Loading...
HomeMy WebLinkAbout2787 STATE ST; ; 75-138; Permitr:Jf BUILDING PERMIT APPLICATION 1 City of CARLSBAD, CALIFORNIA 92008 Applicant to complete numbered spaces only Phone 729-1181 Permit No . { JOB AOOA ESS .$~ ~ ASSESSOR'S ~76'7 PARCEL NUMBER LOT NO. I 8CK I mcT BOOK PAGE I PAR, ccm I l05£C ATTACHED SHEET) 1 DCSCR, OWNER MAIL A0011t[55 ZI p PHONE 2 _ •. ' . ~ --' ,, ✓ i' /!'IF CON T,tAC TOA MAIL ADOAESS PHONE LICENSE NO. STATE CITY 3 If 1',,1 ~•,,_Al 1' a'J ;,/':;,_ i. ,,_ r I ~ -. - AftCHlT[CT O R OESIGN[R MAIL ADDRESS PHONE LICCN5C p./Q, 4 [NGINECA MAIL ADDRESS PHONE L ICENSE NO, 5 COMPENSATION INS, CARRI ER MAIL ADDRESS B"ANCH 6 di-! , -_, I' :..1-;,.io,1,ul'I . ) I '1. ,, ,., .' A It ,, I j •~/' JI. •---- use. OF BUILDING 7 . 8 Class of work: □NEW □ ADDITION G ALTERATION □ REPAIR □ MOVE □ REMOVE 9 Describe work: A:-'O .0 rY1AM£~-R...A 12__00 rz ,...,, ,Y ~ I .rn '1" ,1: ,I f •r A._.. 10 Change of use from Change of use to 3 S Oc-•" PLAN CHECK FEE$/ V "2 (, l Ov 11 Valuation of work: $ -PERMIT FEE $ .,>,- SPECIAL CONDITIONS: MICRO FILM FEE Type of Occupancy Const. Group Size o f Bldg. No. of Max. (Total} SQ. Ft. Stories 0cc. Load Fire use Fire Sprinklers APPLICATION ACCEPTED BY PLANS C>jECKEO B~ APPROl/£-C, FOR ISSUANCE BV Zone Zone Required D Yes □No (, r ~-ln--1 ,,,,, No. of OFFSTREET PARKING SPACES: ..i(~/ ; ,, ~ ~? ,,.,.. No. !No. DATE l!>ATE Dwelling Units Covered Sq. Ft. Open NOTI CE Special Approvals Required Received Not Required SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB· PLANNING DEPT. ING, HEATING, VENTILATING OR AIR CONDITIONING. HEAL TH DEPT. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC· TION AUTHORIZED IS NOT COMMENCED WITHIN 120DAYS, OR IF FIRE DEPT. CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A SOIL REPORT PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM· MENCED. OTHER (Specify} I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS ENGINEERING DEPT. APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS WATER DEPT, TYPE OF WORK WILL BE COMPLI ED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. -I'- SIGNATURE OF CONTRACTON OR AIJTHORIZ.EO AGENT (DATE) SIGNATURE 0,-OWNER (I,-OWNUt BUil.DER) DAT£) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH "c-, - INSPECTOR INSPECTION RECORD DATE REMARKS INSPECTOR FOUNDATIONS: SET BACK TRENCH REINFORCING FOUNDATION WALL & WEATHER PROOFING CONCRETE SLAB FRAMING INT. LATHING OR DRYWALL EXT. LATHING MASONRY FINAL USE SPACE BELOW FOR NOTES, FOLLOW-UP, ETC. 4-1-75 All exterior of Building has been nailed off with 5/8 drywall and covered with redwood siding. Additional nails and clips were added to the mansard framing . T. Mata 4-19-75 T check for ribbing for drywall 4ooitl to be finished Saturday after working hours. T checked drywall nailing, they also added 1 5/8 screws for additional holding power. T. Mata STATE OF CALIFORNIA-CALIFORNIA COASTAL ZONE CONSERVATION COMMISSION Edmund G. Br:.iwn, Jr •. Governor SAN DIEGO COAST REGIONAL COMMISSION 6154 MISSION GORGE AOAO,SUITE 220 SAN DIEGO, CALIFORNIA 92°120-TEL(714) 280-6992 Control No : F2200 Date: February 7, 1975 Applicant: Bauer Lumber Company 2787 State Street Carlsbad, CA. 92008 ADMINISTRATIVE PERMIT Agent: Hilton Construction Co . 2829 State Str eet Carl spad, CA. 92008 Project Address: 2787 State Street, Carlsbad. MALCOLM A. LOVE Chairman ROBERT C. FRAZEE Vice Chairman JEFFERY D. FRAUTSCHY Representative to the California Coastal Zone Conservation Commission THOMAS A. CRANDALL Executive Director Work Proposed: Remodel the exterior of existing commercial building used by a Lumber Company. A new mansard roof and exterior siding woµld be installed. No changes in the dimensions of the building are proposed. Your application for an administrative permit is hereby approved and a permit hereby issued subject to the following terms and co.nditions: 1. That the applicant agrees to adhere strictly to the current plans for the project as submitted to the Commission. 2. That the applicant agrees to notify the Commission of any substantial changss in the project. 