Loading...
HomeMy WebLinkAbout1733 SCHOONER WAY; ; CB142417; Permit10-08-2014 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC#: Project Title: Applicant: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Pool Permit Permit No: CB142417 Building Inspection Request Line (760) 602-2725 1733 SCHOONER WY CBAD POOL 2073202200 $18,544.00 Lot#: 0 Construction Type: NEW SISSENWEIN RES= BUILD 380 SF POOL & SPA Owner: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: ISSUED 09/18/2014 JMA 10/08/2014 10/08/2014 PREMIER POOLS AND SPAS SISSENWEIN KACY J SEPARATE PROPERTY TRUST 01-20- 6876 EMBARCADERO LN CARLSBAD CA 92011 760-4 76-0008 Building Permit Add'I Building Permit Fee Plan Check Add'l Plan Check Fee Electrical Fee Plumbing Fee Strong Motion Fee Green Bldg Standards (SB1473) Fee Renewal Fee Add'l Renewal Fee Other Building Fee Additional Fees TOTAL PERMIT FEES 1733 SCHOONER WAY CARLSBAD CA 92008 $193.57 $0.00 $135.50 $0.00 $33.00 $33.00 $2.41 $1.00 $0.00 $0.00 $0.00 $0.00 $398.48 Total Fees: $398.48 Total Payments To Date: $398.48 Balance Due: Inspector: FINAL APPROVAL Date 1--Zl. -I.>' Clearance: $0,00 NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as 'fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions, If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 10-08-2014 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW140337 Job Address: Permit Type: Parcel No: Reference #: CB#: Project Title: Applicant: 1733 SCHOONER WY CBAD SWPPP 2073202200 Lot#: 0 CB142417 SISSENWEIN: RES-380 SF POOL/S Owner: Status: Applied: Entered By: Issued: Inspect Area: Tier: Priority: ISSUED 09/18/2014 JMA 10/08/2014 1 L PREMIER POOLS AND SPAS SISSENWEIN KACY J SEPARATE PROPERTY TRUST 01-20- 6876 EMBARCADERO LN CARLSBAD CA 92011 760-4 76-0008 Emergency Contact: KENNY JUDD 858-248-5442 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Total Fees: $106.00 1733 SCHOONER WAY CARLSBAD CA 92008 $48.00 $58.00 $0.00 $106.00 Total Payments To Date: $106.00 Balance Due: FINAL APPROVAL $0.00 THE FOLLOWING APPROVALS.REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING 0 ENGINEERING □BUILDING Ccityof Carlsbad JOB ADDRESS CT/PROJECT# Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov WW°N.carlsbadca.gov # OF UNITS DESCRIPTION OF WORK: Include Square Feet of Affected Atea(.s) PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) PROPERTY OWNER NAME ADDRESS CITY PHONE EMAIL EMAIL DESIGN PROFESSIONAL ADDRESS FIREPLACE YESO □HEALTH AIR CONDITIONING Nc0 vesONoD 0 HAZMATIAPCD FIRE SPRINKLERS vesONoD CITY STATE ZIP <)lJl) PHONE FAX EMAIL STATE LIC. # (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct alte , improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or Olathe ts exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). WORKERS' COMPENSATION Workers' Compensation Declaration: I hereby affinn under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit ls issued. □ I have and will maintain work om nsatlon reciuired}9V'lec,!io 3700 e Labor Code, for the performance of 1: work for whJSl..lhis pennlt is issued. My workers' compen~r,nce carrier and policy number are: Insurance Co._'':::;;~~~~~_'\.9~~'\/_'_-""1,-" ____ Policy No. \ X,)(o 3 l O \ Expiration Date -J -\ S: This section need not be complet the permit is for one hundred dollars ($100) or less. D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California, WARNING: Failure to secure workers' com pen co erage Is unlawful, and shall employer to criminal penalties and clvll fines up to one hundred thousand dollars (&100,000), In addition to the cost of compensation, damages as provid for in on 37.06 of the Lali'br c e and attorney's fees • .8$ CONTRACTOR SIGNATURE I hereby affirm that I am exempt from Contractor's License Law for the following reason: □ □ □ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not appfy to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within or.e year of comp~tion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed coritractors to construct the project {Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License law). I am exempt under Section _____ ,Busiriess and Professions Code for this reasori: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement OYes 0No 2. / (have/ have not) signed an applk:ation for a building permit for the proposed work, 3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number): 4. I plan to provide portions of !tie work, but I have hired the following person to coordinate, supervise and provide !tie major work {include name I address I phone I contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provkle the work indicated (Include name/ address/ phone/ type of work)· ~ PROPERTY OWNER SIGNATURE DATE COMPLETE Tl-11$ SECTlOI\I FOR 1\10!