Loading...
HomeMy WebLinkAbout1994-06-14; Municipal Water District; 248; Ponto Sewer Main Realignment & Manhole RepairsAB # c@f8 TITLE: AWARD OF CONTRACT FOR CONSTRUCTION MTG. 6-l 4-94 OF PONTO SEWER MAIN REALIGNMENT & DEPT. CMWD EXISTING MANHOLE REPAIRS PROJECT, CMWD PROJECT NO. 93-403, CONTRACT 3432 RECOMMENDED ACTION: CARLSBAD r-‘NICIPAL WATER DISTRICT YGENDA CITY MGRm Adopt Resolution No. r57q accepting a bid and awarding a contract for the construction of Ponto Sewer Main Realignment & Existing Manhole Repair Project, CMWD Project No. 93-403, Contract No. 3432 ITEM EXPLANATION: On March 1, 1994, the Board of Directors authorized the advertisement of bids for construction of The Ponto Sewer Main Realignment and Existing Manhole Repairs Project. Two (2) sealed bids were received April 21, 1994, as follows: 1. Drainage Construction Co., Inc., Vista, CA 2. Arrieta Construction Inc., El Cajon, CA $311,592.00 $346,469.00 This project will involve construction to realign a portion of the Ponto Trunk Sewer Pipeline near the Encina Water Reclamation Facility and repair 13 deteriorated sewer manholes which are structurally impaired. Construction is anticipated to require approximately thirty (30) calendar days to completion. The engineer’s estimate for construction was $229,983.05. In comparing the bids to the engineer’s estimate, two items had a much higher cost. The first item was for by-pass pumping of sewage during construction, The second item included a higher unit price for the sewer pipeline relocation. The higher unit cost was the result of constructing a relatively small quantity of large diameter pipe. Plans and specifications for the construction of the Ponto Sewer Main Realignment and Existing Manhole Repairs were prepared by the District engineering staff. In accordance with Section 3.28.120 of the Municipal Code; an Invitation to Bid was published. Two (2) responses were received, opened, witnessed and recorded on April 21, 1994. Project Manager, Purchasing staff, and the City Attorney’s office have reviewed the complete bid documents from all parties in detail and concluded that the lowest responsive, responsible bidder is Drainage Construction Co., Inc., 1505 Sycamore Avenue, Vista, California, for a contract amount of $311,592. ENVIRONMENTAL REVIEW: The City of Carlsbad Planning Department issued a Notice of Exemption on October 18,1993, and the Coastal Commission issued an exemption letter on October 12, 1993. FiSCAL IMPACT: This project was not a budgeted item, however, deterioration of portions of the existing system necessitates the need for the proposed construction. A portion of this sewer trunkline is used jointly by three (3) agencies, City of Carlsbad, 40%;, Leucadia County Water District, 40.3%; and Encinitas Sanitary District, 19.7%. Carlsbad Municipal Water District will act as the lead agency and will bill the other agencies for their proportionate share in accordance with the existing agreement dated August 24, 1972. The initial estimated cost of $230,000 was appropriated when the Board authorized the advertisement for bids. Because the bids received for this project are higher than anticipated, it is necessary to increase the appropriation to $375,000. However, after receiving reimbursements from Leucadia and Encinitas, the District’s actual cost should not exceed $179,844. Leucadia and Encinitas have been notified of the amount of the bids received and have verbally agreed to proceed. Written confirmation will be received prior to execute of contract. Approximately $2,000,000 is available in the Sewer Replacement Fund thus there are sufficient funds to construct the project. PAGE 2 AB# d# The construction bid for the project is $311,592. The estimated District-funded project costs are as follows: Design $ 1 o,ooo.oo Construction $311,592.00 Construction Contingencies 10% $32,000.00 Inspection/Lab/Administration $21,408.00 Total Estimated Project Costs $375,000.00 Total Appropriation $375,000.00 1. 2. Location Map. Resolution No. 83 q accepting a bid and awarding a contract for the construction of Ponto Sewer Main Realignment and Existing Manhole Repairs Project, CMWD Project No. 93-403, Contract 3432. CMWD 93-403 LOCATION MAP -.--_--- --- ------ I WU.“,. --_- - ~-.. ___ ------- PROJECT NAME: PROJECT NO PONTO SEWER MAIN REALIGNMENT AND EXISTING MANHOLE REPAIRS. 93-403 n EXHIBIT NO. 1 4 . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 EXHIBIT 2 RESOLUTION NO. 874 A RESOLUTION OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING CONTRACT FOR CONSTRUCTlON OF PONTO SEWER MAIN REALIGNMENT AND EXISTING MANHOLE REPAIRS PROJECT, CMWD PROJECT NO. 93493, CONTRACT NO. 3432 WHEREAS, the Board of Directors of the Carl&ad Municipal Water District has previously authorized the advertisement for bids for the construction of Ponto Sewer Main Realignment and Existing Manhole Repairs Project, CMWD Project No. 93493, Contract No. 3432; and, WHEREAS, two (2) sealed bids were received on April 21, 1994, for said project; and, WHEREAS, all bid documents received from all bidders have been reviewed in detail and the Board of Directors does hereby find that the lowest responsive, responsible bid received for the construction of said project was submitted by Drainage Construction Co., Inc., 1505 Sycamore Avenue, Vista, California in the amount of $311,592.00; and WHEREAS, funds in the amount of $230,000 have been appropriated in the 1993-1994 Budget as part of the Capital Improvement Program, and because of the bids received for the project, the total estimated project costs will amount to $375,009, therefore, an increase of $145,000 will be necessary to be appropriated from the Sewer Replacement Fund. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. That the above recitations are true and correct, 2. That the bid amount in the amount $311,592.00 submitted by Drainage Construction Co., Inc. is hereby accepted, and the President is hereby authorized to execute a contract thereafter. ill /II I// I// ifI Ill /ii 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. That the Finance Director be authorized to appropriate an additional $145,000 from the Sewer Replacement Fund. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Water District held on the 14th day of JUNE , 1994, by the following vote to wit: AYES: Board Members Lewis, Stanton, Kulchin, Nygaard, Finnila NOES: None ABSENT: None Al-l-EST: Secretary stant Secretary CMWD 93-403 2 I/