Loading...
HomeMy WebLinkAboutEIR 03-05B; Desalination Project Changes; Environmental Impact Report (EIR)-------------------------------------~-~---- LAND USE REVIEW APPLICATION P-1 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov APPLICATIONS APPLIED FOR: (CHECK BOXES) Development Permits D Administrative Permit [j] Coastal Development Permit (*) D Minor D Conditional Use Permit (*) D Mi~or D Extension . l [KJ Environmental Impact Asse~ D Habitat Management Permit D Minor D Hillside Development Permit(*) D Planned Development Permit D Residential D Non-Residential D Planned Industrial Permit D Planning Commission Determination D Site Development Plan D Special Use Permit D Tentative Tract Map/Parcel Map D Variance D Administrative (FOR DEPT. USE ONLY) Legislative Permits D General Plan Amendment D Local Coastal Program Amendment (*) D Master Plan G '~ o3 -oSG ~·) D Specific Plan D Zone Change (*) D Amendment D Amendment D Zone Code Amendment (FOR DEPT. USE ONLY) South Carlsbad Coastal Review Area Permits D Review Permit D Administrative D Minor D Major Village Rev4ew Area Permits D Review Permit D Administrative D Minor D Major (*) = eligible for 25% discount NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS MUST BE SUBMITTED PRIOR TO 3:30P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION MUST BE SUBMITTED PRIOR TO 4:00P.M. ASSESSOR PARCEL NO(S).: 212-010-15, 212-010-05, and 211-010-31 PROJECT NAME: Carlsbad Desalination Project -Macario Canyon Tunnel, COP Amendment 04-41 (A) BRIEF DESCRIPTION OF PROJECT: Pip~line Tunnel for the Carlsbad Desalination Project Conveyance Pipeline BRIEF LEGAL DESCRIPTION: Portion Lot F Rancho Agua Hedionda Map 823 LOCATION OF PROJECT: Cannon Road and Faraday Avenue STREET ADDRESS ON THE: South SIDE OF the intersection of Cannon and Faraday (NORTH, SOUTH, EAST, WEST) (NAME OF STREET) BETWEEN AND (NAME OF STREET) (NAME OF STREET) W\foooqo P-1 Page 1 of 6 Revised 11/12 J • OWNER NAME (Print): City of Carlsbad --~---------------------MAILING ADDRESS: 405 Oak Ave ---------------------------CITY, STATE, ZIP: Carlsbad, CA, 92008 TELEPHONE: 760-434-2893 EMAIL ADDRESS: Joe.garuba@carlsbadca.gov • APPLICANT NAME (Print): San Diego County Water Authority MAILING ADDRESS: 4677 Overland Avenue CITY, STATE, ZIP: San Diego, CA 92123 TELEPHONE: 858-522-6788 -------------------------EMAIL ADDRESS: FBelock@SDCWA.org I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY AND THAT ALL E ABOVE INFORMATION IS TRUE AND CORRECT TO KNOWLEDG THE B Y W DGE. «· 8-·Z.S 'J{ DATE DATE APPLICANT'S REPRESENTATIVE (Print): Peter Mclaggan ------~~------------------------------------------ MAILING ADDRESS: 5780 Fleet Street, Suite 140 CITY, STATE, ZIP: Carlsbad, CA 92008 TELEPHONE: 760-655-3999 EMAIL ADDRESS: PMclaggan@Poseidon1.com I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE APPLIC T AND THAT ALL HE ABOVE INFORMATION IS TRUE AND COR TO THE 'f 0 MY KNOWLEDGE. DATE IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. 1/WE CONSENT TO ENTRY FOR THIS PURPOSE. NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE APPLICANT. NOTICE OF RESTRICTIONS RUN WITH THE LAND AND BIND ANY SUCCESSORS IN INTEREST. ~ R PERTY OWNER SIGNATURE FOR CITY USE ONLY P-1 Page 2 of 6 RECEIVED CITY OF CARLSBAD PLANNING DIVISION DATE STAMP APPLICATION RECEIVED RECEIVED BY: Revised 11/12 ~~ . «~>·· ~.(flY Of CARLSBAD PROJECT DESCRIPTION P-1(8) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov APPLICANT NAME: .S(hV,\,&:\rt] Cot!A.llr LAJt1-'1l;:¥( !lvvto&rf Please describe fully the proposed project by application· type. Include any details necessary to adequately explain the scope and/or operation of the proposed project. You may als.o include any background information and supporting statement~ regarding the reasons for, or -appropriateness of, the application. Use an addendum sheet if necessary. Description/Explanation: Sa11 Diego County Water Authority with Poseidon Resources are seeking to revise a portion of the Carlsbad Seawater Desalination Project's pipeline alignment to an approved pipeline alternative alignment located in the City of Carlsbad, within the Maca rio Canyon area. Approximately 2,300 feet of 54" diameter pipeline located along Cannon Road and Faraday Park around Macario Canyon will be relocated and tunneled from Calilnon Road to Faraday Park under Macario Canyon. The pipeline alignment modification involves approximately 1,800 feet of trench less pipe installation and. shifts the location of the pipeline in this area approximately 600 to 800 feet to the south. The project will consist of 54 inch pipeline in a 108 inch horseshoe shaped tunnel from a construction pit located on Cannon Road down a 12% slope approximately 860 feet in the Santiago Sandstone Formation. A second a construction pit located east of Faraday Road will be used to tunnel in the opposite direction 940 feet through the alluvial material using either a tunnel shield or tunnel boring machine (TBM). The tunneled pipeline will be constructed at a depth ranging from 20 to 80 feet. ·In addition, to allow for. maintenance, an approximately 12' x 12' by 2-3' high pumping w~ll cover will be installed at the pit located just east of Faraday Road and an access road from Faraday Avenue to the pump well cover (see attached maps). P-1(B) Page 1 of 1 Revised 07/10 «~I;'> ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Section 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. Examples: single family homes, multi-family homes, Automotive repair shop. A facility categorized in any one of Standard Industrial Classification (SIC) codes 5013, 5014, 5541, 7532-7534, and 7536-7539 5. Restaurants. Any facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812), where the land area for development is greater than 5,000 square feet. Restaurants where land development is less than 5,000 square feet shall meet all SUSMP requirements except for structural treatment BMP and numeric sizing criteria oi~rnAnt~andh~lm~nn~lifir.Atirm YES E-34 Page 1 of3 REV 1/14/11 6. 7. 8. 9. «~If> ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Hillside development. Any development that creates more than 5,000 square feet of impervious surface and is , located in an area with known erosive soil conditions, where the development will grade on any natural slope that is twenty-five percent(25%} or greater. Environmentally Sensitive Area (ESAt All development located within or directly adjacent2 to or discharging directly3 to an ESA (where discharges from the development or redevelopment will enter receiving waters within the , ESA), which either creates 2,500 square feet or more of impervious surface on a proposed project site or increases the area of imperviousness of a proposed project site 10% or more of its naturally occurring condition. Parking lot. Area of 5,000 square feet or more, or with 15 or more parking spaces, and potentially exposed to urban , runoff Streets, roads, highwavs. and freeways. Any paved surface that is 5,000 square feet or greater used for the , transportation of automobiles, trucks, motorcycles, and other vehicles 10. Retail Gasoline Outlets. Serving more than 100 vehicles per day and greater than 5,000 square feet ., 11. Coastal Development Zone. Any project located within 200 feet of the Pacific Ocean and (1) creates more than ~ 2500 square feet of impervious surface or (2) increases impervious surface on property by more than 1 0%. 12. More than 1-acre of disturbance. Project results in the disturbance of 1-acre or more of land and is considered a Pollutant-generating Development Project4. , .. . . 1 EnVIronmentally Sensitive Areas Include but are not hm1ted to all Clean Water Act Sect1on 303(d) 1mpa1red water bod1es, areas destgnated as Areas of SpeCial Biological Significance by the State Water Resources Control Board (Water Quamy Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. 2 "Directiy adjacent• means situated within 200 feet of the Environmentally Sensitive Area. 3 "Discharging directly to• means outflow from a drainage conveyance system that is composed entirely of flows from the subject development or redevelopment site. and not commingled with flow from adjacent lands. 4 Pollutant-generating Development Projects are those projects that generate pollutants at levels greater than background levels. In general, these include all projects that contribute to an exceedance to an impaired water body or which create new impervious surfaces greater than 5000 square feet and/or introduce new landscaping areas that require routine use of fertilizers and pesticides. In most cases linear pathway projects that are for infrequent vehicle use, such as emergency or maintenance access, or for pedestrian or bicycle use, are not considered Pollutant-generating Development Projects if they are built with pervious surfaces or if they sheet flow to surrounding pervious surfaces. INSTRUCTIONS: Section 1 Results: If you answered YES to ANY of the questions above, your project is subject to Priority Development Project requirements. Skip Section 2 and please proceed to Section 3. Check the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3. Additional storm water requirements will apply per the SUSMP. If you answered NO to ALL of the questions above, then please proceed to Section 2 and follow the instructions. E-34 Page 2 of3 REV 1/14/11 .. «~ ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov to parking lots and existing roadways; new sidewalk; bike lane on existing road and/or routine maintenance of damaged _; pavement such as pothole repair? Resurfacing/reconfiguring parking lots is where the work does not expose underlying soil y during construction. INSTRUCTIONS: If you answered NO, then proceed to question 4. your or 5,000 square feet of impervious surfaces on existing developed property or will your project be located within 200 feet of the Pacific Ocean and (1) create 2500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? Replacement of existing impervious surfaces includes any activity that is not part of routine maintenance where impervious material(s) are removed soil construction. you you and you PROJECT requirements. Please check the "meets PRIORITY DEVELOPMENT PROJECT requirements" box in Section 3 below. Review SUSMP to find out if SUSMP requirements apply to your project envelope or the entire project site. If you answered NO, then you ARE NOT a significant redevelopment and your project is subject to STANDARD STORMWATER REQUIREMENTS. Please check the "does not meet PDP requirements" box in Section 3 below. D My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As ofthese I will low Applicant Information and Signature Box This Box for City Use Only City Concurrence: I YES I NO I I By: Date: Assessor's Parcel NYJllber(s): ,. 