Loading...
HomeMy WebLinkAboutCUP 06-11C; PACIFIC RIDGE SCHOOL MDIC BUILDING; FINAL SOILS REPORT; 2020-01-08AS-GRADED REPORT FOR MULTI-DISCIPLINARY INNOVATION CENTER PACIFIC RIDGE SCHOOL, BRESSI RANCH CARLSBAD, CALIFORNIA Prepared for: PACIFIC RIDGE SCHOOL. 6269 El Fuerte Street. Carlsbad, California 92009 Project No.11719.003 January 8, 2020 ----Leighton and Associates, Inc. ---• A LEIGHTON GROUP COMPANY 11719.003 2 January 8, 2021 Project No. 11719.003 To: Pacific Ridge School 6269 El Fuerte Street Carlsbad, California 92009 Attention: Ms. Stephanie Holly Subject: As-Graded Report for the Multi-Disciplinary Innovation Center (MDIC), Pacific Ridge School, Bressi Ranch, Carlsbad, California Introduction In accordance with your request and authorization, Leighton and Associates, Inc. (Leighton) has performed geotechnical observation and testing services during the rough, fine and post grading of the Pacific Ridge School located in Carlsbad, California. This report summarizes our geotechnical observations, field and laboratory test results, and the geotechnical conditions encountered during the grading operations of the site. The conclusions and recommendations presented in the Geotechnical Update (Leighton, 2019), and Interim As-Graded Geotechnical Completion Letter (Leighton, 2020) are still considered pertinent and applicable to the construction of the project. As of the date of this report, the grading activities for the project are essentially complete. Summary of Rough and Fine Grading Operations The remedial and fine grading operations were performed by Trinity Grading Company, between February 2, 2020 and March 6, 2020. During the grading, geotechnical observation and testing was performed by a representative of Leighton. Based on our observations and testing services, it is our professional opinion that the MDIC building pad grading was performed in general accordance with the recommendations of the 3934 Murphy Canyon Road, Suite B205 ■San Diego, CA 92123-4425 858.292.8030 ■ Fax 858.292.0771 ■ www.leightongroup.com Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY 11719.003 3 project Geotechnical Update Report (Leighton, 2019) and recommendations made during the course of grading. The geotechnical conditions encountered during grading were generally as anticipated. In summary, the remedial and fine grading operations for the MDIC building pad (i.e., finish pad elevation 253.50 feet) included: 1) over excavation of on-site soils to depths of at least 10 feet beneath the western portion of the proposed building pad to mitigate a cut/fill transition; 2) exporting of wet soil; 3) importing of dry soil; 4) moisture conditioning of existing and imported fills to 2 percent above optimum moisture content; and 5) placement of fill soils compacted to at least 90 percent relative compaction based on ASTM Test Method 1557. It is our professional opinion that the MDIC building pad is suitable for the proposed use provided the recommendations included in the project Geotechnical Update Report (Leighton, 2019) are incorporated into the design and construction of the structure and associated improvements. Summary of Post-Grading Operations The post-grading operations for the project were performed between April 1, 2020 and July 29, 2020. In summary, following completion of the building pad, the post-grading operations included: 1) Sewer and storm drain backfill; 2) Elevator pit backfill; 3) Grading of subgrade for concrete flatwork around the building. Based on our observations and tests, it is our opinion that grading performed was consistent with the recommendations of the project geotechnical documents (Leighton, 