3. That the applica11.t will meet all the local code requirements and ordinances, and obtain all necessary permits from state and federal agencies. 4. That the applicant agrees to conform to the permit rules and regulations of the California Coastal Zone Conservation Commission. 5. That the applicant agrees that the Commission staff may make site inspections of the project during construction and upon completion. 6. That construction on the project will start within one year following final approval of the project by the -san Diego Coast Regional Commission. Note that no permit issued herewith shall become val.id until the happening of the following two conditions: (1) Commission Meeting. The close of the meeting of the San Diego Coast Regional. Commission at which time a report concerning the issuance of t his permit has been presented and where there is no opposition f r om .the Commi ssion (2) Rec~ipt and Acknowl~dgement. Until a copy of the permit is returned to the Regional Commission signed by t he perm.ittee acknowledging the receipt of a copy of the permit and t he fact t hat the permittee understands the contents thereof. This deterr:Jination was made upon t he following findings : 1. Improvements to an existing structur e. 2. Estimated cost -$3,500. This executive determination has been made upon yo ur proposed project that will not h~vc any special adverse environmental or ecological effect and that it is consistent with the findings and declaration· set forth by the Public Resources Code Section 27001 and with the objectives set forth in Public Resources Code Section 27302. It should be noted that the detcnnination and the tenns and conditions of the permit shall.be perpetual and it is the intention to bind a ll future owners and possessors of the subject property except in the following particulars: TAC: gj Very truly yours, ·......,·, ~-, --_;.,,: .. . ✓-.;;..:.~ a.~~ Thomas A. Crandall Executive Director . . -----------------------------------------~-------------------------,L~------Directions to Permittee: Permittee is to execute below and r eturn one copy of this . : .. permit to the San Diego Coast, Regional Commission. '. ·• ·.'.' I have read and understand the terms, conditions and limitations of this permt . . and. agree to abide by them. i,1" ..... •• ••• . /2-IU~?J- Date Signed by Permittec Control Number: F2200 INTERDEPARTMENTAL INFORMATION SHEET DATE: /-"2 2,.. ?f BUILDING DEPARTMENQ ,--y.~ ~ Q-- BfUI LDI NG ADD SS:--:::~t........:..~70E;...._ ..... 8:~_.2'--_►,,..~c.-....11..-=i-~:;...._=.,____..,.,,.,_y:'V _ _.-:; __ , ___________ _ PLANNING DEPARTMENT LOT SIZE ____________ OT WIDTH _________ ZONE ______ _ UNITS PROVIDED _____ J,LLOWED _____ PRKG. SPACES PROVIDED ____ REQ. __ _ % OF COVERAG ..... E ____ ALLOWED _____ BLDG. HEIGHT _____ ALLOWED ____ _ FRONT SETBACK ____ SIDE YARD _____ REAR YARD _____ INTRUSIONS ___ _ ENVIRONMENT AL PROTECTION REO'TSC!,,o..it~~D1SCAPE PLAN, ______ _ ADDITIONAL COMMENTS, ____________________________ _ ISSUE PERMIT _______ DATE ______ OCCUPANCY ______ DATE ____ _ ENGINEERING DEPARTMENT R.O.W .. _______________ INDUSTRIAL WASTE ____________ _ IMPROVEMENTS ___________ SEWER CONNECTION ____________ _ bRIVEWAY LOCATIONS ________________ GRADING PERMIT ______ _ _ EASEMENTS ____________________ DRAINAGE ________ _ LEGAL DESCRIPTION, _____________________________ _ Aoo1T1 oNAL co MM ENTs 6> ~ • ....__;( ,e..,,. ,e,1 uL~ Ro. V<J.~ FIRE DEPARTMENT SPRINKLING SYSTEM _____________________________ _ FIRE PROTECTION EQUIPMENT ____________ FIRE ALARMS ________ _ EXITS ________________________________ ____,,. __ FIRE HYDRANTS ___________ _ LOCATION _____________ _ ADDITIONAL COMMENTS ____________________________ _ ISSUE PERMIT _______ DATE ______ OCCUPANCY ______ DATE ____ _ WATER DEPARTMENT C M W D ________ CARLSBAD ____ OLIVENHAIN. ____ SAN MARCOS ___ _ r ADDITIONAL COMMENTS ____________________________ _ ~ ISSUE PERMIT _______ DATE ______ OCCUPANCY ______ DATE ____ _ SENT TO PLANNING SENT TO ENG. DEPT. ------- RETURNED TO BLDG. RETURNED TO BLDG. DEPT. ____ _ ,.> \~ -:::,.. ~\ \ '¥\ \ ... _. ~ :\ j