Loading...
HomeMy WebLinkAboutMS 2020-0003; HEMLOCK COAST HOMES; FINAL HYDROLOGY STUDY FOR TENTATIVE PARCEL MAP/MINOR SITE DEVELOPMENT PLAN/COASTAL DEVELOPMENT PERMIT, HEMLOCK COAST HOMES - 320 HEMLOCK AVENUE; 2021-03-01 FINAL HYDROLOGY STUDY FOR TENTATIVE PARCEL MAP / MINOR SITE DEVELOPMENT PLAN / COASTAL DEVELOPMENT PERMIT HEMLOCK COAST HOMES - 320 HEMLOCK AVENUE MS 2020-0003 / CDP 2020-0042 / SDP 2020-0004 / PUD 2020-0001 CITY OF CARLSBAD, CA PREPARED FOR: KMJ REAL ESTATE 2888 LOKER AVENUE EAST, SUITE 200 CARLSBAD, CA 92010 PH: (949) 678-4927 PREPARED BY: PASCO LARET SUITER & ASSOCIATES, INC. 535 N. HIGHWAY 101, SUITE A SOLANA BEACH, CA 92075 PH: (858) 259-8212 Prepared: September 2020 Revised: March 2021 ______________________________________________________ BRYAN ANDREW KNAPP, PE #86542 DATE: 03/10/21 TABLE OF CONTENTS SECTION Executive Summary 1.0 Introduction 1.1 Existing Conditions 1.2 Proposed Project 1.3 Conclusions 1.4 References 1.5 Methodology 2.0 Introduction 2.1 County of San Diego Criteria 2.2 Runoff Coefficient Determination 2.3 Hydrology & Hydraulic Model Output 3.0 Pre-Developed Hydrologic Calculations (100-Year Event) 3.1 Post-Developed Hydrologic Calculations (100-Year Event) 3.2 Pre-Developed vs. Post-Developed Peak Flows (100-Year Event) 3.3 Detention Analysis 3.4 Appendix 4.0 Isopluvial Maps Intensity Duration Design Charts Runoff Coefficients Hydrologic Soil Group - USDA Web Soil Survey Pre-Development Hydrology Node Map Post-Development Hydrology Node Map PLSA 3392-01 Page 1 of 11 1.0 EXECUTIVE SUMMARY 1.1 Introduction This Preliminary Hydrology Study for the proposed development at 320 Hemlock Avenue, known as Hemlock Coast Homes, has been prepared to analyze the hydrologic and hydraulic characteristics of the existing and proposed project site. This report intends to present both the methodology and the calculations used for determining the runoff from the project site in both the pre-developed (existing) conditions and the post- developed (proposed) conditions produced by the 100-year, 6-hour storm. 1.2 Existing Conditions The subject property is located along Hemlock Avenue, northeast of the intersection of Hemlock Avenue and Garfield Street, in the City of Carlsbad. The site is bound by a combination of existing single-family and multi-family developments to the west, north, and east, as well as Hemlock Avenue, a public road, to the south. The existing site consists of a single-family residence, driveway, walkways, landscaping, and miscellaneous improvements typical of this type of development. The project site is located in the Agua Hedionda Hydrologic Area, and, more specifically, the Los Monos Hydrologic Sub-Area (904.31) of the Carlsbad watershed. The subject property has an approximate area of 0.189 acres and is approximately 34% impervious in the existing condition. Per the Web Soil Survey application available through the United States Department of Agriculture, the basin is generally categorized to have type B hydrologic soils. Based on the existing impervious area and land use type, a pre-development weighted runoff coefficient of 0.47 was calculated for the subject property using the methodology described in section 3.1.2 of the San Diego County Hydrology Manual and the formula provided therein. After review of the site edge conditions, existing topography, and adjacent developments, it was determined that there is no additional offsite runon entering the site from the neighboring properties. The existing site can be categorized into one (1) major drainage basin, with one (1) primary discharge location leaving the property. Drainage basin EX-1 consists of the entirety of the project site and primarily drains from the northeast corner of the property to the southwest, discharging