Loading...
HomeMy WebLinkAbout; Chestnut Ave Multi-Residential; Soils Report; 1981-11-11LIMITED SOIL RECIYlNAISSA"CE 307 CHESTNUT AVENUE CARLSBAD, CALIFORNIA SDE 2349 PREPARED FOR JIM STAVER TORREY PACIFIC PROPERTIES 1240 MELBA ROAD ENCINITAS, CALIFORNIA SAN DIEGUITO ENGINEERING, INC. PO BOX 2004 RANCH0 SANTA FE, CALIF. (714) 756-3064 ENGINEERING DEPT. LIBRARY City of Carlsbad 2075 Las Palmas Drive CarlsbaQ CA 92009-4859 5 John 6. Fox P.E. Stephen D. Dlllemulh P.E, .Jame~ A. Laret - P.E. SAN DIEGUITO ENGINEERING, INC. AVENIDA DE ACACIAS PRO. BOX 2004 RANCH0 SANTA FE, CA 92067 756-3064 CIVIL ENGINEERING SURVEYING SOIL TESTING SDE 2349 November 11, 1981 James Staver 1240 Melba Road Encinitas, CA 92024 SUBJECT: Report of Preliminary Soil Investigation proposed multi-residential site, CHESTNUT AVENUE, Carlsbad, California. Mr. Staver: In accordance with your request we have performed a Preliminary Soil In- vestigation at the subject site loca,ted at 307 Chestnut Avenue, Carlsbad, Ca. The purpose of this investigation was to identify any potential soil problems and provide foundation design criteria. Based on field and laboratory data the site appears suitable for the proposed development provided the recommenda- tions contained in this report are incorporated into site development. * SITE DESCRIPTION The site is a rectangular parcel, approximately 60' x 326'. The lot is bordered on the north by Chestnilt Avenue, to the west is an apartment house and to the east are single family residences. The lot is fairly level and clear. There are some miscellaneous debris and evidence of previous cultivation. The approx- imate configuration of the site is shown on Plate 1. FIELD RECONNAISSANCE The soils on the suite were examined to a maximum depth of '15' in two trenches excavated with a backhoe. The soils encountered were visually classified according to the unified soil classification system. Detailed logs of the borings were recorded during excavation and are presented on Plates 2 and 3 attached at the end of this report. Trench locations are shown on Plate No. 1. SDE 2349 11 November 1981 Page Two SOIL CONDITIONS Soils encountered on the site consist of brown to orange brown silty medium to fine sand, these are quaternary beach terrace deposits typical of the Carlsbad coastal area. The deposits are typically massive, slightly to moderately dense, and friable. The top 1 l/2 to 3 feet are in a dry loose condition. LABORATORY AND FIELD TESTING Tests performed on soil samples to determine existing conditions were: (1) Maximum Dry Density, (2) Dry Density, and (3) a Direct Shear Test. Procedures and results of the tests are as follows: 1) A maximum dry density test was performed on a representative sample returned to the lab. The results of the test, performed in accordance with A.S.T.M. Test Method D-1557-70, are as follows: Sample Location T-Z @ 2 Maximum Dry Density (pcf) Optimum Moisture (%) 131.4 I 9.4 2) Dry Density tests were performed on wax coated chunk samples using a water displaceme,it method'to determine the existing conditions of the pro- posed foundation soils. The results of the tests, performed in accordance with accepted engineerinq practice are as fol'ows: Sample Location T-l I? 3' T-l @ 10' T-2 @ 1 l/2' T-2 @ 7' Field Dry (pcf) Density 109.8 94.3 99.9 .lO9.9 Field Moisture Content (%) a.7 5.8 6.2 7.9 SDE 2349 11 November 1981 Page Three 3) A Direct Shear test was performed on the proposed foundation soils at the natural density and moisture content. The sample was returned to the lab and remolded to the natural conditions. The results of the test, performed in general accordance with accepted engineering practice, are as follows: Sample Location T-2 (h 2' Density Condition Angle of Internal Apparent Cohesion Description (pcf) Friction 0 _ c (psf) Remolded to 90% of 35O 100 M.D.D. CONCLUSIONS AND RECOMMENDATIONS From a Geotechnical standpoint, the site appears suitable for the proposed development provided the following recommendations are incorporated into the site