 41.07 6.00 246 246 RM TOTAL 160.06 950 704 0 246 RMH-1 (TOTAL) 6.99 11.50 80 80 80 RH-1 (6) (TOTAL) 2.18 50 50 0 TOTAL RES 1044.05 2267 768 227 1093 RH/C/O-2 (5) 1.06 19.00 20 1 19 L-1 (8) 12.54 0.00 190 190 OS-1 11.78 0.00 0 0 OS-2 61.95 0.00 0 0 OS-3 58.77 0.00 0 0 OS TOTAL 132.50 0 0 0 TOTAL DWELLING UNITS 2477 769 227 1302 NOTES: (1) Growth Management Control Point (2) The GMCP for areas within the Sunny Creek Specific Plan (SP 191) are adjusted to provide an overall density of 2.88 du/ac as specified in the plan. (3) This area is the Habitat Conservation Area which was previously known as the Carlsbad Highlands property. This site was originally approved for 740 dwelling units, but is now being utilized for habitat conservation purposes. The 379 units remaining in the 1998 amendment have been put into the (4) This area is developed with 172 market rate single family dwelling units with 28 second dwelling units, total = 200 units. (Project name is Terraces at Sunny Creek.) excess dwelling unit bank. (5) Consistent with the previous Zone 15 LFMP, one third of the net acreage is used to calculate dwelling unit density. (6) 50 affordable housing units were built as part of the “Terraces” residential project. (7) Approved applications include Holly Springs (CT 00-21) and Cantarini (CT 00-18) for a total of 227 units (42 + 105 = 147 SFD plus 80 MF). (8) The City Council (2002) has determined that this L-1 site will be a mixed use project. Assume 1/3 commercial @ 90,000± square feet on 6.26 acres and 2/3 residential @ 190 multi-family units on 12.54± acres. (9) 80 multi-family units being requested. No formal application has been submitted. For planning purposes, 4.5± acres will be for development and 7.1± for open space per PRE-02-15. Previous approvals related to RM-1 stripped all dwelling units off this parcel. The project may require a density bonus and/or a GPA/ZC. (10) 15 gross acres of Holly Springs property was sold to the Carlsbad Unified School District on 8/26/98. (11) 98.88 acres was sold by Holly Springs LTD to the State Wildlife Conservation Board on 5/22/02. Since this property will be conserved as a habitat area, no dwelling units were allocated to the site. This results in 200 dwelling units that will be added to the City excess dwelling units bank. (12) RLM-3, 4 and a portion of 9 have been combined and noted on RM-3 (Dos Colinas) – The 305 unit Dos Colinas project has been determined to be a professional care facility (i.e. commercial dwelling units) and therefore not included in the base residential buildout projections. However, should Dos Colinas (senior site) not be constructed, the base residential projection for the RM designation of 246 units has been included in the table to represent the number of residential units that could hypothetically be built at the RM GMCP. (14) There is a pending application (Rancho Milagro) for 19 half acre lots. Zone 15 LFMP Page 40 October 19, 2011 EXHIBIT 15 ZONE 15 - LFMP NON-RESIDENTIAL BUILDOUT PROJECTIONS May 2011 General Plan Land Use Designation Net Developable Acres GMP Non-Residential LU Intensity Estimate Base Non-Residential Buildout Projections Existing Sq. Ft. Approved Sq. Ft. Estimated Future Sq. Ft. RH/C/O-2 (1) 3.17 35% 48,330 0 0 48,330 L-1 (2) 6.26 35% 95,440 0 0 90,000 PI 2.61 35% 39,792 0 0 39,792 TOTAL ZONE 12.04 183,562 0 0 178,122 NOTES: (1) Non-Residential RH/C/O-2 acreage is two thirds of the total net acreage for this land use as specified in the original Zone 15 LFMP. (2) 175,000 square feet was approved as a part of the original Sycamore Creek I Specific Plan (SP 190). The City has considered developing this parcel as a mixed use project with a reduced commercial area plus residential uses. This zone plan update assumes 190 plus or minus multi-family units on 12.54 acres and 90,000 plus or minus square feet of commercial on 6.26 acres. Zone 15 LFMP Page 41 October 19, 2011 EXHIBIT 16 ZONE 15 BUILDOUT POPULATION PROJECTIONS General Plan Land Use Designation 2011 Base Residential Buildout Projections Existing DU's Approved DU's Future DU's Population Index (2.3178) Existing Population Approved Population Future Population Built Out Population Projection RL-1 (2) 64 1 63 2.3178 2 0 146 148 RL-2 (2) 165 165 2.3178 0 0 382 382 RL TOTAL 229 1 0 228 2 0 528 530 RLM-1 (3) 0 0 2.3178 0 0 0 0 RLM-2 185 0 2.3178 0 0 0 0 RLM-2A (2) 124 42 42 2.3178 0 0 97 97 RLM-2B 0 0 0 RLM-2C (8) 0 0 0 RLM-3A (2) 36 See 4A 0 2.3178 0 0 0 0 RLM-3B 0 0 0 RLM-3C (7) 0 80 2.3178 185 185 RLM-4A (2) 288 105 105 2.3178 2 0 243 245 RLM-5 35 1 34 2.3178 2 0 79 81 RLM-6 34 2 32 2.3178 5 0 74 79 RLM-7 14 14 2.3178 0 32 32 RLM-8 9 2 7 2.3178 5 0 16 21 RLM-8A 4 4 2.3178 0 0 9 9 RLM-9A (2) 40 40 2.3178 0 0 93 93 RLM-10 (2) 12 1 11 2.3178 2 0 25 27 RLM-11 (2) 88 88 2.3178 0 0 204 204 RLM-12 (2) 89 7 82 2.3178 16 0 190 206 RLM TOTAL 958 13 147 539 30 0 1247 1279 RM-1 504 504 0 0 2.3178 1,168 0 0 1,168 RM-2 (4) 200 200 0 0 2.3178 464 0 0 464 RM-3 (9) 246 246 2,3178 0 570 570 RM TOTAL 950 704 0 246 1632 0 5706 2202 RMH-1 80 80 80 185 185 RH-1 (6) (TOTAL 50 50 0 0 2.3178 116 0 0 116 TOTAL RES 2267 768 227 1093 1780 0 2530 4312 RH/C/O-2 (5) 20 1 19 2.3178 2 0 44 46 L-1 190 190 440 440 OS-1 0 0 0 0 0 0 0 OS-2 0 0 2.3178 0 0 OS-3 0 0 0 0 0 0 0 OS TOTAL 0 1 0 0 0 0 0 0 TOTAL DWELLING UNITS 2477 769 227 1302 1782 0 3014 4798 NOTES: (1) Growth Management Control Point (2) The GMCP for areas within the Sunny Creek Specific Plan (SP 191) are adjusted to provide an overall density of 2.0 du/ac as specified in the plan. (3) This area is the Habitat Conservation Area which was previously known as the Carlsbad Highlands property. This site was originally approved for 740 dwelling units, but is now being utilized for habitat conservation purposes. There are 379 units remaining that are now a part of the excess dwelling unit bank. (4) This area proposes 172 market rate single family dwelling units with 28 second units. (5) Consistent with the previous Zone 15 LFMP, one third of the net acreage is used to calculate dwelling unit density. (6) This area is the affordable housing portion of the Terraces. 50 affordable housing units have been completed. (7) 80 units proposed. No units are currently allocated for this site. (8) Since this property will be conserved as a habitat area, no dwelling units were allocated to the site. This results in 200 dwelling units that will be added to the City excess dwelling unit bank. (9) Dos Colinas Senior Project – units. RLM 3, 4, and a portion of 9 have been combined into new Parcel RM-3. Zone 15 LFMP Page 42 October 19, 2011 IV. PHASING PROJECTIONS Phasing projections estimate when, where and how much development will occur in Zone 15 between now and build out. Although difficult to predict exactly, phasing projections begin to make possible advance planning and programming of public facilities to assure adopted performance standards are continually met. Specifically, phasing projections: 1. Project estimated demands for public facilities on a yearly basis until build out. 2. Project and establish thresholds which indicate when and where public facilities improvements are needed. 3. By projecting facility thresholds, allow sufficient lead time for facility programming to assure performance standards are continually met. 4. Through threshold identification, allow the City to implement public facility improvements. A. ZONE 15 LAND USE PHASING 1. Residential The residential phasing projections for Zone 15 are shown on Exhibit 19 on page 43. The projected residential phasing schedule is intended to be used for projecting future need and timing of public facilities. It is a tool to allow the City to anticipate future public facility needs and to budget monies for their improvement. The projected residential phasing schedule is not absolute. The actual number of dwelling units to be built each year will vary depending on economic conditions. Zone 15 LFMP Page 43 October 19, 2011 EXHIBIT 19 Zone 15 Residential Phasing * * * FOR FACILITY PLANNING PURPOSES ONLY * * * Status Years (as of 7/10) Zone 15 TOTAL ZONE DU's TOTAL ZONE POPULATION Existing 2011 769 769 1,782 Proposed 2012 2 771 1,787 2013 70 841 1,949 2014 70 911 2,112 2015 70 981 2,274 2016 70 1,051 2,436 2017 70 1,121 2,598 2018 70 1,191 2,760 2019 70 1,261 2,923 2020 70 1,331 3,085 2021 70 1,401 3,247 2022 70 1,471 3,409 2023 70 1,541 3,572 2024 70 1,611 3,734 2025 70 1,681 3,896 2026 70 1,751 4,058 2027 70 1,821 4,221 2028 70 1,891 4,383 2029 70 1,961 4,545 2030 70 2,031 4,707 Buildout 2031 40 2,071 4,800 TOTAL 1,302 2,071 4,800 NOTE: Phasing projections for Zone 15 shall be incorporated into the Capital Improvement Program. Zone 15 LFMP Page 44 October 19, 2011 2. Non-Residential The nonresidential phasing projections for Zone 15 are shown on Exhibit 21 on page 45. Similar to residential phasing, the nonresidential projections are estimated for purposes of public facility planning. Comparable to residential phasing projections, this exhibit is provided to facilitate future monitoring of this Local Facilities Management Plan. 3. Phasing Summary Both residential and nonresidential phasing projections are provided in order to plan for public facilities. The plan provides these projections to establish thresholds which indicate the need for additional facilities. The Growth Management Program and the Zone 15 LFMP anticipate that the actual phasing of development in this zone will vary from these projections. In no instance, however, will phasing be modified to the point that the performance standard will not be met. The public facility thresholds established in this plan will ensure that compliance with the adopted performance standards is maintained, or no development will be allowed until compliance is reached. The Capital Improvement Plan phasing projections shall incorporate the phasing projections as provided in the Zone 15 LFMP. Zone 15 LFMP Page 45 October 19, 2011 EXHIBIT 21 Zone 15 Non-Residential Phasing * * * FOR FACILITY PLANNING PURPOSES ONLY * * * Status Years (as of 5/11) Zone 15 Sq. Ft. Planning Area Existing 2011 0 Projected 2012 0 2013 0 2014 0 2015 90,000 C-1 2016 0 2017 0 2018 0 2019 0 2020 0 2021 0 2022 0 2023 0 2024 0 2025 48,330 RH/C/O-2 2026 39,792 PI 2027 0 2028 0 2029 0 2030 0 Buildout 2031 0 TOTAL 178,122 NOTE: Phasing projections for Zone 15 shall be incorporated into the Capital Improvement Program. Zone 15 LFMP Page 46 October 19, 2011 EXHIBIT #22 City Wide Residential and Non-Residential Phasing *** FOR FACILITY PLANNING PURPOSES ONLY *** Status Years Local Facilities Management Zones 1 2 3 4 RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. Existing 2003 10,894 610,651 2,514 78,103 241 594,382 3,065 0 Projected 2003-04 27 10,490 1 4,800 2004-05 50 10,030 143 1 53,561 2005-06 20 15,733 1 2006-07 20 20,000 29,256 1 7,770 2007-08 20 20,000 1 6,500 20 2008-09 40 70,000 1 20 2009-10 40 70,000 1 2010-11 40 70,000 1 20,000 2011-12 40 70,000 1 20,130 2012-13 40 70,000 1 2013-14 40 70,000 12,300 2014-15 40 70,000 2,500 2015-16 40 70,000 2016-17 40 70,000 2017-18 40 70,000 2018-19 40 70,000 2019-20 40 190,509 Buildout 2020-XX 41 5 1 Total Future 658 1,036,762 148 31,756 11 125,061 40 0 Buildout Total 11,552 1,647,413 2,662 109,859 252 719,443 3,105 0 Note: The phasing numbers contained in this spreadsheet were obtained from City of Carlsbad Finance Department 2003-2004 Growth Projection spreadsheet. Zone 15 LFMP Page 47 October 19, 2011 EXHIBIT #22 (cont'd) City Wide Residential and Non-Residential Phasing *** FOR FACILITY PLANNING PURPOSES ONLY *** Status Years Local Facilities Management Zones 5 6 7 8 RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. Existing 2003 138 7,118,014 8,384 251,677 1,752 1,668 723 11,289 Projected 2003-04 48,827 39 19 2004-05 138,410 50 43,943 259 2005-06 140,442 50 43,943 259 16 6,000 2006-07 150,000 35 43,943 10,000 70 2007-08 150,000 43,943 2008-09 150,000 43,943 20,000 2009-10 184,169 5 2010-11 184,169 1 2011-12 184,169 2012-13 184,169 2013-14 184,169 2014-15 184,169 2015-16 184,169 2016-17 234,938 2017-18 38,538 2018-19 115,718 7 2019-20 107,988 Buildout 2020-XX 17 Total Future 0 2,564,044 135 219,715 557 30,000 135 6,000 Buildout Total 138 9,682,058 8,519 471,392 2,309 31,668 858 17,289 Note: The phasing numbers contained in this spreadsheet were obtained from City of Carlsbad Finance Department 2003-2004 Growth Projection spreadsheet. Zone 15 LFMP Page 48 October 19, 2011 EXHIBIT #22 (cont'd) City Wide Residential and Non-Residential Phasing *** FOR FACILITY PLANNING PURPOSES ONLY *** Status Years Local Facilities Management Zones 9 10 11 12 RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. Existing 2003 910 2,132 180 5,371 1,949 43,944 1,647 11,001 Projected 2003-04 163 2004-05 95 325 70,320 2005-06 190 56,000 108 133,000 35,000 2006-07 40,000 98 56,000 212 125,000 2007-08 75,000 56,000 133,000 2008-09 75,000 59,819 221 15,700 2009-10 123 75,000 317 2010-11 75,000 250 2011-12 10,200 255 2012-13 2013-14 22,250 2014-15 2015-16 2016-17 2017-18 9,078 2018-19 8,500 2019-20 1 Buildout 2020-XX Total Future 124 367,778 888 227,819 1,346 499,270 0 35,000 Buildout Total 1,034 369,910 1,068 233,190 3,295 543,214 1,647 46,001 Note: The phasing numbers contained in this spreadsheet were obtained from City of Carlsbad Finance Department 2003-2004 Growth Projection spreadsheet. Zone 15 LFMP Page 49 October 19, 2011 EXHIBIT #22 (cont'd) City Wide Residential and Non-Residential Phasing *** FOR FACILITY PLANNING PURPOSES ONLY *** Status Years Local Facilities Management Zones 13 14 15 16 RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. Existing 2011 0 1,747,722 2 0 769 0 0 0 Projected 2011-12 2 2012-13 75,000 70 2013-14 203,417 70 90,000 331,513 2014-15 215,375 157 70 144,297 2015-16 80,875 82 70 144,297 2016-17 