HomeMy WebLinkAboutCDP 2017-0001; PRITCHARD RESIDENCE; FINAL SOILS REPORT; 2020-12-04
Project No 165692-1,4
Date: January 8, 2021
To: Robert and Cathy Pritchard
5098 Shore Drive
Carlsbad, California
Re: Proposed New Residence to be located at 5098 Shore Drive, Carlsbad, California.
Subject: Final Summary Letter
Grading Plan Drawing No. 506-5A
Ref:
1. Geotechnical Investigation & Foundation Recommendations Proposed New Residence to be Located at
5098 Shore Drive, Carlsbad, California, prepared by Engineering Design Group, dated December 23rd,
2016. Project No. 165692-1
2. Plan Review Letter, prepared by Engineering Design Group, dated January 15, 2018.
3. Updated Plan Review Letter, prepared by Engineering Design Group, dated January 31st, 2019
4. Compaction report, prepared by Engineering Design Group, dated September 17, 2019.
5. Basement Subgrade Letter, prepared by Engineering Design Group, dated May 31, 2019.
6. Basement Footing observation letter, prepared by Engineering Design Group, dated June 12, 2019.
7. Sump Pump Excavation Backfill Report, prepared by Engineering Design Group, dated June 24, 2019.
8. Footing Observation Letter, prepared by Engineering Design Group, dated August 22, 2019.
9. Driveway Subgrade Compaction Letter, dated December 4, 2020, prepared by Engineering Design Group.
10. Summary Letter dated November 13, 2020, prepared by Engineering Design Group.
We have prepared this revised final summary letter, as requested by City of Carlsbad inspector as part of project
completion. Onsite quality control services, provided by Engineering Design Group, are summarized in the above
referenced reports and inspections summaries. In our opinion the geotechnical conditions of the project are in
general conformance with the recommendations of the project soils report, referenced above.
Respectfully Submitted,
ENGINEERING DESIGN GROUP
Steve Norris Erin E. Rist
GE #2590 RCE #65122
Attachments:
1. Driveway Compaction Report with Test Results and Figures
2. Compaction Report with Test Results and Figures
2121 Montiel Road, San Marcos, CA 92069
760.839.7302
EDG Project No. 165692-4
Date: December 4, 2020
To: Robert and Kathy Pritchard
5098 Shore Drive
Carlsbad, California
Re: New Residence to be located at 5098 Shore Drive, Carlsbad, California
Subject: Driveway Subgrade Compaction Summary – City of Carlsbad
Ref:
1. Compaction Report, prepared by Engineering Design Group, dated September 17, 2019.
As requested by City of Carlsbad, we have prepared this compaction summary letter based
upon our recent limited field density testing at driveway and driveway approach at the subject
site.
Onsite material was utilized for driveway subgrade. Onsite material was ripped to a minimum
depth of 12 inches and recompacted utilizing a mechanized whacker. Limited field density tests
were performed in accordance with D2922 (Nuclear Gauge Method). Our test results indicate
that, in the locations tested, soils have been compacted to at least 90% relative compaction, as
determined by ASTM D1557, (Procedure A). The reported test results are representative of the
soil conditions at the locations tested.
Sincerely,
Engineering Design Group
Erin Rist
California RCE 65122
Attachments:
1) Table 1 & 2 “Laboratory and Field Test Results”
2) Figure 1: “Approximate Location of Compaction Tests”
ENGINEERING
DESIGN GROUP
www.rJesigngroupcn.com
2121 Montiel Road, San Marcos, CA 92069
760.839.7302
EDG Project No. 165692 - 4
LABORATORY AND FIELD TEST RESULTS
TABLE NO. 1
Laboratory Test Results
SOIL
TYPE
(#)
SOIL TYPE
MAXIMUM DENSITY
(PCF)
OPTIMUM
MOISTURE
(%)
U.S.C.S.
CLASSIFICATION
1
Light brown to brown,
silty sand
ONSITE
122.4 9.5 SW-SM
2
Light brown to brown
silty sand/sandy silt
IMPORT
117.5 11.3 SW - SM
TABLE NO. 2
Field Test Results
TEST NO. DATE ELEVATION SOIL TYPE
DRY DENSITY (PCF)
FIELD MOISTURE (%)
RELATIVE COMPACTION (%) COMMENT
1 10/1/2020 SG 1 110.2 12.3 90
2 10/1/2020 SG 1 110.6 11.4 90
3 10/1/2020 SG 1 111.6 10.5 91
4 10/1/2020 SG 1 111.4 11.1 91
FIGURE 2
Approximate Location of Compaction Test
Project: Pritchard ResidenceAddress: 5098 Shore Drive, Carlsbad, California
EDG Project No:165692-4
●1
●3
●2
●4
NOT TO SCALE
ENGINEERING
DESIGN GROUP
www.designgroupca.com
/ -,--\
/
2121 Montiel Road, San Marcos, CA 92069
760.839.7302
I ~
\.