\l·RESIDENTIAL BUILDII\IG PERMITS 01\11.Y Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration fonn or risk manaiJement and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Yes □ No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes O No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I certify that I have read the application and state that the above information Is coR'8Cl:ancl that the lnfonnation on the plans Is accurate. I agiee ID compty\\fth all Ci1y ordinances and Sta1e laws relating 1D bullclng construction. I hereby authol'2e representative of the City of Carlsboo to enteruJX)ll the alx>ve mentioned J'.11)perty br inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CAALSBJiD AG<\INST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAJNST S<\I0 CITY IN CONSEQUENCE OF IBE GRANTING OF IBIS PERMIT. OSHA: NI OSHA ~nnit is required for excavations over 5'0' deep and dem:i@:,n CJ oonstrucoon of structures over 3 stories in height. EXPIRATION: Every ~nnlt issued by the Building Official under the provisions of this Code shall expire by limitation and ta::ome nul and void if the Wilding or'AOIK authorized by sudl ~nnit is not oomrnenced 'Mlhin 180 days from the date of soc:h permit or if the building orw:irk a . by sudl pennlt is suspended or abandoned at any time after the 'AOIK is oommenced for a ~ricd of 180 da~ (Section 100~~ Un~nn ~l'dr Code). ,lf5 APPLICANT'S SIGNATURE 1..---.. DATE ,r ( 1c) { \ Inspection List Permit#: CB142417 Type: POOL Date Inspection Item 01/21/2015 55 Fence/Pre-Plaster 01/21/2015 55 Fence/Pre-Plaster 01/21/2015 59 Final Pool 01/21/2015 59 Final Pool 12/23/2014 51 Excav/Steel/Bonding/Fence 11/20/2014 23 GasffesVRepairs 11/20/2014 31 Underground/Conduit-Wirin 11/06/2014 21 Underground/Under Floor 11/06/2014 51 Excav/Steel/Bonding/Fence Thursday, January 22, 2015 Inspector PB PB PB PB PB PB PB Act RI AP RI AP AP AP AP AP AP SISSENWEIN RES= BUILD 380 SF POOL&SPA Comments Page 1 of 1 «' ~ CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL DATE: 9/26/14 PROJECT NAME: SISSENWEIN Residence PLAN CHECK NO: CB142417 SET#:1 ADDRESS: 1733 Schooner Wy VALUATION:$18,544 SCOPE OF WORK: Pool and Spa Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov PROJECT ID: APN: 207-320-22 This plan check review is complete and has been APPROVED by: □ LAND DEVELOPMENT ENGINEERING DIVISION Final Inspection by the CM&I division is required: Yes X No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: carriejones@hotmail.com Chris Sexton 760-602-4624 Kathleen Lawrence 760-602-27 41 Ch ris,Sc xto11·.6_-c n r lsbndca. gov Kathlcc1·LLawrence:rfcar!sbndc~·1.gov Greg Ryan 760-602-4663 Gregory. Ry;:m'.h')ca r lsbadcri .gov Gina Ruiz 760-602·-4 fi 7 ~:i (\inJ R11i1t·ica1 l':",bc"1cJc~1.~'.ov Remarks: Linda Ontiveros 760-602-2773 Linda. Ont ive ros·'.::rca rl sbadcn .gov Dale Willis 760-602-2784 Dale.Wlllls@carlsbadca.gov Cindy Wong 760-602-4662 Cynthia. Wo ng;oJc,1 rl s bad en .gov Dominic Fieri 760-602-4664 Dominic.Fie ri(fl_icarlsbadca.gov CB142417 SISSENWEIN Residence Please Read Instructions Outstanding issues will be marked with X Items that conform to permit requirements are marked with I -or-have intentionally been left blank. 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: ✓ North arrow ✓ Existing & proposed structures ✓ . Property line dimensions Easements Show on site plan: ✓ Drainage patterns ✓ Existing & proposed slopes Existing topography Retaining Walls (location and height) ✓ Indicate what will happen with soil excavated from pool area. Include on title sheet: ✓ Site address ✓ Assessor's parcel number ✓ Legal description/lot number Grading: Quantities of Cut Fill Import Export Project does not comply with the following engineering conditions of approval for project no: Conditions were complies with by: Date: Lot/ Map No.: 58 / 7657 Subdivision/Tract: CT 72-18 / CARLSBAD MANOR Reference No(s): DWG 167•4, Sh 5 E-37 Page2of4 REV 6/2012 CB142417 RW 14-202 Application submitted 9/18/14 E-37 SISSENWEIN Residence 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11.06.030 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" Minor Grading Permit required. NOTE: The grading permit must be issued and grading approval obtained prior to issuance of a building permit. A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached. ✓ . No grading permit required. 