HomeMy WebLinkAboutCDP 2018-0040; BAUM RESIDENCE; FINAL SOILS REPORT; 2021-05-12Mr. David Raum
261 Apple Blossom Lane
Vista, California 92084
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALIFORNIA 92071
TEL. 619-258-7901
May 12, 2021
Project No. ll-1127C5
Subject: Final As-Graded Soil Report for Proposed Single-Family Residence
1587 Triton Street
Carlsbad, California 92009
Dear Mr. Raum:
In accordance with your request, we have prepared this final, as-graded soil report for the
proposed single-family residence at the subject site.
Based on our field observations and attached Figure 1, References and Reports of Field Density
Tests (References 2 and 7), it is our opinion that the soil engineering and engineering geologic
aspects of the site grading are in accordance with our Preliminary Geotechnical Investigation
Report (Reference 11 ), local grading ordinances and the project grading plans. In addition,
footing excavations, soil expansion characteristics and soil bearing capacity were observed to be
in conformance with the approved plans and specifications.
This opportunity to be of service is appreciated. If you have any questions, or we can be of
further service, please do not hesitate to call or contact us.
Respectfully Submitted,
Martin R. Owen, PE, GE
Geotechnical Engineer
Attachment: Figure 1, References and Reports of Field Density Tests
Final As-Graded Soil Report for Proposed Single-Family Residence
1587 Triton Street
Carlsbad, California 92009
FIGURE 1
Page 2
May 12, 2021
Project No. 11-1127C5
REFERENCES AND REPORTS OF FIELD DENSITY TESTS
1. "Foundation Excavation Observation, Proposed Single-Family Residence, 1587 Triton Street,
Carlsbad, California 92009", Project No. 1 l-1127C5, Prepared by East County Soil Consultation and
Engineering, Inc ., Dated October 24, 2019.
2. "Report of Field Density Tests, Proposed Single-Fanuly Residence, 1587 Triton Street, Carlsbad,
California 92009", Project No. l l-l 127C5, Prepared by East County Soil Consultation and
Engineering, Inc ., Dated August 15, 2019.
3. "Response to Tlurd Party Second Review, Proposed Single-Family Residence, 1587 Triton Street,
Carlsbad, California 92009", Project No. ll-1127C5, Prepared by East County Soil Consultation and
Engineering, Inc., Dated May 22, 2019.
4. "Grading Plan, Foundation Plan and Details Review, Proposed Single-Family Residence, 1587 Triton
Street, Carlsbad, California 92009", Project No. ll-1127C5, Prepared by East County Soil
Consultation and Engineering, Inc., Dated May 22, 2019.
5. "Soils Report Update, Proposed Single-Family Residence, 1587 Triton Street, Carlsbad, California
92009", Project No. ll-1127C5, Prepared by East County Soil Consultation and Engineering, Inc.,
Dated October 19, 2018.
6. "Soils Report Update, Proposed Single-Family Residence, 6575 Black Rail Road (Lot No. 2),
Carlsbad, California 92009", Project No. 11-1127C5, Prepared by East County Soil Consultation and
Engineering, Inc., Dated September 27, 2012.
7. "Report of Field Density Tests, Proposed Single-Family Residence, 6575 Black Rail Road (Lot No . 2),
Carlsbad, California 92009", Project No. ll-1127C5, Prepared by East County Soil Consultation and
Engineering, Inc., Dated August 23, 2011.
8. "Transfer of Geotechnical Responsibility, Geotechnical Engineer of Record, Two Proposed Single-
Family Residences, 6575 Black Rail Road, City of Carlsbad, California", Prepared by East County
Soil Consultation and Engineering, Inc., Dated July 11 , 2011 .
9. "Geotechnical Update, Parcel 1 of Parcel Map 19411, APN 215-070-39, Carlsbad, San Diego County,
California," W .O. 6087-A-SC, Prepared by Geosoils Inc. Dated June 16, 2010.
10. "Final Compaction Report of Grading, Building Pad Area, Parcel 4, 6575 Black Rail Road, Carlsbad,
San Diego County, California," W .O. 34601-B-SC, Prepared by Geosoils Inc. Dated September 14,
2004 .
