HomeMy WebLinkAboutSteve Bubalo Construction Co; 2001-02-08; 31821 Change OrdersCITY OF CARLSBAD . ) ',, ... , Project: #3182/3528/3855 VISTA/CARLSBAD INTERCEPTOR SEWER ANDSOUTH CARLSBAD STORM DRAIN PROJECTS CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 1 3182/3528/3667 SEWER ACCT. 51270009060/31821921 51270009060/31822921 PAVEMENT ACCT. 34270009060/38551921 P.O. NO. P109207 STORM DRAIN ACCT. 34270009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY, INC. PO Box 1048 Monrovia, California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete a_nd final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions perform the following as directed by the Engineer: Item 4: Determine the horizontal and vertical locations of existing subsurface structures, utility lines, and other objects through exploratory excavations. Estimated increase to contract amount.. .................................. $ 10,000.00 ESTIMATED INCREASE TO CONTRACT COST ....................... $ 10,000.00 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 3 / 31821/31822/35823/38551 P.O. NO. P109207 STORM DRAIN ACCT. 343270009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Furnish and Install six (6) R96 and six (6) R96C "Pedestrians Prohibited" Signs within the NCTD Right of Way. Signs shall be posted at various locations as directed by the Engineer. Estimated increase to contract cost.. ....................................... $ 2,000.00 Item 2: Refer to Plan Set 2 of 2, Sheet 5. Perform exploratory excavations at Stations 22+16 and 20+ 7 4 as directed by the Engineer. Relocate jacking and receiving pits at Stations 22+16 and 20+74 four feet westerly. Estimated increase to contract cost ........... :........................... $ 2,000.00 Item 3: Refer to Plan Set 2 of 2, Sheet 5. Remove and recompact loose fill at Station 22+16 for Storm Drain jacking pit as directed by the engineer Estimated increase to contract cost .......................................... $ 2,500.00 ', CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 6 31821 /31822/35283/38551 P. 0. NO. P 1 09207 INTERCEPTOR SEWER ACCT. 51270009060/31821921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048Monrovia. California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Refer to Plan Set 1 of 2, Sheets 21 and 22. Modify existing traffic control and install additional signage and striping on Jefferson Avenue from Oak Avenue to Arbuckle Place in accordance with the attached City of Carlsbad transmittals dated August 30,2001, September 13, 2001, September 21, 2001 and October 1, 2001. Estimated increase to contract cost.. ........................................ $ 4,500.00 Public Works -Engineering .. ' � .. CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 7 31821/31822/35283/38551 P.O. NO. P109207 STORM DRAIN ACCT. 343270009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-2.2.3, Agreed Prices, SSPWC 2000 and the Special Provisions perform the following: Item 1: Refer to Plan Set 2 of 2, Sheets 19 and 28. Perform additional excavation and install 1-inch gravel and filter fabric from station 3+40 to station 3+ 70 in accordance with FieldChange #1, all for the lump sum price of $5,292.33. Increase to contract cost.. ..................................................... $ 5,292.33 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT CHANGE ORDER NO. 10 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 11 31821 /31822/35283/38551 P. 0. NO. P 109207 INTERCEPTOR SEWER ACCT. 51270009060/31821921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or Mayor. Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Refer to Plan Set 2 of 2, Sheet 5. Additional reference is made to Steve Bubalo Construction Company transmittal to the City of Carlsbad dated 11/20/01. Contractor shall perform exploratory excavations as directed by the City of Carlsbad's Field Representatives to confirm location of existing 36" Sewer from Sta. 15+61 to 20+ 73. Estimated increase to contract cost.. ........................................ $ 5,000.00 Item 2: Refer to Plan Set 1 of 2, Sheets 7 and 8, Stations 169+00 to 172+00. Additional reference is made to City of Carlsbad's transmittal to Steve Bubalo Construction Company dated 12/14/01. Contractor shall furnish and install a 9000 gallon "Baker" tank, isolate and stockpile potentially contaminated tunneling spoil, conform to the City's Community Health and Safety Plan and implement necessary revisions to the Contractor's Employee Protection Plan. The City will furnish additional direction to the Contractor regarding the means and methods for disposal of contaminated solid and liquid wastes. The Contractor shall dispose of contaminated waste as directed by the City as a provision of this Change Order Item. Estimated increase to contract cost.. ........................................ $ 70,000.00 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 12 31821/31822/35283/38551 P.O. NO. P109207 STORM DRAIN ACCT. 343270009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-2.2.3, Agreed Prices, SSPWC 2000 and the Special Provisions perform the following: Item 1: Refer to Plan Set 2 of 2, Sheet 4, Field Change #7 and the Contractor's response to the City's Request for Quote #7, restore damaged landscaping in accordance with the City's Request for Quote #7 and maintain restored landscaping for a 90 day establishment period, complete for the lump sum cost of $1,610.95 Increase to contract cost. ........................................................ $ 1,610.95 Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 2: Refer to Plan Set 1 of 2, Sheet 16. Additional reference is made to Steve Bubalo Construction Company transmittal to the City of Carlsbad dated 1/30/02. The Contractor shall expose a conflicting Pacific Bell telephone duct from Station 145+20 through 145+80 and prepare sub-grade for relocation by Pacific Bell forces. All work shall be performed as directed by the City's Field Representatives. Removal and Replacement of Curb, Gutter and Sidewalk shall be performed in accordance with Unit Prices established within the Contract Documents. Estimated increase to contract cost. ......................................... $ 7,000. oo �i � s,,> CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 14 31821/31822/35283/38551 P.O. NO. P109207 STORM DRAIN ACCT. 35170009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-2.2.3, Agreed Prices, SSPWC 2000 and the Special Provisions perform the following: Item 1: Refer to Contract Specification Section 6-6.1. The Contract time is extended six (6) working days due to adverse weather conditions experienced on 11/29/01, 12/3/01, 1/29/02, 3/7/02, 4/15/02 and 4/24/02. The Contract Cost will remain unchanged. Increase to contract cost.. ....................................................... $ 0.00 Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 2: Refer to Plan Set 1 of 2, Sheet 16. The Contractor shall remove approximately 75 lineal feet of 10" ACP waterline at approximate Station 148+40 and replace with 10" C-900 PVC waterline. The Contractor shall also remove two (2) 1 O" x 1 O" tee outlets and associated valves and replace with one (1) four-way 10" cross and valve assembly. The City shall furnish the new four-way 1 O" cross and valve materials pre­assembled and ready for installation by the Contractor. All work shall be performed at the direction of the City's Field Representatives. Estimated increase to contract cost .......................................... $ 17,500.00 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 15 31821 /31822/35283/38551 P. 0. NO. P 109207 INTERCEPTOR SEWER ACCT. 51270009060/31821921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048Monrovia. California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Refer to Plan Set 1 of 2, Sheet 19. Additional reference is made to the City's transmittal to Steve Bubalo Construction Company, dated 3/25/02. Contractor shall install a double yellow centerline west of the Oak Avenue jacking pit from Station 145+00 to Station 148+50. The Contractor shall also grind/remove the existing double yellow centerline on Oak Avenue from Station 151+00 to 153+50 and install a new double yellow centerline in accordance with the above referenced transmittal. All work shall be performed at the direction of the City's Field Representatives. Estimated increase to contract cost. ......................................... $ 3,800.00 CITY OF. CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT CHANGE ORDER NO. 16 10.d 7!:!101 P.O. Box 1048, Monrovia, CA 91017 (626)574-7570 FAX (626) 574-7642 To: Mr. Mark Sullivan PBS&J -City of Carlsbad