Loading...
HomeMy WebLinkAbout1997-08-26; Municipal Water District; 384; 12-Inch Water Main ReplacementQ 9 0 E % . . p 2 2 % m 4B# -324 TITLE: APPROVAL OF PLANS AND SPECIFICATIONS, APPROPRIATION OF FUNDS, AND AUTHORIZATION TO VlTG. 08126197 ADVERTISE FOR BIDS FOR A 124NCH WATER MAIN >EPT. CMWD REPLACEMENT, CMWD PROJECT No. 85401, CONTRACT NO. 34521134522 RECOMMENDED ACTION: CARLSBAD MUNICIPAL WATER DISTRKT -AGENDA BILL , . /v IN ” DEPT. HD. CITY Al-l-Y. CITY MGR. Adopt Resolution No. 9 7 % for approval of plans and specifications, appropriation of funds, and authorization to advertise a notice inviting bids for the construction of 12” Water Main Replacement, CMWD Project No. 85-401, Contract No. 34521/34522. This project involves the replacement of two deteriorated pipelines. The first pipeline is a sewage force main extending from the Batiquitos Pump Station to a gravity sewer located adjacent to Interstate 5. The second pipeline is a water pipeline located in parallel with the sewage force main near Interstate 5. Both pipelines are within a 40-foot wide easement granted by the property owner as shown on the attached location map. The sewer portion of the project is being presented to the City Council for review and approval. The water portion of the project is being presented to the District Board of Directors for review and approval. The contract will be a three party contract between the Contractor, City of Carlsbad and Carlsbad Municipal Water District. The contract will involve separate bid schedules for sewer and water, and the fiscal impact will be separated accordingly. The District has prepared plans and specifications to construct the water pipeline which are on file in the office of the District Engineer and are incorporated by reference. In accordance with Section 3.28.120 of the Municipal Code, an Invitation to Bid will be published, and the contract will be awarded to the lowest responsive, responsible bidder subject to the Board of Director’s approval. Construction is anticipated to require approximately seventy-five (75) calendar days from the date of issuance of the Notice to Proceed. Staff recommends approval of the project plans and specifications and requests approval to proceed to bid for the replacement of the water pipeline to improve conveyance system reliability. FISCAL IMPACT: The engineer’s estimate for construction of the waterline portion of this project is: Waterline $50,000 Survevina/Soils Testina $1 .ooo The additional funds will be appropriated from the water replacement fund in the amount of $55,000. 3 ,,$- - , . Page 2 of Agenda Bill No. 38 Y ENVIRONMENTAL IMPACT: The Planning Department has reviewed the documentation on the project and has issued a mitigated negative declaration on August 20, 1997. The mitigation measures include staking of all coastal sage scrub habitat adjacent to the corridor, mitigation of any disturbed coastal sage scrub habitat as required by a qualified project biologist, minimization of the release of construction related pollutants in accordance with the City Grading Standards, and re- vegetation of the construction corridor consistent with the approved Brocatto Project (CT 89-19) Habitat Enhancement Landscape Plan. The Coastal Permit was also issued on August 20, 1997. EXHIBITS: 1. 2. Location Map Resolution No. 9 9 G for approval of plans and specifications, appropriation of funds, and authorization to advertise a notice inviting bids for the construction of 12” Water Main Replacement, CMWD Project No. 85-401, Contract No. 34521/34522. REDUCED SITE PLAN > rt2 ject >. 1. --,-‘: NOF5-I BATIQUITOS SEWAGE Project Exhibit FORCE MAIN No. Non REPLACEMENT PROJECT 85-401 1 I _ ,,’ ’ w ’ _’ A’ -. RESOLUTION NO. 992 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD MUNICIPAL WATER DISTRICT, CARLSBAD, CALIFORNIA, FOR APPROVAL OF PLANS AND SPECIFICATIONS, APPROPRIATION OF FUNDS, AND AUTHORIZATION TO PUBLISH AN ADVERTISEMENT FOR BIDS 12” WATER MAIN REPLACEMENT, CMWD PROJECT NO. 85-401 -CONTRACT NO. 34521/34522 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District of Carlsbad, California, has determined it necessary and in the public interest to approve the plans and specifications, to appropriate funds, and to authorize publishing an advertisement for bids for the construction of 12-Inch Water Main Replacement, CMWD Project No. 85401-Contract No. 34521/34522; and WHEREAS, plans and specifications for the 12” Water Main Replacement, CMWD Project No. 85-401, have been prepared by the Carlsbad Municipal Water District engineering staff with a cost estimate of $55,000 for water pipeline replacement, including $1,000 for construction surveying services and soil testing, and $4,000 for construction inspection services, and are on file in the Engineering Department of the Catlsbad Municipal Water District; and WHEREAS, authorization is hereby granted by the Board of Directors to publish an Invitation to Bid in accordance with Section 3.28.080 of the Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District of Carlsbad, California, as follows: 1. That the above recitations are true and correct. . 2. That the plans and specifications and cost estimate of $55,000 submitted by the Carlsbad Municipal Water District engineering staff which are on file with the Carlsbad Municipal Water District Engineering Department are incorporated herein by reference and are accepted. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 4 3. That authorization to publish an invitation to bid in accordance with Section 3.28.080 of the Municipal Code be granted. 4. That approval of funds in the amount of $55,000 be appropriated from the Water Replacement Fund. PASSED, APPROVED, AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on 26th day of August , 1997, by the following vote to wit: AYES: Board Members Lewis, Finnila, Nygaard and Hall NOES: None ABSENT: Board Member Kulc ATTEST: . - ALETHA L. RAUTENKRANZ, Secretary \ (SEAL) CMWD 85-401