2019) and recommendations made during the course of grading. Trench and Miscellaneous Backfill Underground utilities (including sewer and storm drain) were constructed during the post grading. During the utility trench and elevator pit backfill operations, onsite and import soils were placed in 4- to 8- inch thick loose lifts, moisture-conditioned prior to fill placement, and compacted to a minimum 90 percent relative compaction (based on ASTM Test Method D1557). Compaction of the trench backfill soils was accomplished by hand tampers, sheepsfoot roller and/or wheel-rolling with heavy-duty construction equipment. The results and description of approximate location of the backfill tests are summarized in Appendix B. Leighton 11719.003 4 Foundation Excavation Observation Geotechnical observations of conventional foundation excavations for the building were performed by representatives of Leighton. Observations performed included probing of exposed competent fill. Soil conditions were judged to be generally as anticipated per the referenced geotechnical report (Leighton, 2019). Fill Placement and Compaction Fill placement associated with backfill operations described above was spread in 4- to 8- inch loose lifts; moisture conditioned as needed to attain near-optimum moisture content, and compacted. Field density test results performed during the post grading operations indicated the fill soils were compacted to at least 90 percent of the maximum dry density in accordance with ASTM Test Method D1557. The upper 12 inches of subgrade soils within pavement areas were compacted to at least 95 percent per ASTM D1557. Compaction of the fill soils was achieved by use of heavy-duty construction equipment (including rubber-tire compactors). Areas of fill in which field density tests indicated compactions less than the recommended relative compaction or where the soils exhibited nonuniformity were reworked. The reworked areas were recompacted and re-tested until the recommended minimum 90 or 95 percent relative compaction and above optimum moisture content was achieved. Field and Laboratory Testing Field density tests were performed during the placement and compaction of fills during the grading operations performed at the site. Density tests were performed in general accordance with the Nuclear-Gauge Method (ASTM Test Methods D6938). The results and approximate locations of the field density tests performed are summarized in Appendix B. The field density testing was performed in general accordance with the applicable ASTM standards, the current standard of care in the industry, and the precision of the testing method itself. Variations in relative compaction should be expected from the results documented herein. Representative samples of the onsite soil placed and compacted during the post-grading operations were tested for maximum dry density optimum moisture, Expansion Potential Leighton 11719.003 5 and Soluble Sulfate content in accordance with ASTM Test Method D1557. The laboratory test results are presented in Appendix C. Laboratory testing of the finish grade soils on the building pad indicate a very low potential for expansion and negligible soluble sulfate content. Based on expansion index results the slab subgrade soils should be presoaked to 3 percent over optimum moisture to a depth of 18 inches below finished grade (Leighton, 2008). Conclusions The geotechnical conditions encountered during the grading operations for the planned improvements were generally as anticipated. Based on our geotechnical observations and testing, it is our professional opinion (i.e., certifying as defined by the California Business and Professions