Loading...
HomeMy WebLinkAbout2000-04-04; Municipal Water District; Resolution 1078t I 1 0 0 EXHIBIT 3 RESOLUTION NO. 1078 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE AUTHORIZING EXECUTION OF AN AGREEMENT FOR 3 PROJECT 2000-101. CONTRACT NO. 38161. 5 PRELIMINARY AND FINAL ENGINEERING DESIGN SERVICES FOR 4 CARLSBAD MUNICIPAL WATER DISTRICT FOR APPROVING AND EL FUERTE 30-INCH WATER TRANSMISSION MAIN, CMWD 6 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District of C: 7 8 California, has determined it necessary and in the public interest to enter into an agreen file in the City Clerk’s Office between Dokken Engineering and the Carlsbad Municipa 9 WHEREAS, the Board of Directors of the Carlsbad Municipal Water District of C 10 District, CMWD Project No. 2000-101, Contract No. 38161; and 11 services for a 30-inch potable water transmission main; and 12 California, approves and authorizes the execution of an agreement for engineering 13 WHEREAS, the Department of Public Works - Utility Engineering Division re 14 multiple proposals for the transmission main design; and 15 WHEREAS, the Department of Public Works - Utility Engineering staff recommel 16 the proposal received from Dokken Engineering be selected as most responsive and COI l7 /land 18 WHEREAS, the proposal amount of $48,495 for Design, $4,800 for engineering 19 appropriated in the 1999/2000 Budget for the El Fuerte Water Line. 20 during construction, plus $6,705 for engineering services contingencies, is available 21 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the 22 Municipal Water District, as follows: 23 2. That the proposal by Dokken Engineering in the amount of $53,295 for de 24 1. That the above recitations are true and correct. 25 engineering services of the 30-inch transmission main be accepted and approved. 26 //I 27 //I 28 /I/ ' 0 e 1 3. That the President, as the Representative of the Carlsbad Municipal 2 5 30-inch Transmission Main, CMWD Project No. 2000-101; Contract No. 38161. 4 the Carlsbad Municipal Water District for the engineering design services for the El 3 District, is authorized and directed to execute an agreement between Dokken Engineerir PASSED, APPROVED AND ADOPTED at a special meeting of the Board of Direc 6 7 the Carlsbad Municipal Water District held on the 4th day of April 1 2 8 9 the following vote, to wit: AYES: Board Members Lewis, Hall, Finnila, Nygaard, Kulchin. 10 11 12 13 14 i l5 1 16 17 i 18 19 20 21 22 23 24 25 26 27 28 NOES: None. 5 ATTEST: -/ L b.% LOR-WlNe M. WOOD, Secretary (SEAL)