From: Phil Kang Project Manager Fax: (760) 720 -1079 Pages: 1 Including Cover Phone: (760) 720 -9723 Date: 5/1/02 Re: Vista/Carisbad Interceptor Sewer & South CC: Schiller Carisbad Storm Drain Projects @ Urgent 0 for Review □Please Comment 21 Please Reply •Comments: Mr. Sullivan, □Please Recycle In accordance with Section 3-4, Changed Conditions, of the Standard Specifications forPublic Works Construction (2000 as amended), this fax transmittal shall serve as written notification that we have discovered a subsurface condition that differs from the Contact Plans. During trench excavation for the proposed 12-inch PVC sewer line along Chestnut Ave. on May 1, 2002, SBCC uncovered a concrete thnJst block at approximate Sta. 14+15 that is in direct conflict with the proposed sewer and Sewer Manhole No. 108 at Sta. 14+11. The thrust block is approximately 5-feet from street grade. Please feel free to contact the undersigned at the above listed number with"any questions. Thank you. Phil Kang � r Carisbad Office 760.720.1657 / Fax 760.720.9469 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 17 31821/31822/35283/38551 P.O. NO. P109207 STORM DRAIN ACCT. 35170009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia. California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Refer to Plan Set 2 of 2, Sheet 9, Station 12+25 through 22+00. Additional reference is made to the City's transmittal to Steve Bubalo Construction Company, dated 5/3/02 (PCO#53). The Contractor shall coordinate additional work activities with the City's Field Representatives to remove those portions of the existing 27" Storm Drain, which cannot be removed while excavating for and installing the new 72" and 60" pipeline on Chestnut. Estimated increase to contract cost. ......................................... $ 6,500.00 Item 2: Refer to Plan Set 2 of 2, Sheet 17, Station 10+59. Perform exploratory excavation to locate an existing 2" copper water service, which may conflict with the new storm drain installaion. Estimated increase to contract cost. ..............•.......................... $ 1,500.00 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER ANO SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 20 31821/31822/35283/38551 P.O. NO. P109207 SOUTH CARLSBAD VILLAGE STORM DRAIN ACCT. 35170009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia, California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. *See Note Page 3 -&- Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Refer to Plan Set 2 of 2, Sheets 11, 12 and 13. Coordinate with SDG&E to obtain temporary power service in order to operate groundwater pumps on Harding Street from Oak Avenue to Magnolia Avenue. Estimated increase to contract cost.. ........................................ $ 5,000.00 Item 2: Refer to Plan Set 2 of 2, Sheet 15. Coordinate with City of Carlsbad Field Representatives to perform exploratory excavations and adjust the horizontal alignment of the new 24" Storm Drain and Storm Drain Clean Out from Station 5+80 to 6+47 in order to avoid an existing waterline. Estimated increase to contract cost. ......................................... $ 2,500.00 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT CHANGE ORDER NO. 21 3,500.00 Phil, City of Carlsbad Public Works - Engineering FACSIMILE TRANSMITTAL FORM DATE: Nov:ember 18, 2002 INDMDUAL, COMPANY TO: Philip Kang, Bubalo Const. FAX COPY: . Grant Eklund, Carlsbad. Gary Goodman, Carlsbad Terry Smith, Carlsbad File: 82.095 #15 FROM: Mark Sullivan, Powell/PBSJ PROJECT NO.: 3182, 3528, 3667 FAXNillvIBER (626)5 7 4·7642 (760)438·4178 (760)438·4178 (760)602·8562 (760)720·1079 SUBJECT: VISTA CARLSBAD SEWER & STORM DRAIN; FIELD CHANGE #35 NUMBER OF PAGES (Including this transmittal form): 3 The attached Field Change #35 is transmitted herein for your review. Please review this F'ield Change and provide any comments you may have as soon as possible. Please proceed with the implementation of this work as soon as possible. This item will be tracked as PCO #96 and will be discussed at the weekly progress meetings until it has been resolved. ff you have any questions or require additional information please contact me at (760) 525·8652. Mark Sullivan Senior Construction Mgr. / 0 : / S' ,19--- CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 22 31821/31822/35283/38551 P.O. NO. P109207 INTERCEPTOR SEWER ACCT. 51270009060/31821921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia, California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. *See Note Page 3 ·�· Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Refer to Plan Set 2 of 2, Sheet 7 and Field Change .