80,875 82 70 313,753 2017-18 138,825 82 16,500 70 381,832 2018-19 138,825 82 87,120 70 196,836 2019-20 138,825 44 70 196,836 2020-21 138,825 109 70 211,636 2021-22 57,950 142 70 2022-23 57,950 142 70 48,330 2023-24 57,950 38 70 39,792 2024-25 70 2025-26 70 2026-27 70 2027-28 70 2028-29 70 2029-30 70 2030-31 40 Buildout 1,302 Total Future 0 1,384,692 960 103,620 1,302 178,122 0 1,921,000 Buildout Total 0 3,132,414 962 103,620 2,071 178,122 0 1,921,000 Note: The phasing numbers contained in this spreadsheet were obtained from City of Carlsbad Finance Department 2003-2004 Growth Projection spreadsheet. Zone 15 LFMP Page 50 October 19, 2011 EXHIBIT #22 (cont'd) City Wide Residential and Non-Residential Phasing *** FOR FACILITY PLANNING PURPOSES ONLY *** Status Years Local Facilities Management Zones 17 18 19 20 RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. Existing 2003 1 0 1,738 10,888 1,923 326,772 1,391 26,978 Projected 2003-04 110 88 2004-05 171 217,000 70,000 3 173 2005-06 171 351,000 195,545 3 25,688 53 2006-07 171 351,000 195,545 3 25,688 2007-08 217,000 195,545 3 25,688 2008-09 217,000 195,545 4 25,688 2009-10 217,000 195,545 4 20 30,000 2010-11 217,000 225,545 20 2011-12 217,000 195,545 6 35,000 20 2012-13 217,000 195,545 6 35,000 20 30,000 2013-14 217,000 195,545 6 35,000 20 2014-15 195,545 6 21,828 20 2015-16 195,550 6 57,900 20 2016-17 6 20 2017-18 6 21 2018-19 6 18 2019-20 6 Buildout 2020-XX 1 Total Future 623 2,438,000 0 2,251,000 75 287,480 513 60,000 Buildout Total 624 2,438,000 1,738 2,261,888 1,998 614,252 1,904 86,978 Note: The phasing numbers contained in this spreadsheet were obtained from City of Carlsbad Finance Department 2003-2004 Growth Projection spreadsheet. Zone 15 LFMP Page 51 October 19, 2011 EXHIBIT #22 (cont'd) City Wide Residential and Non-Residential Phasing *** FOR FACILITY PLANNING PURPOSES ONLY *** Status Years Local Facilities Management Zones 21 22 23 24 RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. RES/DU ' OF NON RES. Existing 2003 593 0 768 112,772 0 792,615 338 0 Projected 2003-04 157 51 2004-05 21 87,048 2005-06 68 4,000 87,048 2006-07 1 20,000 2007-08 1 20,000 2008-09 1 6 2009-10 44 1 21,780 6 2010-11 49 1 6 2011-12 20 1 19,000 6 2012-13 20 1 6 2013-14 20 1 2014-15 20 1 2015-16 20 1 2016-17 20 1 2017-18 22 1 2018-19 1 2019-20 1 Buildout 2020-XX Total Future 392 0 154 84,780 0 174,096 30 0 Buildout Total 985 0 922 197,552 0 966,711 368 0 Note: The phasing numbers contained in this spreadsheet were obtained from City of Carlsbad Finance Department 2003-2004 Growth Projection spreadsheet. Zone 15 LFMP Page 52 October 19, 2011 EXHIBIT #22 (cont'd) City Wide Residential and Non-Residential Phasing *** FOR FACILITY PLANNING PURPOSES ONLY *** Status Years Local Facilities Management Zones 25 TOTALS RES/DU ' OF NON RES. RES/DU ' OF NON RES. Existing 2003 1 0 39,923 11,745,979 Projected 2003-04 655 64,117 2004-05 1,366 765,312 2005-06 1,014 1,718,329 2006-07 843 1,433,874 2007-08 202 1,167,848 2008-09 450 1,267,323 2009-10 718 1,330,651 2010-11 525 1,214,495 2011-12 468 1,086,705 2012-13 278 1,082,175 2013-14 304 794,214 2014-15 304 580,322 2015-16 25 225 605,361 2016-17 25 187 304,938 2017-18 25 190 117,616 2018-19 25 172 194,218 2019-20 30 162 298,497 Buildout 2020-XX 65 0 Total Future 130 0 8,128 14,025,995 Buildout Total 131 0 48,051 25,771,974 Note: The phasing numbers contained in this spreadsheet were obtained from City of Carlsbad Finance Department 2003-2004 Growth Projection spreadsheet. Zone 15 LFMP Page 86 October 19, 2011 DRAINAGE FACILITIES I. PERFORMANCE STANDARD Drainage facilities must be provided as required by the City concurrent with development. II. FACILITY PLANNING AND ADEQUACY ANALYSIS Zone 15 is located in the Agua Hedionda Lagoon Watershed. The storm water within this watershed flows through man-made channels, storm drains, and natural drainage courses to Agua Hedionda Creek. Agua Hedionda Creek, in turn, flows into the Agua Hedionda Lagoon. The primary source of information contained in this report is extracted from the master drainage plan entitled, ”Carlsbad Drainage Master Plan”, dated July 3, 2008, and prepared by Brown and Caldwell. This Master Drainage Plan sets forth the comprehensive local drainage systems necessary to meet the long-term needs of the City. As was indicated in the Citywide Facilities and Improvements Plan, drainage is distinguished from all other public facilities and improvements because, by its very nature, it is more accurately assessed as specific development plans are finalized. However, certain facilities may be necessary which are larger than those required from a single development project and, therefore, need to be identified so that the proper funding can be collected for the construction of these facilities. A. INVENTORY 1. Existing Facilities The existing major drainage facilities (30” or larger) that are within Zone 15 are shown on the Carlsbad Drainage Maser Plan, dated July 3, 2008. The existing major drainage facilities within Zone 15 are as follows: Facility Location Improved Channel Rancho Carlsbad Mobile Home Park (Agua Hedionda Creek) Earth Channel Rancho Carlsbad Mobile Home Park (Calavera Creek) BNB An 84” RCP Constructed in Cannon Road BJB A Sedimentation Basin at the N.E. Corner of College Blvd. and Cannon Road Zone 15 LFMP Page 87 October 19, 2011 2. Proposed Build Out Facilities: Facility BJ-1 (Detention Basin): This system (little Encinas Creek) carries water from the City of Oceanside near Cannon Road. The natural flow will go through Basin BJ and will flow under College Boulevard in a 4’ x 7’ box culvert with a raised animal crossing bench and join an earthen channel adjacent to Rancho Carlsbad Mobile Home Park which flows under El Camino Real to Agua Hedionda Lagoon. Facility BL-L (78” RCP Extension and College Bridge: Removal of a headwall on an existing 78” RCP in College Boulevard East of Sunny Creek Road and connect to Agua Hedionda Creek just downstream of the proposed College Boulevard Bridge. BL-L also includes construction of the College Bridge over Agua Hedionda Creek. Facility BR: A 66” culvert under College Boulevard North of Bridge BL-L to drain an un- named creek coming from Cantarini and Holly Springs development. Note: Project B and BN are proposed City dredging projects for Agua Hedionda Creek (B) and portions of Calavera Creek (BN) to improve capacity of the channel for conveyance of the 100 year flood event through Rancho Carlsbad. The location and size of the proposed storm drain facilities have been approximated for the purposes of this plan. The actual locations and sizes will be defined as the surrounding area develops and the storm runoff is analyzed according to current design standards. The City updated the Drainage Master Plan, July 3, 2008. The updated version analyzed the adequacy of the existing and proposed storm drain facilities and proposed the construction for specific major storm drain facilities so that with the implementation of the above projects future development will achieve the adopted performance standard as development occurs. Zone 15 LFMP Page 88 October 19, 2011 B. PHASING The watershed boundaries are shown in the City Master Drainage plan. The approach taken to establishing the watershed boundaries is based on ensuring that needed facilities are in place prior to or commensurate with development. C. ADEQUACY FINDINGS Existing drainage facilities currently do not meet the adopted performance standard for major storm drain facilities. The July 3, 2008 Drainage Master Planhas indicated that a drainage inadequacy exists in the event of a 100-year flood that will require construction of detention basins and restoration or reconstruction of Calavera Creek and Agua Hedionda Creek. In addition to the future facilities required by the Drainage Master Plan, future development will be required to construct any major drainage facilities identified in the current Master Plan at the time of development as determined by the City Engineer. The Drainage Master Plan may also require additional conditions at the time of development. The construction of these facilities will be a condition to the approval of future development in Zone 15 so that conformance with the adopted performance standard will be achieved. III. MITIGATION Special Conditions A. All future development in Zone 15 will be required to construct any future Zone 15 storm drain facilities identified in the current Drainage Master Plan, for each watershed basin as determined by the City Engineer. Any facilities necessary to accommodate future development must be guaranteed prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first in Zone 15. B. Prior to the recordation of any final map, grading permit or building permit (whichever occurs first), for any specific project within Zone 15, the developers of that project are required to: 1. Pay the required drainage area fees established in the Drainage Master Plan and; 2. When drainage area fee changes are contemplated, execute a city standard agreement to pay changes in drainage area fees as adopted by City Council. C. Prior to the recordation of the first final map, issuance of grading permit or building permit, whichever occurs first within Zone 15, the developers are required to financially guarantee Zone 15’s proportional share of the following to the satisfaction of the City Engineer: Zone 15 LFMP Page 89 October 19, 2011 1. Detention basin “BJ-1” to be installed in Zone 15 upstream of College Boulevard along with a 4’ x 7’ box culvert with raised critter crossing under College Boulevard and an un-lined channel within basin “BJ-1”. 2. Provide a mechanism for the maintenance of the “BJ-1”detention basin. 3. Remove the existing headwall of the 78” RCP in College Boulevard and connect just downstream of the new bridge at Agua Hedionda Creek. 4. Bridge on College Boulevard at Agua Hedionda Creek (BL-L). 5. A 66” culvert under College Boulevard just north of Bridge (BR). D. Concurrent with the development of property within Development Area 1 of Zone 15, the following shall be constructed to the satisfaction of the City Engineer: 6. Detention basin “BJ-1” including a 4’ x 7’ Box Culvert with a raised animal crossing bench under College Boulevard and unlined channel within basin “BJ.” 7. Connection of the existing 78” RCP in College Boulevard just downstream of the new bridge at Agua Hedionda Creek. 8. Bridge on College Boulevard at Agua Hedionda Creek (BL-L). 9. A 66” culvert under College Boulevard just north of Bridge (BR). E. Phasing –has been . College Boulevard Reach A (El Camino Real to Cannon Road) may be phased and could be constructed either from the north end at Cannon Road or the south end at the bridge at Agua Hedionda Creek. Drainage improvements could be constructed in 2 phases and coordinated with the phased College Boulevard improvements. Detention basin “BJ-1 could be constructed with the northerly portion of College Boulevard and the Agua Hedionda bridge and 78” RCP connection and 66” with the southerly portion of College Boulevard. Zone 15 LFMP Page 90 October 19, 2011 IV. FINANCING All of Zone 15 falls within Drainage Master Plan Area B. Fees for these drainage areas were recently updated and range from $1,970 per acre for low runoff areas to $8,535 per acre for high runoff areas. However, future development must comply with condition B above which may affect actual fees applied to final maps. The cost of the proposed detention basin BJ and the 4’ x 7’ box culvert with a raised bench to facilitate small animal crossings is estimated to be $964,875, the estimated cost of the bridge on College Boulevard at Agua Hedionda Creek is estimated at $3,553,996, the estimated cost of the 78” RCP extension is $92,201 and the 66” culvert (BR) is estimated at $103,209. The cost for Calavera Creek improvements and Agua Hedionda Channel “B” are estimated below. Estimated costs do not include land acquisition or relocation of onsite land use on proposed BJ Basin site. Additional acquisition and relocation costs will be the responsibility of private development in Zone 15. The City has identified CIP Project #33381 (Agua Hedionda Channel “B” and Calavera Creek Channel BN) with a total budget of $5,243,450. The project is funded from 2 sources: PLDA provides $4,384,413 and $859,037 comes from the Cities general construction contingency. The City is currently pursuing agency permits. This project will improve and dredge the existing channel and remove the majority of the homes within Rancho Carlsbad from the 100 year flood plain. When Rancho Carlsbad converted to an ownership park, they paid a drainage fee to the City on their fair share cost of the improvements. The financing for the required drainage facilities shall be borne by the developer of Zone 15. To the extent provided by the City Planned Local Drainage Area Fee Program, the costs incurred by individual developers for constructing Master Plan Drainage facilities shall be reimbursed from Planned Local Drainage Area “B” fee revenues at a time and in a manner as determined by the City Council. Note: The improvement cost estimate shown currently exceed estimates shown in the City C.I.P. or drainage master plan. Prior to recordation of the first final map, issuance of grading permit or building permit, whichever occurs first, within each of the specifically identified four development areas of Zone 15, a financing program guaranteeing construction of the following circulation improvements shall be approved. Said financing program can include but not be limited to such programs as developer funding, assessment district or private reimbursement agreements. The ultimate financing program must receive City council approval prior to recordation of the first final map or other development permits. Zone 15 LFMP Page 91 October 19, 2011 CIRCULATION FACILITIES I. PERFORMANCE STANDARD No road segment or intersection in the zone nor any road segment or intersection outside the zone, which is impacted by development within the zone shall be projected to exceed a Service Level C during off-peak hours, nor Service Level D during peak hours. Impacted is when twenty percent or more of the traffic generated by the Local Facilities Management Zone will use the road segment or intersection. II. FACILITY PLANNING AND ADEQUACY ANALYSIS This analysis determines whether or not the circulation system within Zone 15 conforms to the adopted performance standard. It will also address all circulation element road segments and intersections outside Zone 15 impacted by twenty percent (20%) or more of the traffic generated by Zone 15 to ensure conformance with the adopted performance standard. This section is based on the LFMP Zone 15 traffic study prepared by Linscott, Law & Greenspan Engineers dated May 16, 2003. This analysis identifies the transportation related impacts, which are likely to result from the development of LFMP Zone 15. A. INVENTORY 1. Circulation Element Roads Within Zone 15 There are three circulation roadways located within or adjacent to Zone 15. Cannon Road and College Boulevard are located within the boundaries of Zone 15 while El Camino Real is outside but adjacent to the Zone. Cannon Road and College Boulevard are designated as 4-lane major arterials, while El Camino Real is designated as a 6-lane prime arterial. 