HomeMy WebLinkAbout2637 JEFFERSON ST; ; CBR2018-3291; PermitBuilding Permit Finaled
Residential Permit
Print Date: 05/14/2021
Job Address:
Permit Type:
2637 JEFFERSON ST,
BLDG-Residential
1551702500
$728,058.32
CARLSBAD, CA 92008-1440
Work Class:
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units: 4
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title: MFD-01
Track#:
Lot#:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check#:
Description: MFD-01: (JEFFERSON ST APARTMENTS) 4,886 SF// 4-UNITS
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
DRAINAGE FEE PLDA A Medium Runoff
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
FIRE R-1 & R-2 Occupancies <50 units New
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 1" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1 -MEDIUM
TRAFFIC IMPACT Residential Apartments Outside CFD
WATER METER FEE 1" Displacement (P)
WATER SERVICE CONNECTION FEE 1" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 1" Displacement
Apartments
DEV2016-0061
Total Fees: $64,059.04 Total Payments To Date: $64,059.04
Building Division
(city of
Carlsbad
Permit No: CBR2018-3291
Status:
Applied:
Issued:
Finaled Close Out:
Inspector:
Final Inspection:
CoApplicant:
MSR CONSTRUCTION INC
1166 AGUA TIBIA AVE
Closed -Finaled
11/28/2018
03/06/2019
PBurn
05/14/2021
CHULA VISTA, CA 91911-3504
(619) 322-9444
Balance Due:
AMOUNT
$2,724.00
$1,906.80
$4,155.55
$96.00
$1,188.00
$175.00
$110.00
$224.00
$25,482.04
$30.00
$8,428.00
$2,880.00
$94.65
$246.00
$58.00
$6,102.00
$282.00
$9,644.00
$233.00
$0.00
Page 1 of 2
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
Building Permit Finaled
Residential Permit
Print Date: 05/14/2021
{city of
Carlsbad
Permit No: CBR2018-3291
Please take NOTICE that approval of your project includes the "lmposition11 of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 2 of 2
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
Cci~of
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check Of',R..20(~-3.Z..q /
Est. Value 12'0 1 CJo'p
PC Deposit ---------
Date ...... i_,_l-__;0~5'----'/_,,'()..,___
Job Address Y, ~ 1 ~ffci??:<) '71. Suite: APN: 155-\'.:'.jO-"Zv-Oc, -----
CT/Project#: __________ Lot#: ____ Fire Sprinklers:@no Air Conditioning: @J no
~Addition/New: t-l;Bf>f. Living SF, \Dµ. Deck SF, l(O Patio SF, l<f.1..1 Garage SF
Is this to create an Accessory Dwelling Unit? Yes@ New Fireplace? Yes/ No, if yes how many? __
D Remodel: _____ SF of affected area Is the area a conversion or change of use ? Yes/ No
0 Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _
□Solar: ___ KW, ___ Modules, Mounted: Roof/ Ground, Tilt: Yes/ No, RMA: Yes/ No, Battery: Yes/ No
Panel Upgrade: Yes/ No
D Reroof: ________________________________ _
D Plumbing/Mechanical/Electrical Only: ________________________ _
D Other: _________________________________ _
APPLICANT (PRIMARY) PROPERTY OWNER
Name: .Jt?£ AuQ-(A<VO Name: :xi~ A~cA:AV<>
Address: SgS IAO'<¾ l}tv ~ Address: 83:, !AP':<lx-t7 lAVt
City: ~-A,\.',~ State:JA__Zip: q2,otF! City: C/AJ >A./\Q1t,J State:Jd....._Zip:
Phone: .W 4 )_. qBO-l:Dc" Phone: 6\Lf jl;lt:, bab
Email: _________________ Email: __________________ _
DESIGN PROFESSIONAL
Name: o\\M.') (g.u,;')#).-1\l/;;;
Address: ~ "&EA/L'.J Ave.
City: ,;NJ 011::bo State: Cl\ Zip: '{211 e
Phone: 6l'l '.$1;\ ~61
Email: _________________ _
Architect State License: ___________ _
CONTRACTOR BUSINESS
Name: HSt'2 ( Pn s:h-u S :\ ~ t? r' I Iv C
Address: ti &G O: Cr'-'9 li L;, i c; e,v f'
City: <?,.AI:.!"...--11 • C V State:..i!.J;L_Zip: 'f I 5 I I
Phone: ' 1 'I -3 Z,:Z. -j 4 4 <./
Email: A.\\o r rlu Mal 1:1122 a3 l q CS, M,; I s Cs, -
State License: 8 S3 IS I Bus. License: ~Lo SQ c;:,3 (q'}" ~,
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to Its Z, Oi Y
Issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law
{Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500}).
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
B-1 Page 1 of 2 Rev. 06/18
( OPTION A): WORKERS'COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following declarations: □ I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit ls Issued.
□ I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: ______________________ _
Polley No. '11 0 ~ Cl < S' Expiration Date: )::,. ,J I 3 '1 0? C,
□ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful, and shall subject an employer to
criminal penalties and clvll fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for In Section 3706 of the Labor Code,
Interest and attorney's fees.
CONTRACTOR SIGNATURE: ~< <, cC /.c-:z---z z _ ~ □AGENT DATE: _____ _ / > -,,,,, ,,,"--I ~
( OPTION B ): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's license Law for the following reason:
□ I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or Improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
□ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) llcensed
pursuant to the Contractor's license Law).
l!\I am exempt under Section ________ ,Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction ofthe proposed property improvement. □ Yes □ No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/
contractors' llcense number):
5. I will provide some of the work, but I have contracted {hired) the following persons to provide the work indicated {include name/ address/ phone/ type of work):
OWNER SIGNATURE: __________________ □AGENT DATE: _____ _
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ______________________ Lender's Address: _____________________ _
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
1s the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Yes □ No
Is the applicant or future bulldlng occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No
Is the facillty to be constructed within 1,000 feet of the outer boundary of a school site? □ Yes □ No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
APPLICANT CERTIFICATION:
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building constructlon.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I Al50 AGREE TO SAVE, INDEMNIFY AND KEEP
HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF
THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shalt expire by limitation and become null and void if the building or work authorized
by such permit Is not commenced within 180 days from the date of such p · or if th uilding or work authorized by such permit is suspended or abandoned at any time
after the work is commenced for a period of 180 days (Section 106.4.4 iforJTI Buil · g Cod
APPLICANT SIGNATURE: _____ c::::;,i..-t,e::_,-<a,,-',--,,t."""+..a:.t.4......_i::.:(v<_<,_;_:__:<.)c..._ __ DATE: _______ _
1635 Faraday Ave Carlsbad, CA 92008
B-1
Ph: 760-602-2719 Fax: 760-602-8558
Page2 of2
Email: Building@carlsbadca.gov
Rev. 06118
Permit Type: BLDG-Residential
Work Class: Apartments
Status:
Scheduled
Date
Closed -Finaled
Actual Inspection Type
Start Date
BLDG-Structural Final
BLDG-Electrical Final
Application Date: 11/28/2018 Owner: TRUST ARELLANO FAMILY TRUST
09-03-13
Issue Date: 03/06/2019 Subdivision:
Expiration Date: 09/28/2021
IVR Number: 15693
Address: 2637 JEFFERSON ST
CARLSBAD, CA 92008-1440
Inspection No.
May 14, 2021
Inspection
Status
1. No building deficiencies.
Primary Inspector
2. Final structural, electrical, plumbing, and
mechanical work, per structural and
architectural plans and design
specifications-approved.
3. Verified final third-party special
for/deputy inspector reports-approved.
4. Waste management Final receipts and
documentation Verified-Approved.
5. City representative David with (LOE),
approved trash enclosure structure and
location-approved
6. no outstanding correction items.
May 14, 2021
1. No building deficiencies.
2. Final structural, electrical, plumbing, and
mechanical work, per structural and
architectural plans and design
specifications•approved.
3. Verified final third-party special
for/deputy inspector reports-approved.
4. Waste management Final receipts and
documentation Verified-Approved.
5. City representative David with (LDE),
approved trash enclosure structure and
location-approved
6. no outstanding correction items.
Reinspection Inspection
Yes
Yes
----" --,.,,_,,,,_ .. ,, ............. ,,_ .. ,_, , ..
Friday, May 14, 2021 Page 7 of 7
:-c,Y -----> ~ -,;::_-];f -. ~:: ---½
. · _ .~ e.ERMIT-lNSPECTIOfl:i:_ . 'QB:'l~lor (CBR2018-~~9..,1). ... ~ _ :
Permit Type: BLDG-Residential
Work Class: Apartments
Status: Closed -Finaled
Application Date: 11/28/2018 Owner: TRUST ARELLANO FAMILY TRUST
Issue Date: 03/06/2019
Expiration Date: 09/28/2021
IVR Number: 15693
09-03-13
Subdivision:
Address: 2637 JEFFERSON ST
CARLSBAD, CA 92008-1440
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
•-W-•••-•••---------------------------------------------•------
Friday, May 14, 2021
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
COMMENTS
May 10, 2021:
1. Final inspection not approved, due to
CMU concrete block walls-trash enclosure
per Approved stamped plans does not
reflect as-built site conditions of a new
trash enclosure of wood construction.
2. Spoke to contractor superintendent Lilia,
and informed to provide an approval
revision from planning department and
architect to revise plan notes indicating
New wood trashing closure reflect as-built
site conditions.
May 14, 2021
1. No building deficiencies.
2. Final structural. electrical. plumbing, and
mechanical work, per structural and
architectural plans and design
specifications-approved.
3. Verified final third-party special
for/deputy inspector reports-approved.
4. Waste management Final receipts and
documentation Verified-Approved.
5. City representative David with (LOE),
approved trash enclosure structure and
location-approved
6. no outstanding correction items.
May 14, 2021
1. No building deficiencies.
2. Final structural, electrical, plumbing, and
mechanical work, per structural and
architectural plans and design
specifications-approved.
3. Verified final third-party special
for/deputy inspector reports-approved.
4. Waste management Final receipts and
documentation Verified-Approved.
5. City representative David with (LOE),
approved trash enclosure structure and
location-approved
6. no outstanding correction items.
__________ ,. ____ ---------
Passed
No
Yes
Yes
Page 6 of 7
, --,.,""£.* ;: ---3:""-, ~,$,"'~~*?-' ;L: --~~ -\ -, -, :::.
_ PERMIT INSPECTJ,ON HIST~R"Y"+for (CBR2018-32_91) : -
Permit Type: BLDG-Residential
Work Class: Apartments
Status:
Scheduled
Date
Closed -Finaled
Actual Inspection Type
Start Date
Application Date: 11/28/2018 Owner: TRUST ARELLANO FAMILY TRUST
09-03-13
Issue Date: 03/06/2019 Subdivision:
Expiration Date: 09/28/2021
IVR Number:
Inspection No.
15693
Inspection
Status
Address: 2637 JEFFERSON ST
CARLSBAD, CA 92008-1440
Primary Inspector Reinspection Inspection
-----· ·------·----···-----~·-·--------------
Chetklist ltom COMMENTS
BLDG-Building Deficiency April 1, 2021: (gas meter release)
-approved.
04/29/2021
05/10/2021
04/29/2021 BLDG-Fire Final
Checklist Item
FIRE-Building Final
05/10/2021 BLDG-Final Inspection
Checklist Item
1. No building/drywall nailing Deficiencies.
2. Gas test under air pressure leak test
with gauge•approved.
3. Approved gas meter releases,
multi-family building/units.
4. Released gas meters to SDGE-New
service.
156348-2021
COMMENTS
156922-2021
COMMENTS
Passed
Failed
Felix Salcedo
Tony Alvarado
BLDG-Building Deficiency May 10, 2021:
BLDG-Structural Final
05/14/2021 05/14/2021 BLDG-Final Inspection
,,,,,-,,,-, ·-· -"'"""""'
Friday, May 14, 2021
1. Final inspection not approved, due to
CMU concrete block walls-trash enclosure
per Approved stamped plans does not
reflect as-built site conditions of a new
trash enclosure of wood construction.
2. Spoke to contractor superintendent Lilia,
and informed to provide an approval
revision from planning department and
architect to revise plan notes indicating
New wood trashing closure reflect as-built
site conditions.
May 10, 2021:
1. Final inspection not approved, due to
CMU concrete block walls-trash enclosure
per Approved stamped plans does not
reflect as-built site conditions of a new
trash enclosure of wood construction.
2. Spoke to contractor superintendent Lilia,
and informed to provide an approval
revision from planning department and
architect to revise plan notes indicating
New wood trashing closure reflect as-built
site conditions.
157366-2021 Passed Tony Alvarado
Passed
Yes
Complete
Passed
Yes
Reinspection Incomplete
Passed
No
No
Complete
Page 5 of 7
Permit Type: BLDG-Residential Application Date: 11/28/2018 Owner: TRUST ARELLANO FAMILY TRUST
09-03-13
Work Class: Apartments Issue Date: 03/06/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 09/28/2021 Address: 2637 JEFFERSON ST
IVR Number: 15693 CARLSBAD, CA 92008-1440
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status ____ ,. _________ ,,-·-··
02/12/2020 02/12/2020 BLDG-17 Interior 119181-2020 Passed Paul Burnette Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/01/2020 07/01/2020 BLDG-22 Sewer/Water 131625-2020 Passed Mlchael Collins Complete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Waste to POC and Bldg. water supply to Yes
Bldg.
07/22/2020 07/22/2020 BLDG-Electric Meter 133547-2020 Failed Paul Burnette Rcinspcction Incomplete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Gas Meter 133548-2020 Failed Paul Burnette Re inspection Incomplete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
08/19/2020 08/19/2020 BLDG-Electric Meter 136017-2020 Passed Paul Burnette Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Gas Meter 136018-2020 Passed Paul Burnette Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/1512020 10/15/2020 BLDG-11 141032-2020 Passed Paul Burnette Complete
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-12 Steel/Bond 141031-2020 Passed Paul Burnette Complete
Beam
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04101/2021 04101/2021 BLDG-23 154056-2021 Passed Tony Alvarado Complete
Gas/Test/Repairs
-··•-··--------.__, ···---·~·-•-».
Friday, May 14, 2021 Page 4 of 7
------·•--·---•-·· --------
Permit Type: BLDG-Residential Application Date: 11/28/2018 Owner: TRUST ARELLANO FAMILY TRUST
09-03-13
Work Class: Apartments Issue Date: 03/06/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 09/28/2021 Address: 2637 JEFFERSON ST
IVR Number: 15693 CARLSBAD, CA 92008-1440
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status ----·---·---'
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
01/03/2020 01/0312020 BLDG-16 lnsulatlon 115287-2020 Failed Michael Collins Reinspect/on Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
01/14/2020 01/14/2020 BLOG-16 lnsulatlon 116284-2020 Partial Pass Michael Colllns Rcinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial, see card. Yes
BLDG-Building Deficiency Not ready No
01/16/2020 01/16/2020 BLDG-14 116716-2020 Partial Pass Michael Collins Rcinspection Incomplete
Frame/Steel/Boltlng/We
ldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Garage shear walls only. Yes
BLDG-16 lnsulatlon 116589-2020 Passed Michael Collins Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Building Deficiency Partial, see card. Yes
BLDG-Building Deficiency Not ready No
01/17/2020 01/17/2020 BLOG.13 Shear 116718-2020 Falled Michael Collins Reinspection Incomplete
Panels/HD (ok to wrap}
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Need mechanical connectors throughout. No
01/21/2020 01/21/2020 BLDG-13 Shear 116875-2020 Passed Michael Colllns Complete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG•Building Deficiency Need mechanical connectors throughout. No
BLDG-Building Deficiency Yes
02/04/2020 02/04/2020 BLDG-17 Interior 118379-2020 Partlal Pass Paul Burnette Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes -----Friday, May 14, 2021 Page 3 of 7
Permit Type: BLDG-Residential Application Date: 11/28/2018 Owner: TRUST ARELLANO FAMILY TRUST
09-03-13
Work Class: Apartments Issue Date: 03/06/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 09/28/2021 Address: 2637 JEFFERSON ST
IVR Number: 15693 CARLSBAD, CA 92008-1440
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status -H••----•-------•-
08/08/2019 08/08/2019 BLDG-15 Roof/ReRoof 100216-2019 Failed Paul Burnette Reinspcction Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
08/13/2019 08113/2019 BLDG-15 Roof/ReRoof 100622-2019 Failed Paul Burnette Re inspection Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
08/21/2019 08/21/2019 BLDG-15 RooffReRoof 101423-2019 Failed Paul Burnette Reinspcction Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
08/28/2019 08/28/2019 BLDG-15 Roof/ReRoof 102295-2019 Passed Paul Burnette Complete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/18/2019 10/18/2019 BLDG-13 Shear 108087-2019 Passed Paul Burnette Complete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
11/20/2019 11/20/2019 BLDG-18 Exterior 111435-2019 Failed Paul Burnette Re inspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
12/06/2019 12/06/2019 BL0G-84 Rough 11287 4-2019 Failed Luke Storno Reinspection Incomplete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Work not ready. No
12/13/2019 12/13/2019 BLDG-84 Rough 113696-2019 Passed Paul Burnette Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Work not ready. Yes
12/16/2019 12/18/2019 BLDG-84 Rough 113852-2019 Passed Paul Burnette Complete
Combo(14,24,34,44)
Friday, May 14, 2021 Page 2 of 7
Building Permit Inspection History Finaled
( City of
Carlsbad
Permit Type: BLDG-Residential Application Date: 11/28/2018 Owner: TRUST ARELLANO FAMILY TRUST
09-03-13
Work Class: Apartments Issue Date: 03/06/2019 S<1bdivision:
Status: Closed -Finaled Expiration Date: 09/28/2021
JVR Number: 15693
Address: 2637 JEFFERSON ST
CARLSBAD, CA 92008-1440
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector
Date Start Date Status
03/08/2019 03/08/2019 BLDG-SW-Pre-Con 085613-2019 Passed Paul Burnette
03/25/2019 03/25/2019
03/28/2019 03128/2019
04/12/2019 04/12/2019
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-21 086869-2019 Failed Paul Burnette
Underground/Undertlo
or Plumbing
Checklist Item COMMENTS
BLOG-Building Deficiency
BLDG-21 087233-2019 Passed Paul Burnette
Underground/Under11o
or Plumbing
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-11 088792-2019 Failed Michael Collins
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item COMMENTS
BLDG-Building Deficiency Footing depth not met, missing HD anchors
and spread footing steel.
04/15/2019 04/15/2019 BLDG-11 088946-2019 Failed Paul Burnette
05/01/2019
08/01/2019
Foun datlon/Ftg/Plers
(Rebar)
Checklist Item
BLDG-Building Deficiency
COMMENTS
Footing depth not met, missing HD anchors
and spread footing steel.
05/01/2019 BLDG-11 090538-2019 Passed Paul Burnette
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item
BLDG-Building Deficiency
COMMENTS
Footing depth not met, missing HD anchors
and spread footing steel.
