Loading...
HomeMy WebLinkAboutDWG 410-3A; PD 03-02; ENCINA POWER PLANT SOIL REMEDIATION; 01-03GRADING NOTES (IN ADDITION TO THE REQUIREMENTS OF CHAPTfR 15. 16 OF THE CARLSBAD MUNICIPAL CODE) 1. THIS PLAN SUPERCEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS. 2. APPROVAL OF TH/$ PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. TH£ ENGINEER IN RESPONSIBLE CHARGE SHALL REVIS£ THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED. 3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR £NGIN££R-OF-WORk FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMMISIONS DISCOVERED DURING CONSTRUCT/ON. ALL PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO TH£ CITY ENGINEER FOR APPROVAL. 4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A CERTIFICATE OF INSURANCE AS WELL AS ADDITIONAL INSURED ENDORSEMENT MUST B[ FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE PERM/TTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH OCCURANCE OF LIABILITY. TH£ INSURAC£ COMPANY WRITING THE POLICY MUST HAVE A RATING OF"A" OR BETTER AND A Sil£ CATEGORY OF CLASS V OR BETTER AS ESTABLISHED BY "BESTS" KEY RATING GUIDE. 5. UNLESS EXEMPTED BY SECT/ON 301.(b)5 OF THE UNIFORM BUILDING CODI::, RETAINING WALLS OUTSIDE OF PUBLIC RIGHT OF WAY Rf:QUIR[ SEPARATE PERMITS FROM THE BUILDING DEPARTMENT. 6. NO WPRK SHALL Bf: COMMENCED UNTIL ALL PERMITS HAVE BEEN Ol3TAINEb FROM THE CITY AND OTHER APPROPRIATE AGENCIES. 7. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK OR GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS BEEN OBTAINED ANO A VALID GRADING PERMIT HAS BEEN ISSUED. 8. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON TH£ APPROPRIATE SHf:£T OF THE PLANS AND THE TITLE SHEET. 9. ORIGINAL DRAWINGS SHALL BECOME THE PROPERTY OF THE CITY UPON Bf:ING SIGNED BY THE CITY ENGINEER. 10. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF TH£ WORK BY TH£ CITY. 11. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION. 12. WHERE TRENCHES AR£ WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF: (A) SUMMARY SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION CURVES, SHALL BE SUBMITTED BY A PROFFESIONAL ENGINEER OF THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. THE SOILS REPORT WILL 8£ SUBMITTED TO THE CITY ENGINEERING INSPECTOR WITHIN TWO WORKING DAYS OF THE COMPLETION OF FIELD TESTS. 13. A SOILS COMPACTION REPORT AND COMPLIANCE VERIFICATION REGA7W!NG ADHERANCE TO R[COMMENDA T/ONS OUTLINED IN THE SOILS REPORT IS REQUIRED PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING SHALL 8£ DONE UNDER THE DIRECTION OF A PROFFESIONAL ENGINEER OF THE STATE OF CALIFORNIA PRINCIPALLY DOING BUSINESS IN TH[ FIELD OF APPLIED SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD SPECIFICATIONS ANO THE RECOMMENDATIONS OF THE SOILS REPORT. DAILY FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE PROJECT INSPECTOR. 14. A PR£CONSTRUCTION M[£TING SHALL 8£ HELD AT TH£ SIT£ PRIOR TO TH£ BEGINNING OF WORK AND SHALL B£ ATTENDED BY ALL REPRESENTATIVES RESPONSIBLE FOR CONSTRUCT/ON, INSPECTION, SUPERVISION, [[STING AND ALL OTHER ASPECTS OF TH£ WORK. THE CONTRACTOR SHALL SCHEDULE THE MEETING THROUGH THE PERMIT CLERK (760) 438-3891 AT LEAST FIVE (5) WORKING DAYS PR/OR TO STARTING CONSTRUCTION. APPROVED DRAWINGS MUST BE AVAILABLE PRIOR TO SCHEDULING. TH£ GRADING PERMIT WILL BE PROVIDED BY THE PROJECT INSPECTOR AT THE MEETING. 15. ALL INSPECTION RWU£STS OTHER THAN FOR PRECONSTRUCTION MEITING WILL 8£ MADE BY CALLING THE (NGINITRING 24 HOUR INSPECTION REQUEST LINE AT (619) 438 3891, INSPECTION REQUEST MUST BE RECIEVED PRIOR TO 2:00 P,M. ON THE DAY BEFORE THE INSPECTION IS NEEDED. INSPECTIONS WILL BE MAD£ TH£ NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS MAD£ AFTER 2:00 P.M. WILL BE SCHEDULED FOR TWO FULL DAYS LATER. 16. THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAJNTAJN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL L-GCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 17. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 5705 BY SUBMITTING A DETAIL PLAN TO TH£ CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING THE DESIGN OF SHOR/NG, BRACING, SLOPING OR OTHER PROVISIONS TO 8£ MADE FOR WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FRO ALL TRENCHES FIVE FEET (5') OR MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORD[RS, TITLE 8 CALIFORNIA ADMINISTRATIVE COD£. THE PLAN SHALL 8£ PREPARED BY A REGIST£RE;D ENGINEER AT THE CONTRACTOR'S EXPENSE. A COPY OF THE OSHA EXCAVATION PERMIT MUST 8£ SUBMITTED TO THE INSPECTOR PRIOR TO EXCAVATION. 18. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN OBTAINED FROM THE CITY OF CARLSBAD. SUBMIT APPLICATION FOR BLASTING PERMIT WELL IN ADVANCE OF THE SCHEDULING OF BLASTING OPERATIONS. 19. IF ANY ARCHEOLOGICAL RESOURCES ARE DISCOV£11£D WITHIN ANY WORK AREA DURING CONSTRUCTION. OPERATIONS WILL CEASE /MME;DIATEl Y AND THE PERMITTIT WILL NOVO'. THE CITY ENGINEER. OPERATIONS WILL NOT RESTART UNTILL THE PERM/TT£[ HAS R[C/£V£0 WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DD SO. 20. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED GRADING EQUIPMENT SHALL 8£ LIMITED TO THE PERIOD BETWEEN 7:00 A.M. AND SUNSET EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CONDUCTfD ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY HOLIDAYS JS AVAILABLE AT TH£ £NG/NEERING DEPARTMENT COUNTER.) 27. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AN PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT, DRAWING NO. N/A AND/OR AS DIRECTED BY THE CITY ENGINEER OR PLANNING DIRECTOR. 28. THE OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACTORS SHALL COORDINATE THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPE AND IRRIGATION PLANS ANFD THE IMPROVEMENT PLANS AS REQUIRED FOR THIS WORK IN ACCORDANCE WITH THE LANDSCAPE MANUAL TIM£ REQUIREMENTS. 29. STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE WITH A MINIMUM 0-LOAD OF 1,350. FOR PRIVATE STORM DRAIN PIPES, UP TO 15" PVC MAY BE UTILIZED PROVIDED DEPTH IS LESS THAN 15 FEET AND BACKFILLED WITH 3/4" ROCK PER SDRSD S-4 TYPE "c• AND PIPE MEETS ASTM STANDARD 3034 FOR SOR 35 SOLID WALL PIPE 30. WHERE AN EXISTING PIPE LINE IS TO BE ABANDONED AS A RESULT OF THE GRADING OPERATION, IT SHALL 8£ REMOVED WITHIN TWENTY (20) FEET OF BUILDING OR STREET AREAS AND REPLACf:O WITH PRPERLY COMPACTED SOILS. IN OTHER AREAS THE PIPE WILL 8£ PLUGGED WITH CONCRETE OR REMOVED AS APPROVED BY TH£ CITY ENGINEER. 31. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES (ABOVE GROUND AND UNDERGROUND) WITHIN TH[ PROJECT SIT[ SUFFICIENTLY AHEAD OF GRADING TO PERMIT TH£ REVISION OF GRADING PLANS IF IT IS FOUND THAT THE AC/UAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED WORK. 32. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY CdMPAN/ES (SEE BELOW) AT LEAST TWO (2) FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY REPRESENTATIVE. UNDERGROUND SERVICE ALERT SDG&E SBC (PACIFIC BELL) ADELPHIA CABLEVISION CITY OF CARLSBAD (STREETS & STORM DRAIN) •CITY OF CARLSBAD (SEWER, WATER & RECLA/MED WATER) *SAN 0I£GUITO WATER DISTRICT *LEUCADIA COUNTY WATER DISTRICT *VALLECITOS WATER DISTRICT *OLIVENHAIN WATER DISTRICT *BUENA SANITATION DISTRICT *AS APPROPRIATE 33. PERMIT COMPLIANCE REQUIREMENTS: (800) 422-4133 (800) 660-7343 (800) 892-0123 (760) 438-7741 (760) 434-2980 (760) 438-2722 (760) 633-2650 (760) 753-0155 (760) 744-0460 (760) 753-6466 (760) 726-1340 A. FOR CONTROLLED GRADING -THE APPLICANT HIRES A CIVIL ENGINEER, SOILS ENGJNE:ER, AND/OR GEOLOGIST TO GIVE TECHNICAL ADVICE, OBStRVE AND CONTROL THE WORK IN PROGRESS /15.16.120.8/ CARLSBAD MUNICIPAL CODE. B. PRIOR TO FINAL APPROVAL OF GRADING PERMIT -THE FOLLOWING REPORTS MUST 8£ SUBMITTED TO THE CITY ENGINEER VIA TH£ PROJECT INSPECTOR /15.16.129.9&10} CARLSBAD MUNICIPAL CODE: (1) FINAL REPORT BY SUPERVISING GRADING ENGIN[tR STATING ALL GRAD/NG JS COMPLETf (2) AS-BUILT GRADING PLAN. (3) REPORT FROM THE SO/LS ENGINEER, WHICH INCLIJDES SUMMARIES OF FIELD AND LABORATORY TESTS. TH[ REPORT SHALL ALSO INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE GRADING WAS DONE IN ACCORDANCE WITH THE REQUIREMENTS AND RECOMMENDATIONS OUTLINED IN THE PRELIMINARY SOILS REPORT AND SUPPLEMENTS THERETO. 34. UNLESS AGRADING PERMIT FRO THIS PROJECT JS ISSUED WITHIN ONE (1) YEAR AFTER THE CITY ENGINEER'S APPROVAL, THESE PLANS MAY 8£ REQUIRED TO BE RESUBMITTED FOR PLANCHECK. PLANCHECK FEES WILL BE REQUIRED FOR ANY SUCH RECHECK. 35. THE SOILS REPORT TITLED "SOILS REPORT, ENC/NA POWER PLANT SOIL REMEDIATION" PREPARED BY HALEY 4c ALDRICH, INC,. DATED 5 MARCH, 2003, SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL 8£ DONE IN ACCORDANC[ WITH THE RfCOMM£NDATJONS AND SPECIFIACA110NS CONTAINED IN SAID SOILS REPORT. "DECLARATION OF RESPONSIBLE CHARGE" I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINtSS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTfNT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIF/CATIONS BY THE CITY OF CARLSBAD DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN. FIRM: HALEY & ALDRICH INC. ADDRESS: 9040 FRIARS ROAD SUl1F 220 CITY, STATE: SAN DIEGO CA 92108 TELEPHONE: 619-280-9210 B~ _ _.,JA~M~£-S~R~•jG~IN~G~ER~Y'-~~=~---(NAM[ OF ENGINEER) R.C.£. NO.::__!.i.98J'.L_ __________ _ REGISTRATION EXP/RATION DA TE: -'7.L,2,;...IJ11t1-/,1201L01.1J ___ _ SOILS ENGINEER'S CERTIFICATE /, JAMES R. GINGERY , A REGISTERED CIVIL ENGINEER OF THE STAT£ OF CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN TH[ FJELD OF APPLIED SOILS MECHANICS, HERl::BY CERTIFY THAT A STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION IN JANUARY 2003. TWO COP/ES OF TH[ SO/LS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS HAS BEEN SUBMITTED TO TH£ OFFICE OF 77:\. CITY [.NG/NEER. 21. ALL OFF -SITE HAUL ROUTES SHALL 8£ SUBMITTED BY TH£ CONTRACTOR TO TH£ CITY £NGINITR FOR APPROVAL TWO (2) FULL WORKING DAYS PRIOR TO BEGINNEING OF WORK. SIGNED: y02=::::::· P.E. NO.: _ ___..5:,z9Bi..1c.9c_ ________ _ 22. IMPORTANT MATERIAL SHALL 8£ OBTAINED FROM, AND WASTE MATERIAL SHALL BE DEPOSITED AT, A SITE APPROVED BY THE CITY ENGINEER TH£ CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCUR/NG ALONG THE HAUL ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION. 2J. BRUSH SHALL BE REMOVED ONLY WITHIN THE AF/EA TO BE GRADED. NO TREES ARE TO BE REMOVED UNLESS SPECIFICALLY NOTED ON THE PLAN. 24. THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SET OF ERROSION CONTROL PLANS. EROSION CONTROL SHALL BE SHOWN AND AS APPROVED BY THE CITY ENGINEER OR AS DIRECTED BY THE PROJECT INSPECTOR. 25. ALL SLOPES SHALL 8£ TRIMMED TO A FIN/SH GRADE TO PRODUCE A UN/FORM . SURFACE AND CROSS SECTION. THE SITE SHALL 8£ LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE REMOVEtr AND DISPOSED OF AT A SIT£ APPROVED BY THE CITY ENGINEER. :26. ALL SLOPES SHALL 8£ IRRIGATED, STABILIZED, PLANTED AND/OR HYDROSEEDED WITHIN TEN (10) :!! DAYS OF THE TIM£ WHEN EACH SLOPE IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED ~ GRADING PLANS. DA TE: __ :\-'1/Jc...1~12i/,u.0_;...3,__ ______ _ LICENSE EXPIRATION DA TE: 1?