2. Identification of Impacted Road Segments and Intersections As stated in the performance standard, impacted road segments and intersections are those with 20% or more of the Zone 15 traffic. It is possible that certain road segments or intersections will not be analyzed for each study year since the construction of additional road segments may decrease the distribution on a road segment below the 20% distribution threshold from a previous study year. The Zone 15 traffic distributions are based on a Select Zone Assignment (SZA) from the San Diego Association of Governments (SANDAG) Cities/County Zone 15 LFMP Page 92 October 19, 2011 Carlsbad Series 9 Subarea Model. Figures 1, 2 and 3 (following the text and tables) show the computerized traffic distribution percentages of Zone 15 traffic on the roadway system for Years 2005, 2010 and 2020 (buildout) conditions. The computerized distribution percentages are generated by the SANDAG traffic model, which matches traffic between home, work, school, retail, and other daily travel patterns. The traffic model accounts for current and future land uses, population, and the roadway network. The road segments and intersections that are impacted by 20% or more of Zone 15 traffic are listed below. These facilities were evaluated to determine the geometry necessary to meet the Level of Service performance standards. The intersection numbering sequence matches the City of Carlsbad 2002 Traffic Monitoring Program, which is the cause for the non-sequential order. The road segments and intersections impacted by Zone 15 include: Road Segments El Camino Real – from Cannon Road to Faraday Ave El Camino Real – from Faraday Ave to Palomar Airport Road Intersections El Camino Real/Cannon Road (#7) El Camino Real/College Boulevard (#8) El Camino Real/Faraday Avenue (#9) El Camino Real/Palomar Airport Road (#10) College Blvd/Cannon Rd (new #) B. PHASING The traffic analysis prepared by LLG is a detailed study dealing with the specific traffic generated from within the boundaries of Zone 15. This study analyzes the impacts of traffic on existing and proposed road segments and intersections impacted by Zone 15. The report also proposes a mitigation plan to ensure conformance with the adopted performance standard through buildout of Zone 15. The traffic analysis uses the street segments and intersections identified in the City of Carlsbad General Plan Circulation Element to evaluate existing, 2005, 2010 and 2020 conditions. The time increments are used more as benchmarks than actual completion dates. If a future traffic analysis indicates that the timing of the necessary improvements needs to be accelerated, the required improvements must also be adjusted to guarantee that conformance with the adopted performance standard will be maintained. Zone 15 LFMP Page 93 October 19, 2011 The phasing of development for Zone 15 under years 2005, 2010, 2015 and 2020 is summarized in Table 1. A detailed listing of the development within Zone 15 by TAZ and by Land Use Development code is shown in Table 2. The buildout traffic generation for Zone 15 is calculated at 39,328 ADT. The purpose of this analysis is to evaluate impacted road segments and intersections serving Zone 15 and propose mitigation measures if these facilities are determined to operate below the adopted performance standard. The phasing of development and analysis of traffic impacts will be monitored on an annual basis. However, for the purpose of this study, the timing of the necessary improvements will be represented in the following increments: Improvements needed now Improvements needed prior to 2005 Improvements needed prior to 2010 Improvements needed prior to 2020 The phasing schedule noted above shall not limit traffic improvements to the years mentioned. If a future traffic analysis indicates that the timing of the necessary improvements has changed the required improvements shall also be adjusted to guarantee that conformance with the adopted performance standard will be maintained. C. ADEQUACY FINDINGS This section will analyze the existing and proposed intersections and road segments affected by the traffic generated from Zone 15. In accordance with the adopted performance standard, the existing and proposed traffic facilities within and surrounding Zone 15 will be identified by an evaluated level of service. The performance standard determines that during peak hours a level of service A-D is acceptable and level of service of E or worse is unacceptable. Levels of service for road segments and intersections were determined for both AM and PM peak hours. Road segments were evaluated using a per lane capacity basis to obtain the roadway peak hour volume to capacity ratio. This ratio was then converted to a level of service grade by using a table. Intersections were evaluated using the Intersection Capacity Utilization (ICU) method, which also uses a table to convert the results to a level of service grade. If a facility fails to meet the standard, a mitigation program must be prepared so that the facility will operate at an acceptable level of service. The proposed mitigation program will be discussed more thoroughly later in this report. Traffic conditions for existing, 2005, 2010 and 2020 are shown below. The level of service for impacted roadways and intersections are indicated and, if needed, recommended circulation improvement needs are identified. The intersection and segment operation summaries are included in Tables 3 and 4 on pages 104-105, with calculations included in Appendix A. Zone 15 LFMP Page 94 October 19, 2011 ANALYSIS OF EXISTING CIRCULATION CONDITIONS The existing conditions and traffic volumes are shown in Figure 4 and 5. The levels of service for the analyzed roadways for existing conditions are as follows: Segments ICU LOS El Camino Real (Cannon Road to Faraday Ave) 0.62 B El Camino Real (Faraday Ave to Palomar Airport Rd) 0.44 A AM Peak PM Peak Intersections ICU LOS ICU LOS El Camino Real/Cannon Road (#7) 0.47 A 0.65 B El Camino Real/College Blvd (#8) 0.53 A 0.44 A El Camino Real/Faraday Ave (#9) 0.68 B 0.75 C El Camino Real/Palomar Airport (#10) 0.64 B 0.84 D College Blvd/Cannon Rd (new #) Does not exist ANALYSIS OF YEAR 2005 CIRCULATION CONDITIONS The year 2005 circulation element and traffic volumes are shown in Figure 6-8. The levels of service for the analyzed roadways for year 2005 conditions are as follows: Segments ICU LOS El Camino Real (Cannon Road to Faraday Ave) 0.84 D El Camino Real (Faraday Ave to Palomar Airport Rd) 0.57 A AM Peak PM Peak Intersections ICU LOS ICU LOS El Camino Real/Cannon Road (#7) 0.85 D 0.65 B El Camino Real/College Blvd (#8) 0.70 B 0.59 A El Camino Real/Faraday Ave (#9) 0.81 D 0.80 C El Camino Real/Palomar Airport (#10) 0.88 D 0.87 D College Blvd/Cannon Rd (new #) 0.63 B 0.42 A The traffic analysis shows that the street segment and intersections with at least 20% of Zone 15 traffic are operating at an acceptable level of service. Zone 15 LFMP Page 95 October 19, 2011 ANALYSIS OF YEAR 2010 CIRCULATION CONDITIONS The year 2010 circulation element and traffic volumes are shown in Figure 9-11.The levels of service for the analyzed roadways for year 2010 conditions are as follows: Segments ICU LOS El Camino Real (Cannon Road to Faraday Ave) 0.78 C El Camino Real (Faraday Ave to Palomar Airport Rd) 0.62 B AM Peak PM Peak Intersections ICU LOS ICU LOS El Camino Real/Cannon Road (#7) 0.67 B 0.62 B El Camino Real/College Blvd (#8) 0.72 C 0.69 B El Camino Real/Faraday Ave (#9) 0.84 D 0.87 D El Camino Real/Palomar Airport (#10) 0.88 D 0.89 D College Blvd/Cannon Rd (new #) 0.88 D 0.56 A The traffic analysis shows that the street segment and intersections with at least20% of Zone 15 traffic are operating at an acceptable level of service. ANALYSIS OF YEAR 2020 CIRCULATION CONDITIONS The year 2020 circulation element and traffic volumes are shown in Figure 12-14. The levels of service for the analyzed roadways for year 2020 conditions are as follows: Segments ICU LOS El Camino Real (Cannon Road to Faraday Ave) 0.68 B El Camino Real (Faraday Ave to Palomar Airport Rd) 0.63 B AM Peak PM Peak Intersections ICU LOS ICU LOS El Camino Real/Cannon Road (#7) 0.82 D 0.88 D El Camino Real/College Blvd (#8) 0.72 C 0.73 C El Camino Real/Faraday Ave (#9) 0.84 D 0.72 C El Camino Real/Palomar Airport (#10) Less than 20% of Zone Traffic College Blvd/Cannon Rd (new #) 0.81 D 0.83 D The traffic analysis shows that the street segment and intersections with at least20% of Zone 15 traffic are operating at an acceptable level of service. Zone 15 LFMP Page 96 October 19, 2011 III. MITIGATION Special Conditions Circulation The format of the special conditions for circulation facilities has been modified to create a better understanding of the intent of this LFMP Amendment. The special conditions have been divided into four categories directly corresponding to the four development areas within Zone 15. These areas are depicted on Exhibit 5A on page 25. A. The construction of improvements is based on the projected demand of development in the zone and the surrounding region. The construction schedule may be modified without amendment to this plan. However, any deletions or additions to the improvements will require amending this LFMP. B. The funding for the construction of College Boulevard will be guaranteed as provided by the Zone 15 Finance Plan. The alignment has been established and the EIR certified (EIR No 98-02, as SCH No. 99111082). C. Cannon Road – Reach 4A & 4B (East from College Boulevard to Oceanside City limits). All of Reach 4, from College Boulevard easterly to the City of Oceanside was included in the EIR for Calavera Hills Phase II (EIR No. 98-02 as SCH No. 99111082). Because of public testimony during the public hearings, Reach 4 was divided in 2 reaches. Reach 4A went from College Boulevard easterly approximately 900 feet to provide access to the Carlsbad Unified School District (CUSD) property north of Cannon Road and to the Rancho Carlsbad Homeowner’s property (BJ Basin parcel) south of Cannon Road. A modified cross section of Reach 4A has been constructed by CUSD as part of the new high school. The remaining improvements to complete Reach 4A to a standard major arterial are included in the estimate for the finance plan including intersection improvements at College Blvd. and Cannon Road. In addition, the City and CUSD entered into a settlement agreement (October 14, 2009 – effective date) that resolved all claims from a lawsuit. CUSD has agreed to make improvements to the intersection of College Blvd. and Cannon Road plus pay $350,000 into the CIP for improvements at the intersection of College Blvd. and El Camino Real. CUSD also agreed to pay $302,000 for intersection improvements at El Camino Real and Cannon Road. Reach 4B (the remainder of Reach 4 to Oceanside) was not approved or the alignment certified as part of the final EIR 98-02. Reach 4B will be studied in conjunction with Oceanside at some undetermined date in the future. D. Prior to recordation of the first final map, issuance of grading permit or building permit, whichever occurs first, within each of the specifically identified four development areas of Zone 15, a financing program guaranteeing construction of the following circulation improvements shall be approved: Zone 15 LFMP Page 97 October 19, 2011 1. DEVELOPMENT AREA 1 a. College Boulevard 1. Prior to the approval of the first final map within the Development Area 1 of Zone 15, the participating owners’ must develop and agree to the formation of a comprehensive financing program that guarantees the construction of full width improvements of College Boulevard between Cannon Road and El Camino Real. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map. 2. Prior to the approval of the first building permit (see phasing exception in paragraph 3 below) within Development Area 1, the following public improvements must be completed and operational: Complete the connection of College Boulevard from Cannon Road and El Camino Real. This would include the following elements: • Full width grading to major arterial standards. • Two center travel lanes including a raised median and left turn pockets. • Construction of full width bridge over Agua Hedionda Creek. • Full intersection improvements to Cannon Road and College Boulevard including appropriated lane transitions to the southern leg of College Boulevard. Partial intersection improvements at College Boulevard and Cannon Road are being constructed as part of the new high school. 