Loading...
HomeMy WebLinkAbout2021-01-20; Planning Commission; ; CT 2019-0004/PUD 2019-0004/CDP 2019-0012 (DEV2018-0087) – 330 CHINQUAPIN AVENUEItem No. Application complete date: April 14, 2020 P.C. AGENDA OF:January 20, 2021 Project Planner: Chris Garcia Project Engineer: Tecla Levy SUBJECT: CT 2019-0004/PUD 2019-0004/CDP 2019-0012 (DEV2018-0087) – 330 CHINQUAPIN AVENUE – Request for approval of a Tentative Tract Map, Planned Development Permit and Coastal Development Permit to allow the demolition of a single-family home and the development of a seven-unit, residential air-space condominium project on a 0.44-acre site located at 330 Chinquapin Avenue, within the Mello II Segment of the Local Coastal Program and within Local Facilities Management Zone 1. The project site is located within the appealable area of the California Coastal Commission. The City Planner has determined that this project is exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to Section 15332 “In-Fill Development Projects” of the State CEQA Guidelines and will not have any adverse significant impact on the environment. I.RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7402 APPROVING Tentative Tract Map CT 2019-0004, Planned Development Permit PUD 2019-0004, and Coastal Development Permit CDP 2019-00012 based upon the findings and subject to the conditions contained therein. II.PROJECT DESCRIPTION AND BACKGROUND The applicant proposes to demolish a single-family residence and construct a seven-unit residential air- space condominium project on a 0.44-acre site located at 330 Chinquapin Avenue. Topographically, the site is generally flat and presently developed with a single-family home. The development proposes three buildings consisting of two to three residential units each. The condominium project requires the approval of a Tentative Tract Map, Planned Development Permit, and Coastal Development Permit. The proposed project contains a drive-aisle down the east side of the site, with five units on the west side of the drive-aisle and two units at the north terminus. Parking is provided within attached garages and open and covered parking spaces. Building 1 consists of a 1,673-square-foot three-bedroom unit with a 414-square-foot two-car garage and a 1,404-square-foot three-bedroom unit with a 448-square-foot garage. Building 2 consists of a 569-square-foot low-income one-bedroom unit, a 942-square-foot two- bedroom unit, an 891-square-foot two-bedroom unit, and a 650-square-foot garage. Building 3 consists of a 580-square-foot studio unit, a 1,944-square-foot two-bedroom unit, and a 407-square-foot garage. All buildings are two stories with an overall building height of 30 feet as measured from the new finished grade. The finished grade for measuring building height is being established slightly higher than the existing grade for a uniform design and for drainage purposes. All units include a private patio, balcony and/or roof deck. The underlying lot will be held in common interest divided between the seven air-space condominiums. The common area includes, but is not limited to, the private drive aisle, guest parking spaces, and common landscaped areas. 50 I I L___~ 0 CT 2019-0004/PUD 2019-0004/CDP 2019-0012 – 330 CHINQUAPIN AVENUE January 20, 2021 Page 2 Each building includes a curved standing seam metal “barrel” roof and decorative metal and glass railings along the balconies and roof decks. The exterior consists mainly of a white stucco finish with design elements such as cultured stone, blue ceramic tile, and varied window shapes and sizes. Table “A” below includes the General Plan Land Use designations, zoning and current land uses of the project site and surrounding properties. TABLE A – SURROUNDING LAND USE Location General Plan Designation Zoning Current Land Use Site R-23 Residential 15-23 du/ac with a Growth Management Control Point (GMCP) of 19 du/ac. Multiple-Family Residential (RD-M) Zone Single-Family Home North R-23 Residential RD-M Multi-Family Residential South R-15 Residential with a GMCP of 11.5 du/ac. RD-M Single-Family/Multi-Family Residential East R-23 Residential RD-M Single-Family/Multi-Family Residential West R-23 Residential RD-M Multi-Family Residential Table “B” below includes the project site’s gross and net acreage, the number of dwelling units allowed by the General Plan’s Growth Management Control Point (GMCP) density and the proposed project’s number of dwelling units and density. TABLE B – PROPOSED DENSITY Gross Acres Net Acres (for density calculation) DUs Allowed at GMCP Density DUs Proposed and Project Density 0.44 acres 0.44 acres 8 units 7 units at 15.9 du/ac. In order to meet the city’s Inclusionary Housing requirements, the project is proposing one affordable unit on-site. The project has been conditioned to require the approval of an Affordable Housing Agreement prior to approval of the final map. Grading quantities include 154 cubic yards (c.y.) of cut, 407 c.y. of fill, and 939 c.y. of remedial grading. A grading permit will be required for the project. The project meets the city’s standards for planned developments and subdivisions, and as designed and conditioned, complies with the General Plan, Subdivision Ordinance, and relevant zoning regulations of the Carlsbad Municipal Code (CMC). III.ANALYSIS The project is subject to the following regulations: A.R-23 Residential General Plan Land Use designation; B.Residential Density – Multiple (RD-M) Zone, Planned Development Regulations and Beach Area Overlay Zone (BAOZ) (CMC Chapters 21.24, 21.45 and 21.82); C.Coastal Development Regulations for the Mello II Segment of the Local Coastal Program (CMC Chapter 21.201) and the Coastal Resource Protection Overlay Zone (CMC Chapter 21.203); D.Subdivision Ordinance (CMC Title 20); CT 2019-0004/PUD 2019-0004/CDP 2019-0012 – 330 CHINQUAPIN AVENUE January 20, 2021 Page 3 E.Inclusionary Housing Ordinance (CMC Chapter 21.85); and F.Growth Management Ordinance (CMC Chapter 21.90) and Zone 1 Local Facilities Management Plan. The recommendation for approval of this project was developed by analyzing the project’s consistency with the applicable regulations and policies. The project’s compliance with each of the above regulations is discussed in detail in the sections below. A.R-23 Residential General Plan Land Use Designation The General Plan Land Use designation for the property is R-23 Residential, which allows residential development at a density range of 15-23 dwelling units per acre (du/ac) with a Growth Management Control Point (GMCP) of 19 du/ac. The project site has a net developable acreage of 0.44 acres. At the GMCP, eight dwelling units would be permitted on this 0.44-net-developable-acre property (8.4 dwelling units rounded down to eight dwelling units). The proposed seven-unit residential development will result in a density of 15.9 du/ac. Consistent with Program 3.2 of the city’s certified Housing Element, all the dwelling units which were anticipated toward achieving the city’s share of the regional housing needs that are not utilized by developers in approved projects will be deposited in the city’s Excess Dwelling Unit Bank (EDUB). This project will deposit one dwelling unit into the EDUB and the excess dwelling unit is then available for allocation to other projects. Accordingly, there is no net loss of residential unit capacity. There are adequate properties identified in the Housing Element allowing residential development with a unit capacity, including accessory dwelling units, adequate to satisfy the city’s share of the regional housing need. Therefore, the project complies with the R-23 General Plan Land Use designation for density. Additionally, the project complies with the Elements of the General Plan as outlined in Table “C” below: TABLE C – GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Land Use Policy 2-P.7 Do not permit residential development below the minimum of the density range except in certain circumstances. Policy 2-P.8 Do not permit residential development to exceed the applicable Growth Management Control Point (GMCP) density unless certain findings are made. The seven-unit residential project density of 15.9 du/ac is within the R- 23 Residential density range and below the GMCP unit yield of eight units. The project is one dwelling unit below the unit yield at the GMCP (19 du/ac) and, therefore, one dwelling unit will be deposited in the city’s Excess Dwelling Unit Bank consistent with Housing Element Program 3.2 and City Council Policy 43. Yes Mobility Policy 3-P.5 Require developers to construct or pay their fair share toward improvements for all travel modes consistent with the Mobility Element, the Growth Management Plan, and specific impacts associated with their development. The proposed project has been designed to meet applicable circulation requirements, which include a single driveway access point from Chinquapin Avenue. In addition, the applicant will be required to pay traffic impact fees Yes CT 2019-0004/PUD 2019-0004/CDP 2019-0012 – 330 CHINQUAPIN AVENUE January 20, 2021 Page 4 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? Goal 3-G.3 Provide inviting streetscapes that encourage walking and promote livable streets. prior to issuance of a building permit that will go towards future road improvements. The proposed project will maintain an existing sidewalk along Chinquapin Avenue and will provide pedestrian access to and from the project. Public Safety Goal 6-G.1 Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disasters. Policy 6-P.6 Enforce the requirements of Titles 18, 20, and 21 pertaining to drainage and flood control when reviewing applications for building permits and subdivisions. Policy 6-P.34 Enforce the Uniform Building and Fire codes, adopted by the city, to provide fire protection standards for all existing and proposed structures. Policy 6-P.39 Ensure all new development complies with all applicable regulations regarding the provision of public utilities and facilities. The proposed structural improvements are required to be designed in conformance with all seismic design standards. In addition, the proposed project is consistent with all the applicable fire safety requirements. Further, the project has been conditioned to develop and implement a program of “best management practices” for the elimination and reduction of pollutants which enter into and/or are transported within storm drainage facilities. Yes Noise Goal 5-G.2 Ensure that new development is compatible with the noise environment, by continuing to use potential noise exposure as a criterion in land use planning. Policy 5.P.2 Require a noise study analysis be conducted for all discretionary development proposals located where projected noise exposure would be other than “normally acceptable.” The project consists of seven residential condominiums located in three buildings. A noise study by Dudek, dated April 2019, was provided. The exterior required private recreation areas are below the maximum 60 dB(a) CNEL noise level with the glass safety railings and, therefore, comply. The windows of each residential unit will need to be closed to meet a 45 dB(a) CNEL interior noise level. Therefore, Yes CT 2019-0004/PUD 2019-0004/CDP 2019-0012 – 330 CHINQUAPIN AVENUE January 20, 2021 Page 5 ELEMENT USE, CLASSIFICATION, GOAL, OBJECTIVE OR PROGRAM PROPOSED USES & IMPROVEMENTS COMPLY? mechanical ventilation is required and is conditioned to be provided. Housing Program 3.1 The Inclusionary Housing Ordinance requires that a minimum of 15 percent of all ownership projects of seven units or more be restricted and affordable to lower income households. The city’s Housing Policy Team reviewed the proposed seven-unit project and approved of the proposed affordable unit on-site to fulfill the project’s affordable housing requirement. The project has been conditioned to require the approval of an Affordable Housing Agreement prior to approval of the final map. Yes B. Residential Density - Multiple (RD-M) Zone, Planned Development Regulations, and Beach Area Overlay Zone (BAOZ) The proposed project is required to comply with all applicable use and development standards of the Carlsbad Municipal Code (CMC) including the Multiple-Family Residential (RD-M) Zone (CMC Chapter 21.24), Planned Developments (CMC Chapter 21.45), and the Beach Area Overlay Zone (BAOZ) (CMC Chapter 21.82). The seven-unit residential air-space condominium project meets or exceeds the requirements of the RD- M Zone and the BAOZ as outlined in Table “D” below. The Planned Development regulations provide most of the development standards except for those listed in the table below. The project complies with all applicable development standards for Planned Developments (CMC Chapter 21.45). Please refer to Attachment Nos. 4 and 5 (Exhibits “A” and “B”) for an analysis of project compliance with Tables C and E of the Planned Development regulations and full compliance with City Council Policy No. 66. TABLE D – RD-M AND BAOZ COMPLIANCE RD-M Standards Required Proposed Comply Setbacks Interior Side: 5’ Rear: 10’ Sides: 5’ Rear: 10’ Yes Lot Coverage 60% 32.2% Yes BAOZ Standards Required Proposed Comply Building Height 30 feet with a minimum 3:12 roof pitch provided or 24 feet if less than a 3:12 roof pitch is provided Roof Peak = 30’ with 3:12 roof pitch Decks = 20-22’; required guardrails 23’-6” – 25’-6” – permitted projection per CMC Section 21.46.020 Yes CT 2019-0004/PUD 2019-0004/CDP 2019-0012 – 330 CHINQUAPIN AVENUE January 20, 2021 Page 6 C. Coastal Development Regulations for the Mello II Segment of the Local Coastal Program (CMC 21.201) and the Coastal Resource Protection Overlay Zone (CMC 21.203) 1. Mello II Segment of the Certified Local Coastal Program and all applicable policies The proposed site is in the Mello II Segment of the Local Coastal Program (LCP) and is within the appealable area of the California Coastal Commission. The project site has an LCP Land Use designation of R-23 Residential and Zoning of RD-M, which are consistent with the city’s General Plan and Zoning. The project’s consistency with the R-23 General Plan Land Use designation is analyzed in Section “A,” Table “C” above. The project consists of the demolition of a single-family home and the construction of seven, air- space condominiums in three buildings. The proposed project is compatible with the surrounding development of single-family and multiple-family residential structures. The two-story structures will not obstruct views of the coastline as seen from public lands or the public right-of-way, nor otherwise damage the visual beauty of the Coastal Zone. No agricultural uses currently exist on the previously graded site, nor are there any sensitive resources located on-site. The proposed project is not located in an area of known geologic instability or flood hazard. Since the site does not have frontage along the coastline, no public opportunities for coastal shoreline access are available from the subject site. Furthermore, the residentially-designated site is not suited for water-oriented recreation activities. 2. Coastal Resource Protection Overlay Zone The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone (CMC Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the city’s Master Drainage Plan, Grading Ordinance, Storm Water Ordinance, BMP Design Manual and Jurisdictional Runoff Management Program (JRMP) to avoid increased urban run-off, pollutants and soil erosion. The subject property does not include steep slopes (equal to or greater than 25 percent gradient) nor native vegetation. In addition, the site is not located in an area prone to landslides, or susceptible to accelerated erosion, floods or liquefaction. D. Subdivision Ordinance The Land Development Engineering Division has reviewed the proposed Tentative Tract Map and has found that the subdivision complies with all applicable requirements of the Subdivision Map Act and the city’s Subdivision Ordinance (Title 20) for Major Subdivisions. The subdivision is considered major because it involves the division of land into five or more condominiums (seven condominiums proposed). The project has been conditioned to install all infrastructure-related improvements and the necessary easements for these improvements concurrent with the development. E. Inclusionary Housing Ordinance The proposed seven-unit project is required to provide one affordable unit on-site or purchase one affordable housing credit, if available. The city’s Housing Policy Team has reviewed the project and has approved of the developer’s proposal to provide one affordable unit on-site. The proposed 569-square- foot unit is located on the ground floor of Building 2. As required by CMC Chapter 21.85, the project has been accordingly-conditioned to require the approval of an Affordable Housing Agreement prior to approval of the final map. CT 2019-0004/PUD 2019-0004/CDP 2019-0012 – 330 CHINQUAPIN AVENUE January 20, 2021 Page 7 F.Growth Management The proposed project is located within Local Facilities Management Zone 1 in the Northwest Quadrant of the city. The impacts on public facilities created by the project, and its compliance with the adopted performance standards, are summarized in Table “F” below. TABLE F – GROWTH MANAGEMENT COMPLIANCE STANDARD IMPACTS COMPLIANCE City Administration 24.8 sq. ft. Yes Library 13.2 sq. ft. Yes Waste Water Treatment 7 EDU = 1,540 GPD Yes Parks 0.05 acre Yes Drainage 2.52 CFS Yes Circulation 42 ADT Yes Fire Station No. 1 Yes Open Space N/A N/A Schools Carlsbad (E=0.63/M=0.28/HS = 0.34) Yes Sewer Collection System 7 EDU Yes Water 1,750 GPD Yes The project proposes seven dwelling units, whereas the unit yield at the GMCP of the property is eight dwelling units. The proposed seven-unit project is one unit below the Growth Management Control Point density for this R-23 Residential designated property. Consistent with the General Plan and City Council Policy No. 43, one dwelling unit will be deposited in the city’s Excess Dwelling Unit Bank. IV.ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15332 (In-Fill Development Projects) Class 32 Categorical Exemption of the State CEQA Guidelines. The project is consistent with the General Plan as well as with the Zoning Ordinance, the project site is within the city limits, is less than five acres in size, and is surrounded by urban uses; there is no evidence that the site has value as habitat for endangered, rare, or threatened species; approval of the project will not result in significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services. In making this determination, the City Planner has found that the exceptions listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project, including “historical resources.” Specifically, the existing structure, which is estimated to be 61 years old and is proposed to be demolished, is not included in a local register of historical resources, and a qualified professional has determined that it does not meet the criteria for listing on the California Register of Historical Resources. A Notice of Exemption will be filed by the City Planner upon final project approval. The seven-unit residential condominium project is required to comply with the city’s Climate Action Plan and the recently adopted Climate Action Plan Ordinances, including electric vehicle charging infrastructure (Ordinance No. CS-349), energy efficiency measures and solar photovoltaic systems (Ordinance No. CS-347) and new residential standards for water heating (Ordinance No. CS-348). CT 2019-0004/PUD 2019-0004/CDP 2019-0012 – 330 CHINQUAPIN AVENUE January 20, 2021 Page 8 ATTACHMENTS: 1.Planning Commission Resolution No. 7402 2.Location Map 3.Disclosure Statement 4.Exhibit “A” – Planned Development Tables C & E 5.Exhibit “B” – City Council Policy No. 66 Compliance Table 6.Reduced Exhibits 7.Full Size Exhibits “A” – “GG” dated January 20, 2021 8.Public Comments CHINQUAPIN AVTAMARACK AVL O N G P L G A R F I E L D S T CT 2019-0004/PUD 2019-0004/CDP 2019-0012 (DEV2018-0087) 330 CHINQUAPIN AVENUE SITE MAP J SITE E L C AMINO R E ALLA COSTA AV A L G A R DCARLSBAD B L POINSETT I A L N ATTACHMENT 2 ATTACHMENT 3 ( { Cicyof Carlsbad DISCLOSURE STATEMENT P-1(A) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov ) Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. 2. P-1(A) APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person (g~,1 UcJeJ.g.ft Corp/Part t.Afztta-1&11tz: ftddfrecltf;M/ t;i:vJ,'.) Title fr;Mp/.P. Title ____________ _ Address /~"27 LJJPNA & UZJ'IK /3,gacl,.. Address __________ _ cA. 'Jo~4 {/ OWNER (Not the owner's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person J~~t?fet//~,'~ _ Corp/Part __________ _ Title LUtUJJi e Galt 7.-t O Title -------------- Address ------------- Page 1 of 2 Revised 07/1 0 3. NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to ( 1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non- profit organization or as trustee or beneficiary of the. Non Profit/Trust________ Non Profit/Trust _________ _ Title____________ Title _____________ _ Address Address ---------------------- 4. Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? D Yes ~ No If yes, please indicate person(s): __________ _ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of my knowledge. /Wh 1 ~, , ;/)~j Ck: c...----- sifnat~~~~/a~te O-Signature of applicant/date .Jell-~ ?,-., r (2 LIA a rz n e GaJ,"t. Io l'.J>{J.,i-e>,'\,> ~ ~~ Print'of{ype name of o.Jner Print or type name of applicant ~~ Signature of owner/applicant's agent if applicable/date Print or type name of owner/applicant's agent P-1(A) Page 2 of 2 Revised 07/10 ATTACHMENT 4 PLANNED DEVELOPMENTS (CMC SECTION 21.45.060) TABLE C: GENERAL DEVELOPMENT STANDARDS APPLICABLE TO ALL PLANNED DEVELOPMENTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT C.1 Density Per the underlying General Plan designation. When two or more general plan land use designations exist within a planned development, the density may be transferred from one general plan designation to another with a general plan amendment. N/A C.2 Arterial Setbacks All dwelling units adjacent to any arterial road shown on the Circulation Element of the General Plan shall maintain the following minimum setbacks from the right-of-way: Prime Arterial 50 Feet Major Arterial 40 Feet Secondary Arterial 30 Feet Carlsbad Boulevard 20 Feet N/A Half (50%) of the required arterial setback area located closest to the arterial shall be fully landscaped to enhance the street scene and buffer homes from traffic on adjacent arterials, and: •Shall contain a minimum of one 24” box tree for every 30 lineal feet of street frontage; and •Shall be commonly owned and maintained N/A Project perimeter walls greater than 42 inches in height shall not be located in the required landscaped portion of the arterial setback, except noise attenuation walls that: •Are required by a noise study, and •Due to topography, are necessary to be placed within the required landscaped portion of the arterial setback. N/A C.3 Permitted Intrusions into Setbacks/ Building Separation Permitted intrusions into required building setbacks shall be the same as specified in Section 21.46.120 of this code. The same intrusions specified in Section 21.46.120 shall be permitted into required building separation. All balconies, overhangs, and architectural projections comply with the maximum two-foot allowance per CMC Section 21.46.120. C.4 Streets Private Minimum right-of-way width 56 feet N/A Minimum curb-to-curb width 34 feet Minimum parkway width (curb adjacent) 5.5 feet, including curb Minimum sidewalk width 5 feet (setback 6 inches from property line) Public Minimum right-of-way width 60 feet N/A Minimum curb-to-curb width 34 feet Minimum parkway width (curb adjacent) 7.5 feet, including curb Minimum sidewalk width 5 feet (setback 6 inches from property line) Street Trees within parkways One-family dwellings and twin homes on small-lots A minimum of one street tree (24-inch box) per lot is required to be planted in the parkway along all streets. N/A Condominium projects Street trees shall be spaced no further apart than 30 feet on center within the parkway. Street trees are shown on the conceptual landscape plan and will be approved with the final landscape plan. PLANNED DEVELOPMENTS (CMC SECTION 21.45.060) TABLE C: GENERAL DEVELOPMENT STANDARDS APPLICABLE TO ALL PLANNED DEVELOPMENTS Tree species should be selected to create a unified image for the street, provide an effective canopy, avoid sidewalk damage and minimize water consumption. See above C.5 Drive-aisles 3 or fewer dwelling units Minimum 12 feet wide when the drive-aisle is not required for emergency vehicle access, as determined by the Fire Chief. N/A If the drive-aisle is required for emergency vehicle access, it shall be a minimum of 20 feet wide. 4 or more dwelling units Minimum 20 feet wide. A 24’ wide drive aisle is provided. All projects No parking shall be permitted within the minimum required width of a drive-aisle. Project does not propose any parking within the drive aisle. A minimum 24-foot vehicle back-up/maneuvering area shall be provided in front of garages, carports or uncovered parking spaces (this may include driveway area, drive-aisles, and streets). Each garage space and visitor parking space includes a minimum 24’ vehicle back-up/maneuvering area behind each space. Additional width may be required for vehicle/emergency vehicle maneuvering area. Fire Prevention has reviewed and approved of the proposed design. Parkways and/or sidewalks may be required. N/A No more than 24 dwelling units shall be located along a single- entry drive-aisle. N/A All drive-aisles shall be enhanced with decorative pavement. Project drive-aisle has been enhanced with decorative pavers. C.6 Number of Visitor Parking Spaces Required (1) Projects with 10 units or fewer A .30 space per each unit Project proposes seven units. At 0.3 spaces per unit, the seven-unit project requires 2.1 spaces or 3 spaces based on rounding up to the nearest whole number. Project provides three visitor parking spaces on-site. Projects 11 units or more A .25 space per each unit When calculating the required number of visitor parking spaces, if the calculation results in a fractional parking space, the required number of visitor parking spaces shall always be rounded up to the nearest whole number. C.7 Location of Visitor Parking On Private/ Public Streets On-street visitor parking is permitted on private/public streets, subject to the following: •The private/public street is a minimum 34-feet wide (curb- to-curb) •There are no restrictions that would prohibit on-street parking where the visitor parking is proposed •The visitor parking spaces may be located: o Along one or both sides of any private/public street(s) located within the project boundary, andoAlong the abutting side and portion of any existing public/private street(s) that is contiguous to the project boundary No required visitor parking is allowed on the street nor proposed. In parking bays along public/private streets within the project boundary, provided the parking bays are outside the minimum required street right-of-way width. N/A When visitor parking is provided as on-street parallel parking, not less than 24 lineal feet per space, exclusive of driveway/drive-aisle entrances and aprons, shall be provided for each parking space, except where parallel parking spaces are located immediately adjacent to driveway/drive-aisle aprons, then 20 lineal feet may be provided. N/A PLANNED DEVELOPMENTS (CMC SECTION 