Loading...
HomeMy WebLinkAboutCT 2018-0004; The Seaglass; Drainage Study The SeaGlass; 2019-08-26 (3)DRAINAGE STUDY THE SEAGLASS CT2018-0004, GR2019-0025 DWG #: 519-2A APN: 451-613-36 2646 STATE ST. CARLSBAD, CA 92008 Prepared By: _________________________________________________________ John A. Van Ryn, P.E. RCE 80667 EXP: 3-31-21 Pasco Laret Suiter & Associates, Inc. 535 N. Highway 101, Suite A Solana Beach, CA 92075 Prepared for: 2646 SEA GLASS LLC. 7922 DAGGET ST. San Diego, CA 92111 August 26, 2019 DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................................... 4 1.1 Project Description ........................................................................................................................ 4 1.2 Existing Conditions ........................................................................................................................ 4 1.3 Proposed Conditions .................................................................................................................... 4 2. METHODOLOGY .................................................................................................................................. 6 2.1 Rational Method............................................................................................................................ 6 2.2 Runoff Coefficient ......................................................................................................................... 6 2.3 Rainfall Intensity ............................................................................................................................ 6 2.4 Tributary Areas .............................................................................................................................. 6 3. CALCULATIONS/RESULTS ................................................................................................................... 6 3.1 Pre & Post Development Peak Flow Comparison ...................................................................... 6 3.2 Detention ....................................................................................................................................... 6 3.3 Storm Water Quality ..................................................................................................................... 8 4. CONCLUSION ....................................................................................................................................... 8 Appendix 1 ....................................................... Pre & Post Project Hydrology Calculations Appendix 2 .......................................................... Existing and Proposed Drainage Exhibits Appendix 3……………………………………………………………..Sump Pump Details DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 Figure 1 Vicinity Map DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 1. INTRODUCTION Project Description The project is located at 2646 State St. in Carlsbad California. The site exists today as a single lot with one vacant residential building. The project proposes the demolition of the existing residential building and constructing a new 8 unit residential condominium. The project will divide the property into 8 airspace condominium lots via a parcel map. The project is designed in accordance with the San Diego County Hydrology Manual dated June 2003 and complies with the Regional Water Quality Control Board Region 9 MS4 Permit, Order No. R9-2015-0100. The project does not propose work adjacent regulated waters therefore 401 and 404 permits are not applicable. Existing Conditions The 0.25 acre project site is delineated into one drainage area (DMA) because all drainage is conveyed to one discharge location. The site relatively flat and sheets flows drainage in a southwesterly direction towards State Street, therefore the southwest most corner of the site is considered the most downstream edge of the DMA. Storm water then collects and is conveyed in the street gutter of State St. in a southeasterly direction approximately 190 feet where it is picked up by a public storm drain inlet located on the east side of State St. The storm continues in the 36” RCP public storm drain north westerly in State St and ultimately discharges to the Buena Vista Lagoon. The existing single family dwelling roof drains to the