HomeMy WebLinkAbout1741 SKIMMER CT; ; CB160485; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
02-17-2016 Pool Permit Permit No: CB160485
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
1741 SKIMMER CT CBAD
POOL Status:
Parcel No: 2159212300 Lot#: 0 Applied:
Valuation: $18,046.00 Construction Type: NEW Entered By:
Reference #:
PC#:
Project Title:
Applicant:
HEMERICK: 350 SF POOUSPA
WITH 5' TALL ROCK WATERFALL
WATERLINE POOLS AND SPAS INC.
P.O. BOX605
CARDIFF CA 92007
760-815-6733
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Electrical Fee
Plumbing Fee
Strong Motion Fee
Green Bldg Standards (SB1473) Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
Plan Approved:
Issued:
Inspect Area:
Owner:
HEMERICK SCOTT R&VICTORIA A
1741 SKIMMER CT
CARLSBAD CA 92011
ISSUED
02/09/2016
SLE
02/17/2016
02/17/2016
$194.42
$0.00
$136.09
$0.00
$35.00
$35.00
$2.35
$1.00
$0.00
$0.00
$0.00
$0.00
$403.86
Total Fees: $403.86 Total Payments To Date: $403.86 Balance Due:
Inspector: Clearance:
$0.00
NOTICE; Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, l'ese!Vations, or other exactions hereafter collectively
referred to as ''fees/exactions." You have 90 days from the data this pennit was issued to protest irrposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follcw that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTl FIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sev.er connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
' . . . . . ' ' . '
------~------·;.-~----.. --··--·-···
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
02-17-2016
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW 160046
Job Address:
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
Applicant:
1741 SKIMMER CT CBAD
SWPPP
2159212300
HEMERICK: POOL/ SPA
WATERLINE POOLS AND SPAS INC.
P.O. BOX 605
CARDIFF CA 92007
760-815-6733
Emergency Contact:
H. PIETER
760-815-6733
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Status:
Lot#: 0 Applied:
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
HEMERICK SCOTT R&VICTORIA A
1741 SKIMMER CT
CARLSBAD CA 92011
ISSUED
02/09/2016
SLE
02/17/2016
1
M
$54.00
$228.00
$0.00
$282.00
Total Fees: $282.00 Total Payments To Date: $282.00 Balance Due:
FINAL APPROVAL
=~:C-1~--
•------a ... w111 II • • 1• _,. ,. ..•..
$0.00
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING 0 ENGINEERING
Ccicyof
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
□BUILDING □FIRE
Plan Check No.
Est. Value
Plan Ck. Deposit
Date Z-9-/ SWPPP
SUITEf/SPACEf/UNITf ~IS--9ZJ
LOT# PHASE# # OF UNITS # BEDROOMS It BATHROOMS TENANT BUSINESS NAME CONSTR. "TYPE OCC. GROUP
DESCRIPTION OF WORK: Include Squa111 Feet at Affected Area(S) /4
C! ~IU S77l ve-77 ~,...J CJF ?°'--/ sr c.._! /'f:»l;',tE7E) ::F:JJ :) F
W/ 5\ To.JI {loc.x_ wo...terfoJI
EXISTING USE PROPOSED USE PATIOS (SF) AIR CONDITIONING FIRE SPRINKLERS
NcQ YES □No □ YES□ No□
APPLICANT NAME A ~ L/ /t,£'
Ptln• COnt•ct vr..,,r,7c;-, <.
ADDREssp O Box l.t,o S"
CITY STATE
C..l'f,UJ r. CA
DESIGN PROFESSIONAL
ADDRESS
CITY STATE
PHONE FAX
EMAIL
ZIP z_()o 7
ZIP
STATE LIC. #
ADDRESS I r SK11ttHt=7t... er,
Cll):..Lln STATE .............-icL.l P:,fl.f) t!A-ZIP
d/2011
PHONE FAX 7&:. 0 -1./73 -702<.c
EMAIL
CONTRACTOR BUS. NAME
ADDRESS
CITY STATE ZIP
PHONE FAX
EMAIL
STATE UC.# CllY BUS. LIC.#
5'73SO 'z., 2-4 '3
(Sec. 7031.5 Business and Professions Code: Any Ci!Y or Counly which requires a permit to construct, alter, improve, demolish or repair any structure. prlQr to Its issuance, also requires the applicant for such permit to file a sil!lled statement tl\at he is licensed pursuant to the provisions of the contractor's License Law IChapterl:I, commending with Section 7000 of Division 3 of the Business and Professions Code} or fhat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penally of not more than five hundred dollars ($500)).