08/01/2019 BLDG-15 Roof/ReRoof
(Patio)
099326-2019 Falled Paul Burnette
Checklist Item COMMENTS
BLDG-Building Deficiency
Reinspection Inspection
Complete
Passed
No
Reinspection Incomplete
Passed
No
Complete
Passed
No
Reinspection Incomplete
Passed
No
Reinspection Incomplete
Passed
No
Complete
Passed
No
Rcinspection Incomplete-
Passed
No
_________ ,, ____________________ _
Friday, May 14, 2021 Page 1 of 7
Ccityof
Carlsbad
DECE~EJment Services SPECIAL INSPECTICJN Building Division
AGREEMENT NOV 2 8 Z0t8 1635FaradayAvenue
B-45 160-602-2719
CITY OF CARLSBAD www.carlsbadca.gov
In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed
requires special Inspection, structural observation and construction material testing.
ProjecVPermit: CoB2Dl'b-o26 l Project Address: .2.c..,Q,3 "J 1J~ J\8l"1L\
A. THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNER/AUTHORIZED AGENT. Please check if you are Owner-Builder
□. (If you checked as owner-builder you must also complete Section B of this agreement.)
Name: (Please print.,-) _\)l~"E,_(f.-=0{l.,,~· ~----------------'-&:_,_,,'l"-'j\--'l'-'--'-(\--'-l!:>-\J___,_'{2..,Q"--"'-
(First) (M.I.) (Last)
Mailing Address· I~\ 'O 1¥,J'f-_ J :\¥, (£.J\ZC>f-J A.DO CA q d-\ \ "'b
Email· f-\ Q UW\ Y\~ I\Q, t\.\\'W,\.,,32 -~OV\ Phone: uv;_, S \3:.1,j)'i\ \
I am: □Property Owner □Property Owner's Agent of Record
State of California Registration Number· C, --~ /e'.7 03,
•Architect of Record □Engineer of Record
Expiration Date: \ / ::> I I \ 1
AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read,
understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections, structural
observations, construction materials testing and off-site fabrication of building components, as prescribed in the statement of
special inspections noted on the proved plans and, as required by the California Building Code.
Signatur·e:· __ .,c:;;::;::::~:;:=::::::;;,__ _________ Date: __ /~l_/~Z~":J~/_/_f~--
B. CONTRACTOR'S STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the
contractor I builder/ owner-builder.
Contractor's Company Name: __________________ Please check if you are Owner-Builder K
Name: (Please print) ___ -;::. __ 0~"7_,.,,_ _______ --,,1..--~ _________ f¼',,t'-'-'=~u....,=~A~N~V~-~-
(First) (M.I.) (Last)
Mailing Address: 'ii~ S-\..,A.p':'.) \\\/ \n \..,A N:ft
Email: .')O';:,{G,..@ <:ii:,°otclW nS,. Ul=
<,,p.,J \"'-AJJ U)', CA 1 'l.. ei~ 9
Phone· ';-fi,('.) • /4:1:, · Ca ) 5 A
State of California Contractor's License Number:_---';v_,.__/~A-+-----Expiration Date: -~w=.,_/,~A=----
• I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on
the approved plans;
• I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the
building official;
• I will have in-place procedures for exercising control within our (the contractor's) organization, for the method and
frequency of reporting and the distribution of the reports; and
• I certify that I will have a qualified person within our (the contractor's) organization to exercise such control.
• I will provide a final report I letter in compliance with CBC Section 1704.1.2 prior to requesting final
lnspecJ/cm. ,,.--7'
Signature· ~ ;;l__-_,.~ Date: II (1,1-{ IJ
8-45 Page 1 of 1 Rev. 08/11
·, ,
Project No. FC-18-11-154
April 5, 2019
Mr. Jose Luis Arellano
835 Ladybug Lane
San Marcos, California 92069.
6.M§ GEOTECHNICAL SOLUTIONS, INC.
Consulting Geotechnical Engineers & Geologists
5931 Sea Lion Place, Suite 109
Carlsbad, California 92010
Office: 760-602-7815
smsgeosol.inc@gmail.com
Geotechnical Foundation Trench Observation, 4-Unit Apartment Complex
2637 Jefferson Street, Carlsbad, California
We have performed a geotechnical observation of foundation trenching completed for the project
4-unit apartment building, subsequent to remedial pad grading which was recently carried out under
engineering observations and compaction testing services provided by this office. Based on our
observations, foundation trench excavations meet or exceed the minimum widths and depths
specified in the pertinent soil report(s) and shown on the project plans, and are acceptable to us. Our
observations further indicate that excavated foundation trenches expose dense bearing strata, suitable
for structural support.
Steel placement and concrete pour can proceed and carried out per the project construction schedule,
as planned.
If you have any questions or need clarification, please contact this office at your convenience.
We appreciate this opportunity to be of service to you.
61'16 Geotechnical Solutions, Inc.
Distribution: Addressee (3, e-mail)
6116 GEOTECHNICAL SOLUTIONS, INC.
6M6 GEOTECHNICAL SOLUTIONS, INC.
Consulting Geotechnical Engineers & Geologists
Phone: 760-602-781t
smsgeosol. inc@g mail. corr
5931 Sea Lion Place
Suite 10~
Carlsbad, CA 9201 C
FIELD REPORT
Field Reports will be distributed to the parties listed below within 14 days. Reports of non-compliant conditions will be distributed immediately.
Project Name: Are/ltuiJo 4--Yh,t ApntUJ4etit urnpex 'r/1 t-1, Date: 4:-1-2.a\ 9 4 4--'3-2,s
Project #: Fc,:--/8-1/-/ !'i'+: Time Arrived: I I • 00 AM/~ \3a A~ Time Departed=--,---,---.---,---,.-
Project Locatlon:,2,Q-;t ~ c5f. 1 ~d::arlTime On-Site:_______ Travel Time: 314-C,Hr-) / Ne. ~
Contractor: MSR <otJsTP.IJCTfJIJ,h. Equipment: Total Time: :Z..·1:5 (Hrs,)
lype of inspection
GP#
The Work
□ Engineered Fill
Bid . Permit #
□WAS NOT
IN ACCORDANCE WITH THE REQUIREMENTS OF THE
APPROVED PLANS ANO GEOTECHNICAL INVEST/CATION
REPORT.
CC: Client
P · Architect
ural Engineer
Ject Inspector
Contractor
White
Signature of Client RepresentaHve
Test Location
J1 ~dJJ ~-
r--------f YYYYYY ;:s
Fr.!. -.,. I
, ···-
E Technician
5,8.
Please Print Name/ Title Print Name/ Title
Registration#. ___________ _
Yellow -Contractor Pink -Building Official
VICTOR RODRIGUEZ-FERNANDEZ, P.E., L.S.
1283 E Main Street, Suite 109, El Cajon, CA. 92021
PH: (760) 357-2434, Fax. (760) 660-4848
e-mail:engineervictorrf@aol.com
To: City of Carlsbad
Inspection Department
BUILDING HE IGHT CERTIFI CATION
August 7, 2019
Re: Forms Certification for 4 Unit Apartment Complex at 2637 Jefferson Street
CDP-2016-0006, DEV 2016-061, MFD-01, GR 2018-0002 (DWG NO. 509-4A)
To whom it may concern:
T his letter is to certify that the property above mentioned was surveyed by me or under my
supervision on August 5, 2019 locating the highest top of roof elevation (plywood) for the subject
project. The maximum height elevation was found to be in conformance with the approved building
plans for the project.
Highest measured Top of Roof Elevation (Plywood)= 92.3'
Measured Finish Floor Elevation = 58.2'
Total Height = 34.1' (FF to top of roof)
If you need any additional information, please do not hesitate calling me.
Sincerely,
I' ,
( , ,/
Victor Rodriguez-Fernandez,
L.S. 5335
8/07/2019
VICTOR RODRIGUEZ-FERNANDEZ, P.E., L.S.
1283 E Main Street, Suite 109, El Cajon, CA. 92021
To: City of Carlsbad
Inspection Department
PH: (760) 357-2434, Fax. (760) 660-4848
e-mail:engineervictorrf@aol.com
BUILDING FORMS CERTIFICATION
April 11, 20 I 9
Re: Fonns Certification for 4 Unit Apartment Complex at 2235 Jefferson Street
CDP-2016-0006, DEV 2016-061, MFD-01, GR 2018-0002 (DWG NO. 509-4A)
To whom it may concern:
This letter is to certify that the property above mentioned was surveyed by me or under my
supervision on April 1, 2019 locating existing horizontal control survey monuments and existing
wood fonns for the subject project. The wood forms inside face were found to be outside the
required building setbacks as shown at the approved building plans for the project.
58.6 top of forms
If you need any additional information, please do not hesitate calling me.
Sincerely,
Victor Rodriguez-Fernandez,
L.S. 5335
4/11/2019
PAOFIC CONSTIIUCTION INSPECTIONS, INC.
12308 Fronsac Street Tel (619) 7784219
San Diego, CA 92131 Email. pacificinsp20@Yahoo.com
CERTIFIED INSPECTOR'S WEEKLY REPORT IJOBNO. 1:-: 10/ 7 / 19
-COVERING WORK PERFORMED □ REINFORCED CONCRETE 0 STRUCT STEEL ASSEMBLY □ SPRAY·APPLIED FIREPROOFING
WHICH REQUIRED APPROVAL BY 0 PRE~STRESSED CONCRETE 0 REINFORCED GYPSUM IKJ OTHER Wood
THE SPECIAL INSPECTOR OF □ REINFORCED MASONRY □ DEEP FOUNDATION
JOBADDl<SS BUIUllNG _,,......,.
2637 Jefferson St, Ca~sbad 92008 CBR2018-3291 I PUNAL.f.NUMIIER
OWNER OR PRClJECT NAME AROl!lB:T
Arellano 4 Unn Anartments
CONSTR.. MAR... (TYPE. GRADE. ETC) IDESIGN STRBkiTH SOURCE OF MFGR ENGH9I
GAMA Enaineerina
OESClllEMMl.(MIX~RE-&MQtADE&MFGR.WB..D.flOO,ETQ GB<BIAI.CDNTIW:IOR
MSR Construction
CONTR.i:x:.«i IE'ORIEDWORK
LAB. IE<BW«i & lESTING CONSlR. MAJl SAMPl.ES
INSP£CT10N ----OElAI.EDIIB'ORI"
""" ""''""-'""""-OfW!>U<sPEC1"> LOCAJIOIIOFW0ar~llSTSAalESTJUIBl,.._IIEJIICl& .. ~,...;ass.....s.RC .:1.U0B.-.oNAIOUT-#M)gffl.Of--_l'UaDOII ___ T'lft.lDBff.NO'SOF'1151'-lMEM.snlJCT.
CDINaDIS(alDSIWlE,M.t.lOIJSlOIIQUIDtOBJIID;Eft
Arrived on site to orovide n,:,,Jiodic sn,:,,cial inspection of shear walls requiring nailing at 4" on
center or less. Referenced sheet S1-34 for wall types, locations, Shearwall Schedule and Holdown
Schedule. ln~n<>rtion included shealhina lvnA and thickness. Verified nail size, spacing, edge
distance and penetration. Top and bottom shear transfers are complete.
lnsnAMion also induded epoxy anchor bolt installations throughout. 5/8" diameter all thread
were installed =r Shearwall Schedule. Contractor used Simpson SET XP, lot# 1000049927,
expires 07/31/21 and is placed in compliance with ESR 2508. Verified hole depth, diameter and
cleanness. Observed the epoxy injection and dowel installation in accordance with the manufacturer
instructions.
INSPECTOR IPRINT ORTYPE) Michael Vr/.ovich
SIGNATURE: i\fl,, /\. \ _.1o A s.1
DATE SIGNB>: 10/7/19 cemFICATE NO. 1262 / 8292714
CERTIRCATK»i OF COMPLIANCE: to the best of our knowledge,. al of the reported work, urnes5 otherwise noted, substantially complies with approved P'ans.
spedfications and applicable sections of the buikfing codes. This report covers the locations of the work inspected only and does not constitute engineering pin
Ion or project control.
DATE: 1/30/2019
JURISDICTION: CARLSBAD
PLAN CHECK#.: CBR2018-3291
✓• EsG1I
A SAFEbuitf ColTlpany
SET: ii
PROJECT ADDRESS: 2637 JEFFERSON STREET
PROJECT NAME: 3 STORY APARTMENT FOR ARELLANO
□ APPLICANT
~URIS.
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
JOSE ARELLANO
~ EsGil staff did not advise the applicant that the plan check has been completed.
D EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: J~ Telephone#: 619 980 6006
Date contacted: ·· (r!JY ) AARCHITECT Email: H@OHMSARCHITECTS.COM
Mail Telephone
0 REMARKS:
By: Bert Domingo
EsGil
Fax In Person
Enclosures:
1/17/2019
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
' . ... .
DATE: 12/6/2018
JURISDICTION: CARLSBAD
PLAN CHECK#.: CBR2018-3291
✓• EsG1I
A SME.buill Compa11y
SET: I
PROJECT ADDRESS: 2637 JEFFERSON STREET
PROJECT NAME: 3 STORY APARTMENT FOR ARELLANO
□ APPLICANT
□ JURIS.
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
IZJ The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
IZJ The applicant's copy of the check list has been sent to:
JOSE ARELLANO
D EsGil staff did not advise the applicant that the plan check has been completed.
IZJ EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: JOSE Telephone#: 619 980 6006
Date contacted: (by: ) AARCHITECT Email: H@OHMSARCHITECTS.COM
Mail Telephone
0 REMARKS:
By: Bert Domingo
EsGil
Fax In Person
Enclosures:
11/29/2018
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
•• . CARLSBAD CBR2018-3291
12/6/2018
PLAN REVIEW CORRECTION LIST
MULTI-FAMILY
PLAN CHECK#.: CBR2018-3291
OCCUPANCY: R 2
TYPE OF CONSTRUCTION:
ALLOWABLE FLOOR AREA:
SPRINKLERS?: YES
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED:12/6/2018
FOREWORD (PLEASE READ):
JURISDICTION: CARLSBAD
USE: APARTMENTS
ACTUAL AREA: 4886 SQ FT
STORIES: 3
HEIGHT:
OCCUPANT LOAD:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 11/29/2018
PLAN REVIEWER: Bert Domingo
This plan review is limited to the technical requirements contained in the California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy conservation, noise attenuation and access for
the disabled. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinance by the Planning Department,
Engineering Department, Fire Department or other departments. Clearance from those
departments may be required prior to the issuance of a building permit.
Present California law mandates that construction comply with the 2016 edition of the California
Building Code (Title 24), which adopts the following model codes: 2015 IBC, 2015 UPC, 2015
UMC and 2014 NEC.
The above regulations apply, regardless of the code editions adopted by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2015 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
CARLSBAD CBR2018-3291
12/6/2018
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: CARLSBAD
PREPARED BY: Bert Domingo
PLAN CHECK#.: CBR2018-3291
DATE: 12/6/2018
BUILDING ADDRESS: 2637 JEFFERSON STREET
BUILDING OCCUPANCY: R2/U
BUILDING AREA Valuation
PORTION ( Sq. Ft.) Multiplier
LIVING 4886 126.45
CARPORT 1054 12.33
STORAGE 181 43.15
PATIO/DECK 1112 20.03
Air Conditioning 4886 5.39
Fire Sprinklers 6261 4.01
TOTAL VALUE
Jurisdiction Code CB By Ordinance
-----------
1997 UBC Buildin Permit Fee • g I
1997 UBC Plan Check Fee __ ~-~
Type of Review: 0 Complete Review
D Repetitive Fee 3 Repeats
D Other
□ Hourly
EsGil Fee
Reg. VALUE
Mod.
D Structural Only
f-----ilHr. @ *
Comments: In addition to the above fee, an additional fee of$
$ /hr.) for the CalGreen review.
($)
617,835
12,996
7,810
22,273
26,336
25,107
712,356
$1,632.521
is due ( hour@
Sheet 1 of 1
CARLSBAD CBR2018-3291
12/6/2018
GENERAL
1. Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil and the Carlsbad Planning,
Engineering and Fire Departments.
2. Bring IWQ corrected set of plans and calculations/reports to EsGil, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad
Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the
City Planning, Engineering and Fire Departments until review by EsGil is complete.
2. All sheets of the plans and the first sheet of the calculations are required to be
signed by the licensed architect or engineer responsible for the plan preparation.
California State Law.
3. Show on the Title Sheet all buildings, structures, walls, etc. included under this
application. Any portion of the project shown on the site plan that is not included
with the building permit application filed should be clearly identified as "not
included" on the site plan or Title Sheet. Sec. 107 .2.
INTERIOR WALL AND CEILING FINISHES
4. Provide a note on the plans or on the finish schedule, stating, "Wall and ceiling
materials shall not exceed the flame spread classifications in IBC Table 803.11."
SOUND TRANSMISSION
5. The Title Sheet or Site Plan should clearly indicate if any portion of the project is
in a noise critical area (CNEL contours of 60 dB) as shown on the City or County's
General Plan. If no portion of the project is within a noise critical area, provide a
note on the Title Sheet stating: "This project is not within a noise critical area
(CNEL contour of 60 dB) as shown on the General Plan".
6. If the project is located in noise critical areas (CNEL contours of 60 dB) as shown
on the City or County's General Plan, then an acoustical analysis showing that the
proposed building has been designed to limit noise in habitable rooms to CNEL of
forty-five dB is required. Where windows must be closed to comply, it is
necessary to provide mechanical ventilation in accordance with the mechanical
code. Provide design.
CARLSBAD CBR2018-3291
12/6/2018
ROOFS/DECKS/BALCONIES
7. Balconies and decks shall be designed for 150% of the live load required by
Table 1607.1. CBC Table 1607.1, as amended by emergency building
standards.
8. Enclosed framing in wood exterior balconies and decks shall be provided with
openings that provide a net free cross ventilation area not less than 1 /150 of the
area of each separate space. CBC Section 2304.12.2.6, as amended by
emergency building standards.
9. Wood balconies and decks that support moisture-permeable floors shall be
provided with an impervious moisture barrier system under the moisture-
permeable floor, with positive drainage. CBC Section 2304.12.2.5, as amended
by emergency building standards.
10. Specify on the plans the following information for the deck/balcony surfacing
materials, per Section R 106.1.1:
a) Manufacturer's name and product name/number.
b) ICC approval number, or equal.
11. Show the sizes/locations of roof drains and overflows. Section 1503.4.
12. Show the required attic ventilation on the plans. Show "area required" and "area
provided." The net free ventilating area shall not be less that 11150th of the area
of the space ventilated. Section 1203.2.
13. Show locations of permanently wired smoke alarms with battery backup in Group
R-2 occupancies as follows (Section 907.2.11.2): Please see 3rd floor of C & D
units
a) In each story within a dwelling unit, including basements.
NOTE: Where more than one smoke alarm is required to be installed within a unit,
the smoke alarms shall be interconnected in such a manner that the activation of
one alarm will activate all of the alarms in the unit. Section 907.2.11.3.
14. In dwelling units within which fuel-burning appliances are installed (and in dwelling
units having attached garages), show the locations of permanently wired carbon
monoxide alarms with battery backup, per Section 420.6:
a) Outside each separate sleeping area in the immediate vicinity of the
bedrooms.
b) On each story, including basements.
CARLSBAD CBR2018-3291
12/6/2018
RESIDENTIAL GREEN BUILDING STANDARDS
The California Building Standards Commission has adopted the Green Building
Standards Code and must be enforced by the local building official. The following
mandatory requirements for residential construction must be included on your plans.
