Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
August 28, 2019
Toyota Carlsbad
RECORD -COPY--,
~TE Project No. 10-13214T
I ~1-fr. QI. r--, .r.:1-1:_
Initial Date Attention: Ms. Peggy Keleher
5424 Paseo Del Norte
Carlsbad, California 92008
Telephone: (858) 679-1185 Via Email: pkelcher@toyotacarlsbad.com
Subject:
References:
:.; i ·"""'
i'i'\
! ' , I j
Ms. Keleher:
Response to Third-Party Geotechnical Review-Retaining Wall Calculations
Proposed Eco-Friendly Auto Spa
6010 Avenida Encinas
Carlsbad, California
Project No: 8838.1, Log No. 20536
Dated June 17, 2019
Construction Testing and Engineering, Inc, 2019, Response to Third-Party
Geotechnical Review (Second), Proposed Eco-Friendly Auto Spa, 6010 Avenida
Encinas, Carlsbad, California, Job No. 10-13214T, dated August 23.
Construction Testing and Engineering, Inc, 2017, Percolation Test Results for
Proposed Biofiltration Basins, Proposed Carlsbad Car Wash, 6010 A venida
Encinas, Carlsbad, California, Job No. 10-13214T, dated June 1.
Construction Testing and Engineering, Inc, 2016, Geotechnical Investigation,
Proposed Carlsbad Toyota Car Wash, 6010 Avenida Encinas, Carlsbad,
California, Job No. 10-13214T, dated September 16.
Construction Testing and Engineering, Inc, 2019, Grading Plans For: Eco-
Friendly Auto Spa, 6 Sheets, 6010 Avenida Encinas, Carlsbad CA, 92011,
GR2019-0011, Project No. CPD2017-0049, CUP2017-0009, Drawing No. 517-
2A.
Presented herein is our response to Michael Baker Intemational's (MBI's) review of the
retaining wall calculations dated June 4, 2019. MBI's comments were dated June 24, 2019.
MBI's comments were provided as redline comments on the submitted retaining wall calculation
sheets for the proposed stem wall (Detail 4 Stem Wall, GR 2019-0011, DWG 517-2A) and
proposed modified curb (Detail 5 Modified Curb, GR 2019-0011, DWG 517-2A). Comments
provided for both sets of calculations were "Update geotechnical report for CBC 2016.
Coordinate calcs with Geotech recommendations as applicable".
CTE is submitting a response to City of Carlsbad comments (CTE August 23, 2019)
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
Response to Third-Party Geotechnical Review -Retaining Wall Calculations Page 2
Proposed Eco-Friendly Auto Spa
6010 A venida Encinas, California
August 28. 2019 CTE Job No.: 10-13214T
concurrently with this response letter. The aforementioned CTE response letter included a review
of the previously issued geotechnical report (CTE, 2016) which concluded "the information
provided remains applicable and is considered to be consistent with recommendations of the
2016 California Building Code." Therefore, the previously provided retaining wall calculations
should be considered consistent with CBC 2016, and no update necessary.
We appreciate the opportunity to be of service on this project. Should you have questions, please
contact the undersigned at your convenience.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
~
Dan T. Math, GE# 2665
Principal Engineer
CJK/DTM
Colm J. Kenny, RCE #84406
Senior Engineer