development. Grading Topsoil encountered to depths of 1 l/2 to 3' wai found in a dry, relatively loose condition. This soil should be excavated to firm material, moistened, mixed and replaced as compacted fill prior to placement of concrete, foundations, or paving. All grading should be performed according to the grading provisions attached hereto, and the applicable grading ordinance. Foundations The proposed structure may be iupported by conventional continuous or isolated spread footings, founded a minimum 18" below lowest adjacent grade into firm natural soil or compacted fill. Footings may be designed for an allowable soil bearing pressure of 1500 psf. SOE 2349 11 November 1981 Page Four Minimum foundation reinforcement should consist of 1 #4 bar placed 1 l/2" below top and 1 #4 bar placed 3" above the bottom of continuous footings. An allowable lateral bearing pressure of 300 psf per foot of depth may be assumed provided footings are poured tight against strrounding firm soils. A coefficient of sliding friction of .35 may be assumed between concrete and underlying soils. Lateral bearing may be increased by l/3 for short term wind and seismic loads. Slabs . Slabs on grade should be a minimum 4" thick and reinforced with 6 x 6, lO/lO welded wire mesh placed at the center of slab crossection. Slabs should be underlain by a 4" layer of l/4" crushed rock or gravel. A 6 mil thick plastic or vinyl moisture barrier overlain by 2" of clean sand should be provided over the base material. Retaining Walls The following table is provided for equivalent fluid pressures for design of unrestrained retaining walls with level or sloping backfills. These figures assume adequate drainage and backfill consisting of compacted free draining sandy soils. Slope of Backfill (Horizontal to Vertical Units) Fluid Density (lbs/cu.ft.) Level 35 5 to 1 37 4 to 1 40 3 to 1 43 2 to 1 48 1 l/2 to 1 60 SDE 2349 11 November 1981 Page Five Restrained retaining walls retaining level backfill of free draining sand may be designed for an equivalent fluid pressure of 60 pcf. Any surcharge loads affecting the retaining walls should be added to the above values. Retaining walls should be provided with adequate drainage. The top of the retaining wall backfill wedge should be a minimum 0.; 6/10 of the wall height and be compacted to at least 90% of the maximum dry density. On site soils are suitable for backfill of retaining .Jalls provided they are free of organic or other debris. Drainage and Erosion The site should be provided with positive drainage to direct wa::er away from building areas to a suitable point of discharge. Water should riot be allowed to pond or run in an uncontrolled manner over slopes. The on site soils a 'e friable and may be subject to erosion hazrlrds on newly constructed slopes. All slopes should be planted irmnediately aiter grading. * LIMITATIONS AND UNIFORMITY OF CONDITIONS The recommendations of this report pertain only to tha site invr,stigated and are based upon the assumption that the soil condition: do not dtviate from those observed in the test pits. IF any variations 01β€˜ undesiratle conditions are encountered during construction, or if the proposed construction will differ from that planned at the present time, San Diel:uito Engiaeering Inc., should be notified so tlat supp-emental recommendatior,s can be siven. This report is issued with the understanding that it s the responsibility of the owner, or of his relpresentative, to ensure that tie information and re- commendations contained nerein are brought to the attrntion of the architect and engineer for the prrject and incorporated into the plans, and that the necessary steps are taken to see that the contractor znd subcontractors carry out such recommendation: in the field. SDE 2349 11 November 1981 Page Six The findings of this report are valid as of the present date. However, changes in the conditions of a property can occur with the passage of time, whether they be due to natural processes or the works of man on this 01' adjacent properties. In addition, changes in applicable or appropriate standards may occur, whether they result from legislation or the broadening of knowledge. Accord- ingly, the findings of this report may be invalidated who!ly 01' partially by changes outside our control. Therefore, this report is subject to review and should not be relied upon after a period of three years. If you have any questions regarding this report, please do not lesitate to contact this office. This opportunity to be of service is greatly appreciated. Respectfully submitted, SAN DIEGUITO ENGINEERING, INC., .