3. Phasing – In addition to the above financing mechanisms and in conjunction with specific tentative map conditions, the City Engineer may approve phasing of improvements for College Boulevard to allow for approval of developer requested grading and building permits for a certain number of residential units prior to the full completion of College Boulevard, Reach A. For single entry development no more than 25 units may be constructed as approved by the City Engineer and Fire Marshall south of the intersection of Cannon Road and College Boulevard, or north of the Agua Hedionda Creek Bridge. 4. Relocation of Rancho Carlsbad RV and Garden site – An acceptable site for relocation of the Rancho Carlsbad RV and Garden site currently east of College Blvd. requires a conditional use permit (CUP) or equivalent permit to the satisfaction of the Planning Director for the relocation. A secured agreement with the City for the construction of the RV and Garden site is required (see Planning Commission Resolution No. 5753 – Condition No. 46 for CT-00-18 for reference). Zone 15 LFMP Page 98 October 19, 2011 b. Cannon Road – Reach 4A 1. Prior to the approval of the first final map or other development permit within Development Area 1 of Zone 15, the participating property owners must develop and agree to the formation of a comprehensive financing program that guarantees the construction of the core improvements to Cannon Road (Reach 4A) from College Boulevard easterly 900 feet more or less. The core improvements consist of full width grading, two 18-ft paved lanes, median curbs, drainage facilities required to protect the roadbed, and transition improvements to full City standard intersection improvements at the intersection with College Boulevard. CUSD has currently completed partial improvements to Cannon Road Reach 4A. A financing program guarantee must include the completion of Reach 4A to major arterial standards. CUSD has also dedicated the full width right of way for Reach 4A. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, Transnet and Traffic Impact fees or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map or other development permits. Note: A modified cross-section for Reach 4A of Cannon Road has been approved by Carlsbad staff and is currently (April 2011) under construction as part of Sage Creek High School. Reach 4A right-of-way has been dedicated by the school district. c. El Camino Real 1. Concurrent with development, completion of half street improvements for El Camino Real to prime arterial standards including landscaped median from Rancho Carlsbad Drive to the northwesterly boundary of Development Area 4. This condition applies to the frontage of the property being developed, if any. 2. DEVELOPMENT AREA 2 a. College Boulevard 1. Prior to the approval of the first final map within the Development Area 2 of Zone 15, the participating property owners’ must develop and agree to the formation of a comprehensive financing program that guarantees the construction of full width improvements of College Boulevard between Cannon Road and El Camino Real. Zone 15 LFMP Page 99 October 19, 2011 Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map. b. Cannon Road – Reach 4A 1. Prior to the approval of the first final map or other development permit within Development Area 2 of Zone 15, the participating property owners must develop and agree to the formation of a comprehensive financing program that guarantees the construction of the core improvements to Cannon Road (Reach 4A) from College Boulevard easterly 900 feet more or less. The core improvements consist of full width grading, two 18-ft paved lanes, median curbs, drainage facilities required to protect the roadbed, and transition improvements to full City standard intersection improvements at the intersection with College Boulevard. CUSD has currently completed partial improvements to Cannon Road Reach 4A. A financing program guarantee must include the completion of Reach 4A to major arterial standards. CUSD has also dedicated the full width right of way for Reach 4A. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, Transnet and Traffic Impact fees or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map or other development permits. 2. The following public improvements must be completed and operational, concurrent with development: • Full width grading to major arterial standards. • Two center travel lanes including raised median and left turn pockets. • Intersection improvements to Cannon Road and College Boulevard including appropriate lane transition. • Frontage improvements along the south side of Cannon Road Reach 4A. Note: A modified cross-section for Reach 4A of Cannon Road has been approved by Carlsbad staff and is currently (April 2011) under construction as part of Sage Creek High School. Reach 4A right-of-way has been dedicated by the school district. 3. DEVELOPMENT AREA 3 a. El Camino Real 1. Concurrent with development, completion of half street improvements for El Camino Real to prime arterial standards including landscaped median along the Zone 15 LFMP Page 100 October 19, 2011 frontage of the developing property between Development Area 4 and Cougar Drive. 2. Prior to final map approval or issuance of a building permit the developing property owner shall pay their fair share contribution for the installation of the El Camino Real improvements pursuant to the requirements of the El Camino Real median reimbursement agreement dated May 6, 1988. 4. DEVELOPMENT AREA 4 a. College Boulevard 1. College Boulevard between El Camino Real and the northern boundary of Development Area 4 shall be constructed to full width arterial standards. (Completed) b. College Boulevard 1. Prior to recording a final map or the issuance of a grading permit or building permit, the applicant shall enter into a secured financial agreement in a form acceptable to the City Council that will secure its fair share of the cost of College Boulevard between the northern boundary of Development Area 4 to Cannon Road. Note: A modified cross-section for Reach 4A of Cannon Road has been approved by Carlsbad staff and is currently (April 2011) under construction as part of Sage Creek High School. Reach 4A right-of-way has been dedicated by the school district. c. Cannon Road – Reach 4A 1. Prior to the approval of the first final map or other development permit within Development Area 4 of Zone 15, the participating property owners must develop and agree to the formation of a comprehensive financing program that guarantees the construction of full width improvements of Cannon Road (Reach 4A) from College Boulevard easterly 900 feet more or less. Said financing mechanism can include such programs as Bridge and Thoroughfare District, Assessment District, Transnet and Traffic Impact fees or private reimbursement agreements. The ultimate financing program must receive City Council approval prior to the recordation of the first final map or other development permits. d. El Camino Real Zone 15 LFMP Page 101 October 19, 2011 1. Construction of half street improvements for El Camino Real to prime arterial standards including landscaped median along the frontage of the developing property. 2. Construction of median from the northwestern boundary of Development Area 4 to the existing improvements south of Rancho Carlsbad Drive. 3. Construction of transition improvements on the east side of El Camino Real from the northwestern boundary of Development Area 4 northerly to a distance determined by the City Engineer. Zone 15 LFMP Page 102 October 19, 2011 TABLE 1 PHASING OF ZONE 15 DEVELOPMENT BY TAZ TAZ 2005 2010 2015 2020 Land Use 496 0 0 0 0 Open Space 572 74 99 124 149 Single-Family 79 106 133 160 Multi-Family 595 114 153 191 230 Single-Family 614 252 384 516 648 Single-Family 640 50 67 84 101 Single-Family 94 126 158 190 Multi-Family 90,000 90,000 90,000 90,000 Sq. Ft. Commercial 651 215 287 360 433 Single-Family 35 46 58 70 Multi-Family 48,330 48,330 Sq. Ft. Commercial 39,792 Sq. Ft. Industrial TOTAL 705 990 1,275 1,561 Single-Family 209 279 349 420 Multi-Family 914 1,269 1,624 1,981 Residential Units 90,000 90,000 138,330 138,330 Sq. Ft. Commercial 0 0 0 39,792 Sq. Ft. Industrial 90,000 90,000 138,330 178,122 Non-Residential Sq.Ft Note: Dwelling units and square footage is cumulative between scenarios (I.e. year 2010 with 1269 residential units includes year 2005 count of 914 residential units). Zone 15 LFMP Page 103 October 19, 2011 TABLE 2 BUILDOUT TRAFFIC GENERATION (By TAZ and Total for LFMP Zone 15) TAZ GP LUD Unit Land Use TG Rate ADT % of Total 496 RLM-1, 2C & 2D 0 Open Space 0 572 RLM-2 25 Single-Family 12 300 0.8% RLM-2A 18 Single-Family 12 216 0.5% RLM-3A 13 Single-Family 12 156 0.4% RLM-4A 93 Single-Family 12 1,116 2.8% RMH-1 80 Multi-Family 8 640 1.6% RH-2/OS 80 Multi-Family 8 640 1.6% subtotal 149 Single-Family 12 1,788 4.5% subtotal 160 Multi-Family 8 1,280 3.3% 595 RL-1 64 Single-Family 12 768 2.0% RL-2 165 Single-Family 12 1,980 5.0% OS-2 & 3 1 Single-Family 12 12 0.0% subtotal 230 Single-Family 12 2,760 7.0% 614 RLM-3 110 Single-Family 12 1,320 3.4% RLM-3B 0 Single-Family 12 0 0.0% RLM-4 17 Single-Family 12 204 0.5% RLM-7 9 Single-Family 12 108 0.3% RLM-9 8 Single-Family 12 96 0.2% RM-1 504 Single-Family 12 6,048 15.4% subtotal 648 Single-Family 12 7,776 19.8% 640 RLM-5 35 Single-Family 12 420 1.1% RLM-6 34 Single-Family 12 408 1.0% RLM-8 32 Single-Family 12 384 1.0% C-1 (Residential Part) 190 Multi-Family 8 1,520 3.9% C-1 (Commercial Part) 90,000 Sq. Ft. Commercial 120 10,800 27.5% OS-1 0 Open Space 0 0 0.0% subtotal 101 Single-Family 12 1,212 3.1% subtotal 190 Multi-Family 8 1,520 3.9% subtotal 90,000 Sq. Ft. Commercial 120 10,800 27.5% 651 RLM-8A 4 Single-Family 12 48 0.1% RLM-9A 40 Single-Family 12 480 1.2% RLM-10 12 Single-Family 12 144 0.4% RLM-11 88 Single-Family 12 1,056 2.7% RLM-12 89 Single-Family 12 1,068 2.7% RM-2 200 Single-Family 12 2,400 6.1% RH/C/O-2 20 Multi-Family 8 160 0.4% RH/C/O-2 (Commercial) 48,330 Sq. Ft. Commercial 120 5,800 14.7% RH-1 50 Multi-Family 8 400 1.0% PI (Industrial) 39,792 Sq. Ft. Industrial 16 637 1.6% Zone 15 LFMP Page 104 October 19, 2011 TABLE 2 BUILDOUT TRAFFIC GENERATION (By TAZ and Total for LFMP Zone 15) TAZ GP LUD Unit Land Use TG Rate ADT % of Total subtotal 433 Single-Family 12 5,196 13.2% subtotal 70 Multi-Family 8 560 1.4% subtotal 48,330 Sq. Ft. Commercial 120 5,800 14.7% subtotal 39,792 Sq. Ft. Industrial 16 637 1.6% LFMP ZONE 15 TOTAL 1,561 Single-Family 12 18,732 47.6% TOTAL 420 Multi-Family 8 3,360 8.5% 1,981 Residential Units na 22,092 56.2% TOTAL 138,330 Sq. Ft. Commercial 120 16,600 42.2% TOTAL 39,792 Sq. Ft. Industrial 16 637 1.6% 178,122 Non-Residential Sq.Ft na 17,236 43.8% TOTAL AVERAGE DAILY TRAFFIC (ADT) 39,328 100.0% Source: LLG Engineers. General Plan (GP); Land Use Development (LUD); Traffic Analysis Zone (TAZ); Average Daily Traffic (ADT). TABLE 3 SIGNALIZED INTERSECTION OPERATIONS ICU = Intersection Capacity Utilization ICU LOS = Level of Service 0.00 to 0.60 A OSA = Out of Study Area (i.e. less than 20 % of zone traffic) 0.61 to 0.70 B DNE = Does Not Exist 0.71 to 0.80 C 0.81 to 0.90 D 0.90 to 1.00 E > 1.00 F INTERSECTION EXISTING 2005 2010 2020 AM PM AM PM AM PM AM PM ICU LOS ICU LOS ICU LOS ICU LOS ICU LOS ICU LOS ICU LOS ICU LOS El Camino Real/Cannon Road 0.47 A 0.65 B 0.85 D 0.65 B 0.67 B 0.62 B 0.82 D 0.88 D El Camino Real/College Boulevard 0.53 A 0.44 A 0.70 B 0.59 A 0.72 C 0.69 B 0.72 C 0.73 C El Camino Real/Faraday Avenue 0.68 B 0.75 C 0.81 D 0.80 C 0.84 D 0.87 D 0.84 D 0.72 C El Camino Real/Palomar Airport Road 0.64 B 0.84 D 0.88 D 0.87 D 0.88 D 0.89 D OSA OSA College Boulevard/Cannon Road DNE DNE DNE DNE 0.63 B 0.42 A 0.88 D 0.56 A 0.81 D 0.83 D Zone 15 LFMP Page 105 October 19, 2011 TABLE 4 STREET SEGMENT OPERATIONS (LFMP ZONE 15) Segment Class Peak Hour Cap 2005 2010 2020 ADT Lanes Peak Hr Vol Per Lane V/C LOS ADT Lanes Peak Hr Vol Per Lane V/C LOS ADT Lanes Peak Hr Vol Per Lane V/C LOS El Camino Real Cannon Rd to Faraday Ave Prime 1,800 43,200 5 1,510 0.84 D 40,200 5 1,410 0.78 C 52,600 6 1,230 0.68 B Faraday Ave to Palomar Rd Prime 1,800 43,500 6 1,020 0.57 A 48,200 6 1,120 0.62 B 49,000 6 1,140 0.63 B Note: The peak hour volume per lane is calculated by taking 10% of the ADT and multiplying by a 7/30 peak hour split and then dividing by the number of lanes in one direction. One: Does not exist. Zone15 LFMP Page 106 October 19, 2011 TABLE 5 ZONE 15 MITIGATION SUMMARY Intersections and Segments with 20% or more of Zone 15 Traffic Existing 2015 2020 2030 INTERSECTIONS El Camino Real/ Cannon Road Add an east leg to include dual left-turn lanes, a thru lane and a combination thru right-turn lane. On the south leg, add a combination thru right-turn lane El Camino Real/ College Boulevard Add a thru- lane on the north leg El Camino Real/ Faraday Avenue Add an additional southbound right-turn lane, an additional westbound right-turn lane, and restripe the eastbound approach to include a single eastbound left-turn lane and a dedicated eastbound thru lane. El Camino Real/ Palomar Airport Road College Boulevard/ Cannon Road Does not exist Construct a new signalized intersection with the north leg having a left-turn lane, thru lane, and dual right-turn lanes, the south and east legs having a left-turn lane and a combination thru-right turn lane, the west leg having dual left- turn lanes and a combination thru-right turn lane Re-stripe