11 . "Prelinunary Geotechnical Investigation, 6575 Black Rail Road, Proposed Subdivision, Carlsbad, San
Diego County, California", W.O. 3460-A-SC, Prepared by GeoSoils Inc., Dated November 27, 2002.
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
Mr. David Raum
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I."
SANTEE, CALIFORNIA 92071 ,
(619) 258-7901
Fax 258-7902
261 Apple Blossum Lane
Vista, California 92084
Subject:
References:
Dear Mr. Raum:
Report of Field Density Tests
Proposed Single-Family Residence
1587 Triton Street
Carlsbad, California 92009
See Attached
August 15, 2019
Project No. 1 l-l 127C5
This report presents the results of field density tests performed on the building pad for the proposed
single-family residence at the subject site.
Following your request, in-place field density tests were performed in accordance with ASTM Dl556
(Sand Cone Method). Grading was conducted on August 13 and 14, 2019 under the observation and
testing of a representitive of East County Soil Consultation & Engineering Inc.
The results of the field density tests are presented on Page T-1 under "Table of Test Results". The
laboratory determinations of the maximum dry density and optimum moisture content of the fill soils are
set forth on Page L-1 under "Laboratory Test Results". The approximate test locations are shown on
Plate No. 1.
On-site fill soils consisting of silty sand were scarified to a depth of approximately 6 inches, moisture-
conditioned and compacted in excess of 90 percent relative compaction. Compaction was achieved with
the use of backhoe.
If we can be of further assistance, please do not hesitate to contact our office.
Page T-1, L-1 and Plate No. 1 are parts of this report.
Mamadou Saliou Di
RCE 54071, GE 2704
MSD/md
DEPTH
TEST SOIL OFFILL
NO. TYPE IN FEET
FG
2 FG
David Raum/ 1587 Triton Street/ Carlsbad Project No. 11-I I 27C5
PAGE T-1
TABLE OF TEST RESULTS
ASTMD1556
MAXIMUM
FIELD DRY DRY
MOISTURE DENSITY DENSITY
%DRYWT. P.C.F. P.C.F
6.4 121.3 127.0
7.3 119.7 127.0
FG = FINISH GRADE
2
PERCENT
COMPACTION
96
94
REMARKS
David Raum/ 1587 Triton Street/ Carlsbad Project No. I 1-1127C5
PAGEL-I
LABO RA TORY TEST RESULTS
RESULTS OF MAXIMUM DENSITY AND OPTIMUM MOISTURE
The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM
01557, Procedures A and B which use 25 blows of a 10-pound slide hammer falling from a height of 18
inches on each of 5 equal layers in a 4-inch diameter 1/30 cubic foot compaction cylinder and Procedure
C which uses 56 blows of a 10-pound slide hammer falling from a height of 18 inches on each of 5 equal
layers in a 6-inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows:
SOIL TYPE/
PROCEDURE DESCRIPTION
1/ A REDDISH BROWN SIL TY SAND
3
MAXIMUM
DRY DENSITY
LB/CU. FT.
127.0
OPTIMUM
MOISTURE
CONTENT
%DRY WT.
10.0
EAST COUNTY SOIL CONSULTATION
& ENGINEERING, INC.
10925 HARTLEY RD., SUITE I
SANTEE, CA 92071
GEOTECHNICAL ENGINEERING
,/-
i ,/ I ; , !
I f ll j
I
P.4-WC> /?At,fr-f flf~
lf?t3777fl/wN .:;;;;eeer
~U:ii34-b
-!V· //-//Z7CL_5
David Raum/ 1587 Triton Street/ Carlsbad Project No. l l-l l 27C5
REFERENCES
I. "Response to Third Party Second Review, Proposed Single-Family Residence, 1587 Triton
Street, Carlsbad, California 92009", Project No. 1 l-l 127C5, Prepared by East County Soil
Consultation and Engineering, Inc., Dated May 22, 2019.