Code) that the soil engineering and engineering geologic aspects of grading are in general compliance with the approved geotechnical documents (Leighton, 2019) and the City of Carlsbad requirements. Limitations Please note that the presence of our field representative at the site was intended to provide the owner with professional advice, opinions, and recommendations based on observations of the contractor’s work. Although the observations did not reveal obvious deficiencies or deviations from project specifications, we do not guarantee the contractor’s work, our services do not relieve the contractor of his subcontractor’s work, nor do our services relieve the contractor or his subcontractors of their responsibility if defects are subsequently discovered in their work. Our responsibilities did not include any supervision or direction of the actual work procedures of the contractor, his personnel, or subcontractors. The conclusions in this report are based on test results and observations of the grading and earthwork procedures used and represent our engineering opinion as to the compliance of the results with the project specifications. Leighton 11719.003 6 If you have any questions regarding our letter, please do not hesitate to contact this office. We appreciate this opportunity to be of services. Respectfully submitted, LEIGHTON AND ASSOCIATES, INC. Nick Tracy, PE, GE 3058 Mike D. Jensen, CEG 2457 Associate Engineer Associate Engineering Geologist Attachments: Figure 1 - Site Location Map Figure 2 - Field Density Location Map Appendix A - References Appendix B - Field Density Tests Appendix C - Laboratory Testing Procedures and Test Results Distribution: Email Leighton 11719.003 FIGURES ³ 0 2,000 4,000 Feet Figure 1 Scale: Leighton Base Map: Bing Maps 2020 Thematic Information: Leighton 1 " = 2,000 ' Project: 11719.003 Eng/Geol: WDO/MDJ Map Saved as P:\Drafting\11719\003\Maps\11719-003_F01_SLM_2020-03-09.mxd on 3/9/2020 2:48:03 PM Author: Leighton Geomatics (mmurphy) Date: January 2021 SITE LOCATION MAPPacific Ridge SchoolCarlsbad, California ApproximateSite Boundary í! í! í! í! í! í! í! í! í!í! í!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!FG 31 FG 32 FG 33 FG 34 FG 35 FG 36 423 423 CF 14 CF 15 CF 16 CF 17 CF 18 CF 19 limit limit CF 24 CF 25 CF 26 CF 27 CF 28CF 29 CF 30 243.5 243.5 243.5 243.5 243.5 243.5 243.5 243.5 248 248 251 CF 1 CF 10 CF 11 CF 12 CF 13 CF 2 CF 20 CF 21 CF 22 CF 23 CF 3 CF 4 CF 5 CF 6 CF 7 CF 8 CF 9 Map Saved as P:\Drafting\11719\003\Maps\11719-003_F02_FDLM_2020-03-09.mxd on 3/9/2020 1:42:46 PM FIELD DENSITY TEST LOCATION MAP Pacific Ridge SchoolCarlsbad, California Figure 2 Leighton³0 25 50 Feet Scale: Base Map: Grading Plans by SWS Engineering, Inc. 1 " = 25 ' Project: 11719.003 Eng/Geol: WDO/MDJ Author: (mmurphy) Date: January 2021 Legend !Approximate Location of Density Test(Compacted Fill) !Approximate Location of Density Test(Finish Grade)í!Approximate Removal Bottom Elevation FG-36 243.5 CF-23) II l ASPHALT I I x251 Cl z 9~ ::i . MH~~ ··~1 ; IO~ Cl "' Z IL i= u.: hL ' en 253.5 I CONCRETE I g, X: X UJ '::i: ::J Nl¥n31i Q.l dn¥~ ¥0¥ X3 ..... ---------e------~-254'2 " 254.5 •" <1 ,.,_ \ X a jl, <l "· -:::::::-:. CONCRETE ~5.9 ~ill l:l.lc! ~ _, I I I I I 110 250.7 11:1-:::·~ ,:.:, ,:~~-~-~,:~-~! I X .. . . " , , , . , , , . : -: -: ' d , : , : , , '.,.. , > CONG ~ " "' x25o.s x2~2.3 rr ( [i!;] [i!;] ~J,.250. CONCRETE? ~ ::J 252.3 X le! CONCREi? 1;j c~t:i~d2 x252 ASPHALT x250.7 X 2: □ Q □ 250. 