2.12 010 ... ·~ ~06.-= 10-0~ Z.tl•OIO -:JJ Applicant Title: £(\ fMel Date: Project ID: E-34 Page 3 of3 REV 1/14/11 Construction SWPPPTier Level Tier 3 Tier 2 Tier 1 Exempt CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Perceived Construction Threat Assessment Criteria* Threat to Storm Water Quality Tier 3 -Hiah Construction Threat Assessment Criteria I if" Project site is 50 acres or more and grading will occur during the rainy season Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or ~ discharges directly to an ESA Soil at site is moderately to highly erosive (defined as having a predominance of soils with High USDA-NRCS Erosion factors kt greater than or equal to 0.4) 'V Site slope is 5 to 1 or steeper Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 D through April 30). Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 -Medium Construction Threat Assessment Criteria Medium D All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria D Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA D Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kt greater than or equal to 0.4) High D Site slope is 5 to 1 or steeper D Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). D Owner/contractor received a Storm Water Notice of Violation within past two years D Site results in one half acre or more of soil disturbance Tier 2 -Medium Construction Threat Assessment Criteria Medium D All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier 1 -Medium lns12ection Threat Assessment Criteria D Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA D Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kt greater than or equal to 0.4) Medium D Site slope is 5 to 1 or steeper D Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). D Owner/contractor received a Storm Water Notice of Violation within past two years D Site results in one half acre or more of soil disturbance Tier 1 -Low lns12ection Threat Assessment Criteria Low D All projects not meeting Tier 1 Medium Construction ihreat Assessment Criteria -Not Applicable -Exempt *The c1ty eng1neer may authonze m1nor vanances from the construction threat assessment cntena m spec1al circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 • «~, .. ~ CflY OF DISCLOSURE STATEMENT P-1(A) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www .carlsbadca.gov CARLSBAD Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time ofapplication submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person.isdefined as "Any individual, firm, co-partnership, joil'\t venture, association, social club, fraternal organization, corporation, estate; trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document;··however, the legal name and entity of the applicant and property .owner must.be provided below. · 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be pttached if necessary.) Person If LA Corp/Part I ·----------------------- Title Title _______________________ _ Address __________________ _ Address •• ------------------------ 2. OWNER (Not the owner's agent) P-1(A) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in commor:1, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Tor Gf:tev13ft corp/Part t'V of:" ~ &1D Title MUNJ c.-P/tt.., etZtJPilYj M~----------- ~OS t>~ Address~.S: b#,64{jrlhccr-Address __________ _ CA-te.Ls &/M I CA-9..wtJ r-, Page 1 of 2 Revised 07/10 3. NON-PROFIT ORGANIZATION OR TRUST • If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non- profit organization or as trustee or beneficiary of the. Non ProfiUTrust Non ProfiUTrust _________ _ Title __________ _ Title ____________ _ Address _________ _ Address ___________ _ 4. Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? D Yes C8(No If yes, please indicate person(s): __________ _ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of my knowledge. Print type name of owner Print or type name of owner/applicant's agent ~ /)16VQ CovAl'!/ W /f!(31C ;1r/77kJtz/ry Print or type name of applic£rlt .P-1(A) Page 2 of 2 Revised 07/10 HAZARDOUS WASTE AND SUBSTANCES STATEMENT P-1(C) Development Services Planning Division 1635 Faraday Avenue (760} 602-4610 www.carlsbadca.gov Consultation of Lists of Sites Related to Hazardous Wastes (Certification of Compliance with Government Code Section 65962.5) Pursuant to State of California Government Code Section 65962.5, I have consulted the Hazardous Waste and Substances Sites List compiled by the California Environmental Protection Agency and hereby cer:tify that (check one): The development project and any alternatives proposed in this application are not contair~ed on the lists compiled pursuant to Section 65962.5 of the State Government Code. D The development project and any alternatives proposed in this application ~contained on the lists compiled pursuant to Section 65962.5 of the State Government Code. APPLICANT PROPERTY OWNER .Name Sfh,/ llttiTro Cm"-''/ Wtt'flYK_ ~'itf u.y aF ~IUJ(J Address: J/ b 7 7 0 y/YC.I...ChJI) 11-VtF Address: .YOS OA-1; lbtr .SA?J llttfGo, CA 9~J3'S ~ 8A1), M-9'~ooR PhoneNumber: K~8 -S~;l. -~Jti PhoneNumber: 7!,0-~a¥-.:llfs Address of Site: SDtiTH OF 711Ff 1/J~OtJ t)r ~NOV t/-fig.K rJOo/ Local Agency (City and County): ~a; oF ~e./H) ..$.tt-rJ 1J16YQ W()A!}/ Assessor's book, page, and parcel number: :21 :J. -010 ~ iS ~I~ -0!() -0 S / " Specify list(s): fht"itH<:.DOtJ.S w~w ..,f .SiJ~ ~SITfi! 4$;.7 Regulatory Identification Number: __ ___.N~/:...LA..:...._ ______ ,. ___________ _ I Date of List: ____ ...:.N~....!=..'----------------------- The Hazardous Waste and Substances Sites List (Cortese List) is used by the State, local agencies and developers to comply with the California Environmental Quality Act requirements in providing information about the location of hazardous materials release sites. P-1(C) Page 1 of2 Revised 02/13 TIME LIMITS ON DISCRETIONARY PROJECTS P-1(E) PLEASE NOTE: Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov Time limits on the processing of discretionary projects established by state law do not start until a project application is deemed complete by the City. The City has 30 calendar days from the date of application submittal to determine whether an application is complete or incomplete. Within 30 days of submittal of this application you will receive a letter stating whether this application is. complete or incomplete. If it is incomplete, the letter will state what is neeljled to make this application complete. When the application is complete, the processing period will start upon the date of the completion letter. If you have any questions regarding application submittal requirements (i.e., clarification regarding a specific requirement or whether all requirements are necessary for your particular application) please call (760) ~~;;:::? Applicant Signature: ~ ~ Staff Signature: .,.,£----7 _____ _ Date: To be stapled with receipt to the•application P-1(E) Page 1 of 1 Revised 07/10 • • City of Carlsbad 1635 Faraday Avenue Carlsbad CA 92008 111111111111111111111111111111111111111111111111111111111111111 Applicant: SAN DIEGO COUNTY WATER AUTHORITY Description Amount CDP0441A 1,268.44 5800 THE CROSSINGS DR CBAD Receipt Number: R0096880 Transaction ID: R0096880 Transaction Date: 09/05/2013 Pay Type Method Description Amount Payment Check 25897 1,268.44 Transaction Amount: 1,268.44 , City of Carlsbad Faraday Center Faraday Cashiering 001 1324801-1 09/05/2013 32 Thu, Sep 05, 2013 02:35 PM Receipt Ref Nbr: R1324801-1/0037 PERMITS -PERMITS Tran Ref Nbr: 132480101 0037 0046 Trans/Rcpt#: R0096880 I SET #: CDP0441A Amount: Item Subtotal : Item Total: ITEM(S) TOTAL: Check (Chk# 025897) Total Received: Have a nice day! 1@ $1,268.44 $1,268.44 $1,268.44 $1,268.44 $1,268.44 $1,268.44 **************CUSTOMER COPY************* Pam Drew From: Sent: Josie McKinley <JMcKinley@poseidon1.com> Wednesday, October 23, 2013 2:50 PM To: Pam Drew Subject: FW: Signature Authorization Does this work? From: Belock, Frank [mailto:FBelock@sdcwa.org] Sent: Wednesday, October 23, 2013 2:47 PM To: Josie McKinley Subject: Fwd: Signature Authorization Sent ti·orn my Vcrizon Wireless 4G LTE smm1phonc --------Original message -------- From: "Hentschke, Daniel" <DHentschke@sdcwa.org> Date: 10/23/2013 1:42PM (GMT-08:00) To: "Belock, Frank" <FBelock@sdcwa.org> Subject: RE: Signature Authorization Frank, The authorization for the General Manager, with the concurrence of the General Counsel, "to do any and all things and to execute and any and all documents" necessary or advisable on behalf of the Water Authority is granted in paragraph 23 of Resolution No. 2012-18 adopted by the Water Authority Board of Directors on November 29, 2012. That paragraph reads in full: "The Authorized Officers are hereby authorized and directed, jointly and severally, with the concurrence of the General Counsel, to do any and all things and to execute and deliver any and all contracts and documents which they may deem necessary or advisable in order to consummate the transactions contemplated or authorized by this resolution. The authority of the Authorized Officers and the General Counsel under this resolution may be delegated as provided in the Water Authority's Administrative Code." Resolution No. 2012-18, made all required CEQA findings and approved all contracts required of the Water Authority for the desalination project, including the Design Build Agreement for the Product Water Pipeline. On September 26, 2013, the Water Authority board of directors adopted Resolution No. 2013-22 that approved the addendum to the project EIR and authorized the General Manager to execute amendments to the Design Build Agreement for pipeline realignment in Marcario Canyon. 1 The city of Carlsbad needs docum!tion that you have the authority to sig!n behalf of SDCW A for the Macario Canyon CDP Amendment Application. Can you please forward this to me? Thanks Josie McKinley Poseidon Water 17011 Beach Blvd. Suite 900 1 Huntington Beach, CA 5780 Fleet Street, Suite 140 I Carlbad, CA Mobile: 310-991-3032 Email: JMcKinley@poseidon1.com I 0 ----·--------------------- *This message and any attachments are intended only for the use of the Addressee(s) and may contain information that is PRIVILEGED and CONFIDENTIAL. If you are not the intended recipient, dissemination of this communication is prohibited. If you have received this communication in error, please erase all copies of the message and its attachments and notify us immediately.