CGC Section 101.3. The Standards apply to newly constructed residential buildings,
along with additions/alterations that increase the building's conditioned area, volume
or size. CGC Section 301.1.1. Provide a sheet on the plans labeled "Green
Building Code Requirements" and include the following notes as applicable.
15. Recycling. Note on the plans that a minimum of 65% of construction waste is to
be recycled. CGC Section 4.408.1.
16. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star
rated, vented directly to the outside and controlled by a humidistat. CGC
4.506.1.
ADDITIONAL
17. The referenced detail 9/A 1 0 for the garage separation with the units above
seems not shown. It could be 9/A8.
18. Please see the PME comments below.
To speed up the review process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes. please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction
list? Please indicate: □ Yes □ No
The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding
these plan review items, please contact Bert Domingo at Esgil Corporation.
Thank you.
CARLSBAD CBR2018-3291
12/6/2018
PLUMBING, MECHANICAL, ELECTRICAL, and ENERGY COMMENTS
PLAN REVIEWER: Eric Jensen
ELECTRICAL (2016 CALIFORNIA ELECTRICAL CODE)
1. Update the GFCI and AFCI locations to current Code.
2. Include compliance with CEC 250.52(A)(1) or 250.104(A), whichever applicable,
on the single line diagram.
ENERGY (2016 CALIFORNIA BUILDING ENERGY STANDARDS)
3. R 19 is specified to be installed in the exterior walls. Many of the walls on the
structural plans are 2 X 4. Please review.
Note: If you have any questions regarding this Electrical, Plumbing, Mechanical, and
Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the
review process, note on this list (or a copy) where the corrected items have been
addressed on the plans.
• • n enn i
UPDATED
STRUCTURAL CALCULATIONS
Per CBC 2016
0 a:> ~ 0 ..-
U") 0 O')
N ~ "'-.I 0 a:> ~,
I'-N ~ ..--~-, ll"> ..-I ~ ..-co
~
0
~ m
0
PROJECT:
2637 Jefferson Avenue
Carlsbad, CA 92008
.
I • ,,
-~
• , -_._ t ~· ~ / . ;..
November 12, 2018
38 Third Avenue, Suite C•Chuh Vista, CA 919 l 0 Phone:619.254.8548•Fax:619.489.0464
::;;GAMA ::::IP Engineering~
STRUCTURAL CONSULTANTS
Project ,21c> 3'r :fEaffet-s<> N ,W:;:;.
By: '.:r. ~l'r.ZC.l 1; . /~
Date ll \Ihle Sheef_t_of ,30
TABLE OF CONTENTS
1. DESIGN BASIS:
2. DESIGN LOADS:
3. VERTICAL DESIGN (BEAMS, HEADERS, JOIST, STUDS, COLUMNS, etc.):
4. LATERAL ANALYSIS:
(a) SEISMIC & WIND
(b) LATERAL LOAD DISTRIBUTION
5. LATERAL LOAD RESISTING DESIGN:
6. FOUNDATION DESIGN:
(a) CONTINUOUS FOOTINGS
(b) SPREAD FOOTINGS
7. SHEARWALL SCHEDULE:
8. HOLD-DOWN SCHEDULE:
. ··········-·····-·-------------
z_
3
r-11
IZ•IJ l'l-15
/{.-2"
~GAMA ':::::!P Engineeringi
STRUCTURAL CONSULTANTS
CODE:
CONCRETE:
MASONRY:
MORTAR:
GROUT:
REINFORCING BARS:
STRUCTURAL STEEL:
DESIGN BASIS
2016 CALIFORNIA BUILDING CODE
F'c = 2500 psi @ 28 days
ASTM C90, F'm = 1500 psi
Project: ___________ _
By:. ____________ _
Date: _____ Sheet: ~ of 3-o
ASTM C270, F'c = 1800 psi, TYPE'S"
ASTM C476, F'c = 2000 psi@ 28 days
ASTM A615, F, = 40 ksi, #3 and smaller
ASTM A615, F, = 60 ksi, #4 and larger
"W" SHAPES --ASTM A992, F, = 50 ksi
PLATES & CHANNELS --ASTM A36, F, = 36 ksi
TUBES --ASTM A500, GRADE B, F, = 46 ksi
PIPES --ASTM A53, GRADE B, F, = 35 ksi
CONVENTIONAL LUMBER: DOUG FIR LARCH, ALLOWABLE STRESSES PER 2001 CBC.
TRUSS JOIST PRODUCTS: ESR-1387 (LVL, PSL, & LSL MEMBERS)
GLULAM BEAMS:
SOIL:
ESR 1153 (T JI JOIST)
DOUGLAS FIR OR DOUGLAS FIR/HEM: GRADE 24F-V4 or 24F-V8
{ ] UNCLASSIFIED SOIL PER TABLE 18-I-A
ALLOWABLE SOIL BEARING PRESSURE (ASBP) = ____ PSF
1 Y]PER SOILS REPORT BY SM'? GFDTTT H N l c,,1. L Sol vTlo-.. ..S
ALLOWABLE SOIL BEARING PRESSURE (ASBP) = 21 I 00 PSF
:::GAMA
~ Engineeringi
STRUCTURAL CONSULTANTS
Project: ___________ _
By: ____________ _
Date: _____ Sheet:-~-of :i o
DESIGN LOADS
ROOF t30,L1-vf ) )
ROOF MATERIAL 5,0 -SHEATHING 1.5 1.5
RAFTERS OR TRUSSES 4.0 4.0
INSULATION 1.5 1.5
DRYWALL 2.5 2.5
OTHER M... ..M
TOTAL DEAD LOAD: lS,0 PSF -PSF
LIVE LOAD: 20.0 PSF PSF
TOTAL LOAD: 35. 0 PSF --PSF
FLOOR/DECK { C r'l·tte_F"i°" ) { bf~'>l·O ~"'
FLOOR MATERIAL Lj.o L/, o
SHEATHING & JOIST 5.5 5.5
DRYWALL 2.5 2.5
OTHER _1Q_ 3.0
TOT AL DEAD LOAD: 15,o PSF 15.0 PSF
LIVE LOAD: Ljo .O PSF 40 .o PSF
TOTAL LOAD: 5'5. o PSF 55.0 PSF
WALLS: (EXTERIOR) (INTERIOR)
STUDS 1.0 1.0
DRYWALL 2.5 5.0
INSULATION 1.5
STUCCO 10.0
OTHER 1,Q_ 1,Q
TOTAL LOAD: 16.0 PSF 7.0 PSF
_-..:GAMA
~ Engineeringi
8TIIUOTURAL OON8ULTjloNTS
Project __________ _
By:. ___________ _
Date: ____ Sheet lj of JO
VERTICAL DESIGN
MARK: ~ t\ 1 L= q FT.
w,-(21 1i.) l3St-,f):. 3H ("L f
Wz =
P1 •
Pi ..
USE: Li X IO O. f . frl.
OR:
MARK: f \5 1 L= t FT.
w, -{?2.) l ~5 ~Sf)= ,z <-i 'o ()L\:
w2 ... ('i/1.)P~ f~F): \\0 pu.
P1 -
P1 -
USE: ::} Ii ,, >< \ '-1 psc OR: _________ _
MARK: t 13 '-L• \8. S FT.
w1 -ln/i)( s~ ~f): 4 6 5 pu:
W2 -
P1 -
P1 =
USE: ~1/1 ti X: \LI,, V5l
OR: ...
MARK: f ~3 1,.c ?0.5
w,-
Wz-
P1 -un~n:. l..\13"l-C\\b ~
P1 -
1 I 1 • \.. USE: .., fl )( f 1 \'?I--
OR:
FT.
Rt. -If 6,'.Sb lbs v--1 ,,G lbs
M...-'\ I 1 ;,O ft-lbs I
f 'v.J '
~.s·
RL = '] ... ,-:i lbs
v ... -J-':I): lbs
M ... -I 71;20 ft-lbs
~
Rt."' Ll13 ZC-\ lbs
v ..... '-lf:F~ lbs
M ... -201 QZQ f\-lbs I
VI,
4'
Ra • I 65' lbs
E / • I , ~oo ksi
I,... • 1 1: f in•
l vJ1. 1 3 -S'
Ra-= S6l lbs
E -,1,J gG ksi ..... -,~ ln4
'vJ, t 18 . S '
a.-1-\azg lbs E -2,e,of k.sl
in• , ....... _,
t Fl I
(,~
RL • 3;3q lbs
Vw"' J, S9 0 lbs
M-• \"2..', SY Q 1\-lbs '
~~GAMA ~ Engineeringi
eTIIUCTUl!AL CONIULTANTe
Project ___________ _
By: ____________ _
Date: _____ Sheet S of 30
VERTICAL DESIGN
MARK: 1~ l\ L• \l-FT.
w c2sj , )(/_~ ,,.,., .. -;: 6c~' \ i:.
I= ,
W2 =
P,"'
P1 ..
1-,. Y II 1 /~ 1, f5 L USE:
OR:
MARK: L= FT.
w,-
W1 ..
P1 ..
Pi ""
USE:
OR:
ARK: M EB:i L= 'r~ FT. w / S, , I\ r1 i .
= zw ft\:. w, -( f .p,.S') ( I '1 f~ F
W1 -r~.s• H I t l'H): sti 1 ~ i
usE: ~-,~, x \L1 ., r~c
OR:
MARK: f~ l I,.• q FT.
' .
w, =, Q°{? )( ':>::, 1'1\:) \ ( ·s<i':: •,, (,f ): 216 fL.i
W1 •
P,""
P1 •
USE: '::\ I( IQ o. L :a\; "Z.
OR:
-·• -----------~
w, f 11-' i
Rt,• 5, P>~ t lbs
v_ .. s,xs% lbs M-..,. ?.\r050 ft-lbs I
lbs
lbs
ft-lbs
I \\I I
'I -
1 12. I
RL • J t-~ lbs
v .. , = 1, O l lbs
M-.-5 105 0 n-lbs
RL -If 1 ':I Z, lbs
V ... • I I :z •1 2 lbs
M-•• z, 3 q () ft-lbs
Ra .. s.~~8 I lbs
E -'Z...1QO(L ksi I J 6 r ),.. .. in4
Ra = lbs
E -ksi ·---In•
P,
, It
'4/-Z.. , ,.
11 5' ,
(t\1'11 .
Ra= .. }11'· Z lbs
E -100(.) ksi
1,.... • I Gt_) in4
Ra = 11147
E "'!,H1a
1-= 51,
J
lbs
ksi
in4
::!iGAMA ':::IP Engineering~
IITIIUCTVRAL OONaULTAKn
Project: __________ _
By: ·-------------Date: ____ Sheet 6 of 36
VERTICAL DESIGN r, .l
I II
USE: S / .. 1 )( 16 " f> L OR: _________ _
USE: 5'/t1 ,, X: II t/9" f 5 L
0~ ----------
-i 1 11 I usi:: .) rz x 1.1 ,2 ·· rst
0~ ----------,.
MARK: f O' J-• \\.\, S FT.
('f/t 'il v, !'Sf )° .. u_~ ~Lr w,-
W2 -
P, ..
P1 -
USE: _L-_\X_lt,_\ _0_, ~.;...-_~_,;· ...;:z.;.__ __ _
OR: ---------,--
R1,= 5-Pl\ lbs
v-• • c;' 1 ~ ci lbs M ... -rzJ _ ✓ _ ft-lbs
f
RL "' ld~I lbs \ , v ... = ,&;ii lbs
M .. ,. 5'~10 ft-lbs I
Ra• 15 .qi.o lbs 1 E • -z., 000 ksi
I...,. ~ ,~, in4
~IL: i~~~I ~
1,.. • '-i 38 in4
Ra· 5,H~ lbs
E -2,0 00 ksl ._. -2 O'f ln4
'"' {
\L\.s I
Ra = I , DI lbs I;' 120 E ... ksi ,_ -r 19 3 in~
~FORTE~ MEMBER REPORT Level, [RJ1}
1 piece(s) 11 7 /8" TJI® 110 @ 16" oc
I
Overall Sloped Length: 21' 7 5/16"
,'. \ .. ~·· -: ·~·~·
,• _: :-.:. · . .,, ... :. •, ~
21'
All locations are measured from the outside face of left support (or left cantilever end).AII dimensions are honzontal. -~------·· -..
I
DeslanRnults Aciu.l.l..oalU .... Al--LDf ..-,c--......~)
Member Reaction (lbs) 504@ 2 1/2" 1719 (3.50") Passed (29%) 1.25 1.0 D + 1.0 Lr (All Spans)
Shear (lbs) 490@ 3 1/2" 1950 Passed (25%) 1.25 1.0 D + 1.0 Lr (All Spans)
Moment (R-lbs) 2614 @ 10' 9 1/2" 39SO Passed (66%) 1.25 1.0 D + 1.0 Lr (All Spans)
uve Load Detl. (In) 0.478 @ 10' 9 1/2" 0.706 Passed (l./531) .. 1.0 D + 1.0 Lr (All Spans)
Total Load Dell. (In) 0.837@ 10' 9 1/2" 1.059 Passed (l./304) .. 1.0 D + l .0 Lr (All Spans)
• Defteclion crtlleria: U. (l/360) and TL (l/2'10).
• Bnlclng (Lu): All compression edges (top and bottom) must be braced at J' 1/2" o/c unless detailed olhefwlse. Proper attachment and positioning of la!J!ral
lndng is required to ac-member stability. _,......,, ~"'~(lbs)
Supports Total Awllable Required -Roof T---,.._
I • ee.eled Piale • DF 3.50" 3.50" 1.75• 216 288 S01 Blocldng
2 • ee.eled Pt.Ile • Df 3.50" J.so· 1.75• 216 288 501 Blocking
• lllocldng Pilnets are as.sumed ID c.any no loads opplled dir£dly above them and the full load 1s applied ID the nwmer being designed.
---· --Uwe
Loada ~ Sc,adr,o (0.,0) <-1.!15) ~
1 • Unifom, (PSF) Oto2l'7" 16" 15.0 20.0 Roof
PASSED
36
S\'S11!ffl:Roof
Member Type : Joist
llulklng Use : Resldenttal
llulklng COde : IBC
Desion Metl1odology : ASO
Member Pitch: 0.25/12
~W_e1 .... .,_ .. _m_aaec __ UNr __ Noties _____________________________________ ---l ~S\JSTAINA8lE FOl1ESTRYINITIATIV£
:Wf!y1!111aeoser warrants that the sizing or Its products wlll be In aca>rdance with Weyemaeuser product design a1ler1a and publlslled design -..,1ues.
lw~ ~ dsi:lalms ~ OUler warranties relatro to the software. Refe< ID current Weyerh,>euser literature for Installation dell!lls. l(www.WOCldt>vwy.com) Accessories (Rim Board, Blocking Panels aM Squash Blocks) are not designed by this software. Use or this software Is not lnlended to
. circumvent the need fo, a design professional as dell!rmlncd by the autllor1ty having junsdic11on. The designer ol record, lulde< or framer Is responsible to
!assure that this calculallon 15 compaUble with the .,..,..,.11 project Products manufacturtd at Wcyc,haclJSEr l'acl4illes are third-party ccrttfled to sustainable
foleslry standards. Wcye,l,oeuse< Engineered Lumber Products have been ewtuatcd by ICC ES und<r ll!chnlcal reports ESR·1153 and ESR-1387 a,,,d/or liested
In accordance with appUcabl<! ASTH S1an(lard$. r-or current code evaluation reports rele< ID ht11)://www.w-bywy.com/seMCes/s_COdeReports.aspx.
:The product &lll)llcatton, Input de,lon loads, dimensions and support Information have been provided by Fortl! Softwa"' Operator
Forlo Software Operator Job Notes
Juan Gerc18
GAMA Eng,n"""n~. INC
(619) 254-8~8
1garc,a@gama-1ncc.om
--------·---· -•·-·····-·------; Forte v5.0, Design Engine: V6.4.0.40
2637JE~1.4TE
Page 1 of 1
~!FORTE . MEMBER REPORT Level, {DJ1)
1 piece(s) 11 7 /8" TJI® 210 @ 16" OC
t
0
ill
Overall Length: 17' 7"
17'
All locations are measured from the outside face of left support (or len cantilever end).AJI dimensions are horizontal.
r-----------------·---------·-...
Deslan Results Actual O Locallon Allowed R"""lt LOF Load: Combination (htllem)
Member Reaction (lbs) 637@2 1/2" 1134 (2.25") Passed (56%) 1.00 1.0 D + 1.0 L (All Spans)
Shear (lbs) 623 @3 1/2" 1655 Passed (38%) 1.00 LO D + 1.0 L (All Spans)
Moment (Ft-lbs) 2701 @ 8' 9 1/2" 3795 Passed (71 % ) 1.00 1.0 D + 1.0 L (All Spans)
U...e Load Dell. (In) 0.304 @ 8' 9 1/2" o.5n Passed (1./677) .. 1.0 D + 1.0 L /All Spans)
Total Load Oetl. (In) 0.419 @ 8' 9 1/2" 0.858 Passed (1./492) .. 1.0 D + 1.0 L (All Spans)
TJ·Pro"' Rating 42 40 Passed .. ..
. --·~~·------------• Deflec1jon cr11er1a: u. (1/360) and TL (1/240).
• Bracing (Lu): All compression edges (top and botlom) must be IYaced at 3' 10 9/16" o/c unles.s delailed otherwise. Propel' auachment and positioning of
lateral bracing Is required to achieve member stablltty.
• A Slruellnl analysts of Ille deck has not been performed.
• Deftectlol1 analysts Ii baS<d on composite a<:tk>n with a single layer of 23/32" Weyerhaeuser EclQe'" Panel (24" Span RaUng) that Is glued and nailed down.
• NHttonal COllSlderallons tor Ille TI-Pro'" RaUng Include: None
8eilrlngl.enflltl Leads to Suppaota (b)
Supports Total """'-Requl...i -F1«N' T_. -.....
l • Stud wall · OF 3.50" 2.25" 1.75" 176 169 615 I l/4"Rlmeo..rd
2 • Slud wall • OF 3.50" 2.25" 1.75" 176 469 645 l 1/4" Rim 8oard
• Rim 8oard Is assumed to ca,ry all loads applied dinectly abo"" It, bypassing 11., member ~ng designed.
-----------· --·-----
DeN F'-'U...
Loads t.ocetiM 5paclng (0.,0) (1.00) Cont-
1 • Uniloon (PSF) Oto17'7" 16" 15,0 40.0 ~~ • U"1n9
t
0
PASSED
of 36
System : Floor
~berType:.Joist
BotUr,o use : Resi<lenUal
Bullding Code : IBC
Deslon Mechodology : ilSO
----.. ____ .. ______________________________ _
I--W=reY::..<..:te:...rh.:....:.•..=•..:.use..:....:._r_NcJte...:..:=S---------------------------------------1 ~SUSTAINABlE ~ESllll' INITIAWIE
Weyemaeuser warl'ilnts Uiat !he slzlng of Its n,oducts will be In accordance with W~ product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties relatl!d to the sortware. Reier ID current We,oert,,,euser literature for lns1allatk>n de1311s.