to the Hemlock Avenue right-of-way by surface and sheet flow methods. Once in the Hemlock Avenue right-of-way, runoff leaving the site travels west in the existing curb and gutter toward an existing storm drain sump curb inlet approximately 100 feet west of the property. Once surface flow enters the curb inlet, it is conveyed east in the underground public storm drain system toward the Coastal Rail Trail and outlets on the surface of the SDNR right-of-way. From there, runoff is ultimately conveyed south to outlet in the Agua Hedionda Lagoon prior to entering the Pacific Ocean. Using the Rational Method Procedure outlined in the San Diego County Hydrology Manual, a peak flow rate and time of concentration was calculated for the 100-year, 6- PLSA 3392-01 Page 2 of 11 hour storm event for the onsite drainage basin. Table 1 below summarizes the results of the Rational Method calculations. EXISTING DRAINAGE FLOWS DRAINAGE AREA DRAINAGE AREA (ACRES) Q100 (CFS) I100 (IN/HR) EX-1 0.189 0.58 6.59 Table 1. Existing Condition Peak Drainage Flow Rates Refer to pre-development hydrology calculations included in Section 3.1 of this report for a detailed analysis of the existing drainage basin, as well as a pre-development hydrology node map included in the appendix of this report for pre-development drainage basin delineation and discharge locations. 1.3 Proposed Project The proposed project includes the demolition of all existing onsite improvements and the construction of two (2) new multi-family / duplex structures consisting of four (4) total condominium units. The project proposes a driveway to provide vehicular access to the proposed garages consisting of two types of pervious pavers, delineated by color, style and finish to demarcate proposed walkway locations. Two private onsite parking stalls interior to the site are also shown for site residents. The proposed pad elevations for the two structures are 57.1, which appears to be roughly the same elevation as the existing residence. Site grading, drainage and utility improvements typical of this type of multi- family residential development will also be constructed as can be seen on the Preliminary Grading Plan prepared by Pasco, Laret, Suiter & Associates under separate cover. The subject property is approximately 58% impervious in the proposed condition. Based on the proposed impervious area and land use type, a post-development weighted runoff coefficient of 0.62 was calculated for the subject property using the methodology described in section 3.1.2 of the San Diego County Hydrology Manual and the formula provided therein. The proposed site consists of one (1) major drainage basin, with one (1) primary discharge location from the southwest corner of the property similar to the existing condition. Drainage basin PR-1 consists of the entirety of the site and will continue to convey runoff generally from a high point in the northeast corner of the site to the Hemlock Avenue right-of-way by means of surface flow. A concrete ribbon gutter located at the center of the pervious paver driveway will also serve to capture and convey drainage to the existing curb and gutter along Hemlock Avenue. Using the Rational Method Procedure outlined in the San Diego County Hydrology Manual, a peak flow rate and time of concentration were calculated for the 100-year, 6- hour storm event for the onsite drainage basin. Table 2 below summarizes the results of the Rational Method calculations in the post-developed condition. PLSA 3392-01 Page 3 of 11 PROPOSED DRAINAGE FLOWS DRAINAGE AREA DRAINAGE AREA (ACRES) Q100 (CFS) I100 (IN/HR) PR-1 0.189 0.78 6.59 Table 2. Proposed Condition Peak Drainage Flow Rates Refer to post-development hydrology calculations included in Section 3.2 of this report for