* 3 Notice of Determination To: Office of Planning and Research PO Box 3044 Sacramento, CA 95812-3044 r?Dr"1r1W Em est ,I Dronenburg. Jr. Rocorder Count} Clerk SD County Clerk Attn: James Scott From: CITY OF CARLSBAD Planning Division 1635 Faraday Avenue Carlsbad, CA 92008 (760) 602-4600 NOV 1 8 2013 1600 Pacific Highway, Suite 260 PO Box 121750 .1 3 0 1 8 2 BY J. Vargas San Diego, CA 92101 Project Nos: EIR 03-05(B)/CDP 04-41(A) Fili"ng of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. DESALINATION PROJECT CHANGES Project Title 2004041081 City of Carlsbad -Pam Drew, Associate Planner 760-602-4644 State Clearinghouse No. Lead Agency, Contact Person Telephone Number Right-of-way of Faraday Avenue, within and underneath a portion of Macario Canyon and Veteran's Memorial park (APN: 212-010-05 & 212-010-15) within the City of Carlsbad and County of San Diego. Project Location (include County) Name of Applicant: San Diego County Water Authority Applicant's Address: 4677 Overland Avenue, San Diego, CA 92123 Applicant's Telephone Number: ~8:::::.5!::!.8-...::5::2.::.2--!:6:..:.7.:::8!::!.8 ___________________ _ Project Description: Request for approval of an addendum to Environmental Impact Report EIR 03- 05(A) and an amendment to Coastal Development Permit CDP 04-41 for the Desalination project. The proposed changes would modify the delivery pipe alignment from under the Cannon Road bridge to within the public right-of-way Faraday Avenue, within and underneath a portion of Macario Canyon and Veteran's Memorial park. This is to advise that the City of Carlsbad has approved the above described project on November 6, 2013, ar:d has made the following determination regarding the dbove described project. 1. The project will have a significant effect on the environment. 2. An Environmental Impact Report (EIR 03-05) was prepared for this project. 3. Mitigation measures were made a condition of the approval of the project. 4. A mitigation reporting or monitoring plan was adopted for this project. 5. A statement of Overriding Considerations was adopted for this project. 6. Findings were made pursuant to the provisions of CEQA and CEQA Guideline 15091. This is to certify that the final EIR with comments and responses and record of project approval and the dendu?t:nal EIR are available to the General :~~licatT~~ CllY OF ~RLS;;~ ij ~; 3 '. _ DON NEU, City Planner Da:_te "' Date received for filing at OPR: Revised 05/13 DEPUTY Ernest J. Dronenburg, Jr. COUNTY OF SAN DIEGO ASSESSOR/RECORDER/COUNTY CLERK ASSESSOR'S OFFICE 1600 Pacific Highway, Suite 103 San Diego, CA 92101-2480 Tel. (619) 236-3771 *Fax (619) 557-4056 www.sdarcc.com RECORDER/COUNTY CLERK'S OFFICE 1600 Pacific Highway, Suite 260 P.O. Box 121750 *San Diego, CA 92112-1750 Tel. (619)237-0502 *Fax (619)557-4155 Transaction#: 307433420131118 Deputy: JV ARGAS2 Location: COUNTY ADMINISTRATION BUILDING 18-Nov-2013 10:03 FEES: 50.00 Qty of 1 Fish and Game Filing Fee for Reffl20130957 50.00 TOTAL DUE PAYMENTS: 50.00 Check 50.00 TENDERED SERVICES AVAILABLE AT OFFICE LOCATIONS * Tax Bill Address Changes * Records and Certified Copies: Birth/ Marriage/ Death/ Real Estate * Fictitious Business Names (DBAs) * Marriage Licenses and Ceremonies * Assessor Parcel Maps * Property Ownership * Property Records * Property Values * Document Recordings SERVICES AVAILABLE ON-LINE AT www.sdarcc.com * Forms and Applications * Frequently Asked Questions (F AQs) * Grantor/ Grantee Index * Fictitious Business Names Index (DBAs) * Property Sales * On-Line Purchases Assessor Parcel Maps Property Characteristics Recorded Documents ' . ' ) OGregory J. Smith 0 COUNTY OF SAN DIEGO ASSESSOR/RECORDER/COUNTY CLERK ~------------------------------··· --------· ASSESSOR'S OFFICE 1600 Pacific Highway, Room 103 San Diego, CA 92101-2480 Tel. (619) 236-3771 • Fax (619) 557-4056 www .sdarcc.com RECORDER/COUNTY CLERK'S OFFICE 1600 Pacific Highway, Room 260 P.O. Box 121750 • San Diego, CA 92112-1750 Tel. (619)237-0502 • Fax (619)557-4155 Transaction#: 126302720060614 Deputy: ACONSlJL 14-Jun-2006 14:28 , CITY (ll= CAR,! SBAD l PLM~.~~~=.~~.~~ .. an I -------- FEES: 850.00 Qty of 1 Fish & Game Env Impact (850) 25.00 Qty of I Fish and Game Filing Fee 875.00 TOTALDUE PAYMENTS: 875.00 Check ----- 875.00 TENDERED SERVICES AVAILABLE AT OFFICE LOCATIONS • Tax Bill Address Changes * Records and Certified Copies: Birth/ Marriage/ Death/ Real Estate * Fictitious Business Names (DBAs) * Marriage Licenses and Ceremonies * Assessor Parcel Maps • Property Ownership • Property Records • Property Values * Document Recordings (Except in Kearny Mesa) SERVICES AVAILABLE ON-LINE AT www.sdarcc.com • Forms and Applications "' Frequently Asked Questions (FAQs) "' Grantor/ Grantee Index "' Fictitious Business Names Index (DBAs) • Property Sales "' Weddings on the Web • On-Line Purchases Assessor Parcel Maps Property Characteristics Recorded Documents BRANCH OFFICES AVAILABLE TO SERVE YOU Monday through Friday 8:00a.m.-5:00p.m. Saturdays at the Kearny Mesa Office 9:00a.m.-3:00p.m. CHULA VISTA ELCAJON SAN MARCOS 590 Third Avenue Chula Vista, CA 91910-2646 (619) 498-2277 200 South Magnolia Ave. El Cajon, CA 92020-3316 (619) 401-5750 KEARNY MESA 9225 C1airemont Mesa Blvd. San Diego, CA 92123-1211 (858) 505-6226 334 Via Vera Cruz, Suite 150 San Marcos, CA 92078-2638 (760) 940-6858 State of California-The Resources Agency DEPARTMENT OF FISH AND WILDLIFE 2013 ENVIRONMENTAL FILING FEE CASH RECEIPT SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARLY LEAD AGENCY CITY OF CARLSBAD PLANNING DIVISION COUNTY/STATE AGENCY OF FILING SAN DIEGO PROJECTTITLE DESALINATION PROJECT CHANGES PROJECT APPLICANT NAME SAN DIEGO COUNTY WATER AUTHORITY PROJECT APPLICANT ADDRESS 4677 OVERLAND AVENUE PROJECT APPLICANT (Check appropriate box): D Local Public Agency 0 School District CHECK APPLICABLE FEES: 0 Environmental Impact Report IZl Negative Declaration CITY SAN DIEGO D Other Special District 0 Application Fee Water Diversion (State Water Resources Control Board Only) 0 Projects Subject to Certified Regulatory Program IZl County Administrative Fee '1 3 0 1 8 2 D Project that is exempt from fees D Notice of Exemption D DFG No Effect Determination (Form Attached) D Other------------------- PAYMENT METHOD: D Cash 0 Credit IZl Check D Other CHK# 1 04 SIGNATURE x J. Vargas iREM: 06/14/2006 :RECT: 272952 CITY OF GAR.lSBAD NOV 20 2013 I PLAN~•NuJtt-Arn.,,ENT RECEIPT# SD2013 0957 STATE CLEARING HOUSE# (If applicable) 2004041081 STATE CA DATE 11/18/2013 DOCUMENT NUMBER *20130182* PHONE NUMBER 858-522-6788 ZIP CODE 92123 0 State Agency 1ZJ Private Entity $2,995.25 $ $2,156.25 $ $0.00 $850.00 $ $1,018.50 $ $50.00 $ $50.00 $ ______ _ TOTALRECEIVED $ _____ $5_0_.0_0_ I TITLE Deputy 11111111111111111111111111111111111111111111111111 ORIGINAL-PROJECT APPLICANT COPY-DFG/ASB COPY-LEAD AGENCY COPY-COUNTY CLERK FG 753.5a (Rev. 7/08) I --------··-·--·--------·-··- -v 0 STATE OF CALIFORNIA-THE RESOURCES AGENCY DEPARTMENT OF FISH AND GAME ENVIRONMENTAL ALING FEE CASH RECEIPT OFG 753.5a (8-03) 0 272952 Lead Agency: City of Carlsbad Date: 06/14/2006 County 1 State Agency of Filing: San Diego Document No.: 13624 Project Title: Precise Development Plan and Desalination Plant Project (EIR 03-05) Project Applicant Name: ...:C:..:.ity:L...:o:..:.f....:C:.:a::.:rl..:..:s:..::b...:a:..::d _________________ Phone Number: (760) 602-4618 Project Applicant Address: 1635 Faraday Ave, Carfsbad, CA 92008 Project Applicant (check appropriate box): Local Public Agency [{] School District 0 Other Special District 0 State Agency O Private Entity 0 CHECK APPLICABLE FEES: ( ) Environmental Impact Report ( ) Negative Declaration {.1') Application Fee Water Diversion (State Water Resources Control Board Only) ( ) Projects Subject to Certified Regulatory Programs (.f) County Administrative Fee ( ) Project that is exempt from fees $850.00 $ $1,250.00 $ $850.00 $ $850.00 $ $25.00 $ 4'7? 1/1/?~ ./ jJ TOTAL RECEIVED $ Signature and tiUe of person receiving payment: ~ /~ 850.00 25.00 875.00 Deputy IM11TE -PROJECT APPUCANT YELLOW· OFGIFASB PINK-LEAD AGENCY GOLDENROD-STATE AGENCY OF FlUNG '\, Notice of Determination To: Office of Planning and Research PO Box 3044 Sacramento, CA 95812-3044 From: CITY OF CARLSBAD Planning Division 1635 Faraday Avenue Carlsbad, CA 92008 (760) 602-4600 [? 0 0. [I rn> Ernest J Dronenburg . .lr. Rocorder Count) Clerk SD County Clerk Attn: James Scott NOV 18 2013 1600 Pacific Highway, Suite 260 PO Box 121750 .130182 BY J. Vargas San Diego, CA 92101 Project Nos: EIR 03-05(B)/CDP 04-41(A) Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. DESALINATION PROJECT CHANGES Project Title 2004041081 City of Carlsbad -Pam Drew, Associate Planner 760-602-4644 State Clearinghouse No. Lead Agency, Contact Person Telephone Number Right-of-way of Faraday Avenue, within and underneath a portion of Macario Canyon and Veteran's Memorial park (APN: 212-010-05 & 212-010-15) within the City of Carlsbad and County of San Diego. Project Location (include County) Name of Applicant: San Diego County Water Authority Applicant's Address: 4677 Overland Avenue, San Diego, CA 92123 Applicant's Telephone Number: .:::.85~8~·.:::5=22::..·..:::.6.:.7::::.:88~------------------­ Project Description: Request for approval of an addendum to Environmental Impact Report EIR 03- 05(A) and an amendment to Coastal Development Permit CDP 04-41 for the Desalination project. The proposed changes would modify the delivery pipe alignment from under the Cannon Road bridge to within the public right-of-way Faraday Avenue, within and underneath a portion of Macario Canyon and Veteran's Memorial park. This is to advise that the City of Carlsbad has approved the above described project on November 6, 2013, <>nd has made the following determination regarding the above described project. 1. The project will have a significant effect on the environment. 2. An Environmental Impact Report (EIR 03-05) was prepared for this project. 3. Mitigation measures were made a condition ofthe approval ofthe project. 4. A mitigation reporting or monitoring plan was adopted for this project. 