/l7/QJ OWNER'S CERTIFICATE / ( WE ) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER-ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THIS SITE. S!ifl/./tP-, [.. ii /hOA[)llfiif NAME EXCAVATION. SHORING AND BACKFIT,UNGl !:iQlJ;; ANY AMMENDMENTS TO THE "SOILS REPORT. . NC/NA POWER PLANT SOIL REMEDIATION", DATED MARCH 5, 200J SHALL BE MADE TO THI:: FOLLOWING NOTES, AS APPLICABLE: , EXCAVATION CHARACTERISTICS j 1. EXCAVATIONS IN ARl::AS 1 THROUGH 7 ARE ANTICIP TED TO Bf UP to 2-FT IN DEPTH AND THE EXCAVATION IN AREA 8 IS ANTICIPATED TO BE UP TO APPROXIMATELY 20-FT IN DEPTH. IT IS ANTICIPATED THAT CONVENTIONAL HEAVY GRADING EQUIPMENT IN GOOD WORKING ORDER SHOULD BE CAPABLE OF EXCAVATING THE SOIL MATERIALS IN THE PROPOSED AREAS. DUE. TO THE PRESENCE OF OVERHEAD ELECTRICAL LINES IN AREA 8, AN ACCESS RAMP SHALL 8£ EXCAVATED WHICH PROVIDES SUFFICIENT OVERHEAD CLEARANCE FOR CONSTRUCT/ON EQUIPMENT. EXCAVATION AND SHORING R£0UIR£MENTS 1. THE CONTRACTOR SHALL PERFORM ALL EXCAVATION, SIDI:: WALL SLOPING, SHORING AND BACKFILL/NG IN AREA 8 SO THAT NO DAMAGE OCCURS TO BUILDING 8. THE PRECLUSION OF DAMAGE TO BUILDING 8 DURING CONSTRUTION ACTIVITIES IS THE SOLE RESPOS/8/L/TY OF TH£ CONTRACTOR. . EXCAVATION AND SHORING SHALL 8£ PERFORMED I~ ACCORDANCE WITH FEDERAL AND STATE STANDARDS AND SAFE CONSTRUCTION STANDARDS. EXCAVATION SIDEWALLS SHALL BE LAID BACK OR SHORED IN ACCORDANCE WITH THE. CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (CAL/OSHA) REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR DESIGN AND IMPLEMENTATION OF SHORING AND SAFE WORK/NG CONDITIONS 2. FOR PLANNING PURPOSES, AN OSHA SOIL CLASSIF1¢ATIONS OF TYPE B MAY 8£ USED IN AREAS 1 THROUGH 8. HOWEVER, LOCALIZED ZONES WITHOUT BINDER (I.E. POORLY GRADED SAND WITH TRAC£ TO NO FINES) MAY BE ENCOUNTERED WHICH QUALIFY AS TYPE C MATER/AL. DURING CO/>ISTRUCTJON, THE SOIL CLASSIFICATIONS, INFLUENCE OF ADJACENT UNDERGROUND UTILITIES, STRUCTURES AND SLOPES, AND EXCAVATION PERFORMANCE SHALL BE CONFIRMED BY TH£ CONTRACTOR'S "COMPETfNT PERSON" IN ACCORDANCE WITH CAL/OSHA REGULATIONS. j 3. PORTIONS OF EXCAVATION$ IN AREAS 4, 5 AND 6 MIGHT BE IMMED/AT[LY ADJACENT TO FOUNDATIONS FOR EXISTING ABOVE GROUND STORAGE TANKS OR OTHER STRUCTURES. PRIOR TO MAKING EXCAVATION$ IMMEDJATEL Y ADJACENT TO FOOTINGS, TEST PITS SHALL BE MADE TO DETERMINE IF TH[ ANTICIPATED EXCAVATION DEPTH WILL EXTEND BELOW THE BOTTdMS OF FOUNDATIONS. 4. IF THE E:XCAVATION DEPTHS EXTEND BELOW THE a6TTOMS OF FOUNDATIONS, OPEN EXCAVATIONS WHICH ARE IMMEDIATELY ADJACENT TQ THE FOUNDATIONS SHALL BE LIMITED TO 5-FT IN LENGTH ALONG THE FOUNDATll'!N EDGE. THE EXCAVATION SHALL BE MADE SEQUENTIALLY, BACKFILLING ONE 5-FT SEGMENT PRIOR TO EXCAVATING THE NEXT. IN NO CASE SHALL SOIL 8£ EXCAVATED FROM IMMEDIATELY BENEATH THE BOTTOM OF FOUNDATIONS WITHOUT REVIEW BY A REGISTERED STRUCTURAL ENGINEER. 5. AN EXCAVATION UP TO 20-FT IN DEPTH IS ANTICIJATED IN AREA 8, WHICH JS ADJACENT TO BUILDING 8. PROVIDED THAT CONDITIONS EXPOSED IN THE FIELD VERIFY THAT CAL/OSHA TYPE B SOIL IS PRESENT, UNSHORED EXCAVATION SIDEWALLS SHOULD 8£ LAID BACK AT A SLOPE NOf STEEPER THAN 1 HORIZONTAL TO 1 VERTICAL. VARIOUS SHORING CONFIGURATIONS! AS PERMITTED BY CAL/OSHA REGULATIONS MAY ALSO BE USED. ' 6. SPECIAL PRE:CAUTIONS ARE NECESSARY FOR EXCAvlT10Ns WHICH couLD INFLUENCE BUILDING B. AREAS OF INFLUENCE BENtATH BUILDING B ARE DEFINED AS ZONE A AND ZONE 8 IN THE AREA 8 SPECIAL EXCAVATION