adjacent ground and then sheet flows to State St. The roof area of the existing house makes up the existing impervious area located on the project site which is approximately 580 square feet. The impervious area of the existing site is 580 square feet or 5% of the site. The peak storm water run-off was calculated using the rational method equation (Q=CiA). The precipitation volume of 2.50 inches was used for design consideration according to the San Diego County 100yr 6hr Isopluvial Map. A 6.6 in/hr intensity was determined from the San Diego County Hydrology Manual Figure 3-1 assuming the minimum allowable time of concentration of 5 minutes because the site is relatively small. This resulted in a peak pre-project run-off of Q= 0.63 CFS using a weighted runoff coefficient of 0.38 based on the existing impervious area. Proposed Conditions The project proposes 8 residential townhome style condominium units. The project also proposes a pervious paver drive isle and LID landscape areas to reduce the proposed impervious footprint. The impervious area of the proposed developed site is 8,188 square feet or 75% of the site. The proposed impervious areas will include concrete walkways and roof tops. The pervious areas will include landscape areas and a paver drive isle. The post project condition has been delineated by one (1) drainage area to model the post project condition and the point of compliance (POC) is considered to be the southwesterly most edge of the project which is consistent with the existing condition. PR-1 is the on-site condition of the proposed project. All roof runoff and on-site storm water runoff will be directed to LID landscape areas and pervious paver areas and then outflow via sheet flow to the curb & gutter of State Street. The roof area will be directed via downspouts towards landscape areas directly adjacent to the paver drive isle and the peak flows will continue to sheet flow across the paver drive and discharge from the site in same manner as the existing condition. A small storm drain sump pump is proposed to collect and outlet the subsurface nuisance water collected by the DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 pervious pavers that is not able to infiltrate into the sub-surface soil layer. The sump pump will discharge the sub-surface water out to the street gutter of State St. via a sidewalk under-drain. AThe sump pump detail and pump curve is provided in Appendix 3 of this report. Another 3” sidewalk underdrain is proposed along the northerly edge of the site solely to provide a drainage path for the water collected in the landscape strip and runoff generated from the unit entry landings. The water will then continue in the street gutter of State St. in same manner as the existing condition. The post project peak un-detained runoff flow was calculated to be 1.3 CFS using the Rational Method Q=CiA and a weighted runoff coefficient of 0.76 based on 75% impervious area. DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 2. METHODOLOGY The proposed project has been analyzed to determine the peak runoff flow for 100 year, 6 hour rainfall event using the Rational Method per the San Diego County Hydrology Manual, dated June 2003. The Runoff Coefficient, C, for the existing and proposed conditions were calculated using a weighted average of C values from Table 3-1 on page 3-6 in the San Diego Hydrology Manual. The time of concentration for all existing and proposed drainage areas were calculated using the minimum TC of 5 min which yields an intensity of 6.6 inches per hour from using the equation on Figure 3-1. The proposed LID best management practices have been sized and located such that all runoff will be directed to landscape planters or through pervious areas where feasible before ultimately discharging to the downstream storm drain system. 2.1 Rational Method As mentioned above, runoff from the project site was calculated for the 100-year storm events. Runoff was calculated using the Rational Method which is given by the following equation: Q = C x I x A Where: Q = Flow rate in cubic feet per second (cfs) C = Runoff coefficient (Determined from Table 2, P. 82, City of San Diego Drainage Design Manual) I = Rainfall Intensity in inches per hour (in/hr) A = Drainage basin area in acres, (ac) Rational Method calculations were performed using the City of San Diego Drainage Design Manual (Section 1-102.3) 2.2 Runoff Coefficient The Runoff Coefficient, C, for the existing and proposed conditions were calculated using a weighted average of C values from Table 3-1 on page 3-6 in the San Diego Hydrology Manual. The weighted average runoff coefficient is based on the actual impervious area which was calculated to be 0.76 in the post project condition. See section 3.1.2 in the San Diego County Hydrology Manual. 