5. A statement of Overriding Considerations was adopted for this project. 6. Findings were made pursuant to the provisions of CEQA and CEQA Guideline 15091. This is to certify that the final EIR with comments and responses and record of project approval and the dendums to the final EIR are available to the General Public at THE CITY OF CARLSBAD. n ., .· 11-7-/.3 DON NEU, City Planner Da~e ., Date received for filing at OPR: Revised 05/13 DEPUTY " ' .. ) I 0 ' STATE OF CALIFORNIA· THE RESOURCES AGENCY DEPARTMENT OF FISH AND GAME ENVIRONMENTAL FILING FEE CASH RECEIPT OFG 753.5a (!Hl3) Lead Agency: City of Carlsbad 0 272952 Date: 06/14/2006 County 1 State Agency of Filing: San Diego Document No.: 13624 Project Title: Precise Development Plan and Desalination Plant Project (EIR 03-05) Project Applicant Name: ..:C::...:.itJ.y_o;;..:.f...;C:_a:;.;r..:..:ls::..:::b:..:a:..:d;__ ________________ Phone Number: (760) 602-4618 Project Applicant Address: 1635 Faraday Ave, Carlsbad, CA 92008 Project Applicant (check appropriate box): Local Public Agency [{] School District 0 Other Special District 0 Stale Agency O Private Entity 0 CHECK APPLICABLE FEES: ( ) Environmental Impact Report ( ) Negative Declaration (.1) Application Fee Water Diversion (State Water Resources Controf Board Only) ( ) Projects Subject to Certified Regulatory Programs (.fl County Administrative Fee ( ) Project that Is exempt from fees $850.00 $1,250.00 $850.00 $850.00 $25.00 $ _____ _ $ -----:-::-:-..,...-::-- $ ___ 8::,:5:..:.0:..:::.0.::..0- $ ___ ...,........,....,....-- $ 25.00 ------ 875.00 ~t/1/?~/~ TOTALRECEIVED $ Signature and tiUe of person receiving payment: ~ /'~ Deputy v.tiiTE. PROJECT APPUCANT YELLOW· DFGIFASB PINK ·LEAD AGENCY GOLDENROD· STATE AGENCY OF FILING State of California-The Resources Agency DEPARTMENT OF FISH AND WILDLIFE 2013 ENVIRONMENTAL FILING FEE CASH RECEIPT SEE INSTRUCTIONS ON REVERSE. TYPE OR PRINT CLEARLY LEAD AGENCY CITY OF CARLSBAD PLANNING DIVISION COUNTY/STATE AGENCY OF FILING SAN DIEGO PROJECTTITLE DESALINATION PROJECT CHANGES PROJECT APPLICANT NAME SAN DIEGO COUNTY WATER AUTHORITY PROJECT APPLICANT ADDRESS 4677 OVERLAND AVENUE PROJECT APPLICANT (Check appropriate box): 0 Local Public Agency 0 School District CHECK APPLICABLE FEES: 0 Environmental Impact Report fZJ Negative Declaration CITY SAN DIEGO 0 Other Special Distric 0 Application Fee Water Diversion (State Water Resources Control Board Only) 0 Projects Subject to Certified Regulatory Program '1 3 0 1 8 2 1ZJ County Administrative Fee 0 Project that is exempt from fees 0 Notice of Exemption 0 DFG No Effect Determination (Form Attached) 0 Other------------------ PAYMENT METHOD: 0 Cash 0 Credit 1ZJ Check D Other CHK# 1 04 SIGNATURE x J. Vargas DEC 2 0 2013 Planning Division t RECEIPT# SD2013 0957 STATE CLEARING HOUSE# (If applicable) 2004041081 DATE 11/18/2013 DOCUMENT NUMBER *20130182* PHONE NUMBER 858-522-6788 I STATE ZIP CODE CA 92123 D State Agency !Zl Private Entity $2,995.25 $ $2,156.25 $ $0.00 $850.00 $ $1,018.50 $ $50.00 $ $50.00 $ TOTAL RECEIVED $ $50.00 1::~ .. -·-"""""""~-~~--· .. ,.,_,, __ , __ ~-··· ...... 11111111111111111111111111111111111111111111111111 ORIGINAL-PROJECT APPLICANT COPY-DFG/ASB COPY-LEA DAGENCY COPY .. COUNTY CLERK FG 753.5a (Rev. 7/08) ~ « .,..'#f;; C I T Y 0 F ~,CARLSBAD Community & Economic Development NOTICE OF FINAL ACTION COASTAL DEVELOPMENT PERMIT DFILE www .carlsbadca .gov The following project is located within the City of Carlsbad Coastal Zone. A coastal permit application for the project has been acted upon. SENT TO COASTAL COMMISSION ON November 7. 2013 Application#: EIR 03-0S(Bl/CDP 04-41(A) Filing Date: September 5, 2013 Case Name: DESALINATION PROJECT CHANGES Decision Date: November 6, 2013 Applicant: San Diego County Water Authority Agent (if different): Poseidon Water Resources Address: 4677 Overland Avenue, San Diego, CA 92123 Address: 5780 Fleet Street, Suite 140, San Diego, CA 92123 Phone: 858-522-6788 Phone: 760-655-3999 Project Description: Request for approval of an addendum to Environmental Impact Report EIR 03-0S(A) and an amendment to Coastal Development Permit COP 04-41 for the Desalination plant project to shift the previously approved location of the 54-inch diameter pipeline approximately 600 feet to the south of the intersection of Faraday Avenue and Cannon Road, within and underneath Macario Canyon, and construct ancillary facilities east of Faraday Avenue, within a portion of the city's future Veteran's Memorial park. Project Location: Within and underneath a portion of Macario Canyon. Veteran's Memorial park and right-of-way of Faraday Avenue. ACTION: D APPROVED ~ APPROVED WITH CONDITIONS D DENIED {Copy of final resolution/decision letter is sent to: Coastal Commission, any persons who specifically requested it, and the applicant). COASTAL COMMISSION APPEAL STATUS: ~ NOT APPEALABLE TO THE COASTAL COMMISSION. 0 APPEALABLE TO THE COASTAL COMMISSION pursuant to Coastal Act Section 30603. An aggrieved person may appeal this decision to the Coastal Commission within ten (10) working days following Coastal Commission receipt of this notice. Applicants will be notified by the Coastal Commission as to the date the Coastal Commission's appeal period will conclude. Appeals must be made in writing to the Coastal Commission's district office at the following address: California Coastal Commission, 7575 Metropolitan Dr., Suite 103, San Diego, California 92108-4402, Telephone (619) 767-2370. Attachment: -Location Map to CCC for non-appealable COPs -Staff Report to CCC for appealable COPs The time within which judicial review of this decision must be sought is governed by Code of Civil Procedures, Section 1094.6, which has been made applicable in the City of Carlsbad by Carlsbad Municipal Code Chapter 16. Any petition or other paper seeking judicial review must be filed in the appropriate court not later than ninety {90} days following the date on which this decision becomes final; however, if within ten {10) days after the decision becomes final a request for the record of the proceedings accompanied by the required deposit in an amount sufficient to cover the estimated cost of preparation of such a record, the time within which such petition may be filed in court is extended to not later than thirty {30} days following the date on which the record is either personally delivered or mailed to the party, or his attorney of record, if he has one. A written request for the preparation of the record of the proceedings shall be filed with the City Clerk, City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, California 92008. Planning Division 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-4600 I 760-602-8558 fax ur w bsite at www.usps.com10 .::r [)"" Cl rn --------i -----, - ; )os1age ; (_() l crti!ied Fee 1-_6_L;._o-f'-----l Cl r----------::-=:=----1 CJ Rdurn 11ec.elpt Fee I ) ~~ Cl (Endorceme· t R<>qu<'ed) L.~~ ~ Cl Restr,cted I •nlivory Fee I -==----l (Endor·;eme· t ReqUired) ' Cl L--r--:# Total Postc~ge & Fees l $ 'e rn ~--------~ Postmark Here ent To _____ _ --------~-------------, n.J r-'1 sfreeCiliifi Cl orPOBoxl'< 1"'-citY.siaie::-: California Coastal Commission 7575 Metropolitan Drive, Suite 103 San Diego, CA 92108-4402 • Complete items 1, 2, Also complete item 4 if Restricted Delivery is desired. • Print your name and address on the reverse so that we can return the card to you. • Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: California Coastal Commission 7575 Metropolitan Drive, Suite 103 San Diego, CA 92108-4402 D Certified Marf---rri:xpress M;il D Registered D Return Receipt for Merchandise 0 Insured Mail 0 C.O.D. 4. Restricted Delivery? (Extra Fee) DYes 2. Article Number 7012 3460 DODD 3094 4049 Domestic Return Receipt 102595-02-M-1540 SITE MAP Mello II • N NOT TO SCALE DESALINATION PROJECT CHANGES EIR 03-05(8) I COP 04-41(A) MIJIUb H h /t3 e Notice of Determination To: Office of Planning and Research PO Box 3044 Sacramento, CA 95812-3044 SD County Clerk Attn: James Scott 1600 Pacific Highway, Suite 260 PO Box 121750 San Diego, CA 92101 From: CITY OF CARLSBAD Planning Division 1635 Faraday Avenue Carlsbad, CA 92008 (760) 602-4600 DFILE Project Nos: EIR 03-05(B)/CDP 04-41(A) Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. DESALINATION PROJECT CHANGES Project Title 2004041081 City of Carlsbad -Pam Drew, Associate Planner 760-602-4644 State Clearinghouse No. Lead Agency, Contact Person Telephone Number Right-of-way of Faraday Avenue, within and underneath a portion of Macario Canyon and Veteran's Memorial park (APN: 212-010-05 & 212-010-15) within the City of Carlsbad and County of San Diego. Project Location (include County) Name of Applicant: San Diego County Water Authority Applicant's Address: 4677 Overland Avenue, San Diego, CA 92123 Applicant's Telephone Number: =85=8:;..-=52=2=---=-67:....;8=-=8:;..._ _________________ _ Project Description: Request for approval of an addendum to Environmental Impact Report EIR 03- 05(A) and an amendment to Coastal Development Permit CDP 04-41 for the Desalination project. The proposed changes would modify the delivery pipe alignment from under the Cannon Road bridge to within the public right-of-way Faraday Avenue, within and underneath a portion of Macario Canyon and Veteran's Memorial park. This is to advise that the City of Carlsbad has approved the above described project on November 6, 2013, and has made the following determination regarding the above described project. 1. The project will have a significant effect on the environment. 2. An Environmental Impact Report (EIR 03-05) was prepared for this project. 3. Mitigation measures were made a condition of the approval of the project. 4. A mitigation reporting or monitoring plan was adopted for this project. 5. A statement of Overriding Considerations was adopted for this project. 