Loading...
HomeMy WebLinkAbout1998-12-15; Municipal Water District; 428; North Batiquitos Water Main- - CARLSbAD MUNICIPAL WATER DISkiCT - AC AB# +w TITLE- NOTICE OF COMPLETION FOR THE MTG. 12/l 5/98 COMSTR~CTION OF THE NORTH BAT~QUITOS 12” WATER MAIN AND SEWAGE FORCE MAIN DEPT. Encl. REPLACEMENT, CMWD PROJECT NO. 85-401, CONTRACT NO. 34521134522 @w ENDA BILL DEPT. HD. & RECOMMENDED ACTION: Adopt Resolution No. /d.# accepting the construction of the North Batiquitos 12” Water Main and Sewage Force Main Replacement, CMWD Project No. 85-401, Contract No. 34521/34522, as complete and directing the Secretary to record a Notice of Completion and release bonds in accordance with State Law and City Ordinances. ITEM EXPLANATION: On November 18, 1997, 4 Point Pipeline Construction, Inc., was awarded a contract in the amount of $290,905 for construction of the North Batiquitos 12” Water Main and Sewage Force Main Replacement, CMWD Project No. 85-401, Contract No. 34521/34522. This project involved the replacement of two deteriorated pipelines. A sewage force main extending from the Batiquitos Pump Station to a gravity sewer located adjacent to interstate 5 and a water pipeline located in parallel with the sewage force main near interstate 5. Both pipelines are within a 40-foot easement granted by the property owner as shown on the attached location map. 4 Point Pipeline Construction, Inc., completed the work on September 23, 1998. City forces have inspected said work and found it to be satisfactory. Staff recommends formal acceptance by the District Board of Directors. FISCAL IMPACT: A summary of the final project cost is as follows: CONSTRUCTION OF THE NORTH BATIQUITOS EXHIBITS: 1. Location map. 2. Resolution No. /633 . 3. Notice of Completion. / . . -\ 1 \ -- II,i -4 . . RLDUCED SITE PLAN . , ._A-- _- -’ - . I L --A!‘.. 1 IX-A r:--- 0 /’ / c / / // / f II sAT_fR F’IPELINE IProject Name i I NORTH FJATIQUITOS SEWAGE FORCE MAIN i TTSiACEMENT PROJECT Project Nom 85-401 Exhibit NO. 1 Exhibit 2 RESOLUTION NO. 1033 A RESOLUTION OF THE CARLSBAD MUNICIPAL WATER DISTRICT OF CARLSBAD, CALIFORNIA, ACCEPTING THE CONSTRUCTION OF THE NORTH BATIQUITOS 12” WATER MAIN AND SEWAGE FORCE MAIN REPLACEMENT, CMWD PROJECT NO. 85-401, CONTRACT NO. 34521/34522. 4 WHEREAS, the construction of the North Batiquitos 12” Water Main and Sewage Force 5 Main Replacement, CMWD Project No. 85-401, Contract No. 34521/34222, has been 6 satisfactorily completed; and 7 WHEREAS, the formal project Notice of Completion has been prepared; and 8 WHEREAS, all project costs have been established to date. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Carlsbad Municipal Water District of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the construction of the North Batiquitos 12” Water Main and Sewage Force 9 10 11 12 13 14 Main Replacement, specifically identified as CMWD Project No. 85-401, Contract No. 85-401, is 15 deemed complete and hereby accepted. 16 3. The Secretary is hereby authorized and directed to record the Notice of Completion 17 of said project and release bonds in accordance with State Law and District Codes. 18 4. That the Carlsbad Municipal Water District of Carlsbad, California, is hereby 19 directed to commence maintaining the above described public improvements for said project. 20 21 22 23 24 PASSED, APPROVED AND ADOPTED at a special meeting of the Board of Directors of December the Carlsbad Municipal Water District held on the 15th day of / , 1998 by the following vote, to wit: AYES: Board Members Lewis, Hall, Finnila, Nygaard and Kulchin 25 26 27 28 ATTEST: ALETHA L. RAUTENKRANZ, SecretaryJ (SEAL) II RECORDED REQUESTED BY CITY OF CARLSBAD AND WHEN RECORDED, PLEASE MAIL TO Secretary Carlsbad Municipal Water District 1200 Carlsbad Village Drive Carlsbad, California 92008 Space above this line for Recorder’s use. NOTICE OF COMPLETION Notice is hereby given that: 1. 2. 3. 4. 5. 6. 7. 8. The undersigned is owner of the interest or estate stated below in the property hereinafter described, The full name of the undersigned is Carlsbad Municipal Water District, a municipal corporation. The full address of the undersigned is 5950 El Camino Real, Carlsbad, California 92008. The nature of the title of the undersigned is: In fee. A work or improvement on the property hereinafter described was complete on September 23, 1998. The name of the contractor, if any, for such work or improvement is 4 Point Construction, Inc. The property on which said work or improvement was completed is in the City of Carlsbad, County of San Diego, State of California, and is described as follows: Construction of the North Batiquitos 12-inch Water Main and Sewage Force Main Replacement, CMWD Project No. 85-401, Contract No. 34521/34522. The street address of said property is within the limits of the City of Carlsbad. CARLSBAD MUNICIPAL WATER DISTRICT /&&I& (p& WILLIAM E. PLUMMER, P.E. District Engineer VERIFICATION OF SECRETARY I, the undersigned, say: I am the Secretary of the Board of Directors, Carlsbad Municipal Water District, 5950 El Camino Real, Carlsbad, California, 92008; the Board of Directors of said District on December 15 , 1998 -t accepted the above described work as completed and ordered that a Notice of Completion be filed. I declare under penalty of perjury that the foregoing is true and correct. Executed on December 16 , 192, at Carlsbad. California. CMWD 85-401 CARLSBAD MUNICIPAL WATER DISTRICT Secretary 06/l 4/95 Rev. J City of Carlsbad 1 ‘, December 16,1998 San Diego County Recorder P.O. Box 1750 San Diego CA 921124147 Enclosed for recordation is the following described document: Notice of Completion Construction of the North Batiquitos 12-inch Water Main and Sewage Force Main Replacement, CMWD Project No. 85401 Also enclosed, are instructions on how the City is to be billed for the recordation fees incurred. Thank you for your assistance with this matter. Sincerely, ==$$&&~;G Sr. Office Specialist KDS/lmw Enclosure 1200 Carlsbad Village Drive - Carlsbad, CA 92008-l 989 l (760) 434-2808 @