WORKERS' COMPENSATION
Workers' Compensation Declaration: I herebyalliml unde! penaJtyofperjulyoneofthe following declarations: D I have and will maintain a certlAcate of consent to salf-lnsu111 for workers' compensation as provided by Section 3700 of the Labor Code, lor the performance of Ile work for which this permit is issued. fiil I have and will maintain workers' compen,i;ion, as required b'( Section 3700 of lhe Labor Code, for the performan~;:e work for which Hlis permit is issued. My workers' corr,pensaliz ins\Jrah carrier cWld p:,icy
numberare:lnsuranceeo.5'1'1'tf?::= C4rv-e ftt15Jll hiLC) PolicyNo. ~235'70 Expiration Dale 7 /~ ZPIS
This section need not be completed~ the permit is fo ~e hundred dollars ($100) or less. ~ 0 Certificate of Exemption: I certify lhal in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as lo become subject lo the Workers' Compensation Laws of
California. WARNING: Failure to secu111 workers' comp coverage is unlawful, and shall subjact an employer to criminal penalties and clvll llnes upto one hundred thousand dollars {&100,000), In
addition to the cost of compensation, dama , provi ed ~ n 3706 of the Labor code, lnte111st and attorney's tees.
,L$ CONTRACTOR SIGNATURE --v----~-
I hereby affirm that I am exempt m Contractor's License Law for the foliutling reason:
□
□
□
I, as owner of the property or my employees with wages as their sole compensaljon, wil do the work and lhe structure is not inlended or offered for sale (Sec. 7044, Business cWld Professions Code: The Conlraclor's
License Law does not apply lo an owner of property who builds or improves thereon. and who does such work himse~ or IIYough his own employees, provkled that such i~rovements are not inlended or offered for
sale. If, however, the buiding or improvement is sold within one year of oo~letion, the owner-builder wil have the burden of proving that he did not buld or improve for the purpose of sale).
I, as owner of lhe property, am exclusively conlracting with !censed conlrac\ofs lo construct lhe project (Sec, 7044, Business and Professions Code: The Conlraclllr's License Law does not apply to an 0M1er of
property who builds or improves lhereon, and conlracls for such projects with contractor(s) licensed pursuant to the Contrador's License Lawi
I am exempt under Seclion ____ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for oonstruction of the proposed property improvement □Yes 0No
2. I (have I have not) signed an application for a building permit for lhe proposed work.
3.1 have conlracled w~h the following person (firm) lo provide the proposed construction (include name address I phone I contractors' license number):
4. I plan to provide portions of the work. but I have hired the following person to coordinate, supervise and provide the major work (include name I address I phone I contractors' license number):
5. 1 will provide some of the work, but I have oonlracled (hired) the following persons to provide the work indicated (include name I address I phone I type ol work):
,IS PROPERTY OWNER SIGNATURE □AGENT DATE
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials regis1ration form or risk management and prevention program ooder Sections 25505, 25533 or 25534 ot the
Presley-Tanner Hazardous Substance Account Act? □ Yes □ No
Is the applicant or future building occupant required lo obtain a permit from the air pollution con1rol dis1ricl or air quality management dis1rict? □ Yes □ No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING TIE REQUIREMENTS OF THE OFFICE a=
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
CONSTRUCTION LENDING AGENCY
I hereby affirm lhal lhere is a construction lending agency for the performance of lhe work !his permit is issued (Sec. 3097 ~) Civil Code).
Lender's Name Lender's Address
APPLICANT CERTIFICATION
I a,i1lfy that I have read the appllcatlon and S1ate 1hatlheaboWI tnbmallon ls correct and that the lioonnation on the plans ls accurate. I agree to comply with al Ci!Joldlnences and Slate laws relating" buldlngconstruc:llon.