1;j x2$0.5 x2s1.6 CONCRETE? :l1 a X ASPf _ I CONCRETE ~-----250 rs/ x249 8 1249 6 x249.7 50.3 50.4 249.6 X o x251l6 ~( -~~o_o_o_o_o_oJ·'---, x25P.3 CONCRETE 11719.003 APPENDIX A References 11719.003 A-1 APPENDIX A REFERENCES SWS Engineering, 2020, Grading Plans for Pacific Ridge School MDIC Building, Pacific Ridge School, Carlsbad, California, dated 01/09/2020. Kpff Consulting Engineers, 2019, Structural Plans for Multi-Disciplinary Innovation Center, Pacific Ridge School, Carlsbad, California dated 05/29/19. Leighton and Associates, Inc., 2020, As-Graded Geotechnical Completion Letter for the MDIC Building Pad, Pacific Ridge School, Bressi Ranch, Carlsbad, California, Project No. 11719.003, dated March 10, 2020 Leighton and Associates, Inc., 2019, Geotechnical Update Letter, Pacific Ridge School Expansion, MDIC Building Bressi Ranch, Carlsbad, California, Project No. 11719.002, dated May 24, 2019. Leighton and Associates, Inc., 2013, Geotechnical Update Letter, Pacific Ridge School Expansion, Carlsbad, California, Project No. 971009-068, dated November 21, 2013. Leighton and Associates, Inc. 2008, Geotechnical Update Study, Permanent Campus Facilities and Campus Expansion, Bressi Ranch, Carlsbad, California, Project No. 971009-053, dated July 10, 2008. 11719.003 APPENDIX B Field Density Tests Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 1 Structural Fill: West building pad 245.5 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 2 Structural Fill: West building pad 248.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 3 Structural Fill: West building pad 249.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 4 Structural Fill: West building pad 247.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 5 Structural Fill: West building pad 246.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 6 Structural Fill: West building pad 245.5 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 7 Structural Fill: West building pad 247.5 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 8 Structural Fill: West building pad 249.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%)Remark 1 2/28/20 MD-5 A SC 12.0 122.0 15.2 112.8 129.9 8 92 90 / 100 DP/MP 2 2/28/20 MD-5 A SC 12.0 122.0 16.9 110.4 129.0 8 90 90 / 100 DP/MP 3 2/28/20 MD-5 A SC 12.0 122.0 14.5 115.3 132.0 8 95 90 / 100 DP/MP 4 2/28/20 MD-3 B SC 15.0 118.8 19.2 109.4 130.4 8 92 90 / 100 DP/MP 5 2/28/20 MD-5 A SC 12.0 122.0 14.8 116.6 133.9 8 96 90 / 100 DP/MP 6 2/29/20 MD-5 A SC 12.0 122.0 17.7 110.2 129.7 8 90 90 / 100 DP/MP 7 2/29/20 MD-5 A SC 12.0 122.0 18.1 110.2 130.1 8 90 90 / 100 DP/MP 8 2/29/20 MD-5 A SC 12.0 122.0 16.8 111.0 129.6 8 91 90 / 100 DP/MP Page 1 of 7 Soil Nuclear Gauge Test Method: ASTM D 6938 Final Report Date: 1/7/2021 Client: Pacific Ridge School Project: Pacific Ridge School/Library & Innovation Center 11719.003 Carlsbad, CA 6169 El FuerteSan Diego Office 3934 Murphy Canyon Road, B-205 San Diego, CA 92123 Phone: (858) 292-8030 Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 9 Structural Fill: West building pad 246.5 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 10 Structural Fill: West building pad 248.5 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 11 Structural Fill: West building pad 245.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 12 Structural Fill: West building pad 247.