a detailed analysis of the proposed drainage basin, as well as a post-development hydrology node map included in the appendix of this report for post-development drainage basin delineation and discharge locations. In an effort to comply with the City of Carlsbad storm water standards, the proposed site has incorporated LID design techniques to optimize the site layout. Runoff from proposed roofs and new or removed and replaced hardscape areas will be directed to landscaped areas or pervious pavers in an effort to disperse drainage to pervious surfaces. The landscaped areas will assist to remove sediment and particulate-bound pollutants from storm water. In addition, the storage layers of the pervious pavers will help to mitigate peak runoff by providing detention volume as well as slightly increasing the site’s overall time of concentration. Refer to Section 3.4 of the report for a static detention analysis showing that the increase in overall volume generated by the slight increase in hardscape is accounted for in the gravel storage layer of the pervious pavers. 1.4 Conclusions Based upon the analysis included in this report, there is an increase of ~0.20 cfs in peak runoff as a result of the proposed development due to the 2,000 square feet of additional hardscape in the proposed condition as compared the existing site. Similar to the existing condition, the project will discharge from one (1) location leaving the property in the southwest corner to the Hemlock Avenue right-of-way. Thus, water will not be diverted away from existing drainage patterns, and the increase in proposed impervious area and resulting peak runoff – before taking into account the detention qualities of the proposed pervious pavers - will not have an adverse effect on the downstream watershed. The inherent detention characteristics and storage volume provided in the gravel layers of the pervious pavers will assist to detain and mitigate peak runoff to pre-project conditions. The proposed project will be exempt from hydromodification compliance requirements as it does not qualify as a Priority Development Project as defined in the Regional Municipal Separate Storm Sewer System (MS4) Permit and the San Diego County Model BMP Design Manual. PLSA 3392-01 Page 4 of 11 1.5 References “San Diego County Hydrology Manual”, revised June 2003, County of San Diego, Department of Public Works, Flood Control Section. “San Diego County Hydraulic Design Manual”, revised September 2014, County of San Diego, Department of Public Works, Flood Control Section “City of Carlsbad Engineering Standards, Volume 5: Carlsbad BMP Design Manual (Post Construction Treatment BMPs)”, revised February 2016 “Low Impact Development Handbook – Stormwater Management Strategies”, revised July 2014, County of San Diego, Department of Public Works Soil Survey Staff, Natural Resources Conservation Service, United States Department of Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov. Accessed September 2, 2020 PLSA 3392-01 Page 5 of 11 2.0 METHODOLOGY 2.1 Introduction The hydrologic model used to perform the hydrologic analysis presented in this report utilizes the Rational Method (RM) equation, Q=CIA. The RM formula estimates the peak rate of runoff based on the variables of area, runoff coefficient, and rainfall intensity. The rainfall intensity (I) is equal to: I = 7.44 x P6 x D-0.645 Where: I = Intensity (in/hr) P6 = 6-hour precipitation (inches) D = duration (minutes – use Tc) Using the Time of Concentration (Tc), which is the time required for a given element of water that originates at the most remote point of the basin being analyzed to reach the point at which the runoff from the basin is being analyzed. The RM equation determines the storm water runoff rate (Q) for a