I hereby authorize representative of Ille City of Cadsbad to enter upon the above mentioned property for inspeciion purposes. I ALSO AGREE TO SAVE, lNDEMN FY AND KEEP HARMLESS TfE OTY CF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY 1N ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: AA OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the 8.lilding Dfficia provisions of this Code shall expre by limitation and become nu! and void if the building or wrk authorized by such permtt is not commenced ~ii
100 da1,I from the date of such permit or if the b 'lding or · ch permit is suspended or abandoned at any time after the wrk is commenced for a period of 100 ays (8edi'.Jn 100.4 .4 Unibrm Rildi1g Code).
,.«$" APPLICANT'S SIGNATURE DATE zct
Inspection List
Pennit#: CB160485 Type: POOL
Date . _ lnspec:tio_n !!em .. . .. _ _ ____ _
04/26/2016 55 Fence/Pre-Plaster
04/26/2016 55 Fence/Pre-Plaster
04/26/2016 59 Final Pool
04/26/2016 59 Final Pool
04/12/2016 51 Excav/Steel/Bonding/Fence
03/15/2016 23 Gas/Test/Repairs
03/15/2016 31 Underground/Conduit-Wirin
03/15/2016 51 Excav/Steel/Bonding/Fence
Tuesday, April 26, 2016
Inspector Act
RI
PD AP
RI
PD AP
PD AP
PD AP
PD AP
PD AP
HEMERICK: 350 SF POOL/SPA
WITH 5' TALL ROCK WATERFALL
Comments
Page 1 of 1
,
& ~ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
DATE: 02/16/2016 PROJECT NAME: HEMERICK RESIDENCE POOL/ SPA
PLAN CHECK NO:1 SET#: 1 ADDRESS: 1741SKIMMERCT
VALUATION/SCOPE OF WORK: 18046
Community & Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
PROJECT ID: CB160485
APN: 2159212300
✓ This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: VALRAY NELSON
A Final Inspection by the ENGINEERING Division is required Yes ✓ No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the
attached checklist. Please resubmit amended plans as required.
NOTE: ONLY ITEMS THAT NEED CORRECTION/CLARIFICATION ARE MARKED X.
Plan Check Comments have been sent to: WATERLINEPOOLSSPAS@YAHOO.COM
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the Issuance of a building permit.
Resubmitted plans should Include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-4610 760-602-2750 760-602-4665
Chris Sexton I Kathleen Lawrence Greg Ryan
760-602-4624 760-602-27 41 760-602-4663
Chri:i.SextQn~cs;1rl5!2s;1gca.gov Ks;1!hlggn.Ls;1wreni;;e~~s;1rll2!2i:!g~s;1.gQv ~ regQ!Y, R~a n~~s;1rl5!2s;1g~s:1 .gQ~
Gina Ruiz Linda Ontiveros Cindy Wong
760-602-4675 760-602-2773 L 760-602-4662
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov C~nthia.Wong@carlsbadca.gQv
✓ ValRay Ma rsha ll Dominic Fieri
760-602-2741 760-602-4664
ValRay .Marshall@carlsbadca .gov DQminic.Fieri@carlsbadcs;1.gov
Remarks:
1
50' TRAIL
EASEMENT NOT
SHOWN ON SITE
PLAN. ONLY
SHOWS USEABLE
PL
E-37
Any outstanding issues will be marked with an [X] Make the necessary corrections for
compliance with applicable codes and standards. Submit corrected plans and/or specifications to
the Building division for re-submittal to the Engineering divisions.
Items that conform to pennit requirements are marked with [ZJ
1. SITE PLAN
Provide a fully dimensioned site plan drawn to scale.