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 13 Structural Fill: West building pad 248.5 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 14 Compacted Fill (CF): Pacific ridge school 245.5 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 15 Compacted Fill (CF): Pacific ridge school 247.5 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 16 Compacted Fill (CF): Pacific ridge school 245.5 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%)Remark 9 2/29/20 MD-5 A SC 12.0 122.0 17.7 110.9 130.5 8 91 90 / 100 DP/MP 10 2/29/20 MD-5 A SC 12.0 122.0 17.2 109.6 128.4 8 90 90 / 100 DP/MP 11 3/2/20 MD-5 A SC 12.0 122.0 17.8 112.6 132.6 8 92 90 / 100 DP/MP 12 3/2/20 MD-5 A SC 12.0 122.0 18.3 109.2 129.2 8 90 90 / 100 DP/MP 13 3/2/20 MD-5 A SC 12.0 122.0 17.3 110.6 129.7 8 91 90 / 100 DP/MP 14 3/3/20 MD-5 A SC 12.0 122.0 15.8 113.8 131.8 8 93 90 / 100 DP/MP 15 3/3/20 MD-3 B SC 15.0 118.8 18.0 109.7 129.4 8 92 90 / 100 DP/MP 16 3/3/20 MD-5 A SC 12.0 122.0 16.6 109.9 128.1 8 90 90 / 100 DP/MP Page 2 of 7 Soil Nuclear Gauge Test Method: ASTM D 6938 Final Report Date: 1/7/2021 Client: Pacific Ridge School Project: Pacific Ridge School/Library & Innovation Center 11719.003 Carlsbad, CA 6169 El FuerteSan Diego Office 3934 Murphy Canyon Road, B-205 San Diego, CA 92123 Phone: (858) 292-8030 Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 17 Compacted Fill (CF): Pacific ridge school 247.5 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 18 Compacted Fill (CF): Pacific ridge school 247.5 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 19 Compacted Fill (CF): Pacific ridge school 249.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 20 Compacted Fill (CF): East of building pad 251.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 21 Compacted Fill (CF): East of building pad 253.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 22 Compacted Fill (CF): East building pad 250.5 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 23 Compacted Fill (CF): East building pad 251.0 Campbell / MDRP / MD10406095 / 7/16/2019 Reid, Lynn 24 Compacted Fill (CF): East building pad 251.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%)Remark 17 3/3/20 MD-5 A SC 12.0 122.0 17.0 113.3 132.6 8 93 90 / 100 DP/MP 18 3/3/20 MD-3 B SC 15.0 118.8 18.9 110.6 131.5 8 93 90 / 100 DP/MP 19 3/3/20 MD-3 B SC 15.0 118.8 19.2 109.9 131.0 8 93 90 / 100 DP/MP 20 3/3/20 MD-6 B SM 12.0 119.7 14.9 108.4 124.6 8 91 90 / 100 DP/MP 21 3/3/20 MD-6 B SM 12.0 119.7 14.6 109.9 125.9 8 92 90 / 100 DP/MP 22 3/3/20 MD-6 B SM 12.0 119.7 15.9 109.1 126.4 8 91 90 / 100 DP/MP 23 3/3/20 MD-6 B SM 12.0 119.7 15.4 109.0 125.8 8 91 90 / 100 DP/MP 24 3/5/20 MD-6 B SM 12.0 119.7 17.0 108.0 126.4 8 90 90 / 100 DP/MP Page 3 of 7 Soil Nuclear Gauge Test Method: ASTM D 6938 Final Report Date: 1/7/2021 Client: Pacific Ridge School Project: Pacific Ridge School/Library & Innovation Center 11719.003 Carlsbad, CA 6169 El FuerteSan Diego Office 3934 Murphy Canyon Road, B-205 San Diego, CA 92123 Phone: (858) 292-8030 Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 25 Compacted Fill (CF): East building pad 252.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 26 Compacted Fill (CF): East building pad 252.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 27 Compacted Fill (CF): East building pad 253.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 28 Compacted Fill (CF): East building pad 252.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 29 Compacted Fill (CF): East building pad 253.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 30 Compacted Fill (CF): West building pad 252.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 31 Finish Grade (FG): East of building pad 0.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 32 Finish Grade (FG): East building pad 0.