(www.woodbywy.com) Acccssortcs (Rim Board, Blocking Panels and Squash Blocks) 3re not dcslgnc:d by this software. Use of !Ills software Is not lntz,ndaj ID
clrcu"""""'t the need for a design professional as determined by the authority having Jur1sdlctton. The designer or record, builder or frame' Is responsible ID assure that lt\ls calculaUon is oompaUble with the o-1 projtct. Products manufactured at Weyert,aeuser f'llcllllles are thl~ certlfled 10 sustainable
l'orewy -· Weyemaeuse< Engineered Lumber Products have been evaluatl!d by rec ES under lechr1k:al reports ESR-1153 and ESR-1387 and/or tested In accordance wnll applicable ASTM standams. For current axle evaluation reports refer ID htJp://www.woodbywy.com/se<VICes/s_CodeReports.1spx.
n-c product appllcaUon, Input design loads, dimensions •"'!..:':'.!'l'°'.!.~~~U~n t_>av<: ~ provided by Fort,: Sollwc_ __ •re..:....Opcrator.:...c. ..• _________ _J
[-~~:-~~;;.~~~~~( ---------.... -~~--~-~}~_ --
Juafl G,;\f("•a
CAMA Enij,'lOOr,,.g INC
1619) 25-1-854$
19-w•·10@-J(,ma-•r,r, (',om
Forte v5 o, Design Engine: V6.4.0.40
2637JE-·/.4TE
Page 1 of 1
:.i!FO RTE ,. MEMBER REPORT Level, [FJ1}
1 piece(s) 14" TJI® 230@ 16" OC
Overall Length: 21' 7"
. . . . ~·· t.
21'
AJl locatlons are measured from the cul.side race of left support (or left rantilever end).All dimensions are horizontal.
DulanRelulb -·Lacatlan Allowad --I.DI' ~•o.bl•llttc.~)
Member Reaction (lbs) 784 @ 2 1/2" 1183 (2.25") Passed (66%) 1.00 1.0 D + LO L (All Spans)
Shear (lbs) 770 ® 3 1/2" 1945 Passed ( 40%) 1.00 LO D + 1.0 L (All Spans)
Moment (Ft-lbs) 4107@ JO' 9 1/2" 4990 Passed {82%) 1.00 1.0 D + 1.0 L (All Spans)
Ul.'I! Load Dell. On) 0.439 @ 10' 9 1/2" 0.706 Passed (l/578) --LO D + 1.0 L (All .:;n..ns)
Total Load Den. (In) 0.604 @ 10' 9 1/2" 1.058 Passed {l/420) .. 1.0 D + 1.0 L (All Spans)
Tl-Pro'" Rating 36 35 Passed .. .. ... •-··-.. -·---· ---·-·· • Deftecljon c.-a: U. (l/360) and Tl (l/240).
• llnldng (Lu): All compression edges (lop and bollom) ""'" be braced at 4' 1/8" o/c unless detailed olhetwlse. Proper attichment and positioning or labeRI
brach,g is requi~ ID ilCllieYe member stability.
• A structural analy,ls of the deck has not be<,<, performed.
• Deflection analysis Is based 011 comPoslte action with• single layer ol 1:3/32" wey,,maeuser [clQe .. Pan,! (24" Span Rattng) that Is glued and nailed down.
• Additional considerations for the T J·Pro'" Raang Include: None
8-inll'-lfl ..... 11>5-ts(lbs)
Supports TCMIII ........ ._..... Dead Floor ,._. ,., ... .....
I • Stud wal . Df J.so· 2.25" 1.75• 216 576 792 1 1/4" Rlm Board
2 · Stud wal • DF 3.50" 2.25" 1.75" 216 S/6 /92 l l/4" Rim Board
• Rim Board 15 as,umed lD carry all loads applied dl=tly above it, bypassing the memoe, belng cleSlgned. -FlaorU..
LOlldl Loallloa !ilpadolg (0.90) (1.00) c--
1 -Unilonn (PSF) 0ID21'7" 16" 15.0 40.0 Resldentlal • Uvlng
Neas
0
I
PASSED
q 3o
Sysll!rn :Floor
_, Type : Joist
Building use : _,
Building Code : !BC
~n Methodology : ASD
1-w=,-=· :.:.rtMle==-=;...:..NcJtet==-------------------------------------1 <!j>suSTAINAOlE F<lf!ESTI!\' INIIIATl\lt
Weytrt,aeuser warrants l!lal the sizing of Its products will be In accordance with Weyert\Oalser product design crlll!f1a and published design values.
Weyemaeuser expressly dlsdalms any other warrantles related tD tile software. Refer tD current Weyert,aeuser llbeRture lor lnS1allation details.
(www.woodbywy.com) AtteS50flcs (Rim Board, Blocklng Panels and Squash Bloclts) are not designed by this software. ~ of 1h15 sollware Is not intfflded tc
clrcunwent the need lor • design professional as determined by the authority having Jurisdittk>n. The designer of~. builder or fTamer ls resl)Oflslble ID
assure that this cak:ulaaon Is compa-with the o"""'" project. Products manulac11lred at w..,...,__ fadlltle$ ¥1! third-party Cl!rtllled ID !l/Stlllnoble
fore:sby standards. Weyertlaeuser Engineered Lumber Products have been .,,,.,uatl!d by ICC ES under technical fl!J)Orts ESR·IISJ and ESR-1387 and/o, ll!Sll,d
In actotdante with applcable AS11"I standards. ror current code evaluallon reports r,,fer ID http://www.woodbywy.com/serw:es/s_CodeR<l)Orts.aspx.
The product appllcallon, Input deslgl loacls, dimensions and support lnformatton have been provided by r-orte SOftwore Open,tor
JobNolH, Forw Software Operalor
Juan G8fC18
GAMA Englr80fing. INC
(619 I 2~./1548
1garc,o{~fTla Inc com
Forte v5.0, Design Engine: VG.4.0.40
2637JE-1.4TE
Page 1 of 1
~lFORTE'
+
0
MEMBER REPORT Level, [FJ2]
1 piece(s) 14" TJI® 360 @ 16" OC
Overall Length: 26' 1 •
" " " " " "
l 3'6" ! 22'
1 ,t
12]
All locations are measured from the outSide face or left support (or left cantilever end).AII dimenSions are horizontal.
J
OeslanResults --• Location --t I.DI' 1-1:C-~ (-.i)
! Member Reaction (lbs) 1668@3' 7 3W 2'160 (3.50") Passed (68%) 1.00 t.O D + 1.0 l (All Spans)
I Shear (lbs) 867 @ 3' 9 \/2" 1955 Passed (44%) 1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs) 3986 @ 15' 5 3/8" 7335 Passed (54%) 1.00 1.0 D + 1.0 L (Alt Spans)
Uve Load Dell. (in) 0.458 @ 14' 9 1/8" 0.741 Passed (1./583) ·-LO D + LO L (Alt Spans)
Total Load Defl. (In) 0.546 @ 15' 1/4" 1.111 Passed (L/488) .. 1.0 D + 1.0 L (Alt Spans2__
TI-Pro"' Rating 35 35 Passed .. .. ·--• Deftectlon criteria: LL (l/360) and Tl (l/2~0).
• Ove,hano dellection criteria: LL (2l/360) and TL (2l/2◄0).
• Bracino (Lu): All compn,sslon edges (top •nd boUl>m) must be br.Ked at 4' 6" o/c unless det.llled othe<wt,e. !'roper attachment and positioning of laler•I
bracing Is required ID achieve member st,bility.
• A S1ructural anall'Sls of the decl< ha'5 not been performed.
• Deflecilon anall'Sis Is based on compc,;lti, action With a single la~ of 23/32" Weyemaeuse-Edge'" Panel (2◄" Span Rating) that Is glued and nalll!<I down .
• AddiUonal considerations fo, the T}-P,o~ Rating inel,Kle: Non,
• Permanent bracing at third points in the back spar,°' a direct applied celling over the enure back span length Is required at the lefl end of die rnem!.,e,. See
llte'3ture detaU (PB!) fo, danficaUon.
IM!fng.._ui Loads ID su,,orta oi.)
Supports Total A-.bie Required --T_, --,.._
1 • Slud wall -OF 3.50" 3.50" 3.50" 617 1051 1668 Blocklno
2 • SW<! woll -DF 3.SO" 2.25" 1.75" 176 6°"/-.S 780/ ... 5 1 If◄" Rim Boord ·-· ....• • Rim Board Is assomed to r.,rry an IOads applied directly abo,e It bypilsslng the member being designed.
• Blocking Panels are assumed to carry"" loads applied di...ctly above lllent and Uie full load is applied to tJie ,nember being designed.
---· -,._ u ..
Loads LDcatlon ~ ... (0.90} (l.lNJ) ~
1 -Umfomt (PSFJ 0to26'1" 16" 15.0 40.0 Residential • LMrtQ ,_,.
2 -Point (lb) 0 N/A 271 l lJ
0
PASSED
10
Syslem:Floor
_,Type: Joist
Building Use : ResldenU.I
Building Code : !BC
Design Methodology : ASO
-------------~•-·-----·-··-· ·-··-·--·--··---·------·-
1-w=e:.,ye.:e:.:rti=ae=user=:.:...N:..:..::ote=s::.... _____________________________________ -I (f/Jsus1A1NA8l.f FORESIRY INITIA1'1Vl
w~ warrants that the sizing of Its p,oducts w,11 be ,n accomance with W")'Ortiaeuse< p,oduct <lesign criteria and published desi<Jn values. w~ expressly disclaims any othe' waminties related to tJie scf\ware. Refer to cum,nt w~ literawre fo, inst1lllation details.
(www.woodbrw'/.c0<n) Accessorie5 (Rim Board. Blocking Panels and Squash Bloc"5) are not designed by this scllware. Use or this softwan, Is not lnlended to
ctrcumvent the need for a design professional as detffmlned by the autho~ty havfno Jurlsdlcton. The designer of record, bYilder or framer Is responsible ID
assore that this calculatlon Is compatible with the oven,11 project. Products monut.ctur.d at W~5e< faclllties are lllh'O-P&rtv certified ID sustainable
forestry standards. Weyertlae\Jser Engineered Lumber Prodocts have been evaluated by 10: ES under ll!Chrical reports ESR·llS3 and ESR-1387 and/or tested
In accorclance with applicable ASTM standards. Fo< current code e,,olv,llOO ceportS eefe, to hupcf/www.woodbywy.com/seNice,/s_C-odellepo,ts.asp><.
~~ application, Input design loods. dimensions and SU()l)Ort information have been provided by Forti: software OperalDr
Job Notes Forte Sottw-111rv OperatOJ
Juan Garcio GAMA Eng,neenng, INC
(619) 254-8540
19arcia@<J8lll8•1nc COIII
Forte v5.0. Design Engine: V6.4.0.40
2637JE~1.4TE
Page 1 of 1
~FORTE ' MEMBER REPORT Level, [FJ3]
1 piece(s) 14" TJI® 230@ 16" OC
PASSED
Overall Length: 24' 7" _\I_ 30
" "
" " " " l 3• 21· 1#----,1:,'-,r--------------------------,r
El
All locatlons are measured from the outside face of left support (or left cantilever end).AII dimensions are hortzontal.
-·-· •----·-DeslanResults Actual O LocaUon All-R-,lt U>f lolcl: Coonblnortlon (httam)
Member Reaction (lbs) 748 @ 24' 4 1/2" 1183 (2.25") Passed (63%) J.00 1.0 D + 1.0 L (Alt Spans)
Shear (lbs) 793 @ 3' 3 l/2" 1945 Passed (41%) J.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs) 3742 @ 14' 3 l/4" 4990 Passed (75%) 1.00 1.0 D + 1.0 L (Alt Spans)
Uve Load Oel'I. (lnl 0.444 @ 13' 9 1/8" 0.708 Passed (l/573) .. 1.0 D + 1.0 L (Alt Spans)
Total Load Dell. (In} 0. 548 @ 13' 11 3/8" 1.061 Passed (l/465) .. 1.0 D + 1.0 L (Alt Spans)
TJ·Pro'" Ratlno 36 35 Passed .. ---·--·~ ·-. ·-• Dellection criteria: l1 (1/360) and IL (1/24-0).
• ~ denect1on critl!ria: u. (21/360) and TL (21/24-0).
• Bracing (l.lJ}: All compression edges (top and bot1l>m) must be braced at 4' 2 7/16" o/c unless delalled otrlerwl"'. Proper artachnw,nt and posiboning of l~I bracing Is required to achie',<e member stability,
• A slructural analvsis of lhe deck has oot been performed.
• Deflectlon analysis ts based on composl~ action with a single layer of 23/32" W~r Eclr,le'" Panel (24" Span ~Ung) that Is glued and nailed down.
• Additional consideratlons for lhe TJ-Pro'" Ratjng include: None
• Permanent br'ddny at third points In me ood< span o, a direct Ol)()lled celling over Ille entire back span length ls required at tile Iott end of tile member. See
lller.lture delall (PB!) for Clarilication.
,------------.------,--,--,·· ~ngLenvth
Supports Available Required floor ,.._ Tola! _._
1 -Studwall·OF 3.50" 3.50" 3.50" 53S 838 1373 Blocldng
2 -Sb.Id wall OF 3.50" _ . _1._~S_" _ _,_ __ 1_.7_5_" _ _,__1_79_~_5_7_7/c..·_19 756/·19 I 1/4" Rim Board
• Rim Board Is assumed to cany all loads applied dlrec11y atxr,,e It bypassing the member belog designed.
• Blocking Panels are assumed to cany no loads applied directly ahove them and Uie run load Is applied to tile member being designed.
---·--·--
Dead floorUve
Loads Location Spacing (O,!IO) (1.1)()) Comments
1 • Unifo,m (PSF) 0 to 24' 7" 16" LS.O 10.0 Residential l.Mng •=•
2 -PO<ll(lb) 0 N/A 222 80
1 Weyerhaeuser Notes
-.. -------------
W~ser womints that the s!Zlng or Its products wnr be In acr.Ofdance with Wev,,rhaeuser product design critEna and published des!Qn values.
j Weyemacuscr expressly disclaims any Olher warrantieS related to the software. Refer to current Weyerhaeuser llb!ratun! for inslallation details.
(www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not doslgn<!d by this software. Use nf lhls software is not intended to
drturnverit tile need for a design professional as de!Prmlned by the authority ha"'ng jurisdiction. The designer of re<:l>rd, builder o, l'ramer Is responsible to
aSS<tt tllat lhls calculation Is compabble with the ~•II project. Produ<:ts ~-at Weyerhaeuser facllltlcs are third-party certified to sustainallle
forestry slandards. Wcvert,aeuse, Engineered Lumber Products have been evaluated by ICC ES under technlcal reports ESR-1153 and ESIH387 and/o, b!sll!d
In accordance with applleable ASTM stanc:1an:ts. For current code P.vailuatinn repa,,ts refer tD http://www.woodbywy.com/sef"Aces/s_CodeReport:s.aspx.
The product application, Input desl<,ln loads, dimensions and support lnformab?~ have been provided by ~~•re _opera __ tor _________ ~
System : Floor
MemberTVl)e:.Jolst
Bulldlng Use : ResldenUat
Oulldlng Code : IBC
Oesigrl Melhodology : ASO
~SUSTAJNAetf FOIICSTIIY INITIATM
Forte v5.0. Design Engine: V6 4.0.40
2637JE-1.4TE
Page 1 of 1
:::GAMA ":::::P Engineeringi
8TRUCTURA~ CONSULTANTS
Project: _______________ _
By:, ____________ _
Date: _____ Sheet \2 of 3°
CBC2016 (1613), ASCE 7-10 CHAPTER 11, 12, 13 SEISMIC DESIGN CRITERIA
Soil Site Classro--·--•-1 Table 20-3-1, Default= D
Response Spectral Acc. (0.2 sec) s. = 150 00%g
Response Spectral Acc.( 1.0 sec) s, = 60.00%g
Site Coefficient Fa = 1.000
Site Coefficient Fv"' 1.500
Max Considered Earthquake Acc. S1,1s = F •. s.
Max Considered Earthquake Acc. SM,= F0.S,
@ 5% Damped Design Sos = 2/3(51,15)
So, = 2/3(S1,11)
Building Occupancy Categonesi 11, Standard
Design Category Consideration: \ Flexible Diaphragm
Seismic Design Category for 0.1 sec D
Seismic Design Category for 1.0sec D
s1 < .ng NA
Since Ta < .8Ts (see below), SOC = D
Comply with Seismic Design Category D
12.8 Equivalent lateral force procedure
= 1.500g
= 0.600g
= 1.500
= 0.900
= 1.000
= 0.600 ... ...
Figure 22-1 through 22-14
Figure 22-1 through 22-14
Table 11.4-1
Table 11.4-2
(11.4-1)
(1 1.4-2)
(11.4-3)
(11.4-4)
Table 1-1
with dist. between seismic resisting system >40ft
Table 11.6-1
Table 11.6-2
Section 11. 6
A. BEARING WALL SYSTEMS T-12.2-
Seismic Force Resisting Systems J 13. Light-framed wall, sheathed with wood strucw ral panels rated for shear resistance or steel sheets •
c1= 0.02
Building ht. H0 =
X = 0.75 T-12.8-2
ft Limited Building Height (ft) = 65
for s01 of 0.600g Table 12.8-1
= 0.210 12.8-7 TL= 8 Sec
C0= 1.400
Approx Fundamental period, T. = Ct(h0)'
Calculated T shall not exceed S Cu.Ta
------
Use T = I 0.210 • sec.
0,8Ts = 0.8(So,ISos1
= 0.294
= 0480 Control (exception of Section 11 .6 does not apply)
Is structure Regular & S 5 stories ? I No •
Response Spectral Acc.( 0.2 sec) s. = 1 500g
F, = 1.00
@ 5% Damped Design S0s = ½(F •. S.)
Response Modification Coef. R = 6.5
Over Strength Factor 0 0 = 3
Importance factor I =
Seismic Base Shear V = c,w
C,= Sos
R/1
or need not to exceed, C, = So,
(R/1).T
or C,= SmTL
T2(R/I)
c. shall not be less than= 0.01
Min C, = 0.5S11/R
Use C, = 0.154
Design base shear V = 0.154 W
= 1.000g
=0.154
= 0.439
NIA
N/A
Control
• Since building is assumed Irregular, Base Shear will be increased by 25%
• Since Seismic Design Category is 'D', Redundancy (p) is 1.3
12.8.1 .3
(11.4-3)
Table-12.2-1
Table 11.5-1
For TS TL
ForT >TL
For St::: 0.6g
• Since Allowable Stress Design is being used, multiply Base Shear by a factor of 0.7
(12.3.3.4)
(12.3.4.2)
(1 2.4.1)
Therefore. Voesign= (1 _25)(0. 7)pCsW = (1 .25)(-7)(1.3)(0.154)W = II O.175W
--··--~--------· .. ·------·--------
(12.8-2)
(12.8-3)
(12.8-4)
(12.8-5)
(1 2.8-6)
::;GAMA
~ Engineering i
STRUCTURAL CONSUL TANT$
Project: ___________ _
By: ____________ _
Date: _____ Sheet: I~ of 3 0
CBC 2016 (1609.6), WIND DESIGN CRITERIA
BUILDING DATA:
Basic wind speed (3 sec gust): V = 110 MPH (85 MPH • ASD)
Exposure: B
Building Category: II
Roof Pitch: 0,?..S, ft:12 ('/~ /r-r)
Roof Mean Height, H = _3,~"l..~-
MOTHOD -ALTERNATE ALL-HEIGHTS:
Pnet = qsKzKztlwCnet (Eq. 16-35)
Kn= 1.00
lw = 1.00
q, = 0.00256V2 = 18.5 PSF (ASD)
TABLE 27.3.1 ASCE 7-10
H 0'-15' 15'-20' 20'-25' 25'-30' 40'-50'
Kz 0.85 0.90 0.94 0.98 1.09
TABLE 1609.6.2
Cnet ; walls
Cnet ; roof 5: 12 slo
0.58
MWFRS (85 mph wind)
qs Kzt lw Kz Cnet Pnet
WALLS 18.50 1.00 1.00 \ oL{ o.9.4 \6.0
ROOF 18.50 1.00 1.00 \ .n\,1 \ . o°\ 2\.0
Pnet, min= 16.0 PSF (1609.6.3)
Project: __________ _
By:. __________ --:-_
Date: ____ Sheet tl.j of 30
LATERAL LOAD DISTRIBUTION
BUILDING DEAD LOAD:
ROOF DEAD LOAD: ~
Roof = ( L 15 6 h )( \~ f '>f ) =-' \,.-,31.JD lbs
Exterior Walls = \ \ S l ~ t )( io' /2 ) { lb f Sr ) ·.
