Loading...
HomeMy WebLinkAboutSDP 16-18; CARLSBAD RACEWAY LOT 12; FINAL SOILS REPORT; 2018-08-23 G E O T E C H N I C A L ■ M A T E R I A L S ■ S P E C I A L I N S P E C T I O N S S B E ■ S L B E ■ S C O O P 4373 Viewridge Avenue, Ste. B San Diego, CA 92123 858.292.7575 RAF Pacifica August 23, 2018 111 C Street, Suite 200 NOVA Project No. 1017727 Encinitas, CA 92024 Attention: Mr. Jim Jacob Subject: As-Graded Geotechnical Report Carlsbad Raceway Lot 12 Lionshead Avenue, Carlsbad, California Grading Permit No. GR201-0003 References: See Appendix A. Dear Mr. Jacob: This report presents the geotechnical observations and results of testing performed by NOVA Services, Inc. (NOVA) during earthwork operations for the subject project. This report addresses only the geotechnical considerations associated with the project’s construction. The geotechnical services described herein were performed by NOVA for RAF Pacifica during the period of July 10, 2017 to August 10, 2018. 1.1 SCOPE OF SERVICES 1.1.1 General The scope of services provided by NOVA during the construction period is abstracted below. 1. Soil Observation and Testing. NOVA performed observations as requested during earthwork operations for removals, grading, placement of structural fills and backfills and paving operations. NOVA performed in-place density and moisture content tests of fills and backfills placed. Laboratory testing was performed on materials utilized during the earthwork operations. 2. Technical Support. NOVA provided technical support in response to geotechnical related issues during construction. 3. Reporting. Preparation of this report completes NOVA’s scope of services. As-Graded Geotechnical Report Carlsbad Raceway Lot 12 August 23, 2018 NOVA Project No. 1017727 2 1.2 SITE AND PROJECT DESCRIPTION 1.2.1 Location The development encompasses Lot 12 of the Carlsbad Raceway Business Park. Lot 12 is located west of the intersection of Lionshead Avenue and Business Park Drive and directly west of the Vista Palomar Park shopping center on the south side of Lionhead Avenue in the City of Carlsbad, California. 1.2.2 Project Description The principal element of the project consisted of the development of a new tilt-up constructed commercial building. The building is an approximately 89,000 square feet, single-story structure. The project construction included associated improvements such as loading docks, site retaining walls, detention basins, parking area and driveway pavements, and utilities. 1.3 PREVIOUS EARTHWORK AT THE SITE The project site and all of the former Carlsbad Raceway Tracks were mass graded between August 19, 2004, and May 30, 2006. A record of that work is reported in “Final Report of Testing and Observation Services During Site Grading for Carlsbad Raceway Business Park, Lots 1 through 28, tract C.T. 98-10, Carlsbad, California, Project No. 07349-42-02, June 5, 2006 (hereafter ‘Geocon 2006’). Previous mass grading at the site resulted in fills with a maximum thickness of about 35 feet in the majority of the lot with the exception of the northeastern and southern most portion of Lot 12. Geocon 2006 documents that fills were placed and compacted to at least 90 percent relative compaction after ASTM D1557 (‘Laboratory Compaction Characteristics of Soil Using Modified Effort’). 1.4 EARTHWORK AND DENSITY TESTING 1.4.1 General Prior to the recent earthwork operations, debris, topsoil, and vegetation were removed and disposed of offsite from areas receiving new planned improvements. 1.4.2 Description of Operations The grading contractor, F.J. Willert Contracting, and several utility contractors including C.E. Wilson Corporation, Collins Pacific Plumbing, Precision Electric, and Southland Paving utilized a variety of medium to heavy size equipment to perform the earthwork. Equipment included: scrapers, graders, loaders, backhoes, dozers, excavators, sheepsfoot wheel compactors, rollers, and manually operated reciprocating hammers. NOVA provided observation of earthwork operations as requested by the General Contractor (TFW Construction). Quality Assurance (QA) in-place density testing was performed after ASTM D6938 (‘In-Place Density and Moisture by Nuclear Methods’) on materials placed as compacted fills and backfills. The approximate locations of field density tests are shown on the attached plates. The laboratory test results are presented in the attached Table I. The field in-place density test results are summarized in the attached Table II. Earthwork for the building consisted of cuts and fills to establish the building pad grade. Cuts for the building pad extended to about 11 feet below ground surface at the south end, decreasing to less than 1 foot at the center of the pad. Fills increased from the center of the pad to about 5 feet from grade at the northeast corner. Due to the clayey nature of the existing material, select fill was placed within the upper 3 feet of the design building pad grade extending to at least 3 feet outside of the building footprint. The building pad was over As-Graded Geotechnical Report Carlsbad Raceway Lot 12 August 23, 2018 NOVA Project No. 1017727 3 excavated as necessary to achieve the 3 feet of select fill subgrade. The soils in areas receiving new fills were scarified, moisture-conditioned and compacted to at least 90 percent relative compaction. New fills were placed in relatively thin lifts, moisture conditioned and compacted to at least 90 percent relative compaction after ASTM D1557 in accordance with the project specifications. A cut and fill transition existed in the building pad. At the surface, the northeastern portion of the building exposed Tertiary-aged Santiago Formation while the remaining areas exposed the previously placed compacted fills. As such, the northeastern cut portion of the pad was over-excavated about 3 feet. The removals extended a minimum of 3 feet laterally beyond building footprint. The bottoms of the removals were scarified, moisture conditioned, and densified to at least 90% relative compaction after ASTM D1557 (the ‘Modified Proctor’). The removed soils were replaced with relatively sandy compacted fill derived from the mined soils. Retaining Walls Six (6) retaining walls were included as part of the project improvements. Five (5) retaining walls (Walls A, B, C, D, and E) consisted of masonry (CMU) construction and ranged in height from about 3 feet to 9 feet. One (1) Keystone® mechanically stabilized earth (MSE) wall (identified as Wall #4) ranged in height from about 2 feet to 4 feet. Retaining wall backfill operations consisted of soils that were moisture conditioned to near optimum moisture content, and placed in relatively thin, uniform lifts. Backfill was densified to at least 90% relative compaction after ASTM D1557. The field density test results are summarized in Table II. Construction of ‘Wall E’ included the placement of a permanent sump pump located behind the wall in order to drain any seepage water collected along the eastern ascending slope. NOVA did verify the presence of wall subdrains located near the base of the constructed retaining walls. NOVA was not asked to observe the installation of the subdrain system, the subdrain connections or outlet locations. Utility Trenches NOVA observed the backfilling operations as requested for several utility line trenches where indicated. Backfill soils were moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction after ASTM D1557. Pavement Prior to the placement of paving materials, subgrade preparations consisted of scarifying the surficial soils, moisture conditioning, and compacting the subgrade to at least 95 percent relative compaction. Paving materials consisted of aggregate base and asphalt concrete compacted to at least 95 percent of the material’s maximum density in accordance with ASTM D6938 and ASTM D2950 (Density of Bituminous Concrete In- Place by Nuclear Methods), respectively. Density Testing In-place density and moisture content testing of compacted fills and backfills were performed by NOVA’s field representatives in accordance with ASTM D6938. The results of field density testing are summarized in Table II of Appendix A. The approximate locations of field density tests are shown on the attached figures. Laboratory Testing The field density testing was supported by laboratory testing of representative samples of soils utilized for fills and backfills in accordance with ASTM D1557. The test results are presented in Table I of Appendix A. The As-Graded Geotechnical Report Carlsbad Raceway Lot 12 August 23, 2018 NOVA Project No. 1017727 4 indications of this testing are the basis for NOVA’s judgments regarding the relative compaction of the fills placed. 1.5 OBSERVED SOIL AND GEOLOGIC CONDITIONS The soil and geologic conditions observed during the grading operations were generally consistent with those described in NOVA’s Revised Report of Preliminary Geotechnical Investigation (NOVA 2017a) and Report of Supplemental Geotechnical Investigation (NOVA 2017b). Materials exposed during grading operations were found to be documented fill (Qaf) and Santiago Formation (Tsa). 1.6 CONCLUSIONS Based on the observations and testing reported herein, it is NOVA’s opinion that the soil engineering and engineering geologic aspects of the grading are in compliance with the project grading plans and with the requirements of the City of Carlsbad, and the current edition of the California Building Code. 1.7 LIMITATIONS This report presents information and data relative to the earthwork at the subject site. Representatives of NOVA conducted periodic testing and made observations during the progress of the construction as requested by the general contractor to evaluate conformance with the project requirements. NOVA was not asked to observe or test wall backfills for Wall ‘D’; therefore, NOVA cannot comment on the performance of wall backfills for Wall ‘D’. References to elevations and locations herein were based on surveyor or grade checker stakes in the field and from the project grading plans prepared by Excel Engineering (Excel 2017). NOVA did not provide construction surveying services. NOVA has no opinion regarding the accuracy of the elevations or surface geometry with respect to the approved plans. The presence of NOVA personnel during the work progress did not involve any direct supervision of the Contractor or his work forces. Professional and technical advice and recommendations were provided to the owner and/or his designated representative based upon NOVA’s observations. Results presented herein are only representative of the samples and areas tested. Variations in material properties are inherent in any earthwork operation. 1.8 CLOSURE NOVA appreciates the opportunity to be of continued service to RAF Pacifica. Should you have any questions or comments, please do not hesitate to contact the undersigned at (858) 292-7575. Respectfully Submitted, NOVA Services, Inc. _____________________________ _____________________________ Wail Mokhtar Jesse D. Bearfield, P.E. 84335 Project Engineer Senior Engineer /✓ As-Graded Geotechnical Report Carlsbad Raceway Lot 12 August 23, 2018 NOVA Project No. 1017727 5 APPENDIX A REFERENCES 1. Excel 2017. Precise Grading Plan, Carlsbad Distribute Lot 12 Raceway, Lionshead Avenue, Carlsbad, California, Excel Engineering, Drawing No. 501-2A, Project No. SDP16-18, March 20, 2017. 2. Geocon 2006. Final Report of Testing and Observation Services During Site Grading, Carlsbad Raceway Business Park, Lots 1 through 28, Tract C.T. 98-10, Carlsbad, California, Geocon, Inc., Project No. 07349-42-02, June 5, 2006. 3. NOVA 2017a. Revised Preliminary Geotechnical Investigation, Proposed Tilt-Up Commercial Structure, Carlsbad Raceway Lot 12, Lionshead Avenue, Carlsbad, California, NOVA Services, Inc., Project No. 2016433, Revised March 14, 2017. 4. NOVA 2017b. Supplemental Geotechnical Investigation, Proposed Tilt-Up Commercial Structure, Carlsbad Raceway Lot 12, Lionshead Avenue, Carlsbad, California, NOVA Services, Inc., Project No. 2016433, April 25, 2017. 23542134391683891418174243449.0'448.5'27827956269270638094928748494669728573848378778988959658152151186225226113111105115116235139134233132237103149148147146142175174202287281285241238242239243240245246255315317314316313318325334319137334144451.0'Qaf1Qaf2Tsa28010911010893268817966684750656770717476758290211212196190189195981849718515751154156153150227112100991061141011021382302362311332321401411431441821831761781811801732012862822442472482492543223303313243333123773793783833813803823844024014003993983973963953943932062151042832848632315916116216016319319491294203204205206390387386389385388391392453326059616423417717929529629710729825325222-32Qaf1Qaf2TsaTsaQaf1TsaQaf1TsaQuafSUDRAIN(GEOCON 2006)SUDRAIN(GEOCON 2006)4373 VIEWRIDGE AVENUE, SUITE BSAN DIEGO, CALIFORNIA858-292-7575858-292-7570 (FAX)WWW.USA-NOVA.COMPLATE 10050'100'NOVANWENS-';615;/$1.53CH6UCFILL (OBSERVED BY NOVA)SANTIAGO FORMATIONAPPROXIMATE LOCATION OF IN-PLACE DENSITY TESTS402APPROXIMATE LIMITS OF REMOVALS FOR BUILDING PAD451.0'APPROXIMATE ELEVATION AT EXCAVATION BOTTOM4#%'9#;.16 LIONSHEAD AVE CARLSBAD, CALIFORNIAPROJECT NO:DATE:DRAWN BY:REVIEWED BY:1017727AUG 2018DTWWMAS-GRADEDGEOTECHNICALMAPSEE PLATE 23CHFILL (OBSERVED BY GEOCON)3WCHARTIFICIAL FILL (UNDOCUMENTED)GEOLOGIC CONTACT. --• • • • ~a,o~ ~a~ff, 1-___ • • • o.ar • ZIONSHEAJJ--1rs. _ (!'$!/ l)!/4.,,Dt.f ,fflli.-l) _______ . • st/RFAC£ Mlf'HOlfllENlS {SEE SHEET I FCW S'PE{1fl{)AfllWS} ,t." AC O~ 7" C'-ASS 2 BASE {7NllCK RO(JlF) .f." AC o..m ,f" Cl.AS:S 2 BASE (PA1i'KIN6') ~PCCOJONA, 6"CURB • .J' ctWC1/Eff SWALE (a, AS SHOIW) PCCSINH'ALK /?£TAMI/NC H/41.LS {AIASt:WRY M'£) (SlE 51/EIT II) /?£TAMI/NC H/41.LS (/,/5, M'£) (SlE S/IEITS 12-11) !NASH £Na.OSI.JR£ W/ 7.5" PCC OITT? NAO/£ SO'l BROIY 0/Taf (llPE PER PLAN) BICfif. lNA 1lCH BASIN • OEMOlJncw ccwsmucncw NOTES • (SEE SHEET I FOR .5PECi'fle4 llONs) SU/FACE lll'flf')IEJIENTS /£lla11KJN ~ ~Ha/T I.JNE ~ CONCRE1E CURB • ~ CONCRE1E S/OEIYAlK • --• • • • BUlllJ/NC AIIEA ~ 811,938 S1J FT ff ElEV = VAR1EY lKJE TO ?!M st.ao!M,' r;R, PAO ElEY = !O" 8£!.0W f'F ElEY __ _ (SEE flEOlEC1/NICAl ANO SlRl/CllJRAl EN61Nt. • /JE.51/lN Cli'llFHIA RY? SEClllW N"5'ICN) • • • • • f'REPME1J 1/NOER VY Sllf'Bi'l1Sl'GI\I BY flATE-______ , R09£RT 0. OENllNO R.C.£ Na: -15629 £)(f'IRAllON: !2-J!-18 171?11: EXCil ENC/NffRINC AOORESS: #0 SlJI TE PlACE CITY, ST.: l3'CCW0/04 CAL/FOi/NiA lll£PHCW£-(760} 745-8118 fsHml CITY OF CARLSBAD I SHEETS I L.J!_j ENGINEERING DEPARTMENT 15 GRADING PLANS FOR: CARLSBAD RACEWAY LOT 12 (UONSHEAD A 1/ENUE) NORTH PRECISE GRADING PLAN APPROVED: JASON S. GELDERT EXPIRES 09 30 18 DATE PROJECT NO. DRAWING NO. SOP 16-18 501-2A 3266736451.0'22422811912312021721613115815514518312713613712912819213199354016710166451.0'2001651981722221641171972191912231925727453121276124542291181252722711222072182101262201301872142922152911352902892883563573473523583483593533493601703543613501713551683623632753641693673722773683693713735237537437633631032730030933727355308302307328209338208340299341305343344303351346311221251365366370329306342304111213188321335301320263257262256264258261259265260267293250339345266Qaf1Qaf2TsaQaf1TsaQaf1TsaSUDRAIN(GEOCON 2006)SUDRAIN(GEOCON 2006)SUDRAIN(GEOCON 2006)4373 VIEWRIDGE AVENUE, SUITE BSAN DIEGO, CALIFORNIA858-292-7575858-292-7570 (FAX)WWW.USA-NOVA.COM4#%'9#;.16 LIONSHEAD AVE CARLSBAD, CALIFORNIAPLATE 20050'100'NOVA-';615;/$1.5PROJECT NO:DATE:DRAWN BY:REVIEWED BY:1017727AUG 2018DTWWMAS-GRADEDGEOTECHNICALMAPNWENSSEE PLATE 13CH6UCFILL (OBSERVED BY NOVA)SANTIAGO FORMATIONAPPROXIMATE LOCATION OF IN-PLACE DENSITY TESTS402APPROXIMATE LIMITS OF REMOVALS FOR BUILDING PAD451.0'APPROXIMATE ELEVATION AT EXCAVATION BOTTOM3CHFILL (OBSERVED BY GEOCON)3WCHARTIFICIAL FILL (UNDOCUMENTED)GEOLOGIC CONTACT• r' j ,,_,:-.,1'~"-A~r; ' ' ' ' ' ' --' '~ .. ,, 7 -,-----Wl.lJIN(l AHEA = 88.9.JB Sf) FT ~ ElEV = mWES OIi£ TO IJ.5% Sl. '40 ElEV = JO" BB.OW FF ELEV tlo/NC (}RADE (SEE CEOlRHNICAJ. ANI) SllrUCll/RAl EN6'INllH O£SK;N CRllENIA Ft¥f SECT!tiW OE.X1/j I ' ' ' ' ... • I ., " •. I PREPARED l/NO£ll NY S//PER/,fS/ON, BY 1R.?i:'08£R001TT'lo.1. 'n!JENroillNO=-;R.;-;C.;-;£c-Na=.:--f56._!Z_'9__,~1ZAccl10N.=:-l-'2--J'l---,8-RI/N: £)(C£l EN61NEER/NC AOORESS.· #0 STA 1E PlACE CITY, ST.: ESCONOJ!)O, CAl/FC¥/NIA lll.EPHavE.· (760) 715-8118 fsHml CITY L___1__J OF CARLSBAD ENGINEERING DEPARTMENT GRADING PLANS FOR: CARLSBAD RACEWA y LOT 12 (UONSHEAD AVENUE) SOUTH PRECISE GRADING PLAN APPROVED: JASON S. GELDERT CITY ENGINEER RCE 63912 EXPIRES 09 30 1B DWN BY: DATE CHKD BY: --PROJECT NO. RVWD BY:== SDP 16-18 DRAWING NO. 501-2A Raceway Lot 12 Carlsbad, California August 2018 Project No. 1017727 Optimum Maximum Moisture Dry Density Material ID Material Description (%)(pcf) A Dark Olive Sandy Silt 11.5 115.2 B Tan Clayey Silt 13.2 115.4 C Tan Silty Sand 11.4 120.9 D Tan Sandy Silt 12.4 117.5 E Tan Silty Clay 12.0 116.6 F Tan Sandy Silt 12.3 117.7 G Tan Sandy Silt 13.1 114.7 H Gray Silty Sand 7.3 135.6 I Tan Sandy Silt 12.6 117.5 J Class II Recycled Base 12.0 118.5 K Class II Recycled Base 11.7 119.7 Max Wet Material ID Material Description Density AC-1 1/2" Type III C2 (California Commercial Asphalt, Caroll Canyon)147.0 AC-2 1/2" Type III C2 (California Commercial Asphalt, Caroll Canyon)148.0 AC-3 1/2" Type III C2 (California Commercial Asphalt, Caroll Canyon)146.0 AC-4 ARHM-GG-CC (Vulcan Materials, Caroll Canyon)142.0 Test Type MG Mass Grading SD Storm Drain Line E Electrical Line S Sewer Line F Fire Line SG Subgrade CG Curb & Gutter SW Sidewalk B Aggregate Base AC Asphalt Concrete FG Finish Grade TABLE I DESCRIPTION OF TERMS Laboratory Maximum Density (ASTM D1557) Laboratory Maximum Density (ASTM D1560) NOVA Services, Inc. Raceway Lot 12 Carlsbad, California August 2018 Project No.: 1017727 Test Test Soil Rel.Pass/ Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail7/25/17 1 MG Building Pad 455.0 A 115.2 11.5 107.3 18.5 93%Pass2MGBuilding Pad 455.0 A 115.2 11.5 106.1 20.5 92%Pass 7/26/17 3 MG Building Pad 458.5 A 115.2 11.5 109.7 17.4 95%Pass4MGBuilding Pad 458.5 A 115.2 11.5 108.9 19.2 95%Pass5MGBuilding Pad 458.5 A 115.2 11.5 109.6 18.4 95%Pass 7/27/17 6 MG Building Pad 458.5 B 115.4 13.2 107.8 15.7 93%Pass7MGBuilding Pad 458.5 B 115.4 13.2 107.0 16.0 93%Pass 7/29/17 8 MG Loading Dock 451.0 C 120.9 11.4 108.5 13.6 90%Pass9MGLoading Dock 451.0 C 120.9 11.4 109.7 14.2 91%Pass10MGLoading Dock 451.0 C 120.9 11.4 110.1 13.8 91%Pass11MGLoading Dock 451.0 C 120.9 11.4 109.9 13.7 91%Pass12MGLoading Dock 453.0 C 120.9 11.4 109.5 13.9 91%Pass13MGLoading Dock 453.0 C 120.9 11.4 108.8 13.6 90%Pass14MGLoading Dock 453.0 C 120.9 11.4 110.3 14.3 91%Pass15MGLoading Dock 453.0 C 120.9 11.4 109.8 14.1 91%Pass16MGLoading Dock 455.0 C 120.9 11.4 110.8 13.9 92%Pass17MGLoading Dock 455.0 C 120.9 11.4 110.4 14.0 91%Pass 7/29/17 18 MG Loading Dock 455.0 C 120.9 11.4 109.4 13.8 90%Pass19MGLoading Dock 455.0 C 120.9 11.4 110.4 14.9 91%Pass 7/31/17 20 MG Loading Dock 457.0 C 120.9 11.4 108.8 15.5 90%Pass21MGLoading Dock 457.0 C 120.9 11.4 109.1 15.2 90%Pass 8/1/2017 22 MG Loading Dock 449.0 B 115.4 13.2 103.5 21.7 90%Pass23MGLoading Dock 450.0 B 115.4 13.2 107.1 18.7 93%Pass24MGLoading Dock 450.0 B 115.4 13.2 107.0 19.1 93%Pass25MGLoading Dock 452.0 B 115.4 13.2 106.6 16.6 92%Pass26MGLoading Dock 452.0 B 115.4 13.2 108.2 16.4 94%Pass27MGLoading Dock 454.0 B 115.4 13.2 109.6 16.7 95%Pass28MGLoading Dock 454.0 B 115.4 13.2 108.4 16.0 94%Pass 8/2/17 29 MG Loading Dock 456.0 D 117.5 12.4 110.1 18.7 94%Pass30MGLoading Dock 456.0 D 117.5 12.4 109.9 19.3 94%Pass31MGLoading Dock 458.0 D 117.5 12.4 111.5 19.5 95%Pass32MGLoading Dock 458.0 D 117.5 12.4 113.5 18.5 97%Pass 8/3/17 33 MG Building Pad 460.0 D 117.5 12.4 110.0 15.4 94%Pass34MGBuilding Pad 460.0 D 117.5 12.4 110.2 14.6 94%Pass35MGBuilding Pad 460.0 D 117.5 12.4 107.1 17.9 91%Pass36MGBuilding Pad 460.0 D 117.5 12.4 109.6 16.4 93%Pass37MGBuilding Pad 460.0 D 117.5 12.4 109.4 18.1 93%Pass38MGBuilding Pad 460.0 D 117.5 12.4 108.4 15.3 92%Pass 8/3/17 39 MG Building Pad 460.0 D 117.5 12.4 108.1 16.7 92%Pass40MGBuilding Pad 460.0 D 117.5 12.4 106.6 14.4 91%Pass41MGBuilding Pad 458.0 D 117.5 12.4 106.9 19.1 91%Pass42MGBuilding Pad 458.0 D 117.5 12.4 108.7 19.2 93%Pass 8/4/17 43 MG Building Pad 460.0 D 117.5 12.4 107.2 15.3 91%Pass44MGBuilding Pad 460.0 D 117.5 12.4 108.6 14.6 92%Pass 8/8/17 45 MG Building Footing 453.0 E 116.6 12.0 100.1 14.9 86%Fail46MGRetest #45 453.0 E 116.6 12.0 102.2 19.7 88%Fail47MGRetest #46 453.0 E 116.6 12.0 104.9 17.5 90%Pass48MGBuilding Footing 455.0 B 115.4 13.2 106.1 17.7 92%Pass49MGBuilding Footing 457.0 B 115.4 13.2 104.3 16.6 90%Pass50MGBuilding Footing 459.0 B 115.4 13.2 106.4 17.4 92%PassPass8/10/17 51 MG Parking Area 455.0 D 117.5 12.4 106.5 11.3 91%Pass52MGParking Area 455.0 D 117.5 12.4 105.3 12.5 90%Pass 8/11/17 53 MG Parking Area 455.0 D 117.5 12.4 111.8 11.2 95%Pass54MGParking Area 455.0 D 117.5 12.4 111.5 10.2 95%Pass55MGParking Area 455.0 D 117.5 12.4 109.2 14.6 93%Pass56MGParking Area 455.0 D 117.5 12.4 110.7 13.7 94%Pass57MGParking Area 455.0 D 117.5 12.4 110.4 12.0 94%Pass58MGParking Area 455.0 D 117.5 12.4 111.2 11.1 95%Pass 8/22/17 59 S Sewer Line Trench 453.0 D 117.5 12.4 105.4 17.1 90%Pass60SSewer Line Trench 452.0 D 117.5 12.4 106.2 16.8 90%Pass61SSewer Line Trench 454.0 D 117.5 12.4 106.6 17.2 91%Pass62SSewer Line Trench 454.9 D 117.5 12.4 107.1 16.2 91%Pass Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II NOVA Services, Inc.Page 2 of 8 Raceway Lot 12 Carlsbad, California August 2018 Project No.: 1017727 Test Test Soil Rel.Pass/ Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 8/23/17 63 S Sewer Line Trench 452.6 D 117.5 12.4 105.6 17.1 90%Pass64SSewer Line Trench 453.0 D 117.5 12.4 106.7 17.1 91%Pass65SSewer Line Trench 457.0 D 117.5 12.4 110.2 15.4 94%Pass66SSewer Line Trench 457.0 D 117.5 12.4 106.2 16.9 90%Pass67SSewer Line Trench 459 D 117.5 12.4 106.3 16.7 90%Pass68SSewer Line Trench 459.0 D 117.5 12.4 106.1 16.2 90%Pass 8/24/17 69 S Sewer Line Trench 456.0 D 117.5 12.4 107.8 14.9 92%Pass70SSewer Line Trench 456.0 D 117.5 12.4 109.5 16.1 93%Pass 8/25/17 71 S Building Pad Sewer Line Trench 458.0 D 117.5 12.4 108.5 16.7 92%Pass72SBuilding Pad Sewer Line Trench 458.0 D 117.5 12.4 108.1 16.9 92%Pass73SBuilding Pad Sewer Line Trench 457.0 D 117.5 12.4 107.8 15.8 92%Pass74SBuilding Pad Sewer Line Trench 457.0 D 117.5 12.4 107.9 15.7 92%Pass 8/28/17 75 S Sewer Line Trench 458.0 D 117.5 12.4 107.2 13.6 91%Pass76SSewer Line Trench 458.0 D 117.5 12.4 106.9 16.1 91%Pass77SSewer Line Trench 458.0 D 117.5 12.4 105.4 16.3 90%Pass78SSewer Line Trench 458.0 D 117.5 12.4 112.8 14.3 96%Pass79SSewer Line Trench 457.0 D 117.5 12.4 109.0 14.8 93%Pass80SSewer Line Trench (Manhole)457.0 D 117.5 12.4 105.6 17.1 90%Pass81SSewer Line Trench (Manhole)458.0 D 117.5 12.4 107.2 15.4 91%Pass 8/29/17 82 S Sewer Line Trench 460.0 D 117.5 12.4 106.8 14.2 91%Pass83SSewer Line Trench 460.0 D 117.5 12.4 110.8 13.7 94%Pass84SSewer Line Trench 460.0 D 117.5 12.4 112.9 12.9 96%Pass85SSewer Line Trench 460.0 D 117.5 12.4 110.7 13.2 94%Pass86SSewer Line Trench 460.0 D 117.5 12.4 108.6 13.1 92%Pass87SSewer Line Trench 460.0 D 117.5 12.4 108.4 13.4 92%Pass88SDStorm Drain Line Trench 155.1 D 117.5 12.4 105.7 16.1 90%Pass89SDStorm Drain Line Trench 457.0 D 117.5 12.4 105.9 16.9 90%Pass90SDStorm Drain Line Trench 458.0 D 117.5 12.4 106.3 15.8 90%Pass91EElectrical Line Trench 457.0 D 117.5 12.4 106.2 16.5 90%Pass92EElectrical Line Trench 457.0 D 117.5 12.4 106.5 16.8 91%Pass 8/30/17 93 E Electrical Line Trench 459.0 D 117.5 12.4 106.1 17.1 90%Pass94EElectrical Line Trench 458.0 D 117.5 12.4 106.4 16.9 91%Pass 8/31/2017 95 SD Storm Drain Line Trench 453.8 D 117.5 12.4 106.5 16.1 91%Pass96SDStorm Drain Line Trench 454.8 D 117.5 12.4 106.2 16.5 90%Pass97SDStorm Drain Line Trench 453.0 D 117.5 12.4 107.1 16.4 91%Pass98SDStorm Drain Line Trench 455.0 D 117.5 12.4 112.0 14.9 95%Pass 9/1/17 99 SD Storm Drain Line Trench 456.0 D 117.5 12.4 111.2 15.1 95%Pass100SDStorm Drain Line Trench 458.0 D 117.5 12.4 107.6 16.3 92%Pass 9/5/17 101 SD Storm Drain Catch Basin 446.0 D 117.5 12.4 108.4 14.6 92%Pass102SDStorm Drain Catch Basin 446.0 D 117.5 12.4 106.1 14.3 90%Pass103SDStorm Drain Catch Basin 450.0 D 117.5 12.4 106.3 15.2 90%Pass104SDStorm Drain Catch Basin 450.0 D 117.5 12.4 106.9 16.1 91%Pass 9/7/17 105 SD Storm Drain Line Trench 456.0 D 117.5 12.4 108.5 13.6 92%Pass106SDStorm Drain Line Trench 457.0 D 117.5 12.4 109.6 13.9 93%Pass107E Electrical Line Trench 456 D 117.5 12.4 106.2 16.1 90%Pass108E Electrical Line Trench 458 D 117.5 12.4 103.6 17.1 88%Fail109ERetest #108 458.0 D 117.5 12.4 105.6 16.4 90%Pass110E Electrical Line Trench 455.0 D 117.5 12.4 106.9 15.9 91%Pass111SDStorm Drain Line Trench 453.0 D 117.5 12.4 105.9 14.9 90%Pass112SDStorm Drain Line Trench 455.0 D 117.5 12.4 106.2 14.4 90%Pass113SDStorm Drain Line Trench 457.0 D 117.5 12.4 106.6 14.7 91%Pass 9/14/17 114 SD Storm Drain Line Trench 457.0 D 117.5 12.4 110.6 13.9 94%Pass115SDStorm Drain Line Trench 458.0 D 117.5 12.4 106.3 16.1 90%Pass116SDStorm Drain Line Trench 458.0 D 117.5 12.4 107.1 15.3 91%Pass 9/21/17 117 RW Retaining Wall "B"463.0 F 117.7 12.3 106.8 16.9 91%Pass118RWRetaining Wall "B"463.0 F 117.7 12.3 107.5 15.0 91%Pass119RWRetaining Wall "B"463.0 F 117.7 12.3 107.1 15.8 91%Pass120RWRetaining Wall "B"463.0 F 117.7 12.3 106.9 16.1 91%Pass 9/22/17 121 RW Retaining Wall "B"464.0 F 117.7 12.3 106.4 15.9 90%Pass122RWRetaining Wall "B"464.0 F 117.7 12.3 107.6 16.1 91%Pass123RWRetaining Wall "B"464.0 F 117.7 12.3 106.7 15.7 91%Pass124RWRetaining Wall "B"465.0 F 117.7 12.3 106.4 15.4 90%Pass125RWRetaining Wall "B"465.0 F 117.7 12.3 106.7 15.8 91%Pass126RWRetaining Wall "B"465.0 F 117.7 12.3 106.3 17.0 90%Pass NOVA Services, Inc.Page 3 of 8 Raceway Lot 12 Carlsbad, California August 2018 Project No.: 1017727 Test Test Soil Rel.Pass/ Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 9/23/17 127 RW Retaining Wall "A"464.0 F 117.7 12.3 107.3 15.7 91%Pass128RWRetaining Wall "A"465.0 F 117.7 12.3 106.9 15.4 91%PassPass9/25/17 129 RW Retaining Wall "A"466.0 F 117.7 12.3 106.3 16.2 90%Pass130RWRetaining Wall "A"466.0 F 117.7 12.3 106.7 15.8 91%Pass131RWRetaining Wall "A"466.0 F 117.7 12.3 107.5 14.1 91%Pass132RWKeystone Wall 451.0 H 135.6 7.3 122.1 8.2 90%Pass133RWKeystone Wall 450.0 H 135.6 7.3 122.4 8.6 90%Pass134RWKeystone Wall 449.0 H 135.6 7.3 122.3 8.1 90%Pass135RWRetaining Wall "A"468.0 F 117.7 12.3 106.1 15.3 90%Pass136RWRetaining Wall "A"467.0 F 117.7 12.3 106.4 15.8 90%Pass137RWRetaining Wall "A"468.0 F 117.7 12.3 106.9 14.9 91%Pass 9/27/17 138 RW Keystone Wall 448.0 H 135.6 7.3 122.9 7.6 91%Pass139RWKeystone Wall 448.0 H 135.6 7.3 122.7 8.5 90%Pass 10/19/17 140 F Fire Line Trench 458.0 D 117.5 12.4 106.8 14.6 91%Pass141FFire Line Trench 4458.0 D 117.5 12.4 106.4 15.2 91%Pass142FFire Line Trench 459.0 D 117.5 12.4 105.9 13.9 90%Pass143FFire Line Trench 459.0 D 117.5 12.4 106.2 14.7 90%Pass144FFire Line Trench 460.0 D 117.5 12.4 106.1 15.1 90%Pass145FFire Line Trench 460.0 D 117.5 12.4 106.5 15.4 91%Pass146FFire Line Trench 455.0 D 117.5 12.4 107.2 14.2 91%Pass147FFire Line Trench 455.0 D 117.5 12.4 106.8 14.7 91%Pass148FFire Line Trench 453.0 D 117.5 12.4 106.5 14.4 91%Pass149FFire Line Trench 454.0 D 117.5 12.4 107.3 14.9 91%Pass 10/27/17 150 RW Retaining Wall "E"464.0 F 117.7 12.3 106.4 15.6 90%Pass151RWRetaining Wall "E"464.0 F 117.7 12.3 106.2 14.4 90%Pass152RWRetaining Wall "E"465.0 F 117.7 12.3 106.8 14.9 91%Pass 10/30/17 153 RW Retaining Wall "E"465.0 F 117.7 12.3 106.7 17.1 91%Pass154RWRetaining Wall "E"465.0 F 117.7 12.3 106.3 16.8 90%Pass155RWRetaining Wall "E"465.0 F 117.7 12.3 107.8 16.9 92%Pass156RWRetaining Wall "E"466.0 F 117.7 12.3 106.0 16.4 90%Pass157RWRetaining Wall "E"466.0 F 117.7 12.3 107.0 14.9 91%Pass158RWRetaining Wall "E"466.0 F 117.7 12.3 106.4 15.7 90%Pass 11/1/17 159 RW Retaining Wall "C"452.0 F 117.7 12.3 106.2 14.7 90%Pass160RWRetaining Wall "C"449.0 F 117.7 12.3 106.5 14.9 90%Pass161RWRetaining Wall "C"455.0 F 117.7 12.3 107.1 15.4 91%Pass162RWRetaining Wall "C"453.0 F 117.7 12.3 106.8 15.1 91%Pass163RWRetaining Wall "C"451.0 F 117.7 12.3 107.4 14.7 91%Pass 11/2/2017 164 RW Retaining Wall "E"463.0 H 135.6 7.3 124.0 6.7 91%Pass165RWRetaining Wall "E"463.0 H 135.6 7.3 122.5 6.2 90%Pass166RWRetaining Wall "E"463.0 H 135.6 7.3 121.9 6.1 90%Pass167RWRetaining Wall "E"464.0 F 117.7 12.3 106.4 14.0 90%Pass168RWRetaining Wall "E"464.0 F 117.7 12.3 107.1 14.4 91%Pass169RWRetaining Wall "E"464.0 F 117.7 12.3 106.5 14.7 90%Pass170RWRetaining Wall "E"465.0 F 117.7 12.3 106.1 14.5 90%Pass171RWRetaining Wall "E"466.0 F 117.7 12.3 108.7 15.1 92%Pass172RWRetaining Wall "E"466.0 F 117.7 12.3 106.8 15.5 91%Pass 11/22/2017 173 SG Loading Dock 452.0 G 114.7 13.1 106.2 14.7 93%Pass174SGLoading Dock 450.0 G 114.7 13.1 106.4 17.0 93%Pass175SGLoading Dock 449.0 G 114.7 13.1 107.3 15.7 94%Pass176SGLoading Dock 450.0 G 114.7 13.1 103.1 13.0 90%Pass177SGLoading Dock 452.0 G 114.7 13.1 105.2 10.9 92%Pass178SGBetween Loading Docks 449.0 G 114.7 13.1 107.9 11.0 94%Pass179SGBetween Loading Docks 449.0 G 114.7 13.1 105.4 13.2 92%Pass180SGBetween Loading Docks 449.0 G 114.7 13.1 107.2 13.1 93%Pass181SGBetween Loading Docks 449.0 G 114.7 13.1 110.8 12.7 97%Pass 11/27/17 182 SG Loading Dock 448.0 F 117.7 12.3 106.3 13.4 90%Pass183SGLoading Dock 447.0 F 117.7 12.3 108.9 14.5 93%Pass 11/29/17 184 SG North East Driveway SG F 117.7 12.3 115.8 13.4 98%Pass185SGNorth East Driveway SG F 117.7 12.3 113.3 13.1 96%Pass186SGNorth East Driveway SG F 117.7 12.3 113.7 14.1 97%Pass187SGLoading Dock SG F 117.7 12.3 110.2 13.8 94%Pass188SGLoading Dock SG F 117.7 12.3 109.8 14.3 93%Pass 12/7/17 189 SG North East Driveway SG F 117.7 12.3 112.9 13.6 96%Pass190SGNorth East Driveway SG F 117.7 12.3 112.5 13.9 96%Pass NOVA Services, Inc.Page 4 of 8 Raceway Lot 12 Carlsbad, California August 2018 Project No.: 1017727 Test Test Soil Rel.Pass/ Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 191 SG East Driveway SG F 117.7 12.3 113.3 13.3 96%Pass192SGEast Driveway SG F 117.7 12.3 113.2 13.8 96%Pass193BNorth East Driveway FG J 118.5 12.0 114.2 12.4 96%Pass194BNorth East Driveway FG J 118.5 12.0 116.1 13.0 98%Pass 12/11/17 195 B North East Driveway FG J 118.5 12.0 116.4 12.3 98%Pass196BNorth East Driveway FG J 118.5 12.0 116.3 12.1 98%Pass197CGCurb and Gutter SG H 135.6 7.3 129.7 6.8 96%Pass198CGCurb and Gutter SG H 135.6 7.3 130.1 7.1 96%Pass199CGCurb and Gutter SG F 117.7 12.3 109.4 13.6 93%Pass200CGCurb and Gutter SG F 117.7 12.3 112.7 16.0 96%Pass201CGCurb and Gutter SG F 117.7 12.3 107.2 13.8 91%Pass202CGCurb and Gutter SG F 117.7 12.3 109.2 14.1 93%Pass 12/12/17 203 RW Keystone Wall 450.0 H 135.6 7.3 123.1 6.8 91%Pass204RWKeystone Wall 450.0 H 135.6 7.3 123.8 8.0 91%Pass205RWKeystone Wall 451.0 H 135.6 7.3 124.0 7.8 91%Pass206RWKeystone Wall 451.0 H 135.6 7.3 123.4 7.9 91%Pass 12/13/17 207 SD Storm Drain Line Trench 458.0 F 117.5 12.4 108.0 15.7 92%Pass208SDStorm Drain Line Trench 458.0 F 117.5 12.4 106.4 17.1 91%Pass209SDStorm Drain Line Trench 459.0 F 117.5 12.4 106.9 16.4 91%Pass210SDStorm Drain Line Trench 458.0 F 117.5 12.4 107.3 15.1 91%Pass 12/14/17 211 SG North East Driveway SG F 117.5 12.4 111.9 14.8 95%Pass212SGNorth East Driveway SG F 117.5 12.4 112.2 14.3 95%Pass 12/19/17 213 CG Curb and Gutter 462.0 I 117.5 12.6 106.6 14.9 91%Pass214CGCurb and Gutter 463.0 I 117.5 12.6 106.2 15.5 90%Pass215CGCurb and Gutter 464.0 I 117.5 12.6 107.1 14.8 91%Pass 12/20/17 216 CG Curb and Gutter 462.0 I 117.5 12.6 106.2 15.4 90%Pass217CGCurb and Gutter 462.0 I 117.5 12.6 105.9 14.7 90%Pass218CGCurb and Gutter 462.0 I 117.5 12.6 106.6 16.1 91%Pass219CGCurb and Gutter 462.0 I 117.5 12.6 107.1 15.9 91%Pass220SDStorm Drain Line Trench Tie-In 459.0 I 117.5 12.6 106.1 17.4 90%Pass221SDStorm Drain Line Trench Tie-In 461.0 I 117.5 12.6 106.5 17.1 91%Pass222CGCurb and Gutter 462.0 I 117.5 12.6 106.0 15.1 90%Pass223CGCurb and Gutter 462.0 I 117.5 12.6 108.1 13.8 92%Pass224CGCurb and Gutter 462.0 I 117.5 12.6 106.9 15.4 91%Pass225CGCurb and Gutter 462.0 I 117.5 12.6 106.4 15.0 91%Pass226CGCurb and Gutter 461.0 I 117.5 12.6 109.2 14.1 93%Pass227CGCurb and Gutter 461.0 I 117.5 12.6 108.6 14.7 92%Pass228SDStorm Drain Line Trench Tie-In 461.0 I 117.5 12.6 105.9 15.9 90%Pass229SDStorm Drain Line Trench Tie-In 459.0 I 117.5 12.6 106.4 16.8 91%Pass 12/21/17 230 MG Cut Slop at North West 453.0 I 117.5 12.6 106.3 15.6 90%Pass231MGCut Slop at North West 453.0 I 117.5 12.6 106.9 16.1 91%Pass232MGCut Slop at North West 453.0 I 117.5 12.6 106.2 15.9 90%Pass233MGCut Slop at North West 454.0 I 117.5 12.6 108.3 14.2 92%Pass234MGCut Slop at North West 454.0 I 117.5 12.6 108.1 14.8 92%Pass 12/22/17 235 MG Fill Slope at North West 455.0 I 117.5 12.6 106.8 14.1 91%Pass236MGFill Slope at North West 455.0 I 117.5 12.6 107.3 14.8 91%Pass237MGFill Slope at North West 455.0 I 117.5 12.6 106.2 16.3 90%Pass 12/26/17 238 MG Fill Slope at North West 456.0 I 117.5 12.6 108.9 13.9 93%Pass239MGFill Slope at North West 456.0 I 117.5 12.6 108.4 14.5 92%Pass240MGFill Slope at North West 456.0 I 117.5 12.6 110.1 14.2 94%Pass 12/27/17 241 MG Fill Slope at North West 454.0 I 117.5 12.6 109.2 13.6 93%Pass242MGFill Slope at North West 455.0 I 117.5 12.6 107.0 13.9 91%Pass243MGFill Slope at North West 456.0 I 117.5 12.6 106.6 14.3 91%Pass244MGFill Slope at North West 458.0 I 117.5 12.6 113.6 12.9 97%Pass245MGFill Slope at North West 458.0 I 117.5 12.6 106.5 13.4 91%Pass246MGSidewalk458.0 I 117.5 12.6 107.2 13.0 91%Pass 1/4/18 247 MG Sidewalk SG I 117.5 12.6 107.1 11.1 91%Pass248MGSidewalkSGI117.5 12.6 109.8 10.4 93%Pass249MGSidewalkSGI117.5 12.6 108.5 14 92%Pass 1/5/18 250 CG Curb and Gutter SG I 117.5 12.6 106.7 14.2 91%Pass251CGCurb and Gutter SG I 117.5 12.6 105.5 9.2 90%Pass252CGCurb and Gutter SG I 117.5 12.6 104.0 9.9 89%Fail253CGRetest #252 SG I 117.5 12.7 105.2 8.3 90%Pass NOVA Services, Inc.Page 5 of 8 Raceway Lot 12 Carlsbad, California August 2018 Project No.: 1017727 Test Test Soil Rel.Pass/ Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 1/15/18 254 MG Sidewalk FG I 117.5 12.6 110.1 17.3 94%Pass255MGSidewalkFGI117.5 12.6 107.9 16.1 92%Pass 1/22/18 256 RW Retaining Wall "E"464.0 F 117.7 12.3 107.7 13.9 92%Pass257RWRetaining Wall "E"464.0 F 117.7 12.3 106.4 15.1 90%Pass258RWRetaining Wall "E"465.0 F 117.7 12.3 106.9 14.4 91%Pass259RWRetaining Wall "E"465.0 F 117.7 12.3 107.2 14.5 91%Pass 1/23/18 260 RW Retaining Wall "E"466.0 F 117.7 12.3 106.6 15.2 91%Pass261RWRetaining Wall "E"467.0 F 117.7 12.3 107.8 14.4 92%Pass262RWRetaining Wall "E"465.0 F 117.7 12.3 107.1 14.9 91%Pass263RWRetaining Wall "E"468.0 F 117.7 12.3 106.2 13.7 90%Pass264RWRetaining Wall "E"468.0 F 117.7 12.3 107.9 14.6 92%Pass265RWRetaining Wall "E"466.0 F 117.7 12.3 107.0 15.5 91%Pass 1/24/18 266 RW Retaining Wall "E"469.0 F 117.7 12.3 105.9 15.2 90%Pass267RWRetaining Wall "E"469.0 F 117.7 12.3 106.6 14.5 91%Pass 1/26/18 268 F Fire Line Trench 458.0 F 117.7 12.3 110.0 15.1 93%Pass269FFire Line Trench 457.0 F 117.7 12.3 108.2 14.9 92%Pass 1/29/18 270 F Fire Line Trench 457.0 F 117.7 12.3 106.6 15.5 91%Pass271FFire Line Trench 457.0 F 117.7 12.3 107.3 13.8 91%Pass272FFire Line Trench 458.0 F 117.7 12.3 106.3 17.1 90%Pass273FFire Line Trench 459.0 F 117.7 12.3 106.8 16.4 91%Pass274FFire Line Trench 459.0 F 117.7 12.3 111.1 13.6 94%Pass275FFire Line Trench 460.0 F 117.7 12.3 110.4 14.1 94%Pass276FFire Line Trench 460.0 F 117.7 12.3 106.0 14.2 90%Pass277FFire Line Trench 459.0 F 117.7 12.3 109.9 15.5 93%Pass 1/30/18 278 F Fire Line Trench 455.0 F 117.7 12.3 110.5 13.8 94%Pass279FFire Line Trench 453.0 F 117.7 12.3 106.4 16.9 90%Pass280FFire Line Trench 447.0 F 117.7 12.3 106.1 17.2 90%Pass 2/6/18 281 E Electrical Line Trench 457.0 F 117.7 12.3 111.5 14.7 95%Pass282EElectrical Line Trench 456.0 F 117.7 12.3 106.9 14.2 91%Pass283WWater Line Trench 458.0 F 117.7 12.3 105.8 15.9 90%Pass284WWater Line Trench 458.0 F 117.7 12.3 106.1 16.2 90%Pass285EElectrical Line Trench 456.0 F 117.7 12.3 106.6 15.8 91%Pass 2/7/18 286 E Electrical Line Trench 455.0 F 117.7 12.3 106.2 13.9 90%Pass287EElectrical Line Trench 453.0 F 117.7 12.3 107.0 15.2 91%Pass 2/12/18 288 CG Curb and Gutter FG F 117.7 12.3 106.2 17.6 90%Pass289CGCurb and Gutter FG F 117.7 12.3 106.0 13.7 90%Pass290CGCurb and Gutter FG F 117.7 12.3 107.1 14.4 91%Pass291CGCurb and Gutter FG F 117.7 12.3 106.5 14.8 90%Pass292CGCurb and Gutter FG F 117.7 12.3 107.2 15.1 91%Pass293CGCurb and Gutter FG F 117.7 12.3 109.7 14.2 93%Pass 2/16/18 294 F Fire Line Trench 457.0 F 117.7 12.3 117.0 13.9 99%Pass 3/9/18 295 CG Curb and Gutter SG F 117.7 12.3 110.4 14.9 94%Pass296CGCurb and Gutter SG F 117.7 12.3 111.5 14.6 95%Pass297CGCurb and Gutter SG F 117.7 12.3 109.1 13.9 93%Pass298CGCurb and Gutter SG F 117.7 12.3 115.2 14.8 98%Pass 4/30/18 299 MG Parking Area 461.0 F 117.7 12.3 113.5 11.4 96%Pass300MGParking Area 461.0 F 117.7 12.3 112.4 12.7 95%Pass301MGParking Area 461.0 F 117.7 12.3 113.0 12.0 96%Pass302MGParking Area 461.0 F 117.7 12.3 112.6 11.9 96%Pass303MGParking Area 461.0 F 117.7 12.3 111.9 12.3 95%Pass 5/25/18 304 SG Parking Area 461.0 F 117.7 12.3 112.6 13.7 96%Pass305SGParking Area 461.0 F 117.7 12.3 113.0 12.7 96%Pass306SGParking Area 461.0 F 117.7 12.3 113.2 11.9 96%Pass307SGParking Area 461.0 F 117.7 12.3 112.1 12.5 95%Pass308SGParking Area 461.0 F 117.7 12.3 111.9 11.9 95%Pass309SGParking Area 461.0 F 117.7 12.3 112.5 13.2 96%Pass310SGParking Area 461.0 F 117.7 12.3 113.3 12.2 96%Pass311SGParking Area 461.0 F 117.7 12.3 112.9 12.6 96%Pass312SGParking Area 461.0 F 117.7 12.3 112.3 13.3 95%Pass313SGParking Area 461.0 F 117.7 12.3 112.7 12.9 96%Pass 5/28/18 314 SG Parking Area 461.0 F 117.7 12.3 113.3 12.0 96%Pass315SGParking Area 461.0 F 117.7 12.3 112.4 11.9 95%Pass NOVA Services, Inc.Page 6 of 8 Raceway Lot 12 Carlsbad, California August 2018 Project No.: 1017727 Test Test Soil Rel.Pass/ Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 316 SG Parking Area 461.0 F 117.7 12.3 113.0 12.5 96%Pass 5/31/18 317 B Parking Area 461.5 K 119.7 11.7 115.5 13.5 96%Pass318BParking Area 461.5 K 119.7 11.7 115.9 12.0 97%Pass319BParking Area 461.5 K 119.7 11.7 115.0 12.3 96%Pass320BParking Area 461.5 K 119.7 11.7 115.3 11.6 96%Pass321BParking Area 461.5 K 119.7 11.7 114.8 11.8 96%Pass 6/1/18 322 B Parking Area 462.0 K 119.7 11.7 117.2 10.9 98%Pass323BParking Area 462.0 K 119.7 11.7 116.1 11.6 97%Pass324BParking Area 462.0 K 119.7 11.7 115.8 11.4 97%Pass325BParking Area 462.0 K 119.7 11.7 114.9 11.0 96%Pass326BParking Area 462.0 K 119.7 11.7 115.3 12.6 96%Pass327BParking Area 462.0 K 119.7 11.7 115.1 11.9 96%Pass328BParking Area 462.0 K 119.7 11.7 116.3 12.2 97%Pass329BParking Area 462.0 K 119.7 11.7 115.7 11.7 97%Pass 6/4/18 330 B Parking Area FG K 119.7 11.7 117.1 14.0 98%Pass331BParking Area FG K 119.7 11.7 117.8 11.2 98%Pass332BParking Area FG K 119.7 11.7 119.0 10.7 99%Pass333BParking Area FG K 119.7 11.7 118.4 11.3 99%Pass334BParking Area FG K 119.7 11.7 117.7 13.8 98%Pass335BParking Area FG K 119.7 11.7 118.2 12.9 99%Pass 6/5/18 336 B Parking Area B K 119.7 11.7 116.8 11.2 98%Pass337BParking Area B K 119.7 11.7 118.2 10.7 99%Pass338BParking Area B K 119.7 11.7 117.7 11.4 98%Pass339BParking Area B K 119.7 11.7 117.4 11.1 98%Pass340BParking Area B K 119.7 11.7 117.9 11.2 98%Pass341BParking Area B K 119.7 11.7 116.4 10.4 97%Pass342BParking Area B K 119.7 11.7 115.9 10.7 97%Pass343BParking Area B K 119.7 11.7 117.8 12.1 98%Pass344BParking Area B K 119.7 11.7 117.2 11.8 98%Pass345BParking Area B K 119.7 11.7 116.5 11.0 97%Pass 6/6/18 346 AC Parking Area AC AC-1 147.0 N/A 144.7 N/A 98%Pass347ACParking Area AC AC-1 147.0 N/A 140.1 N/A 95%Pass348ACParking Area AC AC-1 147.0 N/A 145.1 N/A 99%Pass349ACParking Area AC AC-1 147.0 N/A 141.9 N/A 97%Pass350ACParking Area AC AC-1 147.0 N/A 145.7 N/A 99%Pass351ACParking Area AC AC-1 147.0 N/A 145.4 N/A 99%Pass352ACParking Area AC AC-1 147.0 N/A 145.0 N/A 99%Pass353ACParking Area AC AC-1 147.0 N/A 145.3 N/A 99%Pass354ACParking Area AC AC-1 147.0 N/A 141.9 N/A 97%Pass355ACParking Area AC AC-1 147.0 N/A 142.7 N/A 97%Pass356ACParking Area AC AC-1 147.0 N/A 139.7 N/A 95%Pass357ACParking Area AC AC-1 147.0 N/A 141.9 N/A 97%Pass358ACParking Area AC AC-1 147.0 N/A 141.6 N/A 96%Pass359ACParking Area AC AC-1 147.0 N/A 141.4 N/A 96%Pass360ACParking Area AC AC-1 147.0 N/A 143.0 N/A 97%Pass361ACParking Area AC AC-1 147.0 N/A 140.8 N/A 96%Pass362ACParking Area AC AC-1 147.0 N/A 141.2 N/A 96%Pass363ACParking Area AC AC-1 147.0 N/A 141.4 N/A 96%Pass364ACParking Area AC AC-1 147.0 N/A 141.5 N/A 96%Pass365ACParking Area AC AC-1 147.0 N/A 143.3 N/A 97%Pass366ACParking Area AC AC-1 147.0 N/A 142.4 N/A 97%Pass367ACParking Area AC AC-1 147.0 N/A 141.1 N/A 96%Pass 6/7/18 368 AC Parking Area AC AC-2 148.0 N/A 142.6 N/A 96%Pass369ACParking Area AC AC-2 148.0 N/A 143.5 N/A 97%Pass370ACParking Area AC AC-2 148.0 N/A 140.6 N/A 95%Pass371ACParking Area AC AC-2 148.0 N/A 140.6 N/A 95%Pass372ACParking Area AC AC-2 148.0 N/A 144.1 N/A 97%Pass373ACParking Area AC AC-2 148.0 N/A 141.1 N/A 95%Pass374ACParking Area AC AC-2 148.0 N/A 141.0 N/A 95%Pass375ACParking Area AC AC-2 148.0 N/A 140.6 N/A 95%Pass376ACParking Area AC AC-2 148.0 N/A 144.1 N/A 97%Pass 6/22/18 377 SG North West Driveway 457.0 E 116.6 12.0 113.9 14.5 98%Pass378SGNorth West Driveway 455.0 K 119.7 11.7 114.9 11.8 96%Pass 6/28/18 379 SW Sidewalk 456.0 E 116.6 12.0 106.6 10.5 91%Pass380SWSidewalk456.0 E 116.6 12.0 109.8 12.5 94%Pass381SWSidewalk456.0 K 119.7 11.7 107.9 8.5 90%Fail382SWSidewalk456.0 K 119.7 11.7 111.2 8.9 93%Fail NOVA Services, Inc.Page 7 of 8 Raceway Lot 12 Carlsbad, California August 2018 Project No.: 1017727 Test Test Soil Rel.Pass/ Date Number Type Test Location Elevation ID (pcf)(%)(pcf)(%)Comp.Fail Laboratory Field SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTSTABLE II 6/29/18 383 B Retest #381 456.0 K 119.7 11.7 113.7 12.0 95%Pass384BRetest #382 456.0 K 119.7 11.7 114.0 10.0 95%Pass 7/10/18 385 B North West Driveway B K 119.7 11.7 116.7 10.1 97%Pass386BNorth West Driveway B K 119.7 11.7 117.3 10.6 98%Pass387ACNorth West Driveway FG AC-3 146.0 N/A 139.9 N/A 96%Pass388ACNorth West Driveway FG AC-3 146.0 N/A 139.3 N/A 95%Pass389ACNorth West Driveway FG AC-3 146.0 N/A 140.3 N/A 96%Pass390ACNorth West Driveway FG AC-3 146.0 N/A 140.0 N/A 96%Pass391ACParking Area FG AC-3 146.0 N/A 139.9 N/A 96%Pass392ACParking Area FG AC-3 146.0 N/A 140.5 N/A 96%Pass 8/10/18 393 AC Lionshead Avenue 455.5 AC-4 142.0 N/A 135.3 N/A 95%Pass394ACLionshead Avenue 455.5 AC-4 142.0 N/A 138.7 N/A 98%Pass395ACLionshead Avenue 455.5 AC-4 142.0 N/A 135.1 N/A 95%Pass396ACLionshead Avenue 455.0 AC-4 142.0 N/A 140.0 N/A 99%Pass397ACLionshead Avenue 455.0 AC-4 142.0 N/A 137.3 N/A 97%Pass398ACLionshead Avenue 455.0 AC-4 142.0 N/A 135.6 N/A 95%Pass399ACLionshead Avenue 455.0 AC-4 142.0 N/A 138.3 N/A 97%Pass400ACLionshead Avenue 454.5 AC-4 142.0 N/A 136.1 N/A 96%Pass401ACLionshead Avenue 454.5 AC-4 142.0 N/A 139.4 N/A 98%Pass402ACLionshead Avenue 454.5 AC-4 142.0 N/A 138.2 N/A 97%Pass NOVA Services, Inc.Page 8 of 8