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%)Remark 25 3/5/20 MD-6 B SM 12.0 119.7 15.5 110.3 127.4 8 92 90 / 100 DP/MP 26 3/5/20 MD-6 B SM 12.0 119.7 16.9 110.5 129.2 8 92 90 / 100 DP/MP 27 3/5/20 MD-6 B SM 12.0 119.7 15.3 110.0 126.8 8 92 90 / 100 DP/MP 28 3/5/20 MD-6 B SM 12.0 119.7 15.8 110.7 128.2 8 92 90 / 100 DP/MP 29 3/5/20 MD-6 B SM 12.0 119.7 16.2 109.6 127.4 8 92 90 / 100 DP/MP 30 3/6/20 MD-6 B SM 12.0 119.7 15.4 112.5 129.8 8 94 90 / 100 DP/MP 31 3/6/20 MD-6 B SM 12.0 119.7 17.0 110.3 129.0 8 92 90 / 100 DP/MP 32 3/6/20 MD-6 B SM 12.0 119.7 14.9 111.7 128.3 8 93 90 / 100 DP/MP Page 4 of 7 Soil Nuclear Gauge Test Method: ASTM D 6938 Final Report Date: 1/7/2021 Client: Pacific Ridge School Project: Pacific Ridge School/Library & Innovation Center 11719.003 Carlsbad, CA 6169 El FuerteSan Diego Office 3934 Murphy Canyon Road, B-205 San Diego, CA 92123 Phone: (858) 292-8030 Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 33 Finish Grade (FG): West building pad 0.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 34 Finish Grade (FG): East building pad 0.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 35 Finish Grade (FG): West building pad 0.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 36 Finish Grade (FG): East of building pad 0.0 CPN / MC3-Elite / 30489 / 1/10/2020 Switzer, Thomas 37 Sewer and Storm Drain (SS); Structure Backfill: Interior sewer 0.0 Existing grade Campbell / MDRP / MD10406095 / 7/16/2019 Carey, Neil 38 Sewer and Storm Drain (SS); Structure Backfill: Interior sewer 0.0 Existing grade Campbell / MDRP / MD10406095 / 7/16/2019 Carey, Neil 39 Compacted Fill (CF): Interior sewer 0.0 Existing grade Campbell / MDRP / MD10406095 / 7/16/2019 Carey, Neil 40 Compacted Fill (CF): Elevator pit -2.0 Existing grade CPN / MC1-Elite / 31091 / 2/24/2020 Carey, Neil Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%)Remark 33 3/6/20 MD-6 B SM 12.0 119.7 14.6 113.6 130.2 8 95 90 / 100 DP/MP 34 3/6/20 MD-6 B SM 12.0 119.7 15.2 107.6 124.0 8 90 90 / 100 DP/MP 35 3/6/20 MD-6 B SM 12.0 119.7 15.2 114.5 131.9 8 96 90 / 100 DP/MP 36 3/6/20 MD-6 B SM 12.0 119.7 15.3 108.7 125.3 8 91 90 / 100 DP/MP 37 4/2/20 MD-6 B SM 12.0 119.7 16.1 108.0 125.4 8 90 90 / 100 DP/MP 38 4/2/20 MD-6 B SM 12.0 119.7 15.0 109.9 126.4 8 92 90 / 100 DP/MP 39 4/2/20 MD-6 B SM 12.0 119.7 15.4 108.8 125.6 8 91 90 / 100 DP/MP 40 4/21/20 MD-6 B SM 12.0 119.7 17.0 114.1 133.5 8 95 95 / 100 DP/MP Page 5 of 7 Soil Nuclear Gauge Test Method: ASTM D 6938 Final Report Date: 1/7/2021 Client: Pacific Ridge School Project: Pacific Ridge School/Library & Innovation Center 11719.003 Carlsbad, CA 6169 El FuerteSan Diego Office 3934 Murphy Canyon Road, B-205 San Diego, CA 92123 Phone: (858) 292-8030 Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 41 Compacted Fill (CF): Elevator pit -1.0 Existing grade CPN / MC1-Elite / 31091 / 2/24/2020 Carey, Neil 42 Compacted Fill (CF): Elevator pit 0.0 Existing grade CPN / MC1-Elite / 31091 / 2/24/2020 Carey, Neil 43 Utility Trench Backfill: Storm Sewer: Stormdrain inlet trench to manhole Eastside of building -2.0 Existing grade Campbell / MDRP / MD10406094 / 1/9/2020 Carey, Neil 44 Utility Trench Backfill: Storm Sewer: Stormdrain inlet trench to manhole Eastside of building -1.0 Existing grade Campbell / MDRP / MD10406094 / 1/9/2020 Carey, Neil 45 Utility Trench Backfill: Storm Sewer: Stormdrain inlet trench to Westside building 0.0 Existing grade Campbell / MDRP / MD10406093 / 11/13/2019 Carey, Neil 46 Subgrade (SG); Concrete Paving: North of electronic building 0.0 Finished subgrade CPN / MC1-Elite / 31051 / 11/13/2019 Malik, Yusuf 47 Subgrade (SG); Concrete Paving: Paver area East of electronic building 0.0 Finished subgrade CPN / MC1-Elite / 31051 / 11/13/2019 Malik, Yusuf 48 Subgrade (SG); Concrete Paving: Paver area East of electronic building 0.0 Finished subgrade CPN / MC1-Elite / 31051 / 11/13/2019 Malik, Yusuf Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%)Remark 41 4/21/20 MD-6 B SM 12.0 119.7 14.9 