the north leg to a thru lane and right turn-lane and add a thru lane to the south leg Add to the east leg a second left-turn lane and a thru lane Zone15 LFMP Page 107 October 19, 2011 SEGMENTS El Camino Real (Cannon to Faraday) Widen to 6-lanes El Camino Real (Faraday to Palomar) College Boulevard Reach A Construct full width grading to major arterial standards, two center travel lanes with raised median curbs and turn pockets, and a full width bridge over Agua Hedionda Creek Cannon Road Reach 4A Construct full width grading to major arterial standards, two center travel lanes with raised median curbs and turn pockets Zone15 LFMP Page 108 October 19, 2011 Zone15 LFMP Page 109 October 19, 2011 Zone15 LFMP Page 110 October 19, 2011 Zone15 LFMP Page 111 October 19, 2011 Zone15 LFMP Page 112 October 19, 2011 Zone15 LFMP Page 113 October 19, 2011 Zone15 LFMP Page 114 October 19, 2011 Zone15 LFMP Page 115 October 19, 2011 Zone15 LFMP Page 116 October 19, 2011 Zone15 LFMP Page 117 October 19, 2011 Zone15 LFMP Page 118 October 19, 2011 Zone15 LFMP Page 119 October 19, 2011 Zone15 LFMP Page 120 October 19, 2011 Zone15 LFMP Page 121 October 19, 2011 Zone15 LFMP Page 122 October 19, 2011 Zone15 LFMP Page 123 October 19, 2011 IV. FINANCING The major circulation facilities and improvements within Zone 15 will be financed by Developer funding with reimbursement from the CIP or City-approved Financing District and may include City-approved Bridge and Thoroughfare District, Transnet, Traffic Impact Fees or private reimbursement agreements. Zone15 LFMP Page 140 October 19, 2011 SEWER FACILITIES I. PERFORMANCE STANDARD Trunk-line capacity to meet demand as determined by the City concurrent with development. II. FACILITY PLANNING AND ADEQUACY ANALYSIS Sewer service in the City of Carlsbad is provided by three independent agencies: Carlsbad Sewer Service, Leucadia County Water District (LCWD), and Vallecitos Water District. Zone 15 is entirely within the Carlsbad Sewer Service District as shown on Exhibit 55, page 141. The information contained in this plan was obtained from the “City of Carlsbad Master Plan of Sewerage” prepared by Dudek & Associates, dated March 2003. A. INVENTORY 1. Existing Facilities There are two existing gravity sewer lines in the vicinity of the Cantarini and Holly Springs projects and Dos Colinas. To the south of the project is the South Agua Hedionda Trunk Sewer located along the south side of Agua Hedionda Creek. This is an 18-inch sewer main (SAHT 1E)which connects to an existing 24-inch gravity sewer line in El Camino Real. Sewer flow is toward Cannon Road. The second existing facility in the vicinity of the Cantarini and Holly Springs projects and Dos Colinas is a 10-inch and 12-inch gravity sewer (SAHT 2C) which extends from the Calavera Hills development and connects to the existing South Agua Hedionda Trunk Sewer at the intersection of Cannon Road and El Camino Real. 2. Overview of Sewer Service Sewer Basins/Benefit Areas – Projects within Zone 15 are within the South Agua Hedionda sewer drainage basin and will be paying the sewer benefit area fees for this basin. Ultimately, all the sewerage generated by Zone 15 projects will be conveyed through the South Agua Hedionda Interceptor System to the Encina Water Pollution Control Facility which is located between Avenida Encinas and the Interstate 5 south of Palomar Airport Road. Zone 15 falls into two Sewer Benefit Areas: Benefit Area D and Benefit Area E. The dwelling units within Sewer Benefit Area D are proposed to connect to the existing 10- Zone15 LFMP Page 141 October 19, 2011 inch and 12-inch gravity sewer line south of the Cannon Road alignment (City designation: Reach SAHTC2C of the South Agua Hedionda Sewer Interceptor). The dwelling units within Sewer Benefit Area E are proposed to connect to the existing 18- inch gravity sewer line along Agua Hedionda Creek (City designation: Reach SAHT1E of the South Agua Hedionda Sewer Interceptor). 3. Build Out Assumptions Residential dwelling units and square footage is based upon the analysis contained in the build out section of this plan. Land Use Total Build Out Projections Residential 2,477 DU Commercial/Office 183,562 Sq. feet 4. Technical Assumptions Sewer Generation Rates as specified in the Carlsbad Master Plan of Sewerage used to project average sewer flows are as follows: Land Use Unit Flows Residential 220 GPD/DU Commercial 1,800 Sq. Ft./EDU Office 1,800 GPD/AC 5. Existing Demand The existing sewer demand being serviced in Zone 15 is 769 dwelling units. Carlsbad’s current sewer Master Plan establishes 220 GPD/DU as the unit flow generation factor as a basis for projecting the average sewer flows for residential use. By multiplying the number of existing units on sewer service by the flow factor and a peaking factor of 2.5 the existing demand for Zone 15 is .423 MGD. 6. Projected Build Out Demand The ultimate average sewer flows can be determined for Zone 15 by using the build out projections and the average unit flows. The build out sewer demand being serviced in Zone 15 is 2,477 dwelling units and 183,562 square feet of commercial/office at 220 GPD/DU and a 2.5 peaking factor the residential demand is 1.36 MGD. The commercial office demand is 102 EDU’s or 0.056 MGD for a total of 1.42 MGD. Zone15 LFMP Page 142 October 19, 2011 7. Use of Reclaimed Water/Existing Facilities The existing recycled water facilities in the vicinity of the Zone 15 include a 12-inch pipeline in the extension of College Boulevard east of El Camino Real. This 12-inch main ties into the 384 Zone recycled water system that extends west to the Twin “D” Tanks. These two tanks were converted from potable water use several years ago and now serve as 384 Zone storage for recycled water. The Carlsbad Municipal Water District will have a 16-inch recycled water pipeline in Cannon Road and a 12-inch recycled water pipeline in College Boulevard at Canon Road. In addition, the District’s existing “C” Tank Reservoir is being converted to recycled water storage. The recycled water master plan does not address the extension of a higher pressure zone recycled water system to the area of Zone 15. The pressure zone available, which is the 384 Zone, is expected to be the only recycled water source to this area east of El Camino Real. However, this pressure zone can be extended into higher service areas by means of irrigation booster systems. These systems can be connected to the 384 Zone recycled water piping and deliver irrigation service to areas above the service zone elevation. B. ADEQUACY FINDINGS The existing sewer system serving development in Zone 15 currently meets the adopted performance standard. Connection to the existing sewer facilities will be a condition to the approval of future development in Zone 15 as required by the City, so that conformance with the adopted performance standard will be maintained. III. MITIGATION/FINANCING Special Conditions (Sewer Benefit Areas D & E) A. All development in Zone 15 is required to pay the appropriate sewer connection fees and sewer benefit area fees prior to issuance of any building permit. B. 1. SAHT2B and SAHT2C are both constructed and in operation. The remaining un-developed properties in Sewer Benefit Area D will be required to construct/finance connections to the existing SAHT2B and SAHT2C trunk lines. Sewer Benefit Area D C. 1. SAHT1E was constructed as part of the Terraces project. The remaining un- developed properties in Sewer Benefit Area E will be required to construct/finance connections to the existing SAHT1E trunk line. Sewer Benefit Area E Zone15 LFMP Page 143 October 19, 2011 WATER FACILITIES I. PERFORMANCE STANDARD Line capacity to meet demand as determined by the Carlsbad Municipal Water District must be provided concurrent with development. II. FACILITY PLANNING AND ADEQUACY ANALYSIS Water service in the City of Carlsbad is provided by three independent agencies: Carlsbad Municipal Water District (CMWD), Vallecitos Water District, and the Olivenhain Municipal Water District. Water service for Zone 15 is provided entirely by the Carlsbad Municipal Water District (CMWD). CMWD uses a Master Plan to evaluate the water systems within their district and formulate long range plans that will provide for future improvements. The information contained in this plan was extracted from the Water Master Plan update for the Carlsbad Municipal Water District dated March 2003, prepared by Dudek & Associates. This Master Plan, according to CMWD, should be used as a tool in planning for future improvements in Zone 15. A. INVENTORY 1. Existing Facilities The existing major water facilities for CMWD that are in place within Zone 15 are as follows: No. Facility Location 1 200 MG Squiers, Dam I NE Corner Zone 15 2 27” Line Southeasterly Portion Zone 15 3 20” Line El Camino Real 4 1 MG “C” Reservoir North of future Cannon Road 5 14” Line In/Out Parallel future Cannon Road 6 21” Lines Northeasterly Portion Zone 15 T.A.P. Lines 7 36” Lines East of El Camino Real to Sunny Creek Rd. Zone15 LFMP Page 144 October 19, 2011 2. Build Out Assumptions The section entitled, “Build Out Projections” on page 28 presents the ultimate build out projections for Management Zone 15. Land Use Projections Residential 2,477 DU Commercial/Office 183,562 sq. feet 3. Technical Assumptions Average Unit Demand – The District’s Master Plan has established dwelling unit demand factors as a basis for determining projected average water demands. The following shows the average dwelling unit demands as determined in the CMWD report: Land Use Unit Flows Single Family 550 GPD/DU Multi-Family Residential 250 GPD/DU Non-Residential 2300 GPD/10,000 sq. ft. of building area Fire Flow Requirements – The master plan for CMWD uses the following fire flow demands to analyze their water systems: Land Use Unit Flows Single-Family Residential 1500 gpm for 2 hours Multi-Family 3000 gpm for 2 hours Industrial/Commercial/Institutional 4000 gpm for 4 hours 4. Projected Build Out Demand The build out average water demands can be projected for Management Zone 15 by multiplying the build out projection established in this Plan to the average unit demand factors obtained from CMWD’s Master Plan. Projected Average Projected Build Out Build Out X Unit Demand = Average Water Demand The projected build out average water demand, as determined by this plan, is lower than projected in the Master Plan. Therefore, the Master Plans for the district can be used as a tool for determining the proposed major water facilities for this zone, and conformance with the adopted performance standard will be assured through build out Zone15 LFMP Page 145 October 19, 2011 of Zone 15. 5. Proposed Build Out Facilities The CMWD proposes the following major water facilities to serve the ultimate build out of Zone 15: Map Key Facility Location A Squires Expansion Northeasterly corner Zone 15 B 36” Transmission Main (Zone 490) From College Blvd. to Maerkle Reservoir C Pressure Reducing Station At College Blvd. and Cannon Road D 16” Line in College Zone 490 E 12” Line in College Zone 375 F Pressure Reducing Station Grosse PRV Upgrade The location and sizes of the proposed water lines have been taken from the March 2003 Master Plan. The actual locations and sizes will be determined as individual projects within Zone 15 develop. 6. Potential Areas for Reclaimed Water The existing recycled water facilities in the vicinity of the Cantarini and Holly Springs projects and Dos Colinas, includes a 12-inch pipeline in the extension of College Boulevard east of El Camino Real. This 12-inch main ties into the 384 Zone recycled water system that extends west to the Twin “D” Tanks. These two tanks were converted from potable water use several years ago and now serve as 384 Zone storage for recycled water. The Carlsbad Municipal Water District will have a 16-inch recycled water pipeline in Cannon Road and a 12-inch recycled water pipeline in College Boulevard at Cannon Road. In addition, the District’s existing “C” Tank Reservoir is being converted to recycled water storage. The City of Carlsbad Master Plan Update, Recycled Water, Volume IV, dated October 1997 does not specifically address recycled water use in the area of the Cantarini and Holly Springs projects and Dos Colinas. In addition, the recycled water master plan does not address the extension of a higher pressure zone recycled water system to the area east of College Boulevard. The pressure zone available, which is the 384 Zone, is expected to be the only recycled water source to this area east of El Camino Real. However, this pressure zone can be extended into higher service areas by means of irrigation booster systems. These systems can be connected to the 384 Zone recycled water piping and deliver irrigation service to areas above the service zone elevation. 