6. Findings were made pursuant to the provisions of CEQA and CEQA Guideline 15091. This is to certify that the final EIR with comments and responses and record of project approval and the dendums to the final EIR are available to the General Public at THE CITY OF CARLSBAD. n 11-7-13 DON NEU, City Planner Date Date received for filing at OPR: Revised 05/13 ,Jf~.A,. CITY OF VcARLSBAD Community & Economic Development November 7, 2013 Peter Maclaggan, Vice President Poseidon Water 5780 Fleet Street, Suite 140 Carlsbad, CA 92008 PLANNING COMMISSION NOTICE OF DECISION SUBJECT: EIR 03-05(8)/CDP 04-41(A)-DESALINATION PROJECT CHANGES r~cV-0~~ '·1' [1l2? FILE C()PY www.carlsbadca.gov At the November 6, 2013 Planning Commission meeting, your application was considered. The Commission voted 7-0 to approve your request. The decision of the Planning Commission is final on the date of adoption unless a written appeal to the City Council is filed with the City Clerk within ten (10) calendar days in accordance with the provisions of Carlsbad Municipal Code section 21.54.150. The written appeal must specify the reason or reasons for the appeal. If you have any questions regarding the final dispositions of your application, please contact your project planner Pam Drew at (760) 602-4644 or pam.drew@carlsbadca.gov. Sincerely, Q_~ DON NEU, AICP City Planner DN:PD:bd c: Data Entry File Frank Belock, Deputy General Manager, San Diego County Water Authority, 4677 Overland Avenue, San Diego, CA 92123 enc: Planning Commission Resolutions No. 7018 and 7019 Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 .::0 D ...0 .::r .-=! .-=t sireeCApr ''ia D orPOBoxNo ~"-ci!Y;siaie,-itF (}' (>oiitrnark Here California Coastal Commission 7575 Metropolitan Drive, Suite 103 San Diego, CA 92108-4402 • Complete items 1, 2, Also complete item 4 if Restricted Delivery is desired. • Print your name and address on the reverse so that we can return the card to you. • Attach this card to the back of the mail piece, or on the front if space permits. 1. Article Addressed to: California Coastal Commission 7575 Metropolitan Drive, Suite 103 San Diego, CA 92108-4402 D. Is delivery address different from item 1 ? If YES, enter delivery address below: D No 3. Service Type D Certified Mail D Registered 0 Insured Mail 4. Restricted 0 Express Mail 0 Return Receipt for Merchandise 0 C.O.D. (Extra Fee) 0 Yes 2. Article Number (Transfer from servl~ fa/:JeQ 7011 2970 0003 8761 4608 PROOF OF PUBLICATION (2010 & 2011 c.c~.P.) :Om' OF CARLSBAD/I STATE OF CALIFORNIA County of San Diego I OCT 28 2013 PLANNING DEPARTMENT I am a citizen of the United States and a resident of the County aforesaid: I am over the age of eighteen years and not a party to or interested in the above-entitled matter. I am the principal clerk of the printer of UT-North County Formerly known as the North County Times and which newspaper has been adjudicated as a newspaper of general circulation by the Superior Court of the County of San Diego, State of California, for the City of Oceanside and the City of Escondido, Court Decree numbers 171349 & 172171, for the County of San Diego, that the notice of which the annexed is a printed copy (set in type not smaller than nonpariel), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: October 25th, 2013 i certify (or declare) under penalty of perjury that the foregoing is true and correct. Dated at Oceanside, California n Thi th day October, 2013 Jane Allshouse NORTH COUN1Y TIMES Legal Advertising e PLA~ COMMISSION PUBLIC HEARING NOTICE WERE BY GIVEN to you, because your in-terest may be affected, that the Planning Commission of the City of Carlsbad .will hold a public hearing at the Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m. on Wednesday, November 6, 2013, to consider the following: 1) COP 13·10 ·GARFIELD BEACH RESIDENCE -Request for approval of a Coastal Development Permit to allow for the dem-olition ·of an existing two-unit residential apartment building and the construction of a new 3,156 square toot single family res-idence and attached two car garage within the City's Coastal Zone located at 2637 Garfield Street between Cypress Avenue and Beech Avenue, in the Mello II Segment of the Local Coastal Program and within Local Facilities Management Zone 1. The City Planner has determined that the project belongs to a class of projects that the State Secretary tor Resources has found do not have a significant impact on the environment, and It is -therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Sections 15301 (I) (2) demolition of a duplex or similar multi-family resi-dential structure and 15303 Cal construction of a single family residence of the state CEQA Guidelines. \ _ This project is not located within the appealable area of the Cali· _ fornla Coastal Commission. ~v/ \ \v"""' . ' ':\ \' ~ Zf/'; \ ... ,.. z-· y~\ ) v~~i~~~~ /' ~· .... ~~~ 2) CUP 06-ll(B) • PACIFIC RIDGE. SCHOOL EXPANSION • Request for approval of an amendment to the Conditional Use Permit CUP 06-11(A)for the existing Pacific Ridge School for a phased Campus Master Pian that includes the removal of 3 tem- POrary modular buildings and replacing them with a 21,691 SF middle school, 23,589 SF arts building, 23,083 SF theater build-Ing, and the <Jddition of 120 new parking spaces on property lo-cated within Planning Area 13 of the Bressi Ranch Master Pian CBRMP) and generally located north of Greenhaven Drive, south of Bressl Ranch Way, east of Open Space Area 3 and west of El Fuerte Street in Local Facilit1es Management Zone 17. The City Planner determined that the proposed amendment is within the scope of the Previously adopted Mitigated Negative Declaration for the Pacific Ridge School Conditional Use Permit Amendment CUP 06-11(A) and it will not result in patentially significant Impacts that have not already been analyzed and mi-tigated. · 3) EIR 03-GS(B)/CDP 04-41(A) • DESALINATION PROJECT CHANGES -Request for approval of an addendum to Environ-mental Impact Report EIR 03-0S(A) and an amendment to Coastal Development Permit COP 04-41 for the Desalination plant project to shift the previously approved location of the 54· inch diameter pipeline approximately 600 feet to the south of the intersection of Faraday Avenue and Cannon Road, within Macarlo Canyon, and construct ancillary facilities east of Fara-day Avenue, within the city's future Veterans Memorial park, In the Mello I I Segment of the Local Coastal Program and in Local Facilities Management Zone 8. ·An Addendum to the Environmental Impact Report CEIR 03· OS(A)) was prepared for the J)roiect in conformance with the California Environmental Quality Act (CEQA) that will require an approval from the Planning Commission. This proiect is not located within the appealable area of the California Coastal Commission. This project is not located within the appealable area of the Cali-fornia Coastal Commission • .../ ~ .. ,, .. , if you challenge these projects in court, you may be limited to raising only those issues you or someone else raised at the pub-lic hearing described in this notice or in written corresPOndence delivered to the City of Carlsbad at or prior to the public hear· ing. Copies of the environmental documents are available at thp Planning Division at 1635 Faraday Avenue during regular busi-ness hours from 7:30am to 5:30 pm Monday through Thursday and 8:00am to5:00 pm Friday. Those persons wishing to speak on these proPOsals are cordially invited to attend the public hearing. Copies of the staff rePOrts will be available online at http://carlsbad.granlcus.comNiewP ubllsher.php?vlew ld=6 on or otter the Friday prior to the hear-ing date. If you have any questions, please call the Planning Di· vision at (760) 602·4600. . CITY OF CARLSBAD PLANNING DIVISION PUb: 1 0/25/13 -----------------------------, ~~~'~ C I T Y 0 F ~CARLSBAD a FILE Community & Economic Development www.carlsbadca.gov NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN to you that the Planning Commission of the City of Carlsbad will hold a public hearing at the Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m. on Wednesday, November 6, 2013, to consider a request for the following: CASE NAME: EIR 03-05(8)/CDP 04-41(A)-DESALINATION PROJECT CHANGES PUBLISH DATE: October 25, 2013 DESCRIPTION: Request for approval of an addendum to Environmental Impact Report EIR 03-0S(A) and an amendment to Coastal Development Permit CDP 04-41 for the Desalination plant project to shift the previously approved location of the 54-inch diameter pipeline approximately 600 feet to the south of the intersection of Faraday Avenue and Cannon Road, within Macario Canyon, and construct ancillary facilities east of Faraday Avenue, within the city's future Veterans Memorial park, in the Mello II Segment of the local Coastal Program and in local Facilities Management Zone 8. Those persons wishing to speak on this proposal are cordially invited to attend the public hearing and provide the decision makers with any oral or written comments they may have regarding the project. Copies of the staff report will be available online at http://carlsbad.granicus.com/ViewPublisher.php?view id=6 on or after the Friday prior to the hearing date. If you have any questions, or would like to be notified of the decision, please contact Pam Drew in the Planning Division at (760) 602-4644, Monday through Thursday 7:30a.m. to 5:30p.m., Friday 8:00a.m. to 5:00p.m. at 1635 Faraday Avenue, Carlsbad, California 92008. APPEALS The time within which you may judicially challenge these projects, if approved, is established by State law and/or city ordinance, and is very short. If you challenge this project in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City of Carlsbad at or prior to the public hearing. 0 Appeals to the City Council: Where the decision is appealable to the City Council, appeals must be filed in writing within ten (10) calendar days after a decision by the Planning Commission. 0 Coastal Commission Appealable Project: ~ This site is not located within the Coastal Zone Appealable Area. ~ Application deemed complete: 10/18/2013 Where the decision is appealable to the Coastal Commission, appeals must be filed with the Coastal Commission within ten (10) working days after the Coastal Commission has received a Notice of Final Action from the City of Carlsbad. Applicants will be notified by the Coastal Commission of the date that their appeal period will conclude. The San DiE:go office of the Coastal Commission is located at 7575 Metropolitan Drive, Suite 103, San Diego, California 92108-4402. CITY OF CARLSBAD PLANNING DIVISION Planning Division 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-4600 I 760-602-8558 fax NOTIC. PUBLIC HEARING-CITY OF -RLSBAD FILE COPY Response must be received by: .!=O~c~to:!..!b~e~r..=2"'3:,...::2.!:::0.!..13:!._ ____________________________ _ Public Hearing Date: .o.:N~o~v..!::e!!m~b~e:!..r~6:.,__,:_20~13:!._ ________________________________ _ Public Hearing Place: 1200 CARLSBAD VILLAGE DRIVE, CARLSBAD, CALIFORNIA, 92008 Public Hearing Time: .!:::6~:0~0~·±!mo!.:.