Interior Walls = ( IQh <c) ('0/z.)( t &51: J "-
,1,, ,o lbs i
~. J:I 0 tbs >
Total Weight= ___________________ ___.._-...........,.,.__ lbs
2nd FLOOR DEAD LOAD:
Floor = ('21) 83 f fL ) ( \.S f ~ f ) : '35,305 lbs I
Exterior Walls = ( 1. 61 ' )( ~/2 )(ll f5f )± \?..iUO l~S = )\ ,3{;t.t , lbs
Interior Walls = ( l ~ "' )( q /1 )( 3: f ~' t· 1 -I ~ (t) O I '05 ~ 9 1 (,0I lbs
Total Weight=----------------------t-J.b 1:Ho lbs
1st FLOOR DEAD LOAD:
Floor = ( ?. , L\ -i z {( 2 ) ( \ S f S f ) : )' .~30 lbs j
Exterior Walls = (11,1) ( (),'J-i_ )( llf'.,f) +1q 1v-4 lb,:·
Interior Walls = I I q Y ) ( fh_ ) ( r f5 F ) + ' 5 , 89 \ \ 0 S :
' I
:Y1, D9 '7 lbs
11 . crt I lbs ' :, Total Weight= ___________________ __,_.........,!-=-...._._-lbs
1 qt ~qt lbs TOTAL DEAD LOAD, wt=-------------------'---+--"-..:...-
BASE SHEAR, V = o.ns Wt• (Q,\}'5 )(\'ft,3q"'.\-\b$):-?}\, s'-11.I
I lbs
UNIT SHEAR, v = V/AREA= ___ __,psf (ONE-STORY STRUCTURES ONL 'rJ
DISTRIBUTION :
Fµx = w1 h1 (~
Wx hx Wx hx w~ h1 lw;h; A Vx = (Fpx /A)
(kips) (ft) (kip-ft) ~ w, h, (lbs) (fr) (psf)
ROOF )~. '2. 3 1.. , , 06Z.-c.t o. '30 10 t 1(, 3 • L 'I' Sb C\. 0
2..t\tj FLOOR 16-S '2. \ I J 611.e 0. L\t I b I -i. ~ s. T 1 ,3£>l b. a
1,~tFLOOR 81-. t.\ l\ -:\-<c,6.1-0.1. 1 l-, q45 .1 1. '-1-Z.'2. I 3.3
Project ___________ _
By: ___________ -=-:_
Date: _____ Sheet IS of 30
SEISMIC vs. WIND
(HORIZONTAL LOADS)
ROOF LEVEL UNIT SHEAR:
WIND: P=AUA x Fw = S S' ( ~ + \ 1
)
,,1'>(;,f{'l
SEISMIC: Vx= q ·PSF v------
3th FLOOR LEVEL UNIT SHEAR:
x Z. I · O PSF = 5 · 5 PSF
. , ~ISM '(
WIND: I /(l ') .Sl '(II ' t,4'\ P=AUA x Fw = SI I 2 + ;; ·, , 4 J x '2.1.0 PSF = 6. '-f PSF
,,,5i-ft '-
SEISMIC: V,c=_b •~8~-PSF V
2nd FLOOR LEVEL UNIT SHEAR:
WIND: X '1. I. 0 PSF = B. 3 PSF
SEISMIC: vx= 3 · , PSF"' , •. (01'1 A.1 Vl../1 t IVE
·-----· --· ·--------
:::GAMA '::::JP Engineeringi
STRUCTURAL CONSULTANTS
Project: ___________ _
By: ________ -,-----,--
Oate: _____ Sheet: 16 of J 0
SHEARWALL DESIGN
3 ~Q Story Shearwalls, (v = GI , O psf)
Seismic Load, F. = 2, ( <./ 6 I
5. SIS Lbs I
Grldllne 3 · 5
T 'b t A ( 551
) ( Z \') /7.. -:. r -:l r, ft n u ary rea : _ _ _ _ ::::i J O sq. .
Lateral Load: '$1 3 'f-f 1. x g, Q P;, f -:. S, 2 O '2 Lbs • Lateral Load (Above):------------------------'---Lbs
Seismic Load. F, = S , 1 o 7 Lbs
Shearwall Length, L = ___ y~v__,.'--TS ___ ft. I
Unit Shear, v = F,IL = \ -Z, 6 pit
Shearwall type: @
Wall Overturning: L = ZcJ · z 5 ft. [ v(overtuming Okay by inspection
OTF = )7. ~(LF (lo')-O,cf {\O')(J f<_,f )(-1'..~/-·~·):.
Holdown Type: NO I f?-E: G ''p
64 2... Lbs
Grldllne L\
Tributary Area : _____ (,._i_~_>)._..(~i__,1 ')'-+/_-z.~----------------2,.__,j_4 ___ sq. ft.
LateralLoad: 2 '1'-iff 7.X'f-OpH ~ z.1 646 Lbs
Lateral Load (Above): Lbs
Seismic Load, F.= 216 'H Lbs
-Sl?L l t.r Shearwall Length, L = ___ l-\_. __,_J _S ___ ft.
Unit Shear, v = FJ L :: S S '\ plf ':< I()' ----
Shearwall type: @
Wall Overturning: L = l /. 1-5 ft. ] Overturning Okay by inspection
OTF = SQ~ fLF-(IQ') -0 .q (10 1)/ l~ f'Sf) { *') '
Holdown Type: l' .Mo s I 14 <i) 5 ,518 Lbs I
~---GAMA ~ Engineeringi
STRUCTURAL CONSULTANTS
Project: ___________ _
By: ___________ ~--
Date: Sheet: Ir of 30 -----
SHEARWALL DESIGN
3 ii._ Q Story Shearwalls, (v = q . 0 psf)
Grldllne __ ___. ___ _
Tributary Area :
Lateral Load:
Lateral Load (Above):
( ss ') ( 1. I ' ) h ~
5 ~~ff i';-q.opsr-518 sq. ft.
5,2 oz. Lbs
' Lbs
Seismic Load, F. = S, UJ2 lbs I Shearwall Length, L = 2 b ft.
Unit Shear, V = F ,IL = 2 00 plf
Shearwall type: 0
Wall Overturning: L = 1':> ft. [ /overturning Okay by inspection
OTF = ___________________________ Lbs
Holdown Type: ---'-'-t-1-"o_t---'-·(l....._(; _,..Q'--· .._!) ____ _
Gridllne ---~---
Tributary Area : ----~( ~S~<:,~· J .... ( .... 2--'-1~• ),.../~7 T""'-,----------------S:~!..__9 sq. ft.
Lateral Load: 5 :i 'o fJ ' Y q,o fS f.: $. Z o ~ Lbs
Lateral Load (Above): ' Lbs
Seismic Load, Fx = 51 l v l Lbs
~31 fl f
Shearwall Length , L = ---~\ .... ~,...-_'> ___ ft.
Unit Shear, v = F/L = 7. S \ plf X
Shearwall type: @
to' ---~-. \ ~) I, '.I /, '..,')
Wall Overturning: L = 2 ft. J Overturning Okay by inspection
H ' }.-:
OTF = 3:>I ft..f (1 0' )-a.q [ ( ; )( \~f'S~ ) -\ ( 10•·:,-:, c ·> ·-·..: ,.
Holdown Type: __ A~•;,~J~C _S~Z--------<v
Grldllne ______ _
Tributary Area : _____________________ ....,,...,.. ______ sq. ft.
Lateral Load: Lbs
Lateral Load (Above): Lbs
____ Lbs
Shearwall Length, L = ________ ft.
Unit Shear. V = FJL = ---plf
~/
Shearwall type: Q .,.,.--·,.✓-
Wall Overturning: L = _____ . ~..-] Overturning Okay by inspection
OTF = ______ __, _________________________ Lbs
Holdown Type: _____ ,,., ________ _
::GAMA ':::!JJI, Engineeringi
STRUCTURAL CONSULTANTS
Project: ___________ _
By: _____________ _
Date: _____ Sheet: I 8 of Jo
SHEARWALL DESIGN
'2 t1 0 Story Shearwalls, (v = (, · 8 psf)
Gridline --~---Tributary Area : l\ l ')( l S' )h -q q sq. ft.
Lateral Load: gg (: l ; Ca p st : 61 1 Lbs Lateral Load (Above): _________________________ Lbs
a . '2. 5 Seismic Load, Fx = ---=6__.1: ... 3'--_Lbs
Shearwall Length, L = ___ 7---c~----ft.
Unit Shear, v = F,.JL = _-=l-_,_3-"--_ plf
Shearwall type: @
Wall Overturning: L = ____ ft. [ VJ Overturning Okay by inspection
OTF = -:----~-:----=------------------------Lbs Holdown Type: ___ N--=O'-t'-(l-.'---"-~Q,.___,.' ·o,,__ ____ _
Grldllne 7...
Tributary Area : ____ __..[ ..... (_.,, ..... ·)....,(,'-'I !'-."_\ _\ ...,,.(_,16'-' -') l_l{'--,•-') J=+-h...__-:: _________ _,3=0:.....J.__ sq. ft.
LateralLoad: 393H1 2".b8 ~Sr -1 '2,006 Lbs ' Lateral Load (Above): Lbs
Shearwall Length, L = ___ 8_. _2 _5 ____ ft.
Seismic Load, Fx = '21 c 8 ~ Lbs
Unit Shear, v = F,IL = 7..S 3 plf
Shearwall type: @
Wall Overturning: L = P , 'Z. 5 ft. ) Overturning Okay by inspection
OTF = '2.5~ flt (10')-Q. q ( tt>J{lpf S f) ( ~ .• ;~·i
Holdown Type: _..:...M.L.:Sa..,'lu...C--1..1 ..... 0._ ______ ___,0 \.Gl 3'6 I Lbs
~~~~:~Area : _) ____ [~(_16_,·)-{_l ~4 '_1_i ~\ _<'._,._)_( ,_1_')_]_/_1-: __________ -5_, ___ 4 sq. ft.
Lateral Load: Sig tf'l x G-8 rs1. 3, {.2q Lbs
Lateral Load (Above): "2. 6 Lbs
Shearwall Length, L = ---~~5~. 7._S ____ ft.
Seismic Load, F, = b 1 , B 5 Lbs
Unit Shear. V = F,.JL = -11:5 plf
Shearwall type: 0
Wall Overturning: ____ ] Overturning Okay by inspection
OTF = S t~
Holdown Type: -----'----"--'---=---~----
!OAS'
z. 3 'f-Lbs
::GAMA
°::::!JP Engineeringi
STJIUCTURAL CONSULTANTS
Project: ___________ _
By: ____________ _
Date: Sheet: 19 of 30 -----
SHEARWALL DESIGN
1 HD Story Shearwalls, (v = {, · 8 psf)
Grldllne ) · 5
Tributary Area : _____ (,__5....,~-':· ),.,_(=-2=--3_,_
1 )"7/."::c2-:--:-----------------'(_2---'l_ sq. ft.
Lateral load: 6 ? lfF XL 8 PS~ ::: Y,::21., Lbs
Lateral Load (Above): Lbs
Shearwall Length, L = l/ 6 5 ft.
Seismic Load, F.= Y1 H3 Lbs
Unit Shear, v = Fj L = ')0 4 plf
Shearwall type: (I}
Wall Overturning: L = ____ ft. [ /4verturning Okay by inspection
OTF = _____ --, _______________________ Lbs
Holdown Type: ___ rl~0_1_~P.~E_0._'~Q __ _
Gridllne '1
Tributary Area : _____ [ (~I_(..,..' )~(_2~6 ~·) ..... \-~(~2~3_' ,,_.) (~l._.3....,' ) ..... J...,.' /_2 ________ .,.........5"~/...._q_ sq. ft.
Lateral Load: c, i q t P X 6. & es r / t, SZ<j Lbs
Lateral Load (Above}: ~ r " 6 lbs
Seismic Load, Fx = ' • 1 S s Lbs
Shearwall Length, L = ___ 3--=-S ..,..· Z._5 __ ft. '
Unit Shear, v = Fxfl = .\ 't-5 plf
Shearwall type: @
Wall Overturning: L = \0. 1 5 ft. ] Overturning Okay by inspection
orF= 115 pq 1,0')-o q L (10 1ic11, es f) ~ <10•1n f <;F)J ( 1°·1~i'i J:
Holdown Type: t-1 <1 I ·e-t Q 'p
Grldllne _____ _
Tributary Area :
Lateral Load:
Lateral Load (Above}:
Ii 3r Lbs
30 1 sq. ft.
2 ,088 Lbs
' Lbs
Shearwall Length, L = ___ g:-'-·~2.~5---,.-ft.
Seismic Load, F, = 7.1 n ~ B Lbs
Unit Shear, V = F xfL = '2..S?, plf
Shearwall type: 0
Wall Overturning: L = 8, 1. ':i ft. ] Overturning Okay by inspection
OTF :: Z S ⇒ pt. t-l 10' ) -0 · C\ ( 10 1 ) ( I Ii p ~ r ) ( i ·ls • / 1 ) ·.
Holdown Type: ;>, .S , c I..\ {) 0
:::GAMA
':::::!JP Engineering~
STRUCTURAL COHSULTAHTS
Project: ___________ _
By: ____________ _
Date: _____ Sheet: 20 of 30
SHEARWALL DESIGN
?. H l) Story Shearwalls, (v = 6 • S psf)
Grldllne b
Tributary Area : --------=(7ll7'Jf=-' i~')'r-/~1.-=:--,-::------------------r:::-q-.::q_sq. ft.
Lateral Load: q q f 'xC:Q f.SF ~ 6 ~ 3 Lbs
Lateral Load (Above): Lbs
6 13 Lbs
Shearwall Length, L = q . 2. s ft. Seismic Load, Fx =
Unit Shear, v = F,/L = ~3 plf
Shearwall type: @
Wall Overturning: L = ____ ft. [ v1 Overturning Okay by inspection
OTF = ________________________________ lbs
Holdown Type: __ __._N~0'-"1"""f1...'-t"-'Q=--'l'J,__ ____ _
Grldline ______ _
Tributary Area :------------------------"------sq. ft. Lateral Load: _..,,. Lbs
Lateral Load (Above): -Lbs
_,./Sei~mic Load, F x = ____ Lbs
Shearwall Length, L = ________ ft.
Unit Shear, V = F.tL = ---pit
Shearwall type: Q ,..,,.,,,..,.·--,.,
/ _.,,,,,.,,,. ...
Wall Overturning:
_,,./,,,
___ ,.,.,_ ft. ] Overturning Okay by inspection
OTF = ----...,.....:'-------------------------Lbs Holdown Type: ------------
Grldllne ______ _
Tributary Area : ____________________________ sq. ft.
Lateral Load: Lbs
Lateral Load {Above): Lbs
Seismic Loac( F, = Lbs ~------Shearwall Length, L = ________ ft.
Unit Shear, v = F,.IL = ___ plf
Shearwall type: 0 __ .,.,,,,
Wall Overturning: L = ____ ft. [ ,✓}'O;~rturning Okay by inspection
OTF = __________ ..,...,..L ___ .. --_________________ Lbs
Holdown Type:------~/ _____ _
:::GAMA -.:;:p Engineering1
8TRUCTURAL COHSULTAHTS
Project: ___________ _
By: ____________ _
Date: _____ Sheet 2 f of 36
SHEARWALL DESIGN
'21i Q Story Shearwalls, (v = b · 8 psf)
Grldllne __ ......_ __ _
TributaryArea : (?G ')(,ll')/2-: ?2/ sq.ft.
Lateral Load: '211 ~P-)( Li f 5 F , I, 5 Q 3 Lbs
I Lateral Load (Above):------------------,,,-,---,-------,-----lbs
Seismic Load, Fx= 11.so3 Lbs
Shearwall Length, L = __ __.l-=-0...,.-,;$"'-___ ft.
Unit Shear, v = FJL = I L-1 '?> plf
Shearwall type: @
Wall Overturning: L = e. S ft. [ ] Overturning Okay by inspection
orF= \l.\':>(!1,f (10'} o ~ [,10')(1 6f''f)+f :1 /2. )(1s f:;f) \ (~') 330 Lbs
Holdown Type: N o 1 ,, t Q · 0
Gridline -~__....__ __ _
(SLJ')(c1'1/-i.: Tributary Area : ____ __.__---=--;.--__.1+-----------------.,....,,'-"--'-sq. ft.
Lateral load:t,;,£ l ({ 11( 8 f5 t Lbs
Lateral load (Above): 2 .2. lbs
Shearwall Length, L = ____ 3"-2_ • ...;l.a..,S.__ __ ft.
Seismic Load, Fx = 91a s 8 Lbs
Unit Shear, V = F.tl = '2.. ~ ' plf
Shearwall type: @
Wall Overturning: L = ____ ft. [ \/) Overturning Okay by inspection
OTF= ______________________________ Lbs
Holdown Type: N OI [L.t 'D
Grldline _ ___, ___ _
Tributary Area : [c H 'H n' l 1-(I(') ( S' )] /1:
lateral Load: 2 (t {('-y b-8 f">f -
Lateral Load (Above):
Shearwall Length, L = ____ q,_._£\ _Z. ___ ft.
Unit Shear, v = Fxfl = I 1 q plf
Seismic Load, F,=
Shearwall type: @
Wall Overturning: L = ____ ft. [ /J Overturning Okay by inspection
7.. I. I sq. ft.
l,'1"1-5 Lbs
r Lbs
\ 131-S Lbs
OTF = ______________________________ Lbs
Holdown Type: ___ ..:..ti,._,0~1~:Rl"-'~"'-'O..:::,__' 'r)-<------
:::;GAMA
'::::jJJ Engineering~
STRUCTURAL CONSULTANTS
Project: ___________ _
By: ___________ ---::,---
Date: _____ Sheet: 2 2 of 36
SHEARWALL DESIGN
'2 rl tJ Story Shearwalls, (v = b .g psf}
Shearwall Length, L = ____ '1_1--____ ft.
Unit Shear, v = F)L = 2. 1 0 plf
Shearwall type: @
Wall Overturning: L = 6 • i S ft. I Overturning Okay by inspection
oTF= 2w fu (io'\-o .q [('-l~z.-)(1 5 CJ , ~ (20 1)( 16 (F }] t -=t ~z. Lbs
Holdown Type: 1'\01 IH Q ' D
Gridline _____ _
Tributary Area : ----------------7"------------sq. ft. Lateral Load: Lbs
Lateral Load (Above): Lbs
Seismic Load, Fx = ____ lbs
Shearwall Length, L = ________ ft.