given basin in terms of flow (typically in cubic feet per second (cfs) but sometimes as gallons per minute (gpm)). The RM equation is as follows: Q = CIA Where: Q = flow (in cfs) C = runoff coefficient, ratio of rainfall that produces storm water runoff (runoff vs. infiltration/evaporation/absorption/etc) I = average rainfall intensity for a duration equal to the Tc for the area, in inches per hour. A = drainage area contributing to the basin in acres. The RM equation assumes that the storm event being analyzed delivers precipitation to the entire basin uniformly, and therefore the peak discharge rate will occur when a raindrop that falls at the most remote portion of the basin arrives at the point of analysis. The RM also assumes that the fraction of rainfall that becomes runoff or the runoff coefficient C is not affected by the storm intensity, I, or the precipitation zone number. PLSA 3392-01 Page 6 of 11 2.2 County of San Diego Criteria As defined by the County Hydrology Manual dated June 2003, the rational method is the preferred equation for determining the hydrologic characteristics of basins up to approximately one square mile in size. The County of San Diego has developed its own tables, nomographs, and methodologies for analyzing storm water runoff for areas within the county. The County has also developed precipitation isopluvial contour maps that show even lines of rainfall anticipated from a given storm event (i.e. 100-year, 6-hour storm). One of the variables of the RM equation is the runoff coefficient, C. The runoff coefficient is dependent only upon land use and soil type and the County of San Diego has developed a table of Runoff Coefficients for Urban Areas to be applied to basin located within the County of San Diego. The table categorizes the land use, the associated development density (dwelling units per acre) and the percentage of impervious area. Each of the categories listed has an associated runoff coefficient, C, for each soil type class. The County has also illustrated in detail the methodology for determining the time of concentration, in particular the initial time of concentration. The County has adopted the Federal Aviation Agency’s (FAA) overland time of flow equation. This equation essentially limits the flow path length for the initial time of concentration to lengths under 100 feet, and is dependent on land use and slope. The time of concentration minimum is 5 minutes for purposes of calculating rainfall intensity per the County of San Diego Hydrology Manual requirements. 2.3 Runoff Coefficient Determination As stated in section 2.2, the runoff coefficient is dependent only upon land use and soil type and the County of San Diego has developed a table of Runoff Coefficients for Urban Areas to be applied to basin located within the County of San Diego. The table, included in the Appendix of this report, categorizes the land use, the associated development density (dwelling units per acre) and the percentage of impervious area. For this study, a weighted runoff coefficient was used for both the pre-project and post- developed site in accordance with the equation provided in Section 3.1.2 of the County of San Diego Hydrology Manual. The weighted runoff coefficient is a function of the total impervious and pervious surface areas in the existing and proposed conditions. PLSA 3392-01 Page 7 of 11 3.0 HYDROLOGY MODEL OUTPUT 3.1 Pre-Developed Hydrologic Model Output (100-Year Event) Pre-Development: Q = CIA *Rational Method Equation P100 = 2.5 *100-Year, 6-Hour Rainfall Precipitation Basin EX-1 Total Area = 8,241 sf  0.189 Acres Impervious Area = 2,760 sf  0.063 Acres Pervious Area = 5,481 sf  0.126 Acres Cn, Weighted Runoff Coefficient - 0.25, Cn value for natural ground, Type B soils * Per