'5J
✓
EDG JOB NO. 165692-1,4
Date: September 17, 2019
To: Robert and Cathy Pritchard
5098 Shore Drive
Carlsbad, California
Re: Proposed New Residence to be Located at 5098 Shore Drive, Carlsbad, California.
Subject: Compaction Report – Rough Grading and Basement Wall Backfill.
Reference:
1. Geotechnical Investigation and Foundation Recommendations Proposed New Residence to be
Located at 5098 Shore Drive, Carlsbad California, prepared by Engineering Design Group, dated
December 23, 2016.
2. Grading Plan No. GR2017-0048
INTRODUCTION
In accordance with your request and authorization we have provided limited earthwork observation and
compaction testing services during the construction of the proposed single family residence. At the time
of this report, site construction is not complete and ongoing work is anticipated. The scope of site
construction summarized includes basement excavations, installation and backfill of pump chambers,
backfill of site retaining walls and removal and recompaction in the area of new residence and garage
outside of the building footprint. The results of our limited quality control and compaction testing
operations are summarized below. We understand the proposed improvements include a new two-story
residence with basement, attached garage and typical landscape and hardscape improvements.
GRADING OPERATIONS
The scope of operations for this project consisted of the placement and compaction of basement wall
backfill for the new single-family residence and preparation of building pad for attached garage and
those portions of the building that extend beyond the basement. Rough grading operations at the
subject site were conducted during June, August and September 2019.
In the areas of the new basement walls, onsite soils and import soils were utilized for backfill material.
Soil was moisture conditioned, placed and recompacted in place. In the areas of building pad
preparation, onsite soil was utilized as fill material. At new building footprint, beyond the retaining wall,
the upper 3-5 feet of existing weathered and fill materials were removed to competent material,
removal bottom ripped and moisture conditioned, and fill materials recompacted. Onsite soil consisted
of a range of light brown to brown, silty sands. Import material consisted of light brown to brown, silty
sands and sandy silts. Prior to placement, soils were cleaned of vegetative material and debris and
2121 Montiel Road, San Marcos, CA 92069
760.839 7302
EDG JOB NO. 165692-1,4
moisture conditioned. Based upon our visual observation onsite and import soils possess potential for
expansion in the low range. Soil was moisture conditioned with a fire hose and placed utilizing a Bobcat,
Volvo PE5 roller and mechanized wacker.
FIELD AND LABORATORY TESTING
Limited field density tests were performed in accordance with D2922 (Nuclear Gauge Method). Our test
results indicate that, in the locations tested, soils have been compacted to at least 90% relative
compaction, as determined by ASTM D1557, (Procedure A). The reported test results are representative
of the soil conditions at the locations tested. Our observation and field density testing methods are in
accordance with normally accepted procedures. The accuracy of the relative compaction values is
subject to the precision limitations of the ASTM test methods. The accuracy of the maximum dry density
determination (ASTM D1557) is discussed in the Annual Book of ASTM Standards, Section 4, Volume
04.08, entitled, Soil and Rock; Building Stones. Variations of relative compaction values should be
expected, laterally and vertically, from actual test locations.
TESTING SUMMARY
In general, it is our opinion, based on the placement procedure and the test data collected, the fill soils
tested, at the locations tested, were compacted to a minimum of 90% relative compaction (based on
ASTM D1557, Procedure A).
If you have any questions regarding this report, or if we can be of further service, please do not hesitate
to contact us. We hope the report provides you with the necessary information to continue with the
development of the project.