2.3 Rainfall Intensity Rainfall intensity was determined using the Rainfall Intensity Duration Frequency Curves from Figure 3-1 in the San Diego County Hydrology Manual, dated June 2003. Based on a 5 min time of concentration, an intensity of 6.6 inches per hour was determined. 2.4 Tributary Areas Drainage basins are delineated in the Post-Project Hydrology Exhibit in Appendix 1 and graphically portray the tributary area for each drainage basin. 3. CALCULATIONS/RESULTS 3.1 Pre & Post Development Peak Flow Comparison Below are a series of tables which summarize the calculations provided in the Appendix of this report. DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 SITE IMPERVIOUS AREA COMPOSITION TOTAL IMPERVIOUS AREA (ACRES) TOTAL PERVIOUS AREA (ACRES) TOTAL PROJECT AREA (ACRES) % IMPERVIOUS SURFACES RUNOFF COEFFICIENT “C” Existing 0.01 0.24 0.25 5% 0.38 Propose d 0.19 0.06 0.25 75% 0.76 Table 1. Runoff Coefficient “C” Comparison The table above shows the difference in the runoff coefficient, “C”, between the existing and proposed condition. EXISTING DRAINAGE FLOWS DRAINAGE AREA DRAINAGE AREA (ACRES) RUNOFF COEFFICIENT (C) Q100 (CFS) I100 (IN/HR) EX-1 0.25 0.38 0.63 6.6 Table 2. Existing Condition Peak Drainage Flow Rates Table 2 above lists the peak flow rates for the project site in the existing condition for the respective rainfall events. Table 3. Proposed Condition Peak Drainage Flow Rates PROPOSED DRAINAGE FLOWS DRAINAGE AREA DRAINAGE AREA (ACRES) RUNOFF COEFFICIENT (C) Q100 (CFS) I100 (IN/HR) PR-1 0.25 0.76 1.27 6.6 The table above lists the peak flow rates for the project site for the proposed condition for the respective rainfall events. Table 4. Proposed Condition Peak Drainage Flow Rates PEAK DRAINAGE FLOW COMPARISON CONDITION DRAINAGE AREA (ACRES) Q100 (CFS) V100 (CU-FT) C Existing 0..25 0.63 860 0.38 Proposed 0.25 1.27 1731 0.76 DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 Table 4 above shows a comparison between the peak flow rates and precipitation volume for the proposed condition and the existing condition. As shown in Table 4, the project does not increase the peak runoff rate or runoff volume for the design storms analyzed when comparing the pre-project condition to the post-project condition because the proposed development is consistent with the land use of the existing condition. 3.2 Detention The project proposes an increase in total impervious area therefore an increase in peak runoff is anticipated however, the proposed pervious paver section of the drive isle will capture and retain the initial concentration of storm water runoff. The pre-project and post post-project volume was calculated to show the proposed increase in runoff volume. The volume captured by the pervious paver section is greater than the proposed increase in runoff volume therefore adequate detention is provided and as a result the post project runoff peak will be less than the pre-project condition because the paver section will provide sufficient detention. See the detention calculation in Appendix 1 that shows the post-project flow is captured by the pervious paver section. 3.3 Storm Water Quality The project’s runoff will be treated for storm water quality by site design and source control measures. The project does not propose greater than 10,000 square feet of impervious surface therefore the project is classified as a “Standard” Development project according to the Storm Water Standards Questionnaire (E- 34) therefore, permanent treatment control BMPs are not proposed and a Storm Water Quality Management Plan has not been prepared. Low Impact Design was implemented by locating pervious areas where feasible to minimize the impervious footprint and to direct storm water runoff towards pervious areas before leaving the site. 4. CONCLUSION As discussed previously, the proposed project’s peak