AND SHORING ZONES DETAIL ON SHEET 2. ZONE 8 IS DEFINED AS THE SOIL UNDER AND AJACENT TO BUILDING 8, LIMITED BY A PLANE EXTENDING FROM THE GROUND SURFACE AT TWO (2) FEET AWAY FROM THE EDGE OF THE BUILDING, DOWNWARD AND AWAY FROM THE BUILD/NG AT A SLOPE OF 0.1, HORIZONTAL TO 1 VERTICAL. ZONE: A IS DE.FINED AS SOIL BENEATH/ADJACENT 7'o BUILDING 8 BETWEEN THE LIMITS OF ZONE B AND A PLANE EXTENDING FROM! THE GROUND SURFACE AT TWO (2) FEET AWAY FROM THE £OGE OF THE BUILDING, DOWNWARD AND AWAY FROM THE BUILDING AT A SLOPE OF 1 HORIZONTAL TO 1 VERTICAL. 7. BASED ON THE EXPECTED LIMITS OF PETROLEUM HYDROCARBON IMPACTED SOIL TO BE REMOVED AS DEPICTED IN THE FOGT/ (1998) REPORT, IT IS NOT ANTICIPATED THAT EXCAVATION WITHIN ZONE A OR ZONE B WILL BE NECESSARY. HOWEVER, IF ANY EXCAVATION WITHIN THESE ZONE$ IS REQUIRED, THE NOTES FOR DETAIL A ON SHEET 2 SHALL APPLY. , 8. SPECIAL PRECAUTIONS ARE REQUIRED FOR EXCAVAiioN ADJACENT TO EXISTING BUILDINGS AS INDICATED IN SHEET 2 OF THIS PLAN SET. SOURCE OF TOPOGRAPHY j TOPOGRAPHY SHOWN ON THESE PLANS IS BASED O THE "ENC/NA PROPERTY PLOT PLAN, DRAWING S450" DATED AUGUST 1997. THE TH£ £LEVA TIONS SHOWN ARE CONSIDERED APPROX/MA TE. PROJECT LOCATION i THIS PROJECT IS LOCATED WITHIN ASSESSORS PA~CEL NUMBER(S) 210 010 J9 I TH£ CALIFORNIA COORDINA T[ INDEX OF THIS PROJECT IS: N U 1353 DEGREE5 E 17Z 3297 OEGRFES BENCH MARK DESCRIPTION: NOT AVAIi Afl/ F LOCATION: _____________ .._ ___ _ RECORDED:--------------------ELEVA TION: __________ DATUM:----- i BACKFILLING l 1. BACKFILL TO BE PLACED IN THE EXCAVATIONS S L CONSIST OF EITHER EXCAVATED MATERIAL, OR APPROVED IMPORTED MATERIAL. SOIL TO BE USED AS BACKFILL SHALL 8£ MINERAL SOIL, FREE OF ORGANIC MATERIAL, ROCKS OR CLODS OVER 5 INCHES IN GREATEST DIMENSION, TRASH, AND DEBRIS, THAT ARE CAPABLE OF BEING PLACED IN LAYERS AND READILY COMPACTED TO THE REQUIRED RELATIVE COMPACTION. PRIOR TO DELIVERY OF IMPORTED FILL TO TH£ SITE, A REPRES£NTA T/VE SAMPLE SHALL BE SENT TO HALEY & ALDRICH FOR EVALUATION AND TESTING. 2. PRIOR TO PLACEMENT, ALL BACKFILL MATERIALS Jr TO BE MOISTURE -CONDITIONED TO WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE CONTENT, SPREAD AND PLACED IN LIFTS (LAYERS)) LOOSE LIFT THICKNESS SHALL NOT EXCEED 12 INCHES WHEN HEAVY COMPACTION EQUIPMENT IS USED (SUCH AS A RIDE-ALONG SHEEP'S FOOT ROLLER) AND 6 INCHES WHEN LIGHT EQUIPMENT IS USED (SUCH AS A "JUMPING JACK"}. BACKFILL AND PAVEMENT SUBGRADE MATERIAL SHALL BE UNIFORMLY COMPACTED TO THE MINIMUM RELATIVE COMPACTION AS SPECIFIE:D BELOW. 3. THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONT[NT OF THE BACKFILL MATfRIALS SHALL BE DETERMINED IN ACCORDANCE WITH THE ASTM 01557-91 TESTING PROCf:DURES. FLOODING OR Jffi/NG SHALL NOT BE USED TO DENS/FY THE BACKFILL. PAVEMENT R£$TORA TION 1. WHERE EXCAVATIONS ARE MADE IN PAVED AREAS, A NEW PAVEMENT SECTION EQUAL to OR GREA1£R THAN THE EXISTING PAVEMENT THICKNESS SHALL 8£ CONSTRUCTED. THI:: NEW PAVEMENT SECTION WILL INCLUDE ASPHALT CONCR[T[, AGGREGATE BASE AND SUBBAS£, AS NECESSARY TO MEET OR EXCEED TH£ EXISTING PAVEMENT SECTION THICKNESSES. ASPHALT CONCRETE, AGGREGATE BASE AND SUBBASE SHALL MEET THE REQUIREMENTS OF THE CITY OF CARLSBAD STANDARDS AND OR TH£ SAN DIEGO COUNTY REGIONAL STANDARDS, AS APPLICABLE. LtGAL DESCRIPTION THE LAND REFERRED TO HEREIN IS SITUATED IN THE STAT[ OF CALIFORNIA, COUNTY OF SAN DIEGO AND IS DESCRIBED AS FOLLOWS: PARCEL''.