7. Average Ten-Day Storage Capacity Zone15 LFMP Page 146 October 19, 2011 The CMWD emergency storage policy is to provide 10 days of average water use. Based on the existing ADD of 16.2 MGD, the required storage volume is 162 MG. Maerkel Dam, which has a storage capacity of 195 MG, currently provides the required storage volume for the District. The CMWD emergency storage policy is to provide 10 days of average water use. Based on the projected ultimate average demand of 23.9 MGD, the required storage volume is 239 MG. If demands identified as being supplied from the future Phase II Recycled Water System are not included, the projected ultimate demand is approximately 21.2 MGD, and 212 MG of emergency storage will be required. Maerkle Dam is reported to have a storage capacity of 195 MG. Therefore, additional storage will need to be constructed to comply with the CMWD emergency storage policy. B. PHASING The approach to phasing taken by this Local Facilities Management Plan is based on ensuring that needed facilities are in place prior to or commensurate with development. Due to the fact Zone 15 lies within 2 pressure zones, phasing should not be determined in relationship to water service. The phasing boundaries allow for independent review and development for the water facilities within each boundary. Development within one phase is independent of the improvement requirements of another phase. However, the water district may require improvements outside of the phase boundaries if deemed necessary to serve development. C. ADEQUACY FINDINGS The water distribution system for Zone 15 currently conforms to the adopted performance standard. The development review process established by CMWD will ensure that Zone 15 will remain in conformance with the adopted performance standard through build out of this Zone. All of Holly Springs and the upper portion of Cantarini will be served by the 36” 490 Zone water line in College Boulevard with a 16” and 12” loop system. The lower portion of Cantarini and all of Dos Colinas will be served by a 12-inch 375 Zone water line in College Boulevard with a 12” loop back to Cannon Road. III. MITIGATION Zone15 LFMP Page 147 October 19, 2011 Water Distribution A. All future development in Zone 15 shall be subject to requirements of the 2003 CMWD Water Master Plan Update and the Water Reclamation Master Plan as determined by the City Engineer. Any potable and recycled water facilities necessary to accommodate future development must be guaranteed prior to the recordation of a final map, issuance of a grading permit or building permit, whichever occurs first for any project in Zone 15. B. Water facilities for Zone 15 shall be provided at the time of development to the satisfaction of CMWD. C. Prior to or commensurate with installation of Zone 15 water facilities, CMWD shall determine that sufficient water facilities are in place to serve Zone 15. D. All development within Zone 15 shall pay the appropriate water fees established by CMWD. WATER DISTRIBUTION SYSTEM (Potable Water) A. Service Area A (375 Zone Water) The following water facilities will be required as a condition to the approval of development within Service Area A and B to the satisfaction of the City: 1. Construct a potable 12” water main in College Boulevard from Sunny Creek Road northerly to “A” Street, easterly in “A” Street to the east boundary of Cantarini, also, northerly from “A” Street through the Cantarini project to “C” Street to the intersection of College Boulevard, then northerly in College Boulevard to the existing 12” line at Cannon Road. B. Service Area B (490 Zone Water) 1. Construct a potable 36” water main in College Boulevard from Sunny Creek Road northerly to “A” Street, easterly in “A” Street to the easterly boundary of Cantarini. 2. Development easterly of Cantarini will extend the 36” line up to Maerkel Reservoir. 3. Construct a 16” water main in College Boulevard from the 36” at “A” Street northerly to a 16” main at Cannon Road. Zone15 LFMP Page 148 October 19, 2011 WATER DISTRIBUTION SYSTEM (Reclaimed Water) A. Service Area 384 Zone 1. Construct a recycled 12” main in College Boulevard from an existing main at Sunny Creek Road northerly to an existing 12” main at Cannon Road. 2. Construct a 12” main in “A” Street from College Boulevard easterly to the East line of Cantarini. Development east of Cantarini will extend the 12” main as needed. Note: Private development may be required to construct a booster/pump station to provide reclaimed water where necessary. IV. FINANCING The major water facilities and improvements within Zone 15 will be financed by the water districts capital improvement fund. Revenue for that budget is funded from development fees. Other improvements as noted in the Master Plan are not included in the CIP and will be required to be funded by individual developers as needed. VI. FACILITY FINANCING As specified in the City of Carlsbad Growth Management Ordinance (CC 21.90.110), “Contents of Local Facilities Management Plans,” a facility financing plan establishing the methodology for funding the facilities and improvements identified within the Local Facility Management Plan (LFMP) shall be prepared. A Finance Plan was prepared and approved for Zone 15 in 1998. This financing section was written concurrently with LFMP 15(C) to reflect the latest changes that have occurred affecting this zone. This chapter details how the public facilities and improvements required of Zone 15 to maintain the adopted Growth Management Performance Standards will be financially guaranteed. This section addresses the prevailing facility requirements of the Zone 15 LFMP or the more updated requirements per Dos Colinas the Cantarini tentative map (CT00-18) and Holly Springs tentative map (CT0021). The special conditions for public facilities and improvements are presented in this section. The most important function of this section is to identify how the public facilities and improvements required by the Zone 15 LFMP and as revised within this financing plan may be financially guaranteed to maintain the adopted Growth Management Performance Standards. Financing Mechanisms In preparing this financing plan, it became clear that no single financing mechanism could Zone15 LFMP Page 149 October 19, 2011 satisfy the complex infrastructure requirements of this zone. Therefore, several financing techniques are being used to address both the need for upgrading facilities, enabling them to conform with the adopted performance standards, and to ensure conformance of future facilities as development occurs. The following financing techniques will be used to guarantee the public facilities needed to serve future development within Zone 15 as required by the Carlsbad Municipal Code Section 21.90.080. A. COMMUNITY FACILITIES DISTRICT NO. 1 Development in Zone 15 is within CFD #1 and will contribute to a number of citywide and regional facilities such as city administrative offices, library facilities and Veteran’s Memorial Park, through participation in this citywide Community Facilities District. B. DEVELOPER FUNDING The developers will fund and construct certain required facilities prior to or concurrent with development of the developer’s property. This form of funding may also be employed for facilities not funded by a financing district approved by the Carlsbad City Council or in lieu of a financing district if one is not formed. Facilities funded in this way are those which normally would be imposed as a condition of approval of a tentative map under the City’s existing development review process. C. ASSESSMENT DISTRICT One financing method available to developers for the cost of constructing certain required facilities is an Assessment District pursuant to the 1915 Bond Act. In addition to requiring formal approval from the Carlsbad City Council, this financing method would necessitate participation by the owners of a majority of the undeveloped property in the defined benefit area, i.e. Zone 15. Certain properties unwilling to participate in the Assessment District could be excluded and allowed to pay their fair share of costs through a separate reimbursement method. However, only one such Assessment District will be allowed by the City of Carlsbad for the Zone 15 area. The 1915 Bond Act Assessment District would entail the sponsoring developer selling bonds for the amount for funds required to pay for the construction of the required facilities. The bond debt would then become a secured lien against the benefiting properties in the Assessment District. The bonds would be paid off (i.e. the debt would be retired) through payment of a supplemental property tax bill by the property owners in the Assessment District. D. BRIDGE AND THOROUGHFARE DISTRICT One method available to developers for supporting the construction of certain required facilities is a Bridge and Thoroughfare District (“B&T District”), which would be authorized, formed and managed through the City of Carlsbad. A B&T District does not provide any direct construction funding or financing. Rather, it is a means of providing some assurance to the sponsoring developer that certain required costs, which that sponsoring developer fronts/pays Zone15 LFMP Page 150 October 19, 2011 concurrent with the construction of his project, will ultimately be paid for by all benefiting property owners in the defined B&T District (i.e. Zone 15) through pro-rata share reimbursements. The applicable cost-sharing formula and specific B&T District Fee, is determined through property owner meetings, spread-engineering and City policy. In addition to the actual facility design and construction costs, all costs related to formation of the B&T District and the ongoing management and administration by the City are included in the B&T District Fee. Under a B&T District, the City of Carlsbad would collect fees from property owners in the B&T District at the time that the City issued permits for development of those properties. The fees collected by the City, less the City’s B&T District costs, would be paid, pursuant to the specific terms of the B&T District agreement, as reimbursements to the sponsoring developer that originally paid for and constructed (i.e. fronted the costs of) the required facilities. A B&T District can be used as a supplement to a 1915 Bond Act Assessment District or private developer agreement as a means of collecting reimbursements from benefiting property owners that do not participated in the original facility financing method. E. BENEFIT AREA Another method available to developers for supporting the construction of certain required facilities is a Benefit Area, which would be authorized, formed and managed through the City of Carlsbad. A Benefit Area does not provide any direct construction funding or financing. Rather, it is a means of providing some assurance to the sponsoring developer that certain required costs, which that sponsoring developer fronts/pays concurrent with the construction of his project, will ultimately be paid for by all benefiting property owners in the defined Benefit Area (i.e. Zone 15) through reimbursements. The applicable cost sharing formula and specific B&T District Fee, is determined through property owner meetings, spread-engineering and City policy. In addition to the actual facility design and construction costs, all costs related to formation of the Benefit Area and a City administration fee is included in the Benefit Area Fee. Under a Benefit Area, the City of Carlsbad would collect fees from property owners in the Benefit Area in accordance with the specific terms of the Benefit Area agreement. The Benefit Area Fees collected by the City, less the city’s administration fee (typically 2%), would be paid as reimbursements to the sponsoring developer that originally paid for and constructed (i.e. fronted the costs of) the required facilities. A Benefit Area can be used as a supplement to a 1915 Bond Act Assessment District or private developer agreement as a means of collecting reimbursements from benefiting property owners that do not participate in the original facility financing method. A Benefit Area agreement generally requires less involvement by the City and can provide more flexibility in the terms of payment by the benefiting property owners. A Benefit Area agreement usually contains an expiration clause, typically 15 years, after which the City no longer collects fees to reimburse the sponsoring developer. V. Agreements with the City When appropriate, the City may enter into a reimbursement agreement with the developer for Zone15 LFMP Page 151 October 19, 2011 any facility that is included in a City impact fee program. The source of reimbursement shall be from the appropriate City impact fee. The schedule for reimbursement shall be based on the City Capital Improvement Program and the availability of unobligated impact fee revenue. In Zone 15, it is anticipated that Reimbursement Agreements with the City will include, but may not be limited to, the following facilities: (1) College Boulevard, Bridge over Sunny Creek; (2) BJ Basin detention facility; (3) a 36” water line eventually connecting to Maerkle Reservoir; and (4) a 12” and 16” water line in College Boulevard between “A” Street and Cannon Road. In addition, fees collected by the City for the Terraces residential development in Zone 15 are available for reimbursement to the developer of the College Boulevard “core” improvements. VI. Reimbursement Agreements Among Property Owners Several facilities discussed in this Local Facility Management Plan directly benefit all the properties and property owners within Zone 15, but will have to be, as a condition of development permitting, constructed and initially funded by the first project (i.e. the sponsoring developer). In order to support the sponsoring developer’s efforts and ensure a fair allocation of costs by the benefiting Zone 15 area properties, the property owners and developers within Zone 15 may enter into private agreements that address the fair share cost allocation and reimbursement process. The private cost sharing and reimbursement agreements would be voluntary and only affect the undeveloped or under-developed properties in Zone 15. Subject to the specific terms against the title of the participating properties with copies of said agreements provided to the City’s Growth Management Division. Private agreements can result in significant cost savings and other benefits for the participating property owners. Coordination with Financing Plans for Other Zones Pursuant to the Growth Management Ordinance, future finance plans for other zones which impact facilities in common with Zone 15 shall be