·------------------------------------- Project Title: EIR 03-05(A)/CDP 04-4l(A) -Desalination Project Changes Lead Agency: City of Carlsbad-Planning Contact Person: !..P~am~D~re:C!w:!..:,~A~ss~o~c~ia!!:te~P.!!la~nn~e!,.r ___________ _ Street Address: 1635 Faraday Avenue Phone: .~..(7~6~0:.L)~6~02=.=-:::!4.!:::64:r:4~------------------ City: CARLSBAD Zip: 92008 County: ~sa~n~D~iece.g~o ___________ _ PROJECT LOCATION~ County: San Diego City/Nearest Community: .!=C:.!!ity~o!.!.f~C~a~rl!-'!s:!!ba~d:!...._ ___________ _ Cross Streets: Cannon Road & Faraday Avenue Assessor's Parcel No. 212-010-05 and -15 Total Lineal Feet: Approximately 1.000 lineal feet Section: Rancho Agua Hedionda Within 2 Miles: State Hwy #: ~5 ______ _ Waterways: Agua Hedionda Lagoon, Agua Hedionda Creek, Calavera Creek, Pacific Ocean Airports: McClellan/Palomar Railways: .:...N'""C""T,_,D:;__ _______ _ ENVIRONMENTAL DOCUMENT: CEQA: D NOP D Supplement/Subsequent D Early Cons 1:8] EIR Addendum (Prior SCH No.) =20"-'0'-'4""04..:...1.:..::0=8..:...1 ____ _ D Neg Dec D Other:----------------- 0 Draft EIR LOCAL ACTION TYPE: 0General Plan Update D 0General Plan Amendment D 0General Plan Element D Ozone Code Amendment D DEVELOPMENT TYPE: Specific Plan Master Plan Planned Unit Development Site Plan 0Residential: Units "-N""/ A'-'---------- Ooffice: Sq. Ft. ...:N~/A.,!_, _______ _ Ocommercial: Sq. Ft. ...:N~/A,L_ _______ _ Drndustrial: Sq. Ft. "-N""IA..o...._ _______ _ 0Recreational: PROJECT ISSUES DISCUSSED IN DOCUMENT: [8]Aesthetic/V isual D Flood Plain/Flooding 0Agricultural Land D Forest Land/Fire Hazard [8]Air Quality 1:8] Geological/Seismic 0Archaeologicai/Historical D Minerals ~Coastal Zone D Noise D Drainage/ Absorption D Population/Housing Balance 0Economic/Jobs D Public Services/Facilities 0Fiscal 1:8] Recreation/Parks D Rezone D Use Permit D Land Division (Subdivision, Parcel Map, Tract Map, etc.) Acres "-N"'-/ A'-'------- Acres .:..N.:.:../ A:...:.... ____ _ Acres .:..N.:.:../ A:....:_ ____ _ Acres .:..N.:.:..I A:...:.... ____ _ D Schools/Universities D Septic Systems D Sewer Capacity 1:8] Soil Erosion/Compaction/Grading D Solid Waste D Toxic/Hazardous 1:8] Traffic/Circulation 1:8] Vegetation Schools: Sage Creek High School D Annexation D Redevelopment 1:8] Coastal Permit Amendment D Other: _______ _ D Water Quality D Water Supply/Ground Water D Wetland/Riparian D Wildlife D Growth Inducing 1:8] Land Use D Cumulative Effect D Other: Present Land Use: Roadway right-of-way, habitat preserve and undeveloped open space with trails (this area will eventually be developed into a passive park). Zoning: The preserve and undeveloped area have a zoning designation of Open Space. The roadway right-of-way has a zoning designation of Arterial Roadways. General Plan Use: The preserve and undeveloped area have General Plan designation of Open Space. The roadway right-of-way has a General Plan designations of Collector Street. Project Description: Proposed modification to the alignment of a small section of piping for the desalination plant pipeline that was previously approved. The modification would realign the pipeline from under the Cannon Road bridge to within the public right-of- way of Faraday Avenue, under a section of Macario Canyon, via trenchless method, and within a portion of the future Veteran's Memorial park. Mail notice to: San Diego County Clerk of the Board of Supervisors, Public Notice Hearings, Mailstop A-45, Room 402, 1600 Pacific Highway, San Diego, CA 9210 I Where documents are located for Public Review: Planning Division, 1635 Faraday Avenue, Carlsbad, CA 92008 April2011 «~q> C I T Y 0 F DFILE ~CARLSBAD Community &: Economic Development www.carlsbadca.gov I EARLY PUBLIC NOTICE PROJECT NAME: DESALINATION PROJECT CHANGES PROJECT NUMBER: EIR 03-05(B)/CDP 04-41(A) This early public notice is to let you know that a development application for a an Addendum to a previously adopted Environmental Impact Report and an Amendment to a previously approved Coastal Development Permit for the Desalination project within your neighborhood has been submitted to the City of Carlsbad on September 5, 2013. The project application is undergoing its initial review by the City. LOCATION: Generally located within a portion of Macario Canyon, Veteran's Memorial park and right-of- way of Faraday Avenue. PROJECT DESCRIPTION: To realign and install approximately 1,000 lineal feet of a previously approved underground pipeline and install a vault to convey desalinated water. Please keep in mind that this is an early public notice and that the project design could change as a result of further staff and public review. A future public hearing notice will be mailed to you when this project is scheduled for public hearing before the Planning Commission. CONTACT INFORMATION: If you have questions or comments regarding this proposed project please contact Pam Drew, Associate Planner at pam.drew@carlsbadca.gov, 760-602-4644, City of Carlsbad Planning Division, or Sherri Howard, Associate Engineer at sherri.howard@carlsbadca.gov, 760-602- 2756, City of Carlsbad Land Use Engineering Division 1635 Faraday Avenue, Carlsbad, CA 92008. Planning Division 1635 Faraday Ave. I Carlsbad, CA 92008 I 760-602-4600 I 760-602-8558 fax I City of Carlsbad DESALINATION PROJECT CHANGES EIR 03-05(8) I COP 04-41 (A) N A 0 300 600 1 ,200 ----======:::~------• Feet Map created by the City of Carlsbad GIS. Portions of the DERIVED PRODUCT contain geographic information copyrighted by SanG IS. All Rights Reserved City of Carlsbad DESALINATION PROJECT CHANGES EIR 03-05(8) I COP 04-41(A) N A 0 300 600 -----=======::::~Feet Map created by the City of Carlsbad GIS. P~rt!ons of . the DERIVED PRODUCT contain geographiC mformat1on copyrighted by SanG IS. All Rights Reserved • CITY OF CARLSBAD REVIEW AND COMMENT MEMO • DATE: SEPTEMBER 6, 2013 PROJECT NO(S}: COP 04-41(A) REVIEW NO: ~~~~~------------------------------ PROJECT TITLE: DESALINATION PROJECT TUNNEL APPLICANT: POSEIDON 1 FOR SDCWA/PETER McLAGGAN TO: 1 t8J Land Development Engineering-Jeremy Riddle 0 Police Department-J. Sasway t8J Fire Department-Greg Ryan 0 Public Works (Storm Drain)-Clayton Dobbs 0 Public Works (Wastewater) -Don Wasko 0 Public Works (Water)-Jase Warner t8J Building Division -Will Foss 0 Water/Sewer District ~...x'Landscape Plancheck Consultant-PELA t8J Parks & Recreation (Parks/Trails)-Liz Ketabian 0 Parks & Recreation (Trees & Medians)-Mike Bliss t8J Public Works Department (Utilities)-Sherri Howard 0 Public Works Department (Traffic)-John Kim 0 Public Works Department (Design)-Bill Plummer *ALWAYS SEND EXHIBITS FROM: PLANNING DIVISION 0 School District 0 North County Transit District-Planning Dept. 0 Sempra Energy-Land Management 0 Caltrans (Send anything adjacent to 1-5) Please review and submit written comments and/or conditions to the PLANNING TRACKING DESK in the Planning Division at 1635 Faraday Avenue, by 9/26/13. If you have "No Comments," please so state. If you determine that there are items that need to be submitted to deem the application "complete" for processing, please immediately contact the applicant and/or their representatives (via phone or e-mail) to let them know. Thank you COMMENTS: E~ /-lilies .Ne ~4"/lrif?)TS tJ& 'k>A .. £'¥7ic:!>A.}S. tiA"',.-s li!-J?e,., rzc..-t Sva.M r-r-rrv s J2r 74tM£P 6¥ ~e:A.Jc e: . ~~nature j. ('S. ~fJI3. Date PLANS ATTACHED Review & Comment 03/13 DATE: PROJECT NO(S): PROJECT TITLE: APPLICANT: TO: SEPTEMBER 6, 2013 CITY OF CARLSBAD REVIEW AND COMMENT MEMO COP 04-41(A) REVIEW NO: --------~------------------------------ DESALINATION PROJECT TUNNEL POSEIDON 1 FOR SDCWA/PETER McLAGGAN 1 [8] Land Development Engineering-Jeremy Riddle 0 Public Works {Storm Drain)-Clayton Dobbs 0 Public Works {Wastewater) -Don Wasko 0 Public Works {Water)-Jase Warner 0 Police Department-J. Sasway [8] Fire Department-Greg Ryan [8] Building Division-Will Foss 0 Water/Sewer District [8] Parks & Recreation {Parks/Trails)-Liz Ketabian 0 Parks & Recreation {Trees & Medians)-Mike Bliss [8] Public Works Department {Utilities)-Sherri Howard 0 Public Works Department {Traffic)-John Kim 0 Public Works Department {Design)-Bill Plummer *ALWAYS SEND EXHIBITS FROM: PLANNING DIVISION [8] Landscape Plancheck Consultant-PELA 0 School District 0 North County Transit District-Planning Dept. 0 Sempra Energy-Land Management 0 Caltrans {Send anything adjacent to 1-5) Please review and submit written comments and/or conditions to the PLANNING TRACKING DESK in the Planning Division at 1635 Faraday Avenue, by 9/26/13. If you have "No Comments," please so state. If you determine that there are items that need to be submitted to deem the application "complete" for processing, please immediately contact the applicant and/or their representatives (via phone or e-mail) to let them know. PLANS AD ACHED Review & Comment 03/13 September 23, 2013 TO: ASSOCIATE PLANNER, DREW ASSOCIATE ENGINEER, HOWARD FROM: PARK PLANNING MANAGER RE: DESALINATION PROJECT TUNNEL-COP 04-41(A)-REVIEW NO.1 PACKAGE 58-(MACARIO TUNNEL) CONSTRUCTION PLANS PARKS AND RECREATION REVIEW COMMENTS & CONDITIONS Thank you for providing plans for review for the above project as it pertains to the proposed construction within a portion of Veteran's Memorial park and for construction of the pipeline within the Faraday Ave. R/0/W. The Parks and Recreation Department has prepared this comment letter with the purpose of our review and comments to be forwarded as conditions of the project and as a way to provide further direction and comments on the construction plans. Please include the following with the responses you are preparing to Poseidon 1 for SDCWNPeter Mclaggan. Drawing No. SD-22: Fencing and gate on north side of Faraday Ave. at Veteran's Park 1. Please include in construction peeler pole fencing along the park boundary on the north side of Faraday Ave. Fencing shall match the existing fencing along Faraday Ave. park boundary further east. A detail of the fence installation is provided on MWD Drawing PD-2 to include on sheet SD-22 and is attached to sheet SD-22 of the Parks and Recreation plan review set of drawings. Extent of fencing to begin at Whitman Way and continue eastward to connect to the existing fence at the trailhead is also shown on Sheet C-301, Site Plan mark up. 2. Revise details to include the gate access at Veteran's Park to be a wood peeler pole gate per MWD Drawing No. PD-2. A copy of the detail is attached to this memo for reference and to sheet SD-22 of the Parks and Recreation plan review set of drawings. 