<\": PORTION OF ASSESSOR PARCEL NO. 210-010-36 [BOOk 4821 PAGE 199 / ECK£] PARCEL "B': PORTION OF ASSESSOR PARCEL NO. 210-010-36 [BOOK 4456 PAGE 49 JACOBSEN] PARCEL "C": PORTION OF APN 210-010-32 PARCEL "D": PORTION OF APN 210-010-36 PARCEL "E": APN 210-010-24 (66-6700/[CKE) PARCEL "F": (EASEMENT) (BOOK 4968 PAGE 560/PA TTERSON) PARCEL "G': [AS£M[NT (82-175943/ECKE) PARCEL "H": (tASEMENT) PARCEL "I": (LEASEHOLD) (FUEL OIL PIPELINE) PARCEL "J"; (LICENSE) UNRECORDED DOCUMENT DATED 3/31/99 PARCEL 'K': (LICENSE) UNRECORDED DOCUMENT DATED J/31/99 PARCEL 'L ": (LICENSE) PARCEL "M": (LEASEHOLD) PARCEL "N": (LEASEHOLD / DISCHARGE CHANNEL) PARCEL "0": (LEASEHOLD / DREDGE SPOILS) PARCEL "P": [LEASEHOLD / JETTIES AND CHANNEL] PARCEL "Q": [LICENSE / RIP-RAP} PARCEL "R': CANNON ACC[SS PARCEL "5": OPTION PARCEL PARCEL ''T': OPTION PARCEL REFER TO THE: TITLE REPORT DATED 8 MAY 2003 FOR COMPLETE DESCRIPTIONS OF THESE PARCELS RtMEDIATION NOT£ ENVIRONMENTAL SAMPLERS ft!LL BE ONSITE DURING GRADING OPERATIONS TO TEST SOIL. IF SOIL IS CONTAMINATED AND HAS ODOR IT ft!LL GO TO: OTAY LANDFILL 1700 MAXWELL ROAD CHULA VISTA, CALIFORNIA 91910 THE ENGINEERING INSPECTOR SHALL 8£ NOTIFIED OF CON TAM/NA TED SOIL DISCOVERED DURING [XCAVA TION •tXPLANAVON OF APPROX/MAT£ EARTHWORK QUANT/Tl[$: -4,400 CY OF TOTAL EXCAVATION -2,700 CY OF WHICH ft!LL 8£ DISPOSED OF OFF-SITE AT THE OTAY LANDFILL -2,700 CY OF IMPORTED CLEAN MATER/AL WILL REPLACE THE OFF-SITE DISPOSAL MATERIAL -1,700 CY OF CLEAN £XCAVA TED MATER/AL fWLL BE REPLACED BACK IN THE EXCAVA T/ON(S) WORK TO BE DONE THE GRADING WORK SHALL CONSIST OF THI:: CONSTRUCT/ON OF ALL curs AND FILLS, REMEDIAL GRADING, DRAINAGE FACILITIES, EROSION CONTROL FACILITIES, AND AND PR£PARA T/ON OF AS-BUILT GRADING AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET OF PLANS AND TH£ CITY STANDARDS, SPECIF/CATIONS, REQUIREM£N1S, RESOLUTIONS AND ORDINANCES CITfD ON THESE PLANS. THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE ft!TH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER. 1. CARLSBAD MUNICIPAL CODE 2. CITY OF CARLSBAD STANDARDS J. THIS SET OF PLANS 4. RCS0HI llOI/ 110. OA ;re 5. THE STANDARD SPECIF/CATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK). 6. SOILS REPORT AND RECOMMENDATIONS BY HAI [Y & Al QR/CH INC DA TED MARCH 200,'.3 7. THE SAN DIEGO REGIONAL STANDARD ORA WINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS. /3. CALIFORNIA COASTAL COMMISSION DEVELOPMENT PERMIT CONDITIONS WHICH AR£ PENDING 9. THE FOLLOWING TWO WORK PLANS WHICH HA VE BEEN APPROVED BY THE COUNTY OF SAN DIEGO ENVIRONMENTAL HEAL TH DEPARTMENT: A. "RE:MED/AL ACTION WORK PLAN, CABRILLO I (ENC/NA) POWER PLANT: FUEL SUPPLY AREAS", PREPAR[D BY IT CORPORATION AND DATED JUNE 2001. B. "REMEDIAL ACTION WORK PLAN, SAN DIEGO GAS & [LECTRIC, CABRILLO 1 POWER PLANT, CARLSBAD, CALIFORNIA", PREPARED BY HALEY & ALDRICH, INC. AND DA TED 25 JULY 2003. 10. SWPPP AND BEST MANAGEMENT PRACTICES PLAN, JUNE 2002. CABRILLO POWER 1, LLC VICINITY MAP CITY OF OCEANSIDE PACIFIC OCEAN 711 () AL()l,\AR c-.,.,i,,,..o .,.~ ~ Ro4 c?-~ ~?-1 . . . ,',•,•,•',•,',' ~A"°VE" CITY OF" ENCINITAS CllY OF VISTA ~ '<-c CITY OF ~ --'L SAN MARCOS EARTHWORK QUANTITIES P~Nlt DEPARTMENT APPROVAL 11 AS BUIL T11 CUT: 4 400 CY FILL: 4 400 CY ~~ 7 -fof' DATE:9/z.°t/03 C.llej'2lf (SIGNID) : IMPORT: Z ZQQ CY MICIIAl!L 1. HOLZXILLER, PLANNING DIRECTOR I RCE ~3Z.1l EXP. (,/3,:,/12_'1. DATE EXPORT: 2,7QQ CY r 1 REMEDIAL: 2,700 • CY ~ fJ. f ll I' ~ DATE: "1./2,'7 /o :3 (!IIGNID) ~ ...... v.1 ~ A -I lA.('Yl<r /,)IE}/2i 01/0~ RECOMMENDED BY: . /) ~ ~ "~tb (PRINT NAXE) INS.PECT □R DATE I SH1ET I CITY OF CARLSBAD I SH3TS I ENGINEERING DEPARTMENT GRADING/EROSION CONTROL PLANS FOR: ENCINA POWER PLANT SOIL REMEDIATION PROJECT APPROVED: LLOYD 8. H_UBBSIJ"' .