Loading...
HomeMy WebLinkAbout2001-04-03; Municipal Water District; 500; El Fuerte Water Main ProjectCARLSBAD MUNICIPAL WATER DISTRICT -AGENDA BILL AB# - 500 TITLE- AUTHORIZATION TO ADVERTISE FOR BIDS FOR CONSTRUCTION 0F THE EL FUERTE 30” WATER MAIN MTG. 4/3/2001 FROM ALGA ROAD TO CHORILITO STREET PROJECT NO. 38161 RECOMMENDED ACTION: ..; Adopt Resolution No. , 11! Approving plans and specification and authorizing the District Secretary to the Board to advertise the El Fuerte 30” Water Main from Alga Road to Chorilito Street Project No. 38161 for bids. I ITEM EXPLANATION: Construction of the water main will connect the Carlsbad Municipal Water District’s two (2)-700 foot elevation potable water reservoirs; Santa Fe II, near Palomar Airport Road at Business Park Drive and La Costa Hi, near El Fuerte Street at Alga Road. The connection will provide redundant sources for both pressure zones both now isolated and dependent on single connection sources. The water transmission main will improve the operation and reliability of the District’s entire existing potable water system and is an essential element to support the projected ultimate potable water demands within the City of Carlsbad. This phase of the project will consists of open trench construction for 2,010 lineal feet of 30” steel pipeline including valves and appurtenances in El Fuerte Street from Alga Road to Chorilito Street. I ENVIRONMENTAL REVIEW: A Notice of Exemption for this project was filled in compliance with Section 21152b of Public Resources Code (California Environmental Quality Act) with in the Office of the County Clerk on May 3,200O FISCAL IMPACT: There is currently $‘l,335,750 allocated to Project No. 38161. The remaining portion of this fund is estimated to be $609,793 and will provide for the construction of the final phase of this project. The funding source is the Water Connection Fee: Construction Contingeicy (15%) ’ $80:530 Proiect Manaaement. Administration & lnsoection (I 0%) $53.866 I I J EXHIBITS: I. Location Map for Water Pipeline. 2. Resolution No.. 1120 Approving plans and specification and authorizing the Districts - Secretary to the Board to advertise the El Fuerte 30” Water Main from Alga Road to Chorilito Street Project No. 3816. LOCATION MAP PROJECT NAME PROJECT NO. EXHIBIT EL FUERTE WATER MAIN FROM ALGA RD TO CHORILITO ST 38161 '1' 3 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1120 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD) TO APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE THE DISTRICT SECRETARY TO ADVERTISE THE EL FUERTE 30” WATER MAIN FROM ALGA RD TO CHORILITO STREET PROJECT NO 38161 FOR BIDS. WHEREAS, the District’s Board of Directors, has determined it necessary, desirable, and in the public interest to construct the 30” water main in El Fuerte Street; and WHEREAS, the plans and specifications for furnishing of all labor, material, tools, equipment, transportation and other expenses necessary or incidental for said project have been prepared, are on file in the Engineering Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, there are sufficient appropriations available to complete the project. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal water District (CMWD) of the City of Carlsbad, California, as follows: 1. 2. approved. ‘// v I// I/l v if II N II IJ II That the above recitations are true and correct. That the plans, specifications, and contract documents as presented are hereby 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. The District Secretary is hereby authorized and directed to publish in accordance with State law, a Notice to Contractors inviting bids for the El Fuerte 30” Water Main from Alga Road to Chorilito Street Project No. 38161. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on the 3rd day of April (2001 by the following vote, to wit: AYES: Board Members Lewis, Kulchin, Finnila, Nygaard and Hall. TEST: & h- M. WOOD, Secretary (SEW