Sincerely,
ENGINEERING DESIGN GROUP
Erin Rist Steven B. Norris
California RCE# 65122 California GE# 2590
Attachments:
1) Table 1 & 2: “Laboratory and Field Test Results”
2) Figure 1: “Approximate Location of Compaction Tests”
EDG JOB NO. 165692-1,4
LABORATORY AND FIELD TEST RESULTS
TABLE NO. 1
Laboratory Test Results
SOIL
TYPE (#)
SOIL TYPE MAXIMUM
DENSITY (PCF)
OPTIMUM
MOISTURE (%)
U.S.C.S. CLASSIFICATION
1 Light Brown to Brown
Silty Sand
ONSITE
122.7 5.4 SW - SM
2
Light Brown to Brown
Silty Sand/Sandy Silt
IMPORT
117.5 11.3 SW - SM
TABLE NO. 2
Field Test Results
TEST NO. DATE ELEVATION SOIL TYPE
DRY DENSITY (PCF)
FIELD MOISTURE (%)
RELATIVE COMPACTION (%) COMMENT
1 6/13/2019 29.8' 1 110.1 5.6 90
2 6/13/2019 29.8' 1 110.7 6.0 90
3 6/19/2019 FG 1 106.7 5.5 87 RETEST 4
4 6/19/2019 FG 1 110.9 5.8 90
5 8/2/2019 BTM +2' 1 114.2 7.2 94
6 8/2/2019 BTM +2' 1 107.5 8.9 88 RETEST 8
7 8/2/2019 BTM +2' 1 118.5 8 97
8 8/2/2019 BTM +2' 1 111.6 6.9 91
9 8/2/2019 BTM +2' 1 121.8 6.2 100
10 8/2/2019 BTM +2' 1 118.7 8.0 97
11 8/6/2019 BTM +2' 1 118.6 7.1 97
12 8/6/2019 BTM +2' 1 117.8 7.6 96
13 8/6/2019 BTM +4' 1 119.2 7.1 97
14 8/6/2019 BTM +4' 1 124.9 6.8 102
15 8/6/2019 BTM +2' 1 122.6 7.9 100
16 8/6/2019 BTM +2' 1 123.0 9.0 101
17 8/6/2019 BTM +4' 1 120.9 6.5 99
18 8/6/2019 BTM +4' 1 123.2 7.6 101
19 8/6/2019 BTM +2' 1 111.6 6.0 91
20 8/6/2019 BTM +2' 1 116.0 6.5 95
21 8/6/2019 BTM +4' 1 125.8 9.3 103
EDG JOB NO. 165692-1,4
TEST NO. DATE ELEVATION SOIL TYPE
DRY DENSITY (PCF)
FIELD MOISTURE (%)
RELATIVE COMPACTION (%) COMMENT
22 8/6/2019 BTM +4' 1 120.9 9.1 99
23 8/6/2019 BTM +4' 1 116.2 9.3 96
24 8/7/2019 BTM +6' 1 123.8 6.7 101
25 8/7/2019 BTM +6' 1 125.5 8.2 103
26 8/7/2019 BTM +6' 1 117 6.5 96
27 8/7/2019 BTM +6' 1 122.5 7.5 100
28 8/7/2019 BTM +4' 1 125.3 7.9 102
29 8/7/2019 BTM +4' 1 124.7 8.6 102
30 8/7/2019 BTM +6' 1 124.7 7.1 102
31 8/7/2019 BTM +6' 1 121.1 7.0 99
32 8/8/2019 FG 1 119.6 7.4 98
33 8/8/2019 FG 1 121.0 7.7 99
34 8/8/2019 FG 1 122.2 6.8 100
35 8/8/2019 FG 1 122.6 7.7 100
36 8/8/2019 FG 1 121.2 7.7 99
37 8/8/2019 FG 1 112,6 8.7 92 RETEST 40
38 8/8/2019 FG 1 122.2 6.4 100
39 8/8/2019 FG 1 123.1 7.1 101
40 8/8/2019 FG 1 118.0 7.0 96
41 8/13/2019 FG 1 122.2 6.4 100
42 8/13/2019 FG 1 122.5 8.1 100
43 8/13/2019 FG 1 122.7 7.1 100
44 8/13/2019 FG 1 119.8 6.1 98
45 8/13/2019 FG 1 121.2 5 99
46 8/13/2019 FG 1 121.1 6.8 99
47 8/15/2019 BTM +4' 2 106.8 11.8 91
48 8/15/2019 BTM +4' 2 105.9 14.2 90
49 8/21/2019 BTM +6' 2 105.9 14 90
50 8/21/2019 BTM +6' 2 107.1 12.4 91
51 9/6/2019 BTM +6' 2 107.1 11.6 91
52 9/6/2019 BTM +6' 2 104.4 13.1 93
53 9/9/2019 FG 1 119.9 6.8 98
54 9/9/2019 FG 1 117.0 7.1 96
FIGURE 1
Approximate Location of Compaction Test
Project: Pritchard ResidenceAddress: 5098 Shore Drive, Carlsbad, California
EDG Project No:165692-1,4
●1●3
●5
●2●4
NOT TO SCALE
●13
●12●11
●10
●9
●8
●7
●6
●14
●15
●16
●17
●18 ●19●20
●21
●22
●23
●24
●25
●26
●27
●28●29
●30
●31 ●32
●33
●34
●35
●36
●37
●38●39
●40
●41
●42
●43
●44
●45
●46
●47●48 ●49
●50 ●51●52 ●53●54
ENGINEERING
DESIGN GROUP
www.designgroupca.com
2121 Montiel Road, San Marcos, CA 92069
760.839.7302
L,
I I I I r----------.J I I I I I I I I -~--__ J
I I I I L-----