2. "Grading Plan, Foundation Plan and Details Review, Proposed Single-Family Residence, 1587
Triton Street, Carlsbad, California 92009", Project No. 11-1127C5, Prepared by East County Soil
Consultation and Engineering, Inc., Dated May 22, 2019.
3. "Soils Report Update, Proposed Single-Family Residence, 1587 Triton Street, Carlsbad,
California 92009", Project No. l l-l l 27C5, Prepared by East County Soil Consultation and
Engineering, Inc., Dated October 19, 2018.
4. "Soils Report Update, Proposed Single-Family Residence, 6575 Black Rail Road (Lot No. 2),
Carlsbad, California 92009", Project No. l I-I 127C5, Prepared by East County Soil Consultation
and Engineering, Inc., Dated September 27, 2012.
5. "Report of Field Density Tests, Proposed Single-Family Residence, 6575 Black Rail Road (Lot
No. 2), Carlsbad, California 92009", Project No. l 1-1 I 27C5, Prepared by East County Soil
Consultation and Engineering, Inc., Dated August 23, 2011.
6. "Transfer of Geotechnical Responsibility, Geotechnical Engineer of Record, Two Proposed
Single-Family Residences, 6575 Black Rail Road, City of Carlsbad, California", Prepared by
East County Soil Consultation and Engineering, Inc., Dated July 11 , 2011.
7. "Geotechnical Update, Parcel 1 of Parcel Map 19411, APN 215-070-39, Carlsbad, San Diego
County, California," W.O. 6087-A-SC, Prepared by Geosoils Inc. Dated June 16, 2010.
8. "Final Compaction Report of Grading, Building Pad Area, Parcel 4, 6575 Black Rail Road,
Carlsbad, San Diego County, California," W.O. 34601-B-SC, Prepared by Geosoils Inc. Dated
September 14, 2004.
9. "Preliminary Geotechnical Investigation, 6575 Black Rail Road, Proposed Subdivision, Carlsbad,
San Diego County, California", W.O. 3460-A-SC, Prepared by GeoSoils Inc., Dated November
27, 2002.
4
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALIFORNIA 92071
(619) 258-7901
Fax 258-7902
A & E Construction Services
P.O. Box 130400
Carlsbad, California 92013
Project: Report of Field Density Tests
Proposed Single-Family Residence
6575 Black Rail Road (Lot No. 2)
Carlsbad, California 92009
References: See Attached
Ladies & Gentlemen:
August 23, 2011
Project No. l 1-1127C5
This is to present the results of field density tests performed on the building pad for the the
proposed single-family residence, including the backfill of the keystone retaining wall for the
driveway at the subject site.
In accordance with your request, in-place field density tests were performed in accordance with
ASTM D1556 (Sand Cone Method). Backfill and grading were conducted between July 14 and
August 19, 2011 under the observation and testing of a representitive of East County Soil
Consultation & Engineering Inc.
The results of the field density tests are presented on Page T-1 under "Table of Test Results".
The laboratory determinations of the maximum dry densities and optimum moisture contents of
the fill soils are set forth on Page L-1 under "Laboratory Test Results". The approximate test
locations are shown on Plate No. 1.
Following clearing and grubbing, i.e. the removal of vegetation and deleterious materials,
subgrade soils were overexcavated to a depth of approximately 2 feet below existing grade into
dense terrace deposits. The bottom of the excavation was scarified to a depth of approximately 6
inches, moisture conditioned and compacted.
On-site fill soils consisting of silty sand were placed in thin lifts, moisture conditioned around
optimum and compacted in excess of 90 percent relative compaction. Compaction was achieved
with the use of a Caterpillar 941 track loader and a hand whacker.
A & E CONSTRUCTION SERVICES/ BLACK RAIL ROAD/ PROJECT NO. I l-1127C5
Based on our field observations and density test results, it is our opinion that the grading
operation for the the proposed single-family residence was performed in accordance with the
referenced geotechnical reports (References No. 2 and No. 4) and local grading ordinances.
If we can be of further assistance, please do not hesitate to contact our office.
Pages T-1, L-1 and Plate No. 1 are parts of this report.