21.45.060) TABLE C: GENERAL DEVELOPMENT STANDARDS APPLICABLE TO ALL PLANNED DEVELOPMENTS Within the Beach Area Overlay Zone, on-street parking shall not count toward meeting the visitor parking requirement. N/A On Drive- aisles Visitor parking must be provided in parking bays that are located outside the required minimum drive-aisle width. Project is located within the BAOZ. All required visitor parking is being provided on-site outside of the required drive-aisle. On a Driveway Outside the Beach Area Overlay Zone One required visitor parking space may be credited for each driveway in a project that has a depth of 40 feet or more. N/A For projects with 10 or fewer units, all required visitor parking may be located within driveways (located in front of a unit’s garage), provided that all dwelling units in the project have driveways with a depth of 20 feet or more. N/A Within the Beach Area Overlay Zone One required visitor parking space may be credited for each driveway in a project that has a depth of 40 feet or more. N/A If the streets within and/or adjacent to the project allow for on-street parking on both sides of the street, then visitor parking may be located in a driveway, subject to the following: •All required visitor parking may be located within driveways (located in front of a unit’s garage), provided that all dwelling units in the project have driveways with a depth of 20 feet or more. •If less than 100% of the driveways in a project have a depth of 20 feet or more, then a .25 visitor parking space will be credited for each driveway in a project that has a depth of 20 feet or more (calculations resulting in a fractional parking space credit shall always be rounded down to the nearest whole number). N/A All projects The minimum driveway depth required for visitor parking (20 feet or 40 feet) applies to driveways for front or side-loaded garages, and is measured from the property line, back of sidewalk, or from the edge of the drive-aisle, whichever is closest to the structure. N/A Compact Parking For projects of more than 25 units, up to 25% of visitor parking may be provided as compact spaces (8 feet by 15 feet). No overhang is permitted into any required setback area or over sidewalks less than 6 feet wide. N/A For all projects within the Beach Area Overlay Zone, up to 55% of the visitor parking may be provided as compact spaces (8 feet by 15 feet). N/A Distance from unit Visitor parking spaces must be located no more than 300 feet as measured in a logical walking path from the entrance of the unit it could be considered to serve. Distance from visitor parking spaces to the furthest unit is less than 300’. PLANNED DEVELOPMENTS (CMC SECTION 21.45.060) TABLE C: GENERAL DEVELOPMENT STANDARDS APPLICABLE TO ALL PLANNED DEVELOPMENTS C.8 Screening of Parking Areas Open parking areas should be screened from adjacent residences and public rights-of-way by either a view-obscuring wall, landscaped berm, or landscaping, except parking located within a driveway. The visitor parking spaces are located between buildings outside of the drive-aisle and are screened from adjacent residences by perimeter walls and fencing and screened from the public right-of- way by the buildings. C.9 Community Recreational Space (1) Community recreational space shall be provided for all projects of 11 or more dwelling units, as follows: N/A Minimum community recreational space required Project is NOT within R-23 general plan designation 200 square feet per unit Project IS within R-23 general plan designation 150 square feet per unit Projects with 11 to 25 dwelling units Community recreational space shall be provided as either (or both) passive or active recreation facilities. N/A Projects with 26 or more dwelling units Community recreational space shall be provided as both passive and active recreational facilities with a minimum of 75% of the area allocated for active facilities. N/A Projects with 50 or more dwelling units Community recreational space shall be provided as both passive and active recreational facilities for a variety of age groups (a minimum of 75% of the area allocated for active facilities). N/A For projects consisting of one-family dwellings or twin homes on small-lots, at least 25% of the community recreation space must be provided as pocket parks. • Pocket park lots must have a minimum width of 50 feet and be located at strategic locations such as street intersections (especially “T- intersections”) and where open space vistas may be achieved. N/A All projects (with 11 or more dwelling units) Community recreational space shall be located and designed so as to be functional, usable, and easily accessible from the units it is intended to serve. N/A Credit for indoor recreation facilities shall not exceed 25% of the required community recreation area. N/A Required community recreation areas shall not be located in any required front yard and may not include any streets, drive-aisles, driveways, parking areas, storage areas, slopes of 5% or greater, or walkways (except those walkways that are clearly integral to the design of the recreation area). N/A Recreation Area Parking In addition to required resident and visitor parking, recreation area parking shall be provided, as follows: 1 space for each 15 residential units, or fraction thereof, for units located more than 1,000 feet from a community recreation area. N/A PLANNED DEVELOPMENTS (CMC SECTION 21.45.060) TABLE C: GENERAL DEVELOPMENT STANDARDS APPLICABLE TO ALL PLANNED DEVELOPMENTS The location of recreation area parking shall be subject to the same location requirements as for visitor parking, except that required recreation area parking shall not be located within a driveway(s). N/A Examples of recreation facilities include, but are not limited to, the following: Active Swimming pool area Children’s playground equipment Spa Courts (tennis, racquetball, volleyball, basketball) Recreation rooms or buildings Horseshoe pits Pitch and putt Grassy play areas with a slope of less than 5% (minimum area of 5,000 square feet and a minimum dimension of 50 feet) Any other facility deemed by the City Planner to satisfy the intent of providing active recreational facilities Passive Benches Barbecues Community gardens Grassy play areas with a slope of less than 5% C.10 Lighting Lighting adequate for pedestrian and vehicular safety shall be provided. Appropriate lighting for the seven- unit project will be evaluated with the final landscape and building plans. C.11 Reserved C.12 Recreational Vehicle (RV) Storage (1) Required for projects with 100 or more units, or a master or specific plan with 100 or more planned development units. Exception: RV storage is not required for projects located within the R-15 or R-23 land use designations. N/A 20 square feet per unit, not to include area required for driveways and approaches. Developments located within master plans or residential specific plans may have this requirement met by the common RV storage area provided by the master plan or residential specific plan. RV storage areas shall be designed to accommodate recreational vehicles of various sizes (i.e. motorhomes, campers, boats, personal watercraft, etc.). N/A The storage of recreational vehicles shall be prohibited in the front yard setback and on any public or private streets or any other area visible to the public. A provision containing this restriction shall be included in the covenants, conditions and restrictions for the project. All RV storage areas shall be screened from adjacent residences and public rights-of-way by a view-obscuring wall and landscaping. N/A C.13 Storage Space 480 cubic feet of separate storage space per unit. Each unit provides a one-car or two-car garage with minimum required dimensions or a dedicated storage area with at least 392 cubic feet. If all storage for each unit is located in one area, the space may be reduced to 392 cubic feet. Required storage space shall be separately enclosed for each unit and be conveniently accessible to the outdoors. PLANNED DEVELOPMENTS (CMC SECTION 21.45.060) TABLE C: GENERAL DEVELOPMENT STANDARDS APPLICABLE TO ALL PLANNED DEVELOPMENTS Required storage space may be designed as an enlargement of a covered parking structure provided it does not extend into the area of the required parking stall, and does not impede the ability to utilize the parking stall (for vehicle parking). A garage (12’x20’ one-car, 20’x20’ two-car, or larger) satisfies the required storage space per unit. This requirement is in addition to closets and other indoor storage areas. (1) This standard does not apply to housing for senior citizens (see Chapter 21.84 of this code). PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT E.1 Livable Neighborho od Policy Must comply with City Council Policy 66, Principles for the Development of Livable Neighborhoods. SEE SEPARATE COMPLIANCE CHART E.2 Architectural Requiremen ts One-family and two-family dwellings Must comply with City Council Policy 44, Neighborhood Architectural Design Guidelines N/A. The project proposes two- and three-unit buildings. Since the project proposes more than three units in a multi-family zone, the entire seven-unit project is considered a multi-family project for purposes of this table. Multiple-family dwellings There shall be at least three separate building planes on all building elevations. The minimum offset in planes shall be 18 inches and shall include, but not be limited to, building walls, windows, and roofs. The project provides at least three separate building planes on all building elevations with balconies, decks, varied roofs and/or building articulations located on all elevations. All building elevations shall incorporate a minimum of four complimentary design elements, including but not limited to: • A variety of roof planes; • Windows and doors recessed a minimum of 2 inches; • Decorative window or door frames; • Exposed roof rafter tails; • Dormers; • Columns; • Arched elements; • Varied window shapes; • Exterior wood elements; • Accent materials such as brick, stone, shingles, wood, or siding; • Knee braces; and • Towers. The project provides at least four complimentary design elements on all building elevations including cultured stone, blue ceramic tile, varied window shapes, metal and glass railings, and a blue standing seam metal barrel roof which provides a variety of roof planes with the flat roof decks. E.3 Maximum Coverage 60% of total project net developable acreage. Proposed building coverage is 32.2% of the net lot area (0.44 acres). E.4 Maximum Building Height Same as required by the underlying zone, and not to exceed three stories (1)(7) The project is located within the BAOZ, and therefore pursuant to Footnote #1 below, building height shall be subject to the requirements of CMC Chapter 21.82. Pursuant to CMC Section 21.82.050, no residential structure shall exceed 30’ when providing a minimum 3:12 roof pitch, or 24’ when providing less than a 3:12 roof pitch. The project is proposing a building with a height up to 30’ with barrel roofs. The barrel roofs fit within a 3:12 roof PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT pitch. The roof decks and flat roof areas are under 24’ with allowable guardrail projections per CMC Section 21.46.020. Projects within the R- 23 general plan designation (1)(7) 40 feet, if roof pitch is 3:12 or greater N/A. The project is in the R-23 General Plan Land Use designation but is subject to the BAOZ for building height purposes. 35 feet, if roof pitch is less than 3:12 Building height shall not exceed three stories E.5 Minimum Building Setbacks From a private or public street(2)(3) Residential structure 10 feet Chinquapin Avenue is a public street. The residential structures are set back at least 10’ as measured from the outside edge of the ultimate street right-of- way width. Some roof eaves, balconies and architectural features encroach two feet into the front setback. No direct entry garages are proposed from the street. Direct entry garage 20 feet From a drive-aisle(4) Residential structure (except as specified below) 5 feet, fully landscaped (walkways providing access to dwelling entryways may be located within required landscaped area) N/A. Project is less than 25 units and located within the R-23 General Plan designation (see section below for compliance). Residential structure – directly above a garage 0 feet when projecting over the front of a garage. N/A. Project is less than 25 units and located within the R-23 General Plan designation (see section below for compliance). Garage 3 feet N/A. Project is less than 25 units and located within the R-23 General Plan designation (see section below for compliance). Garages facing directly onto a drive-aisle shall be equipped with an automatic garage door opener. Projects of 25 units or less within the R-15 and R-23 general plan designations 0 feet (residential structure and garage) Residential structure and garage is set back ≥ 0’ from the required 20-foot drive- aisle. Garages facing directly onto a drive-aisle shall be equipped with an automatic garage door opener. Each garage is equipped with an automatic garage door opener. Balconies/decks (unenclosed and uncovered) 0 feet The project’s balconies do not cantilever over the required 20-foot drive aisle. May cantilever over a drive-aisle, provided the balcony/deck complies with all other applicable requirements, such as: •Setbacks from property lines •Building separation •Fire and Engineering Department requirements PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT From the perimeter property lines of the project site (not adjacent to a public/private street) The building setback from an interior side or rear perimeter property line shall be the same as required by the underlying zone for an interior side or rear yard setback. The underlying zone for the project is RD-M. The required interior side yard setback is 5’. The project has interior side yard setbacks of 5’. The required rear yard setback is 10’. The project has a rear setback of 10’. E.6 Minimum Building Separation 10 feet The homes are separated by at least 10’. E.7 Resident Parking (6) All dwelling types If a project is located within the R-23 general plan designation, resident parking shall be provided as specified below, and may also be provided as follows: •25% of the units in the project may include a tandem two-car garage (minimum 12 feet x 40 feet). •Calculations for this provision resulting in a fractional unit may be rounded up to the next whole number. Tandem parking is not proposed. One-family and two- family dwellings 2 spaces per unit, provided as either: •a two-car garage (minimum 20 feet x 20 feet), or •2 separate one-car garages (minimum 12 feet x 20 feet each) •In the R-W Zone, the 2 required parking spaces may be provided as 1 covered space and 1 uncovered space (5) N/A Multiple- family dwellings Studio and one- bedroom units 1.5 spaces per unit, 1 of which must be covered (5) The two studio units require 3 parking spaces with one covered space. Two covered spaces and one uncovered space is provided for the studio units. When calculating the required number of parking spaces, if the calculation results in a fractional parking space, the required number of parking spaces shall always be rounded up to the nearest whole number. Units with two or more bedrooms 2 spaces per unit, provided as either: •a one-car garage (12 feet x 20 feet) and 1 covered or uncovered space; or (5) •a two-car garage (minimum 20 feet x 20 feet), or •2 separate one-car garages (minimum 12 feet x 20 feet each) •In the R-W Zone and the Beach Area Overlay Zone, the 2 required parking spaces may be provided as 1 covered space and 1 uncovered space (5) The remaining five units contain two or more bedrooms and therefore require ten parking spaces with at least one garaged space. Nine spaces are garaged spaces with the remaining parking space partially covered. Required parking may be provided within an enclosed parking garage with multiple, open parking spaces, subject to the following: •Each parking space shall maintain a standard stall size of 8.5 feet by 20 feet, exclusive of supporting columns; and •A backup distance of 24 feet shall be maintained in addition to a minimum 5 feet turning bump-out located at the end of any stallseries. N/A Required resident parking spaces shall be located no more than 150 feet as measured in a logical walking path from the entrance of the units it could be considered to serve. Each unit provides parking within 150 feet of the unit it is intended to serve. E.8 Private Recreational Space One-family, two-family, and Required private recreational space shall be designed so as to be functional, usable, and easily accessible from the dwelling it is intended to serve. Each home provides a private recreation area in the form of ground level PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT multiple- family dwellings Required private recreational space shall be located adjacent to the unit the area is intended to serve. area, second level balconies and roof decks which meet or exceed the 60-square-foot requirement. The private recreation areas are easily accessible from the interior living area of each unit. The required areas do not encroach within the required front yard setback, nor include any driveways, parking areas, storage areas, or common walkways. Required private recreational space shall not be located within any required front yard setback area, and may not include any driveways, parking areas, storage areas, or common walkways. One-family and two- family dwellings Minimum total area per unit Projects not within the R-15 or R-23 general plan designations 400 square feet N/A Projects within the R-15 or R-23 general plan designations 200 square feet May consist of more than one recreational space. N/A May be provided at ground level and/or as a deck/balcony on a second/third floor or roof. N/A If provided at ground level Minimum dimension Not within the R-15 or R- 23 general plan designations 15 feet N/A Within the R- 15 or R-23 general plan designations 10 feet Shall not have a slope gradient greater than 5%. N/A Attached solid patio covers and decks/balconies may project into a required private recreational space, subject to the following: • The depth of the projection shall not exceed 6 feet (measured from the wall of the dwelling that is contiguous to the patio/deck/balcony). The length of the projection shall not be limited, except as required by any setback or lot coverage standards. N/A Open or lattice-top patio covers may be located within the required private recreation space (provided the patio cover complies with all applicable standards, including the required setbacks). N/A If provided above ground level as a Minimum dimension 6 feet N/A Minimum area 60 square feet PLANNED DEVELOPMENTS (CMC SECTION 21.45.080) TABLE E: CONDOMINIUM PROJECTS REF. NO. SUBJECT DEVELOPMENT STANDARD COMPLIANCE COMMENT deck/ balcony or roof deck Multiple-family dwellings Minimum total area per unit (patio, porch, or balcony) 60 square feet The project provides at least a 6’ dimension and a minimum 60 square feet in area for required recreational space located at ground level in addition to private balconies and roof decks. Minimum dimension of patio, porch or balcony 6 feet See above. Projects of 11 or more units that are within the R-23 general plan designation may opt to provide an additional 75 square feet of community recreation space per unit (subject to the standards specified in Table C of this Chapter), in lieu of providing the per unit private recreational space specified above. N/A (1)If a project is located within the Beach Area Overlay Zone, building height shall be subject to the requirements of Chapter 21.82 of this code. (2)See Table C in Section 21.45.060 for required setbacks from an arterial street. (3)Building setbacks shall be measured from the outside edge of the required street right-of-way width, whichever is closest to the building. (4)Building setbacks shall be measured from one of the following (whichever is closest to the building): a) the outside edge of the required drive-aisle width; b) the back of sidewalk; or c) the nearest side of a parking bay located contiguous to a drive- aisle (excluding parking located in a driveway in front of a unit’s garage). (5)Any uncovered required parking space in the R-W zone may be located within a required front yard setback and may be tandem. (6)This standard does not apply to housing for senior citizens (see Chapter 21.84 of this code). (7)Protrusions above the height limit shall be allowed pursuant to Section 21.46.020 of this code. Such protrusions include protective barriers for balconies and roof decks. I ATTACHMENT 5 CITY COUNCIL POLICY 66 – LIVABLE NEIGHBORHOODS Principle Compliance Comments 1. Building Facades, Front Entries, Porches Facades create interest and character and should be varied and articulated to provide visual interest to pedestrians. Clearly identifiable front doors and porches enhance the street scene and create opportunities for greater social interaction within the neighborhood. Building entries and windows should face the street. Front porches, bay windows, courtyards and balconies are encouraged. The south/front elevation architecture of Building 1 provides multiple material finishes, varied window shapes, articulated building planes and roof planes, and a balcony facing the street. In addition, the front unit along Chinquapin Avenue has been designed with an entry door facing the street. 2. Garages Homes should be designed to feature the residence as the prominent part of the structure in relation to the street. A variety of garage configurations should be used to improve the street scene. This may include tandem garages, side- loaded garages, front-loaded garages, alley-loaded garages and recessed garages. Each dwelling will include a garaged space and/or covered or open parking space. All garages are accessed from a private drive-aisle located on the east side of the property and, therefore, do not face and are oriented away from public view of the street. 3. Street Design An interconnected, modified (grid) street pattern should be incorporated into project designs when there are no topographic or environmental constraints. Interconnected streets provide pedestrians and automobiles many alternative routes to follow, disperse traffic and reduce the volume of cars on any one street in the neighborhood. Streets should be designed to provide both vehicular and pedestrian connectivity by minimizing the use of cul-de-sacs. The street network should also be designed to create a safer, more comfortable pedestrian and bicycling environment. Local residential streets should have travel and parking lanes, be sufficiently narrow to slow traffic, provide adequate access for emergency and service vehicles and emergency evacuation routes for residents and include parkways with trees to form a pleasing canopy over the street. Local residential streets are the public open space in which children often play and around which neighborhoods interact. Within this context, vehicular movement should be additionally influenced through the use of City-accepted designs for traffic calming measures. The project is developing on an existing multi-family residentially zoned lot adjacent to an existing public street (Chinquapin Avenue) presently developed as part of an existing interconnected modified street pattern south of the Carlsbad Village area. The existing street design in this area has curb, gutter and sidewalks. CITY COUNCIL POLICY 66 – LIVABLE NEIGHBORHOODS Principle Compliance Comments 4. Parkways Street trees should be planted in the parkways along all streets. Tree species should be selected to create a unified image for the street, provide an effective canopy, avoid sidewalk damage and minimize water consumption. Street trees will be provided in the parkway along Chinquapin Avenue. 5. Pedestrian Walkways Pedestrian walkways should be located along or visible from all streets. Walkways (sidewalks or trails) should provide clear, comfortable and direct access to neighborhood schools, parks/plazas and transit stops. Primary pedestrian routes should be bordered by residential fronts, parks or plazas. Where street connections are not feasible (at the end of cul-de-sacs), pedestrian paths should also be provided. The project provides for pedestrian circulation in the form of a sidewalk along its frontage with Chinquapin Avenue, as well as a walkway to and from the project to the sidewalk. 6. Centralized Community Recreation Areas Park or plazas, which serve as neighborhood meeting places and as recreational activity centers should be incorporated into all planned unit developments. As frequently as possible, these parks/plazas should be designed for both active and passive uses for residents of all ages and should be centrally located within the project. Parks and plazas should not be sited on residual parcels, used as buffers from surrounding developments or to separate buildings from streets. The project consists of only seven units and is not required to provide community recreation areas. OVERVIEW 330 CHINQUAPIN AVE. CARLSBAD, CA 92008APN: 206-020-11-00ZONE: RD-MGENERAL PLAN LAND USE DESOIGNATION: R-23OCCUPANCY: R-2GENERAL PLAN LAND USE DESIGNATION: R-23 RESIDENTIALTOTAL NUMBER OF LOTS PROPOSED: 1TYPE V-B CONSTRUCTION W/ AUTO SPRINKLERED PER NFPA 13ADT(Average daily traffic):64 ALLOWABLE MAX HEIGHT: 24' WITH FLAT ROOF 30' WITH 3"/12" PITCH ROOFFROM FINISHED GRADE OR EXISTING GRADE, WHICH ONE IS LOWER PROPOSED MAX HEIGHT: 30' w/ MIN 3"/12" PITCH ROOF REQ'D SIDEYARD SETBACK: 5'REQ'D FRONTYARD SETBACK: 10' W/ FULLY LANDSCAPE YARDREQ'D REAR YARD SETBACK: 10'ALLOWABLE PROJECTIONS: 2' TOTAL LOT AREA: 19,250 SQFT (0.44acre) UNIT : 7 PROPOSED DWELLING DENSITY: 15.9 UNITS /ACREREQUIED DWELLING DESITY: 15-23 UNITS/ACRE MINIMUM BUILDING SEPERATION: 10 ft. BUILDING AREA: 6,195 SQFTALLOWABLE LOT COVERAGE @ 0.6LOT TOTAL COVERAGE PROVIDED: 6,195/19,250 =0.32 PER CBC TABLE 506.2:R-2 TYPE V-B WITH SM MAX AREA: 21,000 SQFT LANDSCAPE: 3,727 SQFTPERCENTAGE TO BE LANDSCAPED: 3,727/19,250=19.4% TOTAL BUILDING AREA: 11,264 SQFT.FAR: 11,264/19,250=0.59 DWELLING UNITS = 7EXISTING UNITS DEMOED = 1 PARKING REQUIRED : STUDIO/1BR: NUMBER OF UNIT: 2 SPACE PER UNIT:1.5 -at least 1 covered space TOTAL: 3 - at least 2 covered space 2BR+: NUMBER OF UNIT: 5 SPACE PER UNIT: 2 TOTAL :10 ADA VAN PARKING REQ.D. <24 = 1(One two-car garage or two seperate one-car garageor a one-car garage and a covered or uncovered parking space per unit.) GUEST PARKING: NUMBER OF UNIT: 7 SPACE PER UNIT: 0.3 TOTAL PROVIDED GUEST PARKING: 3 TOTAL PROVIDED ADA PARKING: 1 PARKING REQUIRED = 16PARKING PROVIDED = 16 LOT COVERAGE SITE QUALIFICATIONS PARKING MINIMUM TOTAL AREA PER UNIT: 60 SQFT.NUMBER OF UNIT: 7MINIMUM DIMENSION: GROUND LEVEL: 6' x 10' AREA REQUIRED: 420 SQFTAREA PROVIDED: 420 SQFT SEE A-100, A-100.1 FOR BREAK DOWN PRIVATE RECREATIONAL SPACE SCOPE: DEMO EXSITING ONE STORY SINGLE FAMILY DWELLING AND GARAGE. NEW CONSTRUCTION OF THREE TWO STORY RESIDENTIAL DWELLINGS WITH TOTAL OF 7 CONDOS. BUILDING #1 A TWO-FAMILY BUILDING WITH A 1673 SF THREE BEDROOM UNIT WITH 414 SF TWO CAR GARAGE AND A 1404 SF THREE BEDROOM UNIT WITH A 448 SF TWO CAR GARAGE. BUILDING #2A MULTI-FAMILY BUILDING CONTAINS A 569 SF LOW-INCOME ONE BEDROOM UNIT, A 942 SF TWO BEDROOM UNIT, A 891 SF TWO BEDROOM UNIT AND 650 SF THREE CAR GARAGE. BUILDING #3 A TWO-FAMILTY BUILDING WITH A 580 SF STUDIO UNIT, A 1944 SF TWO BEDROOM UNIT AND A 407 SF TWO CAR GARAGE. INCLUSIONARY HOUSING REQUIREMENT AFFORDABLE HOUSING REQUIRED: 1AFFORDABLE HOUSING PROVIDED: 1 -UNIT 3 CT 2019-0004 PUD 2019-0004 CDP 2019-0012 UTILITIES SEWER: CITY OF CARLSBADWATER: CARLSBAD MINICIPAL WATER DISTRICTELEMENTARY SCHOOL: CARLSBAD UNIFIED SCHOOL DISRICTHIGH SCHOOL: CALSBAD UNIFIED SCHOOL DISTRICTGPM: 200 GPM FOR 1 HRGPD: 250 GPD/UNIT X 7 UNITS = 1,750 GPDCFS: 2.52 CFS Vinicity Map Issue Date: Project: Original Issuance: P R O G R E S S P R IN T S N O T F O R C O N S T R U C TIO N Architect Stamp Project:Team RENEWAL 1.31.2021 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT DateProject Number Sheet Name Client Name:Revisions Architect: Ultra-Unit Architectural Studio 1327 Loma AvenueLong Beach, California 90804t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer: David Choi & Associates1327 Loma AvenueLong Beach, California 90804t. 562.382.8040e. david@dca-se.com Civil Engineer: CJE1820 S. EL Camino Real. Unit A205Encinitas, California 92024t. 619.884.0576 Mechanical, Electrical, Plumbing Engineering: Title 24 Energy: Alternative Energy System3235 N. Verdugo Road.Glendale, California 91208t. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek 405 3rd St.Encinitas, California 92024t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate535 N Hwy 101Solana Beach, California 92075t. 858.259.8212 Acoustic Engineering: DuDek 605 3rd St.Encinitas, California 92024t.562.997.0971 #1 12/3/2020 4:01:16 PM 12/3/2020 4:01:16 PM 12/3/2020 4:01:16 PM330CHINQUAPIN 07/20/20 330 CHINQUAPIN AVE CARLSBAD CA 17-1230 330CHINQUAPINJEFF GALIZIO COVER JEFF GALIZIO07/20/2017-1230 PROPERTY OWNER: JEFF GALIZIO330 CHINQUAPIN AVE, CARLSBAD, 92008 T:760-473-0800 -PLANNING CORR. RESPONSE05/16/2019-PLANNING CORR. RESPONSE03/10/2020 02 - 000 - SHEET INDEX-planning Number Sheet ISSUE DATEView/Sheet Discipline Group 0000 COVER 03/07/20 General 01 General A-100 SITE PLAN 03/07/20 A1 09 Architectural A-100.1 ROOF PLAN 03/07/20 A1 09 Architectural A-100.2 BACK UP DIAGRAM 03/07/20 A1 09 Architectural A-100.3 FAR 03/07/20 A1 09 Architectural A-110 BUILDING 1- LEVEL 1 03/07/20 A1 09 Architectural A-111 BUILDING 1- LEVEL 2 03/07/20 A1 09 Architectural A-112 BUILDING 1 - ROOF DECK 03/07/20 A1 09 Architectural A-120 BUILDING 2 - LEVEL 1 03/07/20 A1 09 Architectural A-121 BUILDING 2- LEVEL 2 03/07/20 A1 09 Architectural A-122 BUILDING 2- ROOF DECK 03/07/20 A1 09 Architectural A-130 BUILDING 3- LEVEL 1 03/07/20 A1 09 Architectural A-131 BUILDING 3 - LEVEL 2 03/07/20 A1 09 Architectural A-132 BUILDING 3 - ROOF DECK 03/07/20 A1 09 Architectural A-201 ELEVATION - BUILDING 1 E/W 03/07/20 A2 09 Architectural A-201.1 ELEVATION - BUILDING 1 S/N 03/07/20 A2 09 Architectural A-202 ELEVATION - BUILDING 2 - E/W 03/07/20 A2 09 Architectural A-202.1 ELEVATION - BUILDING 2 - S/N 03/07/20 A2 09 Architectural A-203 ELEVATION - CUSTOM HOUSE W/E 03/07/20 A2 09 Architectural A-203.1 ELEVATION - CUSTOM HOUSE S/N 03/07/20 A2 09 Architectural C-1.0 1 03/07/20 Civil 03 Civil C-2.0 2 03/07/20 Civil 03 Civil C-3.0 3 03/07/20 Civil 03 Civil C-4.0 4 03/07/20 Civil 03 Civil C-5.0 5 03/07/20 Civil 03 Civil C-6.0 6 03/07/20 Civil 03 Civil C-7.0 7 03/07/20 Civil 03 Civil L-100 LANDSCAPE PLAN 03/07/20 LS 04-LANDSACPE L-101 PLANTIN GPLAN BLDG 1&2 03/07/20 LS 04-LANDSACPE L-102 PLANTIN GPLAN BLDG 3 03/07/20 LS 04-LANDSACPE L-103 Unnamed 03/07/20 LS 04-LANDSACPE L-104 LANDSCAPE DETAILS 03/07/20 LS 04-LANDSACPE TOTAL SHEET COUNT: 32 CT 2019-0004 PUD 2019-0004 CDP 2019-0012ATTACHMENT 6 DE S IGN BU IL D ♦ ♦ EXISTING 2 STORY BUILDING CHINQUAPIN AVE.GUEST PARKING PROPERTY LINE PROPOSED TWO STORYBUILDING 1 SIDEYARD SETBACK SIDEYARD SETBACK FRONT YARD SETBACK TWO-WAY DRIVE NLANDSCAPEHANDICAPPARKING 70'-0" PL269'-11 1/2" PL 269'-11 1/2" PL UNIT 1 GARAGE UNIT 3 PARKING Existing Driveway EXISTING ONE STORY BUILDING EXISTING ONE STORY GARAGE EXISTING 2 STORY BUILDING EXISTING 1 STORY BUILDING (N) RETAINING WALL, EXISTING RETAINING WALL REPLACED BY NEW ONE, SEE CIVIL PROPOSED FENCE, TOP OF FENCE 51', TW 48.83', BW 45.5', TOTAL HT. 5.5' SEE CIVIL TRASHPROPOSED TWO STORYBUILDING 4BACKYAD SETBACKExisting Fire Hydrant(E)SIDEWALKSIDEWALK1' - 11 1/2" 1' - 11 1/2" 12 UNIT 7 GARAGE SIDEWALKSIDEWALK SIDEWALK (N)6'-0" GATE UNIT 6 PARKING (E)SIDEWALK TO BE REPLACED CLCL(E)RoWGUEST PARKING FUTURE EV PARKING 2' - 0" PEDESTRAIN PATH OFTRAVEL UNIT 4 GARAGE UNIT 5 GARAGE 7' - 2"UNIT 2 GARAGE 9 8 7 11 10 4 3 2 1 UNIT 5 PARKING GUEST PARKINGEV PARKING 8' - 6" 0' - 6" 6' - 5"(N)RoW(E)RoW(N)RoW10' - 0" 20' - 0"24' - 0"20' - 0" 16 15 14 13 6 534' - 8 1/2"9' - 0"1' - 4"9' - 0"2' - 4"9' - 0"8' - 0"8' - 6"5' - 10"8' - 6"8' - 6"UNIT 3 YARD 20' - 1 1/2"20' - 5 1/2"12' - 0 1/2"20' - 5 1/2"22' - 3 1/2"21' - 0"20' - 4"20' - 4"3' - 0"20' - 3 1/2"20' - 3" BLDG 3 TANKLESS GAS WATER HEATER BLDG 2 TANKLESS GAS WATER HEATER BLDG 1 TANKLESS GAS WATER HEATER 7' - 4" (E)RETAINING WALL TO REMAIN. SEE CIVIL COMPACT COMPACT 15' - 0" (E)SIDEWALK TO BE REPLACED (N)TREE 4' x 4' UNDERGROUND TRANSFORMER 10' - 0"5' - 0"24' - 0"PROPOSED FENCE, TOP OF FENCE 52.5', TW 50.75', BW 47', TOTAL HT 5.5' SEE CIVIL PROPOSED FENCE, TOP OF FENCE 54', TW 51.5', BW 48.5', TOTAL HT 5.5'. SEE CIVIL 5.5' SLOPED WOOD FENCE AND NEW RETAINING WALL, SEE CIVIL PROTECT IN PLACE (E) PL FENCE,(N)COMBINED SHORING AND RETAINING WALL, SEE CIVIL (N)RETAINING WALL. TW 49.75', SEE CIVIL (E)P.P TO REMAIN R 4' - 0 "5' - 0"GRASSCRETEGRASSCRETE 5' - 0" 3' - 10 1/2" 4' - 3 1/2" 8' - 2 1/2" 30' - 0"24' - 1 1/2"Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1" = 10'-0"10/7/2020 3:26:56 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-100 SITE PLAN JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1" = 10'-0"1 Site Plan 05 - PARKING COUNT SCHEDULE Comments Mark Sub-Category ADA 13 COVERED GUEST 16 UNCOVERED GUEST - COMPACT 14 UNCOVERED GUEST - COMPACT 15 UNCOVERED UNIT 1 1 COVERED UNIT 1 2 COVERED UNIT 2 3 COVERED UNIT 2 4 COVERED UNIT 3 5 COVERED UNIT 4 8 COVERED UNIT 4 9 COVERED UNIT 5 6 COVERED UNIT 5 7 COVERED UNIT 6 12 UNCOVERED UNIT 7 10 COVERED UNIT 7 11 COVERED 16 FAR AREA SCHEDULE - LEVEL 1 Name SQ.FT.ROOF DECK DECK TO FLOORAREA RATIO BLDG 1-FOOTPRINT 2086 SF 400 SF 19.2 BLDG 2-FOOTPRINT 1423 SF 324 SF 22.8 BLDG 3-FOOTPRINT 2673 SF 315 SF 11.8 6182 SF No. Description Date PROPOSED TWO STORY BUILDING 1 LANDSCAPE70'-0" PL269'-11 1/2" PL 269'-11 1/2" PL PROPOSED TWO STORY BUILDING 2 PROPOSED TWO STORY BUILDING 3 SIDEWALK2' - 0" 12 (E)P.P TO REMAIN(N)6'-0" GATE(N)6'-0" FENCE PER CIVIL (N)TREE RELOCATE GAS METER CHINQUAPIN AVE.CLCL6" FIRE WATER SERVICE 8' - 6"RoWRoW(N) IRRIGATION METER TO STREETEXISTING 2 STORY BUILDING PROPERTY LINE FRONT YARD SETBACK NExisting Driveway EXISTING 2 STORY BUILDING EXISTING 1 STORY BUILDING BLDG 3 ROOF DECK-315 SF BLDG 2 ROOF DECK-324 SF BLDG 1 ROOF DECK-400 SF UNIT 4 YARD 60 SF 8' R. BARREL VAULT 5' R. BARREL VAULT8' R. BARREL VAULT 10' R. BARREL VAULT4' R. BARREL VAULT 8' R. BARREL VAULT8' R. BARREL VAULT5' R. BARREL VAULT 4' R. BARREL VAULT7' R. BARREL VAULT7' R. BARREL VAULT 4' R. BARREL VAULTUNIT 1 YARDUNIT 2 YARDUNIT 5 YARD 60 SF UNIT 6 YARD 60 SF UNIT 7 YARD-PATIO BELOW 60 SF 5' R. BARREL VAULT4' R. BARREL VAULT3' R. BARREL VAULT 272 SF SOLAR ZONE 206 SF SOLAR ZONE GUEST PARKINGFUTURE EV PARKING GUEST PARKINGEV PARKING 14 15 16 224 SF SOLAR ZONE (N) ELECTRIC AL METER LINE OF SIGHT @DRIVEWAY (N)WATER METER (N)BACKFLOW W W W W W W W W W W W W EEEEEE FW FW FW FW FW FW FW FW FW FW W W W W S S S S S S S S S (E)SIDEWALK TO BE REPLACED 10' - 0" 6" FIRE WATER SERVICE WITH DDCV SITE PLAN LEGEND PROPOSED PRIVATE BMP STENCIL PER CIVIL PROPOSED PRIVATE ELEC HAND HOLE PER CIVIL PROPOSED SEWER LINE PER CIVIL SLOPE PER CIVILPROPOSED PERMEABLE PAVER PROPERTY LINE PROPOSED WATER LINE PER CIVIL PROPOSED ELECTIRCAL LINE PER CIVIL SET BACK LINE PROPOSED SOLAR ZONE PROPOSED ROOF DECK CAP COMPLIANCE TABLE: 2A -PHOTOVOLATIC SYSTEM: 3A -WATER HEATING: 4A -ELECTRICAL VEHICLE CHARGING: 12.65KWDC REQUIRED-330 W PER CELL12650/330= 38 CELL REQ.D. SOLAR AREA: 691 SFPROPOSED SOLAR AREA : 702 SF GAS WATER HEATING SYSTEM 1 INSTALL EV PARKING #161 FUTURE EV PARKING #15 S W E LINE OF SIGHT @ DRWY PROPOSED 6" FIRE WATER SERVICE PER CIVIL FW STORM WATER DRAINAGE www.ULTRA-UNIT.com Scale DateDrawn By Checked By Project Number Sheet Name Architect Stamp Sheet Number Client Name:Project:Team Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Ultra-Unit Architectural Studio 1327 Loma AvenueLong Beach, California 90804t. 562.997.0971e. cameron@ultra-unit.come. karl@ultra-unit.com David Choi -Structural Engineer1327 Loma AvenueLong Beach, California 90804 t. 562.961.5600 MINARC2324 Michigan aveSanta Monica, California 90404t. 310.998.8899e. tryggvi@minarc.come. lark@ultra-unit.com As indicated 10/7/2020 3:27:03 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-100.1 ROOF PLAN JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1" = 10'-0"1 ROOF PLAN NOTE: ROOF MOUNTED EQUIPMENT WILL BE CONCEALED FROM VIEW AND SOUND BUFFER FROM ADJACENT PROPERTIES. FAR AREA SCHEDULE - LEVEL 1 Name SQ.FT.ROOF DECK DECK TO FLOORAREA RATIO BLDG 1-FOOTPRINT 2086 SF 400 SF 19.2 BLDG 2-FOOTPRINT 1423 SF 324 SF 22.8 BLDG 3-FOOTPRINT 2673 SF 315 SF 11.8 6182 SF SOLAR ZONE AREA CALCULATION Comments CFA # d.u. caluculatedkWdc watt per cell Number of cell req.d. solararea UNIT 1 1673 SF 1 2.11 330 6 115 UNIT 2 1404 SF 1 1.95 330 6 107 UNIT 3 574 SF 1 1.48 330 4 81 UNIT 4 984 SF 1 1.71 330 5 94 UNIT 5 891 SF 1 1.66 330 5 91 UNIT 6 583 SF 1 1.48 330 4 81 UNIT 7 1940 SF 1 2.26 330 7 123 78 8048 SF 12.65 38 691 No. Description Date EXISTING 2 STORY BUILDING CHINQUAPIN AVE.PROPERTY LINE UNIT 2 GARAGE PROPOSED TWO STORYBUILDING 1 SIDEYARD SETBACK TWO-WAY DRIVE NLANDSCAPE70'-0" PL269'-11 1/2" PL 269'-11 1/2" PL UNIT 1 GARAGE EXISTING 2 STORY BUILDING EXISTING 1 STORY BUILDING PROPOSED 6' FENCE PROPOSED TWO STORYBUILDING 4BACKYAD SETBACKExisting Fire Hydrant8' - 6"SIDEWALK2' - 0" 2' - 0" 12 UNIT 7 GARAGE SIDEWALKSIDEWALKSIDEWALKSIDEWALK (N)SIDEWALKCLCLRoWRoW2' - 0" 789 11 10 20' - 0"R 28' - 0"R 28' - 0"20' - 0"20' - 0"24' - 0"24' - 0"4 3 2 1 120' - 0"R 1 5' - 4 " R 24' - 0" Scale DateDrawn By Checked By Project Number Cameron Crockett -Architect/Contractor Ultra-Unit Architectural Studio 1327 Loma AvenueLong Beach, California 90804t. 562.997.0971 e. cameron@ultra-unit.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team Revisions RENEWAL 1.31.2021 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT 1" = 10'-0"10/7/2020 3:27:08 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-100.2 BACK UP DIAGRAMJEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1" = 10'-0"1 Site Plan -back up No. Description Date AREA: AREA USE: 2086.50 SF BLDG 1-FOOTPRINT AREA: AREA USE: 1422.52 SF BLDG 2-FOOTPRINT AREA: AREA USE: 2672.94 SF BLDG 3-FOOTPRINT Schema 1 Legend BLDG 1-FOOTPRINT BLDG 2-FOOTPRINT BLDG 3-FOOTPRINT LANDSCAPE 1 LANDSCAPE 2 LANDSCAPE 3 AREA: AREA USE: 3601.20 SF LANDSCAPE 3 AREA: AREA USE: 103.32 SF LANDSCAPE 2 AREA: AREA USE: 22.64 SF LANDSCAPE 1 Schema 1 Legend BLDG 1 - LEVEL 2 BLDG 2 - LEVEL 2 BLDG 3- LEVEL 2 AREA: AREA USE: 2340.03 SF BLDG 1 -LEVEL 2 AREA: AREA USE: 652.87 SF BLDG 3-LEVEL 2 AREA: AREA USE: 2088.67 SF BLDG 2 -LEVEL 2 Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/16" = 1'-0"10/7/2020 3:27:12 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-100.3 FAR JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/16" = 1'-0"1 BLDG 1 - LEVEL 11/16" = 1'-0"2 BLDG 3 - LEVEL 2 LANDSCAPE SCHEDULE Name SQ.FT.Comments LANDSCAPE 3 3601 SF LEVEL 1 LANDSCAPE 2 103 SF LEVEL 1 LANDSCAPE 1 23 SF LEVEL 1 3727 SF FAR AREA SCHEDULE - LEVEL 1 Name SQ.FT.ROOF DECK DECK TO FLOORAREA RATIO BLDG 1-FOOTPRINT 2086 SF 400 SF 19.2 BLDG 2-FOOTPRINT 1423 SF 324 SF 22.8 BLDG 3-FOOTPRINT 2673 SF 315 SF 11.8 6182 SF FAR AREA SCHEDULE - LEVEL 2 Name SQ.FT.ROOF DECK DECK TO FLOORAREA RATIO Category Comments BLDG 1 - LEVEL 2 2340 SF RESIDENTIAL LEVEL 2 BLDG 3- LEVEL 2 653 SF RESIDENTIAL LEVEL 2 BLDG 2 - LEVEL 2 2089 SF RESIDENTIAL LEVEL 2 5082 SF No. Description Date 2 3 41 A C B 2 A-302 D 85 SF UNIT 1 - RR1104 414 SF UNIT 1 - GARAGE107 22 SF UNIT 1 - LUANDRY105 69 SF UNIT 1 - STORAGE106 77 SF UNIT 1 - FOYER101260 SF UNIT 1 - BR11022' - 6"1 21 1' - 6"ø 5' - 0"D04 D05 D01 D02 W01 W01 W01 19 SF UNIT 1 - CLS1109 D06 D09 1 A-301 1 A-301 EXT 5 EXT1 INT 3 INT 2 INT 2 EXT 1 EXT 1 14' - 7 1/2"19' - 5" 34' - 8 1/2" 3' - 1"2' - 0"2' - 0"10' - 1 1/2" EXT1 17' - 7"4' - 4 1/2"4' - 0"2' - 7"3' - 7 1/2"8' - 0"10' - 9"INT 3 INT 3 E 20' - 6"4' - 2 1/2" ø 5' - 0"22' - 2"20' - 2 1/2" 20' - 2 1/2" 3 4 56 SF UNIT 2 - STORAGE227 14 SF UNIT 2 - LAUNDRY214 86 SF UNIT 2 - RR1224 19 SF UNIT 2 - CLS1213 73 SF UNIT 2 - FOYER219 141516 9' - 5 1/2"448 SF UNIT 2 - GARAGE210 235 SF UNIT 2 - BR 1211 Survey 50'-0" PLAN LEGEND N ABOVE FLOOR LINE CENTERLINE NOT IN CONTRACT or BY OWNER EQUIPMENT NEW WALL/PARTITION. REFER TO PARTITION LEGEND EXPANSION JOINT (EJ) At least one accessible route shall be provided within the site from accessible parking spaces and accessible passenger loading zones: Public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve. where more than one route is provided, all routes must be accessible. (11b-206.2.1) At least on accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. (11b-206.2.2) ACCESSIBLE ROUTES Entrances shall be provided in accordance with 11b-206.4 entrances.Entrance doors, doorways, and gates shall comply with 11b-404 doors. doorways, and gates and shall be on an accessible route complying with 11b-402 accessible routes; (11b-206.4)All entrances and exterior ground-floor exits to buildings and facilities shall comply with 11b-404 doors, doorways and gates (11b-206.4.1) Every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. Accessible routes shall consist of one or more of the following components: walking surface with a running slope not steeper than 1:20(5%), doorways, ramps, curb ramps excluding the flared sides, elevators, and platform lifts. (11b-402.2) The running slope of walking surfaces shall not be steeper than 1:20 (5%). the cross slope of walking surface shall be steeper than 1:48 (2.083%) (11b-403.3) Except a turns or passing spaces, the clear width of walking surface shall be 36" inches minimum. (11b-403.5.1) the clear width for walking surfaces in corridors serving an occupant load of 10 or more shall be 44 inches minimum. (11b-403.5.1)The clear width for sidewalks and walks shall be 48 inches minimum.(11b-403.5.1)The clear width for accessible routes to accessible toilet compartments shall be 44 inches except for door-opening widths and door swings. (11b-403.5.1) SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCESALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL CONSTRUCTION CREW TO COVER DUCT OPENINGS AND PROTECT MECH EQUIPMENT DURING CONSTRUCTION = CBC 11 -4.410.1MATERIALS WITH VISIBLE WATER DAMAGE SHALL NOT BE INSTALLED.FOR ALL ELEVATIONS -SEE CIVIL PLAN NOTES #-A GRIDLINE -FOR STRUCTURESEE STRUCTURAL DRAWINGS FOR KEY 1.The construction shall not restrict a five-foot clear and unobstructed access to any water of power distribution facilities (power poles, pull boxes, transformers, vaults, pumps, valves, meters, appurtenances, etc.) or to the location of the hook-up. The construction shall not be within ten feet of any power lines-whether or not the lines are located on the property. Failure to comply may cause construction delays and/or additional expenses. 2.An approved seismic gas shutoff valve will be installed on the fuel gas line on the downstream side of the utility meter and be rigidly connected to the exterior of the building or structure containing the fuel gas piping. NOTE separate plumbing permit is required. 3.Provide ultra-low flush water closets for all new construction. Existing shower heads and toilets must be adapted for low water consumption. 4.Shower compartments and walls above bathtubs with installed shower heads shall be finished with a smooth non-absorbent surface to height no less than 72 inches above the drain inlet. 5.Water heaters must be strapped to a wall.6.Null7.A copy of the evaluation report and or conditions of listing shall be made available at the job site. 60" TURNING RADIUS 30" X 48" CLEARANCE 60" D IA. 48" 30"ACCESSIBILITY CLEARANCE FOR DOOR 4' - 6"9' - 6"4' - 6"4' - 0"5' - 0".12" 18" INT. 24" EXT..WITHIN DWELLING UNIT 4' - 6"5' - 0" NOT REQ'D18" 4' - 0" PRIMARY / EXTERIOR / COMMON 3' - 0"3' - 4"3' - 0"3' - 6"2' - 0" 32" MIN CLR DOOR STOP 1 1/2" MIN Double striping of stalls shall be per zoning code section 12.21a5 chart no. 5 every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. SEE A700 FOR EXTERIOR WALL SEE A701 FOR INTERIOR WALL ASSEMBLIES EXT 1:2 X 6 EXTERIOR WALL, R-19 BATT EXT 4:2 X 6 EXTERIOR WALL, R-19 BATT, CULTURED STONE O/ LATH & SCRATCH COAT, STC EXT 5:2 X 6 EXTERIOR WALL, R-19 BATT, INT 1:PARTY WALL, 2X STGR STUD, U341,STC INT 2:2 X 4 INTERIOR PARTION INT 4:2X 6 PLUMBING 8.The electrical system shall have sufficient capacity to simultaneously charge all designated EV spaces at the full rated amperage of the EVSE. plan design shall be based upon a 40-ampere minimum branch circuit. a separate electrical permit is required.9.The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as EV CAPABLE in accordance with the Los Angeles Electrical Code. INT 3:2 X 4 INTERIOR PARTION WALL, KEY NOTE 1 TANKLESS WALL MOUNTED WATER HEATER Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:18 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-110 BUILDING 1- LEVEL 1 JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 1 - LEVEL 1 Room Schedule -BUILDING 1 Name Area TotalRR TotalBR UnboundedHeight StorageVolumn UNIT 2 - BR 1 235 SF 10' - 0" UNIT 2 - BR 2 198 SF 20' - 6" UNIT 2 - FOYER 73 SF 8' - 0" UNIT 2 - RR1 46 SF 1 8' - 0" UNIT 2 - CLS1 19 SF 8' - 0" UNIT 2 - LAUNDRY 14 SF 8' - 0" UNIT 2 - CLS2 17 SF 8' - 0" UNIT 2 - RR1 86 SF 1 8' - 0" UNIT 2 - RR3 47 SF 1 8' - 0" UNIT 2 - CLS3 28 SF 8' - 0" UNIT 2 - BR3 140 SF 1 8' - 0" UNIT 2 - STAIR 62 SF 8' - 0" UNIT 2 - LIVING ROOM 384 SF 8' - 0" UNIT 2 - STORAGE 56 SF 8' - 0" 1404 SF 3 1 0.00 CF UNIT 1 - RR1 85 SF 1 8' - 0" UNIT 1 - LUANDRY 22 SF 8' - 10" UNIT 1 - STORAGE 69 SF 8' - 10" UNIT 1 - FOYER 77 SF 8' - 10" UNIT 1 - BR1 260 SF 1 8' - 10" UNIT 2 - STAIR 84 SF 8' - 0" UNIT 1 - BR2 140 SF 1 8' - 0" UNIT 1 - CLS2 28 SF 8' - 10" UNIT 1 - RR3 46 SF 1 8' - 0" UNIT 1 - RR2 47 SF 1 8' - 0" UNIT 1 - BR3 147 SF 1 8' - 10" UNIT 1 - CLS3 13 SF 8' - 10" UNIT 1 - LIVING ROOM 408 SF 9' - 0" UNIT 1 - STAIR 22 SF 7' - 8" UNIT 1 - STAIR 62 SF 18' - 0" UNIT 1 - KITCHEN 144 SF 9' - 0" UNIT 1 - CLS1 19 SF 8' - 10" 1673 SF 3 3 0.00 CF UNIT 2 - GARAGE 448 SF 10' - 0" UNIT 1 - GARAGE 414 SF 8' - 10" BDLG 1 - ROOF DECK 400 SF 21' - 0" 1262 SF 0 0 0.00 CF 4338 SF 6 4 0.00 CF No. Description Date PLAN LEGEND N ABOVE FLOOR LINE CENTERLINE NOT IN CONTRACT or BY OWNER EQUIPMENT NEW WALL/PARTITION. REFER TO PARTITION LEGEND EXPANSION JOINT (EJ) At least one accessible route shall be provided within the site from accessible parking spaces and accessible passenger loading zones: Public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve. where more than one route is provided, all routes must be accessible. (11b-206.2.1) At least on accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. (11b-206.2.2) ACCESSIBLE ROUTES Entrances shall be provided in accordance with 11b-206.4 entrances.Entrance doors, doorways, and gates shall comply with 11b-404 doors. doorways, and gates and shall be on an accessible route complying with 11b-402 accessible routes; (11b-206.4)All entrances and exterior ground-floor exits to buildings and facilities shall comply with 11b-404 doors, doorways and gates (11b-206.4.1) Every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. Accessible routes shall consist of one or more of the following components: walking surface with a running slope not steeper than 1:20(5%), doorways, ramps, curb ramps excluding the flared sides, elevators, and platform lifts. (11b-402.2) The running slope of walking surfaces shall not be steeper than 1:20 (5%). the cross slope of walking surface shall be steeper than 1:48 (2.083%) (11b-403.3) Except a turns or passing spaces, the clear width of walking surface shall be 36" inches minimum. (11b-403.5.1) the clear width for walking surfaces in corridors serving an occupant load of 10 or more shall be 44 inches minimum. (11b-403.5.1)The clear width for sidewalks and walks shall be 48 inches minimum.(11b-403.5.1)The clear width for accessible routes to accessible toilet compartments shall be 44 inches except for door-opening widths and door swings. (11b-403.5.1) SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCESALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIALCONSTRUCTION CREW TO COVER DUCT OPENINGS AND PROTECT MECH EQUIPMENT DURING CONSTRUCTION = CBC 11 -4.410.1MATERIALS WITH VISIBLE WATER DAMAGE SHALL NOT BE INSTALLED.FOR ALL ELEVATIONS -SEE CIVIL PLAN NOTES #-A GRIDLINE -FOR STRUCTURESEE STRUCTURAL DRAWINGS FOR KEY 1.The construction shall not restrict a five-foot clear and unobstructed access to any water of power distribution facilities (power poles, pull boxes, transformers, vaults, pumps, valves, meters, appurtenances, etc.) or to the location of the hook-up. The construction shall not be within ten feet of any power lines-whether or not the lines are located on the property. Failure to comply may cause construction delays and/or additional expenses. 2.An approved seismic gas shutoff valve will be installed on the fuel gas line on the downstream side of the utility meter and be rigidly connected to the exterior of the building or structure containing the fuel gas piping. NOTE separate plumbing permit is required. 3.Provide ultra-low flush water closets for all new construction. Existing shower heads and toilets must be adapted for low water consumption. 4.Shower compartments and walls above bathtubs with installed shower heads shall be finished with a smooth non-absorbent surface to height no less than 72 inches above the drain inlet. 5.Water heaters must be strapped to a wall.6.Null7.A copy of the evaluation report and or conditions of listing shall be made available at the job site. 60" TURNING RADIUS 30" X 48" CLEARANCE 60" D IA . 48" 30"ACCESSIBILITY CLEARANCE FOR DOOR 4' - 6"9' - 6"4' - 6"4' - 0"5' - 0".12" 18" INT. 24" EXT..WITHIN DWELLING UNIT 4' - 6"5' - 0" NOT REQ'D18" 4' - 0" PRIMARY / EXTERIOR / COMMON 3' - 0"3' - 4"3' - 0"3' - 6"2' - 0" 32" MIN CLR DOOR STOP 1 1/2" MIN Double striping of stalls shall be per zoning code section 12.21a5 chart no. 5 every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. SEE A700 FOR EXTERIOR WALL SEE A701 FOR INTERIOR WALL ASSEMBLIES EXT 1:2 X 6 EXTERIOR WALL, R-19 BATT EXT 4:2 X 6 EXTERIOR WALL, R-19 BATT, CULTURED STONE O/ LATH & SCRATCH COAT, STC EXT 5:2 X 6 EXTERIOR WALL, R-19 BATT, INT 1:PARTY WALL, 2X STGR STUD, U341,STC INT 2:2 X 4 INTERIOR PARTION INT 4:2X 6 PLUMBING 8.The electrical system shall have sufficient capacity to simultaneously charge all designated EV spaces at the full rated amperage of the EVSE. plan design shall be based upon a 40-ampere minimum branch circuit. a separate electrical permit is required.9.The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as EV CAPABLE in accordance with the Los Angeles Electrical Code. INT 3:2 X 4 INTERIOR PARTION WALL, KEY NOTE 1 TANKLESS WALL MOUNTED WATER HEATER 2 3 41 A A C C B B 2 A-302 D D 140 SF UNIT 1 - BR2109 28 SF UNIT 1 - CLS2111 46 SF UNIT 1 - RR3113 47 SF UNIT 1 - RR2110 147 SF UNIT 1 - BR3112 13 SF UNIT 1 - CLS3114 62 SF UNIT 1 - STAIR115 40' - 10 1/2"30' - 5 1/2"2' - 0"W02 D07 5' HT. WINDOW W03 W03 D04 A11 C11 1 A-301 1 A-301 EXT 5 EXT1 EXT1 INT 2 EXT 1 14' - 7 1/2"24' - 3"3' - 11"11' - 4 1/2"12' - 0 1/2"A-460 1 A-460 7 A-4011 30' - 5 1/2"E E 30' - 6 1/2"46 SF UNIT 2 - RR1229 47 SF UNIT 2 - RR3226 140 SF UNIT 2 - BR3228 17 SF UNIT 2 - CLS2224 384 SF UNIT 2 - LIVING ROOM225 28 SF UNIT 2 - CLS3222 62 SF UNIT 2 - STAIR230 143 SF UNIT 2 - KITCHEN221 408 SF UNIT 1 - LIVING ROOM108 144 SF UNIT 1 - KITCHEN117 198 SF UNIT 2 - BR 2215 Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:23 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-111 BUILDING 1- LEVEL 2 JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 1 - LEVEL 2 No. Description Date SOLAR ZONE The solar zone is an allocated space that is unshaded, un-penetrated, and free of obstructions. it serves as a suitable place that solar panels can be installed at a future date. Solar Zone Calculations Total roof area: 6 715 SFTotal area required solar zone (15%)(6 715 SF x 0.15) = 1 008 SF required. Solar Zone 1 = 508 SFSolar Zone 2 = 500 SF Note: -Minimum dimension 5’-0”, 80 SF-No obstructions and 2 times height of obstruction setback.-Minimum 4’-0”centerline access path to stand pipes, roof hatches, skylights or vent hatches.-Solar zone shall have 4’-0”clear perimeter access.-The solar zone shall be oriented between 10 deg. And 270 deg. From the north. A minimum of 1”metalic conduit termination point for future solar use.-The main electrical service panel shall have a reserved space to allow for installation of a double pole circuit breaker for a future solar electric installation. The reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location and shall be permanently marked as “for future solar electric” ROOF PLAN SPECIFIC NOTESTOTAL COMBINED ROOF AREA = 11362SQFT1704 SQFT SOLAR ZONE REQD -NO AREA LESS THAN 160SQFT4 SOLAR ZONES AT 450SQFT = 1800SQFT PROVIDED ROOF NOTES: 1.Contractor shall confirm that all areas of roof are provided with positive drainage. 2.Roof penetrations shall be flashed per building and manufactures specifications. 3.Contractor shall be responsible for coordination of sizes and locations of roof openings, platforms, bases, lighting, power, convenience outlets, etc., with equipment being supplied. 4.All roofing materials to be installed as per manufacture's recommendations and specifications. 5. Provide roof insulation per t-24 sheets. 6.Provide rain gutters, diverters and downspouts as required, refer to grading plans for drainage patterns. 7.Roof diaphragm nailing to be inspected before covering. face grain of plywood shall be perpendicular to supports. 8. All new crickets shall slope minimum 1/2" per foot. 9.Provide roof scupper with overflow to downspouts as shown on lid plan. 10.Parapet dimensions are shown from face of finish uno.11. G.C. to verify all dimensions and contact architect if any discrepancies exist, prior to commencing work.12. G.C. to assure roof installation and all penetrations to be fully weathertight. 13.Roofing to comply with UBC standards 15-4 and shall be installed in accordance with table 15-b-2 (r902.1) 14.Installed roofing over minimum 30# underlayment. 15.The quality and design of roofing materials and their fastening devices shall conform to the applicable standards listed in chapter 35, part II (1507.1) 16. All materials shall be delivered in packages bearing the manufacturers label or identifying mark. 17.The roofing installer shall be responsible for providing a complete waterproof installation including all necessary flashing, caps, pipe jacks, opening protection and sealants. all roofing shall comply with NRCA standards UBC chapter 13. 18. Verify that all areas have a positive 1/4" per foot min. roof drainage prior to installation. 19.Downspouts are sized either for UPC code average 6"/ hour rainfall or minimum 8" interior DIA. -whichever is greater. 20. Provide plywood or felt crickets as required to maintain 1/2" per foot drainage at equipment pads and roof hatch. 