Loading...
HomeMy WebLinkAboutSDP 96-14C; LEGOLAND HOTEL; Civil Engineer's Verification of Permanent BMP; 2020-12-28--Hofman Planning & Engineering December 28. 2020 City of Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Civil Engineer's Verification of Permanent BMP Project: LEGOLAND HOTEL, DWG NO. 472-3A To Whom It May Concern: LETTER HPE conducted a site observation on March 8, 2013, and on December 23, 2020. Based on the site observation and contractor's confirmation, I have verified that the permanent BMPs as shown on the Grading Plan DWG No. 472-3A have been installed properly. Photos of the BMPs and the corresponding site map are attached as reference. The BMPs includes the following: • Porous concrete pavement at the parking lot. • Tufftrack grass road paver permeable fire access road. • Filterra precast storm inlets and tree wells as bio-filtration. Hofman Planning & Engineering Haixin Li, PE C59064 Principal Engineer Tel: (760) 692-4016 Direct Fax (760) 692-4105 Email: hli@hofmanplanninq.com 3156 Lionshead A venue, Suite l · Carlsbad · CA · 920 l 0 · 7 60-692-4 l 00 · Fax 7 60-692-4 l 05 -' ~ ~:~-_i,, ~ --~.. ... "