&~. ~r"'~~ iltf'.e3 c1TY ENGINE PE23 El<ffiiEs 12/31 /os DA 95% RELATIVE COMPACTION IN THE UPPER 8-INCHES OF FIN/SHED SUBGRADE AND IN ALL AGGREGATE BASE AND SU8BASE MATERIALS. HALEY& ALf>RICl-l DATE INITIAL DATE INITIAL DATE OWN BY: PROJECT NO. DRAWING NO. INITIAL CHKD BY: ~€P. PD 03-02 410-3A RVWD BY: -r.t. 90% RELATIVE COMPACTION IN ALL OTHER AREAS ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL 101403 C :E ..a. G') 0 .,:. .... w ~ I 0 I , I w I > ' . ' ',/ .. I ' t· FU15LOIL TANKlfT ArllA S • FUEL OIL TANKJ/6 f'UEL OIL TANKll2 l"U!L OIL TANK#5 \ PUMFPIT ?,00 FUEL ¢IL TANK#4 • 0 0 \ •, lo \ \ .. ( I I I ) c:::, c:, ~NO~THGAS METERING STATION 0 '31KV SWITCHYAl'tO AGUA H[D!ONDA LAGOON I -liiiiiiiiiif-N _ .. I 0 100 200 400 APPROXIMATE SCALE IN FEET Ll::GEND L] SOIL STOCK PILE Si AGING AREA ~ SOIL STOCK PILE STAGING AREA-(AREA 3 SOIL) AREA OF PROPOSED REMEDIATION W19ERE EXCAVATION DEPTHS UP TO 2-FT ARE ANTICIPATED AREA OF PROPOSED REMEDIATION WHERE EXCAVATION DEPTHS UP TO 20-FT ARE ANTICIPATED _8 __ APPROXIMATE TOPOGRAPHIC ELEVATION CONTOUR LINE FEET MEAN SEA LEVEL (MSL) -o-APPROXIMATE WATER BODIES IMITS OF SURFACE -------- cIID EXISTING SLOl'>ES OUTSIDE OF WORK AREA FENCELINE EASEMENT BOUNDARY Alti A "'" E.)(c.14-V.,.TldA/ CJ~ W Y1>~,::, U,. I.. ON IM P,f<.. 'fl&? :,C,IL AN"1) R.£ l'V.'6"'1 EN-r W 1.,-11 C.L6AN IM ,O~T'~;) (.ta/If PA.GT6-P f=I '-'- .,,. .. IASl!MENT --:::::·.:::.--::;•:..:-.~------ !STORMDl'IAI ASEMENT ., GRADING PLAN -· '0} -__Q- -------A'.}--DJaCH,t,ME"---; , r BASIN __ / , ·, INTAKE t OISCHAfl:GE STRUCTU NOTES \-_ _ . -.. 20" SU8MEFI.QED ,\,-\---1/ OIL PIPELINE -J('"" __ SUBMEM!'::CI OIL , PIPELINE EASEMENT 1. BASE MAP FROM FIGURE 4 OF THE "REMEDIAL ACTION WORK PLAN, CABRILLO (ENCINA) POWER PLANT: FUEL SUPPLY AREAS" REPORT BY IT CORPORATION, JUNE 2001 2. CONTOUR LINES: ENCINA PROPERTY PLOT PLAN, DRAWING S450, AUGUST 1997 3. EASE:MENi LOCATION SOURCE: NOLTE ENGINEERING, SHEET ALTAB-10.DWG, 7/15/03 4. EXCAVATION CONSTRUCTION AND STOCK PILE AREAS ARE OUTSIOE OF KNOWN EASEMENTS HAZMAT IUILCING I ,, , NO l!!A.!S'=.Ml!!NT INDICATED ~I ON TltlE REPORT OR THE/' EASEMENT MAP [SEE NOTES) HALEY& ALDRICf-1 TEMPORARY SPOIL MINIMUM OF 5' FROM EDGE SLOPE OR SHORE EXCAVATION SIDEWALLS IN ACCORDANCE WITH THE REQUIREMENTS OF CAL/OSHA, THE SOILS REPORT, AND OTHER APPLICABLE FEDERAL, STATE AND LOCAL STANDARDS. RAMP SLOPED AS NECESSARY FOR ACCESS AND TO CLEAR OVERHEAD POWER LINES DATE INITIAL . i:NGINEER OF WORK SCHEMATIC EXCAVATION DETAIL NOTTO SCALE BUILDING B APPROXIMATE EXTENT OF SOIL WITH HYDROCARBON CONC. > 1,000 mg/kg 2' FORMER DIESEL UST APPROXIMATE LOCATION OF EXISTING STORM DRAIN PIPE FROM CANNON DAM. CONTRACTOR TO POTHOLE AS NECESSARY TO LOCATE AND PREVENT DAMAGE. DETAIL A AREA 8 SPECIAL EXCAVATION AND SHORING ZONES SCALE: 1 "s2Q' NOTES f'OR DITAIL A: 1. EXCAVATION WITHIN ZONE A SHALL BE SHORED WITH A SUITABLE SHORING SYSTEM SUCH AS HYDRAULIC "QUICK" SHORING OR TRENCH SHIELDS. THE SHORING SHALL FIT SNUGLY AT BOTH SIDES OF THE EXCAVATION SO THAT LOAD IS TRANSFERRED FROM THE SIDE OF THE EXCAVATION CLOSEST TO THE BUILDING TO THE SIDE EXCAVATION FURTHEST FROM THE BUILDING. WHERE TRENCH BOXES ARE USED, SPECIAL CARE SHALL BE TAKEN TO size: THE BOX TO MATCH THE EXCAVATION WIDTH. THE SPACE OR VOIDS BETWEEN THE SHIELD AND THE TRENCH WALLS SHALL BE FILLED WITH GRANULAR MATERIAL SO THAT THE SHIELD FITS SNUGLY. AS AN ALTERNATIVE TO USING SHORING WITHIN ZONE A, STRATEGICALLY SEQUENCED EXCAVATIONS COULD BE MADE. IF USED, THE ZONES SHALL BE EXCAVATED AS SLOTS NO GREATER THAN 5' IN WIDTH, ORIENTED PERPENDICULAR TO THE NEAREST FACE OF THE BUILDING. ANY EXCAVATION WITHIN ZONE A SHALL BE BACKFILLED BY THE END OF THE DAY. IN NO CASE SHALL E)(CAVATIONS IN ZONE A BE LEFT OPEN OVER NIGHT. 