Loading...
HomeMy WebLinkAboutSDP 00-06C; DAYBREAK COMMUNITY CHURCH PHASE IV; FINAL SOILS REPORT; 2016-10-31Project No. FC-4-15-13 October 31, 2016 SMS GEOTECHNICAL SOLUTIONS, INC. Consulting Geotechnical Engineers & Geologists 5931 Sea Lion Place, Suite 109 Carlsbad, California 92010 Office: 760-602-7815 smsgeosol.inc@gmail.com Daybreak Community Church of Carlsbad North County Attention: Pastor Gary Webb 6515 Ambrosia Lane Carlsbad, California 92011 Final Report Of Geotechnical Engineering Observations And Compaction Testing, Phase IV Worship Center Building Pad And Retaining Wall Backfill, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad I. INTRODUCTION Submitted herewith please find the following summary of geotechnical engineering observations and compaction testing recently completed by our firm in connection with the project Phase IV worship center building final phase retaining wall backfill and upper building pad development at the above- referenced church property. Wall backfill and grading limits (inclusive of initial phase lower pad partial development) at the property are delineated on the enclosed Approximate Compaction Tests Location Map reproduced from the project grading plan. The project consisted of pad development completed in two phases. Partial pad development was carried out for the lower building areas in the initial phase grading operations. At the completion of the initial phase partial pad development, a report of geotechnical engineering observations and compaction testing, dated June 20, 2016, was prepared and issued by this office (see References below). This report summarizes retaining wall backfill and upper pad rough grading operations and compaction test results performed during second (final) phase development, supplemented with test results complied during the first phase partial development oflower building pad areas. First phase compaction test locations are also shown on the attached Approximate Compaction Tests Location Map. Overall, upper elevated portions of the building pad development consisted of backfilling the perimeter retaining walls and remedial grading work to provide uniform bearing and subgrade soil conditions throughout. Backfills behind the western building retaining wall was compacted to higher Final Report Of Geotechnical Engineering Observations and Compaction Testing, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad Page2 Oct. 31, 2016 (minimum 93%) compaction levels in order to create a more uniform bearing soil condition throughout the building areas. Elsewhere, remedial pad grading chiefly consisted of stripping and recompaction of the native Terrace Deposits (or existing well-compacted fills, where they were encountered) a minimum of 12 inches below the bottom of finish subgrade surfaces. Upper level building foundations were stepped down and deepened to near the bottom of the transition wall foundation level, with the elevating and stepping up foundations supported on minimum 93% compacted fills/backfills or dense native Terrace Deposits, as required by the project soils report(s). Final phase perimeter retaining wall backfill and upper building pad development and remedial, sub grade preparations, compaction and testing were mostly carried out periodically from August 23 to September 28, 2016 under engineering observations and testing services provided by this office. Intermittent trench testing was also carried between the initial and final phase pad development as requested. II. REFERENCES The following plans and documents were used by this office in support of our field work and preparation of this report: 1. "Report of Geotechnical Engineering Observations and Compaction Testing, Phase IV Worship Center Building Pad, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad," prepared by SMS Geotechnical Solutions, Inc., Project No. FC-4-15-13, dated June 20, 2016. 2. "Report of Geo technical Engineering Observations and Compaction Testing, Phase IV Upper Pad Parking and Drainage Improvements, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad," prepared by SMS Geotechnical Solutions, Inc., Project No. FC-4-15-13, dated August 31, 2015. 3. "R-Value Test Results and Pavement Structural Section Design Conformation, Phase IV Upper Pad Parking Improvements, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad," prepared by SMS Geotechnical Solutions, Inc., Project No. FC-4-15-13, dated June 1, 2015. 