Unit Shear, v = Fo/l = =7 .
Shearwall type: /
L = / ft. [ ] Overturning Okay by inspection _,,,/
OTF = ______ /_" _______________________ Lbs
Wall Overturning:
Holdown Type: ___________ _
Grldllne _____ _
Tributary Area : ___________________ _,,,,../~------sq. ft.
Lateral Load: Z Lbs
Lateral Load (Above): Z Lbs
/ Seismic Load, F,= ____ Lbs
Shearwall Length, L = ________ ft. /
Unit Shear, V = F.tl = ---plf ,.,, ,/
Shearwall type: Q //
//
Wall Overturning: L = ____ ft.-~/ [ ] Overturning Okay by inspection
/ OTF = _______ _,,,,,,. ______________________ Lbs
Holdown Type: _____________ _
:::GAMA '::::;!P Engineering~
&TRUCTURAL CONSULTANTS
Project: ___________ _
By: _____________ _
Date: _____ Sheet: ZJ of 3d
SHEARWALL DESIGN
1.)1 Story Shearwalls, (v = 3 · 3 psf)
Grldline ______ (II')( I B ') 11_1 a
Tributary Area : ------=---:-...,,-:-=---":'~-=---,;7",-----------------.,,-,,1-:'!ij,--sq. ft. Lateral Load: g q C (' x , · '3 fS F ~ 3 2 6 lbs
Lateral Load (Above}: 6 ~ 3 Lbs
Shearwall Length, L = -----'\ -Z"'--_,,5,--____ ft.
Seismic Load, Fx = q q q Lbs
Unit Shear, v = FJL = 8 0 plf
Shearwall type: G}
Wall Overturning: L = ____ ft. [ v1 Overturning Okay by inspection
OTF = Lbs ---:::----------:-7":"'-:---------------------H o Id own Type: --~N_o_1_P._1:_Q_•t2~----
Grldllne 2
Tributary Area :
Lateral Load:
Lateral Load (Above):
CC\1'){1b') ~ (lr.'\(2l'r\/i.
-, o 1 ( l • X.3 · 3 ,.H ~
J<,:,. sq. ft.
\, ti1 I J Lbs
08& Lbs
Shearwall Length, L = __ __.a8,....1_$ ____ ft.
Seismic Load, Fx = SJ I a r Lbs
Unit Shear, v = F,/L = _3~1_1_ pit
Shearwall type: @
Wall Overturning: L = 8. 2 s ft. ] Overturning Okay by inspection
OTF = 3HCd(\d)-(o.~)(zo'J(l6 1·.,f J ( ~:.·) c
Holdown Type: tl Ov 2. <£> '2, 5=t-2 Lbs
Gridllne "3
Tributary Area : ------=( :-':-( 7/ 6_' ·._l /....,.7..,,.l~'~) _\ ~('-!2'::"3::--. ,._) ._I ~z ..,_J_' .._) _J .,_/_'-_-_______ -"T_5-=',.,.'I=--sq. ft.
Lateral Load: '5 lq rp X;>-3 fSf : I, ':rt, Lbs
LateralLoad (Above): f>,JJ51gst/'1,Z-Z3 1½hl ~ 8,~8:,. Lbs
•
1
· r Seismic Load, F,= •q.o oo Lbs
'1 'Z.. ft.
'2."3>fl plf
Shearwall Length, L =
Unit Shear, v = FJL =
Shearwall type: @
Wall Overturning: L = ____ ft. [ lioverturning Okay by inspection
OTF = _______________________________ Lbs
Holdown Type: N 01 ~ E G '()
---=-GAMA ~ Engineering~
STRUCTURAL CONSULTANTS
Project: ___________ _
By: ____________ _
Date: _____ Sheet: l. '1 of 3o
SHEARWALL DESIGN
1 ST Story Shearwalls, (v = 3 • 3 psf)
Grtdllne LI
Tributary Area : ____ ...... )_(_l_l ~')_( '-__ t __ '-) ~J_(_2~3·_,~,· ~\_'~;]'-+1~1;,'--· --------~__,;5_/__.q_sq. ft.
Lateral Load: 15:1 q f<' x~-"3 pr= r /.':!: Lbs
Lateral Load (Above}: 6: 11 S l~s x ( \ 1 :z 3 1 ½:,h ) ~ n . £1.:i !. Lbs
Seismic Load, Fx = i°t ooo Lbs
Shearwall Length, L = l-\ 2: ft.
Unit Shear, v = F,/L = 1.3i ptf
Shearwall type: <I)
Wall Overturning: L = ____ ft. [ /i Overturning Okay by inspection
OTF = Lbs ----------:----::----------------------Ho Id own Type: ____ t1 ____ 0-'-r--'f.c....;...t-~O__..' D.__ ___ _
Grldllne ___ ..__ __ _
Tributary Area : ____ __,.[ __ (,_1.:..1 ',..I (,.._I 6.._'+i .... t .... C .... 1 ..... l ..,._' )_._{ Z=...JL ...... •.._))<.-,/'-'2._·_. -----------'~::...:0"'-1;i._ sq. ft.
Lateral Load: 3 b 1 ( ! ' x' :'i-3 e <' r ·. /. o 1 3 Lbs
Lateral Load (Above): -z' Lbs
Shearwall Length, L = ---"""8 ..... 7_S ____ ft.
Seismic Load, Fx= 1,r o I Lbs I •
Unit Shear, v = F.JL = ] 16 pit
Shearwall type: @
Wall Overturning: L = 8 ·2 5 ft. J Overturning Okay by inspection
OTF= "H tu (10') -fO c;\f10' HI€ esr ) ( 8-:/5
'):
Holdown Type: .ti OU 2 <f) Z,5 't 2 Lbs I
Grldllne 6
T .b t A (1•')(/8' , · ft n u ary rea : --------~--------------------'--+--sq .. Lateral Load: 'i j , { 1 >c 3.3 ! <, r • Lbs
Lateral Load (Above): Lbs
ioa iJ Lbs Shearwall Length, L = ______ \ =-1._5 ___ ft.
Unit Shear, V :: FJL = 8 0 plf
Seismic Load, F,=
Shearwall type: @
Wall Overturning: L = ____ ft. [ /J Overturning Okay by inspection
OTF = _______________________________ Lbs
Holdown Type: ___ l'\--'--0~' ~f:~E~Q-'~b ____ _
:::GAMA Project: ___________ _
~ Engineeringi By: ________ ~,------
Date: Sheet: 25 of 3Q STRUCTURAL CONIIULTANTII -----
SHEARWALL DESIGN
1. ":>l" Story Shearwalls, (v = 3 ·) psf)
Grid line A f J l Tributary Area : ----t::'d-::-Z,~'""';•),_(~_1~t--'::{8:-"----:,}"-:"l{-=-.j_j4 /_·:_: ___________ 2~B~5_ sq. ft.
lateral Load: 2 t'2 $ (~' _ 1i ~ t<r -_ q'-1 I Lbs
Lateral Load (Above): I $ '3 Lbs
Seismic Load, F.= i,11 q 'I Lbs
Shearwall Length, L = q_ l-S ft. IO •
UnitShear, v=F.,/L = 'l51 plf X _____ --Z.1<-\ f l f
Shearwall type: @ 1:'.)(Y,S')
Wall Overturning: L = Lj . c; ft . [ ) Overturning Okay by inspection
[(n'~l)( . )f (. ·'(/. ·i { ')'{1 )]{4.~•1 OTF= n<\ t1lfl10')-o_q -i..-1s (5 f, ;_51 q",r t 2.0 lbP?F 2 = l,Slz..Lbs
' Holdown Type: ti Ou 2. <£>
Grldllne __ ....._ ___ (
Tributary Area : 5'-1 'J ( Z. 1 ' ) / 2.
Lateral Load: 5 (] < t 7 X: 3. i (,f
S-6:i. sq. ft.
I, 8 :Jr Lbs
Lateral Load (Above): q Lbs
Shearwall Length, L = -----=-\ 2_._l_;S ___ ft.
Seismic Load, F,= 101 9 3 f Lbs
Unit Shear, v = F.tL = ~ 50 plf
Shearwall type: @
Wall Overturning: L = 12 • }S ft. ] Overturning Okay by inspection
OTF = ess {LI' (\0'l -0-1 [(0 id( ,sr~f )j {30'}(1£ r,n· ]ii..
Holdown Type:
1
jlQ V 11 ' <Iv ' -
Grldllne C.
Tributary Area : _________________________ -_sq. ft.
Lateral Load: Lbs
Lateral Load (Above): Lbs
Shearwall Length. L = ___ 1....,-,_-,_s ____ ft. ~
Unit Shear, v = F/L = Lrj 3 plf .:X ---l't )n:1-n
Shearwall type: @
Seismic Load, F. =
5 6 8 fL f
Wall Overturning: L = 3, 1' ft. [ ] Overturning Okay by inspection
OTF = S6 BIL l7(10 1)·0.q R1J,S')(i/,f ':,1~) + (11/7.l(•L)(",f)] 3·~
1~/z -
Holdown Type. :\;\O V S ¢
3 S $() Lbs 7
4, 'o 30 Lbs I
:::G~M_A
~ Eng1neenng~
eTIIUCTURAL CONSULTANT&
Project: ___________ _
By: -----------=-~---Date: _____ Sheet 2( of 30
SHEARWALL DESIGN
16T Story Shearwalls, (v = J. 1 psf)
Gridllne D
Tributary Area : ----~[-'-( S_s,,' )-':"/ Z"""'I_' l~~ 1__.1l.._'.,_.) /'"'"~-· 1'--'h'-11~·...,,,,1..._~ _,_' )J~/"""'-z'--'-t ..... ("""3....,,1 l.J..;{ B=S=-'.,_) ___ =--q.._1...,_1 sq. ft.
Lateral Load: 91:1f£2x-.,,3 f5F , r 1'v'IJ Lbs
Lateral Load (Above): I/ / Lbs
Shearwall Length, L = ___ c_S--=·,...-:i-c-5 ___ ft. Seismic Load, F.= • l'-'13 Js Lbs
Unit Shear, v = F,/L = 'S 5 f pit y .
( ;_ .
Shearwall type: @
Wall Overturning: L = ?.. 5 ft. ] Overturning Okay by inspection
6,'l½S'2
oTF = 11~~ ~i= c10·,-o.(j U10'1c u, eH 1 + (33~.6. J c,s t 1t > l _
Holdown Type: ti Pu ~ (!>
Grldline ______ _
S I TO ( Lbs
'
Tributary Area : -------------------,.L ___________ sq. ft.
Lateral Load: Lbs
Lateral Load (Above): Lbs
Seismic l:.oad, F, = ____ Lbs
Shearwall Length, L = ________ ft.
Unit Shear, v = F,/L = ___ plf
Shearwall type: Q
J Overturning Okay by inspection
OTF = _______ ,.&-_______________________ L.bs
Holdown Type: __ __,....,__ _______ _
/ Gridline ______ _
Tributary Area : ___________________ .,..,_..-_· ________ sq. ft.
Lateral Load: Lbs
Lateral Lood (Above): / Lbs 7 Seismic Load, F1 = ____ Lbs
Shearwall Length, L = ________ ft. //
Unit Shear, v = FJL = ___ plf
//
Shearwall type: Q ,/'
Wall Overturnlng: L = ____ ft. ,/;·Overturning Okay by inspection
//
OTF = ·-----------,..-=--_.,. ____________________ Lbs
Holdown Type: ------.,,.C------
/
Project: ___________ _
By: ____________ _
Date: _____ Sheet: -Z..1: of 3'1
CONTINUOUS FOOTINGS
ALLOWABLE FOOTING LOAD
Allowable Soil Bearing Pressure (ASBP) = 2 , 100 ' psf
CASE 1: MG \!J f 0011 ril15
Width (b)::: I , S ft. Depth (h) = -~-ft.
Allowable Distributed Load:
WALLow=ASBP(b)= 2,160 f•,f (1-:if:i):: 3, ISO plf I
USE: IS "Widex 2 ~ " Deep with z # _...::;.5_ Top & Bottom
Allowable continuous footing point load:
PAJ,owable = ASBP(b)(2)(h)= 1.1 100 f5 t{ /. s'J( 2 ) ( 2. I) = 11, C "0 lbs I
I I
CASE 2: /
/
Width (b) = ___ ft. Depth (h) = ___ ft. /
Allowable Distributed Load: /
WALLOW = ASBP (b) = __________ ,_/ ____ __,plf
USE: ___ " Wide x ___ .. Deep with ,/ # __ Top & Bottom
/
Allowable continuous footing point ad:
P /\.llowable = ASBP(b)(2)(h)= __ __,,'-------= ____ lbs
Project: __________ _
By: ___________ _
Date: ____ Sheet: Z 8 of 3 ~
SPREAD FOOTINGS
MARK: lliJ
PIMX =ASBP (width)2 = 1.,/o() fs f (z ')1--= B,4ro lbs r I
USE: 24" Square x I\$ " Deep with (2) # ~ Each way @ bottom
MARK: [ill
PMAX = ASBP (width)2 = '7.-, loo ~~f (2.5') 1.::: 1, ,-zs Lbs J
USE: 30" Square x \ 8 " Deep with (3) # 5 Each way @ bottom
MARK: [IT]
PMAx = ASBP (width)2 = '.2 ,loo e;; F c; ')1· = I 8, qoo Lbs I I
USE: 36" Square x 18 "Deep W,t1'1l4J •s· Each way@ bottom
MARK: (RJ
PMAx = ASBP (width)2 = 1-100 f -s f (2.s·x 4 ') = -Z I. o 00 Lbs I r
USE: "30) x _ Y 'o 1~ x 18 ff Deep w; #'>@ v '' Each way @ bottom
MARK: IKJ
PMAX =ASBP {width)2 = 1,100 f5f {~'X S')== 'b l,S Do Lbs
USE: 3(, ")(~o 11 x I ei" Deep w/ ,w 5 € 6 11 Each way@ bottom
Project: ______________ _
By:, _________ _,,... ___ _
Date: _____ Sheet~ of 30
SHEARWALL SCHEDULE
Ail.OW. 5/8. DlA. SILL Pl.A 1E B0TIOII Sill Pl.ATE ATTACHl.lENT Ta> PLATE ATTACHWENT
W,RI( PLYY«lOO m'E LOAD PL YWOOO HAIUNG ANCHOR BOLT SPACINC TO R1M oXl!ST OR BU<'G TO RI! JOIST 00 BLK'C
(Pl.fl 0 FOUNOATION &LOW ABOVE
0 7 ~-1HCI( STUCCO W/ NO. 11 CA., 1-1 /2"LOHC, >J5 0 ~6' 0/C
P , rtAHO COIENTON 0'tUl 180 48" o.c. 16d O 8" 0.C.
~'O YIIRE MESH 7 /16° HEAD O 6' 0/C L TP4 0 24" 0.C.
0 J/C: COX PLY\\000 260 8d O 6' 0.C. [.H. & 12 0/C F.N. 45• o.c. 16d O s• 0.C. AJS OJ6" 0/C
LTP4 0 24" 0.C.
0 s;s· rox PLYlKJOO 350 8d O 4" 0.C. [.N. & 12 0/C F.N. 32' o.c. 16d O 6" 0.C. AJS OJ2" 0/C
L TP4 0 16° 0.C.
0 J/R,' SlR\JCTIJRAL 1 550 6d O J" O.C. E.N. & 12 0/C F.H. 24° o.c. 16d O J' o.c. ~5 o,l o/c
HA ra> PL Y'IIOOl * LTP4 0 12• O.C.
0 J /t ' STRUCTIJRAL 1 730 8d O 2' 0.C. E.N. & 12 0/C F.N. 16° o.c. 16d O 2· o.c. 1.35 00f 0/C
(JI
RA!cD PLYWOOD * J/8"~io X 6' LACS O 8' O.C. L TP4 0 6' O.C.
0 15/ Jt SlR\JCTIJIW. I 10d O 2° 0.C. E.N. & 12 0/C F.H. 16d O 2• 0.C. A35 0 6' 0/C
870 16° o.c. Ill Ill RA lED PL YW000 * (1-1/r 1111, NM. P!H[l11A'IQI) J/8'001 X 5• LAGS O 6" 0.C. L TP4 0 6" 0.C.
0 15(,32' ~UCTIJRAL I RATED 1330 lOd O J' 0.C. E.N. & 12 0/C F.N. 12· o.c. J/8.dia X 6' LACS O 6' 0.C. t TP4 0 5' O.C. PL f'WOOO APPi.JED TO
r,~,nt SI or WALL) * (1-1/2" 1111. MM. P(Jl[~TKJI)
SHEAl'lNI\LL ~~HEQULE NOTES:
1. AU P,CHOR BOLTS SHALL HAVE A t.llNlijUij EMBEOMENT OF 7 INCHES 10. *ARWALLS ¥UH I.IORE TH'-11 ONE 'tUlllCAL PAtt:l IN HEJQfl SHALL
11-11 J ~()ICR(T[ (UHO) & NOT SPACED l.l~ THAN 6 FEET APART. HAVE E1Tl£R ·,urnCAt. OR HOR1ZQITAL STAGC(RE0 SPUCO> .Ql'ffi,
2. USE 0•'.'JGI.AS FR NO. 2 PRESSURE TREATE0 Sill PLATES. 11. All PL YWOOO PANELS SHALL BE BLOCKED W/ 2X !l.OO<ING, (UHO)
3. J",J' ,i/4" Pl.ATE WASHERS SHALL BE USED ON EACH Sill PLATE 12. PROVIDE ~ t.41H1t.lUM [DC( OIST ANCES FOR ALL SHEA THlfC ANO ffiAMINC
ANC11(~ BOLT. MEMOCR N AIUNC.
4. PR•)WE A 11\NIMUM ll' TWO ANCHOR 801.. TS PER Sill PLATE 'MTH ONE 801.. T 11 ALL EOC£ NAlJNG SHAU. 1'9£TRATE INTO FRAI.IING 1-3/8" MINIMUM, UNO.
LQI ' 'D WITHIN 12' or EACH ENO Of EACH PIECE. 14. PI.YWOOO SHEATltNG EDGE NAIUiG IS REQUllED AT ALL HW>--OOWH POST.
5. CO• 11 ~CTOR'S OPTION TO US( 5/6' OIA. All TltlEAO W/ SIMPSON 'SCT-XP'
EP• .. :y ~· MIH. EIIBEDMENT AHO EDGE DISTANCE OF 1-3/4' AT SAl.lE SPACtNG 15. FRAMING SHALL BE 3' NOMINAL OR WI0ER ANO NAllS SHALL 8£ STAGGERED
AT All PLYWOOO JOINTS ANO SILL PLATES, AT V• 350>Plf. DR GREATER.*
SH' ,,, IIERE IN.
FAil' •IERS FOR PREASSURE-PRESERVATM: TREATUl ANO FJ!E RETARDANT 16. AT ADJOINING PAHU EDGES, 2-2X STIJDS NAUD TOGETHER MAY BE USED
6. t4 PLAct: OF A SINGt.£ JX Sl\J0.