3. Preference is for 6" protection posts to be 6" diameter wood posts with beveled top to match the peeler pole posts used for post n-rail fencing along Faraday Ave. 4. Add a detail to show a 6' high wood screen fence around the concrete pad where the tunnel pit access is located within the park. Drawing No. C-302 Site Plan Additonal landscape improvements at tunnel pit at Veteran's Park 1. See mark up and notes on review plan set of drawings, regarding addition of screening fence, landscaping and irrigation around the tunnel pit that is to be located within the park. Add the requested landscape items on the site plan or provide an additional landscape plan sheet to show the requested landscape improvements at the tunnel pit at Veteran's park. The added landscape items/plan sheets shall be subject to submittal by Page2 Parks and Recreation Plan Review CDP-04-41(A)-Package 5B-Macario Tunnel Poseidon and review/approval by the Parks and Recreation Department, prior to commencement of any related work. Note: There is no water meter currently servicing the park site. Therefore, Poseidon would need to arrange for a meter to be installed. Condition Request: Poseidon is to be responsible for installing all mainline, water meter, and irrigation system to support the landscaping as well as the screening fence to screen the pad and above ground equipment at the tunnel pit. In addition Poiseidon is to be responsible for the ongoing water expenses and the ongoing maintenance for the irrigation/landscape/screening fence. Drawing No. C-455: Riser and Air Release Vault Plan and Sections 1. Revise steel protection post to be 6" diameter treated wood post to match posts used for the peeler pole fence along park boundary. Drawing No. TC 302:Traffic Control Plan, Stage 26 It appears that during construction that on street parking at the Veteran's Park trailhead may not be available to the public. If parking will not be available on Faraday Ave. at the north side of the street adjacent to the park due to construction, please provide the traffic control plans and signage to that effect so the general public will be aware that the trail head access parking is not available. If it is possible to keep the on street parking available to the public at the trailhead, then add safe traffic control that will allow for access to on-street parking at the Veteran's Park trailhead. THANKS. LIZ KETABIAN Park Planning Manager c: Chris Hazeltine, Parks and Recreation Director Kyle Lancaster, Parks Superintendent Michael Bliss, Parks Supervisor Paul Meadows, Parks Supervisor Project File Attachments Mark up Plan Set of Drawings, Package 58 -Macario Tunnel MWD Drawing PD-2 -Peeler log and pole fence and utility access gate CITY OF CARLSBAD REVIEW AND COMMENT MEMO DATE: SEPTEMBER 6, 2013 PROJECT NO(S): COP 04-41(A) REVIEW NO: ----~--~~---------------------------- PROJECT TITLE: DESALINATION PROJECT TUNNEL APPLICANT: POSEIDON 1 FOR SDCWA/PETER McLAGGAN TO: 1 [gl land Development Engineering-Jeremy Riddle D Police Department-J. Sasway [gl Fire Department-Greg Ryan D Public Works (Storm Drain)-Clayton Dobbs D Public Works (Wastewater)-Don Wasko D Public Works (Water) -Jase Warner [gl Building Division-Will Foss D Water/Sewer District [gl Parks & Recreation (Parks/Trails) -liz Ketabian 0 Parks & Recreation (Trees & Medians)-Mike Bliss [gl Public Works Department (Utilities)-Sherri Howard D Public Works Department (Traffic)-John Kim D Public Works Department (Design)-Bill Plummer *ALWAYS SEND EXHIBITS FROM: PLANNING DIVISION [gl landscape Plancheck Consultant-PELA D School District D North County Transit District-Planning Dept. D Sempra Energy -land Management D Caltrans (Send anything adjacent to 1-5) Please review and submit written comments and/or conditions to the PLANNING TRACKING DESK in the Planning Division at 1635 Faraday Avenue, by 9/26/13. If you have "No Comments," please so state. If you determine that there are items that need to be submitted to deem the application "complete" for 2rocessing, please immediately contact the applicant and/or their representatives (via phone or e-mail) to let them know. ~lihw~ Srgnature Date PLANS AITACHED Review & Comment 03/13 .. ... ·· TOTAL Aelle$ PER ZONE .e .. f: . ' ~ . -j i .I . -. "' ' - CD •• C>IA. COC>QI!. -.. ~-~I.LBP tDOITe ee.r ®::'::!' .,...,.._TYP. @ >" t>IA. ,..,., I>CKSO "'-'1.6 @ ~':'"..: """L.IN<I&. I)IIOIU. --I'C&T& CCO'IPU!TliL. Y. ®~,:,.~":a· a· C(lN0102!T! ®-- G) -"""· CClMP'ACTID -@oWCIIIII&>IIOCWUMIL @ ,..,I&"""*' -.-..... @..0.1TAT,.._'IICN --.TOIIII ~DYl1+&0. eeeAINI W/'IH00.2~-· t1o6CWfNI~· ... _ NO kALE 0 ,.... ..... ,..l"W8'U'fJ* DW1I"'nn. ~ TO K ..... ~ .. .....,. .. .,.~~"" CNrtiiW .......,.'fM ® t'~1'Hac:IP ....... .,.." L..,... OlllMIW lrlrfi'O -® :=....-=~ =.:.= G) ---® ........... ~ ........ NJt IOtiiO, L·l WASTEWATER. G) G) ® ® ('j) ® ® @ 2' .,., IGIAM',... """'1NICK IIQ.laP'YOI"'tfW-~ M040IIIl. GOitC1Sflt. ... NJT. HIL.O .... I'C*I' Ml: , ..... ..... Y'Y' CUh' ...,.. .... r ... ~,......~ ~----· .. ....; ........... LOll ...... ~..,.~ ...... ~-T ~w••xw~*x N,t. . ~~,..._Mll.o.TO =..-:=.."":""'.=-W'O'X WMfiiiLIIDIOiaMIICII.f. ==:.!-~· &.OCKJIIDCJeotw .... a.t.-. .. ~. ~·· DATE: PROJECT NO(S): PROJECT TITLE: APPLICANT: TO: SEPTEMBER 6, 2013 CITY OF CARLSBAD REVIEW AND COMMENT MEMO COP 04-41(A) REVIEW NO: --------~~----------------------------- DESALINATION PROJECT TUNNEL POSEIDON 1 FOR SDCWA/PETER McLAGGAN 1 1Z1 Land Development Engineering-Jeremy Riddle D Public Works {Storm Drain)-Clayton Dobbs D Public Works (Wastewater)-Don Wasko D Public Works (Water)-Jase Warner D Police Department-J. Sa sway 1Zl Fire Department-Greg Ryan IZ! Building Division-Will Foss D Water/Sewer District 1Z1 Parks & Recreation (Parks/Trails)-Liz Ketabian D Parks & Recreation (Trees & Medians)-Mike Bliss 1Z1 Public Works Department {Utilities)-Sherri Howard D Public Works Department (Traffic)-John Kim D Public Works Department (Design)-Bill Plummer *ALWAYS SEND EXHIBITS FROM: PLANNING DIVISION IZI Landscape Plancheck Consultant-PELA D School District D North County Transit District-Planning Dept. D Sempra Energy-Land Management D Caltrans {Send anything adjacent to 1-5) Please review and submit written comments and/or conditions to the PLANNING TRACKING DESK in the Planning Division at 1635 Faraday Avenue, by 9/26/13. If you have "No Comments," please so state. lfvou determine that there are items that need to be submitted to deem the application "complete" for processing, please immediately contact the applicant and/or their representatives (via phone or e-mail) to let them know. Thank you 1\/Y! /'A-ru!M~ ,,_/.r- COMMENTS: __ f_ 'V_vv_v_vtJr_~n___:_ I'? _______________ _ Signature Date PLANS ATIACHED Review & Comment 03/13 _4~A_ CITY OF VcARLSBAD Community & Economic Development October 18, 2013 Peter Maclaggan, Vice President Poseidon Water 5780 Fleet Street, Suite 140 Carlsbad, CA 92008 VlriA__WJ )0 1, v :' i?.-J FILE COPY www.carlsbadca.gov SUBJECT: 2nd REVIEW FOR EIR 03-0S(B)/CDP 04-41(A)-DESALINATION PROJECT CHANGES Thank you for applying for land Use Permits in the City of Carlsbad. The Planning Division has reviewed your Environmental Impact Report Addendum and Coastal Development Permit Amendment, application nos. EIR 03-0S(B) and CDP 04-41(A), as to its completeness for processing. The items requested from you earlier to make your Environmental Impact Report Addendum and Coastal Development Permit Amendment, application nos. EIR 03-0S(B) and CDP 04-41(A), complete have been received and reviewed by the Planning Division. It has been determined that the application is now complete for processing. Although the initial processing of your application may have already begun, the technical acceptance date is acknowledged by the date of this communication. Please note that although the application is now considered complete, there may be issues that could be discovered during project review and/or environmental review. Any issues should be resolved prior to scheduling the project for public hearing. In addition, the City may request, in the course of processing the application, that you clarify, amplify, correct, or otherwise supplement the basic information required for the application. Sincerely, DAVID De CORDOVA Principal Planner CD:PD:bd c: Frank Belock, Deputy General Manager, San Diego County Water Authority, 4677 Overland Avenue, San Diego, CA 92123 Joe Garuba, Municipal Property Manager Casey Arndt, Construction Manager Don Neu, City Planner Scott Donnell, Senior Planner Sherri Howard, Associate Engineer Jeremy Riddle, Associate Engineer John Kim, Associate Engineer File Copy Data Entry Planning Division .df~.A,_ C I T Y 0 F VcARLSBAD • Community & Economic Development October 15, 2013 Peter Maclaggan, Vice President Poseidon Water 5780 Fleet Street, Suite 140 Carlsbad, CA 92008 SUBJECT: EIR 03-05(8}/CDP 04-41(A)-DESALINATION PROJECT CHANGES )V\/, , r cl "' I) , i )'7 lAAI<i \ \ G i ~I 0 I I ·U H ,/ v I ' I www.carlsbadca.gov The preliminary staff report for the above referenced project will be sent to you via email on Wednesday, October 23, 2013. This preliminary report will be discussed by staff at the Development Coordinating Committee (DCC) meeting which will be held on October 28, 2013. A twenty (20) minute appointment has been set aside for you at 9:30 a.m. If you have any questions concerning your project you should attend the DCC meeting. It is necessary that you bring the following required information with you to this meeting or provide it to your planner prior to the meeting in order for your project to go forward to the Planning Commission: 1. Unmounted colored exhibit(s) of your site plan and elevations. For residential projects of 2 or more homes a typical street scene of the elevations shall be provided. The corresponding rear elevations for the homes shown for the typical street scene shall also be provided; and 2. A PDF of your colored site plan and elevations. The colored exhibits must be submitted at this time to ensure review by the Planning Commission at their briefings. If the colored exhibits are not available for their review, your project could be rescheduled to a later time. The PDF of your colored site plan and elevations will be used in the presentation to the Planning Commission and the public at the Planning Commission Hearing. If you do not plan to attend this meeting, please make arrangements to have your colored exhibit(s) and the PDF here by the scheduled time above. Should you wish to use visual materials in your presentation to the Planning Commission, they should be submitted to the Planning Division no later than 12:00 p.m. on the day of a Regular Planning Commission Meeting. Digital materials will be placed on a computer in Council Chambers for public presentations. Please label all materials with the agenda item number you are representing. Items submitted for viewing, including presentations/digital materials, will be included in the time limit maximum for speakers. All materials exhibited to the Planning Commission during the meeting (slides, maps, photos, etc.) are part of the public record and must be kept by the Planning Division for at least 60 days after final action on the matter. Your materials will be returned upon written request. If you need additional information concerning this matter, please contact your Planner, Pam Drew at (760) 602- 4644. Sincerely, \)e~ ~ ~AICP City Planner DN:PD:bd c: File Copy Sherri Howard, Project Engineer Frank Belock, Deputy General Manager, San Diego County Water Authority, 4677 Overland Avenue, San Diego, CA 92123 Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 ' J .