__.~. I 3zd lb; Pf?l-J& ?e , PROposes )(ouuWS APPARTMEUT 0 li PW -- OWAIER: ToRWGS( F%iFlC .PRop~f?Tl=S~ I 240 MEL- ROAD mJa~\TAS CA. 92024 TEL:C7/4) -753-7bb8 . atd IXEGulra EN’+. IUc t?%wC+b SWTA FE CA. q2067 TEL:<7/4.> 73b-3064 l&END: --- 8: TEST LOCATIOEJ 1 , ., PRVEW ..Staver JOB ,# SDE: 2349 LOCGED BY: Lc BOPING'NO,; ~ T-l LCJCHTION: See Plate No. 1 ;j'XCA~VATION DATE; 11/3/81 -- color, grain size, cosolidation, moisture ', @8&&i uses ::; .__.-_-. __-_.-- __._ --.I.--.- I_ loose, dry -- maple Orange brown silty med. to fine sand loose, dry Orange brown slightly clayey medium to fine sand 1, * moderately dense, moist Light brown to yellow brown slightly silty medium to fine f sand moderately dense, moist t β€˜: Dark yellow brown medium to fine sand dense, moist , H .I Limited of Excavation 15 Feet. . ---~.- . . -__ - LL _-_-~--. ,..~ ...,. .~. ,. ._,_ . ..___. ~,~._ SAN ~IEGUITO &JNEERIN,, INC. B-CURING LOG ---I . _. PHWECT,I Sta,ver JOB # SDE: 2349 LOGGED BYt Lc BORING N0.i T-2 I,OCATIONI See Plate.1 EXCAVATION DATI ------ SOIL DESCRIPTION; color. grain size, cosolidation. moisture Dark brown silty fine sand, loose, dry Orange brown slightly silty medium to fine sar?d firm, moist Dark yellow brown medium to fine sand moist, moderately L dense Limit of Excavation 7 Feet. ___ .._..._~ .,.. .,.. ~~~~ -~--~~-~-~~,.-..~__-. _._ - .- .-..., Si ti DIEGUITO ENGJNEERING, IM. 11/3/81 L +. -- triple RECOKHENDED GRADINC~ SPECIFICATION - GENERAL PROVISIONS GENERAL INTENT: The intent of these specifications is to establish pro- cedures for clearing, compacting natural ground, preparing areas to be filled and placing and compacting fill soil to the l-ines and grades shown on the accepted plans. The recormlendations contained in the preliminary soil invest- igation report and/or the attached special provsions are a part i,f,the recommended grading specifi~cations and shall supersede the provisions contained herc,inafter i.n the case of cotflict. INSPECTION AND TESTING --- A qualified soil engineer shall be employed to r.bserve and test the earthwork in accordance with these sperifications. It will be necessary that the soil engineer or his repre- sentative provide adequate observations so that he may provide a memorandum that the work was or was net accom- plishcii as specified. It shall be the responsitility of the contractor to assist the soil engineer and to keep him appraised of work schedules, changes and new information and data so that he may provide the memorandum to the owner and proper county authorities, as required. If, in the opinion of the soi. engineer, substandard con- ditions are encountered, such as questionable soil,' poor moisture: contl-01, inadequtire compaction, adverse weather, etc., he will be empowerecl c:o either stop construction until the col>dit:ion:: are reruedi& or corrected or recommend rejection of the worii. Soil lz,lStiS us~jd to tletermiile the degree of compaction will be pe~r<ormeJ in accordance with the following American Society for Testing and Htirerials test methods: Maximum Dry Density and Optimum Content. A.S.T.M. D-1557-70 Density of Soil In-Place A.S.T.M. D-1556-64 PBEPARATION OF AREAS TO RECEIVE FI'LL: All vegetation, brush and debris shall be removed, piled and burned or otherwise disposed of. After clearing, the natural ground shall be scarified to a depth of 6 inches, brought to the proper moisture content, compacted and tested for the minimum density specified in the