4. "Final Grading Plan and Bioswales/Bioretention BMP Design Review, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad," prepared by SMS Geotechnical Solutions, Inc., Project No. GI-7-14-7, dated February 26, 2015. 5. "Phase IV Grading Plan Review and Recommendations, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad, California,"prepared by SMSGeotechnical Solutions, Inc., Project No. GI-7-14-7, dated November 24, 2014. Final Report Of Geotechnical Engineering Observations and Compaction Testing, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad Page3 Oct. 31, 2016 6. "Geotechnical Update Letter and Additional Field Testing for the Proposed Bioswales, Phase N Development, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad, California," prepared by SMS Geotechnical Solutions, Inc., Project No. GI-7-14-7, dated August 8, 2014. 7. Final Report of Geotechnical Engineering Observations and Compaction Testing, Remedial Pad Grading, Daybreak Community Church, Phase III, Building C, 6515 Ambrosia Lane, Carlsbad, California," prepared by Vinje & Middleton Engineering, Inc., Job #12-252-F, dated August 15; 2013. 8. "Geotechnical Update Report, Proposed Phase III and Phase N, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad, California," prepared by Vinje & Middleton Engineering, Inc., Job #11-259-P, dated November30, 2011. 9. "Geotechnical Final Report for the Grading Operations and Field Documentation Conducted During Grading and Construction of Daybreak Community Church Phase II, City of Carlsbad Drawing #3 92-6B," prepared by Vinj e & Middleton Engineering, Inc., Job #09-159-F, report dated November 30, 2010. 10. "Update R-Value Test Result, Pavement/Base Thickness and Sub/Basegrade Recommendations for On-Site hnprovements," prepared by Vinje & Middleton Engineering, Inc., Job #09-159-F, letter dated October 28, 2010. 11. "As-Graded Compaction Report and Foundation Recommendations for Proposed 2-Story Building Addition," prepared by Vinj e & Middleton Engineering, Inc., Job #09-159-F, report dated June 18, 2010. 12. "Update of Compaction Report, Proposed 2-Story Building Addition," prepared by Vinje & Middleton Engineering, Inc., Job #09-159-F, report dated April 8, 2010. 13. "Grading and Foundation Plan Review, Proposed 2-Story Building Addition," prepared by Vinje & Middleton Engineering, Inc., Job #09-159-F, letter dated January 12, 2010. 14. Precise Grading Plan, Sheet 4 of 22, prepared by Hofman Planning & Engineering, dated December 08 2015. Pertinent portions of the grading plan are reproduced herein as Compaction Tests Location Map. III. GEOTECHNICAL CONDITIONS AND FILL/BACKFILL OPERATIONS Geotechnical conditions at the project building pad areas substantially remained unchanged from those described in the referenced reports. Upper building pad was chiefly established by backfilling of the westerly transition retaining wall benched into wall backcut exposing dense sandstone formational units, and remedial grading of the remainder pad grade surfaces. Final Report Of Geotechnical Engineering Observations and Compaction Testing, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad Page4 Oct. 31, 2016 Prior to the backfilling and remedial grading operations, all vegetation, roots and other surface improvements were removed and cleared for the site as appropriate. Site excavations and wall backcut exposures developed undisturbed natural dense formational units (or existing well- compacted fills, where they were encountered). Exposed backcutwas subsequently benched to allow horizontal lift backfill placement and compaction. The bottoms of over-excavations were also ripped, reworked, moisture conditioned to near optimum moisture levels and recompacted within the upper 6 inches. Site fills and backfills were adequately processed, moisture conditioned to near or slightly above the optimum moisture levels, as appropriate, manufactured into a uniform mixture, placed in thin ( approximately 8 inches thick) horizontal lifts and mechanically compacted with heavy construction equipments consisting of a hand-held whacker, walk-behind sheepsfoot vibratory roller (Wacker Neuson RTSC2 remote control trench roller), and a loader (Komatsu WA500) to at least 90% of the corresponding