116.7 134.1 8 97 95 / 100 DP/MP 42 4/21/20 MD-6 B SM 12.0 119.7 16.0 114.6 132.9 8 96 95 / 100 DP/MP 43 7/15/20 MD-6 B SM 12.0 119.7 16.5 114.2 133.0 8 95 90 / 100 DP/MP 44 7/15/20 MD-6 B SM 12.0 119.7 16.1 114.0 132.4 8 95 90 / 100 DP/MP 45 7/22/20 MD-6 B SM 12.0 119.7 14.4 114.9 131.4 8 96 90 / 100 DP/MP 46 7/29/20 MD-1 A SC 14.0 116.0 18.1 110.9 131.0 6 96 90 / 100 DP/MP 47 7/29/20 MD-1 A SC 14.0 116.0 16.6 112.5 131.2 6 97 95 / 100 DP/MP 48 7/29/20 MD-2 A SM 12.5 118.0 14.9 111.6 128.2 6 95 95 / 100 DP/MP Page 6 of 7 Soil Nuclear Gauge Test Method: ASTM D 6938 Final Report Date: 1/7/2021 Client: Pacific Ridge School Project: Pacific Ridge School/Library & Innovation Center 11719.003 Carlsbad, CA 6169 El FuerteSan Diego Office 3934 Murphy Canyon Road, B-205 San Diego, CA 92123 Phone: (858) 292-8030 Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 49 Subgrade (SG); Concrete Paving: Paver area East of electronic building 0.0 Finished subgrade CPN / MC1-Elite / 31051 / 11/13/2019 Malik, Yusuf 50 Subgrade (SG); Concrete Paving: Side walk West of electronic building 0.0 Finished subgrade CPN / MC1-Elite / 31051 / 11/13/2019 Malik, Yusuf 51 Subgrade (SG); Concrete Paving: Side walk West of electronic building 0.0 Finished subgrade CPN / MC1-Elite / 31051 / 11/13/2019 Malik, Yusuf Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%)Remark 49 7/29/20 MD-2 A SM 12.5 118.0 16.3 113.2 131.7 6 96 95 / 100 DP/MP 50 7/29/20 MD-2 A SM 12.5 118.0 15.8 110.3 127.7 6 93 90 / 100 DP/MP 51 7/29/20 MD-2 A SM 12.5 118.0 16.4 107.6 125.3 6 91 90 / 100 DP/MP Page 7 of 7 Soil Nuclear Gauge Test Method: ASTM D 6938 Final Report Date: 1/7/2021 Client: Pacific Ridge School Project: Pacific Ridge School/Library & Innovation Center 11719.003 Carlsbad, CA 6169 El FuerteSan Diego Office 3934 Murphy Canyon Road, B-205 San Diego, CA 92123 Phone: (858) 292-8030 Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY 11719.003 APPENDIX C Laboratory Testing Procedures and Test Results 11719.003 C-1 APPENDIX C Laboratory Testing Procedures and Test Results Maximum Density Tests: The maximum dry density and optimum moisture content of typical materials were determined in accordance with ASTM Test Method D1557. The results of these tests are presented in the table below: Soil Type Sample Description Maximum Dry Density (pcf) Optimum Moisture Content (%) MD-1 Olive Brown Clayey Sand (SC) 116.0 14.0 MD-2 Brown Silty Sand (SM) 118.0 12.5 MD-3 Yellowish-Brown Clayey Sand (SC) 118.8 15.0 MD-3 Brown Silty Sand (SM) 118.8 15.0 MD-5 Brown Silty Sand (SM) 122.2 12.0 MD-6 Reddish Brown Silty SAND (SM) 119.7 12.0 Soluble Sulfates: The soluble sulfate contents of selected samples were determined by standard geochemical methods (Hach Sulfate Test Kit). The test results are presented in the table below: Sample Location Sample Description Sulfate Content (%) Potential Degree of Sulfate Attack* MD-6 Reddish Brown Silty SAND (SM) 0.015 S0, Negligible *Based on the 2014 edition of American Concrete Institute (ACI) Committee 318 R-14, Table No. 19.3.1.1. I I I I I 11719.003 C-2 APPENDIX C (Continued) Expansion Index Tests: The expansion potential of selected materials was evaluated by the Expansion Index Text, ASTM Test Method 4829. A specimen is molded under a given compactive energy to approximately 50 percent saturation. The prepared 1-inch thick by 4-inch diameter specimen is loaded to an equivalent 144 psf surcharge and is inundated with water until volumetric equilibrium is reached. The result of this test is presented in the table below: Sample Location Description Expansion Index Expansion Potential MD-6 Reddish Brown Silty SAND (SM) 11 Very Low I I I I I