Loading...
HomeMy WebLinkAboutCT 14-05; MAGNOLIA TOWNHOMES; FINAL SOILS REPORT; 2019-09-21r--;z;;;;;;;~--S TR AT A-TECH, I NC. ____ __,GEO CO N 5 UL T A N TS --- 310. 968. 2999 September 21, 2019 Expanded TMS Highland Investments, LLC Tony Sfreddo 29250 Paseo Sedano San Juan Capistrano, California tsfreddo@icloud.com Reference: ---------- Subject: s tratatech@yahoo.com W.O. 273114 As-Built Compaction Report, Multifamily Residential Development749-763 Magnolia Dr, Carlsbad, California STRATA -TECH, INC., Preliminary Geotechnical Engineering Investigation, Proposed Multi Family Residential Development, 749-763 Magnolia Drive, Carlsbad, California, WO. 273114 Sept JO, 2014 Mr. Sfreddo: Submitted herewith is the As-Built Compaction Report for the subject site. The grading construction was conducted between April 14, 2017 and November 8, 2017, utilizing the recommendations of the referenced report. Observations of the grading were provided by STRATA-TECH, Inc. PLACEMENT OF STRUCTURAL FILL Compacted fill was placed on the subject site to provide adequate support for the proposed multifamily dwellings. 0 Compaction testing was provided for OBSERVATIONS DURING GRADING Preparation for placement of compacted fill included over excavation to approximately 4 feet below pad grade, and 5-feet beyond the building foundation to provide a minimum of 2 feet of STRATA-TECH,INC. GEOCO N SUL.TANTS TMS Highland Investments, LLC As-Built Compaction Report 2 w.o. 273114 September 21, 2019 compacted fill under the footings of the proposed building. Prior to placement of fill, the bottom was made level, scarified, watered and compacted. Subsequent fills were placed in 6 to 8 inch loose lifts and compacted to a minimum of 90 percent. IMPROVMENTS Utility services Sewer main and water installed in June -September 2017. Fire water line in August 2017. Gas service line installed in October 2017. Street improvements in May 2019 Interior utilities Sewer and water were backfilled with birds eye/ pea gravel to avoid damage from mechanical compaction. Foundations Foundations were excavated per plan and penetrate the bearing soils a min of 24". All building foundations were observed before pouring of concrete with capillary break, 1 Smill visqueen, sand and steel ready for pour, 1/25/18. Foundations for sound walls were observed July 2017. Foundations for screen wall patios observed in February 2019 TESTING Maximum density optimum moisture relationship determinations were performed for each soil type encountered during grading operations. Test results were as follows: Laboratory Standard: (ASTM: D-1557) 4 inch dia. mold; 1/30 cu.ft.vol.; 5 layers-25 blows per layer; 10 lb. hammer dropped 18 inches STRATA-TECH ,INC. GEOCO N SUL.TANTS TMS Highland Investments, LLC As-Built Compaction Report 4 COMPACTION TEST RESULTS Test Below Moisture Dry Unit Soil Proposed Content Weight No. Location Type Grade (ft) % (Lbs!fr3) 1 Building Pad A 4 10.8 116.2 I 2 Building Pad A 4 10.2 115.8 I 3 Building Pad A 3 11.1 116.8 I 4 Building Pad A 2 10.5 116.9 I 5 Building Pad A 2 9.4 114.9 I 6 Building Pad A 2 9.8 116.2 I 7 Building Pad C 4 9.9 115.1 I 8 Building Pad C 4 11.1 112.1 I 9 Building Pad B 4 10.1 112.7 I 10 Building Pad B 4 9.9 114.7 I 11 Building Pad C 2.5 11.1 113.2 I 12 Building Pad C 1 10.5 112.0 I 13 Building Pad C 1 9.9 112.7 I 14 Building Pad B R.G. 8.6 115.2 I 15 Building Pad B R.G. 9.4 115.1 I 16 Building Pad C R.G. 8.8 115.2 I 17 Building Pad C R.G 8.1 115.6 I 18 Building Pad A FG 9.2 117.4 I 19 Building Pad A FG 9.1 117.3 20 Building Pad B FG 9.8 116.5 21 Building Pad B FG 9.8 118.3 22 Building Pad C FG 10.4 116.8 23 Building Pad C FG 10.6 118.2 24 See plan 2.5 9.7 112.0 25 " 1.0 10.1 117.4 26 " 3.5 11.0 116.9 27 " 2 9.8 119.4 28 " 2.5 10.8 118.7 28 " 2 8.9 121.9 29 " 1 11.5 123.4 30 1 11.4 120.0 W.O. 273114 September 21. 2019 %Relative Date Compaction 91.5 4-17-17 91.2 92.0 92.1 4-18-17 90.5 91.5 90.7 4-19-17 91.1 91.6 4-20-17 92.5 91.2 90.3 90.4 4-21-17 92.3 4-24-17 91.2 91.4 91.2 92.5 11-8-17 92.4 91.8 93.2 11-17-17 92.0 93.1 90.3 2-11-19 92.4 92.1 94.0 93.6 96.0 97.2 94.4 'STRATA-TECH,INC. GE □CO N SUL.TANTS 1MS Highland hwestments, LLC As-Built Compaction Report Test No. Location 31 " 32 CG 33 CG 34 CG 35 CG 36 CG 37 D 38 D 39 D 40 D 41 D R. G.: rough grade FG: finish grade G:gas W: water F:fore line S: sewer D: drive CG: curb gutters SG: subgrade Below Proposed Grade (ft) 1 SG SG SG SG SG SG SG SG SG SG Moisture Content % 9.7 10.2 9.3 10.5 9.9 9.8 11.1 11.2 10.7 10.3 10.6 5 Dry Unit Soil Weight Type (Lbs!ft3) 121.9 I 123.1 I 122.0 I 121.5 I 120.9 I 121.0 I 121.5 I 120.8 I 121.9 I 121 .0 I 122.0 I W.O. 273114 September 21, 2019 %Relative Compaction Date 96.1 96.9 5-5-19 96.0 95.6 95.2 95.3 5-6-19 95.6 4-9-19 95.1 96. 95.2 96.0