laboratory maximum density per ASTM D-15 57. Water was added with a water hose. Remedial subgrade preparation and recompaction were extended a minimum of 3 horizontal feet outside the building envelop. Earth deposits exposed at finish pad grade surfaces predominantly consisted of sandy to silty sand (SM/SP) deposits with very low to low expansion potential ( expansion index less than 50) based on visual observations. Periodic engineering observation of the wall backfill and remedial subgrade operations and compaction testing within the limits of the project grading were provided by this office from August 23 to September 28, 2016. Approximate limits of wall backfill and remedial sub grade grading works and test locations, as established by a hand level and pacing/tape measure relative to identifiable features located at the site and noted on the grading plan, are shown on the enclosed Compacted Tests Location Map. Pertaining maximum dry density and optimum moisture content tests (ASTM D1557) were obtained from prior site geotechnical investigations reports (see references) and are summarized in the enclosed Maximum Dry Density & Optimum Moisture Content sheet. Site preparations and remedial subgrade grading were conducted in substantial conformance with Chapter 18 (Soils and Foundations) and Appendix "J" (Grading) of the 2013 California Building Code (CBC), the Grading Ordinance for the City of Carlsbad, the requirements of the project soil report( s) referenced herein and our field recommendations, where applicable and as appropriate. All observations and testing were conducted by a representative from this office under direct supervision of the project geotechnical engineering .. Field density tests establishing both the in-place dry densities and moisture contents were performed in accordance with the ASTM DI 556 sand cone test method. Test locations were placed to provide the best possible coverage. Areas of low compaction, as indicated by the field density tests, were brought to the attention of the project contractor. These areas were reworked by the contractor and retested. Engineering observations and compaction test results indicated that the site fills/wall Final Report Of Geotechnical Engineering Observations and Compaction Testing, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad PageS Oct. 31, 2016 backfill soils within the project building pad areas were properly placed and compacted to at least 90% ( or 93% where specified) of the corresponding maximum dry density at the tested locations and are suitable for their intended use. IV. CONCLUSIONS AND RECOMMENDATIONS In our opinion, site excavations, wall backfill operations, and building pad remedial grading works and recompaction procedures were completed in substantial conformance with the project approved plans, project pertinent geotechnical reports, and applicable codes, and are acceptable for their intended use. Substantially the same or better site conditions, earth materials and engineering properties of the compacted fills, compared to those outlined in the referenced reports, were indicated. All conclusions and recommendations including soil design parameters, geotechnical foundation/slab designs and improvement sections provided in the referenced reports will stay unchanged, as specified therein and should be considered in the final designs and implemented during the construction phase. V. ADDITIONAL GEOTECHNICAL OBSERVATIONS AND TESTING This office should be notified before any of the following operations begin in order to schedule appropriate testing and/or field observations for confirmation and approval of the completed work: 1. Utility Trenches: Engineering observations or testing will be required for the following work prior to foundation and slab concrete pours: a) Observe the plumbing and utility trenches after the pipes are laid and prior to backfilling. Backfill soils within trenches 12-inches or more in depth shall be compacted by mechanical means to a minimum of 90% of the corresponding maximum dry density, unless otherwise specified. Jetting or flooding of the backfill is not allowed. Care should be taken not to crush the utilities or pipes during the compaction of the trench backfill. b) Test the plumbing trenches beneath slabs for minimum compaction requirements prior to sand and moisture barrier placement. 2. Fine Grading and Improvements: a) Observe placement and perform compaction testing for fills placed under any conditions 12-inches or more in depth, to include: 0 Building pad contour grading. Final Report Of Geotechnical Engineering Observations and Compaction Testing, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad Page6 Oct. 31, 2016 • Driveways, street and yard improvements, sidewalks, curbs and gutters. • Utility trench backfills. 0 Additional retaining wall backfills. 0 Spreading or placement of soil obtained from any excavation ( spoils from footings, underground utilities, swimming pools, etc.). b) Observation and testing of base and subgrade beneath the perimeter yards, driveways, patios, sidewalks, etc., prior to placement of pavement or concrete. c) Moisture testing prior to concrete pour, if required and as specified. d) Any operation not included herein which requires our testing, observation, or conformation for submittal to the appropriate agencies. VI. DRAINAGE The owner/ developer is responsible for insuring adequate measures are taken to proper I y finish grade the building pad after the structures and other improvements are in-place so that the drainage waters from the graded pad and improved sites as well as adjacent properties are directed away from the new building foundations and top of slope. A minimum of2% gradient should be maintained away from all foundations and top of slopes. Roof gutters and downspouts should be installed and all discharge from downspouts should be led away from the foundations and slab to a suitable location. Install area drains in the yards for collection and disposal of surlace water. Planter areas adjacent to foundations should be provided with damp/water proofing, using an impermeable liner against the footings, and a sub-drainage system, if appropriate. Site and building type retaining walls should be provided a well-constructed back drain as specified in the project soil report(s). Planting large trees near the building foundations and behind site retaining walls should be avoided. It should be noted that shallow groundwater conditions may develop in areas where no such conditions existed prior to site development. This can be contributed to by substantial increases of surface water infiltration resulting from landscape irrigation and infiltration bio-retention facilities which was not present prior to the site redevelopment. Proposed storm water BMP infiltration facilities shall not be allowed to result in saturation of building foundation bearing and sub grade soils, wall backfills or cause soil piping or daylight water seepage conditions. Concrete slurry cutoff walls shall be provided along the edge of infiltration bio-retention facilities, where necessary and as Final Report Of Geotechnical Engineering Observations and Compaction Testing, Daybreak Community Church, 6515 Ambrosia Lane, Carlsbad Page? Oct. 31, 2016 appropriate, for protection of nearby building foundation, pavings, improvements, graded slopes, utilities and wall backfills per the recommendations of the referenced reports. It is almost impossible to absolutely prevent the possibility of shallow water conditions developed from excessive landscape irrigation over the entire site and storm water BMP infiltration facilities. Therefore, we recommend that shallow water conditions, if developed, be immediately remedied. The property owner should be made aware that altering drainage patterns, landscaping, altering or removals of protective cutoff walls, planters, and other improvements, as well as over-irrigation and variations in seasonal rainfall, all effect subsurface moisture conditions, which in tum effect structural and overall slope performance. VII. LIMITATIONS Our description of project parking improvements, including engineering observations and compaction testing services provided, has been limited to those work performed periodically from August 23 through September 28, 2016. The recommendations provided by this office during the course of project wall backfill and building pad development were based on our field observations and testing, as noted or brought to our attention. No representations are made as to the quality, extent or performance of materials, fills/backfills, pavings and construction works not observed and tested. All