21. Installed roofing materials as soon as possible after installation of metal roof deck to minimize exposure of the deck to moisture sources. 22. All exposed roof metal and vents shall be primed and prepared for paint finish. paint shall match exterior wall color per exterior finish schedule. 23. All/any roof penetrations shall be minimum 18" away from air conditioning units and a minimum18" from other penetrations. 24. Vents through roof shall be installed 10'-0" from and terminated 3'-0" above any fresh air intakes. 25. Openings in the building envelope that are potential sources of air leakage shall be caulked, gasketed, weather-stripe or otherwise sealed to limit infiltration and exfiltration. 26. Contractor shall verify that all gas lines condensation and all conduit lines shall not extend above roof surfaces. 27. Lead flashing shall be used at all roof and overflow drain penetrations. 28. Material used for roof sheathing: wood structural panels used for roof sheathing shall be bonded by intermediate or exterior glue. (CBC 2320.12.9) 29. The roof sheathing shall include a radiant barrier. 30. The main electrical service panel shall have a reserved space to allow for installation of a double pole circuit breaker for a future solar electric installation. the reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location and shall be permanently marked as "for future solar electric" (4.211.4 energy code and 110.10 LAFD requirement no. 96) EQUIPMENT ON ROOFS. CMC 2016 308.1.1-6,304 1. Enclosures. equipment on roof shall be designed or enclosed so as to withstand climatic conditions in the areas in which it is installed. where enclosures are provided, each enclosure shall be of reasonable height, and shall have at least a thirty (30) inch (762 mm) clearance between the entire service access panel(s) of the equipment and the wall of the enclosure. 2.Roof support. roofs on which equipment is to be installed shall be capable of supporting the additional load or shall be reinforced to support the additional load. 3.Corrosion resistance. all access locks, screws, and bolts shall be of corrosion-resistant material. 4. Roof drainage. equipment shall be installed on a well-drained surface of the roof. 5.Guards or rails. at least six (6) ft. (1,829 mm) between any part of the equipment and the edge of a roof or similar hazard, or rigidly fixed rail, guards, parapets, or other building structures at least forty-two (42) inches (1,067 mm) in height shall be provided on the exposed side. 6. Electrical power. all equipment requiring an external source of electrical power for its operation shall be provided with: (1) readily accessible electrical disconnecting means within sight of the equipment.(2) a 120 vac grounding-type receptacle outlet on the roof adjacent to the equipment. the receptacle outlet shall be on the supply side of the disconnect switch. 7.Service and access to equipment and appliances. equipment and appliances shall be accessible for inspection, service, repair, and replacement without removing permanent construction. sufficient clearance shall be maintained to permit cleaning of heating surfaces; the replacement of filters, blowers, motors, burners, controls, and vent connections; the lubrication of moving parts where necessary; the adjustment and cleaning of burners and pilots; and the proper functioning of explosion vents, if provided. [NFPA 54-09:9.2.1] unless otherwise specified, not less than thirty (30) i inches (762 mm) in depth, width, and height of working space shall be provided. class b -built up roofing-white surfaced 8.The panel or subpanel shall provide capacity to install a 40-ampere minimum dedicated branch circuit and space(s) reserved to permint installation of a branch circuit over current protective device. 9.The service panel or subpanel circuit directory shall identify the over current protective device space(s) reserved for future EV charching as EV capable the raceway termination location shall be permanent and visibly marked EV capable. 10. A copy of the construction documents or a comparable document indicating the information from energy code sections 110.10(b) trough 110.10(c) shall be provided to the occupant.(ENERGY CODE 110.10(d)) ROOF LEGEND ROOF KEYNOTE 2 BARREL VAULT CEILING 3 CRICKET 4 CONDENSOR 5 DRAIN & SCUPPER OVER FLOW 1 2'-0 X 4'-0 VELUX MOTORIZED SKYLIGHT 2 3 41 A C B 2 A-302 D 1 A-301 1 A-301 2 A-542 22 SF UNIT 1 - STAIR116 2 EXT1 28' - 0 1/4"RF 1 4 5 RD RD 5 3 2%2%5 E 84 SF UNIT 2 - STAIR216 400 SF BDLG 1 - ROOF DECK132 UNIT 2 RECREATION SPACE UNIT 1 RECREATION SPACE Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:27 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-112 BUILDING 1 - ROOF DECK JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"2 BLDG 1 - ROOF DECK NOTE:-A COPY OF THE CONSTRUCTION DOCUMENTS OR A COMPARABLE DOCUMENT INDICATING THE INFORMATION FROM ENERGY CODE SECTIONS 110.10B THROUGH 110.10C SHALL BE PROVIDED TO THE OCCUPANT.-ROOF MOUNTED EQUIPMENT SHALL BE CONCEALED FROM VIEW AND THE SOUND BUFFERED FROM ADJACENT PROPERTIES AND STREETS IN ACCORDANCE WITH BUILDING DEPARTMENT POLICY NO. 80-6 No. Description Date 5 5 6 6 1 A-303 1 A-303 7 7 8 8 3 A-303.1 3 A-303.1 2 A-303 2 A-303 I I F F G G H HSIDEWALK2.0% 2.0% 407 SF UNIT 4 - GARAGE401 243 SF UNIT 5 - GARAGE501 61 SF UNIT 3 - RR303 140 SF UNIT 3 - BR304 18 SF UNIT 3 - LAUNDRY306 15 SF UNIT 3 - CLS305 AFFORDABLE UNIT J J K ø 5' - 0"1 2.0% 49 SF UNIT 3 - STORAGE307 7 820' - 0"20' - 4"12' - 0"20' - 4" 9 5 6 13 159 SF UNIT 3 - LIVING ROOM301 131 SF UNIT 3 - KITCHEN302 20' - 8"UNIT 3 RECREATION SPACE PLAN LEGEND N ABOVE FLOOR LINE CENTERLINE NOT IN CONTRACT or BY OWNER EQUIPMENT NEW WALL/PARTITION. REFER TO PARTITION LEGEND EXPANSION JOINT (EJ) At least one accessible route shall be provided within the site from accessible parking spaces and accessible passenger loading zones: Public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve. where more than one route is provided, all routes must be accessible. (11b-206.2.1) At least on accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. (11b-206.2.2) ACCESSIBLE ROUTES Entrances shall be provided in accordance with 11b-206.4 entrances.Entrance doors, doorways, and gates shall comply with 11b-404 doors. doorways, and gates and shall be on an accessible route complying with 11b-402 accessible routes; (11b-206.4)All entrances and exterior ground-floor exits to buildings and facilities shall comply with 11b-404 doors, doorways and gates (11b-206.4.1) Every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. Accessible routes shall consist of one or more of the following components: walking surface with a running slope not steeper than 1:20(5%), doorways, ramps, curb ramps excluding the flared sides, elevators, and platform lifts. (11b-402.2) The running slope of walking surfaces shall not be steeper than 1:20 (5%). the cross slope of walking surface shall be steeper than 1:48 (2.083%) (11b-403.3) Except a turns or passing spaces, the clear width of walking surface shall be 36" inches minimum. (11b-403.5.1) the clear width for walking surfaces in corridors serving an occupant load of 10 or more shall be 44 inches minimum. (11b-403.5.1)The clear width for sidewalks and walks shall be 48 inches minimum.(11b-403.5.1)The clear width for accessible routes to accessible toilet compartments shall be 44 inches except for door-opening widths and door swings. (11b-403.5.1) SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCESALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL CONSTRUCTION CREW TO COVER DUCT OPENINGS AND PROTECT MECH EQUIPMENT DURING CONSTRUCTION = CBC 11 -4.410.1MATERIALS WITH VISIBLE WATER DAMAGE SHALL NOT BE INSTALLED.FOR ALL ELEVATIONS -SEE CIVIL PLAN NOTES #-A GRIDLINE -FOR STRUCTURESEE STRUCTURAL DRAWINGS FOR KEY 1.The construction shall not restrict a five-foot clear and unobstructed access to any water of power distribution facilities (power poles, pull boxes, transformers, vaults, pumps, valves, meters, appurtenances, etc.) or to the location of the hook-up. The construction shall not be within ten feet of any power lines-whether or not the lines are located on the property. Failure to comply may cause construction delays and/or additional expenses. 2.An approved seismic gas shutoff valve will be installed on the fuel gas line on the downstream side of the utility meter and be rigidly connected to the exterior of the building or structure containing the fuel gas piping. NOTE separate plumbing permit is required. 3.Provide ultra-low flush water closets for all new construction. Existing shower heads and toilets must be adapted for low water consumption. 4.Shower compartments and walls above bathtubs with installed shower heads shall be finished with a smooth non-absorbent surface to height no less than 72 inches above the drain inlet. 5.Water heaters must be strapped to a wall.6.Null7.A copy of the evaluation report and or conditions of listing shall be made available at the job site. 60" TURNING RADIUS 30" X 48" CLEARANCE 60" D IA . 48" 30"ACCESSIBILITY CLEARANCE FOR DOOR 4' - 6"9' - 6"4' - 6"4' - 0"5' - 0".12" 18" INT. 24" EXT..WITHIN DWELLING UNIT 4' - 6"5' - 0" NOT REQ'D18" 4' - 0" PRIMARY / EXTERIOR / COMMON 3' - 0"3' - 4"3' - 0"3' - 6"2' - 0" 32" MIN CLR DOOR STOP 1 1/2" MIN Double striping of stalls shall be per zoning code section 12.21a5 chart no. 5 every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. SEE A700 FOR EXTERIOR WALL SEE A701 FOR INTERIOR WALL ASSEMBLIES EXT 1:2 X 6 EXTERIOR WALL, R-19 BATT EXT 4:2 X 6 EXTERIOR WALL, R-19 BATT, CULTURED STONE O/ LATH & SCRATCH COAT, STC EXT 5:2 X 6 EXTERIOR WALL, R-19 BATT, INT 1:PARTY WALL, 2X STGR STUD, U341,STC INT 2:2 X 4 INTERIOR PARTION INT 4:2X 6 PLUMBING 8.The electrical system shall have sufficient capacity to simultaneously charge all designated EV spaces at the full rated amperage of the EVSE. plan design shall be based upon a 40-ampere minimum branch circuit. a separate electrical permit is required.9.The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as EV CAPABLE in accordance with the Los Angeles Electrical Code. INT 3:2 X 4 INTERIOR PARTION WALL, KEY NOTE 1 TANKLESS WALL MOUNTED WATER HEATER Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:32 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-120 BUILDING 2 - LEVEL 1 JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 2 - LEVEL 1 Room Schedule -BUILDING 2 Name Area Comments TotalBR TotalRR UnboundedHeight UNIT 5 - RR 63 SF UNIT 5 1 8' - 0" UNIT 5 - BR2 149 SF UNIT 5 1 8' - 0" UNIT 5 - KITCHEN 238 SF UNIT 5 8' - 0" UNIT 5 - PANTRY 31 SF UNIT 5 8' - 0" UNIT 5 - BR1 143 SF UNIT 5 1 8' - 0" UNIT 5 - CLS1 14 SF UNIT 5 8' - 0" UNIT 5 - CLS2 13 SF UNIT 5 8' - 10" UNIT 5 - LAUNDRY 32 SF UNIT 5 8' - 10" UNIT 5 - LIVING 208 SF UNIT 5 1 8' - 10" 891 SF 2 2 UNIT 4 - CLS2 10 SF UNIT 4 8' - 0" UNIT 4 - LAUNDRY 32 SF UNIT 4 1 8' - 0" UNIT 4 - PANTRY 33 SF UNIT 4 8' - 0" UNIT 4 - LIVING ROOM 338 SF UNIT 4 8' - 0" UNIT 4 - BR1 147 SF UNIT 4 1 8' - 0" UNIT 4 - CLS1 10 SF UNIT 4 8' - 0" UNIT 4 - RR 65 SF UNIT 4 1 8' - 0" UNIT 4 - KITCHEN 157 SF UNIT 4 8' - 0" UNIT 4 - BR2 150 SF UNIT 4 1 8' - 10" 942 SF 2 2 UNIT 3 - STORAGE 49 SF UNIT 3 8' - 0" UNIT 3 - KITCHEN 131 SF UNIT 3 8' - 0" UNIT 3 - RR 61 SF UNIT 3 1 8' - 0" UNIT 3 - LIVING ROOM 159 SF UNIT 3 8' - 0" UNIT 3 - BR 140 SF UNIT 3 1 8' - 10" UNIT 3 - LAUNDRY 18 SF UNIT 3 8' - 10" UNIT 3 - CLS 15 SF UNIT 3 8' - 10" 574 SF 1 1 UNIT 4 - GARAGE 407 SF 8' - 10" UNIT 5 - GARAGE 243 SF 8' - 10" 650 SF 0 0 BLDG 2- ROOF RECK Not Enclosed 21' - 0" 0 SF 0 0 3057 SF 5 5 No. Description Date 5 5 6 6 1 A-303 1 A-303 7 7 8 8 3 A-303.1 3 A-303.1 2 A-303 2 A-303 I I F F G G H H 150 SF UNIT 4 - BR2407 63 SF UNIT 5 - RR509 208 SF UNIT 5 - LIVING504 40' - 10 1/2" J J K K 32 SF UNIT 5 - LAUNDRY510 143 SF UNIT 5 - BR1505 147 SF UNIT 4 - BR1404 32 SF UNIT 4 - LAUNDRY408 149 SF UNIT 5 - BR2507 10 SF UNIT 4 - CLS2409 10 SF UNIT 4 - CLS1410 65 SF UNIT 4 - RR405 33 SF UNIT 4 - PANTRY402 31 SF UNIT 5 - PANTRY506 13 SF UNIT 5 - CLS2508 14 SF UNIT 5 - CLS1511 338 SF UNIT 4 - LIVING ROOM403 157 SF UNIT 4 - KITCHEN406 238 SF UNIT 5 - KITCHEN502 8' - 9 1/2"8' - 11 1/2"42 SF UNIT 4 - PATIO4111' - 1 1/2"PLAN LEGEND N ABOVE FLOOR LINE CENTERLINE NOT IN CONTRACT or BY OWNER EQUIPMENT NEW WALL/PARTITION. REFER TO PARTITION LEGEND EXPANSION JOINT (EJ) At least one accessible route shall be provided within the site from accessible parking spaces and accessible passenger loading zones: Public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve. where more than one route is provided, all routes must be accessible. (11b-206.2.1) At least on accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. (11b-206.2.2) ACCESSIBLE ROUTES Entrances shall be provided in accordance with 11b-206.4 entrances.Entrance doors, doorways, and gates shall comply with 11b-404 doors. doorways, and gates and shall be on an accessible route complying with 11b-402 accessible routes; (11b-206.4)All entrances and exterior ground-floor exits to buildings and facilities shall comply with 11b-404 doors, doorways and gates (11b-206.4.1) Every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. Accessible routes shall consist of one or more of the following components: walking surface with a running slope not steeper than 1:20(5%), doorways, ramps, curb ramps excluding the flared sides, elevators, and platform lifts. (11b-402.2) The running slope of walking surfaces shall not be steeper than 1:20 (5%). the cross slope of walking surface shall be steeper than 1:48 (2.083%) (11b-403.3) Except a turns or passing spaces, the clear width of walking surface shall be 36" inches minimum. (11b-403.5.1) the clear width for walking surfaces in corridors serving an occupant load of 10 or more shall be 44 inches minimum. (11b-403.5.1)The clear width for sidewalks and walks shall be 48 inches minimum.(11b-403.5.1)The clear width for accessible routes to accessible toilet compartments shall be 44 inches except for door-opening widths and door swings. (11b-403.5.1) SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCESALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIALCONSTRUCTION CREW TO COVER DUCT OPENINGS AND PROTECT MECH EQUIPMENT DURING CONSTRUCTION = CBC 11 -4.410.1MATERIALS WITH VISIBLE WATER DAMAGE SHALL NOT BE INSTALLED.FOR ALL ELEVATIONS -SEE CIVIL PLAN NOTES #-A GRIDLINE -FOR STRUCTURESEE STRUCTURAL DRAWINGS FOR KEY 1.The construction shall not restrict a five-foot clear and unobstructed access to any water of power distribution facilities (power poles, pull boxes, transformers, vaults, pumps, valves, meters, appurtenances, etc.) or to the location of the hook-up. The construction shall not be within ten feet of any power lines-whether or not the lines are located on the property. Failure to comply may cause construction delays and/or additional expenses. 2.An approved seismic gas shutoff valve will be installed on the fuel gas line on the downstream side of the utility meter and be rigidly connected to the exterior of the building or structure containing the fuel gas piping. NOTE separate plumbing permit is required. 3.Provide ultra-low flush water closets for all new construction. Existing shower heads and toilets must be adapted for low water consumption. 4.Shower compartments and walls above bathtubs with installed shower heads shall be finished with a smooth non-absorbent surface to height no less than 72 inches above the drain inlet. 5.Water heaters must be strapped to a wall.6.Null7.A copy of the evaluation report and or conditions of listing shall be made available at the job site. 60" TURNING RADIUS 30" X 48" CLEARANCE 60" D IA . 48" 30"ACCESSIBILITY CLEARANCE FOR DOOR 4' - 6"9' - 6"4' - 6"4' - 0"5' - 0".12" 18" INT. 24" EXT..WITHIN DWELLING UNIT 4' - 6"5' - 0" NOT REQ'D18" 4' - 0" PRIMARY / EXTERIOR / COMMON 3' - 0"3' - 4"3' - 0"3' - 6"2' - 0" 32" MIN CLR DOOR STOP 1 1/2" MIN Double striping of stalls shall be per zoning code section 12.21a5 chart no. 5 every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. SEE A700 FOR EXTERIOR WALL SEE A701 FOR INTERIOR WALL ASSEMBLIES EXT 1:2 X 6 EXTERIOR WALL, R-19 BATT EXT 4:2 X 6 EXTERIOR WALL, R-19 BATT, CULTURED STONE O/ LATH & SCRATCH COAT, STC EXT 5:2 X 6 EXTERIOR WALL, R-19 BATT, INT 1:PARTY WALL, 2X STGR STUD, U341,STC INT 2:2 X 4 INTERIOR PARTION INT 4:2X 6 PLUMBING 8.The electrical system shall have sufficient capacity to simultaneously charge all designated EV spaces at the full rated amperage of the EVSE. plan design shall be based upon a 40-ampere minimum branch circuit. a separate electrical permit is required.9.The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as EV CAPABLE in accordance with the Los Angeles Electrical Code. INT 3:2 X 4 INTERIOR PARTION WALL, KEY NOTE 1 TANKLESS WALL MOUNTED WATER HEATER Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:36 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-121 BUILDING 2- LEVEL 2 JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 2 - LEVEL 2 No. Description Date 5 5 6 6 1 A-303 1 A-303 7 7 8 8 3 A-303.1 3 A-303.1 2 A-303 2 A-303 I I F F G G H H J J K K 22 4 4 3 3 3 3 5 3 3 5 5 DO SLOPE* Not Enclosed BLDG 2- ROOF RECK308 UNIT 4 RECREATION SPACE UNIT 5 RECREATION SPACE 1 FIRESTONE 'ULTRAPLY TYPO' ROOFING MEMBRANCE CLASS 'B' ESR-2831,CRRC PROD ID. 0608-0034. NOTE ALL ROOF AREAS TO BE 3-YEAR AGED SRIVALUE AT 75 AND A THERMAL EMMITTANCE OF AT LEAST 0.75 2 SHAFT PENETRATION 3 'DEX-O-TEX WEATHERWEAR AS A CLASS A FIRE-RETARDANT ROOFCOVERING' CSI#07180 LARR REPORT #2360-T 4 10" BASE THROUGH-BOLT TIEBACK ANCHORS, SEE A-902 FOR SPEC 5 ROOF DRAIN 6 OVER FLOW 7 LINE TO UV TREATED PVC PIPE DRAIN 8 SCUPPER: 4"x6" SCUPPER WITH DOWNSPOUT. 9 WOOD FRAMED PARAPET WITH CAP FLASHING. MIN. 42" HIGH PARAPET. 10 FUTURE CONDUIT FROM SOLAR ZONE TO MAIN SERVICE PANEL 11 METAL EQUIPMENT SCREEN 42" MAX. 12 INVERTER, METERING EQUIPMENT AND CONDUIT TO MAIN SERVICE PANELS 13 PATHWAY FOR ROUTING PLUMBING FROM SOLAR ZONE TO HOT WATERSYSTEM SOLAR ZONE The solar zone is an allocated space that is unshaded, un-penetrated, and free of obstructions. it serves as a suitable place that solar panels can be installed at a future date. Solar Zone Calculations Total roof area: 6 715 SFTotal area required solar zone (15%)(6 715 SF x 0.15) = 1 008 SF required. Solar Zone 1 = 508 SFSolar Zone 2 = 500 SF Note: -Minimum dimension 5’-0”, 80 SF-No obstructions and 2 times height of obstruction setback.-Minimum 4’-0”centerline access path to stand pipes, roof hatches, skylights or vent hatches.-Solar zone shall have 4’-0”clear perimeter access.-The solar zone shall be oriented between 10 deg. And 270 deg. From the north. A minimum of 1”metalic conduit termination point for future solar use.-The main electrical service panel shall have a reserved space to allow for installation of a double pole circuit breaker for a future solar electric installation. The reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location and shall be permanently marked as “for future solar electric” ROOF PLAN SPECIFIC NOTESTOTAL COMBINED ROOF AREA = 11362SQFT1704 SQFT SOLAR ZONE REQD -NO AREA LESS THAN 160SQFT4 SOLAR ZONES AT 450SQFT = 1800SQFT PROVIDED ROOF NOTES: 1.Contractor shall confirm that all areas of roof are provided with positive drainage. 2.Roof penetrations shall be flashed per building and manufactures specifications. 3.Contractor shall be responsible for coordination of sizes and locations of roof openings, platforms, bases, lighting, power, convenience outlets, etc., with equipment being supplied. 4.All roofing materials to be installed as per manufacture's recommendations and specifications. 5. Provide roof insulation per t-24 sheets. 6.Provide rain gutters, diverters and downspouts as required, refer to grading plans for drainage patterns. 7.Roof diaphragm nailing to be inspected before covering. face grain of plywood shall be perpendicular to supports. 8. All new crickets shall slope minimum 1/2" per foot. 9.Provide roof scupper with overflow to downspouts as shown on lid plan. 10.Parapet dimensions are shown from face of finish uno. 11. G.C. to verify all dimensions and contact architect if any discrepancies exist, prior to commencing work.12. G.C. to assure roof installation and all penetrations to be fully weathertight. 13.Roofing to comply with UBC standards 15-4 and shall be installed in accordance with table 15-b-2 (r902.1) 14.Installed roofing over minimum 30# underlayment. 15.The quality and design of roofing materials and their fastening devices shall conform to the applicable standards listed in chapter 35, part II (1507.1) 16. All materials shall be delivered in packages bearing the manufacturers label or identifying mark. 17.The roofing installer shall be responsible for providing a complete waterproof installation including all necessary flashing, caps, pipe jacks, opening protection and sealants. all roofing shall comply with NRCA standards UBC chapter 13. 18. Verify that all areas have a positive 1/4" per foot min. roof drainage prior to installation. 19.Downspouts are sized either for UPC code average 6"/ hour rainfall or minimum 8" interior DIA. -whichever is greater. 20. Provide plywood or felt crickets as required to maintain 1/2" per foot drainage at equipment pads and roof hatch. 21. Installed roofing materials as soon as possible after installation of metal roof deck to minimize exposure of the deck to moisture sources. 22. All exposed roof metal and vents shall be primed and prepared for paint finish. paint shall match exterior wall color per exterior finish schedule. 23. All/any roof penetrations shall be minimum 18" away from air conditioning units and a minimum18" from other penetrations. 24. Vents through roof shall be installed 10'-0" from and terminated 3'-0" above any fresh air intakes. 25. Openings in the building envelope that are potential sources of air leakage shall be caulked, gasketed, weather-stripe or otherwise sealed to limit infiltration and exfiltration. 26. Contractor shall verify that all gas lines condensation and all conduit lines shall not extend above roof surfaces. 27. Lead flashing shall be used at all roof and overflow drain penetrations. 28. Material used for roof sheathing: wood structural panels used for roof sheathing shall be bonded by intermediate or exterior glue. (CBC 2320.12.9) 29. The roof sheathing shall include a radiant barrier. 30. The main electrical service panel shall have a reserved space to allow for installation of a double pole circuit breaker for a future solar electric installation. the reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location and shall be permanently marked as "for future solar electric" (4.211.4 energy code and 110.10 LAFD requirement no. 96) EQUIPMENT ON ROOFS. CMC 2016 308.1.1-6,304 1. Enclosures. equipment on roof shall be designed or enclosed so as to withstand climatic conditions in the areas in which it is installed. where enclosures are provided, each enclosure shall be of reasonable height, and shall have at least a thirty (30) inch (762 mm) clearance between the entire service access panel(s) of the equipment and the wall of the enclosure. 2.Roof support. roofs on which equipment is to be installed shall be capable of supporting the additional load or shall be reinforced to support the additional load. 3.Corrosion resistance. all access locks, screws, and bolts shall be of corrosion-resistant material. 4. Roof drainage. equipment shall be installed on a well-drained surface of the roof. 5.Guards or rails. at least six (6) ft. (1,829 mm) between any part of the equipment and the edge of a roof or similar hazard, or rigidly fixed rail, guards, parapets, or other building structures at least forty-two (42) inches (1,067 mm) in height shall be provided on the exposed side. 6. Electrical power. all equipment requiring an external source of electrical power for its operation shall be provided with: (1) readily accessible electrical disconnecting means within sight of the equipment.(2) a 120 vac grounding-type receptacle outlet on the roof adjacent to the equipment. the receptacle outlet shall be on the supply side of the disconnect switch. 7.Service and access to equipment and appliances. equipment and appliances shall be accessible for inspection, service, repair, and replacement without removing permanent construction. sufficient clearance shall be maintained to permit cleaning of heating surfaces; the replacement of filters, blowers, motors, burners, controls, and vent connections; the lubrication of moving parts where necessary; the adjustment and cleaning of burners and pilots; and the proper functioning of explosion vents, if provided. [NFPA 54-09:9.2.1] unless otherwise specified, not less than thirty (30) i inches (762 mm) in depth, width, and height of working space shall be provided. class b -built up roofing-white surfaced 8.The panel or subpanel shall provide capacity to install a 40-ampere minimum dedicated branch circuit and space(s) reserved to permint installation of a branch circuit over current protective device. 9.The service panel or subpanel circuit directory shall identify the over current protective device space(s) reserved for future EV charching as EV capable the raceway termination location shall be permanent and visibly marked EV capable. 10. A copy of the construction documents or a comparable document indicating the information from energy code sections 110.10(b) trough 110.10(c) shall be provided to the occupant.(ENERGY CODE 110.10(d)) ROOF LEGEND ROOF KEYNOTE 2 BARREL VAULT CEILING 3 CRICKET 4 CONDENSOR 5 DRAIN & SCUPPER OVER FLOW 1 2'-0 X 4'-0 VELUX MOTORIZED SKYLIGHT Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:40 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-122 BUILDING 2- ROOF DECK JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 2 - ROOF DECK NOTE:-A COPY OF THE CONSTRUCTION DOCUMENTS OR A COMPARABLE DOCUMENT INDICATING THE INFORMATION FROM ENERGY CODE SECTIONS 110.10B THROUGH 110.10C SHALL BE PROVIDED TO THE OCCUPANT.