coordinated with this finance plan. Coordination, however, shall not require identical funding methods. Timing and Areas of Development The plan is based on certain assumptions regarding the timing of development of Zone 15 in relation to other zones that share facilities with Zone 15. In the event that another zone develops earlier or later than anticipated, this plan may need to be amended. Zone15 LFMP Page 152 October 19, 2011 Summary A discussion of each facility follows, including the presentation of the prevailing special conditions contained in the latest LFMP, and a detailed description of the financial guarantee for each special condition. Financial responsibility for portions of the circulation element roadway requirements and certain drainage improvements may be satisfied through a private developer funding and reimbursement agreement among the property owners, or through an assessment district, a bridge & thoroughfare district, a benefit area, or some combination of these methods. All roadways will be financially secured pursuant to tentative map conditions in accordance with the City’s cul-de-sac policy, engineering standards and other city policies and standards. Property owners/developers who construct offsite improvements that benefit other properties throughout the City and/or the zone, may be eligible for reimbursement from the City and from other property owners in the zone. Any reimbursement agreements among the property owners would be formulated and agreed to concurrent with the formation of an assessment district or other special financing district or benefit area. Any reimbursement agreement with the City would require approval by formal action of the City Council. Similarly, any assessment district, bridge & thoroughfare district, or benefit area financing method involving City management or administration would require formal action and approval by the City Council. Zone15 LFMP Page 153 October 19, 2011 EXHIBIT 62 - Zone 15 LFMP Finance Summary FACILITY FINANCE SUMMARY City Administrative Participation in CFD #1 and Payment of PFF at Building Permit Library Participation in CFD #1 and Payment of PFF at Building Permit Park Payment of Park in-Lieu Fee Drainage Payment of Local Drainage Area Fee Detention Basin BJ at southeast corner of College/ Cannon, Bridge construction at Agua Hedionda Creek Developer Funding with reimbursement from CIP or City-Approved Financing District Circulation College Boulevard (Reach A) – Sunny Creek Road to Cannon Road Developer Funding with reimbursement from private reimbursement agreements or City-Approved Financing District El Camino Real – Cannon to Faraday Avenue Developer Funding and City-Approved Financing Widen El Camino Real between Cannon Road and Faraday Avenue to 6 lanes – 3 in each direction Developer Funding and City-Approved Financing Cannon Road – Reach 4A – East of College Boulevard Developer Funding or City-Approved Bridge and Thoroughfare District, Transnet, Traffic Impact Fees or private reimbursement agreements Fire No Special Funding Required Wastewater Treatment Payment of Sewer Connection Fees at Building Permit Open Space Property Owners or Association Funded School Payment of Mitigation Fees at Building Permit Sewer Payment of Sewer Benefit Area Fees Water (Service Area A) (375 Zone) 12" potable main in College from Sunny Creek Road northerly to Cantarini, “A” Street – Easterly in “A” to Cantarini, East line – North from “A” Street within Cantarini to College and “C” Street – northerly in College from “C” Street to Cannon Road Developer Funding with private reimbursement agreement or City-Approved Financing District. Reimbursement available from water connection fees – CIP Project No. 5012. Water (Service Area B) (490 Zone) 36” potable line in College Boulevard from Sunny Creek Road northerly to Cantarini “A” Street, easterly in “A” Street to easterly boundary of Cantarini with eventual extension to Maerkle Reservoir Developer Funding with Reimbursement from CIP Project No. 5001. 16” potable line in College from 36” at Cantarini “A” Street-northerly to 16” main at Cannon Road Developer Funding with Reimbursement from CIP Project No. 5001. Zone15 LFMP Page 154 October 19, 2011 FACILITY FUNDING A. City Administrative Facilities Zone 15 will contribute to the funding of City Administrative Facilities through participation in the Citywide Mello-Roos Community Facilities District and through the payment of Public Facilities Fees (PFF). B. Library Facilities Zone 15 will contribute to the funding of Library Facilities through participation in the Citywide Mello-Roos Community Facilities District and through the payment of Public Facilities Fees (PFF). C. Park Facilities Payment of Park in-lieu fees will be required at issuance of building permits. D. Drainage Facilities Prior to the recordation of the first final map, issuance of a grading permit or building permit, whichever occurs first within Zone 15, the developers of a project are required to provide a financial mechanism to guarantee the construction of the following storm drain facilities: ZONE 15 Drainage Financing Matrix Facility Amount Estimated Cost Timing Funding Options Notes Drainage 4’ x 7’ Box Culvert, Headwalls, Dike (roadway), Grading, Channel, and Detention BasinBJ-Environmental MIT (Facility BJ-1). 276 LF $964,875 With development of Reach “A” of College Blvd Developer Funding, private reimbursement agreement or City Approved Financing District with reimbursement of PLDA drainage fees or credits (CIP Project No. 3636). College Boulevard Bridge over Agua Hedionda Creek Facility BL-L $3,553,996 With development of Reach “A” of College Blvd Developer Funding, private reimbursement agreementor City Approved Financing District with also reimbursement of drainage fees or credits – CIP projects. LF = Lineal Feet 78 RCP in College at Agua Hedionda Creek Bridge extend 78” RCP from existing and discharge downstream of bridge (portion of Facility BL-L) ISO LF $92,201 With development of Reach A of College Blvd. Developer Funding , private reimbursement agreement or City Approved Financing District with also reimbursement of drainage fees or credits 66” curlvert under College Blvd. just north of Agua Hedionda Creek (Facility BR) 157 LF $103,209 With development of Reach A of College Blvd. Developer Funding , private reimbursement agreement or City Approved Financing District with reimbursement of drainage fees or credits Total Drainage Costs $4,714,281 Zone 15 will contribute to the funding of drainage facilities by paying the required drainage area fees established in the current Drainage Master Plan and agree to pay the revised Planned Local Drainage Area (PLDA) fees identified in the updated Drainage Master Plan. The following pages detail the financial guarantee for each special drainage condition identified in the Drainage Facilities section of this Zone15 LFMP Page 155 October 19, 2011 plan. VII. Mechanism The identified facilities will be privately designed and/or constructed by developer. Reimbursement of drainage fees or credits may be requested. Financing Guarantee These facilities shall be constructed or an improvement agreement shall be provided prior to the recordation of the applicable final map by the first developer in Zone 15 requiring the need for this facility. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Finance Director and the City Attorney. Reimbursement If any benefits extend outside the boundaries of the development, the developer constructing the facility may enter into a private reimbursement agreement with the owners of the benefited properties. E. Circulation Facilities This updated Facilities Financing section addresses those facilities identified in this Zone 15 LFMP amendment, which are the responsibility of Zone 15 based on the traffic report prepared by Linscott Law & Greenspan dated May 16, 2003. Some circulation improvements are outside the boundaries of Zone 15 and may be subject to reimbursement as identified above. 1. Conditions Prior to the recordation of a final map, grading permit or building permit, whichever occurs first within Zone 15, a comprehensive financing program guaranteeing construction of the following circulation improvements shall be approved: a. Improvements Needed Now Calculations indicate that no roadway improvements are needed under existing conditions. Zone15 LFMP Page 156 October 19, 2011 b. Improvements Needed by 2015 College Boulevard (Reach A) – Construct full width grading to major arterial standards, two center travel lanes with raised median curbs and turn pockets, full width bridge over Agua Hedionda Creek. The intersection of El Camino Real/Cannon Road will require the construction of the east leg to include dual left-turn lanes, a thru lane and a combination thru right-turn lane. The south leg will require the construction of a combination thru right-turn lane. The intersection of College Boulevard/Cannon Road will require a new traffic signal with the north leg having a left-turn lane, thru lane, and dual right-turn lanes; the South and east legs having a left-turn lane and a combination thru right-turn lane; the west leg having dual left-turn lanes and a combination thru-right-turn lane. c. Improvements Needed by 2020 The intersection of College Boulevard/Cannon Road will require the north leg to be re-striped to a thru lane and a right turn-lane and the south leg will require widening to add a thru lane. d. Improvements Needed by 2030 Cannon Road (Reach 4A) - Construct full width grading to major arterial standards, two center travel lanes with raised median curbs and turn pockets. The intersection of El Camino Real/College Boulevard will require an additional thru lane on the north leg. The intersection of College Boulevard/Cannon Road will require a second left- turn lane and thru lane on the east leg. Widen El Camino Real between Cannon Road and Faraday Avenue to six lanes (three lanes in each direction). Note: Cannon Road – Reach 3 and College Boulevard – Reach B and C are constructed Any proposed development that fronts on or requires access from College Boulevard – Reach A – will require, prior to recordation of a final map, grading permit or building permit, whichever occurs first within Zone 15, a comprehensive financing program guaranteeing the construction of College Boulevard – Reach A to be approved: Zone15 LFMP Page 157 October 19, 2011 El Camino Widening – Projects fronting El Camino Real where widening is required will guarantee the widening improvements as required by the City Engineer. Reimbursement to the City may be required if completed by the City prior to adjacent development. Note: Cannon Road – Reach 4A (East of College Boulevard). Any proposed development that fronts on or requires access from Cannon Road – Reach 4A – will require, prior to recordation of a final map, grading permit or building permit, whichever occurs first with Zone 15, a comprehensive financing program guaranteeing the construction of Cannon Road – Reach 4A to be approved. Zone15 LFMP Page 158 October 19, 2011 Circulation Condition (2015) College Boulevard – Reach A – Full width grading – drainage median curbs – 1 lane each direction Estimated Cost $444,175 Source: Hunsaker and Associates (May 12, 2011) Financing Mechanism Developer Funding with Reimbursement Agreement Guarantee Financing District, Bond or Reimbursement Agreement Approved by City Council based on fair share allocation Responsible Area Zone 15 College Boulevard shall be graded to full width standards for a four lane major Arterial roadway. Construction of the 2 center lanes and raised median shall also be provided. Financing Mechanism The preferred method of financing is a private developer’s agreement with reimbursement from various developer impact fees including PLDA, PFF, Water Connection Fees and special developer contributions. Alternatively the impacts could be financed by Special District or Bridge and Thoroughfare District with approval by the City Council prior to recordation of the first final map. Financing Guarantee The financial guarantee proposed must be approved by the Carlsbad City Council. If an Improvement Agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Carlsbad Municipal Code. Reimbursement If the developer is required to construct these facilities, then they may be eligible for reimbursement pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if their benefits extend outside the boundaries of the development, the developer constructing these facilities may enter into a private reimbursement agreement with the owners of benefited properties. Zone15 LFMP Page 159 October 19, 2011 Circulation Condition (2015) Cannon Road – Reach 4B (From 900’ east of College Boulevard to City of Oceanside) Full width grading – drainage – median curbs and improvements – 1 or 2 lanes in each direction, including environmental mitigation Estimated Cost $27,000,000 Financing Mechanism Public funds such as transnet highway funds, traffic impact fee or Federal and State Grants Guarantee Not required by Zone 15 Responsible Area City 2015 intersection and segment improvements shall provide for the build out configuration. Financing Mechanism TransNet Highway 78 funds, Proposition “C” funds, Federal Grants and/or Facility Impact Fees. Financing Guarantee The financial guarantee proposed must be approved by the Carlsbad City Council. Zone15 LFMP Page 160 October 19, 2011 Circulation Condition (2020) Intersection of El Camino Real/Cannon Road – Restriping, bridge widening (NB LEG.), bike lane. Improvements include 1 left turn lane, 3 through lanes and right-turn lane. Estimated Cost $589,000 Source: TIF Financing Mechanism TIF Guarantee TIF Responsible Area Zone 15 El Camino Real/Cannon Road intersection shall provide for