runoff flow and volume does not increase in comparison to the existing condition because of the proposed pervious paver areas capture the additional volume, therefore, the project will not negatively affect downstream facilities since the overall peak flow rate will remain the same. The project does not negatively impact adjacent properties. It is my professional opinion that the storm drain systems as proposed in this report and on the grading plans herein is adequate to intercept, contain and convey Q100 and will not create negative impacts to the downstream system. DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 APPENDIX 1 PRE-PROJECT & POST-PROJECT HYDROLGY CALCULATIONS THE SEAGLASS J-3078 8/26/2019 Drainage Area Area Description Total Area (Ac) Total Area (sq-ft) Total Impervious Area (Sq-Ft)% Impervious % Pervious Weighted Runoff Coefficient Peak Runoff Q: (CFS) Peak Runoff Volume: (cu-ft) EX-1 Existing Site 0.25 10878 580 5%95%0.38 0.63 860 BMP Location Basin Description Total Area (Ac) Total Area (sq-ft) Total Impervious Area (Sq-Ft)% Impervious % Pervious Weighted Runoff Coefficient Peak Runoff Q: (CFS) Peak Runoff Volume: (cu-ft) PR-1A Proposed Site 0.02 822 613 75%25%0.76 0.10 130 PR-1B Proposed Site 0.23 10056 7575 75%25%0.76 1.17 1601 0.25 10878.0 8188.00 75%25%0.76 1.27 1731 Note: 1 Intensity:6.60 in/hr 0.90 Precip:2.50 in 0.35 0.35 Detention Calculation: Pre-Project Peak Runoff Volume:860 cu-ft Post-Project Peak Runoff Volume:1601 cu-ft Delta Peak Runoff Volume (Post - Pre):742 cu-ft Pervious Paver Area:3820 sq-ft *Proposed Drive Isle Pavers Section Depth:1.75 ft Paver Section Void Ratio 0.4 Paver Retention Volume:2674 cu-ft 2674>872 Therefore, Adequate Detention Provided ON-SITE POST-PROJECT HYDOLOGY ON-SITE PRE-PROJECT HYDOLOGY Permeable Pavers Landscape Impervious Runoff Coefficient100 Yr Storm at 5 Min TC TOTAL J:\Active Jobs\3078 THE SEAGLASS\CIVIL\REPORTS\HYDROLOGY\3078-DRN.xlsx THE SEAGLASS J-3078 8/26/2019 J:\Active Jobs\3078 THE SEAGLASS\CIVIL\REPORTS\HYDROLOGY\3078-DRN.xlsx HydraflowTableofContents 3078-DETENTION.gpw HydraflowHydrographsExtensionforAutoCAD®Civil3D®2018byAutodesk,Inc.v2018.3 Monday,08/26/2019 WatershedModelSchematic......................................................................................1 HydrographReturnPeriodRecap.............................................................................2 100-Year SummaryReport.........................................................................................................................3HydrographReports...................................................................................................................4HydrographNo.1,Manual,PAVERINFLOW..........................................................................4 HydrographNo.2,Reservoir,PAVEROUTFLOW...................................................................5 PondReport-PAVERSTORAGE.......................................................................................6 1 2 1 WatershedModelSchematicHydraflowHydrographsExtensionforAutoCAD®Civil3D®2018byAutodesk,Inc.v2018.3 Project:3078-DETENTION.gpw Monday,08/26/2019 Hyd.Origin Description Legend 1 Manual PAVERINFLOW 2 Reservoir PAVEROUTFLOW HydrographReturnPeriodRecap 2 Hyd.Hydrograph Inflow PeakOutflow(cfs)Hydrograph No.type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Manual -------------------------------------------------------1.270 PAVERINFLOW 2 Reservoir 1 -------------------------------------------------0.000 PAVEROUTFLOW Proj.file:3078-DETENTION.gpw Monday,08/26/2019 HydraflowHydrographsExtensionforAutoCAD®Civil3D®2018byAutodesk,Inc.v2018.3 HydrographSummaryReport 3 Hyd.Hydrograph Peak Time Timeto Hyd.Inflow Maximum Total Hydrograph No.type flow interval Peak volume hyd(s)elevation strgeused Description (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1 Manual 1.270 5 240 1,371 ------------------PAVERINFLOW 2 Reservoir 0.000 5 n/a 0 1 35.61 1,371 PAVEROUTFLOW 3078-DETENTION.gpw ReturnPeriod:100Year Monday,08/26/2019 HydraflowHydrographsExtensionforAutoCAD®Civil3D®2018byAutodesk,Inc.v2018.3 HydrographReport HydraflowHydrographsExtensionforAutoCAD®Civil3D®2018byAutodesk,Inc.v2018.3 Monday,08/26/2019 Hyd.No.1 PAVERINFLOW Hydrographtype =Manual Peakdischarge =1.270cfs Stormfrequency =100yrs Timetopeak =240minTimeinterval =5min Hyd.volume =1,371cuft 4 0 50 100 150 200 250 300 Q(cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q(cfs) Time(min) PAVERINFLOW Hyd.No.1--100Year HydNo.1 HydrographReport HydraflowHydrographsExtensionforAutoCAD®Civil3D®2018byAutodesk,Inc.v2018.3 Monday,08/26/2019 Hyd.No.2 PAVEROUTFLOW Hydrographtype =Reservoir Peakdischarge =0.000cfs Stormfrequency =100yrs Timetopeak =n/aTimeinterval =5min Hyd.volume =0cuftInflowhyd.No.