~ e ~CARLSBAD Community & Economic Development September 30, 2013 Peter Maclaggan Vice President Poseidon Water 5780 Fleet Street, Suite 140 Carlsbad, CA 92008 www.~arlsbadca.gov SUBJECT: 1st REVIEW FOR EIR 03-0S(B)/CDP 04-41(A)-DESALINATION PROJECT CHANGES Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Division has reviewed your Environmental Impact Report Addendum and Coastal Development Permit Amendment, application nos. EIR 03-05(B) and COP 04-41(A), as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. The second list is project issues of concern to staff. In order to expedite the processing of your application, the "incomplete" items and your response to the project issues of concern to Staff must be submitted directly to your staff planner; therefore, please contact your staff planner directly to schedule a re-submittal appointment. As part of your re-submittal package, please prepare and include with your re-submittal: (1) a copy of these lists, (2) a detailed letter summarizing how all identified incomplete items and/or project issues have been addressed; and (3) five (5) sets of revised plans. No processing of your application can occur until the application is determined to be complete. When all required materials are submitted, the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, September 5, 2013, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. In order to expedite the processing of your application, you are strongly encouraged to contact your Staff Planner, Pam Drew, at (760) 602-4644, to discuss or to schedule a meeting to discuss your application and to completely understand this letter. You may also contact each commenting department individually as follows: Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 ~ .• t1 ~· ~~)/COP 04-41(A),ESALINATION PROJECT CHANGES · . ~I e tt!l,tJ~r:3o 2o13 .,i, ·t ·' .:· "<#.' i I · ··p ge 2 • Planning Division: Pam Drew, Associate Planner, at (760) 602-4644 • Land Development Engineering: Jeremy Riddle, Associate Engineer, at (760) 602-2737 • Utilities: Sherri Howard, Associate Engineer, at (760) 602-2756 • Parks and Recreation Department: Liz Ketabian, Park Planning Manager, at (760) 434-2978 Sincerely, DAVID de CORDOVA Principal Planner CD:PD:fn c: Frank Belock, Deputy General Manager, San Diego County Water Authority, 4677 Overland Avenue, San Diego, CA 92123 Joe Garuba, Municipal Property Manager Casey Arndt, Construction Manager Don Neu, City Planner Scott Donnell, Senior Planner Sherri Howard, Associate Engineer Jeremy Riddle, Associate Engineer John Kim, Associate Engineer File Copy Data Entry • EI,R 03-05(8) / CDP 04-41(A) -·SALINATION PROJECT CHANGES September 30, 2013 Pa e 3 LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION Planning: 1. Depict the location of all existing major vegetation, showing size and type, within the project area on Sheet C-301. 2. Provide documentation from the San Diego County Water Authority (SDCWA) stating that Frank Belock has the authority to sign the application on behalf of the SDCWA. 3. Indicate the existing and proposed grade and structural elevations in relation to Mean Sea Level (MSL) on Sheets C-455 and C-456. 4. Include elevations of all above grade structures as shown from the north, south, east and west on Sheet C-453. 5. Show the entire construction area, including all staging of equipment and storage of materials on Sheet C-301. 6. Highlight the areas that will have cut and fill grading (use different symbols for cut and fill) and list cut, fill, import and/or export quantities on Sheet C-302. 7. Include the dimensions and square footage of each structure shown on Sheets C-302, C-455 and C-456. 8. Provide a separate landscape plan and show plant species, quantity of each plant species and their size (both size at planting and maturity) in a legend. Landscaping needs to be adequate to screen the above grade structures. Furthermore, include all temporary impact areas that will need to be hydro-seeded after construction is completed. 9. Only the pipe and ancillary facilities located from approximately station 109 (see plan sheet #C- 301) east to the pumping vault are within the city's coastal permit jurisdiction and included in this CDP. The remaining pipeline is either within the California Coastal Commission's original jurisdiction or has previously been approved. Please differentiate the project components within the two jurisdictions and the project components that have previously been approved, using different shades of gray and include a legend. EIR 03-05{B) I CDP 04-41(A) ~ESALINATION PROJECT CHANGES September 30, 2013 Page4 ISSUES OF CONCERN Planning: 10. Submit a color rendering of the above grade structures and proposed vegetation as viewed from Faraday Avenue looking east. 11. Include on all sheets the application numbers in the upper right corner {EIR 03-05(B) I CDP 04- 41(A)) and the project name (Desalination Project Changes). 12. Under general notes, drawing G-1, please add: Before construction begins, a qualified biologist shall survey the construction route to determine locations of habitat adjacent to pipeline construction and then mark these locations with clearly visible orange construction fencing and signs, or other measures the biologist determines appropriate, so that the habitat is protected from any encroachment or damage. Further, the biologist shall monitor construction and coordinate with the contractor as necessary to ensure compliance with the applicable requirements identified in mitigation measure BI0-3, which are repeated in item "c)" of the Biological Resources section of the Environmental Mitigation Measures in these plans. Contractor shall avoid construction during the gnatcatcher breeding season or maintain noise levels below 60 dBA leq at occupied nest locations if construction takes place during the breeding season (i.e., February 15 through August 15). The maintenance of appropriate noise levels shall be confirmed through protocol gnatcatcher surveys by a qualified biologist to determine presence of all gnatcatchers within 500 feet of project construction and noise measurements at nest locations during peak construction activity by a qualified acoustician. 13. Other items required and applicable to this project are noted on the redline drawings previously distributed to you. Please return the redline drawings with your next submittal. Parks and Recreation: 14. The traffic control plan should clearly show that on street parking for the public will be maintaine.d at the trail head during construction of the pump station and ancillary structures. Please indicate on the traffic control plan if pedestrians will have access to the trail head via the sidewalk. 15. Revise steel protection post shown on Sheet C-455 to be 6-inch diameter treated wood post to match posts used for the peeler pole fence located at the trail head. 16. Please include on Sheet SD-22 a peeler pole fence along Veteran's Memorial park boundary on the north side of Faraday Ave. The fence shall match the existing fence that exists at the trail head at Veteran's Memorial park. The fence shall begin at Whitman Way and continue eastward to connect to the existing fence at the trailhead. A detail of the fence installation is attached to the redline plan review the Parks and Recreation Department completed, which you received on September 25, 2013. Furthermore, the requested location of fencing is also shown on Sheet C-301 of the red line plans. Show entire length of fence on Sheet C-301. • • • 1 El~ 03-0S(B) / CDP 04-41(A) -~ALINATION PROJECT CHANGES September 39, 2013 Page 5 17. Revise details to include the gate access at Veteran's Park to be a wood peeler pole gate per MWD Drawing No. PD-2. A copy of the detail is attached to this memo for reference and to sheet SD-22 of the Parks and Recreation plan review set of drawings. 18. Preference is for 6-inch protection posts to be 6-inch diameter wood posts with beveled top to match the peeler pole posts used for post-n-rail fencing along Faraday Avenue. 19. Add a detail to show a 4-foot high wood screen fence around the concrete pad where the pump vault is proposed within the park. 20. See mark up and notes on Sheet C-302 regarding the addition of a decorative screen fence, landscaping and irrigation around the tunnel pit proposed within the park. Add the requested landscape items on the site plan or provide an additional landscape plan sheet to show the requested landscape improvements at the tunnel pit at Veteran's Memorial park. The added landscape items/plan sheets shall be subject to submittal by Poseidon and review/approval by the Parks and Recreation Department, prior to commencement of any related work. Note: There is no water meter currently servicing the park site. Therefore, Poseidon would need to arrange for a meter to be installed. Engineering: 21. See redline drawing that were previously distributed to you. Please return the redline drawings with your next submittal. Utilities: 22. See redline drawing that were previously distributed to you. Please return the redline drawings with your next submittal.