Respectfully Submitted,
Mamadou Saliou Diallo, P .E.
RCE 54071, GE 2704
MSD/md
2
TEST SOIL
NO. TYPE
1 1
2 1
3 2
4 3
5 3
6 2
7 2
8 2
9 1
10 1
11 2
12
13 1
14 1
15 1
16
A & E CONSTRUCTION SERVICES/ BLACK RAIL ROAD/ PROJECT NO.11-1127C5
DEPTH
OFFILL
IN FEET
1
1
3
3
5
6
7FG
2
2
4
5
7
2
8FG
3FG
PAGET-1
TABLE OF TEST RESULTS
ASTMD1556
MAXIMUM
FIELD DRY DRY
MOISTURE DENSITY DENSITY
¾DRYWT. P.C.F. P.C.F
11.6 118.0 127.0
12.1 117.8 127.0
10.5 122.5 125.5
8.7 120.4 128.0
8.9 120.7 128.0
9.7 120.2 125.5
13.4 119.5 125.5
11.5 116.9 125.5
9.9 116.2 127.0
11.7 121.6 127.0
12.9 114.4 125.5
11.5 119.6 127.0
11.4 121.7 127.0
12.1 115.7 127.0
11.3 120.3 127.0
10.6 119.5 127.0
FG = FINISH GRADE
3
PERCENT
COMPACTION
93
93
98
94
94
96
95
93
92
96
91
94
96
91
95
94
REMARKS
A & E CONSTRUCTION SERVICES/ BLACK RAIL ROAD/ PROJECT NO. I l-l 127C5
PAGE L-1
LABORATORY TEST RESULTS
RESULTS OF MAXIMUM DENSITY AND OPTIMUM MOISTURE
The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM
D1557, Procedures A and B which use 25 blows of a IO-pound slide hammer falling from a height of 18
inches on each of 5 equal layers in a 4-inch diameter 1/30 cubic foot compaction cylinder and Procedure
C which uses 56 blows of a 10-pound slide hammer falling from a height of 18 inches on each of 5 equal
layers in a 6-inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows:
OPTIMUM
MAXIMUM MOISTURE
SOIL TYPE/ DRY DENSITY CONTENT
PROCEDURE DESCRIPTION LB/CU. FT. %DRY WT.
1/A REDDISH BROWN SIL TY SAND 127.0 10.0
2/A TAN BROWN SILTY SAND 125.5 11.0
3/A DARK BROWN SILTY SAND 128.0 9.5
4
,i,
Tklro,v
_, ----..
•1 '\
1
I
\ I .1-J \i
.4 11
l I I I
·" ~ " .,~ . \~ • \'v \"'J
•\\
EAST COUNTY SOIL CONSULTATION
& ENGINEERING, INC.
I 092S HARTLEY RD .• SUITE I, SANTEE. CA 92071
(619) 258-7901 Fax (619) 258-7902
~I:!£,
~
M)
s~
~
• \'1
A & E CONSTRUCTION SERVICES/ BLACK RAIL ROAD/ PROJECT NO. I 1-1127C5
REFERENCES
1. "Transfer of Geotechnical Responsibility, Geotechnical Engineer of Record, Two
Proposed Single-Family Residences, 6575 Black Rail Road, City of Carlsbad,
California", Prepared by East County Soil Consultation and Engineering, Inc., Dated July
11, 2011.
2. "Geotechnical Update, Parcel 1 of Parcel Map 19411, APN 215-070-39, Carlsbad, San
Diego County, California," W.O. 6087-A-SC, Prepared by Geosoils Inc. Dated June 16,
2010.
3. "Final Compaction Report of Grading, Building Pad Area, Parcel 4, 6575 Black Rail
Road, Carlsbad, San Diego County, California," W.O. 34601-B-SC, Prepared by Geosoils
Inc. Dated September 14, 2004.
4. "Preliminary Geotechnical Investigation, 6575 Black Rail Road, Proposed Subdivision,
Carlsbad, San Diego County, California", W.O. 3460-A-SC, Prepared by GeoSoils Inc.,
Dated November 27, 2002.
5