=1-PAVERINFLOW Max.Elevation =35.61ft Reservoirname =PAVERSTORAGE Max.Storage =1,371cuft StorageIndicationmethodused. 5 0 50 100 150 200 250 300 Q(cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q(cfs) Time(min) PAVEROUTFLOW Hyd.No.2--100Year HydNo.2 HydNo.1 Totalstorageused=1,371cuft PondReport 6 HydraflowHydrographsExtensionforAutoCAD®Civil3D®2018byAutodesk,Inc.v2018.3 Monday,08/26/2019 PondNo.1-PAVERSTORAGE PondData Contours-User-definedcontourareas.Conicmethodusedforvolumecalculation.BeginingElevation=35.07ft.Voids=67.00% Stage/StorageTable Stage(ft)Elevation(ft)Contourarea(sqft)Incr.Storage(cuft)Totalstorage(cuft) 0.00 35.07 3,820 0 00.25 35.32 3,820 640 6400.50 35.57 3,820 640 1,2800.75 35.82 3,820 640 1,9191.00 36.07 3,820 640 2,5591.25 36.32 3,820 640 3,1991.50 36.57 3,820 640 3,8391.75 36.82 3,820 640 4,4792.00 37.07 3,820 640 5,118 Culvert/OrificeStructures WeirStructures [A][B][C][PrfRsr][A][B][C][D] Rise(in)=3.00 0.00 0.00 0.00 Span(in)=3.00 0.00 0.00 0.00 No.Barrels =1 0 0 0 InvertEl.(ft)=35.07 0.00 0.00 0.00 Length(ft)=10.00 0.00 0.00 0.00 Slope(%)=2.00 0.00 0.00 n/a N-Value =.013 .013 .013 n/a OrificeCoeff.=0.60 0.60 0.60 0.60 Multi-Stage =n/a No No No CrestLen(ft)=8.00 0.00 0.00 0.00 CrestEl.(ft)=37.00 0.00 0.00 0.00 WeirCoeff.=2.60 3.33 3.33 3.33 WeirType =Broad --------- Multi-Stage =Yes No No No Exfil.(in/hr)=0.000 (byWetarea) TWElev.(ft)=0.00 Note:Culvert/Orificeoutflowsareanalyzedunderinlet(ic)andoutlet(oc)control.Weirriserscheckedfororificeconditions(ic)andsubmergence(s).Stage/Storage/DischargeTable Stage Storage Elevation ClvA ClvB ClvC PrfRsr WrA WrB WrC WrD Exfil User Totalftcuftftcfscfscfscfscfscfscfscfscfscfscfs 0.00 0 35.07 0.00 ---------0.00 ---------------0.0000.25 640 35.32 0.00 ---------0.00 ---------------0.0000.50 1,280 35.57 0.00 ---------0.00 ---------------0.0000.75 1,919 35.82 0.00 ---------0.00 ---------------0.0001.00 2,559 36.07 0.00 ---------0.00 ---------------0.0001.25 3,199 36.32 0.00 ---------0.00 ---------------0.0001.50 3,839 36.57 0.00 ---------0.00 ---------------0.0001.75 4,479 36.82 0.00 ---------0.00 ---------------0.0002.00 5,118 37.07 0.29oc ---------0.29s ---------------0.294 DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 APPENDIX 2 EXISTING & PROPOSED DRAINAGE EXHIBITS DRAINAGE STUDY – THE SEAGLASS AUGUST 2019 APPENDIX 3 SUMP PUMP DETAIL & PUMP CURVE EFFLUENT PUMPS MYERS® ME3 SERIES PUMP PERFoRMaNcE Capacity gallons per minute Total head in metersTotal head in feetCapacity liters per minute 40 30 20 10 0010203070506040 0 150 25010050200 12 10 8 6 4 2 0 ME 3 H 1 / 3 H P ME 3 F 1 / 3 H P 3 ‹SAFDIE RABINESARCHITECTS43215CDBASUBMITTAL / REVISIONSIssue DateScaleNo.DateSRA Project Number01Description06/10/19BUILDING PERMIT SUBMITTAL02030408/02/19BUILDING PERMIT RESUBMITTAL171308/02/2019925 FORT STOCKTON DRIVE, SAN DIEGO, CA 92103P: (619) 297-6153 / F: (619) 299-6072www.safdierabines.comSeaGlassNEW CONSTRUCTIONOWNER2646 Sea Glass LLC7922 DAGGET ST.SAN DIEGO, CA 921111(949) 369-3966APPLICANTPROPHET SOLUTIONS, INC5845 AVENIDA ENCINAS, SUITE 138CARLSBAD, CA 92008C: (858) 334-9490 / O: (760) 999-2146CIVIL ENGINEERPASCO LARET SUITER & ASSOCIATES535 NORTH HIGHWAY 101, SUITE ASOLANA BEACH, CA 92075(858) 259-8212LANDSCAPE ARCHITECTMcCULLOUGH LANDSCAPE ARCHITECTURE, INC.703 16TH STREET, SUITE 100,SAN DIEGO, CA(619) 296-3150STRUCTURAL ENGINEERPATTERSON ENGINEERING, INC.928 FORT STOCKTON DRIVE #201SAN DIEGO, CA 92103(858) 605-0937MECHANICAL / PLUMBING ENGINEERBTA ENGINEERING, INC.9845 ERMA RD, SUITE 204SAN DIEGO, CA 92131(858) 715-6601ELECTRICAL ENGINEERNEDC, INC.3103 FALCON ST. SUITE JSAN DIEGO, CA 92103(619) 278-0078SOILS ENGINEERGEOSOILS, INC.5741 PALMER WAYCARLSBAD, CA 92010(760) 931-0915LAND SURVEYORK&S ENGINEERING, INC.7801 MISSION CENTER COURT, SUITE 100SAN DIEGO, CA 92108(619) 296-5565S A F D I E R A B I N E SA R C H I T E C T S2646 STATE STREET, CARLSBAD, CA 92008APN: 203-101-20-00PLUMBINGDETAILSP8.1