the build out configuration. Financing Mechanism The preferred method of financing is a private developer’s agreement with reimbursement from various developer impact fees including PLDA, PFF, Water Connection Fees and special developer contributions. Alternatively the impacts could be financed by Special District or Bridge and Thoroughfare District with approval by the City Council prior to recordation of the first final map. Financing Guarantee The financial guarantee proposed must be approved by the Carlsbad City Council. If an Improvement Agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Carlsbad Municipal Code. Reimbursement If the developer is required to construct these facilities, then they may be eligible for reimbursement pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if their benefits extend outside the boundaries of the development, the developer constructing these facilities may enter into a private reimbursement agreement with the owners of benefited properties. Zone15 LFMP Page 161 October 19, 2011 Circulation Condition (2015) Intersection of College Boulevard/Cannon Road; New traffic signal with north leg having a left-turn lane, thru lane and dual right-turn lanes; south and east leg – dual left-turn lanes and combination thru-right-turn lane. Estimated Cost $116,634 Source: Hunsaker and Associates (May 12, 2011) Financing Mechanism Financing District, Bond or Reimbursement Agreement Gas tax reimbursement. (Per CIP) Guarantee Condition of Tentative Map Approval – Approved by City Council based on fair share allocation. Responsible Area Zone 15 College Boulevard/Cannon Road intersection/signal improvements shall provide for the build out configuration. This estimate is based on completion of the intersection improvements for work required that is not shown on plans prepared by Flores Lund for work currently (5/11) under construction by CUSD for the new high school. Financing Mechanism Financing mechanism (i.e., Developer financing with reimbursement from City PFF revenues). Financing Guarantee The financial guarantee proposed must be approved by the Carlsbad City Council. If an Improvement Agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Carlsbad Municipal Code. Reimbursement If the developer is required to construct these facilities, then they may be eligible for reimbursement pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if their benefits extend outside the boundaries of the development, the developer constructing these facilities may enter into a private reimbursement agreement with the owners of benefited properties. Zone15 LFMP Page 162 October 19, 2011 Circulation Condition (2020) Cannon Road – Reach 4A (East of College Boulevard 900 ft.±) Full width grading – drainage – median curbs – 1 lane in each direction. Estimated Cost $444,174 Source: Hunsaker and Associates Financing Mechanism Developer Funding with Reimbursement Agreement with TransNet local funds, traffic, impact fees, bridge and thoroughfare District, Assessment District Guarantee Finance District, Bond or Reimbursement Agreement Approved by City Council based on fair share allocation Responsible Area Zone 15 2020 intersection and segment improvements shall provide for the build out configuration. This estimate is based on completion of the intersection improvements for work required that is not shown on plans prepared by Flores Lund for work currently (5/11) under construction by CUSD for the new high school. Financing Mechanism The preferred method of financing is a private developer’s agreement with reimbursement from various developer impact fees including PLDA, PFF, Water Connection Fees and special developer contributions. Alternatively the impacts could be financed by Special District or Bridge and Thoroughfare District with approval by the City Council prior to recordation of the first final map. Financing Guarantee The financial guarantee proposed must be approved by the Carlsbad City Council. If an Improvement Agreement is utilized as an alternative financing mechanism, then the improvement agreement shall be in accordance with Section 66462 of the Carlsbad Municipal Code. Reimbursement If the developer is required to construct these facilities, then they may be eligible for reimbursement pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if their benefits extend outside the boundaries of the development, the developer constructing these facilities may enter into a private reimbursement agreement with the owners of benefited properties. Zone15 LFMP Page 163 October 19, 2011 F. Fire Facilities No special conditions or financing mechanisms for Fire Facilities are required as a condition of development within Zone 15. Non-residential and residential development will be required to pay a standard Public Facilities Fee. This fee is collected at the time building permits are issued. G. Wastewater Treatment No special conditions or financing mechanisms for Wastewater Treatment Facilities are required as a condition of development within the zone. Sewer connection fees will provide the primary source of funding for both sewer line upgrades and expansion of treatment plant capacity. The timing of sewer facility upgrades and the mechanism of financing are critical to analysis of the adequacy of funding for plant expansion. The Encina treatment plant is currently (1/04) under construction. Carlsbad Sewer Service District has projected Capital Improvement Program funds to provide for needed facilities. H. Open Space No special conditions or financing mechanisms for Open Space are required as a condition of development within Zone 15. During the preparation of the Citywide Facilities and Improvements Plan, it was determined that certain areas of the city are already developed or meet or exceed the requirements for open space. I. School Facilities No special conditions or financing mechanisms for school facilities are required as a condition of development within Zone 15. Future development will continue to pay school fees and no other financing options are necessary. The school fees collected will be utilized for the construction or reconstruction of new school facilities as required. The District may elect to pursue Mello-Roos financing, and if that program is installed, the existing procedure of school fee collection will be discontinued and replaced with an alternative financing system. J. Sewer Facilities All gravity and force main facilities to serve Zone 15 are constructed with the exception of the SAH lift station along Cannon Road between Faraday Avenue and El Camino Real. The lift station is in final design (8/03) and construction is expected to start in 2004. All new development will provide local sewer lines to connect to existing master plan facilities and will be required to pay sewer benefit fees prior to issuance of building permits. Zone15 LFMP Page 164 October 19, 2011 Sewer Master Plan Sewer Master Plan Sewer Master Plan Sewer Master Plan Sewer Master Plan SAHT2B, SAHT2C- Constructed SAH1, SAH3, SAH4 - Constructed SAHT1G, SAHT1E - Constructed SAH Lift SAH3 Force Main - Constructed Estimated Cost No new Master Plan Facilities to be constructed Financing Mechanism Developer Funding/Sewer Benefit Area Fees Guarantee Improvement Agreement Prior to Final Map Recordation Reimbursement Sewer Benefit Area Fees (Lift Station/Force Main) Facility Also Required By: * Zones 8, 14, 5, 15, and 18 and coastal permits approved (1/04), lift station in final design, construction anticipated to be completed 12/04. Cost to be advanced by City with reimbursement from sewer benefit fees/sewer connection fees. Financing Mechanism There are no Master Plan Facilities to be constructed in Zone 15. K. Water Facilities 1. Conditions The following conditions were either identified in the Zone 15 LFMP Amendment, or in the latest approved Water Master Plan. Projected potable water facilities within Zone 15 are separated into two pressure zones (Elev. 375 and Elev. 490). Reclaimed water is limited to one pressure zone (Elev. 384). For financing purposes, the water facilities are listed as conditioned in the Zone 15 LFMP. Special conditions for Zone 15 A. All development within Zone 15 shall pay a major facilities fee based on EDU’s to the CMWD and a capacity charge based on meter size to the San Diego County Water Authority. In addition all development in Zone 15 shall be required to provide any water reclamation facilities identified in the future Water Reclamation Master Plan as determined by the District Engineer. Any water reclamation facilities necessary to accommodate future development must be guaranteed prior to the recordation of a final map, issuance of a grading permit or building permit, whichever occurs first for any project in Zone 15. Zone15 LFMP Page 165 October 19, 2011 B. Pressure Zone 375 (Potable Water) (Service Area A) The following water facilities will be required as a condition of approval of future development within Pressure Zone 375 to the satisfaction of CMWD: 1.The proposed potable 12-inch water main in College Boulevard from Sunny Creek Road northerly to “A” Street, easterly in “A” Street to the east boundary of Cantarini; also, northerly from “A” Street through the Cantarini project to “C” Street to the intersection of existing 12” line in Cannon Road. Potable Water Condition (Zone 375) The proposed potable 12-inch water main in College Boulevard from Sunny Creek Road – North to “A” Street, East in “A” Street to Cantarini East line – North from “A” Street within Cantarini to College and “C” Street – Northerly in College from “C” Street to Cannon Road. Estimated Cost $880,810 Source: Hunsaker and Associates Financing Mechanism Developer funding with Reimbursement from CIP Guarantee Participation in an improvement agreement Reimbursable Area Pressure Zone 375 C. Pressure Zone 490 (Potable Water) (Service Area B) 1.The proposed 36-inch water main in College Boulevard from Sunny Creek Road northerly to “A” Street, easterly in “A” Street to the easterly boundary of Cantarini. Development easterly of Cantarini will extend the 36” line up to Maerkle Reservoir. 2.Construct a 16” water main in College Boulevard from the 36” at “A” Street northerly to a 16” main at Cannon Road. Potable Water Condition (Zone 490) The proposed 36-inch main in College Boulevard from Sunny Creek Road – Northerly to “A” Street, Easterly in “A” Street to Cantarini East boundary. The 16-inch main in College Boulevard from the 36-inch main at “A” Street Northerly to the 16-inch main at Cannon Road. Estimated Cost $1,862,203 Source: Hunsaker and Associates Financing Mechanism Developer funding with Reimbursement from CIP Guarantee Participation in an improvement agreement Reimbursable Area Pressure Zone 490 Financing Mechanism The above facilities will be privately designed and/or constructed by the development requiring the need for them. Zone15 LFMP Page 166 October 19, 2011 Financing Guarantee These facilities shall be constructed or an improvement agreement shall be provided prior to the recordation of the applicable final map by the first developer in Zone 15 requiring the need for these facilities. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Finance Director and the City Attorney. Reimbursement The developer(s) required to construct these facilities is eligible for reimbursement pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if their benefits extend outside the boundaries of the development, the developer constructing these facilities may enter into a private reimbursement agreement with the owners of benefited properties. Reclaimed System There is one service pressure zone - Elevation 384. Most of Cantarini and none of Holly Springs can be served with reclaimed water. There is no reclaimed water above Zone 384 (service to elevation 245±). Elevation 384 Zone 1. A proposed 12" main in College Boulevard from Sunny Creek Road northerly to Cannon Road. 2. A proposed 12" line in “A” Street from College Boulevard to easterly line of Cantarini. Development east of Cantarini will extend the 12” reclaimed line as needed. Zone15 LFMP Page 167 October 19, 2011 Reclaimed Water Condition (Zone 384) A proposed 12" main in College Boulevard from Sunny Creek Road to Cannon Road. A proposed 12" line in “A” Street from College Boulevard to east line of Cantarini. Development to east of Cantarini will extend 12” line as-needed. Estimated Cost $580,048 Source: Hunsaker and Associates Financing Mechanism Developer funding with reimbursement Guarantee Participation in an improvement agreement Reimbursable Area Pressure Zone 384 Financing Mechanism The above reclaimed water facilities will be privately designed and/or constructed by the development requiring the need for them. Financing Guarantee These facilities shall be constructed or an improvement agreement shall be provided prior to the recordation of the applicable final map by the first developer in Zone 15 requiring the need for these facilities. The improvement agreement shall be in accordance with Section 66462 of the Subdivision Map Act and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement agreement shall be secured with one of the following forms of security as described in Section 20.16.070 of the Carlsbad Municipal Code: surety bonds, cash, irrevocable instrument of credit or letter of credit, acceptable to the Finance Director and the City Attorney. Reimbursement The developer(s) required to construct these facilities may be eligible for reimbursement pursuant to Section 20.16.041 of the Carlsbad Municipal Code. In addition, if their benefits extend outside the boundaries of the development, the developer constructing these facilities may enter into a private reimbursement agreement with the owners of benefited properties.