-ROOF MOUNTED EQUIPMENT SHALL BE CONCEALED FROM VIEW AND THE SOUND BUFFERED FROM ADJACENT PROPERTIES AND STREETS IN ACCORDANCE WITH BUILDING DEPARTMENT POLICY NO. 80-6 No. Description Date 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 Q Q R R S S T T U U V W W X X Y Y Z Z 292 SF UNIT 7 - KITCHEN704 78 SF UNIT 7 - MASTER RR709 60 SF UNIT 7- MASTER CLS710 397 SF UNIT 7 - LIVING ROOM702 187 SF UNIT 7 - STUDY ROOM703 28 SF UNIT 7 - STORAGE706 145 SF UNIT 7 - GUEST BR711 45 SF UNIT 7 - LAUNDRY714 407 SF UNIT 7 - GARAGE715 58 SF UNIT 7 - GUEST RR712 17 SF UNIT 7 - PANTRY707 11 SF UNIT 7 - GURST CLS713 37 SF UNIT 7 - FORYER701 42 SF UNIT 6 - STAIR616 1011 BENCH 1 A-304 1 A-304 2 A-304 42" HT.WALL 5' - 11 1/2" EQEQ 20' - 2 1/2"3' - 2"ø 5' - 0"268 SF UNIT 7 - MASTER BR708 D10 D10 D10 D10 D15 D06 D07 D04 D06 D14D14D14 D06 D07 D12 W06W06 D01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 D02 D06 D08 D06 D09 D11 D15 W01 W01 W01 W01 W01 W01 19' - 11"EXT1 EXT 4 EXT 1 B41 A41 B45 A-403 1 A-46316' - 2"3' - 9 1/2"2' - 0"2' - 0"2' - 0"2' - 0"2' - 3 1/2"3' - 7 1/2"17' - 1"2' - 0"2' - 10"5' - 0"5' - 0"2' - 2 1/2"5' - 1"7' - 4"3' - 10"1' - 10 1/2"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"2' - 3 1/2"4' - 2"3' - 0"3' - 0"4' - 4"2' - 0"11' - 6"2' - 0"2' - 0"2' - 0"3' - 9 1/2"1' - 4"6' - 0"1' - 5 1/2"2' - 2"11' - 1"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"1' - 7 1/2"2' - 0" 2' - 0" 250 SF UNIT 7 - DINING705 D07 7' - 7" 61 SF UNIT 6 - STORAGE618 410 CF 27' - 0 1/2"1' - 6"4' - 0"PLAN LEGEND N ABOVE FLOOR LINE CENTERLINE NOT IN CONTRACT or BY OWNER EQUIPMENT NEW WALL/PARTITION. REFER TO PARTITION LEGEND EXPANSION JOINT (EJ) At least one accessible route shall be provided within the site from accessible parking spaces and accessible passenger loading zones: Public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve. where more than one route is provided, all routes must be accessible. (11b-206.2.1) At least on accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. (11b-206.2.2) ACCESSIBLE ROUTES Entrances shall be provided in accordance with 11b-206.4 entrances.Entrance doors, doorways, and gates shall comply with 11b-404 doors. doorways, and gates and shall be on an accessible route complying with 11b-402 accessible routes; (11b-206.4)All entrances and exterior ground-floor exits to buildings and facilities shall comply with 11b-404 doors, doorways and gates (11b-206.4.1) Every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. Accessible routes shall consist of one or more of the following components: walking surface with a running slope not steeper than 1:20(5%), doorways, ramps, curb ramps excluding the flared sides, elevators, and platform lifts. (11b-402.2) The running slope of walking surfaces shall not be steeper than 1:20 (5%). the cross slope of walking surface shall be steeper than 1:48 (2.083%) (11b-403.3) Except a turns or passing spaces, the clear width of walking surface shall be 36" inches minimum. (11b-403.5.1) the clear width for walking surfaces in corridors serving an occupant load of 10 or more shall be 44 inches minimum. (11b-403.5.1)The clear width for sidewalks and walks shall be 48 inches minimum.(11b-403.5.1)The clear width for accessible routes to accessible toilet compartments shall be 44 inches except for door-opening widths and door swings. (11b-403.5.1) SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCESALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL CONSTRUCTION CREW TO COVER DUCT OPENINGS AND PROTECT MECH EQUIPMENT DURING CONSTRUCTION = CBC 11 -4.410.1MATERIALS WITH VISIBLE WATER DAMAGE SHALL NOT BE INSTALLED.FOR ALL ELEVATIONS -SEE CIVIL PLAN NOTES #-A GRIDLINE -FOR STRUCTURESEE STRUCTURAL DRAWINGS FOR KEY 1.The construction shall not restrict a five-foot clear and unobstructed access to any water of power distribution facilities (power poles, pull boxes, transformers, vaults, pumps, valves, meters, appurtenances, etc.) or to the location of the hook-up. The construction shall not be within ten feet of any power lines-whether or not the lines are located on the property. Failure to comply may cause construction delays and/or additional expenses. 2.An approved seismic gas shutoff valve will be installed on the fuel gas line on the downstream side of the utility meter and be rigidly connected to the exterior of the building or structure containing the fuel gas piping. NOTE separate plumbing permit is required. 3.Provide ultra-low flush water closets for all new construction. Existing shower heads and toilets must be adapted for low water consumption. 4.Shower compartments and walls above bathtubs with installed shower heads shall be finished with a smooth non-absorbent surface to height no less than 72 inches above the drain inlet. 5.Water heaters must be strapped to a wall.6.Null7.A copy of the evaluation report and or conditions of listing shall be made available at the job site. 60" TURNING RADIUS 30" X 48" CLEARANCE 60" D IA. 48" 30"ACCESSIBILITY CLEARANCE FOR DOOR 4' - 6"9' - 6"4' - 6"4' - 0"5' - 0".12" 18" INT. 24" EXT..WITHIN DWELLING UNIT 4' - 6"5' - 0" NOT REQ'D18" 4' - 0" PRIMARY / EXTERIOR / COMMON 3' - 0"3' - 4"3' - 0"3' - 6"2' - 0" 32" MIN CLR DOOR STOP 1 1/2" MIN Double striping of stalls shall be per zoning code section 12.21a5 chart no. 5 every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. SEE A700 FOR EXTERIOR WALL SEE A701 FOR INTERIOR WALL ASSEMBLIES EXT 1:2 X 6 EXTERIOR WALL, R-19 BATT EXT 4:2 X 6 EXTERIOR WALL, R-19 BATT, CULTURED STONE O/ LATH & SCRATCH COAT, STC EXT 5:2 X 6 EXTERIOR WALL, R-19 BATT, INT 1:PARTY WALL, 2X STGR STUD, U341,STC INT 2:2 X 4 INTERIOR PARTION INT 4:2X 6 PLUMBING 8.The electrical system shall have sufficient capacity to simultaneously charge all designated EV spaces at the full rated amperage of the EVSE. plan design shall be based upon a 40-ampere minimum branch circuit. a separate electrical permit is required.9.The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as EV CAPABLE in accordance with the Los Angeles Electrical Code. INT 3:2 X 4 INTERIOR PARTION WALL, KEY NOTE 1 TANKLESS WALL MOUNTED WATER HEATER Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:46 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-130 BUILDING 3- LEVEL 1 JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 3 - LEVEL 1 Room Schedule -BUILDING 3 Name Area TotalBedroom TotalBathroom UnboundedHeight UNIT 7 - MASTER RR 78 SF 1 8' - 0" UNIT 7 - LAUNDRY 45 SF 8' - 0" UNIT 7 - GUEST RR 58 SF 1 8' - 0" UNIT 7 - STAIR 67 SF 8' - 0" UNIT 7 - KITCHEN 292 SF 8' - 10" UNIT 7- MASTER CLS 60 SF 8' - 10" UNIT 7 - LIVING ROOM 397 SF 8' - 10" UNIT 7 - STUDY ROOM 187 SF 8' - 10" UNIT 7 - STORAGE 28 SF 8' - 10" UNIT 7 - GUEST BR 145 SF 1 8' - 10" UNIT 7 - PANTRY 17 SF 8' - 10" UNIT 7 - GURST CLS 11 SF 8' - 10" UNIT 7 - FORYER 37 SF 8' - 10" UNIT 7 - MASTER BR 268 SF 1 10' - 0" UNIT 7 - DINING 250 SF 11' - 6" 1940 SF 2 2 UNIT 6 - KITCHEN 127 SF 8' - 0" UNIT 6 - BEDROOM 261 SF 1 8' - 0" UNIT 6 - RR 55 SF 1 8' - 0" UNIT 6 - CLS 36 SF 8' - 0" UNIT 6 - STORAGE 61 SF 8' - 0" UNIT 6 - STAIR 42 SF 18' - 0" 583 SF 1 1 UNIT 7 - GARAGE 407 SF 8' - 0" UNIT 7 - PATIO 424 SF 10' - 0" BLDG 3 - ROOF DECK 315 SF 22' - 7 5/8" 1147 SF 0 0 3669 SF 3 3 No. Description Date 9 10 11 12 13 14 15 16 Q R S T U V W X Y Z Fireplace BBQ 127 SF UNIT 6 - KITCHEN602 261 SF UNIT 6 - BEDROOM601 55 SF UNIT 6 - RR603 36 SF UNIT 6 - CLS604 424 SF UNIT 7 - PATIO716 67 SF UNIT 7 - STAIR717 1 A-304 1 A-304 2 A-304 STUDIO APT. UP TO VIEW DECK BARREL VAULT BARREL VAULT BARREL VAULT BARREL VAULT BARREL VAULTW06 W07 D08 D11 W06 W05 W01 W01 W01 B44 C12 A-403 2 A-463 2 2%2%14'-1" 13'-0" 12'-0 1/8" 4 4 4' - 3 1/2"12' - 7" 4' - 9" 3' - 7" 20 SF UNIT 6 - STORAGE605 D07 UNIT 7 RECREATION SPACE PLAN LEGEND N ABOVE FLOOR LINE CENTERLINE NOT IN CONTRACT or BY OWNER EQUIPMENT NEW WALL/PARTITION. REFER TO PARTITION LEGEND EXPANSION JOINT (EJ) At least one accessible route shall be provided within the site from accessible parking spaces and accessible passenger loading zones: Public streets and sidewalks; and public transportation stops to the accessible building or facility entrance they serve. where more than one route is provided, all routes must be accessible. (11b-206.2.1) At least on accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site. (11b-206.2.2) ACCESSIBLE ROUTES Entrances shall be provided in accordance with 11b-206.4 entrances.Entrance doors, doorways, and gates shall comply with 11b-404 doors. doorways, and gates and shall be on an accessible route complying with 11b-402 accessible routes; (11b-206.4)All entrances and exterior ground-floor exits to buildings and facilities shall comply with 11b-404 doors, doorways and gates (11b-206.4.1) Every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. Accessible routes shall consist of one or more of the following components: walking surface with a running slope not steeper than 1:20(5%), doorways, ramps, curb ramps excluding the flared sides, elevators, and platform lifts. (11b-402.2) The running slope of walking surfaces shall not be steeper than 1:20 (5%). the cross slope of walking surface shall be steeper than 1:48 (2.083%) (11b-403.3) Except a turns or passing spaces, the clear width of walking surface shall be 36" inches minimum. (11b-403.5.1) the clear width for walking surfaces in corridors serving an occupant load of 10 or more shall be 44 inches minimum. (11b-403.5.1)The clear width for sidewalks and walks shall be 48 inches minimum.(11b-403.5.1)The clear width for accessible routes to accessible toilet compartments shall be 44 inches except for door-opening widths and door swings. (11b-403.5.1) SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCESALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIALCONSTRUCTION CREW TO COVER DUCT OPENINGS AND PROTECT MECH EQUIPMENT DURING CONSTRUCTION = CBC 11 -4.410.1MATERIALS WITH VISIBLE WATER DAMAGE SHALL NOT BE INSTALLED.FOR ALL ELEVATIONS -SEE CIVIL PLAN NOTES #-A GRIDLINE -FOR STRUCTURESEE STRUCTURAL DRAWINGS FOR KEY 1.The construction shall not restrict a five-foot clear and unobstructed access to any water of power distribution facilities (power poles, pull boxes, transformers, vaults, pumps, valves, meters, appurtenances, etc.) or to the location of the hook-up. The construction shall not be within ten feet of any power lines-whether or not the lines are located on the property. Failure to comply may cause construction delays and/or additional expenses. 2.An approved seismic gas shutoff valve will be installed on the fuel gas line on the downstream side of the utility meter and be rigidly connected to the exterior of the building or structure containing the fuel gas piping. NOTE separate plumbing permit is required. 3.Provide ultra-low flush water closets for all new construction. Existing shower heads and toilets must be adapted for low water consumption. 4.Shower compartments and walls above bathtubs with installed shower heads shall be finished with a smooth non-absorbent surface to height no less than 72 inches above the drain inlet. 5.Water heaters must be strapped to a wall.6.Null7.A copy of the evaluation report and or conditions of listing shall be made available at the job site. 60" TURNING RADIUS 30" X 48" CLEARANCE 60" D IA . 48" 30"ACCESSIBILITY CLEARANCE FOR DOOR 4' - 6"9' - 6"4' - 6"4' - 0"5' - 0".12" 18" INT. 24" EXT..WITHIN DWELLING UNIT 4' - 6"5' - 0" NOT REQ'D18" 4' - 0" PRIMARY / EXTERIOR / COMMON 3' - 0"3' - 4"3' - 0"3' - 6"2' - 0" 32" MIN CLR DOOR STOP 1 1/2" MIN Double striping of stalls shall be per zoning code section 12.21a5 chart no. 5 every space intended for human occupancy shall be provided with natural light by means of exterior glazed openings in accordance with section 1205.2 or shall be provided with artificial light that is adequate to provide an average illumination of 10 foot-candles over the area of the room at a height of 30 inches above the floor level. SEE A700 FOR EXTERIOR WALL SEE A701 FOR INTERIOR WALL ASSEMBLIES EXT 1:2 X 6 EXTERIOR WALL, R-19 BATT EXT 4:2 X 6 EXTERIOR WALL, R-19 BATT, CULTURED STONE O/ LATH & SCRATCH COAT, STC EXT 5:2 X 6 EXTERIOR WALL, R-19 BATT, INT 1:PARTY WALL, 2X STGR STUD, U341,STC INT 2:2 X 4 INTERIOR PARTION INT 4:2X 6 PLUMBING 8.The electrical system shall have sufficient capacity to simultaneously charge all designated EV spaces at the full rated amperage of the EVSE. plan design shall be based upon a 40-ampere minimum branch circuit. a separate electrical permit is required.9.The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as EV CAPABLE in accordance with the Los Angeles Electrical Code. INT 3:2 X 4 INTERIOR PARTION WALL, KEY NOTE 1 TANKLESS WALL MOUNTED WATER HEATER Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:50 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-131 BUILDING 3 - LEVEL 2 JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 3 - LEVEL 2 No. Description Date 9 10 11 12 13 14 15 16 Q R S T U V W X Y Z 315 SF BLDG 3 - ROOF DECK71711%21'-6" 23'-2" 21'-6" 1 A-304 1 A-304 2 A-304 2 A-304 2 4 4% 2 % 21'-0 5/8" 21'-2 7/8"21'-2 7/8" 21'-2 5/8" 20'-11" 20'-11 3/4" 20'-9 7/8"2%2%2%2%2%2%2%2%21'-6" 2 %1%1%1%1%2%12'-1 1/8" 10"2%1%12'-6"12'-2" 12'-1"1%2%13'-6" 14'-0" 13'-6" 14'-0" 14'-0" 13'-10" 13'-6" 13'-10 1/4" 12'-0 3/4" 2% 1% 2% 2 %DRAIN & SCUPPER OVERFLOW DRAIN & SCUPPER OVERFLOW 2 22%2%2%2%2%2%22 2%22 5 3 3 3 3 3 3 3 3 3 2%2%2% 5 UNIT 6 RECREATION SPACE SOLAR ZONE The solar zone is an allocated space that is unshaded, un-penetrated, and free of obstructions. it serves as a suitable place that solar panels can be installed at a future date. Solar Zone Calculations Total roof area: 6 715 SFTotal area required solar zone (15%)(6 715 SF x 0.15) = 1 008 SF required. Solar Zone 1 = 508 SFSolar Zone 2 = 500 SF Note: -Minimum dimension 5’-0”, 80 SF-No obstructions and 2 times height of obstruction setback.-Minimum 4’-0”centerline access path to stand pipes, roof hatches, skylights or vent hatches.-Solar zone shall have 4’-0”clear perimeter access.-The solar zone shall be oriented between 10 deg. And 270 deg. From the north. A minimum of 1”metalic conduit termination point for future solar use.-The main electrical service panel shall have a reserved space to allow for installation of a double pole circuit breaker for a future solar electric installation. The reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location and shall be permanently marked as “for future solar electric” ROOF PLAN SPECIFIC NOTESTOTAL COMBINED ROOF AREA = 11362SQFT1704 SQFT SOLAR ZONE REQD -NO AREA LESS THAN 160SQFT4 SOLAR ZONES AT 450SQFT = 1800SQFT PROVIDED ROOF NOTES: 1.Contractor shall confirm that all areas of roof are provided with positive drainage. 2.Roof penetrations shall be flashed per building and manufactures specifications. 3.Contractor shall be responsible for coordination of sizes and locations of roof openings, platforms, bases, lighting, power, convenience outlets, etc., with equipment being supplied. 4.All roofing materials to be installed as per manufacture's recommendations and specifications. 5. Provide roof insulation per t-24 sheets. 6.Provide rain gutters, diverters and downspouts as required, refer to grading plans for drainage patterns. 7.Roof diaphragm nailing to be inspected before covering. face grain of plywood shall be perpendicular to supports. 8. All new crickets shall slope minimum 1/2" per foot. 9.Provide roof scupper with overflow to downspouts as shown on lid plan. 10.Parapet dimensions are shown from face of finish uno.11. G.C. to verify all dimensions and contact architect if any discrepancies exist, prior to commencing work. 12. G.C. to assure roof installation and all penetrations to be fully weathertight. 13.Roofing to comply with UBC standards 15-4 and shall be installed in accordance with table 15-b-2 (r902.1) 14.Installed roofing over minimum 30# underlayment. 15.The quality and design of roofing materials and their fastening devices shall conform to the applicable standards listed in chapter 35, part II (1507.1) 16. All materials shall be delivered in packages bearing the manufacturers label or identifying mark. 17.The roofing installer shall be responsible for providing a complete waterproof installation including all necessary flashing, caps, pipe jacks, opening protection and sealants. all roofing shall comply with NRCA standards UBC chapter 13. 18. Verify that all areas have a positive 1/4" per foot min. roof drainage prior to installation. 19.Downspouts are sized either for UPC code average 6"/ hour rainfall or minimum 8" interior DIA. -whichever is greater. 20. Provide plywood or felt crickets as required to maintain 1/2" per foot drainage at equipment pads and roof hatch. 21. Installed roofing materials as soon as possible after installation of metal roof deck to minimize exposure of the deck to moisture sources. 22. All exposed roof metal and vents shall be primed and prepared for paint finish. paint shall match exterior wall color per exterior finish schedule. 23. All/any roof penetrations shall be minimum 18" away from air conditioning units and a minimum18" from other penetrations. 24. Vents through roof shall be installed 10'-0" from and terminated 3'-0" above any fresh air intakes. 25. Openings in the building envelope that are potential sources of air leakage shall be caulked, gasketed, weather-stripe or otherwise sealed to limit infiltration and exfiltration. 26. Contractor shall verify that all gas lines condensation and all conduit lines shall not extend above roof surfaces. 27. Lead flashing shall be used at all roof and overflow drain penetrations. 28. Material used for roof sheathing: wood structural panels used for roof sheathing shall be bonded by intermediate or exterior glue. (CBC 2320.12.9) 29. The roof sheathing shall include a radiant barrier. 30. The main electrical service panel shall have a reserved space to allow for installation of a double pole circuit breaker for a future solar electric installation. the reserved space shall be positioned at the opposite (load) end from the input feeder location or main circuit location and shall be permanently marked as "for future solar electric" (4.211.4 energy code and 110.10 LAFD requirement no. 96) EQUIPMENT ON ROOFS. CMC 2016 308.1.1-6,304 1. Enclosures. equipment on roof shall be designed or enclosed so as to withstand climatic conditions in the areas in which it is installed. where enclosures are provided, each enclosure shall be of reasonable height, and shall have at least a thirty (30) inch (762 mm) clearance between the entire service access panel(s) of the equipment and the wall of the enclosure. 2.Roof support. roofs on which equipment is to be installed shall be capable of supporting the additional load or shall be reinforced to support the additional load. 3.Corrosion resistance. all access locks, screws, and bolts shall be of corrosion-resistant material. 4. Roof drainage. equipment shall be installed on a well-drained surface of the roof. 5.Guards or rails. at least six (6) ft. (1,829 mm) between any part of the equipment and the edge of a roof or similar hazard, or rigidly fixed rail, guards, parapets, or other building structures at least forty-two (42) inches (1,067 mm) in height shall be provided on the exposed side. 6. Electrical power. all equipment requiring an external source of electrical power for its operation shall be provided with: (1) readily accessible electrical disconnecting means within sight of the equipment.(2) a 120 vac grounding-type receptacle outlet on the roof adjacent to the equipment. the receptacle outlet shall be on the supply side of the disconnect switch. 7.Service and access to equipment and appliances. equipment and appliances shall be accessible for inspection, service, repair, and replacement without removing permanent construction. sufficient clearance shall be maintained to permit cleaning of heating surfaces; the replacement of filters, blowers, motors, burners, controls, and vent connections; the lubrication of moving parts where necessary; the adjustment and cleaning of burners and pilots; and the proper functioning of explosion vents, if provided. [NFPA 54-09:9.2.1] unless otherwise specified, not less than thirty (30) i inches (762 mm) in depth, width, and height of working space shall be provided. class b -built up roofing-white surfaced 8.The panel or subpanel shall provide capacity to install a 40-ampere minimum dedicated branch circuit and space(s) reserved to permint installation of a branch circuit over current protective device. 9.The service panel or subpanel circuit directory shall identify the over current protective device space(s) reserved for future EV charching as EV capable the raceway termination location shall be permanent and visibly marked EV capable. 10. A copy of the construction documents or a comparable document indicating the information from energy code sections 110.10(b) trough 110.10(c) shall be provided to the occupant.(ENERGY CODE 110.10(d)) ROOF LEGEND ROOF KEYNOTE 2 BARREL VAULT CEILING 3 CRICKET 4 CONDENSOR 5 DRAIN & SCUPPER OVER FLOW 1 2'-0 X 4'-0 VELUX MOTORIZED SKYLIGHT Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:27:55 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-132 BUILDING 3 - ROOF DECK JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 C-HOUSE - ROOF NOTE:-A COPY OF THE CONSTRUCTION DOCUMENTS OR A COMPARABLE DOCUMENT INDICATING THE INFORMATION FROM ENERGY CODE SECTIONS 110.10B THROUGH 110.10C SHALL BE PROVIDED TO THE OCCUPANT.-ROOF MOUNTED EQUIPMENT SHALL BE CONCEALED FROM VIEW AND THE SOUND BUFFERED FROM ADJACENT PROPERTIES AND STREETS IN ACCORDANCE WITH BUILDING DEPARTMENT POLICY NO. 80-6 No. Description Date BLDG 1 -LEVEL 10' -0" BLDG 1 -LEVEL 210' -0" BLDG 1 -ROOF DECK20' -0" A CB 2 A-302 D EXT 2 FRM 1 RF 1 EXT 1 GLS 1 EXT 2 GLS 1 EXT 4 GLS 1 A-802 3 A-802 2 C11 W03 W01 W03 Survey 70'-0" Survey 50'-0" Survey 60'-0" 2 A-542 RL 1 E W03 6 1 /2 " / 1 2 "6 1/2" / 12" R 8' - 1 3/ 4 " R 4' - 6"113.4° 127.8° 6 " / 1 2 "6" / 12"10' - 0"10' - 0"10' - 0"HEIGHT LIMIT30' - 0"Survey 50'-0" SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCES ALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISH SEE FINISH PLAN FOR FINISH MATERIAL ELEVATION NOTES 1. EXTERIOR STUCCO:A. MATERIALS & APPLICATION SHALL COMPLY WITH APPLICABLE SECTIONS OF THE "HANDBOOK OF RECOMMENDED SPECIFICATIONS FOR LATHING, FURRING & PLASTERING" BY THE CALIFORNIA LATHING/ PLASTERING CONTRACTORS ASSOC. AND CHAPTER 25, CBC. EXTERIOR STUCCO COLORS, TEXTURE AND FINISH SHALL BE SELECTED AND APPROVED BY OWNER. B. STUCCO LATH SHALL BE NAILED TO ALL STUDS AND TOP AND BOTTOM PLATESC. ALL STUCCO SHALL BE PLUMB & EVEN WITHIN 1/8" IN 10'. STUCCO SHALL BE 3 COATS W/ FINAL COAT BEING A LATEX BASED COLOR COAT.2. GYPSUM WALLBOARD (DRYWALL) 5/8" :A. ALL GYPSUM WALLBOARD SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE CURRENT EDITION OF THE CBC, AND APPLICABLEAGENCIES.B. GYPSUM WALLBOARD SHALL NOT BE INSTALLED UNTIL WEATHER PROTECTIONFOR THE INSTALLATION IS PROVIDED.C. SINGLE-PLY APPLICATION. 1. ALL EDGES AND ENDS OF GYPSUM WALLBOARD SHALL OCCUR ON THE FRAMING MEMBERS, EXCEPT THOSE EDGES AND ENDS THAT ARE PERPENDICULAR TO THE FRAMING MEMBERS. ALL EDGES AND ENDSOF GYPSUM WALLBOARD SHALL BE IN MODERATE CONTACT EXCEPT IN CONCEALED SPACES WHERE FIRE-RESISTIVE CONSTRUCTION OR DIAPHRAGM ACTION IS NOT REQUIRED.2. THE SIZE AND SPACING OF FASTENERS SHALL COMPLY WITH THE CURRENT EDITION OF THE CBC EXCEPT WHERE MODIFIED BY FIRE-RESISTIVE CONSTRUCTION. FASTENERS SHALL NOT BE SPACED LESS THAN 3/8 INCH FROMEDGES AND ENDS OF GYPSUM WALLBOARD. FASTENERS AT THE TOP AND BOTTOM PLATES OF VERTICAL ASSEMBLIES, OR THE EDGES AND ENDS OF HORIZONTAL ASSEMBLIES PERPENDICULAR TO SUPPORTS, AND AT THE WALLLINE MAY BE OMITTED EXCEPT ON SHEAR-RESISTING ELEMENTS OR FIRE-RESISTIVE ASSEMBLIES. FASTENERS SHALL BE APPLIED IN SUCH A MANNERAS NOT TO FRACTURE THE FACE PAPER WITH THE FASTENER HEAD.D. WHEN GYPSUM IS USED AS A BASE FOR TILE OR WALL PANELS FOR TUB, SHOWER OR WATER CLOSET COMPARTMENT WALLS , WATER-RESISTANT GYPSUM BACKING BOARD SHALL BE USED.E. WATER-RESISTANT GYPSUM BOARD SHALL NOT BE USED IN THE FOLLOWING LOCATIONS:1. OVER A VAPOR RETARDER2. IN AREAS SUBJECT TO CONTINUOUS HIGH HUMIDITY, SUCH AS SAUNAS, STEAM OOMS OR GANG SHOWER ROOMS.3. ON CEILINGS WHERE FRAME SPACING EXCEEDS 12 INCHES ON CENTER.F. PROVIDE 5/8" GYPSUM WALLBOARD @ ALL INTERIOR WALLS U.N.O. AND 1/2" GYPSUM WALLBOARD @ ALL INTERIOR CEILING SURFACES, U.N.O. G. ALL GYPSUM WALLBOARD SHALL HAVE THE FOLLOWING:1. AT JOINTS: PROVIDE PERFORATED TAPE, BEDDING & TAPING COMPOUND FINISHED SMOOTH @ ALL JOINTS. PROVIDE BULL NOSED CORNERS @ ALL INTERIOR CORNERS.2. FINISH: WALLS SHALL HAVE A SMOOTH OR LIGHT ORANGE PEAL FINISH3. LINOLEUM: MATERIALS, COLOR & FINISH SHALL BE SELECTED & APPROVED BY THE OWNER. FLOORING SUB-CONTRACTOR SHALL FURNISH, INSTALL & FINISH ALL FLOORING WORK TO BE TRUE & PLUMB. INSTALL PER MANUFACTURERS INSTALATION INSTRUCTIONS.4. TILE FLOORING: THE OWNER SHALL SELECT ALL FLOOR TILE & COLORS. ALL TILE MATERIALS SHALL BE INSTALLED "LATEX- PORTLAND CEMENT MORTAR SET", NO HAND-SET TILE APPLICATIONS WILL BE ALLOWED. CONTRACTOR SHALL SUPPLY ALL MATERIALS, PREP. AND INSTALL.5. ALL AREAS & INSTALL ALL CERAMIC TILE MATERIALS IN STRICT CONFORMANCE WITH THE LATEST EDITION OF THE AMERICAN TILE INSTITUTE, HANDBOOK FOR TILE INSTALLATION.PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4”ABOVE THE EARTH OR 2”ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. ELEVATION NOTES SEE A700 FOR EXTERIOR WALL SYSTEM TAGSSEE A701 FOR FLOOR AND ROOF SYSTEM TAGS ELEVATION LEGEND (BASE COLOR): 7/8" STUCCO O/ LATH; 20/30 FINISH -L/A HABRA "WHITE" BLUE CERAMIC TILE O/ STUCCO SCRATCH COAT BASE (BASE COLOR) : 7/8" STUCCO O/ LATH 20/30 FINISH -LA HABRA "WHITE". 1HR F.R. CULTURED STONE O/ LATH & STUCCO SCRATCH COAT DARK BRONZE KYNAR FINISH BY ARCADIA (ACCENT COLOR) 7/8" STUCCO O/LATH; 20/30 FINISH -LA HABRA "GREY" BLUE STANDING SEAM ROOF, DREXEL METALS ING., " DMC 100SS 1", WITH FULLY ADHERED UNDERLAYMENT. FRM 1 -DARK BRONZE HYNAR FINISH BY ARCADIA RAILING: 42" HIGH METAL RAILING WITH PAINT FINISH COLOR: DUNN EDWARDS; BLACKJACK (DE6371)RL 1 RF 1 FRM1 DR 1 EXT 5 EXT 4 EXT 3 EXT 2 EXT 1 NOTE: ROOF MOUNTED EQUIPMENT WILL BE CONCEALED FROM VIEW AND SOUND BUFFER FROM ADJACENT PROPERTIES. BLDG 1 -LEVEL 10' -0" BLDG 1 -LEVEL 210' -0"BLDG 1 -LEVEL 210' -0" BLDG 1 -ROOF DECK20' -0"BLDG 1 -ROOF DECK20' -0" AC W02 3' - 6"26' - 5"B 2 A-302 D EXT 1 RF 1 GLS 1 FRM2 GLS 1 RL 1 10' - 0"9' - 0"1' - 0"50.25' 60.25' 70.25' 2 A-542 RL 1 E 2' - 0"2' - 6"4' - 6"2' - 6"2' - 0" 113.4°R 3' - 6"W07 W02 W02 W07 W02 W07W07 W02 6 " / 1 2 "6" / 12" W01 EXT 4 RF 1 EXT 1 GLS 1 FRM 1 FRM2 FRM 1 Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:28:01 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-201 ELEVATION - BUILDING 1 E/W JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"1 BLDG 1 - ELEVATION - EAST 1/4" = 1'-0"2 BLDG 1 - ELEVATION - WEST No. Description Date 2 3 41 BLDG 1 -LEVEL 10' -0" BLDG 1 -LEVEL 210' -0" BLDG 1 -ROOF DECK20' -0" 1 A-302 EXT 1 GLS 1 EXT 1 FRM 1 RL 1 RL 1 109.4° 3' - 3" 3' - 5" 25' - 3" A-8021 A-8024 A-8025 A11 1 A-301 RF 1 DR 1 Survey 50'-0" Survey 60'-0" Survey 70'-0" 6 1 /2 " / 12 "6 1/2" / 12" R 9' - 1 0"HEIGHT LIMIT30' - 0"10' - 0"10' - 0"10' - 0"EXT 4 GLS 1 FRM 1 FRM 1 GLS 1 GLS 1 GLS 1 234 1 BLDG 1 -LEVEL 10' -0" BLDG 1 -LEVEL 210' -0" BLDG 1 -ROOF DECK20' -0" A-8026 1 A-301 Survey 50'-0" Survey 60'-0" Survey 70'-0"2' - 0"7' - 6"1' - 0"1' - 0"3' - 2"1' - 0"5' - 0"1' - 0"3' - 2" R 5' - 0"7" / 12"7" / 12" 128.7°10' - 0"10' - 0"10' - 0"HEIGHT LIMIT30' - 0"EXT 1 GLS 1 RF 1 EXT 4 EXT 1 RF 1 DR 1 FRM 1 FRM 1 SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCES ALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL ELEVATION NOTES 1. EXTERIOR STUCCO:A. MATERIALS & APPLICATION SHALL COMPLY WITH APPLICABLE SECTIONS OF THE "HANDBOOK OF RECOMMENDED SPECIFICATIONS FOR LATHING, FURRING & PLASTERING" BY THE CALIFORNIA LATHING/ PLASTERING CONTRACTORS ASSOC. AND CHAPTER 25, CBC. EXTERIOR STUCCO COLORS, TEXTURE AND FINISH SHALL BE SELECTED AND APPROVED BY OWNER. B. STUCCO LATH SHALL BE NAILED TO ALL STUDS AND TOP AND BOTTOM PLATESC. ALL STUCCO SHALL BE PLUMB & EVEN WITHIN 1/8" IN 10'. STUCCO SHALL BE 3 COATS W/ FINAL COAT BEING A LATEX BASED COLOR COAT.2. GYPSUM WALLBOARD (DRYWALL) 5/8" :A. ALL GYPSUM WALLBOARD SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE CURRENT EDITION OF THE CBC, AND APPLICABLEAGENCIES. B. GYPSUM WALLBOARD SHALL NOT BE INSTALLED UNTIL WEATHER PROTECTIONFOR THE INSTALLATION IS PROVIDED.C. SINGLE-PLY APPLICATION. 