Show:
North arrow
Existing & proposed structures
Property line dimensions
Easements
Show on site plan:
Drainage patterns
Existing & proposed slopes
Existing topography
Retaining Walls (location and height)
[?] Indicate what will happen with soil excavated from pool area.
lnc1uae on title sheet:
r7J Site address
Assessor's parcel number
Legal description/lot number
Grading: Quantities of
Cut Fill Import
Project does not comply with the following engineering conditions of approval
for project no:
Conditions were complies with by:
LOT NO. 64
MAP NO. 13839
REF. NO. CT 97-15
Page 2 of 4
Date:
REV 6/2012
'
..
1 1
2. GRADING PERMIT REQUIREMENTS
The conditions that require a grading permit are found in Section 11.06.030 of the Municipal
Code.
1 ---~] [--] Inadequate information available on site plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and
remedial). This information must be included on the plans. If no grading is proposed
write: "NO GRADING"
L .. __ l !__ ___ J Grading Permit required. NOTE: The grading permit must be issued and rough grading
approval obtained prior to issuance of a building permit A separate grading plan prepared a
registered civil engineer must be submitted together with the completed application form attached.
No grading permit required.
3. MISCELLANEOUS PERMITS
INDICATED ALL r7 RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work
WORK AND adjacent to the public right-of-way.
STAGING TO BE
DONE ON A separate right-of-way issued by the engineering division is required for the following:
DRIVEWAY
E-37
L __ _j Please complete attached right-of-way application form and return to the engineering
department together with the requirements on the attached right-of-way checklist, at
the time of resubmittal.
Right-of-way permit and pool permit will be issued simultaneously.
Page3 of◄ REV6/2012
------•-···. , ........... _. ---·-··---··-------
1
E-37
•
1
4. STORM WATER
Construction Compliance
Ci.] Project Threat Assessment Form complete[.{] incomplete C~J.
r~····-1 ~----....l LLJ Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form
and return (SW 16-46 )
Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2
SWPPP, payment of processing fee and review by city.
Post-Development (SUSMP) Compliance
r~J Storm Water Standards Questionnaire complete,-✓ l incomplete L ... J.
r----7 r~-7 Project is subject to Standard Storm Water Requirements. See city Standard Urban •···••···· .. ···...l .............. ,
Storm Water Management Plan (SUSMP) for reference.
http://www.carlsbadca.gov/business/building/Documents/EngStandsw-stds-vol4-ch2.pdf
L ...... .J L_ _ __J Project needs to incorporate low impact development strategies throughout in one or
more of the following ways:
LJ Rainwater harvesting (rain barrels or cistern)
[] Vegetated Roof
[~] Bio-retentions cell/rain garden
[-·-··1 Pervious pavement/pavers
[=:) Flow-through planter/vegetated or rock drip line
D Vegetated swales or rock infiltration swales
L~ Downspouts disconnect and discharge over landscape
[=:) Other:.
S. ADDITIONAL COMMENTS
·-----······-··-···----------
Page 4 of 4
--------------·-·•··. -..
REV6/2012
«,It',
~ CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
I am applying to the City of Carlsbad for the following type(s} of construction permit:
'Ji Building Permit □ Right-of-Way Permit
□ My project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Mechanical
Mobile Home
Plumbing Water Discharge
Project Storm Water Threat Assessment Criteria*
No Threat Assessment Criteria
□ My project qualifies as NO THREAT and is exempt from the requirement to prepare a stonm water pollution prevention plan (SWPPP) because
it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tier 1 -Low Threat Assessment Criteria ;s My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt pennit type (See list above) and the project
meets one or more of the following criteria:
• Resu Its in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehk:le fueling, waste stockpiling).
Tier 2 -Moderate Threat Assessment Criteria
□ My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following aiteria:
• Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is located along or within 30 feet of a storm drain inlet. an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Tier 3 -Significant Threat Assessment Criteria
□ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totalilg one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
□ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or,
□ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s).
I certify to the best of my knowledge that the above
checked statement• are true and correct. I underatand
and acknowledge that even though this project does
not require preparation of a construction SWPP, I must
still adhere to, and at all times during construction
activities for the permit type(s) check above comply
with the storm water best management practices
pursuant to Title 15 of the Carlsbad Municipal Code
and to City Standards.
Project Address: Assessor Parcel No.
"The City Engineer may authorize minor variances from the Stonn
Waler Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Construction SWPPP Tier Level is
warranted.