San Diego Hydrology Design Manual (SDHDM) Section 3.1.2 - 0.9, C value for developed / impervious surface * Per SDHDM Section 3.1.2 Cn = 0.9 x 2,760 sf + 0.25 x 5,481 sf = 0.47 8,241 sf Tc = 5.0 Min *Minimum Tc for Rainfall Intensity per SDHDM I = 7.44 x P6 x D-0.645 *Rainfall Intensity Equation I = 7.44 x 2.5 x 5.0-0.645 ≈ 6.59 in/hr Q100 = 0.47 x 6.59 in/hr x 0.189 Ac = 0.58 cfs PLSA 3392-01 Page 8 of 11 3.2 Post-Developed Hydrologic Model Output (100-Year Event) Post-Development (without considering HMP/BMP treatment): Q = CIA *Rational Method Equation P100 = 2.5 *100-Year, 6-Hour Rainfall Precipitation Basin PR-1 Total Area = 8,241 sf  0.189 Acres Impervious Area = 4,760 sf  0.109 Acres Pervious Area = 3,481 sf  0.080 Acres Cn, Weighted Runoff Coefficient - 0.25, Cn value for natural ground, Type B soils * Per San Diego Hydrology Design Manual (SDHDM) Section 3.1.2 - 0.9, C value for developed / impervious surface * Per SDHDM Section 3.1.2 Cn = 0.9 x 4,760 sf + 0.25 x 3,481 sf = 0.62 8,241 sf Tc = 5.0 Min *Minimum Tc for Rainfall Intensity per SDHDM I = 7.44 x P6 x D-0.645 *Rainfall Intensity Equation I = 7.44 x 2.5 x 5.0-0.645 ≈ 6.59 in/hr Q100 = 0.62 x 6.59 in/hr x 0.189 Ac = 0.78 cfs PLSA 3392-01 Page 9 of 11 3.3 Pre-Developed vs. Post-Developed Peak Flows (100-Year Event) Total Pre-Development (Discharge Leaving Site) Basin EX-1 Q100 = 0.58 cfs *Discharging from the site at the southwest corner to Hemlock Avenue Total Q100 = 0.58 cfs Total Post-Development (Discharge Leaving Site) Basin PR-1 Q100 = 0.78 cfs *Discharging from the site at the southwest corner to Hemlock Avenue Total Q100 = 0.78 cfs Pre-Development vs. Post-Development (Discharge Leaving Site): Pre-Development Post-Development Delta Q100 = 0.58 cfs Q100 = 0.78 cfs 0.20 cfs increase 3.4 Detention Analysis The 100-year, 6-hour storm event detention analysis was performed in accordance with Chapter 6 of the San Diego County Hydrology Manual (SDCHM). The results of the analysis provide a static detention requirement by comparing the total volume produced by the 100-year, 6-hour storm in the existing and post-project conditions. The total volume can be calculated after producing a hydrograph for each event (pre- and post- developed) with the results of the Rational Method analysis. Calculations and results of this analysis can be shown below. The proposed pervious pavement driveway provides mitigation of the 100-year, 6-hour storm event peak flow rate. Underneath the paver units and bedding layer is a 6-inch gravel storage layer that provides sufficient detention volume to offset the increase in total volume generated in the proposed condition due to the increase in overall hardscape. See sections 3.4.1 and 3.4.2 below for the results of these calculations. PLSA 3392-01 Page 10 of 11 3.4.1 Static (No Routing) Detention Calculation Pre-Development: 100-Year Event (Basin EX-1) Volume = C*P6*A *Equation 6-1 of SDCHM Volume = 0.47 * (2.5 in * 1 ft / 12 in) * (8,241 SF) = 807 CF Post-Development: 100-Year Event (Basin PR-1) Volume = C*P6*A *Equation 6-1 of SDCHM Volume = 0.62 * (2.5 in * 1 ft / 12 in) * (8,241 SF) = 1,074 CF Required Detention Volume = Total Post-Development – Total Pre-Development = Basin PR-1 – Basin EX-1 = 1,074 CF – 807 CF = 267 CF -> 267 CF static storage required for proposed basin PR-1 3.4.2 Pervious Pavement Drive Aisle – Storage Detention Volume Provided = Driveway Area x 6” Gravel Layer x 40% Voids = 2,650 SF * (6 in * 1 ft / 12 in) * 0.40 = 530 CF 530 CF storage in gravel layers under pervious paver driveway > 267 CF static storage required for drainage basin PR-1 per SDCHM. **As stated in the conclusion of the report, the slight increase in total peak flow leaving the project site will be mitigated by the storage volume provided by the pervious pavers proposed throughout the site, as shown above. Refer to Sheet 3 of the Civil plans prepared by Pasco, Laret, Suiter & Associates for the Tentative Parcel Map (MS) and minor Site Development Plan application under separate cover for a cross-section of the pervious pavers showing a gravel storage layer underneath the paver and bedding layers. 