1. ALL EDGES AND ENDS OF GYPSUM WALLBOARD SHALL OCCUR ON THE FRAMING MEMBERS, EXCEPT THOSE EDGES AND ENDS THAT ARE PERPENDICULAR TO THE FRAMING MEMBERS. ALL EDGES AND ENDSOF GYPSUM WALLBOARD SHALL BE IN MODERATE CONTACT EXCEPT IN CONCEALED SPACES WHERE FIRE-RESISTIVE CONSTRUCTION OR DIAPHRAGM ACTION IS NOT REQUIRED.2. THE SIZE AND SPACING OF FASTENERS SHALL COMPLY WITH THE CURRENT EDITION OF THE CBC EXCEPT WHERE MODIFIED BY FIRE-RESISTIVE CONSTRUCTION. FASTENERS SHALL NOT BE SPACED LESS THAN 3/8 INCH FROMEDGES AND ENDS OF GYPSUM WALLBOARD. FASTENERS AT THE TOP AND BOTTOM PLATES OF VERTICAL ASSEMBLIES, OR THE EDGES AND ENDS OF HORIZONTAL ASSEMBLIES PERPENDICULAR TO SUPPORTS, AND AT THE WALLLINE MAY BE OMITTED EXCEPT ON SHEAR-RESISTING ELEMENTS OR FIRE-RESISTIVE ASSEMBLIES. FASTENERS SHALL BE APPLIED IN SUCH A MANNERAS NOT TO FRACTURE THE FACE PAPER WITH THE FASTENER HEAD.D. WHEN GYPSUM IS USED AS A BASE FOR TILE OR WALL PANELS FOR TUB, SHOWER OR WATER CLOSET COMPARTMENT WALLS , WATER-RESISTANT GYPSUM BACKING BOARD SHALL BE USED.E. WATER-RESISTANT GYPSUM BOARD SHALL NOT BE USED IN THE FOLLOWING LOCATIONS:1. OVER A VAPOR RETARDER2. IN AREAS SUBJECT TO CONTINUOUS HIGH HUMIDITY, SUCH AS SAUNAS, STEAM OOMS OR GANG SHOWER ROOMS.3. ON CEILINGS WHERE FRAME SPACING EXCEEDS 12 INCHES ON CENTER.F. PROVIDE 5/8" GYPSUM WALLBOARD @ ALL INTERIOR WALLS U.N.O. AND 1/2" GYPSUM WALLBOARD @ ALL INTERIOR CEILING SURFACES, U.N.O. G. ALL GYPSUM WALLBOARD SHALL HAVE THE FOLLOWING:1. AT JOINTS: PROVIDE PERFORATED TAPE, BEDDING & TAPING COMPOUND FINISHED SMOOTH @ ALL JOINTS. PROVIDE BULL NOSED CORNERS @ ALL INTERIOR CORNERS.2. FINISH: WALLS SHALL HAVE A SMOOTH OR LIGHT ORANGE PEAL FINISH3. LINOLEUM: MATERIALS, COLOR & FINISH SHALL BE SELECTED & APPROVED BY THE OWNER. FLOORING SUB-CONTRACTOR SHALL FURNISH, INSTALL & FINISH ALL FLOORING WORK TO BE TRUE & PLUMB. INSTALL PER MANUFACTURERS INSTALATION INSTRUCTIONS.4. TILE FLOORING: THE OWNER SHALL SELECT ALL FLOOR TILE & COLORS. ALL TILE MATERIALS SHALL BE INSTALLED "LATEX- PORTLAND CEMENT MORTAR SET", NO HAND-SET TILE APPLICATIONS WILL BE ALLOWED. CONTRACTOR SHALL SUPPLY ALL MATERIALS, PREP. AND INSTALL.5. ALL AREAS & INSTALL ALL CERAMIC TILE MATERIALS IN STRICT CONFORMANCE WITH THE LATEST EDITION OF THE AMERICAN TILE INSTITUTE, HANDBOOK FOR TILE INSTALLATION.PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4”ABOVE THE EARTH OR 2”ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. ELEVATION NOTES SEE A700 FOR EXTERIOR WALL SYSTEM TAGSSEE A701 FOR FLOOR AND ROOF SYSTEM TAGS ELEVATION LEGEND (BASE COLOR): 7/8" STUCCO O/ LATH; 20/30 FINISH -L/A HABRA "WHITE" BLUE CERAMIC TILE O/ STUCCO SCRATCH COAT BASE (BASE COLOR) : 7/8" STUCCO O/ LATH 20/30 FINISH -LA HABRA "WHITE". 1HR F.R. CULTURED STONE O/ LATH & STUCCO SCRATCH COAT DARK BRONZE KYNAR FINISH BY ARCADIA (ACCENT COLOR) 7/8" STUCCO O/LATH; 20/30 FINISH -LA HABRA "GREY" BLUE STANDING SEAM ROOF, DREXEL METALS ING., " DMC 100SS 1",WITH FULLY ADHERED UNDERLAYMENT. FRM 1 -DARK BRONZE HYNAR FINISH BY ARCADIA RAILING: 42" HIGH METAL RAILING WITH PAINT FINISH COLOR: DUNN EDWARDS; BLACKJACK (DE6371)RL 1 RF 1 FRM1 DR 1 EXT 5 EXT 4 EXT 3 EXT 2 EXT 1 NOTE: ROOF MOUNTED EQUIPMENT WILL BE CONCEALED FROM VIEW AND SOUND BUFFER FROM ADJACENT PROPERTIES. Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:28:05 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-201.1 ELEVATION - BUILDING 1 S/N JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"4 BLDG 1 - ELEVATION - SOUTH 1/4" = 1'-0"3 BLDG 1 - ELEVATION - NORTH No. Description Date BLDG 2 -LEVEL 11' -0" BLDG 2 -LEVEL 211' -0" BLDG 2 -ROOF DECK21' -0" 3 A-303.1 2 A-303I FGHJK 10' - 0"10' - 0"4' - 7"HEIGHT LIMIT30' - 0"Survey 51'-0" Survey 61'-0" Survey 71'-0" BLDG 2 -LEVEL 11' -0"BLDG 2 -LEVEL 11' -0" BLDG 2 -LEVEL 211' -0" BLDG 2 -ROOF DECK21' -0" 3 A-303.1 2 A-303 IFGH J K A-8028 A-802 11 Survey 51'-0" Survey 61'-0" Survey 71'-0"R 8' - 1 3/4" 6 1 /2 " / 12"6 1/2" / 12" 127.7°3' - 8"1' - 2"4' - 4"10' - 0"10' - 0"HEIGHT LIMIT30' - 0"5 1/2" / 12" 144.2° R 3' - 5 1/4" 5 1 /2 " / 1 2 "SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCES ALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL ELEVATION NOTES 1. EXTERIOR STUCCO:A. MATERIALS & APPLICATION SHALL COMPLY WITH APPLICABLE SECTIONS OF THE "HANDBOOK OF RECOMMENDED SPECIFICATIONS FOR LATHING, FURRING & PLASTERING" BY THE CALIFORNIA LATHING/ PLASTERING CONTRACTORS ASSOC. AND CHAPTER 25, CBC. EXTERIOR STUCCO COLORS, TEXTURE AND FINISH SHALL BE SELECTED AND APPROVED BY OWNER. B. STUCCO LATH SHALL BE NAILED TO ALL STUDS AND TOP AND BOTTOM PLATESC. ALL STUCCO SHALL BE PLUMB & EVEN WITHIN 1/8" IN 10'. STUCCO SHALL BE 3 COATS W/ FINAL COAT BEING A LATEX BASED COLOR COAT.2. GYPSUM WALLBOARD (DRYWALL) 5/8" :A. ALL GYPSUM WALLBOARD SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE CURRENT EDITION OF THE CBC, AND APPLICABLEAGENCIES. B. GYPSUM WALLBOARD SHALL NOT BE INSTALLED UNTIL WEATHER PROTECTIONFOR THE INSTALLATION IS PROVIDED.C. SINGLE-PLY APPLICATION. 1. ALL EDGES AND ENDS OF GYPSUM WALLBOARD SHALL OCCUR ON THE FRAMING MEMBERS, EXCEPT THOSE EDGES AND ENDS THAT ARE PERPENDICULAR TO THE FRAMING MEMBERS. ALL EDGES AND ENDSOF GYPSUM WALLBOARD SHALL BE IN MODERATE CONTACT EXCEPT IN CONCEALED SPACES WHERE FIRE-RESISTIVE CONSTRUCTION OR DIAPHRAGM ACTION IS NOT REQUIRED.2. THE SIZE AND SPACING OF FASTENERS SHALL COMPLY WITH THE CURRENT EDITION OF THE CBC EXCEPT WHERE MODIFIED BY FIRE-RESISTIVE CONSTRUCTION. FASTENERS SHALL NOT BE SPACED LESS THAN 3/8 INCH FROMEDGES AND ENDS OF GYPSUM WALLBOARD. FASTENERS AT THE TOP AND BOTTOM PLATES OF VERTICAL ASSEMBLIES, OR THE EDGES AND ENDS OF HORIZONTAL ASSEMBLIES PERPENDICULAR TO SUPPORTS, AND AT THE WALLLINE MAY BE OMITTED EXCEPT ON SHEAR-RESISTING ELEMENTS OR FIRE-RESISTIVE ASSEMBLIES. FASTENERS SHALL BE APPLIED IN SUCH A MANNERAS NOT TO FRACTURE THE FACE PAPER WITH THE FASTENER HEAD.D. WHEN GYPSUM IS USED AS A BASE FOR TILE OR WALL PANELS FOR TUB, SHOWER OR WATER CLOSET COMPARTMENT WALLS , WATER-RESISTANT GYPSUM BACKING BOARD SHALL BE USED.E. WATER-RESISTANT GYPSUM BOARD SHALL NOT BE USED IN THE FOLLOWING LOCATIONS:1. OVER A VAPOR RETARDER2. IN AREAS SUBJECT TO CONTINUOUS HIGH HUMIDITY, SUCH AS SAUNAS, STEAM OOMS OR GANG SHOWER ROOMS.3. ON CEILINGS WHERE FRAME SPACING EXCEEDS 12 INCHES ON CENTER.F. PROVIDE 5/8" GYPSUM WALLBOARD @ ALL INTERIOR WALLS U.N.O. AND 1/2" GYPSUM WALLBOARD @ ALL INTERIOR CEILING SURFACES, U.N.O. G. ALL GYPSUM WALLBOARD SHALL HAVE THE FOLLOWING:1. AT JOINTS: PROVIDE PERFORATED TAPE, BEDDING & TAPING COMPOUND FINISHED SMOOTH @ ALL JOINTS. PROVIDE BULL NOSED CORNERS @ ALL INTERIOR CORNERS.2. FINISH: WALLS SHALL HAVE A SMOOTH OR LIGHT ORANGE PEAL FINISH3. LINOLEUM: MATERIALS, COLOR & FINISH SHALL BE SELECTED & APPROVED BY THE OWNER. FLOORING SUB-CONTRACTOR SHALL FURNISH, INSTALL & FINISH ALL FLOORING WORK TO BE TRUE & PLUMB. INSTALL PER MANUFACTURERS INSTALATION INSTRUCTIONS.4. TILE FLOORING: THE OWNER SHALL SELECT ALL FLOOR TILE & COLORS. ALL TILE MATERIALS SHALL BE INSTALLED "LATEX- PORTLAND CEMENT MORTAR SET", NO HAND-SET TILE APPLICATIONS WILL BE ALLOWED. CONTRACTOR SHALL SUPPLY ALL MATERIALS, PREP. AND INSTALL.5. ALL AREAS & INSTALL ALL CERAMIC TILE MATERIALS IN STRICT CONFORMANCE WITH THE LATEST EDITION OF THE AMERICAN TILE INSTITUTE, HANDBOOK FOR TILE INSTALLATION.PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4”ABOVE THE EARTH OR 2”ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. ELEVATION NOTES SEE A700 FOR EXTERIOR WALL SYSTEM TAGSSEE A701 FOR FLOOR AND ROOF SYSTEM TAGS ELEVATION LEGEND (BASE COLOR): 7/8" STUCCO O/ LATH; 20/30 FINISH -L/A HABRA "WHITE" BLUE CERAMIC TILE O/ STUCCO SCRATCH COAT BASE (BASE COLOR) : 7/8" STUCCO O/ LATH 20/30 FINISH - LA HABRA "WHITE". 1HR F.R. CULTURED STONE O/ LATH & STUCCO SCRATCH COAT DARK BRONZE KYNAR FINISH BY ARCADIA (ACCENT COLOR) 7/8" STUCCO O/LATH; 20/30 FINISH -LA HABRA "GREY" BLUE STANDING SEAM ROOF, DREXEL METALS ING., " DMC 100SS 1",WITH FULLY ADHERED UNDERLAYMENT. FRM 1 -DARK BRONZE HYNAR FINISH BY ARCADIA RAILING: 42" HIGH METAL RAILING WITH PAINT FINISH COLOR: DUNN EDWARDS; BLACKJACK (DE6371)RL 1 RF 1 FRM1 DR 1 EXT 5 EXT 4 EXT 3 EXT 2 EXT 1 NOTE: ROOF MOUNTED EQUIPMENT WILL BE CONCEALED FROM VIEW AND SOUND BUFFER FROM ADJACENT PROPERTIES. Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:28:11 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-202 ELEVATION - BUILDING 2 - E/W JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"3 ELEVATION - WEST 1/4" = 1'-0"4 ELEVATION - EAST No. Description Date BLDG 2 -LEVEL 11' -0" BLDG 2 -LEVEL 211' -0" BLDG 2 -ROOF DECK21' -0" 56 1 A-303 78 2 XA-303.2 A-8025 Sim A-802 4 Sim 10' - 0"10' - 0"8' - 11"Survey 51'-0" Survey 61'-0" Survey 71'-0"HEIGHT LIMIT30' - 0"BLDG 2 -LEVEL 11' -0" BLDG 2 -LEVEL 211' -0" BLDG 2 -ROOF DECK21' -0" 5 6 1 A-303 7 8 A-802 10 A-8024 Sim A-80213 Survey 51'-0" Survey 61'-0" Survey 71'-0"2' - 5"6' - 6 1/2"10' - 0"10' - 0"HEIGHT LIMIT30' - 0"R 4' - 0" R 5' - 0" 6 1/2 " / 12"6 1/2" / 12" 131.1° 7 " / 1 2 "7" / 12" 129.0° SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCES ALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL ELEVATION NOTES 1. EXTERIOR STUCCO:A. MATERIALS & APPLICATION SHALL COMPLY WITH APPLICABLE SECTIONS OF THE "HANDBOOK OF RECOMMENDED SPECIFICATIONS FOR LATHING, FURRING & PLASTERING" BY THE CALIFORNIA LATHING/ PLASTERING CONTRACTORS ASSOC. AND CHAPTER 25, CBC. EXTERIOR STUCCO COLORS, TEXTURE AND FINISH SHALL BE SELECTED AND APPROVED BY OWNER. B. STUCCO LATH SHALL BE NAILED TO ALL STUDS AND TOP AND BOTTOM PLATESC. ALL STUCCO SHALL BE PLUMB & EVEN WITHIN 1/8" IN 10'. STUCCO SHALL BE 3 COATS W/ FINAL COAT BEING A LATEX BASED COLOR COAT.2. GYPSUM WALLBOARD (DRYWALL) 5/8" :A. ALL GYPSUM WALLBOARD SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE CURRENT EDITION OF THE CBC, AND APPLICABLEAGENCIES. B. GYPSUM WALLBOARD SHALL NOT BE INSTALLED UNTIL WEATHER PROTECTIONFOR THE INSTALLATION IS PROVIDED.C. SINGLE-PLY APPLICATION. 1. ALL EDGES AND ENDS OF GYPSUM WALLBOARD SHALL OCCUR ON THE FRAMING MEMBERS, EXCEPT THOSE EDGES AND ENDS THAT ARE PERPENDICULAR TO THE FRAMING MEMBERS. ALL EDGES AND ENDSOF GYPSUM WALLBOARD SHALL BE IN MODERATE CONTACT EXCEPT IN CONCEALED SPACES WHERE FIRE-RESISTIVE CONSTRUCTION OR DIAPHRAGM ACTION IS NOT REQUIRED.2. THE SIZE AND SPACING OF FASTENERS SHALL COMPLY WITH THE CURRENT EDITION OF THE CBC EXCEPT WHERE MODIFIED BY FIRE-RESISTIVE CONSTRUCTION. FASTENERS SHALL NOT BE SPACED LESS THAN 3/8 INCH FROMEDGES AND ENDS OF GYPSUM WALLBOARD. FASTENERS AT THE TOP AND BOTTOM PLATES OF VERTICAL ASSEMBLIES, OR THE EDGES AND ENDS OF HORIZONTAL ASSEMBLIES PERPENDICULAR TO SUPPORTS, AND AT THE WALLLINE MAY BE OMITTED EXCEPT ON SHEAR-RESISTING ELEMENTS OR FIRE-RESISTIVE ASSEMBLIES. FASTENERS SHALL BE APPLIED IN SUCH A MANNERAS NOT TO FRACTURE THE FACE PAPER WITH THE FASTENER HEAD.D. WHEN GYPSUM IS USED AS A BASE FOR TILE OR WALL PANELS FOR TUB, SHOWER OR WATER CLOSET COMPARTMENT WALLS , WATER-RESISTANT GYPSUM BACKING BOARD SHALL BE USED.E. WATER-RESISTANT GYPSUM BOARD SHALL NOT BE USED IN THE FOLLOWING LOCATIONS:1. OVER A VAPOR RETARDER2. IN AREAS SUBJECT TO CONTINUOUS HIGH HUMIDITY, SUCH AS SAUNAS, STEAM OOMS OR GANG SHOWER ROOMS.3. ON CEILINGS WHERE FRAME SPACING EXCEEDS 12 INCHES ON CENTER.F. PROVIDE 5/8" GYPSUM WALLBOARD @ ALL INTERIOR WALLS U.N.O. AND 1/2" GYPSUM WALLBOARD @ ALL INTERIOR CEILING SURFACES, U.N.O. G. ALL GYPSUM WALLBOARD SHALL HAVE THE FOLLOWING:1. AT JOINTS: PROVIDE PERFORATED TAPE, BEDDING & TAPING COMPOUND FINISHED SMOOTH @ ALL JOINTS. PROVIDE BULL NOSED CORNERS @ ALL INTERIOR CORNERS.2. FINISH: WALLS SHALL HAVE A SMOOTH OR LIGHT ORANGE PEAL FINISH3. LINOLEUM: MATERIALS, COLOR & FINISH SHALL BE SELECTED & APPROVED BY THE OWNER. FLOORING SUB-CONTRACTOR SHALL FURNISH, INSTALL & FINISH ALL FLOORING WORK TO BE TRUE & PLUMB. INSTALL PER MANUFACTURERS INSTALATION INSTRUCTIONS.4. TILE FLOORING: THE OWNER SHALL SELECT ALL FLOOR TILE & COLORS. ALL TILE MATERIALS SHALL BE INSTALLED "LATEX- PORTLAND CEMENT MORTAR SET", NO HAND-SET TILE APPLICATIONS WILL BE ALLOWED. CONTRACTOR SHALL SUPPLY ALL MATERIALS, PREP. AND INSTALL.5. ALL AREAS & INSTALL ALL CERAMIC TILE MATERIALS IN STRICT CONFORMANCE WITH THE LATEST EDITION OF THE AMERICAN TILE INSTITUTE, HANDBOOK FOR TILE INSTALLATION.PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4”ABOVE THE EARTH OR 2”ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. ELEVATION NOTES SEE A700 FOR EXTERIOR WALL SYSTEM TAGSSEE A701 FOR FLOOR AND ROOF SYSTEM TAGS ELEVATION LEGEND (BASE COLOR): 7/8" STUCCO O/ LATH; 20/30 FINISH -L/A HABRA "WHITE" BLUE CERAMIC TILE O/ STUCCO SCRATCH COAT BASE (BASE COLOR) : 7/8" STUCCO O/ LATH 20/30 FINISH - LA HABRA "WHITE". 1HR F.R. CULTURED STONE O/ LATH & STUCCO SCRATCH COAT DARK BRONZE KYNAR FINISH BY ARCADIA (ACCENT COLOR) 7/8" STUCCO O/LATH; 20/30 FINISH -LA HABRA "GREY" BLUE STANDING SEAM ROOF, DREXEL METALS ING., " DMC 100SS 1",WITH FULLY ADHERED UNDERLAYMENT. FRM 1 -DARK BRONZE HYNAR FINISH BY ARCADIA RAILING: 42" HIGH METAL RAILING WITH PAINT FINISH COLOR: DUNN EDWARDS; BLACKJACK (DE6371)RL 1 RF 1 FRM1 DR 1 EXT 5 EXT 4 EXT 3 EXT 2 EXT 1 NOTE: ROOF MOUNTED EQUIPMENT WILL BE CONCEALED FROM VIEW AND SOUND BUFFER FROM ADJACENT PROPERTIES. Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:28:15 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-202.1 ELEVATION - BUILDING 2 - S/N JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"2 ELEVATION - NORTH 1/4" = 1'-0"1 ELEVATION - SOUTH No. Description Date BLDG 3 -LEVEL 212' -0" BLDG 3 -LEVEL 12' -0" BLDG 3 - ROOF DECK22' -0" QRSTUVWXYZ 1 A-304 18' - 2" W01 W05 10' - 0"10' - 0"8' - 3"EXT 4 Survey 52'-0" Survey 62'-0" Survey 72'-0"HEIGHT LIMIT30' - 0"BLDG 3 -LEVEL 212' -0" BLDG 3 -LEVEL 12' -0" BLDG 3 - ROOF DECK22' -0" Q R S T U V W X Y Z 1 A-304 9' - 3" 14' - 3 1/2" A-802 18 A-80219 W01 W06 W06 B45 B44 10' - 0"10' - 0"Survey 72'-0" Survey 62'-0" Survey 52'-0" 132.3° 6 " / 1 2 "6" / 12" 6 " / 1 2 "6" / 12"HEIGHT LIMIT30' - 0"R 6' - 1 3/4" R 3' - 0" 1' - 11 1/2"2' - 4" W01 SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCES ALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL ELEVATION NOTES 1. EXTERIOR STUCCO:A. MATERIALS & APPLICATION SHALL COMPLY WITH APPLICABLE SECTIONS OF THE "HANDBOOK OF RECOMMENDED SPECIFICATIONS FOR LATHING, FURRING & PLASTERING" BY THE CALIFORNIA LATHING/ PLASTERING CONTRACTORS ASSOC. AND CHAPTER 25, CBC. EXTERIOR STUCCO COLORS, TEXTURE AND FINISH SHALL BE SELECTED AND APPROVED BY OWNER. B. STUCCO LATH SHALL BE NAILED TO ALL STUDS AND TOP AND BOTTOM PLATESC. ALL STUCCO SHALL BE PLUMB & EVEN WITHIN 1/8" IN 10'. STUCCO SHALL BE 3 COATS W/ FINAL COAT BEING A LATEX BASED COLOR COAT.2. GYPSUM WALLBOARD (DRYWALL) 5/8" :A. ALL GYPSUM WALLBOARD SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE CURRENT EDITION OF THE CBC, AND APPLICABLEAGENCIES.B. GYPSUM WALLBOARD SHALL NOT BE INSTALLED UNTIL WEATHER PROTECTIONFOR THE INSTALLATION IS PROVIDED.C. SINGLE-PLY APPLICATION. 1. ALL EDGES AND ENDS OF GYPSUM WALLBOARD SHALL OCCUR ON THE FRAMING MEMBERS, EXCEPT THOSE EDGES AND ENDS THAT ARE PERPENDICULAR TO THE FRAMING MEMBERS. ALL EDGES AND ENDSOF GYPSUM WALLBOARD SHALL BE IN MODERATE CONTACT EXCEPT IN CONCEALED SPACES WHERE FIRE-RESISTIVE CONSTRUCTION OR DIAPHRAGM ACTION IS NOT REQUIRED.2. THE SIZE AND SPACING OF FASTENERS SHALL COMPLY WITH THE CURRENT EDITION OF THE CBC EXCEPT WHERE MODIFIED BY FIRE-RESISTIVE CONSTRUCTION. FASTENERS SHALL NOT BE SPACED LESS THAN 3/8 INCH FROMEDGES AND ENDS OF GYPSUM WALLBOARD. FASTENERS AT THE TOP AND BOTTOM PLATES OF VERTICAL ASSEMBLIES, OR THE EDGES AND ENDS OF HORIZONTAL ASSEMBLIES PERPENDICULAR TO SUPPORTS, AND AT THE WALLLINE MAY BE OMITTED EXCEPT ON SHEAR-RESISTING ELEMENTS OR FIRE-RESISTIVE ASSEMBLIES. FASTENERS SHALL BE APPLIED IN SUCH A MANNERAS NOT TO FRACTURE THE FACE PAPER WITH THE FASTENER HEAD.D. WHEN GYPSUM IS USED AS A BASE FOR TILE OR WALL PANELS FOR TUB, SHOWER OR WATER CLOSET COMPARTMENT WALLS , WATER-RESISTANT GYPSUM BACKING BOARD SHALL BE USED.E. WATER-RESISTANT GYPSUM BOARD SHALL NOT BE USED IN THE FOLLOWING LOCATIONS:1. OVER A VAPOR RETARDER2. IN AREAS SUBJECT TO CONTINUOUS HIGH HUMIDITY, SUCH AS SAUNAS, STEAM OOMS OR GANG SHOWER ROOMS.3. ON CEILINGS WHERE FRAME SPACING EXCEEDS 12 INCHES ON CENTER.F. PROVIDE 5/8" GYPSUM WALLBOARD @ ALL INTERIOR WALLS U.N.O. AND 1/2" GYPSUM WALLBOARD @ ALL INTERIOR CEILING SURFACES, U.N.O. G. ALL GYPSUM WALLBOARD SHALL HAVE THE FOLLOWING:1. AT JOINTS: PROVIDE PERFORATED TAPE, BEDDING & TAPING COMPOUND FINISHED SMOOTH @ ALL JOINTS. PROVIDE BULL NOSED CORNERS @ ALL INTERIOR CORNERS.2. FINISH: WALLS SHALL HAVE A SMOOTH OR LIGHT ORANGE PEAL FINISH3. LINOLEUM: MATERIALS, COLOR & FINISH SHALL BE SELECTED & APPROVED BY THE OWNER. FLOORING SUB-CONTRACTOR SHALL FURNISH, INSTALL & FINISH ALL FLOORING WORK TO BE TRUE & PLUMB. INSTALL PER MANUFACTURERS INSTALATION INSTRUCTIONS.4. TILE FLOORING: THE OWNER SHALL SELECT ALL FLOOR TILE & COLORS. ALL TILE MATERIALS SHALL BE INSTALLED "LATEX- PORTLAND CEMENT MORTAR SET", NO HAND-SET TILE APPLICATIONS WILL BE ALLOWED. CONTRACTOR SHALL SUPPLY ALL MATERIALS, PREP. AND INSTALL.5. ALL AREAS & INSTALL ALL CERAMIC TILE MATERIALS IN STRICT CONFORMANCE WITH THE LATEST EDITION OF THE AMERICAN TILE INSTITUTE, HANDBOOK FOR TILE INSTALLATION.PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4”ABOVE THE EARTH OR 2”ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. ELEVATION NOTES SEE A700 FOR EXTERIOR WALL SYSTEM TAGSSEE A701 FOR FLOOR AND ROOF SYSTEM TAGS ELEVATION LEGEND (BASE COLOR): 7/8" STUCCO O/ LATH; 20/30 FINISH -L/A HABRA "WHITE" BLUE CERAMIC TILE O/ STUCCO SCRATCH COAT BASE (BASE COLOR) : 7/8" STUCCO O/ LATH 20/30 FINISH -LA HABRA "WHITE". 1HR F.R. CULTURED STONE O/ LATH & STUCCO SCRATCH COAT DARK BRONZE KYNAR FINISH BY ARCADIA (ACCENT COLOR) 7/8" STUCCO O/LATH; 20/30 FINISH -LA HABRA "GREY" BLUE STANDING SEAM ROOF, DREXEL METALS ING., " DMC 100SS 1",WITH FULLY ADHERED UNDERLAYMENT. FRM 1 -DARK BRONZE HYNAR FINISH BY ARCADIA RAILING: 42" HIGH METAL RAILING WITH PAINT FINISH COLOR: DUNN EDWARDS; BLACKJACK (DE6371)RL 1 RF 1 FRM1 DR 1 EXT 5 EXT 4 EXT 3 EXT 2 EXT 1 NOTE: ROOF MOUNTED EQUIPMENT WILL BE CONCEALED FROM VIEW AND SOUND BUFFER FROM ADJACENT PROPERTIES. Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:28:21 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-203 ELEVATION -CUSTOM HOUSE W/E JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"4 ELEVATION - WEST 1/4" = 1'-0"3 ELEVATION - EAST No. Description Date BLDG 3 -LEVEL 212' -0" BLDG 3 -LEVEL 12' -0" BLDG 3 - ROOF DECK22' -0" 9 10 11 12 13 14 15 16 2 A-304 R 3' - 8 1/4"16' - 2 1/2" A-8024 Sim A-80217 D14D14D14 W01 C12 B43 10' - 0"10' - 0"HEIGHT LIMIT30' - 0"151.7°8" / 12"8" / 12"8 1/2" / 12"8 1/2" / 12" R 4' - 8" 131.1° 1' - 1 1/2"1' - 1 1/2"R 8' - 1 3/4" 127.8° Survey 62'-0" Survey 52'-0" Survey 72'-0" BLDG 3 -LEVEL 212' -0" BLDG 3 -LEVEL 12' -0" BLDG 3 - ROOF DECK22' -0" 910111213141516 2 A-304 W01 W01 W01 W01 W01 W01 W06W07 8' - 11" A-80214 A-802 15 A-802 16 B41 A41 B42 10' - 0"10' - 0"Survey 52'-0" Survey 62'-0" Survey 72'-0" 113.1°HEIGHT LIMIT30' - 0"2' - 0"2' - 0"R 7' - 1 3/4"16' - 10 1/2" 10' - 6" R 3' - 6" R 6' - 1 1 3/4"15' - 9 1/2"R 3' - 1 0 " 7' - 7" 86.6° 124.9° 127.8° 151.7° 14' - 10" 1' - 3"13' - 3"1' - 3"7 1/2" / 12"7 1/2" / 12" 8" / 12"8" / 12"8 1/2" / 12"8 1/2" / 12" 6 " / 1 2 "6" / 12" SEE A 400'S FOR ENLARGED UNIT PLANS SEE A 500'S FOR ENLARGED KITCHEN PLANS, ENLARGED BATHROOM PLANS, ADA, AND CLEARANCES ALL GYPSUM FINISH INTERIOR WALLS MAINTAIN LEVEL 3 FINISHSEE FINISH PLAN FOR FINISH MATERIAL ELEVATION NOTES 1. EXTERIOR STUCCO:A. MATERIALS & APPLICATION SHALL COMPLY WITH APPLICABLE SECTIONS OF THE "HANDBOOK OF RECOMMENDED SPECIFICATIONS FOR LATHING, FURRING & PLASTERING" BY THE CALIFORNIA LATHING/ PLASTERING CONTRACTORS ASSOC. AND CHAPTER 25, CBC. EXTERIOR STUCCO COLORS, TEXTURE AND FINISH SHALL BE SELECTED AND APPROVED BY OWNER. B. STUCCO LATH SHALL BE NAILED TO ALL STUDS AND TOP AND BOTTOM PLATESC. ALL STUCCO SHALL BE PLUMB & EVEN WITHIN 1/8" IN 10'. STUCCO SHALL BE 3 COATS W/ FINAL COAT BEING A LATEX BASED COLOR COAT.2. GYPSUM WALLBOARD (DRYWALL) 5/8" :A. ALL GYPSUM WALLBOARD SHALL BE INSTALLED IN ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE CURRENT EDITION OF THE CBC, AND APPLICABLEAGENCIES.B. GYPSUM WALLBOARD SHALL NOT BE INSTALLED UNTIL WEATHER PROTECTIONFOR THE INSTALLATION IS PROVIDED.C. SINGLE-PLY APPLICATION. 1. ALL EDGES AND ENDS OF GYPSUM WALLBOARD SHALL OCCUR ON THE FRAMING MEMBERS, EXCEPT THOSE EDGES AND ENDS THAT ARE PERPENDICULAR TO THE FRAMING MEMBERS. ALL EDGES AND ENDSOF GYPSUM WALLBOARD SHALL BE IN MODERATE CONTACT EXCEPT IN CONCEALED SPACES WHERE FIRE-RESISTIVE CONSTRUCTION OR DIAPHRAGM ACTION IS NOT REQUIRED.2. THE SIZE AND SPACING OF FASTENERS SHALL COMPLY WITH THE CURRENT EDITION OF THE CBC EXCEPT WHERE MODIFIED BY FIRE-RESISTIVE CONSTRUCTION. FASTENERS SHALL NOT BE SPACED LESS THAN 3/8 INCH FROMEDGES AND ENDS OF GYPSUM WALLBOARD. FASTENERS AT THE TOP AND BOTTOM PLATES OF VERTICAL ASSEMBLIES, OR THE EDGES AND ENDS OF HORIZONTAL ASSEMBLIES PERPENDICULAR TO SUPPORTS, AND AT THE WALLLINE MAY BE OMITTED EXCEPT ON SHEAR-RESISTING ELEMENTS OR FIRE-RESISTIVE ASSEMBLIES. FASTENERS SHALL BE APPLIED IN SUCH A MANNERAS NOT TO FRACTURE THE FACE PAPER WITH THE FASTENER HEAD.D. WHEN GYPSUM IS USED AS A BASE FOR TILE OR WALL PANELS FOR TUB, SHOWER OR WATER CLOSET COMPARTMENT WALLS , WATER-RESISTANT GYPSUM BACKING BOARD SHALL BE USED.E. WATER-RESISTANT GYPSUM BOARD SHALL NOT BE USED IN THE FOLLOWING LOCATIONS:1. OVER A VAPOR RETARDER2. IN AREAS SUBJECT TO CONTINUOUS HIGH HUMIDITY, SUCH AS SAUNAS, STEAM OOMS OR GANG SHOWER ROOMS.3. ON CEILINGS WHERE FRAME SPACING EXCEEDS 12 INCHES ON CENTER. F. PROVIDE 5/8" GYPSUM WALLBOARD @ ALL INTERIOR WALLS U.N.O. AND 1/2" GYPSUM WALLBOARD @ ALL INTERIOR CEILING SURFACES, U.N.O. G. ALL GYPSUM WALLBOARD SHALL HAVE THE FOLLOWING:1. AT JOINTS: PROVIDE PERFORATED TAPE, BEDDING & TAPING COMPOUND FINISHED SMOOTH @ ALL JOINTS. PROVIDE BULL NOSED CORNERS @ ALL INTERIOR CORNERS.2. FINISH: WALLS SHALL HAVE A SMOOTH OR LIGHT ORANGE PEAL FINISH3. LINOLEUM: MATERIALS, COLOR & FINISH SHALL BE SELECTED & APPROVED BY THE OWNER. FLOORING SUB-CONTRACTOR SHALL FURNISH, INSTALL & FINISH ALL FLOORING WORK TO BE TRUE & PLUMB. INSTALL PER MANUFACTURERS INSTALATION INSTRUCTIONS.4. TILE FLOORING: THE OWNER SHALL SELECT ALL FLOOR TILE & COLORS. ALL TILE MATERIALS SHALL BE INSTALLED "LATEX- PORTLAND CEMENT MORTAR SET", NO HAND-SET TILE APPLICATIONS WILL BE ALLOWED. CONTRACTOR SHALL SUPPLY ALL MATERIALS, PREP. AND INSTALL.5. ALL AREAS & INSTALL ALL CERAMIC TILE MATERIALS IN STRICT CONFORMANCE WITH THE LATEST EDITION OF THE AMERICAN TILE INSTITUTE, HANDBOOK FOR TILE INSTALLATION.PROVIDE A WEEP SCREED FOR STUCCO AT THE FOUNDATION PLATE LINE A MINIMUM OF 4”ABOVE THE EARTH OR 2”ABOVE PAVED AREAS. WEEP SCREEDS SHALL BE OF A TYPE WHICH WILL ALLOW TRAPPED WATER TO DRAIN TO THE EXTERIOR OF THE BUILDING. ELEVATION NOTES SEE A700 FOR EXTERIOR WALL SYSTEM TAGSSEE A701 FOR FLOOR AND ROOF SYSTEM TAGS ELEVATION LEGEND (BASE COLOR): 7/8" STUCCO O/ LATH; 20/30 FINISH -L/A HABRA "WHITE" BLUE CERAMIC TILE O/ STUCCO SCRATCH COAT BASE (BASE COLOR) : 7/8" STUCCO O/ LATH 20/30 FINISH -LA HABRA "WHITE". 1HR F.R. CULTURED STONE O/ LATH & STUCCO SCRATCH COAT DARK BRONZE KYNAR FINISH BY ARCADIA (ACCENT COLOR) 7/8" STUCCO O/LATH; 20/30 FINISH -LA HABRA "GREY" BLUE STANDING SEAM ROOF, DREXEL METALS ING., " DMC 100SS 1",WITH FULLY ADHERED UNDERLAYMENT. FRM 1 -DARK BRONZE HYNAR FINISH BY ARCADIA RAILING: 42" HIGH METAL RAILING WITH PAINT FINISH COLOR: DUNN EDWARDS; BLACKJACK (DE6371)RL 1 RF 1 FRM1 DR 1 EXT 5 EXT 4 EXT 3 EXT 2 EXT 1 NOTE: ROOF MOUNTED EQUIPMENT WILL BE CONCEALED FROM VIEW AND SOUND BUFFER FROM ADJACENT PROPERTIES. Scale DateDrawn By Checked By Project Number Architect/Contractor Ultra-Unit Architectural Studio t. 562.997.0971e. cameron@ultra-unit.com Structural Engineer David Choi and Associateset. 562.382.8040e. david@dca-se.com Sheet Name Architect Stamp Sheet Number Client Name:Project:Team: Revisions RENEWAL 1.31.2019 FA DATE C31503CLINESDE E TCCAR TIH C ILOFE TTAS IANRO CAMERON CROCKETT Civil Engineer: CJEt. 619.88.0576 Title 24 Energy: Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.com Cutural Resource Survey: DuDek t. 740.942.5147 Surveyor: Pasco Laret Suiter & Assocciate t. 858.259.8212 1/4" = 1'-0"10/7/2020 3:28:26 PM\\unit\Ultra_Projects\2017 pROJECTS\17-1230 330 chinquapin ave - Jeff Galizio - Carlsbad\03 Project Drawings\03-Architectural\17-1230-330CHINQUAPIN 04-28-20.rvtA-203.1 ELEVATION -CUSTOM HOUSE S/N JEFF GALIZIO330CHINQUAPINChecker Author 07/20/2017-1230330 CHINQUAPIN AVECARLSBAD CA1/4" = 1'-0"2 ELEVATION - SOUTH 1/4" = 1'-0"1 ELEVATION - NORTH No. Description Date EX STORM DRAIN INLETEX SEWER LINEEX RET WALLEX STORM DRAIN PIPEEX WATER LINEPROPERTY LINEEX FENCEEX CONCEX SURVEY DISCEX STORM DRAIN CLEANOUTEX CONTOURPROJECTLOCATIONTENTATIVE MAP PREPARED BY:________________________CORY JONES DATECIVIL ENGINEER52.550.047.5EXIST. CURB, GUTTER,& SIDEWALK45.052.550.047.545.0TYPICAL CHINQUAPIN AVE. CROSS-SECTIONR&R AC & BASE IN LIKE & KIND,LOCATIONS AS NECESSARY TOTIE NEW CURB & GUTTER LINEINTO EXIST STREET ELEVATIONSTYPE G-2 CURB & GUTTER, & TYPE G-7 SIDEWLAK, MATCH EX. FLFS PER GRADING PLAN5' STREET DEDICATIONEX. 50' R/WFUTURE 55' R/WCL CHINQUAPIN AVE.EXIST. ASPH. & BASEPROJECTLOCATIONEXIST. RET WALL, TO BE REMOVED,SEE SHT. 2NEW RET WALL, SHT. 4S = 2% MAX.BLDG 1 & 2DESC.SITE DATA TABLEBLDG 3BLDG 4STANDARDPARKINGPROVIDEDAREA (SF)BLDG TOTAL2,0871,4332,8906,41016 TOTAL, SEE ARCHSITE PLAN FORSCHEDULEEXCAVATION TOTALS:CUTFILLTOTALOVEREXCAVATIONQTY. EXPORTMAX FILL SLOPE HT.MAX CUT SLOPE HT.RET. WALLS:TOTAL LENGTHMAX HT.TOTAL SITE GRADINGPERCENT OF SITE GRADEDAMT. OF SITE >=25% SLOPESAMT. OF SITE WITHINHILLSLOPE REVIEWLANDSCAPETOTALNO. LOTS 4, RESIDENTIAL3,031UTILITIES:WATER DEMANDSEWER GEN.FIRE FLOWDRAINAGE DISCHARGETRAFFIC:ADT154 CY407 CY253 CY FILL939 CY0 CY0 FT.5 FT.470 FT.6 FT.3 FT.(FRONTAGE)0.47 AC.90%0%0%250 GPD/UNIT X 7 UNITS =1,750 GPD7 EDU X 220 GPD/EDU =1,540 GPD200 GPM FOR 1 HRS2.52 CFS8 X 7 = 56NOTE: FOR EX. AND PROPOSED LAND USE, DENSITY, ZONING, GENERAL PLAN,SETBACKS, BLDG COVERAGE AND SQUARE FOOTAGE, SEE ARCH. PLANSEX.FS25'LEGAL DESCRIPTION THE NORTHEASTERLY HALF OF LOT 3 IN BLOCKS OF PALISADES NO. 2 IN THE CITY OF CARLSBAD COUNTY OF SAN DIEGO STA TE OF CALIFORNIA ACCORDING TO THE MAP THEREOF NO. 1803 AS FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY AUGUST 25 1924 THE SOUTHWESTERLY BOUNDARY LINE BEING PARALLEL WITH AND DISTANT FROM 70.0 FEET SOUTHWESTERLY FROM THE NORTHWESTERLY LINE OF SAID LOT. PROJECT ADDRESS 330 CHINOUAPIN A VE. CARLSBAD, CA 92008 DEVELOPER NAME: MR. JffF GALIZ/0 ADDRESS: 330 CH/NQUAPIN A VE. PHONE NO.: 760 47.3 0800 REFERENCE DRAWINGS 1. CHINQUAPIN AVE. IMPROVEMENTS FROM GARF'l[LO ST. TO A. T.