3. MISCELLANEOUS PERMITS ✓ RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. A separate right-of-way issued by the engineering division is required for the following: Please complete attached right-of-way application form and return to the engineering department together with the requirements on the attached right-of-way checklist, at the time of resubmittal. Right-of-way permit and pool permit will be issued simultaneously. Page 3 of 4 REV 6/2012 • • (B142417 Attachments: E-37 SISSENWEIN Residence 4. STORM WATER Construction Compliance ✓ Project Threat Assessment Form complete. Enclosed Project Threat Assessment Form incomplete. ✓ Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW 14-337 ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance ✓ Storm Water Standards Questionnaire complete. Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign the questionnaire and resubmit with next submittal. Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http•llwww.carlsbadca.qovlbusiness/building/Documents/EnqStandsw-stds-vol4-ch2.pdf Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Engineering Application Rainwater harvesting (rain barrels or cistern) Vegetated Roof Bio-retentions cell/rain garden Pervious pavemenUpavers Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape Other: Storm Water Form Right-of-Way Application/Info Page 4 of 4 Reference Documents REV 6/01112 • «''» ~ CITY Of CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: □ Building Permit □ Right-of-Way Permit □ My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Water Discharge □ My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. T.1r -Low Threat Assessment Criteria My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type {See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 -Moderate Threat Assessment Criteria □ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Ca~sbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season {Oct. 1 through April 30). Tier 3 • Significant Threat Assessment Criteria □ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or □ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, □ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a s~nificant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non~storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and co"ect I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must stt/I adhere to, and at all times during construction activ/Ues for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. Project Addres : '\33 Assessor Parcel No. Title: Date °1-i B-l y. *The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. 8-24 Page 1 of 1 Rev.03/09 • «~~ ~ CITY OF CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov CARLSBAD Construction Perceived Threat to SWPPP Tier Construction Threat Assessment Criteria* Storm Water Level Qualitv Tier3 High Construction Threat Assessment Criteria □ Project site is 50 acres or more and grading will occur during the rainy season □ Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier 3 USDA-NRCS Erosion factors kr greater than or equal to 0.4) □ Site slope is 5 to 1 or steeper □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). □ Owner/contractor received a Storm Water Notice of Violation within past two years Tier3 Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria □ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kr greater than or equal to 0.4) High □ Site slope is 5 to 1 or steeper Tier2 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). □ Owner/contractor received a Storm Water Notice of Violation within past two years □ Site results in one half acre or more of soil disturbance Tier2 Medium Construction Threat Assessment Criteria □ All projects not meeting Tier 2 High Construction Threat Assessment Criteria Medium Tier 1 -Medium lnsQection Threat Assessment Criteria □ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors k, greater than or equal to 0.4) Medium □ Site slope is 5 to 1 or steeper Tier 1 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). □ Owner/contractor received a Storm Water Notice of Violation within past two years □ Site results in one half acre or more of soil disturbance Tier 1 -Low lnsQection Threat Assessment Criteria □ All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low Exempt -Not Applicable -Exempt *The city engineer may authorize mmor variances from the construction threat assessment cntena in special circumstances