6' X 16' PCC FLUSH CURB OR DEEPENED G-1 CURB APPROVED PERVIOUS PAVER$ WIMIN l'VOID VOIO FILLER-!' raj' (N0.8) AGGREGATE IN VOIOS BEDDING COURSE-2' THICK OF j' raj' (N0.8) AGGREGATE CHOKERCOURSE-4'THICKOFi"-ltlllll!ilL i rat(N057)CRUSHEDROCK ~ MIN. 6"THICKOF¾' !r-...,-h""._,.'h"-,"H-~ ·~1 CRUSHED ROCK ~ SOIL SUBGRADE NOTE: -ALL AGGREGATE MUSTBE CLEAN/WASHED AND FREE OF FINES (SAND, SILT, ETC.) • THE PA VERS SHALL NOT BE SEALED ONCE THE VOID FILLER HAS BEEN ADDED -EACH COURSE SHALL BE VIBRATORY COMPACTED BEFORE PLACEMENT OF NEXT COURSE -NO IMPERVIOUS LINER OR FILTER FABRIC IS TO BE USED -SPECIAL APPROVAL REQUIRED FOR USE IN HIGHLY EXPANSIVE SOIL-SUBDRAIN MAY BE REQUIRED PERV/OUS PAVERS-TYPICAL DETAIL NOTTO SCALE PLSA 3392-01 Page 11 of 11 4.0 APPENDIX IL__·-----_--_I I I I I I . . . . . . . . • . -) . ,-. ' ' . : . . . ,, .,,. . . -... ·, "~ ~ ~ . I I I I I · . --- . . -~ . . . . . . . . ,=' ·---. . . . . . . . ' ~ e,a\H'1'Y 0 ~i.NDIEc;o • I -······_--___JI DPW ~GIS [lep:I.J""iJ7ient Di P11Mc Works Grn,r,..•pfll/,; /11furrr,.itiw1 &rv,tr.i-:; 10.0 9.0 8.0 7.0 6.0 5.0 4.0 3.0 2.0 0.5 0.4 0.3 0.2 0.1 ' ' " .... ' "r-.. ' ' .... i, .... .... ' . ' .... , ........ .... I'-,. 'r-. r-,, ' ... ... 'r-.. ' ' ..... .... , .... ,. ... . ' ' ' .... "r-,. ' ' ' ... ' .... , ' ' . ' 'r.... ... ..... ' .... ,. ' ' .... , ' , .. ' 5 6 7 8 9 10 ·, .... • r-.., ·, ... , ·, .... , r-.r-. .. r-' ' ~ .. .. I" I'-"-""" , .. .. ~ ~ r-.r-, "'i-. '~ ~ .. .. .. , ... , .. 'i-. ~ ~ r-.,. '~ .. .. r-. I", .. .. "r-~ ....... .. ,. 'r-.. ... .. ~ .. 1'-i-,. ,, "", .. 15 20 30 Minutes .. .. '"" .... .. .... .. ~r-.. .. ~ ~ .. .. .. .. ~ .. ~ ~ ~ '"" ~ .. .. .. ""~ 40 50 Duration I = I = p6 = D = EQUATION 7.44 P6 D-0.645 Intensity (in/hr) 6-Hour Precipitation (in) Duration (min) 'i', ... ' ... , .... i', ,i-.. ' ~ i', .... 'i-.. 1, 'i-.. 'r-- I', ... , , ... 'i-.. ' I'-, 'i' '-i-.. 2 ', ', .. ' .... ', ' .. .. ""· ', ', ' ~ "" ', . .... , . .... , .. , ' I" .. ', '"" I" I" 3 Hours .. .. .. .. .. .. .. ~ ~ .. .. .. 4 5 6 O> i 0 ~ 7J ro 0 6.0 R 5.5 ~ 5.0 g 4.5 5' 0 4.0 ~ 3.5 ~ 3.0 2.5 2.0 1.5 1.0 Intensity-Duration Design Chart -Template Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart . (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed . Application Form: (a) Selected frequency ___ year p (b) p6 = ---in., P24 = ---'P 6 = %(2J 24 (c) Adjusted p 6<2l = ___ in. (d) tx = __ min . (e) I = __ in./hr . Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. I P6 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 Duration I I I I I I I I I I I 5 2.63 3.95 5.27 6.59 7.90 9.22 10.54 11.86 13.17 14.49 15.81 7 2.12 3.18 4.24 5.30 6.36 7.42 8.48 9.54 10.60 11.66 12.72 10 1.68 2.53 3.37 4.21 5.05 5.90 6.74 7.58 8.42 9.27 10.11 15 1.30 1.95 2.59 3.24 3.89 4.54 5.19 5.84 6.49 7.13 7.78 20 1.08 1.62 2.15 2.69 3.23 3.77 4.31 4.85 5.39 5.93 6.46 -25 0.93 1.40 1.87 2.33 2.80 3.27 3.73 4.20 4.67 5.13 5.60 30 0.83 1.24 1.66 2.07 2.49 2.90 3.32 3.73 4.15 4.56 4.98 ~ 0.69 1.03 1.38 1.72 2.0~ 2.41 2.76_ 3.10 3.45 3.79 c---4.13 50 0.60 0.90 1.19 1.49 1.79 2.09 2.39 2.69 2.98 3.28 3.58 60 0.53 0.80 ,_~ 1.33 1.59 1.86 2.12 2.39 2.65 2.92 3.18 90 0.41 0.61 0.82 1.02 TI3 1.43 1.63 1.84 2.04 2.25 2 .45 120 0.34 0.51 0.613_ 0.85 ~ 1.19 1.36 1.53 1.70 1.87 2.04 --f--150 0.29 0.44 0.59 0.73 0.88 1.03 1.18 1.32 1.47 1.62 1.76 180 0.26 0.39 0.52 0.65 0.78 0.91 1.04 1.18 1.31 1.44 1.57 240 0.22 0.33 0.43 0.54 