&S.F. R.R. ROW, PROJECT NO. 5-2, DWG. NO. 146-6 2. WATER SYSTEM IMPROVMENETS, LINE /, CH/NQUAPIN AVE. WEST STA o+oo TO 6+89, PROJECT NO. 69-20, DWG. NO. 159-9. EARTHWORK QUANTITIES CUT: 154 CY FILL: 407 CY IMPORT: 253 CY EXPORT: 0 CY REMEDIAL: 939 CY BASIS OF BEARINGS THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA STA TE PLANE COORO/NA TE SYSTEM NAO 83, ZONE 6, 1991.35 EPOCH BASED ON THE GRID BEARING BETWEEN STATION "CLSB 119" AS SHOWN ON RECORD OF SURVEY NO. 17271, BOTH HAVING COORDINATE VALUES OF 1ST ORDER OR BETTER I.E. N66'04'32"£ QUOTED BEARINGS FROM REFERENCE MAPS/DEEDS MAY OR MAY NOT BE IN TERMS OF SAID SYSTEM. OWNER'S CERTIFICATE I HEREBY CERTIFY THAT I AM THE RECORD OWNER OF THE PROPERTY SHOWN ON THE ATTACHED TENTATIVE MAP AND THAT SIAD MAP SHOWS THE ENTIRE CONTIGUOUS OWNERSHIP. I UNDERSTAND THAT PROPERTY IS CONTIGUOUS EVEN IF IT IS SEPARATED BY ROADS, STREETS, UTILITY EASEMENTS, OR RAILROAD RIGHTS OF WAY I HEREBY CONSENT TO THE FILING OF THIS TEN TA TIV[ MAP. DATE OWNER JEFF GALIZ/0 SUBDIVIDER JEFF GALIZ/0 TOTAL LOTS 1 RESIDENTIAL GENERAL PLAN DESIGNATION R-23 RESIDENTIAL PRESENT USE 1 SINGLE FAMILY RESIDENCE DESCRIPTION CURB OUTLET, TYPE A (PVT.) FENCE (PVT.) RETAINING WALL' (PVT.) PRECAST STORM DRAIN INLET (PVT.) PRECAST STORM DRAIN INLET (PVT.) LEGEND DWG.NO. SYMBOL SDRSD D-25 -£C:ll SDRSD M-20 SDRSD, PER PLAN •• •••• •••• • 1212CB BROOKS IOI 9X9 NDS ATRIUM DRAIN ,i PERVIOUS PAVEMENT SYSTEM (PVT.) PER DETAILS 4" THK. PCC PAVEMENT PROPOSED CONTOUR 6" SEWER LATERAL PER DETAILS CITY STD. S-7 ----11505 1-1 --__ _j@ 2" WATER SERVICE W/ MASTER CMWD W-22 □ .. P--+--rvv ~ METER AND BACKFLOW PREVENTER ,e:_ _ _J DOUBLE DETECTOR CHECK VALVE CMWD W-20 l"f fl E:::J SEWER MANHOLE TRENCH RESURFACING PROPOSED BLDG. CONC, CURB & GUTTER GRASSCRETE (PVT.) EXISTING IMPROVEMENTS: ITE/1 I I CITY STD. S-1 -----1G)t----CITY STD. GS-25, GS-26 ~ PER ARCH. SDRSD G-02, TYPE G PER MANUFACTURER ' ' SYMBOL -----□ ---11------s---------X 4 4 4 ■ (so) [505[ ; PROPOSED USE 1 LOT, 7 RESIDENTIAL UNITS -1 ~1 1111\\1111111Ht-t;::t:=t1H1H1H1H1H1 I I I UTILITIES WATER: CARLSBAD MUNICIPAL WATER DISTRICT FIRE: CARLSBAD FIRE DEPARTMENT SEWER: CITY OF CARLSBAD ELEMENTARY SCHOOL: CARLSBAD UNIFIED SCHOOL DISTRICT HIGH SCHOOL: CARLSBAD UNIFIED SCHOOL DISTRICT SOURCE OF TOPOGRAPHY TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERA TED BY FIELD __ METHODS FROM INFORMATION GATHERED ON QR RFmRF NOV 12, 2018, BY PASCO LARET SUITER & ASSOC/A TES. TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP ACCURACY STANDARDS. PROJECT LOCATION THIS PROJECT IS LOCATED WITHIN ASSESSORS PARCEL NUMBER(S) 206-020-11-00 THE CALIFORNIA COORDINATE INDEX OF THIS PROJECT IS: N 1999 E~6=22=8~--------BENCH MARK DESCRIPTION: 2.5" brass disk LOCATION: Southeast corner of a vault adjacent to the Northeast corner of the Northbound Coast Highway 101 Bridge over Aqua Hedionda Lagoon. City RECORDED: Control ooint number 141 Per Record of Survey number 17271 ELEVATION: 26.518 Feet DATUM: ~N~G~\-c~D~2=9 _______ _ I I I I \ \ \ -·• • \ 7 7 -./ -• • I I I I I 7 . I I I 7 7 I I _-~ ... : . -I J / 7 I / / J' / ... • r---.. 1---. ·• .. I I I I I I I I I I I I PACIFIC OCEAN PRELIMINARY GRADING PLANS FOR: MR. GALIZ/0 7-UNIT INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE VICINITY MAP CITY OF OCEANSIDE HIGHWAY 78 NOT TO SCALE CITY OF VISTA PACIFIC OCEAN CITY OF ENCINITAS LOCATION MAP HILLSIDE DR. CANNON PARK DR. RD. NOT TD SCALE CT 2019-0004/PUD 2019-0004 CDP 2019-0012 IND EX OF SHEETS 1. TITLE SHEET 2. EXISTING CONDITIONS AND DEMOLITION PLAN J. SITE PLAN 4. GRADING PLAN 5. CROSS SECTIONS A 6. CROSS SECTIONS C & D 7. CROSS SECTIONS E, F, & G 8. PRELIMINARY SITE PLAN -TURNING RADIUS MAP 9. GRADING PLAN -DETAIL SE CORNER TOTAL LOT AREA =---------"0"-.4"-'4--'A-"C'--TOTAL DISTIJRBED AREA = 0. 46 AC (THIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFIC, SOIL/GRAVEL PILES, UTILITY TRENCHES, BACKFILL CUTS AND SLOPE KEYWA YS) TOTAL REPLACED IMPERVIOUS AREA -5 921 SF TOTAL PROPOSED IMPERVIOUS AREA -3 416 5F LTII CITY OF CARLSBAD II~ PREIJMINARY GRADING PLANS FOR: MR. GALIZ/0 7-UNIT INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE TITLE SHEET PROJECT NO. CT 2019-0004/PUD 2019-0004/ '--c_o_P_2_0_19-_0_0_12_'I_DEV. __ '2o_i_a-DOB __ 7___,I DRAWING No.I CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 1 5 1 2 4 22 5 5 6 7 8 9 10 2 2 2 2 EX. ASPH. BW 53.27 TW 54.43 FS 54.11 FS 54.34 BW 52.87 TW 54.12 BW 52.45 TW 54.02 BW 52.42 TW 54.10 BW 52.20 FS 54.18 FS 54.02 FS 53.84 FS 53.38 FS 52.96 FS 52.29 FS 51.65 FS 48.74 FS 50.97 FS 50.32 TC 48.74FL 48.27 TC 48.85FL 47.40 TC 46.68FL 46.20 TC 46.26FL 46.14 GT 45.34 TC 44.90FL 44.45 TC 44.14FL 43.98 TC 43.48FL 43.34 BW 54.32 FC 59.57 FC 59.87 FC 58.96 FC 60.31 FC 59.00 BW 49.99 TW 53.59 FS 52.41 FS 51.46 FS 50.62 FS 49.53 BW 48.39 TW 51.99 FS 47.60 BW 47.03 TW 49.83 TW 49.97 FS 48.68 FS 48.53 FS 43.85 FS 48.23 FS 48.24 BW 46.94 TW 48.26 FS 47.97 FS 48.31 TW 48.43 BW 46.20 FS 48.55 TW 48.63 FS 48.67 FS 48.78 FS 48.78 FS 48.49 FS 48.71 FS 49.41 FS 49.45 FS 49.36 FS 49.86 FS 49.30 FS 49.57 FS 50.01 TW 49.78 BW 49.27 TW 49.93 BW 49.48 TW 49.91 BW 49.31 TW 49.91 BW 49.31 TW 49.92 BW 48.15 TW 50.04 BW 47.31FL 46.98FL 46.84 TW 50.08 BW 46.47 BW 48.79 TW 50.06 TW 50.10 BW 48.78 TW 51.65 BW 49.26 TW 57.21 BW 49.27 TW 53.00 BW 51.39 TW 51.82 BW 51.10 TW 51.80 BW 50.99FS 51.34 FS 54.26 TC 43.08FL 42.92 TC 45.38FL 45.30 GT 48.32 FS 49.51FS 49.30 FS 49.50 FS 49.12 FS 50.73 FS 48.75 FS 48.34 EX. WALL 190 LF ± (W) EX. RET. WALL (TO REMAIN) 190LF ± (E) EX. RET. WALL (TO BE REMOVED) EX. RET. WALL FC 58.2 FS 54.24 TW 54.58 TW 54.24 TW 54.08TW 54.43 TW 54.05 TW 54.38 TW 52.88 BW 51.45 TW 53.94 TW 54.29BW 51.34TW 57.23 BW 49.03 BW 49.27 TW 53.80 TW 57.21BW 49.47 TW 53.09 TW 53.44 TW 51.70 BW 49.66 TW 51.69 BW 49.24 TW 54.52 FS 49.53 TW 50.06 BW 48.79 FS 49.37 TW 49.99 BW 48.21 TW 48.41 FS 48.25 TW 48.74 BW 45.87 TW 48.97 BW 45.74 TW 48.42 BW 45.66 BW 45.64 TW 48.44 BW 46.62 BW 45.14 TW 47.75 TW 47.12 BW 45.13 BW (W) 46.96 TW 49.99 2 2 5 LF EX. WALL TO REMAIN 79 LF± OF EX. DUAL RET. WALL TO REMAIN 129 LF ± (E) EX. RET. WALL (TO BE REMOVED) 7.5 LF ± (W) EX. PLANTER RET. WALL (TO BE REMOVED) 9.25 LF ± (E) EX. RET. WALL (TO REMAIN)9.25 LF ± (E) EX. RET. WALL (TO REMAIN) FS 43.86 FS 43.76 FS 44.17 FS 47.97 TW 48.26 BW 46.94 FS 45.69 FS 45.26 FS 47.32 FL 47.02FL 46.66 TW 48.61 BW 45.19 TW 48.60 BW 45.12 FS 45.81 FS 45.93FS 45.95 TC 43.28 FL 42.83 TC 43.10 FL 42.72 TC 43.41 FL 42.88 TC 44.10 FL 43.79 ro 0 0 N 0 N ....... ~ 0 ....... 0 ~ s u 0 E m 0 u C " m ·x w I N 0 I u / 0 ~ E n 0 ~ I I 1 EXISTING 2 STORY BUILDING \ ) I I I EXISTING 2 STORY BUILDING ~ ~=~====~ ··-··-··-··-··::_··t';;,,,\7□ 0"jj''-·•-■--■--••-··-··~---·•-■--••-··-··-··-·•-■---~----··-··-··-·· I / C ,, ( \ k ·" I a. en <C, ~ 3' \JDDD FENCE X \ ,s / y / ' SCALE: 1" = 1 O' 0 5' 10' / / / FENCE X / / X -0 6' \JDDD FENCE X X X • C 0--<- ~ 0---... {,, \./ODD .;c::J r NCE "" "-_....- >. ............................................................................................................................................................................................. " EXISTING 1 STORY BUILDING 0 CONSTRUCTION NOTES G) DEMO EXIST STRUCUTRES. @ DEMO EXIST RET. WALL, RETAIN EXIST STONE TO REUSE FOR FUTURE HARDSCAPE PLAN, REFER TO LANDSCAPE PLANS. @ DEMO EXIST STORM DRAIN PIPE AND INLETS . @) DEMO EXIST AC SURFACE. @ DEMO EXIST PCC SURFACE, RETAIN EXIST PCC MATERIALS TO GRIND AND REUSE AS BASE MATERIAL ON-SITE. @ DEMO EXIST FENCE q) RELOCATE EXIST GAS METER @ RELOCATE EXIST WATER METER @ PROTECT IN PLACE EXIST ELEC POLE AND CABLE BOX @ DEMO/ABANDON EXIST SEWER LAT AND PLUG CONNECTION TO SEWER MAIN 0-, X ' --/~/ ;...: ................................................................................................................ ....... I I I X ' EXISTING 1 STORY BUILDING C ' 0- ___...,,. SHED C s " 'I C EXISTING 2 STORY BUILDING ,1 ,> EX.ASPH. ' -rl 8' \./RD' G "" FENe\- > " C " s - --- -o X N utio CT 2019-0004/PUD 2019-0004/ ' I ' " ' , I ' ' ,I,~ i I , : I ' j q, I 1:- ' ~: ' ' ' : ' I I X CDP 2019-0012 d ~ /4 C X ' 0 ' V ~-o 1: UJ 0 ::::> z UJ -s-~ z a. R <( ::::> d 0 z :i: C) 0 ' ~ I 0 ~w- EXISTING OH UTILITY EXISTING 2 STORY BUILDING EASTERLY WALL ELEVATION TOPOGRAPHIC INFORMATION DIAGRAM I/ARNING 1/Z BENCHMARK: L TOLL FREE 00-277-2600 LEAST TWO DAYS an BITTlRE YDU DIG UNDERGROUND SERVICE ALERT OF SOUTl-lERN CALIFORNIA ABBREVIATIONS ASPH. = ASPHALT BW = BOTTOM OF WALL EX= EXISTING FC = FINISH CONCRETE FS = FINISH SURFACE GT= GUTTER OH = OVERHEAD TC= TOP OF CURB TW = TOP OF WALL SWR=SEWER ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: MR. GALIZ/O 7-UNIT INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 13 PRELIMINARY SITE PLAN SWR POC INV 46.0'± WTR POC PERMEABLE PAVERS DETAIL VARIES PER PLAN PAVERS 3-IN THK NO. 8 BEDDING 4-IN THK NO. 57 STONE 12-IN THK NO. 2 STONE 8-IN CONC. CUTOFF WALL W/ NO. 3 REBAR @18 IN O.C., DEPTH PER GEOTECH ENGINEER RECOMMENDATION MIRAFI 1100 N GEOTEXTILE FILTER FABRIC EX OH UTILITIES (TEL, CATV, ELEC) 29 15 23 ORCO AQUA-BRIC TYPE I, CAPABLE OF HANDLING H-20 AND 68,000 LB. TRUCK, OR EQUAL N.T.S. 8.2'16.8'25' 31 31 15 LANDSCAPE PLANTER LANDSCAPED AREA CUT-OFF WALL ABOUT PERVIOUS PAVER AREA, TYP. FS 54.11 FS 54.34 FS 54.18 FS 54.02 FS 48.74 TC 48.74FL 48.27 TC 48.85FL 47.40 TC 46.68FL 46.20 TC 46.26FL 46.14 GT 45.34 TC 44.90FL 44.45 TC 44.14FL 43.98 TC 43.48FL 43.34 FC 59.87 FC 58.96FC 60.31FC 59.00TW 49.97 FS 48.68 FS 48.53 FS 48.23 FS 54.26 TC 43.08FL 42.92 TC 45.38FL 45.30 17 6" PERF. HDPE SD INV. PER GRADING PLAN MIN. 3"BOT. PERF. PIPETO NATIVENOTE: CUT-OFF WALLS SHALL BE 520-C-2500 CONC. 15 1429 15 15 18 19 24 2424 32 5' PROP. ROWDEDICATION SLOPE PER GRADING PLAN 30 37 38 39 I ) I .. ,,. .. .. .. .. + I .. .. .. .. .. .. .. r .. .. .. .. ~ .. .. .. .. ~-----------=-~-==-= r------------~;- . ·1· t· , _~---=..::----'--------------~-) I I/ / • • .. .. .. .. . . . .. .. .. .. . . .. .. .. .. .. .. .. .. .. ' ...... /" • • LS .. .. + + .. + . . • • • . . . + + .. .. + + .. .. ~ .. ... -~l~ / / .. .. .. I .. •• 1 .,-,,.=~/ .. .. .. .. .. ·~ .. • • + + .. .. • .. .. .. I .. • • 1 • .. .. .. .. L--•·~· BLDG 4: FF 52.00' ~) : : : : :u .. : .. .. .. .. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... / + + .. .. + + + + + + + .. .. .. _..___..._ •■---/~~-,~·-·~· ........ . ... ... ... ... ... ... ... ... ... ... ... -II -,,-.-- ...... "'274"96 .. .. :!Q'lli'~ . --------- LEGEND CONC. CURB & GUTTER BMPSIGN PROPOSED LANDSCAPE (LS) AREA PROPERTY LINE I . • • . • I PROPOSED PCC I~ I PROPOSED PERMEABLE PAYERS •. •. • " ". '.: GRASSCRETE ~ " " " ------ □ □ -----flV-- --s - --w- PROPOSED RET. WALL PROPOSED BLDG. PROPOSED PRIVATE 1212CB BROOKS BOX WI BMP STENCIL PROPOSED PRIVATE NDS 9" X 9" SQUARE ATRIUM GRATE, GREEN PROPOSED PRIVATE ELEC HANDHOLE, PER SDGE POLYMER CONCRETE STD. UG3309.1 PROPOSED PRIVATE SS CO, PER SDRSD SC-01 FIRE SERVICE SEWER LINE WATERLINE NOTE TO CONTRACTORS: TOPOGRAPHIC INFORMATION TAKEN FROM A TOPOGRAPHIC SURVEY PERFORMED BY PASCO LARET SUITER & ASSOCIATES OF SOLANA BEACH, CA THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY, IN WRITING, OF ANY DISCREPANCIES OR OMISSIONS TO THE TOPOGRAPHIC INFORMATION. THE OCNTRACTOR(S) SHALL BE RESPONSIBLE FOR CONFIRMING THE LOCATION (HORIZONTAL/ VERTICAL) OF ANY BURIED CABLES, CONDUITS, PIPES, AND STRUCTURES (STORM SWEER, SANITARY SEWER, WATER, GAS, TELEVISION, ETC.) WHICH IMPACT THE CONSTRUCTION SITE. THE CONTRACTOR(S) SHALL NOTIFY THE OWNER IF ANY DISCREPANCIES ARE FOUND BETWEEN THE ACTUAL CONDITIONS VERSUS THE DATA CONTAINED IN THE CONSTRUCTION PLANS. ANY COSTS INCURRED AS A RESULT OF NOT CONFIRMING THE ACTUAL LOCATION (HORIZONTAL OR VERTICAL) OF SAID CABLES, CONDUITS, PIPES, AND STURCTURES SHALL BE BORNE BY THE CONTRACTOR. .. • / V \__ ABBREVIATIONS ASPH. =ASPHALT BW = BOTTOM OF WALL EX = EXISTING FC = FINISH CONCRETE FL= FLOW LINE FS = FINISH SURFACE GT=GUTTER OH = OVERHEAD TC = TOP OF CURB TW = TOP OF WALL SWR=SEWER ) I\ /II\ /I I\ 1111 W 11 W W I\ I II\ I I I \ I II \ I I : \ / :: \ /BLDG 3: ,-\-C):: \ iFF51.00' I \ I II I I I -,---,-.,,__, I I I 1 ~ ~ \ I I -------.. 1 J 11 \ I \ I 11 \ I I \/ II \I I L __ :J... __ _JL __ J.. __ _J -o " I " ' I , I I , I I , I I ' I I I ' I ' I ' I ' ' ' -- , __ .._____ I I ' I '--4J.___ I II I L_ __ _I/_ __ _J _/ +++++LS+ • • • • .. .. ----;;; ... ... '----0 • • • + + + + '\ ""---'-I ·-· "-: I • \ 0- . I •• \ • {\ 11 I\ I\ /I 111 1111 /'1:\ 'DG 1 &:.2: 111~ ~ / :: \ 1FF so.oar\ ::i~ I I I I I \ o-~ Oo o-----=----. 00' I 1 I : •· CT 2019-0004 llUD 2019-0004/ ~ CDP 2019--0()12 \I -_, ~~ I , / (.) ~ a.. lie • I :i::-Uc, X ~I ~ ;; ': I >.... .,,-, a..(/)..... ..-: C) d ...J ""' r1 .-·~12: ~-I; -s- UJ(!) "'i"Z z:!: ~ . ~ ffi ~ti C. I~ Ul w ::::l z w I I I I \ / 11 I I I I 1 I II \ I 1 \ / 11 \ I I I \ I II \ I I I I I \ / 11 \ / I I \ I II \ I I I I I \ / 11 \ I I I \ I II I I I I I I \ / II \ \ I II I I I I I I \ / 11 I II 1 I ''-.J L__ • ;'( z ~ . 1-(, /4/j/ d'i'W M 1!.f.H~I~-~ -,. :, ~ ., I / I I 0 _/ I . -J ··• I I \ / 11 \ I \ I I I II 1 I I I I I I I 11 \ I I I I I II \ I C)-'-'c:'----..J::i I I \ I 11 I I I I 1 I 11 \ I I l'-1 I I \ I 11 I J I I 1 I 11 I I I l".',llli] LL_-_ :i.__ - -----'L - -!L - -----'_ - - - -_L - -:J... - ----::'_L_-_-_!1.-_-_-_-' _ _J • 0-N----<..I • • • . ·1 • I . ... ... \ . : :11--..1_. I I . ,. ' • • \ • I Pl/ /.....---0 0 z J: u I I l . . . ·····...:!:.•**■"'"'"' . . ... ... ... ... ... t~ -11.--... ......... _ .. _ + + ... ... + + + + + + ... ... + + + ~--·· I/ARNING 0 1/Z 1 BENCHMARK: ' ,, t I -:---,-0 '-------0 CAUTION! X EXISTING OH UTILITY (') I ' " ' ,, I 0 CONSTRUCTION NOTES @) RES. CONC. DRWY PER SDRSD G-14C @ REPLACE SIDEWALK IN LIKE AND KIND (SDRSD G-7) @ 6-IN C&G PER SDRSD G-2, TYPE G @ CURB OUTLET, TYPE A, PER SDRSD D-25 @) 6" FIRE WATER SERVICE WITH DDCV PER CMWD W-22 @) NEW BACKFLOW PREVENTER @ PERVIOUS PAYERS I I TORN/ SCALE: 1" = 10' 0 5' 10' @ PROTECT IN PLACE EXIST ELEC POLE AND CABLE BOX, 4-FT CLEARANCE AROUND POLE @ EX. WATER SERVICE -UPSIZE TO 2" WATER SERVICE INSTALL 2" WATER METER WITH 2" BACKFLOW PREVENTER PER CMWD W-20 @ PROTECT IN PLACE EXIST. RET. WALL @) TRASH BINS, PER ARCH PLAN, FINAL DESIGN TO BE PER CITY STD. GS-16 @ LINE OF SIGHT@ DRWY @ PCC SIDEWALK EXTENSION TO PROVIDE MIN. 48" CLEARANCE AROUND EXIST. POWER POLE @ UNDERGROUND ELEC TRANSFORMER @ 3' X 23.8' DRIVABLE GRASSCRETE (DESIGNED FOR H-20 LOADING) @) 396 SF DRIVABLE GRASSCRETE (DESIGNED FOR H-20 LOADING) NOTE: FOR AASHTO TYPE "P" VEHICLE TURN MOVEMENTS, SEE SHEET 8 ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: Description: 2 s• BRASS DISK MR. GALIZ/O 7-UNfr INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE PROJECT NO. TC 45.38 CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 12 14 11 EX SMH INV 36.5 PER DWG 146-6EX W INV 43.5± PER DWG 159-9 PRELIMINARY GRADING PLAN POST-DEV 1.71 CFS* PRE-DEV 1.16 CFS 100-YR FLOW RATE COMPARISON GR 48.20 INV 47.36 FS 49.0 TW 50.50 FS 49.50 FS 49.25FS 49.25 GR 48.59 INV 47.47 GR 49.0 INV 48.0 GR 51.00 INV 49.00 GR 51.00 INV 49.65 GR 48.75 INV 47.50 GR 48.75 INV 47.75 GR 49.25 INV 47.70 GR 49.30 INV 47.89 GR 50.02 INV 48.3 FS 50.50FS 50.50 FS51.00'FS51.37' FS51.5' SWR POC INV 46.0'± WTR POC EX OH UTILITIES (TEL, CATV, ELEC)TW 53.50'BW 51.60'TW 53.50' BW 51.60' FS 51.9' TW 52.0' BW 48.68' 21 2222 GR 50.02 25 BW 49.27 TW 53.80 5' 8.2'16.8'25' 20 TW 51.50' BW 48.80' TW 51.50' BW 48.50'TW 50.75' BW 47.00' TC 51.25' TW 54.25' BW 50.50' 2" WATER SERVICE INSTALL 2" WATER METER WITH 2" BACKFLOW PREVENTER PER CMWD W-20 FS 49.25FS 49.25 GR 48.79 INV 47.70 GR 50.20 INV 49.20 GR 50.76 INV 49.65 FS 50.50 13 GR 47.7 INV 47.30 FL 50.71 30 16 19 FS 50.50 FS 54.11 FS 54.34 FS 54.18 FS 54.02 FS 48.74 TC 48.74FL 48.27 TC 48.85FL 47.40 TC 46.68FL 46.20 TC 46.26FL 46.14 GT 45.34 TC 44.90FL 44.45 TC 44.14FL 43.98 TC 43.48FL 43.34 FC 59.87 FC 58.96TW 49.97 FS 48.68 FS 48.53 FS 48.23 FS 54.26 TC 43.08FL 42.92 FL 45.30 FLAT LANDSCAPE AREA 1515 LS LS 4" SOLID HDPE SD 6" PERF. HDPE SD 4" SOLID PVC SD 6" SOLID PVC SD 6" PERF. HDPE SD 4" SOLID HDPE SD 4" SOLID HDPE SD GR 51.00 INV 50.08 GR 51.00 INV 50.08 GR 50.02 INV 49.604" SOLID HDPE SD 4" SOLID HDPE SD 4" SOLID PVC SD 4" SOLID PVC SD 6" SOLID PVC SD 8" SOLID HDPE SD 4" PERF HDPE SD BW 54.32 FC 59.57 EX. ASPH. FS 53.84 FS 53.38 FC 59.57FC 60.31FC 59.00BW 49.99TW 53.59BW 48.39TW 51.99BW 47.03TW 49.83BW 51.39 TW 53.00 FS 54.26 EX. RET. WALL EX. RET. WALL FC 58.2 FS 54.24 TW 54.58 TW 54.24 TW 54.08 TW 54.43 TW 54.38 TW 54.29 BW 49.27 TF 57.21BW 49.47 TW 53.09 TW 53.44 TW 49.99 FL 46.564" PERF HDPE SD FS 48.90 FS 48.80 2424 GR50.76'TW 51.60'BW 50.00'TW 51.50'BW 49.00'TW 51.50'BW 48.00'TW 51.50'BW 48.70'TW 51.50' BW 48.00' TW 51.10' BW 48.00' FS 50.10' TW 50.17' BW 47.00' FS 49.17' TW 49.50' FS 48.45' BW 46.00'TW 48.83' BW 46.50' FS 47.80'HP 51.25'HP 51.25'HP 51.25HP 51.25'HP 51.25'GR50.76'GR50.76' 33 3333 LINK SEAL AT CUT-OFF WALL PIPE PENETRATION 33 33 33 HP51.25'HP51.25' HP51.25' HP51.25'HP51.25' GR51.00'GR51.00'GR50.76' GR50.76' GR 50.02 HP 50.25 HP 50.25HP 50.25 GR 48.75 INV 47.90 GR 48.75 INV 48.00 HP 49.12 HP 49.12 HP 49.12 GR 49.15 INV 48.20 GR 49.6 34 BEGIN NEW WALL AT PL, REMOVE WALL TO THE N PER SHT 2 34 TW 54.25' BW 49.50' GR 48.75 INV 47.35PP FS 48.60 FS 48.50 FS 48.40 FS 48.30 FS 51.50 FS 51.50 FS 51.25 FS 51.25 FS 50.25FS 50.25 FS 51.25' FS 51.25' FS 50.25' FS 50.25' FS 50.25' GR 50.10 INV 49.80 GR 51.00 TW 50.50' BW 47.25' 35 PEDESTRIAN STAIR AND HANDRAIL PER ARCH. OR AS A MIN. PER SAN DIEGO STANDARD DRAWING SDM-118 AND PER CA BLDG. CODE. TW 48.00 BW 44.92 24 BW 45.22 TW 49.99 2% MIN. SLOPE FS 50.50' BW 48.66' 33 SEE SHEET 9 FOR DETAIL 12 FS 49.25 48.0' 15 17 33 TW 49.30 BW 49.28 24 SEE SHEET 9 FOR DETAIL GR 49.07 INV 47.60 36 H-20 TRAFFIC RATED 10" WIDE TRENCH DRAIN (ACO S200K, OR EQUAL) 6" PERF HDPE SD 4" PERF HDPE SD 6" PERF HDPE SD 18 TW 51.10' BW 48.00' TW 50.83' BW 48.00' FS 50.10' TW 49.50' BW 47.00' FS 49.17' TW 48.83' FS 48.45' BW 46.00'TW 48.17' BW 46.50' FS 47.80'FS 48.00'TW 51.60'BW 50.00'TW 54.25' BW 51.60' TW 54.25' BW 50.50' TW 54.25' BW 50.25' * DOES NOT EVALUATE LOSSES DUE TO ADDITIONAL INFILTRATION WITH PERVIOUS PAVEMENT SYSTEM. LS 38 39 GR 50.30 INV 49.35 FS 50.84' FS 50.15' INV 48.20'4" PERF HDPE SD FS 48.70 33 33I ) ( ,,) / I 1 I ~3'~ FrN~~uu/ \_6' \JD EXISTING 2 STORY BUILDING F· C.£. / / LEGEND BLDG4: FF 52.0' EXISTING 1 STORY BUILDING L _________ _ 4.96 'll~. \\ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I \ I ) r -s- 1111 \\ ,, " 1111 w ,,w w \\ \ \ ' -- /II\ /\ \\ \ \ \\ \ \ \ \ \ I \ \\ \ \ \ \ \ I \\ \ I \ \ \ \ \\ \ I \ \ \ I 11 \ I I I I I II \ I I I 1 , __ II \ ~ aL□~~ : \ / :: \ / Ff 51. '------.: \ / \ I 11 \ I I \/ II \I I ,--LN- 1 II I L __ :J... __ _JL __ J.. __ _J L_ __ _I/_ __ _J Q CONSTRUCTION NOTES EXISTING 2 STORY BUILDING -49_~~- u, ------1-- -r====:~c-~- CONC. CURB & GUTTER BMPSIGN @ SEWER MANHOLE PER CITY STD. S-1, MATCH EXIST. INVERTS, SEWER BYPASS PER ro ro 0 0 N 0 N " ~ 0 " SLOPE _,,_.,_,,_ PROPERTY LINE I • • . • I PROPOSED PCC ====JI PROPOSED PERMEABLE PAVERS (PP) • • • • • • PROPOSED RET. WALL □ PROPOSED BLDG. □ □ GRASSCRETE PROPOSED PRIVATE 1212CB BROOKS BOX W/ BMP STENCIL PROPOSED PRIVATE NDS 9" X 9" SQUARE ATRIUM GRATE, GREEN PROPOSED PRIVATE ELEC HANDHOLE, PER SDGE POLYMER CONCRETE STD. UG3309.1 PROPOSED PRIVATE SS CO, PER SDRSD SC-01 SSPWC SEC. 500-1.2.4 @) TRENCH RESURFACE PER CITY STD. GS-25, GS-26 @ RES. CONC. DRWY PER SDRSD G-14C @ REPLACE SIDEWALK IN LIKE AND KIND PER SDRSD G-7 @ 6-IN C&G PER SDRSD G-2, TYPE G @ NEW MASTER 2" WATER METER @ CURB OUTLET, TYPE A, PER SDRSD D-25 18 6" FIRE WATER SERVICE WITH DDCV PER CMWD W-22 19 NEW BACKFLOW PREVENTER 0 6-IN HDPE STORM DRAIN* 1 GATE VALVE PER CITY STD. W-16 REPLACE 12-IN ACP AT NEAREST JOINTS W/ CL 150 AWWA C900 PVC I NOT USED PROTECT IN PLACE EXIST ELEC POLE AND CABLE BOX, 4-FT CLEARANCE AROUND POLE REMOVE EX. WATER SERVICE @NOT USED @ PROTECT IN PLACE EXIST. RET. WALL R&R EXIST. AC & BASE ] @NITTU~D , 0 s NOTE TO CONTRACTORS, ~ NOT USED TOPOGRAPHIC INFORMATION TAKEN FROM A TOPOGRAPHIC SURVEY PERFORMED BY PASCO LARET SUITER & ~ i ASSOCIATES OF SOLANA BEACH, CA THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY, IN i6o' 1 WRITING, OF ANY DISCREPANCIES OR OMISSIONS TO THE TOPOGRAPHIC INFORMATION. THE OCNTRACTOR(S) ~ u SHALL BE RESPONSIBLE FOR CONFIRMING THE LOCATION (HORIZONTAL/ VERTICAL) OF ANY BURIED CABLES, / CONDUITS, PIPES, AND STRUCTURES (STORM SWEER, SANITARY SEWER, WATER, GAS, TELEVISION, ETC.) WHICH ~ ~ IMPACT THE CONSTRUCTION SITE. THE CONTRACTOR(S) SHALL NOTIFY THE OWNER IF ANY DISCREPANCIES ARE ~ • 6 \JDDD -s- ~o -s- I I -, /, _/ _____ _ --, ------ I - --~cl------ / -s . ---s- '-:. I -~_-,J • • 0 EXISTING 2 STORY BUILDING ADDITIONAL CONSTRUCTION NOTES IN GENERAL, GRADE ALL BUILDINGS AT 5% AWAY FROM BUILDINGS FOR MIN. 5'. -s- /: ~I I \ \ \ \ I I L CAUTION! EXISTING OH UTILITY IN GENERAL, GRADE LANDSCAPE AT MIN. 2% SLOPE IN DIRECTION OF DRAINAGE AS INDICATED BY ARROWS. IN GENERAL, GRADE PAVERS AT MIN. 2% SLOPE, EXCEPT WHERE INDICATED OTHERWISE. *A MIN. 1% SLOPE IS PROVIDED WITHIN PERVIOUS PAVERS IN CENTER PARKING AREA. REQUEST WAIVER FROM CITY STANDARD NOTING THAT DRAINAGE WILL BE HANDLED VIA SUBSURFACE INFILTRATION AND SUBTERRANEAN PIPING SYSTEM. SPOT GRADES ARE PROVIDED ALONG THIS PATH TO ENSURE GRADING WILL BE WITHIN THIS TOLERANCE. -NOTE THAT EXISTING 1-FT SEPARATED RETAINING WALLS ALONG SW SIDE OF BLDG. 1&2 IS SLIGHTLY HIGHER THAN SETBACK REQUIREMENT. SINCE THIS WALL IS TO REMAIN. APPLICANT REQUESTS WAIVER FOR EXISTING CONDITION TO REMAIN WITHIN THIS SETBACK AREA. ~ FOUND BETWEEN THE ACTUAL CONDITIONS VERSUS THE DATA CONTAINED IN THE CONSTRUCTION PLANS. ANY ~ ~ COSTS INCURRED AS A RESULT OF NOT CONFIRMING THE ACTUAL LOCATION (HORIZONTAL OR VERTICAL) OF ~ ~ [/] SAID CABLES, CONDUITS, PIPES, AND STURCTURES SHALL BE BORNE BY THE CONTRACTOR. ~ ~ t----~ '231 L TOLL FREE ~ JE ~ LEAST l'IAl DAYS ~ JCL.J ® 811 BEFORE YOU DIG 0 I/ARNING 1/Z 1 BENCHMARK: Description: 2 s• BRASS DISK ' '6, ~·o ... ' \ : "-I" . I 1 I : •· (') I ' " \ ii I ABBREVIATIONS ASPH. = ASPHALT BW = BOTTOM OF WALL EX = EXISTING FC = FINISH CONCRETE FL= FLOW LINE FS = FINISH SURFACE GT=GUTTER LS = LANDSCAPE OH = OVERHEAD TC = TOP OF CURB TW = TOP OF WALL SWR=SEWER s N I I er /1 w I ::::l z w I '° ;'( 00 z s D. < N ::::l 0 0 z I u TORN/ SCALE: 1" = 10' 0 5' 10' ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: MR. GALIZ/O 7-UNfr INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE PROJECT NO. ~ t-----t ING @ 3' x 23.8' DRIVABLE GRASSCRETE (DESIGNED FOR H-20 LOADING) UNDERGROUND SER~CE ALERT OF SOUTHERN c,,urnRNIA ~M~ HrioNR.RlruNrf i!Ml ffit/fwif ,fl llloB~ ~ JCLJ 1820 s. El Camino Real, A205l-a..==-;;.,;=;;:----::-- 71 @) 396 SF DRIVABLE GRASSCRETE (DESIGNED FOR H-20 LOADING) *NOTE: STORM DRAIN PIPE TO BE PERFERATED FOR ~/~:A:~:E D1~ES AGUA HEQIONQA LAGOON CT 2019-0004/PIJD 2019-0004/ b t-----1 Encinitas, California 92024 ENGINEER OF WORK: LOCATIONS OVER PERVIOUS PAVERS, PERFERATIONS THEN DRAIJING IS Record From:CllY CONTROL PT. NO. 141 PER ROS NO. 17271 CDP 2019-0012/ DEV2018-00S7 I DRAWING NO.I •~ T 619. 8 84. 0 5 7 6 JAMES CORY-LANE:AVER<'/fNfill·•-"""'' SHALL BE ORIENTED DOWN, ALL OTHER LOCATIONS TO BE NOT TD SCALE. Elev: 26_518 FEEi' Da1um: ~NGIID=~29~---~ L~J:C:LJ:__lc:o~r~y~.~l_:a~n~ea~v:e~@~gm~a::i::l_::-c:o~m:_ __ L _____ _:::::_::=l.J,.l_....::::::=::=:::'.----------------------------------------~S~T~A~N~D~A~R'.:D~S~T~O~R~M~D~RA~IN~P~IP~E::,~N~O~P~E:R~F~E:RA~T~l~O~N~S:..._ __ .l.. _______ L....:==========-=-----======_J,;;~~~~~~~~~~~~~~;;:;;~~~;;~ CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 10+00 10+50 11+00 47.5 50.0 52.5 52.5 50.0 47.5 SCALE: HORIZ: 1" = 10' VERT: 1" = 1' 45.0 45.0 55.0 55.0 BLDG. 1 & 2 FG 49.50' EXIST (2) RET. WALLS, PROTECT IN PLACE EXIST (2) RET. WALLS, PROTECT IN PLACE EXIST HARDSCAPE, PROTECT IN PLACE 12-IN THK NO. 2 STONE 8-IN CONC. CUTOFF WALL W/ NO. 3 REBAR @18 IN O.C., DEPTH MOD. AS RECOMMENDED PER GEOTECH ENGINEER IN FIELD DURING INSTALLATION4-IN THK NO. 57 STONE 3-IN THK NO. 8 BEDDING ORCO AQUA BRIC, OR EQUAL G-2, TYPE G C&G 4-IN PCC PL RET. WALL, PERMANENT RETAINING WALL (SPECIAL DESIGN) DEMO EX. RET. WALL MATCH EX. FS APPROX. BLDG. FOOTING LOCATION BASED ON TW AND FS SPOTS PROVIDED BY SURVEYOR APPROX. FOOTING LOCATION BASED ON TW AND FS SPOTS PROVIDED BY SURVEYOR 3' MIN. BLDG. 1 & 2 FF 50.00'4' MIN.18' MIN. BOTTOM CUT-OFF WALLS SET AT MIN. 30-IN. BELOW BOTTOM OF PERVIOUS PAVER BASE COURSE DRAINAGE ROCK, OR PER GEOTECHNICAL RECOMMENDATION NOTES: RET. WALL SHORING PLAN TO BE PROVIDED WITH GRADING PERMIT APPLICATION FOR RETAINING WALLS. SHORING PLANS SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND CALIFORNIA DEPARTMENT OF TRANSPORTATION TRENCHING AND SHORING MANUAL, AUGUST 2011, OR SUBSEQUENT REVISIONS, AND OTHER STANDARDS DEEMED REQUIRED AT TIME OF PERMIT APPLICATION BY THE AUTHORITY HAVING JURISDICTION. CONTRACTOR MEANS AND METHODS ARE NOT WITHIN SCOPE OF THIS PLAN. * PED RAILING TO BE MAINTAINED AT HEIGHT SUCH THAT TOTAL HEIGHT INCLUDING RET. WALL HEIGHT PLUS PED RAILING HEIGHT SHALL NOT EXCEED A MAXIMUM OF 6-FEET OUTSIDE OF 10-FOOT FRONTAGE SETBACK AND TOTAL HEIGHT MAXIMUM OF 42-INCHES WITHIN 10-FOOT FRONTAGE SETBACK. 5' 4-IN PCC TW 48.83' 2.2' MAX. SLO P E V A R I E S , 2% M I N . BW 45.50' PED. RAILING* CUT-OFF WALL (SPECIAL DESIGN)CUT-OFF WALL (SPECIAL DESIGN) TF 45.00' ± INV 47.30 ~ 3 u C 0 > 0 u ~ J 0 > 0 u ~ I ITT 0 " 0 .a u I w 0 I u / 0 ~ E n 0 ~ I I I I I I I - I I I \ I I I I / / ✓ 1\ \ I I I I I /V v/ /. / / / v/ '/ 1// / / '\ I/ V / V , V V / I<\,< • • ' A Sl SECTION DRWY@ BLDG. 1 & 2 , "'A" SCALE: H: 1:10, V: 1:1 4 - v / , V , '\ . I'\_·' '\ " - - I A / / / -/ r--.___. L I'--. / / V 1--- -✓ ~ ~ ,.,. , .... ~ y ~ ¾ "' ~ ~ ._ " ' I '-. -S·,R - ,-... '' J I I ' " , '- / / / I< I _.,.,... V I/ I /I '>--~~'>-- ✓ ,'I'--. - I -----_.,.,... V , __ ~ -1,,-" - I I I I I I I I I I I I I I I I/ARNING 1/Z BENCHMARK: CT 2019-0004/PUD 2019-0004/ CDP 2019-0012 ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: MR. GALIZ/O 7-UNIT INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 10+00 10+50 11+00 47.5 50.0 52.5 52.5 50.0 47.5 SCALE: HORIZ: 1" = 10' VERT: 1" = 1' 45.0 45.0 10+00 10+50 11+00 47.5 50.0 52.5 52.5 50.0 47.5 45.0 45.0 55.0 55.0 SCALE: HORIZ: 1" = 10' VERT: 1" = 1' 55.0 55.0 12-IN THK NO. 2 STONE 8-IN CONC. CUTOFF WALL W/ NO. 3 REBAR @18 IN O.C., DEPTH PER GEOTECH ENGINEER 4-IN THK NO. 57 STONE MIN. 3-IN THK NO. 8 BEDDING ORCO AQUA BRIC, OR EQUAL G-2, TYPE G C&G4-IN PCC BLDG. 4 FF 52.0' MATCH EXIST. PL RET. WALL, PERMANENT RETAINING WALL (SPECIAL DESIGN) MATCH EX. FS PL RET. WALL, PERMANENT RETAINING WALL (SPECIAL DESIGN) EXIST RET. WALL, PROTECT IN PLACE EXIST HARDSCAPE, PROTECT IN PLACE PL RET. WALL, COMBINED PERMANENT SHORING WALL/ RETAINING WALL (SPECIAL DESIGN) PED. RAILING* NOTES: RET. WALL SHORING PLAN TO BE PROVIDED WITH GRADING PERMIT APPLICATION FOR RETAINING WALLS. SHORING PLANS SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND CALIFORNIA DEPARTMENT OF TRANSPORTATION TRENCHING AND SHORING MANUAL, AUGUST 2011, OR SUBSEQUENT REVISIONS, AND OTHER STANDARDS DEEMED REQUIRED AT TIME OF PERMIT APPLICATION BY THE AUTHORITY HAVING JURISDICTION. CONTRACTOR MEANS AND METHODS ARE NOT WITHIN SCOPE OF THIS PLAN. * PED RAILING TO BE MAINTAINED AT HEIGHT SUCH THAT TOTAL HEIGHT INCLUDING RET. WALL HEIGHT PLUS PED RAILING HEIGHT SHALL NOT EXCEED A MAXIMUM OF 6-FEET OUTSIDE OF 10-FOOT FRONTAGE SETBACK AND TOTAL HEIGHT MAXIMUM OF 42-INCHES WITHIN 10-FOOT FRONTAGE SETBACK. EXIST. RET. WALL EXIST. RET. WALL EXIST. RET. WALL (TO BE REMOVED) EX. TW 54.25 TW 54.25 TF 47.85 FG 50.50' BLDG. 3 FF 51.00' FG 51.50' INV 49.56 INV 49.56 INV 47.90 INV 48.22 EX. FG 48.50' S = 5 % MIN. S = 5% MIN.BW 51.60' S = 5 % MIN. S = 5% MIN. LANDSCAPELANDSCAPELANDSCAPE TW 53.50' BW 50.50' S = 5 % MIN . S = 5% MIN. S = 5 % M I N . FOR M I N . 5 ' FRO M B L D G EXIST. FENCE ON ADJACENT PROPERTY 5' PL RET. WALL, COMBINED PERMANENT SHORING WALL/ RETAINING WALL (SPECIAL DESIGN) TW 51.50' FG 51.50' PED. RAILING* BW 47.00' TW 49.50' TF 49.56 TF 48.50± TF 46.20± CUT-OFF WALL (SPECIAL DESIGN) CUT-OFF WALL (SPECIAL DESIGN) 4.3'4.3' ~ 3 u C 0 > 0 u ~ J 0 > 0 u ~ I ITT 0 " 0 .a u I w 0 I u / 0 ~ E n 0 ~ I I I I I I I I I I I I I \ I ~ ,,, / ~ / " ' I'--. i,, ' ~ I I ·_,,, ' I/ I/ v / I/ I/ / '7 >I. £,!\ r/. < ' ,, V r,-_ '-~ I > .. ~ '" t: y ,Y X' ' ~ y ~' 0 ~ ' ' I :--( /, ., ' / ,y D/ • -, ~ " ' " ', '- ----/. v / '/ I/ / I/ / r/ / / // ----" / / I/ / I/ / ✓ // • .. ~ . · .. . r---..· I'--,., . . ~--~ .