B-24
Date:
Page 1 of 1
Date: 2-9-/(p
Project 10:
Rev.03/09
~ «.,~"> ~ CITY OF
CONSTRUCTION THREAT
ASSESSMENT WORKSHEET FOR
DETERMINATION OF PROJECT'S
PERCEIVED THREAT TO
STORM WATER QUALITY
E-33
Development Services
Land Development Engineering
1635 Faraday Avenue
7~602-2750
www.carlsbadca.gov CARLSBAD
Construction Perceived
SWPPPTier Construction Threat Assessment Criteria* Threat to
StonnWater Level Quality
Tier 3 -High Construction Threat Assessment Criteria □ Project site is 50 acres or more and grading will occur during the rainy season
□ Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda
Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or
discharges directly to an ESA High □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
Tier3 □
USDA-NRCS Erosion factors kr greater than or equal to 0.4)
Site slope is 5 to 1 or steeper □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
□
through April 30).
Owner/contractor received a Storm Water Notice of Violation within past two years
Tier 3 -Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria
Tier 2 High Construction Threat Assessment Qriteria
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with
USDA-NRCS Erosion factors kr greater than or equal to 0.4) High
□ Site slope is 5 to 1 or steeper
Tier2 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□ Site results in one half acre or more of soil disturbance
Tier 2 -Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 2 High Construction Threat Assessment Criteria
Tier 1 -Medium lns~ction Threat Assessment Criteria
□ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or
directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA
□ Soil at site is moderately to highly erosive (defined as having a predominance of soils with ~ USDA-NRCS Erosion factors kr greater than or equal to 0.4)
• Tier 1 i Site slope is 5 to 1 or steeper
Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1
through April 30).
□ Owner/contractor received a Storm Water Notice of Violation within past two years
□ Site results in one half acre or more of soil disturbance
' Tier 1 -low lns"""ction Threat Assessment Criteria Low ~ ) All projects not meeting Tier· 1 Medium Construction Threat Assessment Criteria
Exempt -Not Applicable -Exempt
*The city engineer may authorize minor variances from the construction threat assessment cnteria in special circumstances
where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of
the city engineer
E-33 Page 1 of 1 REV4/30/10
,.
\.
«~ ¥ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
INSTRUCTIONS:
To address post-development pollutants that may be generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project
design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadca.gov/standards.
Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to
'Standard Stormwater Requ irements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependent upon the storm water standards applied to a project.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please
seek assistance from Land Development Engineering staff.
A separate completed and signed questionnaire must be submitted for each new development application submission. Only one
completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently.
In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits
for the project.
Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a priority development project, please answer the following questions:
YES NO
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet
the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or IJ other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in
accordance with USEPA Green Streets auidance?
2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are __A designed and constructed in accordance with the USEPA Green Streets guidance?
If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my
project does not meet PDP requirements" and complete applicant information.
If you answered "no" to both questions, then go to Step 2.
E-34 Page 1 of 3 Effective 6/27/13
«~ ~ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
STEP2
TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS
To determine if your project is a priority development project, please answer the following questions: YES
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial, industrial, residential, mixed-use, and public
development projects on public or private land.
2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial,
industrial, residential, mixed-use and public development projects on public or private land.
3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate consumotion.
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project? A hillside development
project includes development on any natural slope that is twenty-five percent or greater.
5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the
temporary parking or storage of motor vehicles used personally for business or for commerce.
6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a street, road, highway freeway or driveway? A street,
road, highway, freeway or driveway is any paved impervious surface used for the transportation of
automobiles, trucks, motorcycles, and other vehicles.
7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive
Area (ESA)? "Discharging Directly to" includes flow that is conveyed overfand"a .distance of 200 feet or less
from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the
project to the ESA (i.e. not commingles with flows from adjacent lands).*
8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a
facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's
that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of
100 or more vehicles oer dav.
10. ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and
are expected to generate pollutants post construction?
11 .ls your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%?
NO
~
)<1
~
><J
·~
X)
)()
)<J
;<\
~
~
If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to
implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such
as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this
questionnaire, check the "my project meets PDP requirements" box and complete applicant information.