0.65 0.76 0.87 0.98 1.08 1.19 1.30 300 0.19 0.28 0.38 0.47 0.56 0.66 0.75 0.85 0.94 1.03 1.13 360 0.17 0.25 0.33 0.42 0.50 0.58 0.67 0.75 0.84 0.92 1.00 FIGURE ~ San Diego County Hydrology Manual Section: 3 Date: June 2003 Page: 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use Runoff Coefficient “C” Soil TypeNRCS Elements County Elements % IMPER. A B C D Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.200.250.300.35Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46 Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52 Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57 Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63 High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 0.78 0.79 Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82 Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DU/A = dwelling units per acre NRCS = National Resources Conservation Service 3-6 Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/2/2020 Page 1 of 43667990366800036680103668020366803036680403668050366806036679903668000366801036680203668030366804036680503668060467890467900467910467920467930467940 467890 467900 467910 467920 467930 467940 33° 9' 3'' N 117° 20' 39'' W33° 9' 3'' N117° 20' 37'' W33° 9' 0'' N 117° 20' 39'' W33° 9' 0'' N 117° 20' 37'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 15 30 60 90Feet 0 5 10 20 30Meters Map Scale: 1:396 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. USDA = MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: San Diego County Area, California Survey Area Data: Version 15, May 27, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jan 24, 2020—Feb 12, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/2/2020 Page 2 of 4USDA = □ D D D D D D D D ,,..,,,. ,,..,,,. □ ■ ■ □ □ ,,..._, t-+-t ~ tllWI ,..,,. ~ • Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI MlC Marina loamy coarse sand, 2 to 9 percent slopes B 0.3 100.0% Totals for Area of Interest 0.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 9/2/2020 Page 3 of 4USDA = XXXXXXXXXXXXXXEGWSSSSSSSSSSSSSSSS5757 5757 57575756 565655 5555 54ASPHALT CONC. CONC./BRICK LAWN CONC.X X X X X X XSCREEN FENCE PLAY STRUCTURE SAND SAND PIT HOSE BIB XLAWN SAND EXISTING 1 STORY BUILDING EXISTING 1 STORY BUILDING EXISTING 2 STORY BUILDING 56.3 57.0 57.0 57.1 57.2 57.0 56.8 56.5 56.5 56.5 57.1 57.157.1 GFF 56.8 57.0 57.7 FF 56.9 56.5 56.6 56.2 55.6 55.9 56.6 56.456.4 56.5 57.1 56.957.2 57.2 57.1 57.1 57.456.8 56.3 56.1 56.7 56.2 55.3 56.4 56.9 54.555.7 54.9 55.7 55.9 55.6 54.09TC 53.61FL 54.40TC 53.93FL 54.96TC 54.50FL 54.78TC 54.67FL 55.06TC 54.96FL 55.59TC 55.11FL 55.91TC 55.42FL 55.93TC 55.45FL 55.64TC 55.17FL EXISTING 2 STORY BUILDINGEXISTING 2 STORY BUILDINGSSSSS HEMLOCK AVENUEBASIN EX-1 A = 8,241 SF Cn = 0.47 25' 17' TO TC8' PARCEL 1 PM 16596 POR LOT 3 BLOCK R PALISADES #2 MAP 1803 POR LOT 3 BLOCK R PALISADES #2 MAP 1803 POR LOT 2 BLOCK R PALISADES #2 MAP 1803 N 56°00'25" E 78.49' N 34°01'00" W 105.00'(3.2%)(54.0 FL) (54.6 FL)(0.2%)(57.7 TW) (57.2 TW@EG) (57.2 BW@FG) (57.4 TW@FG) (57.1 BW@EG) (57.05 FG) (57.05 FG) (57.1 TW@EG) (56.8 BW)@FG (57.2 FG) (56.8 FG) (56.4 FG) (56.8 FG) (57.1 FG) (56.1 FG) (56.9 TW) (55.9 TW@FG) (55.1 BW@FG) (55.1 FG) (56.8 TW) (56.3 TW@EG) (56.1 BW@FG) (56.8 TW) (56.7 TW@EG) (56.2 BW@EG) (57.1 FG) EXISTING STRUCTURE TO REMAIN N 34°01'00" W 105.00' (57.3 FG) (57.3 FG) (56.5 FG) (56.7 FG) EXISTING RETAINING WALL EXISTING 12" RCP STORM DRAINPER DWG 139-7 EXISTING CURB ANDGUTTER TO REMAIN NODE EX-101 (55.2 FG) Q100 = 0.58 CFS NODE EX-100 (57.3 FG) PLSA 3392J:\ACTIVE JOBS\3392 NORUM HEMLOCK\CIVIL\REPORTS\HYDROLOGY\DISCRETIONARY\0_APPENDIX\3392-CV-HYDE.DWG EXISTING HYDROLOGY EXHIBIT 320 HEMLOCK AVENUE CITY OF CARLSBAD 10 20 30 GRAPHIC SCALE: 1" = 10' 010 LEGEND PROPERTY BOUNDARY