2. EXCAVTIONS WITHIN "ZONE B" REQUIRES THAT A SHORING SYSTEM BE USED WHICH HAS BEEN DESIGNED BY A CALIFORNIA REGISTERED PROFESSIONAL ENGINEER ON BEHALF OF THE CONTRACTOR. THE SHORING PLAN SHOULD BE PROVIDED TO SEMPRA UTILITIES FOR REVIEW. '•' "AS 0 10 20 -30 BUil T" ~~ RCE ,;-~z.11 EXP. ~z REVIEWED BY: ~_/~ INSPECTOR '-,L1• lo~ I I DA 'fE t;/4,/.-.,.- DATE I SH2ET I CITY OF CARLSBAD I SH3TS I ENGINEERING DEPARTMENT GRADING/EROSION CONTROL PLANS FOR: ENCINA POWER PLANT SOIL REMEDIATION PROJIECT APPROVED: LLOYD B. HUBl:3S6' r /. ~ . -,-? • -i:i . ~1(<>3 CITY ENGINE~ PE 2388 XPIRES 12/31 /05 DA-E OWN BY: PROJECT NO. DRAWING NO. DATE INITIAL OATE INITIAL CHKD BY: 8t& PD 03-02 410-3A REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL F!VWD BY: i., R, 101403 -I ... EROSION CONTROL NOTES I. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT ROB MANRIQUEZ OR MEHDI MIREMADI At HALEY & ALDRICH, INC. (619) 280-9210 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. J. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TC PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKDAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 10. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 11. SHOULD GERMINATION OF HYDROSEED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE STABILIZED BY PUNCH STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION, STATE OF CALIFORNIA. 12. srocKPILED SOIL SHALL BE PLACED ON 10 mil. POLYETHYLENE SHEETING. THE SOIL STOCKPILES SHALL BE COVERED WITH 10 mil. POLYETHYLENE SHEETING AT THE END OF EACH WORKDAY AND DURING ANY PRECIPITATION. THE SHEETING SHOULD BE SECURED BY PLACING GRAVEL FILLED BAGS AS NECESSARY ATOP AND AROUND THE PERIMETER OF THE SOIL STOCKPILE. IF MULTIPLE SHEETS ARE REQUIRED TO COVER THE STOCKPILE, THEY SHALL BE OVERLAPPED AND/OR SECURED IN A MANNER THAT PREVENTS THE INFILTRATION OF WATER. FIBER ROLLS ARE TO BE PLACED AROUND STOCKPILE PERIMETER TO FORM A SECONDARY DAM PREVENTING THE ESCAPE OF SEDIMENT. TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION I. THIS PROJECT CONSISTS OF MAKING EXCAVATIONS WITHIN RELATIVELY LEVEL AREAS, REMOVING HYDROCARBON CONTAMINATED SOIL AND BACK FILLING THE EXCAVATIONS WITH APPROVED COMPACTED MATERIAL. THE EXCAVATIONS ARE EXPECTED TO BE OPEN FOR A LIMITED TIME, AND AS SUCH, IT IS ASSUMED THAT EROSION CONTROL Of' EXCAVATION CUT SLOPES {SUCH AS HYDROSEEDING) SHALL NOT BE REQUIRED). 2. THE CONTRACTOR SHALL EMPLOY SAND FILLED BAGS OR OTHER MEASURES TC PREVENT THE FLOW OF SURFACE WATER (FROM RAIN OR OTHER SOURCES) INTO THE OPEN EXCAVATIONS. COVERl!D OIL STOCKPILE F'IBER ROLLS EXCAVA TE:D SOIL PLACED ON 10 MIL. POL YE:THYLENE SHEET AND COVERED WITH 10 MIL. POLYETHYLENE SHEtTS. GRA VE:L FILLED SACKS PLACED AS NECESSARY TO SECURE SHEEnNG TEMPORARY SOIL STORA E AND EROSION CONTROL DETAIL NOTTO SCALE EGEND DESCRIPTION I GRAVEL FILLED SACK 10-MIL POLYETHYLENE SHEkT i FIBER ROLL (8" DIAMETER) QUANTITY SYMBOL 100 0 /_;:...1,--::::--.,_ 11,000 Sq Ft. /7·\'j (:· '1 \ -----~" 600 Ft. @1/ H1\LEr' & ALf)RICII DATE INITIAL = ENGINEER OF WORK REVISION DESCRIPTION ' DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL 101403 11 AS BUILT" h~ -•/ 'lf/1141 RCE i'fQ! EXP. ~$-7. DATE :2~ ~/47(,,, ~NSPECTDR DATE I SH3ET I CITY OF CARLSBAD I SH3TS I ENGINEERING DEPARTMENT C GRADING/EROSION CONTROL PLANS FOR: ENCINA POWER PLANT SOIL REMEDIATION PROJECT APPROVED: LLOYD B. HUBBS d'I' 1_[2:J.f>J 4Z,.,~ ,c:,6'~~-"' CITY ENGINEER~23889XPIRES 12/31/05 DATE :e (,,) C') 0 ~ -i (,,) ~ ' 0 ' DWN BY: PROJECT NO. DRAWING NO. CHKD BY: DER PD 03-02 410-3A RVWD BY: D,E', ll t I w )>