Loading...
HomeMy WebLinkAboutResponse to Third Party Geotechnical Review1"',,.. ~1.,,' Construction Testing & Engineering, Inc. Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying August 28, 2019 Toyota Carlsbad RECORD -COPY--, ~TE Project No. 10-13214T I ~1-fr. QI. r--, .r.:1-1:_ Initial Date Attention: Ms. Peggy Keleher 5424 Paseo Del Norte Carlsbad, California 92008 Telephone: (858) 679-1185 Via Email: pkelcher@toyotacarlsbad.com Subject: References: :.; i ·"""' i'i'\ ! ' , I j Ms. Keleher: Response to Third-Party Geotechnical Review-Retaining Wall Calculations Proposed Eco-Friendly Auto Spa 6010 Avenida Encinas Carlsbad, California Project No: 8838.1, Log No. 20536 Dated June 17, 2019 Construction Testing and Engineering, Inc, 2019, Response to Third-Party Geotechnical Review (Second), Proposed Eco-Friendly Auto Spa, 6010 Avenida Encinas, Carlsbad, California, Job No. 10-13214T, dated August 23. Construction Testing and Engineering, Inc, 2017, Percolation Test Results for Proposed Biofiltration Basins, Proposed Carlsbad Car Wash, 6010 A venida Encinas, Carlsbad, California, Job No. 10-13214T, dated June 1. Construction Testing and Engineering, Inc, 2016, Geotechnical Investigation, Proposed Carlsbad Toyota Car Wash, 6010 Avenida Encinas, Carlsbad, California, Job No. 10-13214T, dated September 16. Construction Testing and Engineering, Inc, 2019, Grading Plans For: Eco- Friendly Auto Spa, 6 Sheets, 6010 Avenida Encinas, Carlsbad CA, 92011, GR2019-0011, Project No. CPD2017-0049, CUP2017-0009, Drawing No. 517- 2A. Presented herein is our response to Michael Baker Intemational's (MBI's) review of the retaining wall calculations dated June 4, 2019. MBI's comments were dated June 24, 2019. MBI's comments were provided as redline comments on the submitted retaining wall calculation sheets for the proposed stem wall (Detail 4 Stem Wall, GR 2019-0011, DWG 517-2A) and proposed modified curb (Detail 5 Modified Curb, GR 2019-0011, DWG 517-2A). Comments provided for both sets of calculations were "Update geotechnical report for CBC 2016. Coordinate calcs with Geotech recommendations as applicable". CTE is submitting a response to City of Carlsbad comments (CTE August 23, 2019) 1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net Response to Third-Party Geotechnical Review -Retaining Wall Calculations Page 2 Proposed Eco-Friendly Auto Spa 6010 A venida Encinas, California August 28. 2019 CTE Job No.: 10-13214T concurrently with this response letter. The aforementioned CTE response letter included a review of the previously issued geotechnical report (CTE, 2016) which concluded "the information provided remains applicable and is considered to be consistent with recommendations of the 2016 California Building Code." Therefore, the previously provided retaining wall calculations should be considered consistent with CBC 2016, and no update necessary. We appreciate the opportunity to be of service on this project. Should you have questions, please contact the undersigned at your convenience. Respectfully submitted, CONSTRUCTION TESTING & ENGINEERING, INC. ~ Dan T. Math, GE# 2665 Principal Engineer CJK/DTM Colm J. Kenny, RCE #84406 Senior Engineer