#40, dated 12/20/02. Construct an 8" SDR-35 pipe and catch basin drainage system in accordance with Field Change #40. Estimated increase to contract cost. ......................................... $ 13,000.00 Item 2: Refer to Plan Set 2 of 2, Sheet 17. The Contractor shall coordinate with the City's Field Representatives to perform miscellaneous Asphalt Concrete point repairs on Chinquapin Avenue. Estimated increase to contract cost. ......................................... $ 5,000.00 Item 3: Refer to Plan Set 1 of 2, Sheet 1 o and the City's transmittal to the Contractor dated 12/20/02. Coordinate with the City's Field Representatives to relocate an existing sewer lateral on Jefferson Street, Station 189+50. Estimated increase to contract cost. ......................................... $ 17,000.00 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 23 31821/31822/35283/38551 P.O. NO. P109207 INTERCEPTOR SEWER ACCT. 51270009060/31821921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. -�*See Note Next Page G� Pursuant to Subsection 3-2.2.3, Agreed Prices, SSPWC 2000 and the Special Provisions perform the following: Item 1: Furnish additional NCTD Flagging Protection and Flagging Inspection. Fund NCTD Hourly Flagging Rate increases, Administrative Fees, Flagging Protection, Engineering Inspection and Plan Check Fees. This change order and Change Order #24 shall constitute full and final payment for all outstanding additional NCTD related costs and impacts associated with this project. Increase to contract cost.. ....................................................... $ 95,999.65 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 24 31821/31822/35283/38551 P.O. NO. P109207 SOUTH CARLSBAD VILLAGE STORM DRAIN ACCT. 35170009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia, California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. *See Note Next Page ·� Pursuant to Subsection 3-2.2.3, Agreed Prices, SSPWC 2000 and the Special Provisions perform the following: Item 1: Furnish additional NCTD Flagging Protection and Flagging Inspection. Fund NCTD Hourly Flagging Rate increases, Administrative Fees, Flagging Protection, Engineering Inspection and Plan Check Fees. This change order and Change Order #23 shall constitute full and final payment for all outstandin� additional NCTD related costs and impacts associated with this project. Increase to contract cost ......................................................... $ 95,999.65 CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 25 31821/31822/35283/38551 P.O. NO. P109207 PAVEMENT OVERLAY ACCT. 34270009060/38551921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. Pursuant to Subsection 3-2.2.3, Agreed Prices, SSPWC 2000 and the Special Provisions perform the following: Item 1: Refer to Contractor quote (RFQ #13) dated April 10, 2003. Install Seal Coat and Re-stripe front parking lot on the Casten Property, 2737 Jefferson Street as defined by RFQ #13. Increase to contract cost. ........................................................ $ 2,055.35 Item 2: Refer to Contractor quote (RFQ #15) dated April 18, 2003. Install striping modification at Jefferson Street and Las Flores Dri\e as defined by RFQ #15. Increase to contract cost. ........................................................ $ 2,444.20 Item 3: Refer to the Contractor's quote dated April 28, 2003. Apply seal coat over cold­milled asphalt concrete in accordance Vvith the referenced quote. Increase to contract cost. ........................................................ $ 1,111.00 DAILY EXTRA WORK REPORT OWNER/ CLIENT : City of Carlsbad PROJECT TITLE : Vista/Carlsbad Interceptor Sewer and South Carlsbad Storm Drain Projects PERFORMED BY : STEVE BUBALO CONSTRUCTION CO., INC. Bubalo Project No. r••·AJ/z, DESCR/P110N OF WORK 1JIJS REPORT: "EXTRA WORK" j $2, _ . ___ _ . __ _444.20 . As directed by Request for Quotation No. 15, dated April 10, 2003, SBCC is to funiish labor, equipment and materials to revise the traffic striping at Las Flores Ave. and Jefferson Street. All work is to be completed by Statewide Stripes, Inc. of San Diego In accordance with RFQ No. 15. No. Equipment Hours Hourly Extended No. LABOR or Descriotion Ooer Rate Amount Of Descriotion OPERATED OPERATOR FOREMAN OPERATOR LABORER TEAMSTER CARPENTER FOREMAN STANDBY CARPENTER WELDER MECHANIC Units Material #Of Unit Extended Of Descriotion Units Cost Amount SUBCONTRACTS Statewide Stripes, Inc. Quote No. 4419 < $5000.00@ 10% MARKUP >$5000.00 @ 5% MARKUP Equipment, Material, Special Fees Subtotal c:> ADD 15'¼ MARK-UP @ PAGE I of 1 !TOTAL THIS REPORT 00-6 Hours Worked Reg. O.T. Reg. 0.T. Reg. O.T. Reg. O.T. Reg. O.T. Reg. O.T. Reg. O.T. l!EPORTNO.: RFQ 15 OATEOFWORK Various Various LOCA nON Las Flores/Jefferson Hourly Extended Rate Amount $76.67 $76.67 $61.60 $83,70 $45.88 $61.04 $50.62 $66.78 $57.01 $79.28 $54.14 $74.97 $61.45 $83.48 LABOR SUB-TOTAL 20% MARKUP $2,200.00 $220.00 c:> c:> TOTAL LABOR COSTS REPORT SUBTOTAL $2,420.00 1% BOND ADJUSTMENT $24.20 $2,444.20 C "" .....,.... 0C ..... N C C c..: ,.... C "" cc � C: N C: t11 � "" � C: "" N IE! C C C: CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 27 31821/31822/35283/38551 P.O. NO. P109207 SOUTH CARLSBAD VILLAGE STORM DRAIN ACCT. 35170009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. *See Note Next Page p-,v/� Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: Reference is made to Section 02606, Paragraph 2.3G of the Contract Specifications. The Contractor shall return and re-stock oil/water separator inserts previously designated to be installed within the wing section of the inlet. The Contractor shall procure new oil/water separators designed to be installed within the drop section of the inlet box. Estimated increase to contract cost. ........................................ $ 500.00 Item 2: Reference is made to the City of Carlsbad's Field Changes #6 and #36. Reference is also made to RFQ #16. Additional Reerence is made to the City's facsimile transfer to the Contractor, dated 12/4/02. The Contractor shall construct a concrete drainage swale in lieu of an asphalt concrete drainage swale. Estimated increase to contract cost. ........................................ $ 20,000.00 Item 3: Reference is made to Plan Set 2 of 2, Sheet 20, Detail B. Revise the detailed Modified SDCO in accordance with Field Change #41. Estimated increase to contract cost. ........................................ $ 5,000.00 ... CITY OF CARLSBAD PROJECT: #31821/31822/35283/38551 VISTA/CARLSBAD INTERCEPTOR SEWER AND SOUTH CARLSBAD VILLAGE STORM DRAIN CONTRACT NO. ACCOUNT NO.S CONTRACTOR: ADDRESS: CONTRACT CHANGE ORDER NO. 28 31821/31822/35283/38551 P.O. NO. P109207 SOUTH CARLSBAD VILLAGE STORM DRAIN ACCT. 35170009060/35283921 STEVE BUBALO CONSTRUCTION COMPANY PO Box 1048 Monrovia, California 91017 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. This change order is not effective unless signed by the City Manager and/or the Mayor. *SEE NOTE NEXT PAGE,� Pursuant to Subsection 3-3, Extra Work, SSPWC 2000 and the Special Provisions, perform the following as directed by the Engineer: Item 1: The Contractor is directed to coordinate with the City's Field Representatives to perform remedial grading with. in the NCTD Railroad Right� Way as directed to improve surface drainage. ( So1.A1k. o-F ·-1oi,M..A..N,.c .. /c_; � Estimated increase to contract cost.. ........................................ $ 4,975.87 Item 2: Reference is made to PCO #92. The Contractor is directed to install a Type "C" curb inlet at Station 14+58.91 Harding Street in lieu of the Type "B" curb inlet specified. Estimated increase to contract cost. ......................................... $ 631.85 • t ,.l ' ' ,. . Vi$ta Carlsbad Sewer and Storm Drain Change Order #30 . ' Page 2 of 2 ESTIMATED INCREASE TO CONTRACT COST ....................................... $1,242.13 TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL BE EXTENDED BY ZERO (0) WORKING DAYS. RECOMMENDED BY: C� /-/Z--01/ DEPUYCITY ENGINEER -(DATE) CITY ENGINEER /-l3-/J'1 (DATE) 1':cfu k.. y-/�-3/ c,(a'f FINANCE DIRECTOR (DATE) APPROVED BY: (DATE) *Contractor reserves all rights to overallproject delay and disruption, impact and cumulative impact costs.� f \rot DISTRUBUTION: INSPECTION FILE (ORIGINAL) PURCHASING CONTRACTOR DEPUTY CITY ENGINEER, DESIGN