• • : " . . . •""• . "v " A ,,,. . .. ' f\,.y ~ "/ 1 y; "> >) »; > , / , ~ ' , (, ?, ' '/ y ' <. ' :< ~ ', ,,,,,. SECTION DRWY@ BLDG. 3 SCALE: H: 1:10, V: 1:1 I I I , I I'.._ I ',-• I / • ' ~/ / ' ' l/v • '-/v • / • V / i / - / V ~ ,_ I/ / / ~-~ )( /v "' ~ / ./ -WI tc / .. ,,,v t'-s • " I - CD I I I I I I I I I I I I I I I / / I I I I I I I I I I I / I I -- -- ,. I/ / / / / / / / / / / / / / / / / / / / ,,. • V ·.;. • : 7,-.. ~-~ ~-.. .. ·•· - "' '/, L<' '-'·;(,~~ ((" f-t-+-+-+-+-+---fm f-*,-'ll',c--'lc-, _--b+-+-+---f-f-t-+-+-+-+-----t,,+-+-+-+-+---f-----1f",,.,,w ),lb-_ 1. -i:.,,,~ .,/:++--+---f-----,f-t--t-+-+-+-+---l ' ,.. V.' • SECTION BLDG. 4 VIEW WEST SCALE: H: 1:10, V: 1:1 / I/ARNING 1/Z /2 D ; ' ' y / /r+--+ / BENCHMARK: I I I I I I I I I I I I I I I CT 2019-0004/PUD 2019-0004/ CDP 2019-0012 ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: MR. GALIZ/O 7-UNIT INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 10+00 10+50 47.5 50.0 52.5 52.5 50.0 47.5 SCALE: HORIZ: 1" = 10' VERT: 1" = 1' 45.0 45.010+00 47.5 50.0 52.5 52.5 50.0 47.5 SCALE: HORIZ: 1" = 10' VERT: 1" = 1' 45.0 45.0 10+00 10+50 11+00 11+50 47.5 50.0 52.5 52.5 50.0 47.5 SCALE: HORIZ: 1" = 10' VERT: 1" = 1'45.0 45.0 S = 6 . 3 %CUTOFF WALL7.5-IN PCC, MIN. PERVIOUS PAVER SECTION EXIST. SURFACE PROTECT IN PLACE EX. RET WALL, TW 51.99 EX. R/WFUTURE R/WREPLACE EX. C,G, & S/W, MAX 2% ON SIDEWALK D-25, OUT OF SECTION CUT, SHOWN FOR CLARITY DEMO EX. RET. WALL, RETAIN DECORATIVE BLOCKS FOR ON-SITE RE-USE PL RET. WALL, PER CITY STDS. (SPECIAL DESIGN) 10+25CUTOFF WALLPROTECT IN PLACE EX. PL FENCE RETAINING WALL (SPECIAL DESIGN)REPLACE AC AND BASE TO MATCH GRADE FROM GUTTER HARDSCAPE, PER ARCH. FUTURE ROWFUTURE R/WEX. R/W7.5" PCC OVER 6" CL 2 BASE IN ROW 8-IN HDPE STORM DRAIN CONNECTION TO D-25 MH FRAME AND COVER, SEE SDRSD M-2 2% FS SLOPE WITHIN ROW INV 47.20 GR 48.80 FF 50.00 BLDG 1 & 2 FS 49.50 TW 49.75 TF 46.35 10'5' 1212 BROOKS BOX W/ BMP STENCIL FF 52.00 BLDG 4 FS 51.50TW 51.50 FS 48.30± TF 48.30 NOTES: RET. WALL SHORING PLAN TO BE PROVIDED WITH GRADING PERMIT APPLICATION. SHORING PLANS SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND CALIFORNIA DEPARTMENT OF TRANSPORTATION TRENCHING AND SHORING MANUAL, AUGUST 2011, OR SUBSEQUENT REVISIONS, AND OTHER STANDARDS DEEMED REQUIRED AT TIME OF PERMIT APPLICATION BY THE AUTHORITY HAVING JURISDICTION. CONTRACTOR MEANS AND METHODS ARE NOT WITHIN SCOPE OF THIS PLAN. HP 51.25 S = 5 % MIN .S = 5% MIN. LANDSCAPE S = 2.6 % S = 1.07 % S = 0.53 % S = 0.54 % S = 7 . 7 0 % S = 1.58 % 12+00 12+50 LANDSCAPED PARKWAY CUT-OFF WALL: RETAINING WALL (SPECIAL DESIGN) 2% SLOPE CUT-OFF WALL: RETAINING WALL (SPECIAL DESIGN) 5' BW 47.90'± (AT D-25) BW 47.80'± S( M A X ) = 9 . 6 % S(MAX)=2.0% ~ ~ 0 0 N 0 N " ~ 0 " ~ 3 u C 0 > 0 u ~ J 0 > 0 u ~ I ITT 0 " 0 .a u I w 0 I u / 0 ~ E n 0 ~ I I I /~ / / • ' I I ~ ~ ~ ,. • • ~ ~ '-fa ) , t ~ y • • • ~- I ~ ' f------t------t-t------t---------t----1--+------t-----t-----t------t------t~'"~ ~ i -~ i -~ -~ ~ ~ - 1-++++-+-+-+-+--111-++--f-++++-1-++-+---t-"t'-~ ~ ~~ ~~ -'f, ~ ~ I\. l :i,, D,,,. \ / ' • ·, ... • • SECTION BLDG. A FRONTAGE VIEW NORTH SECTION BLDG. D VIEW NORTH F SCALE: H: 1:10, V: 1:1 SCALE: H: 1:10, V: 1:1 4 I G 4 ... ~·-'r---. ~ .. ,··;'-._ .... ~--·•.· ·.' .... > I/ARNING 1/Z BENCHMARK: ... I I I I I I I I I I I I CT 2019-0004/PUD 2019-0004/ CDP 2019-0012 ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: MR. GALIZ/O 7-UNIT INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 PRELIMINARY SITE PLAN EX OH UTILITIES (TEL, CATV, ELEC) 5' 8.2'16.8'25' 37 LANDSCAPE PLANTER LANDSCAPED AREA FS 54.11 FS 54.34 FS 54.18 FS 54.02 FS 48.74 TC 48.74FL 48.27 TC 48.85FL 47.40 TC 46.68FL 46.20 TC 46.26FL 46.14 GT 45.34 TC 44.90FL 44.45 TC 44.14FL 43.98 TC 43.48FL 43.34 FC 59.87 FC 58.96FC 60.31FC 59.00TW 49.97 FS 48.68 FS 48.53 FS 48.23 FS 54.26 TC 43.08FL 42.92 TC 45.38FL 45.30 7'19'21' VEHICLE RADIUS MIN. IN SI D E R A DI U S 1 4.4'25.5' EXTERIOR VEHICULAR RADIUS24' MIN. DESI GN RADIUS(OUTSIDE TIRE PATH)/ . ; y . . X .. + + + • • I . • • • + + .. .. s . . . . . .. , ·/· -. ~o ••• ....... ,.t" .,, iJ",.,. .. • .. • .. ~,Q:,,,'Q I •"'-''-'-'-'-"[? ', · .. ·~s ........ .\· .... ,,, "" : .. : ...... : .. : .... ~ BLDG 4·. I__, • · • . • • : / -,-..\\\\\'· , 0 + + .... + t\ ----...... ,,, ,, 7 .......... ~ ...::... .................. [Flf .... ,,~",",, .. .. .. .. .. " FF 52.0' .. .. .. .. • .. .. .. ¥J • • , , ·, ", , ~ ·.·.··r····['\ ....................... ~" •" ..... .... .. .. .. .. + ,·:-,; ........................ + + ........ + + .. + Q",",", ~" .. .. .. .. ... .....i\ .. .. .. .. .. .. ... .. . + + .. " " " " i, • • + • • ,t\ + • • • + • • • • + + • 1 "~ , , " " II, ....... 1\ .......... /+++··",,,'" 1 "' ,, ~,"I .... + ....... •" --"' ...... + .......... , .. + + "" "" ~ • • • 1• '°"""'~ [';;: ~ • • • + + • • "'J + + + \ "" k' • • • 1 .,I\,,,,"'\ " • • • • • + + • • • • • "" """ I l' ,\, " , d" " ••+• ~ ........... ••1.••• ,, k ,, I\ l' "\".,,~".,,""., •• ; "'t\ + + + ............ + + .. •"1"",,1"'10 ,,,-........ " n· ...... Ls............ ,,, ,~>r--1'-"",,..., • .. •I\ ~~ • • • + • • • • • • • ",),,"'l ,rf"",,,'1 ........... I\ .............................. ,1~~,r~~(",~K1 ... + + I\ ............... ++ ...... , ............ ~,J,""1',1,~"",~11 ... ... .. I .. " ... ... ... .. .. .. ... 1 ... ... ... ... ¼ ~\" " r ~ ,1) ~ ~ " , ~ lj II " " I r I f I r ' ' I r I f ' I I f r r 1111 1111 /II\ I II \ I II \ I II \ I II \ r II f II I I r r , r r r rl rl fl I I r'BLDG 3: ! FF 51.0' f I r , I \ I 11 \ I I I \/ II \I I L __ :J... __ _JL __ :J... __ _J ,, " " ' ' I f I f I r I I I r ' r r r r , r r r ' r r ,, r ~ I I I , ~ L_ __ :i.__ __ _J . -. -. -;,t,, = = = =; ~ ::~ ~::-:ii-I------- , C =e, • • 1 + ~ ... ... ... ... ... .. + ... ... ... ... ... ... ' ~ '\ K ";" ~ ¼I J " " " ~ " 1,-,. ...... + + L' ......... + + + + #, ............ "",,\~/',',Jl"",",~,1 ------ ~--... + ~ + "i"sSS~ ['\ ................................. ~,,~ ""K ,¼I --- .......... ·""·"""·""""... • ................................ ,"",,,,,,~1"'-'-,,,-,.,_ ·""""·"""""·" ___ ..... - / . • •u ~ •" ... ... ... + + + • /+ ... ... ... ... ' " ,,\,I~ " " I" I" ~ ~ " " 11\ ---- - - - ----:::_ c:c_ - ... .. + + 1'\I ·" ·"" ................. + ....... :::·~·~·~-~'.:'~·---·;:~.•c:·~-;;_-~-~~~";~";~~~;'-':~~~~~~~~~~·'~~~ • •. •. • • •• •• •. •. •. •. • .L" •. •. •. •. •. •. •. •. •. •. •.... ... ... ... ... .. .. ... ' ... .. .. ... ... ... ... ... ... .. .. ... ... IQ ...... -l!"'........ .. ... ... ... ... ... ... ... ~ " Ill . .:,,. ... ... +274"96 .. .. ....:: ,. ... ... .1,;2BA as .. .. .. .. 11 -.... _ _ ~ _ 11,. --• a.. .. .. ... ... ... ... .. -'-, ,...., " , ?-'""" .,~" ,~~ '"............. ... ... "'-:, ............. •'!--~ ........ -;-"' ... ~ ...... -.............. -s:Jil:u'°''3,. "I::;!. ............ 01137:06"-c.................... ... ... ... ........... F................. E E ~ CT 2019-0004/PUD 2019-0004/ CDP 2019-0012 ~ \ \ \ I C r w ::::l z w ;'( z ~ 0 z I u C ® C \_ ~-----------'''------------'"'---------___:•r -----------------~t=·~~_,,:::---~_::'-===~--"s:s;c:"'.~~::::~=---,-_-,_,----c: ,-c-_-,_,---cc,-;-,-c:---:,-;--,,:-----= ,...:..:_"'\:~,s:::::::::::::~~-1~ t: t rn s u .8 0 " I 2 cs I~ • . . ., • I ------ □ □ LEGEND CONC. CURB & GUTTER BMPSIGN PROPOSED LANDSCAPE (LS) AREA PROPERTY LINE PROPOSED PCC PROPOSED PERMEABLE PAVERS I'·• .• •.',','. '-J GRASSCRETE PROPOSED RET. WALL PROPOSED BLDG. PROPOSED PRIVATE 1212CB BROOKS BOX W/ BMP STENCIL PROPOSED PRIVATE NDS 9" X 9"' SQUARE ATRIUM GRATE, GREEN PROPOSED PRIVATE ELEC HANDHOLE, PER SDGE POLYMER CONCRETE STD. UG3309.1 PROPOSED PRIVATE SS CO, PER SDRSD SC-01 ---flV--FIRE SERVICE --s-SEWER LINE --w-WATER LINE .2: NOTE TO CONTRACTORS: ~ ~~g1~:~1g~N;g=T~~~: ~~~~~Jf~°c;~~~~~=~~~OERN~~~:EYR l~~~L6.~~~ 1:urrER& ~ WRITING, OF ANY DISCREPANCIES OR OMISSIONS TO THE TOPOGRAPHIC INFORMATION. THE OCNTRACTOR(S) u SHALL BE RESPONSIBLE FOR CONFIRMING THE LOCATION (HORIZONTAL/ VERTICAL) OF ANY BURIED CABLES, ~ CONDUITS, PIPES, AND STRUCTURES (STORM SWEER, SANITARY SEWER, WATER, GAS, TELEVISION, ETC.) WHICH ~ IMPACT THE CONSTRUCTION SITE. THE CONTRACTOR($) SHALL NOTIFY THE OWNER IF ANY DISCREPANCIES ARE E FOUND BETWEEN THE ACTUAL CONDITIONS VERSUS THE DATA CONTAINED IN THE CONSTRUCTION PLANS. ANY \__ ABBREVIATIONS ASPH. =ASPHALT BW = BOTTOM OF WALL EX = EXISTING FC = FINISH CONCRETE FL= FLOW LINE FS = FINISH SURFACE GT=GUTTER OH = OVERHEAD TC = TOP OF CURB TW = TOP OF WALL SWR=SEWER -g COSTS INCURRED AS A RESULT OF NOT CONFIRMING THE ACTUAL LOCATION (HORIZONTAL OR VERTICAL) OF ~ [/] SAID CABLES, CONDUITS, PIPES, AND STURCTURES SHALL BE BORNE BY THE CONTRACTOR. ~ t----,~ '<"-GrESS/a,v1 , mer me o._ JCL.J ~ ~~ -, '<"' \ 811 BEFORE YOU DIG ~ ~ ~ (\{\ _d, 0 ' I/ARNING 1/Z 1 . BENCHMARK: CAUTION! X EXISTING OH UTILITY Q CONSTRUCTION NOTES @ AASHTO TYPE "P" VEHICLE TURN MOVEMENTS r I I \ \ \ \ \ ,, I I I 'H-~---H I C D D \ \ \ I TO RN/ A V SCALE: 1" = 10' 0 5" 10' ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: Description: 2 s• BRASS DISK MR. GALIZ/O 7-UNfr INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE PROJECT..,~ ,;; JE ,P ,,:1-LAN,~, :;;:,-~~o ~ t-----t C:, 0 UNDERGROUND SER\ICE ALERT OF SOUTHERN C/lLIFORNIA ~ ~ ! No. ;;; Locati • SOUTHEAST CORNER OF VAULT ADJACENT TO THE NORTHEAST g uum,0 ING r _ ',rf/l'Y3a/2t' IF THIS BAR D□E:S CORNl'II' OF THE MORIH SOUND CoAST HIGHwAV tot BRIDGE OVER CT 2019-0004'PLJD 2019-0004/ ~ JCLJ 1820 S. El Camino Real, A2051-===-;;.c-;;;=;:-----::--,~'O v >+-AGUA HEQIONQA LAGOON 11 · , N□T MEASURE: 1 • b 1------!Encinitas, California 92024 ENGINEER OF WORK: r CIVIi. ~'<-THEN DRAIJING IS Record From:CllY CONTROL PT. NO. 141 PER ROS NO. 17271 CDP 2019-0012/ DEV2018-D087 I DRAWING NO.I :~ T 619. 8 84. 0 5 7 6 JAMES CORY-1.ANE:AVE JONES·•-·""'' (" OF C~L\~C)~ N□T T□ SCALE:. Elev: 26_518 FEEi' Da1um: ~N~GIID~2S~---~ L....::JC:LJ:__fc~o:r:y.:.·.:l:a~n_:e:a:v.:e~@~gm~a_:i~l~-~c=o~m'.._ __ l ______ LRC:E:_:C: 69-:)."l'JL_..::::::=:::::=:::.. ___________________________________________________________________ JL _______ j _ _::===========-:..:.. .... ~-=======-J,;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;~;;;;;;;;;;,!J V TW 50.50' BW 47.64' CHECKED BY: DRAWN BY: DESIGNED BY: 10/05/2020 PRELIMINARY GRADING PLAN - DETAIL SE PROPERTY CORNER 8.2'16.8' TO CL10' SETBACK 5' ROW DEDICATION TC 45.38 TW 50.17 BW 48.15 BW 46.96 TW 47.50 FL 45.00' 13 FL 46.59' FS 46.70' FS 46.79' GR 48.80 INV 47.20 TC 46.68FL 46.20 TC 46.26FL 46.14 GT 45.34 TC 44.90FL 44.45 TC 44.14FL 43.98 TC 43.48FL 43.34 FL 45.30 8" SOLID HDPE SD 4" SOLID HDPE SD 8" SOLID PVC SD TW 47.12 BW 46.96 TW 49.99 FL 46.86 TW 50.17 BW 46.86 TW 48.00 BW 44.92 BW 45.22 FS 45.11'FL 45.20' TW 49.99 34 FS 49.10FS 48.77FS 48.27 FS 49.15 FS 49.15 TW 49.30 BW 49.28GR 49.00 INV 47.30 INV 47.25 GR 47.7 INV 47.30 FL 45.27' FL 46.56 TW 50.17 BW 48.45 BW 46.96 TW 47.50 FL 46.86' FL 47.00' TW 50.50 BW 48.06 TW 50.17 BW 47.77 36 14 35 17 15 33 24 LINK SEAL AT CUT-OFF WALL PIPE PENETRATION BEGIN NEW WALL AT PL, REMOVE WALL TO THE N PER SHT 2 PEDESTRIAN STAIR AND HANDRAIL PER ARCH. OR AS A MIN. PER SAN DIEGO STANDARD DRAWING SDM-118 AND PER CA BLDG. CODE. H-20 TRAFFIC RATED 10" WIDE TRENCH DRAIN (ACO S200K, OR EQUAL) 8" SOLID HDPE SD 8" SOLID HDPE SD N ~ 0 0 N 0 N " ~ 0 " ( I> : I 1;, r~o--sit-. I \ I 1- I I i 'N ' ' : BLIDG 1 & 2:1 : FF 50.00' I I : 11 , I L_ SCALE: 1" = 5' 0 2.5' 5' I \ I t I w f- > ' " " . If- \ w I f- w 'w / I: 1/ ' . / / ~ I 0 w => z w :i( z ~ 0 z ::c (.) Q CONSTRUCTION NOTES @ RES. CONC. DRWY PER SDRSD G-14C @ REPLACE SIDEWALK IN LIKE AND KIND PER SDRSD G-7 @ 6-IN C&G PER SDRSD G-2, TYPE G @ PROTECT IN PLACE EXIST ELEC POLE AND CABLE BOX, 4-FT CLEARANCE AROUND POLE @ @ @ ® I/ARNING BENCHMARK: 0 1/Z 1 Description: 2 s• BRASS DISK CT 2019-0004/PUD 2019-0004/ CDP 2019-0012 ~ 11 CITY OF CARLSBAD 1 m GRADING PLANS FOR: MR. GALIZ/O 7-UNIT INFILL DEVELOPMENT 330 CHINOUAPIN A VENUE LANDSCAPE LEGENDPROPOSED PRIVATECATCH BASIN PER CIVILPROPOSED PRIVATEELEC HAND HOLEPER CIVILPROPOSEDSEWER LINEPER CIVILSLOPE PER CIVILPROPOSEDPERMEABLE PAVERPROPERTY LINEPROPOSEDWATER LINEPER CIVILPROPOSEDELECTIRCAL LINEPER CIVILSET BACK LINEPROPOSEDDRAINAGE LINEPER CIVILPROPOSED PLANTER AREA/MULCHED W/ SHREDDED@ 3" DEPTH ARBORISTS TRIMMINGS38" - 12" ANGULAR GRAVEL(E)PALM TO BE REMOVED(E) TREE TO BE REMOVEDSEL-1031L-1021L-1011CHINQUAPIN AVE.(E) RETAINING WALLTO REMAINPROPOSED 6' FENCEBUILDING 1BUILDING 2BUILDING 3TURFBLOCKRDRDRDRDRDRDPROPOSED T:O STOR<BUILDIN* LANDSCAPE70'-0" PL269'-11 1/2" PL269'-11 1/2" PLPROPOSED T:O STOR<BUILDIN* PROPOSED T:O STOR<BUILDIN* SIDEWALK2' - 0"12(E)P.PTO REMAIN(N)6'-0" GATE(E) RETAINING WALLTO REMAIN(N)6'-0" FENCEPER CIVIL(N)TREERELOCATEGAS METERCHINQUAPIN AVE.CLCL6" FIRE WATERSERVICE8' - 6"RoWRoW(N) IRRIGATIONMETERTO STREETEXISTING 2 STORY BUILDINGPROPERTY LINEFRONT YARDSETBACKNExisting DrivewayEXISTING 2 STORYBUILDINGEXISTING 1 STORY BUILDINGBLDG 3 ROOFDECK-315 SFBLDG 2 ROOF DECK-324 SFBLDG 1 ROOFDECK- 400 SF2' - 10"1' - 8"UNIT 4YARD60 SF8' R.BARRELVAULT 5' R.BARRELVAULT8' R. BARREL VAULT 10' R.BARRELVAULT4' R.BARRELVAULT 8' R.BARRELVAULT 8' R.BARRELVAULT 5' R.BARRELVAULT 4' R.BARRELVAULT 7' R.BARRELVAULT7' R.BARRELVAULT 4' R.BARRELVAULTUNIT 1 YARDUNIT 2 YARDUNIT 5YARD60 SFUNIT 6YARD60 SFUNIT 7YARD-PATIOBELOW60 SF 5' R.BARRELVAULT 4' R.BARRELVAULT3' R.BARRELVAULT272 SFSOLARZONE206 SFSOLARZONEGUESTPARKINGFUTURE EVPARKINGGUESTPARKINGEVPARKING141516224 SFSOLARZONE(N)ELECTRICAL METERLINE OF SIGHT @DRIVEWAY(N)WATER METER(N)BACKFLOWWWWWWWWWWWWWEEEEEEFWFWFWFWFWFWFWFWFWFWWWWWSSSSSSS SS(E)SIDEWALK TO BEREPLACED0feet321/16"" = 1'-0"164864NORTHBUILDING 1BUILDING 2BUILDING 3(E)PALM TO BE REMOVED(E) TREE TO BE REMOVEDRDRDRDRDRDRDPROPOSED T:O STOR<BUILDIN* LANDSCAPE70'-0" PL269'-11 1/2" PL269'-11 1/2" PLPROPOSED T:O STOR<BUILDIN* PROPOSED T:O STOR<BUILDIN* SIDEWALK2' - 0"12(E)P.PTO REMAIN(N)6'-0" GATE(E) RETAINING WALLTO REMAIN(N)6'-0" FENCEPER CIVIL(N)TREERELOCATEGAS METERCHINQUAPIN AVE.CLCL6" FIRE WATERSERVICE8' - 6"RoWRoW(N) IRRIGATIONMETERTO STREETEXISTING 2 STORY BUILDINGPROPERTY LINEFRONT YARDSETBACKNExisting DrivewayEXISTING 2 STORYBUILDINGEXISTING 1 STORY BUILDINGBLDG 3 ROOFDECK-315 SFBLDG 2 ROOF DECK-324 SFBLDG 1 ROOFDECK- 400 SF2' - 10"1' - 8"UNIT 4YARD60 SF8' R.BARRELVAULT 5' R.BARRELVAULT8' R. BARREL VAULT 10' R.BARRELVAULT4' R.BARRELVAULT 8' R.BARRELVAULT 8' R.BARRELVAULT 5' R.BARRELVAULT 4' R.BARRELVAULT 7' R.BARRELVAULT7' R.BARRELVAULT 4' R.BARRELVAULTUNIT 1 YARDUNIT 2 YARDUNIT 5YARD60 SFUNIT 6YARD60 SFUNIT 7YARD-PATIOBELOW60 SF 5' R.BARRELVAULT 4' R.BARRELVAULT3' R.BARRELVAULT272 SFSOLARZONE206 SFSOLARZONEGUESTPARKINGFUTURE EVPARKINGGUESTPARKINGEVPARKING141516224 SFSOLARZONE(N)ELECTRICAL METERLINE OF SIGHT @DRIVEWAY(N)WATER METER(N)BACKFLOWWWWWWWWWWWWWEEEEEEFWFWFWFWFWFWFWFWFWFWWWWWSSSSSSS SS(E)SIDEWALK TO BEREPLACEDSITE PLAN LE*ENDPROPOSED PRIVATEBMP STENCIL PER CIVILPROPOSED PRIVATEELEC HAND HOLEPER CIVILPROPOSED SEWERLINE PER CIVILSLOPE PER CIVILPROPOSEDPERMEABLE PAVERPROPERTY LINEPROPOSED WATERLINE PER CIVILPROPOSED ELECTIRCALLINE PER CIVILSET BACK LINEPROPOSED SOLAR ZONEPROPOSED ROOF DECKCAP COMPLIANCE TABLE2A - PHOTOVOLATIC SYSTEM:3A - WATER HEATING:4A - ELECTRICAL VEHICLECHARGING:12.65KWDC REQUIRED- 330 W PER CELL12650/330= 38 CELLREQ.D. SOLAR AREA:691 SFPROPOSED SOLAR AREA :702 SFGAS WATER HEATING SYSTEM1 INSTALL EV PARKING #161 FUTURE EV PARKING #15SWELINE OF SIGHT @ DRWYPROPOSED 6" FIREWATER SERVICE PERCIVILFWSTORM WATERDRAINAGE0feet321/16"" = 1'-0"1648 64NORTH 1/16" = 1'-0"1HYDROZONES 1/16" = 1'-0"2LANDSCAPE PLAN- Layout & MaterialsHYDROZONESHIGH WATERMODERATE WATERLOW WATERVERY LOW WATER1234NOTES:1)All utilities are to be screened2) All landscape areas shall have positive drainage (2% grade in planting areas) away from all structuresand terminating in an approved drainage system.3) POTABLE WATER is proposed for irrigating all planted areas.4) Irrigation system shall be compatible with treated recycled water.5) All existing trees on site to be removed.6) All landscaped areas to be maintained by HOAPF.8.5.3AREA (sf)02831,782LANDSCAPE PLAN & HYDROZONESScaleDateDrawn ByChecked ByProject NumberArchitect/ContractorUltra-Unit Architectural Studiot. 562.997.0971e. cameron@ultra-unit.comStructural EngineerDavid Choi and Associateset. 562.382.8040e. david@dca-se.comSheet NameArchitect StampSheet NumberClient Name: Project:Team:RevisionsRENEWAL1.31.2019FADATEC31503CLI N E SDEETCCARTIHCILOFE TTASIAN RO CAMERON CROCKETTCivil Engineer:CJEt. 619.88.0576Title 24 Energy:Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.comCutural Resource Survey:DuDekt. 740.942.5147Surveyor:Pasco Laret Suiter & Assocciatet. 858.259.8212Landscape Designer/ ContractorCalifornia Eco Design, Inc.t. 562.279.6713e. info@calecodesign.comAs indicatedL-100LANDSCAPE PLAN &HydrozonesJEFF GALIZIO 330CHINQUAPIN CheckerKai Craig03/15/202017-1230330 CHINQUAPIN AVE CARLSBAD CANo. Description Date22222222222222222243333333333333333333333.1 1654 RDRDRDRDRDRDPROPOSED TWO STORYBUILDING 32' - 0"128' - 6"BLDG 3 ROOFDECK-315 SF2' - 10"1' - 8" 8' R.BARRELVAULT 8' R.BARRELVAULT 5' R.BARRELVAULT 4' R.BARRELVAULT 7' R.BARRELVAULT7' R.BARRELVAULT 4' R.BARRELVAULT206 SFSOLARZONEWEEFWSSE(E) RETAINING WALLTO REMAINBUILDING 3TURFBLOCKLANDSCAPE LEGENDPROPOSED PRIVATECATCH BASIN PER CIVILPROPOSED PRIVATEELEC HAND HOLEPER CIVILPROPOSEDSEWER LINEPER CIVILSLOPE PER CIVILPROPOSEDPERMEABLE PAVERPROPERTY LINEPROPOSEDWATER LINEPER CIVILPROPOSEDELECTIRCAL LINEPER CIVILSET BACK LINEPROPOSEDDRAINAGE LINEPER CIVILPROPOSED PLANTER AREA/MULCHED W/ SHREDDED@ 3" DEPTH ARBORISTS TRIMMINGS38" - 12" ANGULAR GRAVELNORTH0103/16" = 1'-0"51621ScaleDateDrawn ByChecked ByProject NumberCameron Crockett - Architect/ContractorUltra-Unit Architectural Studio1327 Loma AvenueLong Beach, California 90804t. 562.997.0971e. cameron@ultra-unit.comSheet NameAUFKLWHFW SWDPSSheet NumberClient Name: Project:TeamRevisionsRENEWAL1.31.2021FADATEC31503CLI N E S DEETCCARTIHCILOFE TTASIAN RO CAMERON CROCKETTArchitect/ContractorUltra-Unit Architectural Studiot. 562.997.0971e. cameron@ultra-unit.comStructural EngineerDavid Choi and Associateset. 562.382.8040e. david@dca-se.comTeam:Civil Engineer:CJEt. 619.88.0576Title 24 Energy:Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.comCutural Resource Survey:DuDekt. 740.942.5147Surveyor:Pasco Laret Suiter & Assocciatet. 858.259.8212Landscape Designer/ ContractorCalifornia Eco Design, Inc.t. 562.279.6713e. info@calecodesign.comAs indicated1121 3 P0 ??XQLW?UOWUDBSRRM?21 SRO-ECTS?1123 33 FKLQTXDSLQ DYH  -HII GDOL]LR  CDUOVEDG?3 PURMHFW DUDZLQJV?3AUFKLWHFWXUDO?112333C+IN4UAPIN YV 11UYWL-103LANDSCAPEPLAN-BLDG 3,4JEFF GALIZIO 330CHINQUAPIN CheckerAuthor01/09/1917-1230330 CHINQUAPIN AVE CARLSBAD CANR DHVFULSWLRQ DDWH1RHYLVLRQ 1DDWH 1 3/16" = 1'-0"1PLAN - 3PLANT SCHEDULEPLANTING PLAN, BUILDING 3NOTES:1. ALL TREES MIN. 15 GALLON CONTAINER SIZE2. ALL UTILITIES ARE TO BE SCREENED.3. ONLY SUBSURFACE IRRIGATION SHALL BE UTILIZED TO IRRIGATEANY VEGETATION WITHIN 24" OF IMPERMEABLE SURFACE. 269'-11 1/2" PLPROPOSED TWO STORYBUILDING 2BLDG 2 ROOF DECK-324 SF8' R.BARRELVAULT 5' R.BARRELVAULT 4' R.BARRELVAULT3' R.BARRELVAULT272 SFSOLARZONEGUESTPARKINGFUTURE EVPARKINGGUESTPARKINGEVPARKINGWWWWEEEFWFWFWFWWWSSSSPROPOSED 6' FENCEBUILDING 2LANDSCAPE LEGENDPROPOSED PRIVATECATCH BASIN PER CIVILPROPOSED PRIVATEELEC HAND HOLEPER CIVILPROPOSEDSEWER LINEPER CIVILSLOPE PER CIVILPROPOSEDPERMEABLE PAVERPROPERTY LINEPROPOSEDWATER LINEPER CIVILPROPOSEDELECTIRCAL LINEPER CIVILSET BACK LINEPROPOSEDDRAINAGE LINEPER CIVILPROPOSED PLANTER AREA/MULCHED W/ SHREDDED@ 3" DEPTH ARBORISTS TRIMMINGS38" - 12" ANGULAR GRAVELNORTH0103/16" = 1'-0"51621ScaleDateDrawn ByChecked ByProject NumberSheet NameAUFKLWHFW SWDPSSheet NumberClient Name: Project:RevisionsRENEWAL1.31.2021FADATEC31503CLI N E SDEETCCARTIHCILOFE TTASIAN RO CAMERON CROCKETTArchitect/ContractorUltra-Unit Architectural Studiot. 562.997.0971e. cameron@ultra-unit.comStructural EngineerDavid Choi and Associateset. 562.382.8040e. david@dca-se.comTeam:Civil Engineer:CJEt. 619.88.0576Title 24 Energy:Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.comCutural Resource Survey:DuDekt. 740.942.5147Surveyor:Pasco Laret Suiter & Assocciatet. 858.259.8212Landscape Designer/ ContractorCalifornia Eco Design, Inc.t. 562.279.6713e. info@calecodesign.comAs indicated1121 3 P0 ??XQLW?UOWUDBSRRM?21 SRO-ECTS?1123 33 FKLQTXDSLQ DYH  -HII GDOL]LR  CDUOVEDG?3 PURMHFW DUDZLQJV?3AUFKLWHFWXUDO?112333C+IN4UAPIN YV 11UYWL-102LANDSCAPEPLAN-BLDG 3,4JEFF GALIZIO 330CHINQUAPIN CheckerAuthor01/09/1917-1230330 CHINQUAPIN AVE CARLSBAD CANR DHVFULSWLRQ DDWH1RHYLVLRQ 1DDWH 1 3/16" = 1'-0"1PLAN - 2PLANT SCHEDULEPLANTING PLAN, BUILDING 2NOTES:1. ALL TREES MIN. 15 GALLON CONTAINER SIZE2. ALL UTILITIES ARE TO BE SCREENED.3. ONLY SUBSURFACE IRRIGATION SHALL BE UTILIZED TO IRRIGATEANY VEGETATION WITHIN 24" OF IMPERMEABLE SURFACE. PROPOSED TWO STORYBUILDING 1LANDSCAPE70'-0" PL269'-11 1/2" PLSIDEWALK(E)P.PTO REMAIN(N)6'-0" GATE(N)6'-0" FENCEPER CIVIL(N)TREERELOCATEGAS METERC+IN4UAPIN A9E6" FIRE WATERSERVICERoWRoW(N) IRRIGATIONMETERTO STREETPROPERTY LINEFRONT YARDSETBACKNExisting DrivewayBLDG 1 ROOFDECK- 400 SF8' R. BARREL VAULT 10' R.BARRELVAULT4' R.BARRELVAULTUNIT 1 YARDUNIT 2 YARD 5' R.BARRELVAULT141516224 SFSOLARZONE(N)ELECTRICAL METERLINE OF SIGHT @DRIVEWAY(N)WATER METER(N)BACKFLOWWWWWWWWEEEFWFWFWFWFWWWSS SS(E)SIDEWALK TO BEREPLACEDBUILDING 1LANDSCAPE LEGENDPROPOSED PRIVATECATCH BASIN PER CIVILPROPOSED PRIVATEELEC HAND HOLEPER CIVILPROPOSEDSEWER LINEPER CIVILSLOPE PER CIVILPROPOSEDPERMEABLE PAVERPROPERTY LINEPROPOSEDWATER LINEPER CIVILPROPOSEDELECTIRCAL LINEPER CIVILSET BACK LINEPROPOSEDDRAINAGE LINEPER CIVILPROPOSED PLANTER AREA/MULCHED W/ SHREDDED@ 3" DEPTH ARBORISTS TRIMMINGS38" - 12" ANGULAR GRAVELNORTH0103/16" = 1'-0"51621ScaleDateDrawn ByChecked ByProject NumberSheet NameAUFKLWHFW SWDPSSheet NumberClient Name: Project:RevisionsRENEWAL1.31.2021FADATEC31503CLI N E SDEETCCARTIHCILOFE TTASIAN RO CAMERON CROCKETTArchitect/ContractorUltra-Unit Architectural Studiot. 562.997.0971e. cameron@ultra-unit.comStructural EngineerDavid Choi and Associateset. 562.382.8040e. david@dca-se.comTeam:Civil Engineer:CJEt. 619.88.0576Title 24 Energy:Alternative Energy Systemt. 818.957.7733e.marylynn@title24energy.comCutural Resource Survey:DuDekt. 740.942.5147Surveyor:Pasco Laret Suiter & Assocciatet. 858.259.8212Landscape Designer/ ContractorCalifornia Eco Design, Inc.t. 562.279.6713e. info@calecodesign.comAs indicatedL-101LANDSCAPEPLAN-BLDG 3,4JEFF GALIZIO 330CHINQUAPIN CheckerKai L. Craig01/09/1917-1230330 CHINQUAPIN AVE CARLSBAD CANR DHVFULSWLRQ DDWH1RHYLVLRQ 1DDWH 1 3/16" = 1'-0"1PLAN - 2PLANTING PLAN, BUILDING1NOTES:1. ALL TREES MIN. 15 GALLON CONTAINER SIZE2. ALL UTILITIES ARE TO BE SCREENED.3. ONLY SUBSURFACE IRRIGATION SHALL BE UTILIZED TO IRRIGATEANY VEGETATION WITHIN 24" OF IMPERMEABLE SURFACE.PLANT SCHEDULE From:Leslie Williams To:Planning Subject:330 Chinquapin Ave Date:Tuesday, January 12, 2021 8:12:21 AM Dear Planning Commission. I am writing to express my deep concern about the proposed 7 unit development on Chinquapin, a street already impacted by excess parking. I am concerned about the increased traffic and the traffic hazards to the existing residents of the area on and off Garfield south of Chinquapin. Already drivers run the stop sign at Chinquapin and Garfield consistently. As you know, there is only one ingress and egress route from the area south of Chinquapin. In case of an emergency requiring evacuation and/or multiple emergency vehicles, the residents of the this entire area would be at risk. Please consider the liability to the City of Carlsbad should poor planning in this area lead to casualties. Please consider reduced density and increased on site parking as well as enforcement of the Stop sign. Thank you for your consideration. Leslie Williams 327 Date Ave Carlsbad, 92008 760-402-5152 CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. ATTACHMENT 7 From:Chris Garcia To:Melissa Flores Subject:Fw: Case Name: CT 2019-0004/PUD 2019-0004/CDP 2019-0012 (DEV2018-0087) - 330 CHINQUAPIN AVENUE Date:Tuesday, January 19, 2021 6:48:40 AM Attachments:Outlook-3qvixz4w.png Melissa, Please forward this email to the Planning Commission, Don and Ron. They have also requested that it be read into the record. Thank you, Chris Garcia Associate Planner Community Development Department 1635 Faraday Ave. Carlsbad, CA 92008 www.carlsbadca.gov P: 760-602-4622 F: 760-602-8558 chris.garcia@carlsbadca.gov FOR ONGOING PROJECTS, PLEASE CONTACT YOUR PROJECT PLANNER TO SCHEDULE A RESUBMITTAL DROP-OFF APPOINTMENT. FOR NEW PROJECT SUBMITTALS AND LANDSCAPE SUBMITTALS/RESUBMITTALS/AS- BUILTS, PLEASE CALL OR EMAIL YOUR REQUEST FOR A SUBMITTAL DROP-OFF APPOINTMENT: Phone: 760-602-4610 Email: planning@carlsbadca.gov From: Jens Peter Timm <jptimm@teamgandt.com> Sent: Monday, January 18, 2021 8:26 PM To: Chris Garcia <Chris.Garcia@carlsbadca.gov> Subject: Case Name: CT 2019-0004/PUD 2019-0004/CDP 2019-0012 (DEV2018-0087) - 330 CHINQUAPIN AVENUE Pursuant to the Notice of Public Hearing published January 8th regarding the above referenced project, I respectfully request that my comments be read into the record at the Planning Commission Meeting scheduled for Wednesday, January 20, 2021. I would like to express my concern in regard to the proposed plan for the three building/seven apartment complex on a parcel currently containing a single family home in the RD-M/beach overlay zone. The allotment of sixteen surface parking spaces for a development of this size is inadequate. Two of the units have only been allocated a single spot. In my experience living in an apartment on Acacia, couples, each with a car, unrelated roommates and their significant others, as well as families with a young adult child spill over into the guest parking, or more commonly onto the street. When the parking requirements exceed what is made available, it creates a nuisance for the neighbors, particularly when delivery people or other vendors need relatively short-term access, on a street which is already full many weeknights after work and most weekends with beach traffic. By way of contrast, in the Crescent Del Sol development on Date Avenue around ten years ago on a parcel over twice the size of this, the city limited the project to seven units and required underground parking at an allotment of four spaces per unit, in addition to guest spaces. The certitude of more overcrowding on Chinquapin highlights another major concern for this peninsular neighborhood south of Tamarack: emergency access. Chinquapin, Date, and Olive Avenues all have a single means of entrance/egress (Garfield Avenue) for emergency vehicles. The only access to Chinquapin (a dead-end street) is a stop sign onto Garfield which already has significant traffic as it stands. As a resident of this neighborhood for over 10 years, I have seen quite a few infill/redevelopment projects here which did not raise concerns, including on Chinquapin. In light of the limited entrance/egress I take issue with the multiple units proposed in each of the three structures. While there is still some legacy high density, packing seven units into three buildings is not in keeping with the standards as they have recently been applied in this part of the village. In light of future development likely to take place here and the geographic limitations that limit emergency access points, the level of density proposed here would create a precedent which would certainly stress the egress point/emergency response if more widely applied in future projects. I believe the standard of one unit per structure should be applied equitably and kept consistent throughout the neighborhood south of Tamarack, particularly as future planned improvement on the Coast Highway will restrict emergency access coming from the north to Garfield once access to Sequoia is limited to northbound Coast Highway traffic only. Thank you for your attention. Respectfully, Jens Peter Timm Owner, 314 Date Avenue -- TeamG&T 314 Date AveCarlsbad, CA 92008 (949) 278-2716 CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe.