HomeMy WebLinkAbout1733 SCHOONER WAY; ; CB142417; Permit10-08-2014
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC#:
Project Title:
Applicant:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Pool Permit Permit No: CB142417
Building Inspection Request Line (760) 602-2725
1733 SCHOONER WY CBAD
POOL
2073202200
$18,544.00
Lot#: 0
Construction Type: NEW
SISSENWEIN RES= BUILD 380 SF
POOL & SPA
Owner:
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
09/18/2014
JMA
10/08/2014
10/08/2014
PREMIER POOLS AND SPAS SISSENWEIN KACY J SEPARATE PROPERTY TRUST 01-20-
6876 EMBARCADERO LN
CARLSBAD CA 92011
760-4 76-0008
Building Permit
Add'I Building Permit Fee
Plan Check
Add'l Plan Check Fee
Electrical Fee
Plumbing Fee
Strong Motion Fee
Green Bldg Standards (SB1473) Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
1733 SCHOONER WAY
CARLSBAD CA 92008
$193.57
$0.00
$135.50
$0.00
$33.00
$33.00
$2.41
$1.00
$0.00
$0.00
$0.00
$0.00
$398.48
Total Fees: $398.48 Total Payments To Date: $398.48 Balance Due:
Inspector:
FINAL APPROVAL
Date 1--Zl. -I.>' Clearance:
$0,00
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions, If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
10-08-2014
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW140337
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
Applicant:
1733 SCHOONER WY CBAD
SWPPP
2073202200 Lot#: 0
CB142417
SISSENWEIN: RES-380 SF POOL/S
Owner:
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
ISSUED
09/18/2014
JMA
10/08/2014
1
L
PREMIER POOLS AND SPAS SISSENWEIN KACY J SEPARATE PROPERTY TRUST 01-20-
6876 EMBARCADERO LN
CARLSBAD CA 92011
760-4 76-0008
Emergency Contact:
KENNY JUDD
858-248-5442
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Total Fees: $106.00
1733 SCHOONER WAY
CARLSBAD CA 92008
$48.00
$58.00
$0.00
$106.00
Total Payments To Date: $106.00 Balance Due:
FINAL APPROVAL
$0.00
THE FOLLOWING APPROVALS.REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING 0 ENGINEERING □BUILDING
Ccityof
Carlsbad
JOB ADDRESS
CT/PROJECT#
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
WW°N.carlsbadca.gov
# OF UNITS
DESCRIPTION OF WORK: Include Square Feet of Affected Atea(.s)
PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF)
PROPERTY OWNER NAME
ADDRESS
CITY
PHONE
EMAIL EMAIL
DESIGN PROFESSIONAL
ADDRESS
FIREPLACE
YESO
□HEALTH
AIR CONDITIONING
Nc0 vesONoD
0 HAZMATIAPCD
FIRE SPRINKLERS
vesONoD
CITY STATE ZIP <)lJl)
PHONE FAX
EMAIL
STATE LIC. #
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct alte , improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or Olathe ts exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: I hereby affinn under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit ls issued.
□ I have and will maintain work om nsatlon reciuired}9V'lec,!io 3700 e Labor Code, for the performance of 1: work for whJSl..lhis pennlt is issued. My workers' compen~r,nce carrier and policy
number are: Insurance Co._'':::;;~~~~~_'\.9~~'\/_'_-""1,-" ____ Policy No. \ X,)(o 3 l O \ Expiration Date -J -\ S:
This section need not be complet the permit is for one hundred dollars ($100) or less. D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California, WARNING: Failure to secure workers' com pen co erage Is unlawful, and shall employer to criminal penalties and clvll fines up to one hundred thousand dollars (&100,000), In
addition to the cost of compensation, damages as provid for in on 37.06 of the Lali'br c e and attorney's fees •
.8$ CONTRACTOR SIGNATURE
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
□
□
□
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not appfy to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within or.e year of comp~tion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I, as owner of the property, am exclusively contracting with licensed coritractors to construct the project {Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License law).
I am exempt under Section _____ ,Busiriess and Professions Code for this reasori:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement OYes 0No
2. / (have/ have not) signed an applk:ation for a building permit for the proposed work,
3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number):
4. I plan to provide portions of !tie work, but I have hired the following person to coordinate, supervise and provide !tie major work {include name I address I phone I contractors' license number):
5. I will provide some of the work, but I have contracted (hired) the following persons to provkle the work indicated (Include name/ address/ phone/ type of work)·
~ PROPERTY OWNER SIGNATURE DATE
COMPLETE Tl-11$ SECTlOI\I FOR 1\10!\l·RESIDENTIAL BUILDII\IG PERMITS 01\11.Y
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration fonn or risk manaiJement and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? □ Yes □ No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes O No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I certify that I have read the application and state that the above information Is coR'8Cl:ancl that the lnfonnation on the plans Is accurate. I agiee ID compty\\fth all Ci1y ordinances and Sta1e laws relating 1D bullclng construction.
I hereby authol'2e representative of the City of Carlsboo to enteruJX)ll the alx>ve mentioned J'.11)perty br inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CAALSBJiD
AG<\INST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAJNST S<\I0 CITY IN CONSEQUENCE OF IBE GRANTING OF IBIS PERMIT.
OSHA: NI OSHA ~nnit is required for excavations over 5'0' deep and dem:i@:,n CJ oonstrucoon of structures over 3 stories in height.
EXPIRATION: Every ~nnlt issued by the Building Official under the provisions of this Code shall expire by limitation and ta::ome nul and void if the Wilding or'AOIK authorized by sudl ~nnit is not oomrnenced 'Mlhin
180 days from the date of soc:h permit or if the building orw:irk a . by sudl pennlt is suspended or abandoned at any time after the 'AOIK is oommenced for a ~ricd of 180 da~ (Section 100~~ Un~nn ~l'dr Code).
,lf5 APPLICANT'S SIGNATURE 1..---.. DATE ,r ( 1c) { \
Inspection List
Permit#: CB142417 Type: POOL
Date Inspection Item
01/21/2015 55 Fence/Pre-Plaster
01/21/2015 55 Fence/Pre-Plaster
01/21/2015 59 Final Pool
01/21/2015 59 Final Pool
12/23/2014 51 Excav/Steel/Bonding/Fence
11/20/2014 23 GasffesVRepairs
11/20/2014 31 Underground/Conduit-Wirin
11/06/2014 21 Underground/Under Floor
11/06/2014 51 Excav/Steel/Bonding/Fence
Thursday, January 22, 2015
Inspector
PB
PB
PB
PB
PB
PB
PB
Act
RI
AP
RI
AP
AP
AP
AP
AP
AP
SISSENWEIN RES= BUILD 380 SF
POOL&SPA
Comments
Page 1 of 1
«' ~ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
DATE: 9/26/14 PROJECT NAME: SISSENWEIN Residence
PLAN CHECK NO: CB142417 SET#:1 ADDRESS: 1733 Schooner Wy
VALUATION:$18,544 SCOPE OF WORK:
Pool and Spa
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
PROJECT ID:
APN: 207-320-22
This plan check review is complete and has been APPROVED by:
□
LAND DEVELOPMENT ENGINEERING DIVISION
Final Inspection by the CM&I division is required: Yes X No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: carriejones@hotmail.com
Chris Sexton
760-602-4624
Kathleen Lawrence
760-602-27 41
Ch ris,Sc xto11·.6_-c n r lsbndca. gov Kathlcc1·LLawrence:rfcar!sbndc~·1.gov
Greg Ryan
760-602-4663
Gregory. Ry;:m'.h')ca r lsbadcri .gov
Gina Ruiz
760-602·-4 fi 7 ~:i
(\inJ R11i1t·ica1 l':",bc"1cJc~1.~'.ov
Remarks:
Linda Ontiveros
760-602-2773
Linda. Ont ive ros·'.::rca rl sbadcn .gov
Dale Willis
760-602-2784
Dale.Wlllls@carlsbadca.gov
Cindy Wong
760-602-4662
Cynthia. Wo ng;oJc,1 rl s bad en .gov
Dominic Fieri
760-602-4664
Dominic.Fie ri(fl_icarlsbadca.gov
CB142417 SISSENWEIN Residence
Please Read
Instructions
Outstanding issues will be marked with X
Items that conform to permit requirements are marked
with I -or-have intentionally been left blank.
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale. Show:
✓ North arrow
✓ Existing & proposed structures
✓ . Property line dimensions
Easements
Show on site plan:
✓ Drainage patterns
✓ Existing & proposed slopes
Existing topography
Retaining Walls (location and height)
✓ Indicate what will happen with soil excavated from pool area.
Include on title sheet:
✓ Site address
✓ Assessor's parcel number
✓ Legal description/lot number
Grading: Quantities of
Cut Fill Import Export
Project does not comply with the following engineering conditions of approval
for project no:
Conditions were complies with by: Date:
Lot/ Map No.: 58 / 7657
Subdivision/Tract: CT 72-18 / CARLSBAD MANOR
Reference No(s): DWG 167•4, Sh 5
E-37 Page2of4 REV 6/2012
CB142417
RW 14-202
Application
submitted
9/18/14
E-37
SISSENWEIN Residence
2. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 11.06.030 of the Municipal
Code.
Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
Minor Grading Permit required. NOTE: The grading permit must be issued and grading
approval obtained prior to issuance of a building permit. A separate grading plan prepared a
registered civil engineer must be submitted together with the completed application form attached.
✓ . No grading permit required.
3. MISCELLANEOUS PERMITS
✓ RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
adjacent to the public right-of-way.
A separate right-of-way issued by the engineering division is required for the following:
Please complete attached right-of-way application form and return to the engineering
department together with the requirements on the attached right-of-way checklist, at
the time of resubmittal.
Right-of-way permit and pool permit will be issued simultaneously.
Page 3 of 4 REV 6/2012
•
•
(B142417
Attachments:
E-37
SISSENWEIN Residence
4. STORM WATER
Construction Compliance
✓ Project Threat Assessment Form complete.
Enclosed Project Threat Assessment Form incomplete.
✓ Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW 14-337 )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
✓ Storm Water Standards Questionnaire complete.
Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign
the questionnaire and resubmit with next submittal.
Project is subject to Standard Storm Water Requirements. See city Standard Urban
Storm Water Management Plan (SUSMP) for reference.
http•llwww.carlsbadca.qovlbusiness/building/Documents/EnqStandsw-stds-vol4-ch2.pdf
Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
Engineering Application
Rainwater harvesting (rain barrels or cistern)
Vegetated Roof
Bio-retentions cell/rain garden
Pervious pavemenUpavers
Flow-through planter/vegetated or rock drip line
Vegetated swales or rock infiltration swales
Downspouts disconnect and discharge over landscape
Other:
Storm Water Form Right-of-Way Application/Info
Page 4 of 4
Reference Documents
REV 6/01112
•
«''» ~ CITY Of
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
I am applying to the City of Carlsbad for the following type(s) of construction permit:
□ Building Permit □ Right-of-Way Permit
□ My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Water Discharge
□ My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
T.1r -Low Threat Assessment Criteria
My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type {See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Tier 2 -Moderate Threat Assessment Criteria
□ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Ca~sbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season {Oct. 1 through April 30).
Tier 3 • Significant Threat Assessment Criteria
□ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
□ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
□ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a s~nificant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non~storm water discharge(s).
I certify to the best of my knowledge that the above
checked statements are true and co"ect I understand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
stt/I adhere to, and at all times during construction
activ/Ues for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 of the Carlsbad Municipal Code
and to City Standards.
Project Addres :
'\33
Assessor Parcel No.
Title:
Date °1-i B-l y.
*The City Engineer may authorize minor variances from the Storm
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
8-24 Page 1 of 1 Rev.03/09
•
«~~ ~ CITY OF
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov CARLSBAD
Construction Perceived
Threat to SWPPP Tier Construction Threat Assessment Criteria* Storm Water Level Qualitv
Tier3 High Construction Threat Assessment Criteria □ Project site is 50 acres or more and grading will occur during the rainy season
□ Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA High □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
Tier 3 USDA-NRCS Erosion factors kr greater than or equal to 0.4) □ Site slope is 5 to 1 or steeper
□ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
Tier3 Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria
Tier 2 High Construction Threat Assessment Criteria
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kr greater than or equal to 0.4) High □ Site slope is 5 to 1 or steeper Tier2 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□ Site results in one half acre or more of soil disturbance
Tier2 Medium Construction Threat Assessment Criteria
□ All projects not meeting Tier 2 High Construction Threat Assessment Criteria Medium
Tier 1 -Medium lnsQection Threat Assessment Criteria
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors k, greater than or equal to 0.4) Medium □ Site slope is 5 to 1 or steeper Tier 1 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□ Site results in one half acre or more of soil disturbance
Tier 1 -Low lnsQection Threat Assessment Criteria
□ All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low
Exempt -Not Applicable -Exempt
*The city engineer may authorize mmor variances from the construction threat assessment cntena in special circumstances
where it can be shown that a lesser or higher amount of stonn water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV 4/30/10
«~'» ~ CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
STORM WATER COMPLIANCE CERTIFICATE
✓ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
✓ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
✓ My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
✓ My project Will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS: AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CON~T.ION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CAR ccµ! J ',-e ~\UL)
OWNER(S)/OWNER'S AGENT NAME (PRINn 1'✓ ! sl-'{1
~
OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE
E-29
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Page 1 of 3
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
PROJECT INFORMATION
SiteAddress: 1133 ':2'1~
Assessor's Parcel Numbe~1,.... 3?<)-l.2,.,·
Project ID: CR) \':\-2"\: \ \
Construction Permit No.:< .,,, > ,e 1 "¥ 1 _,
Estimated Construction Start Date ____ _
Project Duration '3, Months
Emerg~Co~t•~: ~~Vl ~~-
Name:~i&,> ~ _
24 hour Phone: e<;e -~ m 'Z,
Perceived Threat to Storm Water Quality
~ Medium
0 Low
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
,,--s-aa·Tr.-.A~NLlll~D TIER 1 ~ -
Ap~, A, a ~,~\-b
Date:°\\ C..:;::,\ ~\'± \ I
REV 4130/10
,;
•
«t'» ~ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than
50% of the surface area of the reviousl existin develo ment?
If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of
impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant infonnation.
If you answered "no,'' the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the 11m ro ect meets PDP re uirements" box and com lete a licant information.
□ My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Address: (r'\3~ Sckouuf ~
Applicant Name~.) f -:$" O~ S
Applicant Signature: ~
This Box for City Use Only
City Concurrence: 0
• Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of3 Effective 6/27/13
Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs
C C C E E 0 0 0 " "C rJ ti C, iii "C " ' C C E C E "C * 0 C C, m C m .5 2 '6 C. " .!!l ~ ~ .E m gjl C, ~ ]1 i1 ~ ·s "' C, "' " ::. C, C. C "'"' ~ " CT " m C ~ 1n Best Management Practice C m ~ ·a "E C CW w C ~ .,, :e "' ~ a, -
0 " 0 " I -~ " m ~ " C,
m C u "' .; .!!l (BMP) Description ➔ "' £ Ii C E C, a, u~ "C "C "' ::. "' .!!l ~ -~ 1l m .!!l m ~ -~ ~.§ -g~ "C ,.. C C C 0 ::, " "' ~ E 0 C, 0 m " > " ii ::. 0 C " 0 a, (J) E m ~~ u m "' "' 'a. ~-~ 0 i! 0: Ej N"' C, .!!l .!!l-"E ~ " E "' " -~ .c = (I) ·c * a. . "C :§ .5= " IL 0 ~ " ~ "C :0 I!:! --"C .!!l C .c .2 "' m 0 0 C. '6 " " > ~~ C .c m ·;; m .c .!!l 0 =· " N C " ~ m E 0 " .c .c E m .s e m c, J!! 0 ~ m 15 " :!11 i bl ·a 0 m 0 {!) WO in in (j) u u: {!) (j) (j) a. 00£ (j) 0: a. a. > ::. (j) ( (j) :,: u
CASQA Designation ➔ '7 'I' a, -~ Ji "? 'I' '7 'I' 0 -~ -~ ~ ;;; ~ i "t "? 'I' ., c.:, UJ -ci: ch ~ ~ u u c.:, w w w w UJ ::. ::. ::. i w w w (j) (j) (j) (j) (j) (j) (j) f-f-z z z z :;; :;; :;; :;; :;; Construction Activity w (j)
-~ .,,,radinn/Soil Disturbance ,. -Trenching/Excavation
tockoilina -..µ
nnmna/BorinQ .. J.,oncrete/Asphalt Saw '-I-, 'i<:l ~rttina . oncrete flatwork ',C,
avina -onduiUPipe Installation
Stucco/Mortar Work
j Waste Disposal
' Staaina/Lav Down Area "' Equipment Maintenance
and Fuelino
Hazardous Substance
Use/Starace
Dewaterina
Site Access Across Dirt
Other (list}:
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
lngress/Egressn column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 ol 3 REV 4/30/10
• ~
\(~
~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.e:ov
DATE: 9/22/14 PROJECT NAME: POOL ONLY -FREESTANDING WALL STATES 12" (1 FOOT HIGH) -
ANY REVISIONS TO THE WALL HEIGHT NEEDS TO BE REVIEWED AND APPROVED BY PLANNING
PROJECT ID:
PLAN CHECK NO: CB142417 SET#: ADDRESS: 1733 SCHOONER WY APN:
[;8J This plan check review is complete and has been APPROVED by the PLANNING
Division.
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required D Yes [81 No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: CARRIEJONES@HOTMAIL.COM
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 760-602-4665
□ Chris Sexton □ Kathleen Lawrence □ Greg Ryan
760-602-4624 760-602-2741 760-602-4663
Cbris.S~x!Qn@cl!tl~bi!d~l!-gov tsathl~~□.Lawrence@carl~bi!dCa.gQv GregQQ'.Ry,1n@carl~bad~,1.gov
□ Gina Ruiz □ Linda Ontiveros □ Cindy Wong
760-602-4675 760-602-2773 760-602-4662
!aina.Ruiz'l!l~arl~badca.gQv Lin~,!.On!iveros'iil~l!rlsbl!dCa.gQv Cyn!hia.WQng'l!l~l!rl~bi!d~i!-gQv
□ □ □ Dominic Fieri
760-602-4664
Domini~.Fi~ri@carl~bad~i!-gov