If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to
implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all
development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step
4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant
information.
E-34 Page 2 of 3 Effective 6/27/1 3
'
J
«1~ ~ CITY OF
CARLSBAD
STORM WATER
STANDARDS
QUESTIONNAIRE
E-34
STEP 3
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY
Complete the questions below reqardinq your redevelopment project: YES
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than I I 50% of the surface area of the previously existinq development?
NO
If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of
impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and
complete applicant information.
If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4,
check the "my project meets PDP reauirements" box and complete applicant information.
□
STEP4
CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION
My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater
criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application.
I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details.
My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per
the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project.
Applicant Information and Signature Box
Address: Ire/I 5 .J:.tu-tv--tte:71(_ c, Accessor's Parcel Number(s): · VS -q 2 I -z 3
Applicant Title:
(_' c>Nn<./.k,V,t.,__
Date: z/c;/;?:, ~,
This Box for City Use Only
City Concurrence: NO
By:
Project ID:
* Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
E-34 Page 3 of 3 Effective 6/27/13
~ ~ CITY OF
CARLSBAD
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
STORM WATER COMPLIANCE CERTIFICATE
✓ My project is not in a category of permit types exempt from the Construction
SWPPP requirements
✓ My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
✓ My project does nol require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
✓ My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal. equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
• located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
• disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical: and/or
• disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
• construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANPARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT All TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
OWNER(S)/OWNER'S AGENT NAME (SIGNATURE)
E-29
STORM WATER POLLUTION PREVENTION NOTES
1. All NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE
All EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
4. All REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
5. All GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT
CONTROL AND PERIMETER PROTECTION BEST
MANAGEMENT PRACTICE MEASURES MUST BE
INSTALLED AND MAINTAINED.
SPECIAL NOTES
Page 1 of 3
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
PROJECT INFORMATION
Site Address: t'1 l{ \ 5'1(li,.16¾:Yl CT,
Assessor's Parcel Number; '2.15 _ q V-Z:2
Project ID: Q.o \lo 04'3 5
Construction Permit No.: ;N'J [lo --'i-lp
Estimated Construction Start Date ·'2,. (1 l&/t(p
(
Project Duration •~ Months
Emergency Contact:
Name \J-:-Y, 'filrl-~~$
24 hour Phone1cP § 15 ....-{a13 3
Perceived Threat to Storm Water Quality
6, Medium rlow
If medium box is checked, must attach a site plan
sheet showing proposed work area and location
of proposed structural BMPs
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
REV 4/30/10
«~,
~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
APPROVAL
P-29
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.2ov
DATE: 2/10/16 PROJECT NAME: POOL/SPA/WATERFALL PROJECT ID:
PLAN CHECK NO: CB160485 SET#: ADDRESS: 1741SKIMMER CT APN:
[ZI This plan check review is complete and has been APPROVED by the PLANNING
Division.
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required □ Yes rgi No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: WATERLINEPOOLSSPAS@YAHOO.COM
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING ENGINEERING FIRE PREVENTION
760-602-461.0 760-602~2750 760-602-4665
□ Chris Sexton □ Chris Glassen □ Greg Ryan
760-602-4624 760-602-2784 760-602-4663
Chris.Se:xtQn~carlsbadca.gov Christogher.Glassen@carlsb2dca.gov Gregory.Rxi;!n@carlsbadca.gov
~ Gina Ruiz □ ValRay Marshall □ Cindy Wong
760-602-4675 760-602-2741 760-602-4662
Giaa.Ruiz@carl~!;iadca.gQv ValRay:.Marshall@carlsbadca.gov Cxnthia.Wong@carlsbadca.gov
□ Veronica Morones □ Linda Ontiveros □ Dominic Fieri
760-602-4619 7 60-602-2 773 760-602-4664
Veronica.Moron!i!s@carlsbadca.gov Linda. Ontiveros@ca rls badca .gov Dominic.Fieri@carlsbadca.gov
Remarks: WATERFALL STATES HEIGHT IS MAXIMUM 5'