geotechnical information, test location and mapping on the enclosed Approximate Compaction Tests Location Map are based on approximate field measurements for the purpose of geotechnical presentations only. Surface run-off and captured water from the bioretentions/bioswales should be directed into the storm drain facilities in a continuously uninterrupted controlled manner. Periodic maintenance and repairs of the project bioretentions/bioswales and storm drain system should be carried out, as necessary, to assure proper functioning as intended. Poor bioretentions/bioswales and storm drain system performance or failure during a major rainfall event can potentially result in large consequential slope, improvements and structural failures and shall not be allowed. Storm and surface run off water should not be allowed to impact or saturate graded surfaces, natural and graded embankment faces, wall backfills, and bearing and sub grade soils. Concentrated run off, which could cause erosion or scouring, should not be allowed to develop over the graded areas. Over-watering of site vegetation should also not be allowed. Only the amount of water to sustain vegetation should be provided. If you have any questions or need clarification, please contact this office at your convenience. Reference to our Project No. FC-4-15 -13 will help to expedite our response to your inquiries. Maximum Dry Density & Optimum Moisture Content (ASTM D-1557) PROJECT NO: PROJECT NAME: LOCATION: TEST RESULTS: Soil Type 1: Soil Type 2: Soil Type 3: FC-04-15-13 Daybreak Community Church of Carlsbad Phase IV Worship Center Building 6515 Ambrosia Lane, Carlsbad, California Yellowish Tan Silty Fine Sand Maximum Dry Density: 122.6 pcf Optimum Moisture: 13 % Tan to Gray Medium to Coarse Sand Maximum Dry Density: 121.9 pcf Optimum Moisture: 12 % Well-Graded Class II Base Material (Import) Maximum Dry Density: 142.0 pcf Optimum Moisture: 7 % COMPACTION TEST RESULTS PROJECT NO: FC-04-15-13 PROJECT NAME: PROJECT LOCATION: Daybreak Community Church of Carlsbad, Phase IV Worship Center Building 6515 Ambrosia Lane, Carlsbad, California FIELD COMPACTION TEST RESULTS (ASTM D1556): Appr.oximate Fielii 11 Max Approximate Fielii Relative Date Test Test Test Moisture Dry Dr-y Compaction No. Location Elentioli (MSL) (%) Density Densicy (%) (ft) (ocf) (pcf) 6/16/16 1 Westerly, Pad Finish Grade 10 110.3 122.6 90 6/16/16 2 Central, Pad Finish Grade 10 110.6 122.6 90 6/16/16 3 Easterly, Pad Finish Grade 14 112.8 122.6 92 6/22/16 4 Central, Sunken Pad Area Finish Grade 11 110.9 122.6 90 6/22/16 5 Easterly, Pad Area Finish Grade 10 112.7 122.6 92 6/28/16 6 Outside The Work Area Finish Grade 5 134.3 142 95 6/30/16 7 Southerly, Street 306± 11 109.8 121.9 90 6/30/16 8 Southerly, Street 308± 13 115.2 121.9 95 6/30/16 9 Southerly, Street Finish Grade 5 135.9 142 96 7/8/16 10 Easterly, Pad Area Finish Grade 11 109.7 121.9 90 7/8/16 11 Southerly, Pad Area Finish Grade 11 110 121.9 90 8/12/16 12 Westerly, Raised Pad Area 308± 11 112.5 121.9 92 8/12/16 13 Westerly, Raised Pad Area Finish Grade 9 109.6 121.9 90 Comments Trench Backfill Not Shown On The Map Sewer Trench Backfill Sewer Trench Backfill Sewer Trench Backfill Sewer Trench Backfill Sewer Trench Backfill Appr.oximate Approximate Field, M:ax Relative Date Test test 'F,est Field Dry Dr.y ComP,action Comments No. Elevation, ~SL) Moistllle Densify Density Location fft) ,(%) (pcf) (pcf,) (%) 8/23/16 14 Northerly End 309± 15 112.2 122.6 92 Wall Backfill 8/23/16 15 Northerly End Finish Grade 12 112.1 122.6 91 Wall Backfill 8/24/16 16 Northerly End Finish Grade 12 113.5 122.6 93 Wall Backfill 8/24/16 17 Westerly, Upper Pad 312± 9 113.2 121.9 93 Wall Backfill 8/25/16 18 Westerly, Upper Pad 314± 12 114.7 121.9 94 Wall Backfill 8/25/16 19 Westerly, Upper Pad 314± 11 112.9 121.9 93 Wall Backfill 8/25/16 20 Westerly, Upper Pad 315.5± 10 113.5 121.9 93 Wall Backfill 8/26/16 21 Westerly, Upper Pad 317.5± 12 115.4 121.9 95 Wall Backfill 8/26/16 22 Westerly, Upper Pad 317.5± 12 112.9 121.9 93 Wall Backfill 8/29/16 23 Westerly, Upper Pad 319.5± 12 113.4 121.9 93 Wall Backfill 8/29/16 24 Westerly, Upper Pad Finish Grade 11 112.8 121.9 93 Wall Backfill 8/29/16 25 N. E., Lower Pad Area Finish Grade 11 109.6 121.9 90 Trench Backfill 9/28/16 26 Southerly, Lower Pad Area 307.5± 12 110.5 121.9 91 Sewer Trench Backfill