TRLA 'lD W000 SHALL BE OF HAT-OIPPEO ZINC COATED GALVANIZED.
S 1 ~"I rss STEEi.. SILICON BRONZE OR COPPER. 17. v.tt[RE SHEATHING PANELS ARE APPl£D OH BOTH FACES OF Tl£ SHEARWAU.
SHEATHING PANEL .xllNTS SHALL OCCUl AT 3x NOMINAL OR TH\00:R FRAI.IING
7. B0TT'U Pl.ATES 0'1£R FRAIAED FlOORS TO HAVE EITHER NAILS OR LACS W/ MEI.IBERS. PANEi. JOINTS OH EACH SIDE Of WALL SHALL BE SlAGGEREO.
N>'t '.PACING OF 3' 0.C. OR LESS SHALL PENETRATE INTO SOLID +X BU<G.
LAC. 5/iAll PENElRATE AT LEAST 3· INTO BLOCKING BELOW. 18. FRAI.IINC QJPS: A35 OR LTP+ OR APPROVED EOUIV,t,I.EHT.
8. SI ' PANELS SHALL BE APPU(D DIRECTLY TO Sl\J0 FRAMING AT 19. OIAPHRACl.l SHEA TttlNG NAILS OR OTHER APPROVED Sl£A THING CONNECTU!S
If' !l CENTER M~I.IUU. SHALL 8£ ORl'IDI SO THAT THEIR HEAD ell CIW¥111 IS FlUSH 'MTH THE
9. Al >,AILS SHAll BE COMMON MR£ NAILS, U.O.N. SIJRF ACE OF THE SHCA ni!HG. ..__
::::: A M A Project: __________ _
~ Engineering ~
STnUCTURAL CONSULTANTS
By: ___________ _
Date: ____ Sheet 3° of 3o
HOLD-DOWN SCHEDULE
MARK MIN. POST FLOOR TO FLOOR MARK MIN. POST WALL TO FOUND A TlON
0 2-2X MSTC40 <]> 4X4 DF #2 HDU2
0 2-2X MSTC52 <J> 4X4 OF #2 HDU4
q> 2-2X MSTC66 <]> 4X4 DF #2 HDU5
<3> 4X4 OF 62 CMST1 4 w/ 0 4X4 OF #2 HOU8 (30) 16d NAILS
q> 4X4 DF 12 CMST12 w/ <ig> 4X6 OF #2 HDU11 (40) 16d NAILS
Salehi Engineering, Inc.
Mechanical, Electrical and Plumbing Consulting Engineers with 25 years of experience
Energy Analysis
For
Arellano 4 Unit Apartment
2637 Jefferson Street
Carlsbad, CA 92008
CBR2018-3291
2637 JEFFERSON ST
MFD-01 (JEFFERSON ST APARTMENTS) 4.886 SF ii
4-UNITS
1551702500
11/28/2018
CBR2018-3291
8360 Clairemont Mesa Blvd, Suite 111, San Diego, CA 92111
Telephone: (858) 277-5551 Fax: (858) 277-5544
G-1103
. ,.
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Arellano 4 Unit Apartment
2637 Jefferson Street
Carlsbad, CA 92008
Project Designer:
Ohms Collaborative
536 Sears Ave.
San Diego, CA 92114
760-707-6683
Report Prepared by:
Rocky Salehi
Salehi Engineering, Inc
10755 Scripps Poway Pkwy # 357
San Diego, CA 92131
858-277-5551
Job Number:
G1103
Date:
11/12/2018
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards.
This program developed by EnergySoft Software -www.energysoft.com.
CERTIFICATE OF COMPLIANCE • RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Un~ Apartment
Calculation Description: Trtle 24 Analysis
GENERAL INFORMATION
01 I Project Name I Arellano 4 Unit Apartment
02 I Calculation Description I Title 24 Analysis
03 I Project Location I 2637 Jefferson Street
04 City I Ca~sbad
Calculation Dateffime: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.nbd16x
05 Standards Version I Compliance 2017
CF1R-PRF--01
Page 1 of 11
06 Zip Code ( 92008 07 Compliance Manager Version I BEMCmpMgr 2016.3.1 (1149)
08 Climate Zone I CZ7 09 Software Version I EnergyPro 7.2
10 Building Type I Multifamily 11 Front Orientation (deg/Cardinal) IO
12 Project Scope I Newly Constructed 13 Number of Dwelling Units 14
14 Total Cond. Floor Area (112) ( 4886 15 Number of Zones I 3
16 Slab Area (112) ( 1094 17 Number of Stories I 3
18 Addition Cond. Floor Area(tt2) In/a 19 Natural Gas Available I Yes
20 Addition Slab Area (112) In/a 21 Glazing Percentage (%) I 21.5%
COMPLIANCE RESULTS
Building Complies with Computer Performance r-rn"T"r --01
02 This building incorporates featu e supervision of a CEC-approved HERS provider.
03 This building Incorporates on •
ENERGY USE SUMMARY
04 05 06 07 08
Energy Use (kTOVllt2-yr) Standard Design Proposed Design Compliance Margin Percent Improvement
Space Heating 1.41 3.07 -1.66 -117.7%
Space Cooling 3.51 3.60 -0.09 -2.6%
IAQ Ventllatlon 2.63 2.63 0.00 0.0%
Water Heating 13.TT 11.99 1.78 12.9%
Photovoltaic Offset -0.00 0.00 -
Compliance Energy Total 21.32 21.29 0.03 0.1%
Registration Number: 218-P010306917A-000-000-0000000-0000 Registration Datemme: 201a-11-1211:46:11 HERS Provider: CafCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1 R-10232018-1149 Report Generated at: 2018-11-1211:12:13
CERTIFICATE OF COMPLIANCE. RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unit Apartment
Calculation Description: Title 24 Analysis
Calculation Dateffime: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
ENERGY DESIGN RATING
CF1 R-PRF-01
Page 2 of 11
Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system where 100 represents the energy performance of the Residential
Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with Callfomla modeling assumptions. A score of zero represents
the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out'" its TDV energy. Because EDR Includes consideration of
components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics), It is not used to show compliance with Part 6 but may Instead be used by local
Jurisdictions pursuing local ordinances under Title 24, Part 11 (CALGreen).
As a Standard Design building under the 2016 Building Energy Efficiency Standards is significantly more efficient than the baseline EDR building, the EDR of the Standard Design building
is provided for Information. Similarly, the EDR score of the Proposed Design Is provided separatefy from the EDR value of Installed PV so that the effects of efficiency and renewable
enerm, can both be seen
EDR of Standard Efficiency EDR of Proposed Efficiency EDR Value of Proposed PV + Battery Final Proposed EDR
64.9 64.8 0.0 64.8
□ Design meets Tier 1 requirement of 15% or greater code compliance margin (CALGreen A4.203.1.2.1) and QII verification prerequisite.
□ Design meets Tier 2 requirement of 30% or greater code compliance margin (CALGreen A4.203.1.2.2) and QII verification prerequisite.
□ Design meets Zero Net Energy (ZNE) Design Designation requirement for Multifamily In climate zone CZT (San Diego) (CALGreen A4.203.1.2.3) including on-site photovoltaic
(PV) renewable energy generation sufficient to achieve a Final Energy Design Rating (EDR) of zero or less. The PV System must be verified.
Notes:
• Excess PV Generation EDR Credit: Bvpasslna PV size limit mav violate Net Enernv Meterina fNEMl rules
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for mi ffllnglhemod Iea1energv.,enor ~n .. ,o 1$ 4'irriputer an ,_,_ -
• Central parallel piping ' l ,, I. ii ~ I I I
~ . .
HERS FEATURE SUMMARY µ .:.: Q C f") ..---. r·, ~1•1 r,. ,.... r,
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition tO; meeting the modeled energy J)erformance for this computer analysis. Additional detail is
provided in the building components tables below.
Building-level Verifications:
• IAQ mechanical ventilation
Cooling System Verifications:
• -None-
HVAC Distribution System Verifications:
• Duct Sealing
Domestic Hot Water System Verifications:
• -None-
ZONE INFORMATION
01 02 03 04 05
Zone Name Zone Type Zone Floor Area (tt2) Avg. Ceiling Height Number of Dwelling Units
Zone 1 Conditioned 1094 9 2
Zone 2 Conditioned 2538 9 1
Zone3 Conditioned 1254 9 1
Registration Number: 218-P010306917A-000-000-0000000-000 Registration Datemme: 2018-11-1211:46:11 HERS Provider: CalCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1R-10232018-1149 Report Generated at: 2018-11-12 11 :12:13
CERTIFICATE OF COMPLIANCE. RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unit Apartment
Calculation Description: Title 24 Analysis
DWELLING UNIT INFORMATION
01
Dwelling Unit Name
DDU-1 -(1/2)
DDU-1 -(2/2)
DDU-2 -(1/1)
DDU-3 -(1/1)
DWELLING UNIT TYPES
01 02 03 04
Number of Number In
Calculation Datemme: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
02
Dwelling Unit Type
DU-1
DU-1
DU-2
DU-3
05
03
Zone
Zone 1
Zone 1
Zone2
Zone 3
06
CF1R-PRF-01
Page 3 of 11
07
Name CFA (tt2) Bedrooms Bulldlng Space Conditioning Systems Assigned DHW System Name IAQ Vent Fan Name
DDU-1 1/2 I :Heat Pump System 1 :Air Distribution
DU-1 547 3 2 System 1:HVAC Fan 1:2:3 DHW Sys 1 Default Minimum IAQ Fan DOU-1 2/2 I :Heat Pump System 1 :Air Distribution
System 1 :HVAC Fan 1 :2:3
DU-2 2538 3
_, DDU-2 I :Heat Pump System 1 :Air Distribution System DHWSys 1 Default Minimum IAQ Fan
---. .:3
DU-3 1254 1.-..t t1 DDU-: ""1tl!a ... pS lie:~ Distrib ·or1·1 DHWSys 1 Default Minimum IAQ Fan
~ .... L . HV t; F~n !:3. .. .
Registration Number: 218-P010306917A-000-000-0000000-0000 Registration Datetnme: 2018-11-1211:46:11 HERS Provider: CalCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1R-10232018-1149 Report Generated at: 2018-11-12 11 :12:13
CERTIFICATE OF COMPLIANCE • RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R.PRF-01
Page4 of 11 Project Name: Arellano 4 Unit Apartment
Calculation Description: Title 24 Analysis
OPAQUE SURFACES
01 02
Name Zone
Front Wall Zone 1
Back.Wall Zone 1
Right Wall Zone 1
Left Wall Zone 1
Interior Surface Zone 1»Zone 2
Front Wall 2 Zone2
BackWall 2 Zone2
RightWall2 Zone 2
Left Wall 2 Zone 2
Interior Surface 2 Zone'2»Zone 1
Interior Surface 3 Zone 2>>Zone 3
Roof Zone2
Raised Floor Zone2
Front Wall 3 ~ Back Wall 3
RightWall 3 Zone 3
LeftWall 3 Zone3
Interior Surface 4 Zone 3>>Zone 2
Roof1 Zone 3
Roof2 Zone 3
ATTIC
01 02
Name Construction
Attic Zone 2 Attic RoofZone 2
Attic Zone 3 Attic RoofZone 3
Registration Number: 218-P010306917A-000-000-0000000-0000
Calculation Date/Time: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
03 04 05 06
Construction Azimuth Orientation Gross Area (112)
R-19Wall .. 0 Front 504
R-19Wall .. 180 Back 504
R-19 Wall** 270 Right 207
R-19 Wall .. 90 Left 207
R-19 Wall .. 1 n/a n/a 40
R-19 Wall"" 0 Front 1017
R-19Wan-180 Back 1017
R-19 wan-270 Right 234
R-19 Wall .. 90 Left 239
R-19 Wall**1 n/a nla 40
R-19 Wall**1 n/a nla 40
R-30 Roof Attic* n/a n/a 2538 . -· R-19 oor-(nta ... ,. ... 1444
nl R-19 fall** ill . -lrorl l 530 . R;19 Wall"" 1801 . , __ --n ' , _ Ba_c!< 530
f l IL f"\ R49Wall"' r, µ ;!'lo I LI Right I 234
R-19 Wall"* 90 Left 234
R-19 Wall**1 n/a n/a 40
R-30 Roof Attic* n/a n/a 627
R-30 Roof Attic* n/a nla 627
03 04 05 06
Type Roof Rise Roof Reflectance Roof Emittance
Ventilated 4.84831 0.1 0.85
Ventilated 4.84831 0.1 0.85
07 08
Window & Door Area (tt2) TIit (deg)
115 90
48 90
24 90
24 90
0 nla
194.8 90
150 90
27 90
27 90
0 nla
0 n/a
n/a n/a
n/a nla
80 90
135 90
112 90
112 90
0 nla
n/a nla
n/a nla
07 08
Radiant Barrier Cool Roof
No No
No No
Registration Datemme: 201a-11-12 11 :46:11 HERS Provider: CalCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1 R-10232018-1149 Report Generated at: 2018-11-12 11:12:13
CERTIFICATE OF COMPLIANCE • RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unn Apartment
Calculation Description: TIHe 24 Analysis
FENESTRATION/ GLAZING
01 02 03
Calculation Datemme: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
04 05 06 07
Height Area
08 09
CF1R-PRF-01
Page 5 of 11
10
Name Type Surface (Orientation-Azimuth) Width (ft) (ft) Multiplier (112) U-factor SHGC Exterior Shading
9W Window Front Wall (Front--0) --1 12.5 0.35 0.21 Insect Screen (default)
10W Window Front Wall (Front-0) --1 45.0 0.35 0.21 Insect Screen (default)
2W Window Front Wall (Front-0) --1 12.5 0.35 0.21 Insect Screen (default)
1W Window Front Wall (Front-0) --1 45.0 0.35 0.21 Insect Screen (default)
SW Window Back Wall (Back-180) --1 12.0 0.35 0.21 Insect Screen (default)
7W Window Back Wall (Back-180) --1 4.5 0.35 0.21 Insect Screen (default)
6W Window Back Wall (Back-180) --1 7.5 0.35 0.21 Insect Screen (default)
5W Window Back Wall (Back-180) --1 7.5 0.35 0.21 Insect Screen (default)
4W Window Back Wall (Back-180) --1 4.5 0.35 0.21 Insect Screen (default)
3W Window Back Wall (Back-180) --1 12.0 0.35 0.21 Insect Screen (default)
9D Window Right Woll (Right-270) --1 24.0 0.35 0.21 Insect Screen (default)
1D Window ~all(Le -... I 1 24.0 0.35 0.21 Insect Screen (default)
22W Window 'i !front Walbill(I OIi 0) -""' -""--I f1 I 9.0 0.35 0.21 Insect Screen (default)
23W Wmdow ~ • (I ont-,,,... -,_ 1-"'--J Ill ~1 Ill -~ 0.35 0.21 Insect Screen (default)
24W Window ~s Frpoiw.f2 (!'Mt-ob r H-< J V-1 ) 1t--r-<24.o 0.35 0.21 Insect Screen (default)
25W Window Front Wall 2 (Front-0) ---1 4.5 0.35 0.21 Insect Screen (default)
26W Window Front Wall 2 (Front-0) --1 10.0 0.35 0.21 Insect Screen (default)
380 Window Front Wall 2 (Front--0) --1 21.4 0.35 0.21 Insect Screen (default)
260 Window Front Wall 2 (Front-0) --1 24.0 0.35 0.21 Insect Screen (default)
250 Window Front Wall 2 (Front--0) --1 24.0 0.35 0.21 Insect Screen (default)
27W Window Front Wall 2 (Front-0) --1 10.0 0.35 0.21 Insect Screen (default)
28W Window Front Wall 2 (Front-0) --1 4.5 0.35 0.21 Insect Screen (default)
11W Window Front Wall 2 (Front-0) --1 24.0 0.35 0.21 Insect Screen (default)
12W Window Front Wall 2 (Front-0) --1 4.5 0.35 0.21 Insect Screen (default)
130 Window Front Wall 2 (Front-0) --1 21.4 0.35 0.21 Insect Screen (default)
13W Window Front Wall 2 (Front-0) --1 9.0 0.35 0.21 Insect Screen (default)
20W Window Back Wall 2 (Back-180) --1 45.0 0.35 0.21 Insect Screen (default)
19W Window Back Wall 2 (Back-180) --1 15.0 0.35 0.21 Insect Screen (default)
18W Window Back Wall 2 (Back-180) --1 15.0 0.35 0.21 Insect Screen (default)
Registration Number: 218-P010306917A-OOO-OOO-OOOOOOO-OOOO Registration Datetnme: 201s-11-1211:46:11 HERS Provider: CalCERTS inc.
CA Building Energy Efficiency Standards-2016 Residential Compliance Report Version -CF1 R-10232018-1149 Report Generated at: 2018-11-12 11 :12:13
CERTIFICATE OF COMPLIANCE· RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unit Apartment
Calculation Description: Title 24 Analysis
17W Window
16W Window
15W Window
21W Window
14W Window
36W Window
37W Window
38W Window
29W Window
30W Window
31W Window
35W Window
34W Window
33W Window
32W Window
44D Window
41D Window ,.
'I 111...ll
Registration Number: 21B-P010306917A-000-000-0000000-000
Back Wall 2 (Back-180)
Back Wall 2 (Back-180)
Back Wall 2 (Back-180)
Right Wall 2 (Right-270)
Left Wall 2 (Left-90)
Front Wall 3 (Front-0)
Front Wall 3 (Front-0)
Front Wall 3 (Front-0)
Front Wall 3 (Front-0)
Front Wall 3 (Front-0)
Front Wall 3 (Front-0)
Back Wall 3 (Back-180)
Back Wall 3 (Back-180)
Back Wall 3 {Back-180)
Back W.11 3 (Back-180)
Calculation Datemme: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
--1 15.0
--1 15.0
--1 45.0
--1 27.0
--1 27.0
--1 10.0
--1 15.0
--1 15.0
--1 15.0
--1 15.0
--1 10.0
--1 22.5
--1 45.0
--1 45.0
--1 22.5
F'-all3(R hi---""' ....... --1 112.0
I LeftWadL 1-11 ) -... -,_ f'i 'I 112.0
-'-"' --' -· I I _,
Registration Datemme: 201s-11-1211 :46:11
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1R-10232018-1149
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
0.35 0.21
CF1R.PRF-01
Page 6 of 11
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
Insect Screen (default)
HERS Provider: CalCERTS inc.
Report Generated at: 2018-11-12 11:12:13
CERTIFICATE OF COMPLIANCE· RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unit Apartment
Calculation Description: Trtle 24 Analysis
OPAQUE SURFACE CONSTRUCTIONS
01 02
Construction Name Surface Type
R-19 Wall** Exterior Walls
R-19 Wall**1 Interior Walls
Attic RoofZone 2 Attic Roofs
Ceilings (below
R-30 Roof Attic* attic)
Floors Over
R-19 Floor* Crawlspace
Attic Rootzone 3 Attic Roofs
SLAB FLOORS
01
03
Construction Type
Wood Framed Wall
Wood Framed Wall
Wood Framed Ceiling
Wood Framed Ceiling
Wood Framed.floor
Frat~i2
..... t· I r.:
02
Calculation Date/Time: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
04 05 06
Total Cavity Winter Design
Framing R-value U-factor
R 19 in 5-1/2 in.