where it can be shown that a lesser or higher amount of stonn water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 «~'» ~ CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 STORM WATER COMPLIANCE CERTIFICATE ✓ My project is not in a category of permit types exempt from the Construction SWPPP requirements ✓ My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). ✓ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) ✓ My project Will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS: AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CON~T.ION WORK IS COMPLETE AND APPROVED BY THE CITY OF CAR ccµ! J ',-e ~\UL) OWNER(S)/OWNER'S AGENT NAME (PRINn 1'✓ ! sl-'{1 ~ OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE E-29 STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Page 1 of 3 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION SiteAddress: 1133 ':2'1~ Assessor's Parcel Numbe~1,.... 3?<)-l.2,.,· Project ID: CR) \':\-2"\: \ \ Construction Permit No.:< .,,, > ,e 1 "¥ 1 _, Estimated Construction Start Date ____ _ Project Duration '3, Months Emerg~Co~t•~: ~~Vl ~~- Name:~i&,> ~ _ 24 hour Phone: e<;e -~ m 'Z, Perceived Threat to Storm Water Quality ~ Medium 0 Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY OF CARLSBAD ,,--s-aa·Tr.-.A~NLlll~D TIER 1 ~ - Ap~, A, a ~,~\-b Date:°\\ C..:;::,\ ~\'± \ I REV 4130/10 ,; • «t'» ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the reviousl existin develo ment? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant infonnation. If you answered "no,'' the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the 11m ro ect meets PDP re uirements" box and com lete a licant information. □ My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: (r'\3~ Sckouuf ~ Applicant Name~.) f -:$" O~ S Applicant Signature: ~ This Box for City Use Only City Concurrence: 0 • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of3 Effective 6/27/13 Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs C C C E E 0 0 0 " "C rJ ti C, iii "C " ' C C E C E "C * 0 C C, m C m .5 2 '6 C. " .!!l ~ ~ .E m gjl C, ~ ]1 i1 ~ ·s "' C, "' " ::. C, C. C "'"' ~ " CT " m C ~ 1n Best Management Practice C m ~ ·a "E C CW w C ~ .,, :e "' ~ a, - 0 " 0 " I -~ " m ~ " C, m C u "' .; .!!l (BMP) Description ➔ "' £ Ii C E C, a, u~ "C "C "' ::. "' .!!l ~ -~ 1l m .!!l m ~ -~ ~.§ -g~ "C ,.. C C C 0 ::, " "' ~ E 0 C, 0 m " > " ii ::. 0 C " 0 a, (J) E m ~~ u m "' "' 'a. ~-~ 0 i! 0: Ej N"' C, .!!l .!!l-"E ~ " E "' " -~ .c = (I) ·c * a. . "C :§ .5= " IL 0 ~ " ~ "C :0 I!:! --"C .!!l C .c .2 "' m 0 0 C. '6 " " > ~~ C .c m ·;; m .c .!!l 0 =· " N C " ~ m E 0 " .c .c E m .s e m c, J!! 0 ~ m 15 " :!11 i bl ·a 0 m 0 {!) WO in in (j) u u: {!) (j) (j) a. 00£ (j) 0: a. a. > ::. (j) ( (j) :,: u CASQA Designation ➔ '7 'I' a, -~ Ji "? 'I' '7 'I' 0 -~ -~ ~ ;;; ~ i "t "? 'I' ., c.:, UJ -ci: ch ~ ~ u u c.:, w w w w UJ ::. ::. ::. i w w w (j) (j) (j) (j) (j) (j) (j) f-f-z z z z :;; :;; :;; :;; :;; Construction Activity w (j) -~ .,,,radinn/Soil Disturbance ,. -Trenching/Excavation tockoilina -..µ nnmna/BorinQ .. J.,oncrete/Asphalt Saw '-I-, 'i<:l ~rttina . oncrete flatwork ',C, avina -onduiUPipe Installation Stucco/Mortar Work j Waste Disposal ' Staaina/Lav Down Area "' Equipment Maintenance and Fuelino Hazardous Substance Use/Starace Dewaterina Site Access Across Dirt Other (list}: Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction lngress/Egressn column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 ol 3 REV 4/30/10 • ~ \(~ ~ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.e:ov DATE: 9/22/14 PROJECT NAME: POOL ONLY -FREESTANDING WALL STATES 12" (1 FOOT HIGH) - ANY REVISIONS TO THE WALL HEIGHT NEEDS TO BE REVIEWED AND APPROVED BY PLANNING PROJECT ID: PLAN CHECK NO: CB142417 SET#: ADDRESS: 1733 SCHOONER WY APN: [;8J This plan check review is complete and has been APPROVED by the PLANNING Division. By: GINA RUIZ A Final Inspection by the PLANNING Division is required D Yes [81 No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: CARRIEJONES@HOTMAIL.COM For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 □ Chris Sexton □ Kathleen Lawrence □ Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Cbris.S~x!Qn@cl!tl~bi!d~l!-gov tsathl~~□.Lawrence@carl~bi!dCa.gQv GregQQ'.Ry,1n@carl~bad~,1.gov □ Gina Ruiz □ Linda Ontiveros □ Cindy Wong 760-602-4675 760-602-2773 760-602-4662 !aina.Ruiz'l!l~arl~badca.gQv Lin~,!.On!iveros'iil~l!rlsbl!dCa.gQv Cyn!hia.WQng'l!l~l!rl~bi!d~i!-gQv □ □ □ Dominic Fieri 760-602-4664 Domini~.Fi~ri@carl~bad~i!-gov