special provisions or the reccmmendations contained in the preliminary soil investi- gation report. When the slope of the natural ground receiving fill exceeds 20% (5 horizontal to 1 vertical), the criginal ground shall be stepped or benched as shown on the attached Plate A. Benches shall be cut to a firm competent soil condition. The lower bench shall be at least 10 feet wide and all other benches at least 6 feet wide. Ground slopes flatter than 20% shall be bencherl when considered necessary by the soil engineer. FILL MATEIUAL: ------ l Materials placed in the fill shall be approved by the soil engineer ;tnd shall be free of vegetable matter and other deleterious substances. Granular soil shall contain suffic- ient fine material to fill t:le voids. The difinition and dispcsitiL)n of oversized rocks, expansive and/or detrimental covered in the special provisions. Expansive ils of poor graduation or strength characterist soils acre soils, so ,ics may be thoroughly mixed with other soils to provide sa-is- factory fill material, but only with the explicit consent of the soil engineer. PLACING AND CMPACTION OF FILL: Approved material shall be placed in areas prepared to receive fill in layers not to exceed six inches Fn compacted thickness. Each layer shall have a uniform moisture content in the range that will allow the compaction effort to be efficiently applied to achieve the specified degree of compaction to a minimum specified density with adequately sized equipment, either specifically designed for soil compaction or of proven reliability. The minimum degree of compaction to be achieved is specified in either the special provisions or the recomllendations contained in the prelimin- ary soil investigation report. Field tests and inspection to check the degree of compaction of the fill will be taken by the soil engineer or his representative. The location and frequency of the tests shall be at the soil engineer's discretion. In general, the density tests will be made at an interval not exc:eeding two feet in vertical rise and/o.r 500 cubic yards of embankment. SEASON LIMITS: . Fill shall not be placed du!-ing unf.ivorab!.e weather con- ditions. When work is inter:upted by heavy rain, filling opercitions shall not bc resumed until the proper moisture content and density of the :-ill has been achieved. Damage resul~ting from weather shal! be repaired before acceptance of wrjrk. UNFORSEEN CONDITION: In the event that conditions are encountered during the site preparation and construction that were not encountered during the preliminary soil investigation, San Dieguito Engineering, Inc., assumes no responsibility for conditions . encountered which differ from those coni.itions found and described in the prelinimary soil investigation report. SPECIAL PROVISIONS The minimum degree of compaction of compaction to be ob- - tained in compacting natural ground and in the compacted fill shall be 90 percent of the maximum dry density obtained in the laboratory, A.S.T.M. D-1557-70. Detrimentally expansive soil is deEined as soil which will - swell more than 3 percent of the original sample thickness. The expansive potential is determined by allowing the mat- erial, remolded to 90% of its maximum dry density, to swell against a surcharge of 150 psf when brought into contact with water. the expansion of the sample is determined by measuring the swell from air-dry to saturated conditions. Oversized fill material is defined as rocks or :lumps over -- --__- six inches in diameter. At least 40 percent of the fill soil sliall 1~s~ through a No, 4 U.S. Standard Sieve. RECXMMENDAT IONS FOR FILLING ON SLOPING GROUND --....A--- Toe Key I*+- n; 2 ft. Min. _,A bu.E-Lru GrounQ ,* _ ~- .,'y ", V-' - Existing Ground Surface / -- /Zone Of LQO6e / ~' Surface Soil CCnQaCted Pill )~Horizontal Benches Into Firm Ground, 6 Feet ,Minimum Toe Key - W:idth To Be' Deter]nir,ed by SOi1 k iginti.!r, But Not Less 'l'hari 10 k'ee t SCHEMATIC ONLY NOT TO SCALE SAN tW~C;U.lTO E!!~ &β€˜. INC. PLATE A ..- ._-_^_-._., -___-_