CENTERLINE OF ROAD ADJACENT PROPERTY LINE / RIGHT-OF-WAY EXISTING CONTOUR LINE EXISTING PATH OF TRAVEL EXISTING DIRECTION OF FLOW EXISTING IMPERVIOUS AREA MAJOR DRAINAGE BASINBOUNDARY 64 TOTAL SITE AREA 8,241 SF (0.189 AC) BASIN EX-1 TOTAL AREA 8,241 SF (0.189 AC) BASIN EX-1 IMPERVIOUS AREA 2,760 SF (0.063 AC) BASIN EX-1 PERVIOUS AREA 5,481 SF (0.126 AC) % IMPERVIOUS 33.5% Cn 0.47 TIME OF CONCENTRATION 5.0 MINUTES (PER SDCHM) PLAN VIEW - PRE-DEVELOPMENT NODE MAP SCALE: 1" = 10' HORIZONTAL BASIN EX-1 - AREA CALCULATIONS EXISTING HYDROLOGY EXHIBIT HEMLOCK COAST HOMES - 320 HEMLOCK AVENUE (-++-+-- + I ~f----1 I \ \_ -I 7 II 11 11 11 11 I I ' . . ' ---- . .. ···-. PASCO LARET SUITER ----~ ~~~OC!~iilE~ San Diego I Solana Beach I Orange Coumy Phone 858.259.8212 I www.plsaengineering.com X X X X X X X X X X X X X X XX X XXXXXXXXXSSSSSXXXXXXXXXXXXXX EGW5757 5757 57575756 565655 5555 54ASPHALT CONC. CONC./BRICK LAWN CONC.X X X X X X XSCREEN FENCE PLAY STRUCTURE SAND SAND PIT HOSE BIB XLAWN SAND EXISTING 1 STORY BUILDING EXISTING 1 STORY BUILDING EXISTING 2 STORY BUILDING 56.3 57.0 57.0 57.1 57.2 57.0 56.8 56.5 56.5 56.5 57.1 57.157.1 GFF 56.8 57.0 57.7 FF 56.9 56.5 56.6 56.2 55.6 55.9 56.6 56.456.4 56.5 57.1 56.957.2 57.2 57.1 57.1 57.456.8 56.3 56.1 56.7 56.2 55.3 56.4 56.9 54.555.7 54.9 55.7 55.9 55.6 54.09TC 53.61FL 54.40TC 53.93FL 54.96TC 54.50FL 54.78TC 54.67FL 55.06TC 54.96FL 55.59TC 55.11FL 55.91TC 55.42FL 55.93TC 55.45FL 55.64TC 55.17FL EXISTING 2 STORY BUILDINGEXISTING 2 STORY BUILDING25' 17' TO TC8'ROWHEMLOCK AVENUEBASIN PR-1 A = 8,241 SF Cn = 0.62 PARCEL 1 PM 16596 POR LOT 3 BLOCK R PALISADES #2 MAP 1803 POR LOT 2 BLOCK R PALISADES #2 MAP 1803 N 56°00'25" E 78.49' N 34°01'00" W 105.00'(3.2%)(54.0 FL) (54.5 FL)(0.2%)(57.7 TW)57.3 TW@FG (57.2 TW@EG) (57.2 BW@FG) (57.4 TW@FG) 57.3 BW@FG (57.1 BW@EG) (57.05 FG) (57.05 FG) (57.1 TW@EG) 57.1 TW@FG (56.8 BW@FG) (57.2 FG) (56.8 FG) (56.4 FG) (57.1 FG) (56.1 FG) (56.8 TW) 56.8 TW@FG (56.3 TW@EG) (56.1 BW@FG) (57.1 FG) EXISTING STRUCTURE TO REMAIN N 34°01'00" W 105.00' EXISTING RETAINING WALL TO BE REMOVED EXISTING 12" RCP STORM DRAINPER DWG 139-7 EXISTING CURB ANDGUTTER TO REMAINPOR LOT 3 BLOCK R PALISADES #2 MAP 1803 NODE PR-100 57.3 FL NODE PR-102 54.6 FL Q100 = 0.78 CFS NODE PR-101 56.7 FS EXISTING CURB AND GUTTER TO REMAIN (56.9 TW)55.9 TW@FG(55.9 TW@EG) (55.1 BW@FG) PROPOSED PERVIOUS PAVER DRIVEWAY PROPOSED PERVIOUS PAVER DRIVEWAY LIMIT OF ROOF LINE ABOVE (TYP.) (54.7 FL) (55.1 FL) PLSA 3392J:\ACTIVE JOBS\3392 NORUM HEMLOCK\CIVIL\REPORTS\HYDROLOGY\DISCRETIONARY\0_APPENDIX\3392-CV-HYDD.DWG PROPOSED HYDROLOGY EXHIBIT 320 HEMLOCK AVENUE CITY OF CARLSBAD LEGEND PROPERTY BOUNDARY CENTERLINE OF ROAD ADJACENT PROPERTY LINE / RIGHT-OF-WAY EXISTING CONTOUR LINE PROPOSED CONTOUR LINE PROPOSED PATH OF TRAVEL PROPOSED DIRECTION OF FLOW PROPOSED IMPERVIOUS AREA MAJOR DRAINAGE BASIN BOUNDARY 64 BASIN PR-1 - AREA CALCULATIONS TOTAL SITE AREA 8,241 SF (0.189 AC) BASIN PR-1 TOTAL AREA 8,241 SF (0.189 AC) BASIN PR-1 IMPERVIOUS AREA 4,760 SF (0.109 AC) BASIN PR-1 PERVIOUS AREA 3,481 SF (0.080 AC) % IMPERVIOUS 57.8% Cn 0.62 TIME OF CONCENTRATION 5.0 MINUTES (PER SDCHM) 64 PLAN VIEW - POST-DEVELOPMENT NODE MAP SCALE: 1" = 10' HORIZONTAL 10 20 30 GRAPHIC SCALE: 1" = 10' 010 PROPOSED HYDROLOGY EXHIBIT HEMLOCK COAST HOMES - 320 HEMLOCK AVENUE . . . • II)(• K )( K )( ,ex • X ,c )( X X )( >r11K"1/',/' X IC X X I( I XX If )( x x II 1:N•)('\i:>t)(:>l:x: .. \ x ,.'\.x,/' l(X)()C II i=,,..\•:,(•·t-·:f;;~ ,. X X .~.,•,-f .. /.,4·•• II If • X ·•·::r;,.~~;.. ,-- "--" ~'\~ '<VY'-..,,, yz,n..,,y 7 0 ( . I • I ~D , I 'r l '1· . 1·11~ - I ; ' 11 11 I ------ . ··-···-· VZ/27/21/ZZJ PASCO LARET SUITER ----• ~ ~~~OC!~iilE~ San Diego I Solana Beach I Orange Coumy Phone 858.259.8212 I www.plsaengineering.com