Loading...
HomeMy WebLinkAboutCT 02-16; ROBERTSON RANCH EAST VILLAGE; TRENCHING CALCULATION FINDINGS; 2008-04-10 (2)CO NSULTA NTS Civil Engineering Surveying April lo,2008 REcEIVED H LN.011014-1 I:! • Construction Inspector Mr. Joe McMahon I. L 2008 City of Carlsbad j l?R(, 5950 El Camino Real Carlsbad, CA 92008 Dear Mr. McMahon: Please see the enclosed exhibit for reference. Based on hydrologic calculations and field surveys performed by O'Day Consultants on 3/4/08 through 3/6/08, 3/12/08 and 4/4/08, the following table summarizes my findings: V V Basin V V Design Volume (1) Actual Volume (CF) Additional Volume Provided (CF) 2 • 48,888 53,190(2) V 4,302 3 17,352 23,409(3) 6,057 V 4 37,188 • 45,819 V 8,631 5 • V 24,300 34,182 9,882 . V 7A 15,084 V 22,707 • V V 7,623 - 7B 3,456 3,456 - V. 3,600 CF per tributary acre per Option 2 of Water Quality Order 99-08-DWQ Assumes emergency spillway will be raised Moot to elevation 102.47 Assumes standpipe rim elevation to be raised 1 foot to elevation = 87.6 Very, truly yours, O'DAY CONSULTANTS, INC. George U a. y Registered Civil B%er A No 32014' cc: Don Mitchell Greg McDonnel OF N:\O1 1014\08041 0_McMahon2Itr.doc V O'Day Consultants Inc. E-mail: oday@odayconsultants.com 2710 Loker Avenue West, Suite 100 Website: www.odayconsultants.com V V V V • Carlsbad, California 92010-6609 Tel: 76093 1. 17700 Fax: 7609318680 - - 4 lit -I -- s - - -- : i: i 4 .i . I çJ'• (