2x6@ 16 in. O.C. cavity (R-18) 0.074
R 19 in 5-112 in.
2x6@ 16 in. O.C. cavity (R-18) 0.069
2x4 Top Chord of Roof Truss @24
in.O.C. none 0.644
2x4 @ 16 in. O.C. R30 0.032
R 19 in 5-1/2 in.
2'<6 16 in. O.C. _cavity (R-18) 0.050
:4 ,cr'ffl'R!f'luss~24 I~, ' I
lo..). ; .. ) lhon< r -~ -
h .J t-' t, l...J V I l.J L I"'\
03 04 05
CF1 R-PRF--01
Page 7 of 11
07
Assembly Layers
• Inside Finish: Gypsum Board
• Cavfty I Frame: R-19 in 5-112 in. (R-18) / 2x6
• Exterior Finish: 3 Coat Stucco
• Inside Finish: Gypsum Board
• Cavity I Frame: R-19 in 5-112 in. (R-18) I 2x6
• Other Side Finish: Gypsum Board
• Cavffy I Frame: no insul. I 2x4 Top Chrd
• Roof Deck: Wood Siding/sheathing/decking
• Roofing: Ught Roof (Asphalt Shingle)
• Inside Finish: Gypsum Board
• Cawty I Frame: R-9. 1 I 2x4
• Over Ceiling Joists: R-20.9 insul.
• Floor Surface: Carpeted
• Floor Deck: Wood Siding/sheathing/decking
• Cawty/Frame: R-19 in 5-112 in. (R-18)/ 2x6
• Cawty I Frame: no insul. I 2x4 Top Chrd
• Roof Deck: Wood Siding/sheathing/decking
• Roofing: Ught Roof (Asphalt Shingle)
06 07
Name Zone Area (112) Perimeter (ft) Edge lnsul. R-value & Depth Carpeted Fraction Heated
Slab-on-Grade Zone 1 547 79 None 0.8 No
Slab Zone 1 547 79 None 0.8 No
BUILDING ENVELOPE -HERS VERIFICATION
01 02 03 04
Quality Insulation Installation (QII} Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50
Not Required Not Required Not Required n/a
Registration Number: 218-P010306917A-OOO·OOO-OOOOOOO-OOO Registration Date!Time: 2018-11-1211:46:11 HERS Provider: CaJCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1 R-10232018-1149 Report Generated at: 2018-11-12 11:12:13
CERTIFICATE OF COMPLIANCE· RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unit Apartment
Calculation Description: Title 24 Analysis
Calculation Date/Time: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
CF1R-PRF-01
Page 8 of 11
WATER HEATING SYSTEMS
01 02 03 04 05 06 07
Number of Number of Solar
Systems Multi-Family Water Fraction
Name System Type In Building Distribution Type Water Heater Heaters/System (%)
DHWSys 1 Central Parallel Piping 4 Multi-family: No loops or DHW Heater 1 (1) 1 0 recirc pump
WATER HEATING SYSTEMS
01 02 03 04 05 06
Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%)
DHWSys 1 DHW Heater 1 (1) 1 .0%
WATER HEATERS
01 02 03 04 05 06 07 08 09 10 11 12
Input Rating / Tank Standby
Heater Tank Uniform Energy Pilot/ Insulation Loss/ First Hour Tank Location
Element Number ;:,;· Factor/ Energy Thermal R-value Recovery Rating/ NEEA Heat Pump or Ambient
Name Type Tank Type of Units Faf,r 11!1111!;,ftp """llnttExt Elf Flow Rate Brand / Model Condition
S~II ~ \..2..-:11~~c :"! p kE µ/hr ::l,.o ~-n/a n/a n/a DHW Heater 1 Gas lnstantaneousfd 1 .
SPACE CONDITIONING SYSTEMS ~, t:' H. ::, Fl-<C)VI l J t-K
01 02 03 04 05 06
SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name
DDU-1 1/2 I :Heat Pump System 1 :Air Distribution Heat Pump Heating and Heat Pump System 1 Heat Pump System 1 HVAC Fan 1 Air Distribution System 1 System 1 :HVAC Fan 1 :2:3 Cooling System
DDU-1 212 I :Heat Pump System 1 :Air Distribution Heat Pump Heating and Heat Pump System 1 Heat Pump System 1 HVAC Fan 1 Air Distribution System 1 System 1 :HVAC Fan 1 :2:3 Cooling System
OOU-21 :Heat Pump System 1:Air Distribution Heat Pump Heating and Heat Pump System 1 Heat Pump System 1 HVAC Fan 1 Air Distribution System 1 System 1 :HVAC Fan 1 :2:3 Cooling System
DDU-3 I :Heat Pump System 1 :Air Distribution Heat Pump Heating and Heat Pump System 1 Heat Pump System 1 HVAC Fan 1 Air Distribution System 1 System 1:HVAC Fan 1:2:3 Cooling System
Registration Number: 218-P010306917A-OOO-OOO-OOOOOOO-OOOO Registration Date/Time: 2018-11-1211 :46:11 HERS Provider: CalCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1 R-10232018-1149 Report Generated at: 2018-11-12 11 :12:13
CERTIFICATE OF COMPLIANCE -RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unn Apartment
Calculation Description: Trtle 24 Analysis
HVAC -HEAT PUMPS
01
Name
Heat Pump System 1
HVAC COOLING -HERS VERIFICATION
01
02 03
System Type HSPF/COP
SplitHeatPump 8
02
Calculation Datemme: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
04 I 05 06 07 08
Heating Cooling Zonally
Cap47 Cap 17 SEER EER Controlled
45000 I 34000 14 12 No
03 04
09
Muttlspeed
Compressor
No
05
CF1R.PRF--01
Page 9 of 11
10
HERS
Verification
Heat Pump System
1-hers-cool
06
Verified Refrigerant
Name Verified Airflow Airflow Target (CFM) Verified EER Verified SEER Charge
Heat Pump System 1-hers-cool Required 350 Required Not Required Not Required
HVAC • DISTRIBUTION SYSTEMS
01 02 03 04 05 06 07
Name Type Duct Leakage Insulation R-value Duct location Bypass Duct HERS Verification
Air Distribution System 1 OuctsAttic Al ~ Se.alecrn!, -•-
,_ -Attic None Air Distribution System -1-hers-dist
• ~ -
HVAC DISTRIBUTION -HERS VERIFICATION -.. I t"'1 11. '-l II ~ _o3 ... . ·~ -----08 01 ' ,-~04,,_,, . -06 07
Duct Leakagl\ 1DuEi-Lelkage··) ve'rir.e<1'Duc1 "-Vefified Dtlet' L ried Deeply Buried Low-leakage
Name Verification Target{%} Location Design Ducts Ducts Air Handler
total leakage <= 12.0
Air Distribution System 1-hers-dist Required or leakage to Not Required Not Required Not Required Not Required n/a
outdoors <= 5.0
HVAC -FAN SYSTEMS
01 02 03 04
Name Type Fan Power (Watts/CFM) HERS Verification
HVAC Fan 1 Single Speed PSC Furnace Fan 0.58 HVAC Fan 1-hers-fan
HVAC FAN SYSTEMS -HERS VERIFICATION
01 02 03
Name Verified Fan Watt Draw Required Fan Efficiency (Watts/CFM)
HVAC Fan 1-hers-fan Required 0.58
Registration Number: 21&-P010306917A-OOO-OOO-OOOOOOO-OOOO Registration Date/Time: 2010-11-1211:46:11 HERS Provider; CalCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1R-10232018-1149 Report Generated at 2018-11-12 11 :12:13
CERTIFICATE OF COMPLIANCE· RESIDENTIAL PERFORMANCE COMPLIANCE METHOD
Project Name: Arellano 4 Unit Apartment
Calculation Description: Title 24 Analysis
Calculation Datemme: 11:11, Mon, Nov 12, 2018
Input File Name: G1103.ribd16x
CF1R.PRF-01
Page 10 of 11
IAQ (Indoor Air Quality) FANS
01 02 03 04 05 06
IAQ Recovery
Dwelling Unit IAQCFM IAQ Watts/CFM IAQFanType Effectiveness(%) HERS Verification
DDU-11/2 46 0.25 Default 0 Required
DDU-2111 106 0.25 Default 0 Required
DDU-3111 68 0.25 Default 0 Required
PROJECT NOTES
CONTRACTOR MUST COMPLY: . ALL FENESTRATION MUST BE CERTIFIED BY NFRC . INSTALLED FENESTRATION VALUES MUST HAVE EQUAL OR LOWER U FACTOR AND SHGC
CALLED OUT IN THIS CALCULATION •. HVAC & WIH UNITS CALLED OUT IS FOR REFERENCE ONLY. INSTALLED HVAC & WIH UNITS MUST HAVE EQUAL OR HIGHER EFFECIENCY THAN
SPECIFIED IN THIS CALCULATION • SEE MECHANICAL & PLUMBING PLAN FOR EQUIPMENT SCHEDULE
~ Cat~~,~I~,, I C.
Registration Number: 218-P010306917A-OOO-OOO-OOOOOOO-OOOO Registration Date/Time: 2018-11-1211:46:11 HERS Provider: CalCERTS inc.
CA Building Energy Efficiency Standards -2016 Residential Compliance Report Version -CF1R-10232018-1149 Report Generated at: 2018-11-12 11:12:13
Project N..,., Arellano 4 Unl Apanmanl
Calculation Description: Title 24 Analysis
DOCUMENTATION AUTHOR'S DECLARATION STA"IErtENT
1. I certify that 1111& Cer1llcale of COmp1ianc:e -Ion Is acoural8 and ccmplefa.
-AulhorName:
Rocky Salehi
Company:
Salehi Engin"ring -8360 Clairmont Mesa Blvd # 111
City/$11Jte12ip:
San Diego, CA 92111
RESPONSIBLE PERSON'S DECLARATIOII STATEMENT
I -1ify the following under penally of perjury, -tile laws of.,_ Slate of California:
<:alculatlan Date/Time: 11 :11, Man, Nov 12, 2018
Input File~: G1103.ri>d16x
--Signelur-·
Sq,aluleOate:
2018-11-1211:46:11 -~ -1 I .
CEMIERS Certification ldei1dftc:atioo UIU'l!r): ~ ca,__....
Phone:
858-2TT-5551
1. I am eligible under Division 3 of the Bumeos and Professions Code to accept responsibility for the building de$ign identified on lhis Ceni1lcate of Compliance.
Page11 of11
2. I certify Iha! lhe ene,gy fealUres and pt1fu11ta.., specifica1ions identified on this ~e of Compliance conform to the requirements ol Tlfle 24, Part 1 and PIHi 6 of the Celifomie Code ol
Regulations.
3. The building design features or system de$ign -es identified on this Certioome of Complance are c:onsislent with the infonnation prtMde<I on -applioable oomp1;,,nce doc:umera,
-•· calrulalions, plans and $ll8Cifications ..-..I ID.1he • •-· -~ · • " " -, • rmil ~-
RespoolBi,lo Doaigner Name: l ... r1 IL s· . -
Ohms Collaborative -n I _'l
.. --.,. -F}'.'... /.
Company: D Af • t~ ,.. • t =-) R Ohms Collaborative ,., na--12~:4,1~--License:
536 Sears Ave. na
City/S1ate/Zip: Phone:
San Diego, CA 92114 760-707-6683
Digitally signed by Ca/CERTS. This digital signature is provided in order to secure the content of this regmered docwnent and in no way implies Registration
Providf!r ,esponsi!JiHty to, the accuracy of the information.
Rtglmlon N...-r. 2111-P010306917Ml00-000-0000000-00 R~.,_., 201-8-11•1211:46:11 HERS Provido<:
II
Easy to Verify
at CaJCERTS.com
ColCl:RTSinc-
RESIDENTIAL MEASURES SUMMARY RMS-1
Project Name Building Type □ Single Family □ Addition Alone I Date Arellano 4 Unit Apartment '21 Multi Family □ Existing+ Addition/Alteration 11/12/2018
Project Address California Energy Climate Zone I Total Cond. Floor Area I Addition I # of ~nits
2637 Jefferson Street Carlsbad CA Climate Zone 07 4,886 n/a
INSULATION Area
Construction Type Cavity (ff) Special Features Status
Wall Wood Framed R 19 4,568 New
Slab Unheated Slab-on-Grade -no insulation 1,094 Perim = 158' New
Roof Wood Framed Attic R30 3,792 Naw
Floor Wood Framed w/Crawl Space R 19 1,444 Naw
FENESTRATION I Total Area: 1,049j Glazina Percentaae: 21.5 % I New/Altered Averaae U-Factor: 0.35
Orientation Area{ffl U-Fac SHGC Overhana Sidefins Exterior Shades Status
Front /N) 389.8 0.350 0.21 none none Bug Screen New
Rear/S) 333.0 0.350 0.21 none none Bug Screen New
Right /1-\? 163.0 0.350 0.21 none none Bug Screen New
Len /E) 163.0 0.350 0.21 none none Bug Screen New
HVAC SYSTEMS
Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status
4 Split Heat Pump 8.00HSPF Split Heat Pump 14.0SEER Setback New
HVAC DISTRIBUTION Duct
Location Heatina Coolina Duct Location R-Value Status
FIRST FLOOR Ducted Ducted Attic 6.0 New
WATER HEATING
Qty. TvPe Gallons Min. Eff Distribution Status
4 Small Instantaneous Gas 0 0.95 Parallel Piping New
Enern11Pro 7.2 bv Ene Soft User Number: 1233 ID: G1103 Pane2of6
• 2016 Low-Rise Residential Mandatory Measures Summary
~ Low-rise residenlial buildings subject to the Energy Standards must comply with all applicable mandatory measures, regardless of the compliance approach
used. Review the respective section for more information. *Exceptions may apply.
(Revised 04/2017)
Building Envelope Measures:
§ 110.6(a)1: Air Leakage. Manufactured fenestration, exterior doors, and exterior pet doors must limit air leakage to 0.3 cfm/ft2 or less when tested per
NFRC-400 or ASTM E283 or AAMANIDMNCSA 101/I.S.2/A440-2011 .'
§ 110.6(a)5: Labeling. Fenestration products must have a label meeting the requirements of§ 10-111 (a).
§ 110.6(b): Field fabricated exterior doors and fenestration products must use U-factors and solar heat gain coefficient (SHGC) values from TABLES
110.6-A and 110.6-B for comoliance and must be caulked and/or weatherstrinned. •
§ 110.7: Air Leakage. All joints, penetrations, and other openings in the building envelope that are potential sources of air leakage must be caulked,
oasketed, or weather strinned.
§ 110.8(a): Insulation Certification by Manufacturers. Insulation specified or installed must meet Standards for Insulating Material.
§ 110.8(9): Insulation Requirements for Heated Slab Floors. Heated slab floors must be insulated per the requirements of§ 110.8(9).
§ 110.8(1): Roofing Products Solar Reflectance and Thermal Emittance. The thermal emittance and aged solar reflectance values of the roofing
material must meet the reouirements of 6 110.8/i\ when the installation of a cool roof is specified on the CF1R
§ 110.80): Radiant Barrier. A radiant barrier must have an emittance of 0.05 or less and be certified to the Department of Consumer Affairs.
Celling and Rafter Roof Insulation. Minimum R-22 insulation in wood-frame ceiling: or the weighted average U-factor must not exceed 0.043.
Minimum R-19 or weighted average U-factor of 0.054 or less in a rafter roof alteration. Attic access doors must have permanently attached
§ 150.0(a): insulation using adhesive or mechanical fasteners. The attic access must be gasketed to prevent air leakage. Insulation must be installed in
direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration as specified in§ 110.7, including but not limited
to olacina insulation either above or below the roof deck or on too of a d•uur.:iU ceilina.'
§ 150.0(b): Loose-fill Insulation. Loose fill insulation must meet the manufacturer's required density for the labeled R-value.
Above Grade Wall Insulation. Minimum R-13 insulation in 2x4 inch wood framing wall or have a LI-factor of 0.102 or less (R-19 in 2x6 or LI-
§ 150.0(c): factor of 0.074 or less). Opaque non-framed assemblies must have an overall assembly LI-factor not exceeding 0.102, equivalent to an installed
value of R-13 in a wood framed assemblv .'
§ 150.0(d): Raised-floor Insulation. Minimum R-19 insulation in raised wood framed floor or 0.037 maximum LI-factor.
§ 150.0(~: Slab Edge Insulation. Slab edge insulation must meet all of the following: have a water absorption rate, for the insulation material alone without
facings, no greater than 0.3%; have a water vapor permeance no greater than 2.0 perm/inch; be protected from physical damage and UV light
deterioration; and, when installed as part of a heated slab floor meet the reauirements of§ 110.8/n\.
§ 150.0(g)1: Vapor Retarder. In Climate Zones 1-16, the earth floor of unvented crawl space must be covered with a Class I or Class II vapor retarder. This
reauirement also aoolies to controlled ventilation crawl srmce for buildinas comolvina with the exceotion to S 150.0ldl.
§ 150.0(g)2: Vapor Retarder. In Climate Zones 14 and 16, a Class I or Class II vapor retarder must be installed on the conditioned space side of all
insulation in all exterior walls, vented attics, and unvented attics with air-oermeable insulation.
§ 150.0(q): Fenestration Products. Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors must have a
maximum U-factor of 0.58; or the weiohted averaoe U-factor of all fenestration must not exceed 0.58.'
Fireplaces, Decorative Gas Appliances, and Gas Log Measures:
§ 150.0(e)1A: Closable Doors. Masonry or factory-built fireplaces must have a closable metal or glass door covering the entire opening of the firebox.
§ 150.0(e)1B: Combustion Intake. Masonry or factory-built fireplaces must have a combustion outside air intake, which is at least six square inches in area
and is eQuinoed with a readilv accessible ooerable and tiaht-fittina damoer or combustion-air control device.'
§ 150.0(e)1C: Flue Damper. Masonry or factory-built fireplaces must have a flue damper with a readily accessible control.'
§ 150.0(e)2: Pilot Light. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of
the buildina. are prohibited.
Space Conditioning, Water Heating, and Plumbing System Measures:
§ 110.0-§ 110.3: Certification. Heating, ventilation and air conditioning (HVAC) equipment, w~ter heaters, showerheads, faucets, and all other regulated
annliances must be certified bv the manufacturer to the EnerQY Commission.
§ 110.2(a): HVAC Efficiency. Equipment must meet the applicable efficiency requirements in TABLE 110.2-A through TABLE 110.2-K.'
Controls for Heat Pumps with Supplementary Electric Resistance Heaters. Heat pumps with supplementary electric resistance heaters
§ 110.2(b): must have controls that prevent supplementary heater operation when the heating load can be met by the heat pump alone; and in which the
cut-on temperature for compression heating is higher than the cut-on temperature for supplementary heating, and the cut-off temperature for
compression heatinQ is hiQher than the cut-off temoerature for sunnlementarv heatina.'
§ 110.2(c): Thermostats. All unitary heating or cooling systems not controlled by a central energy management control system (EMCS) must have a
setback thennostat.'
Water Heating Recirculation Loops Serving Multiple Dwelling Units. Water heating recirculation loops serving multiple dwelling units must
§ 110.3(c)5: meet the air release valve, backflow prevention, pump priming, pump isolation valve, and recirculation loop connection requirements of§
110.3(cl5.
§ 110.3(c)7: Isolation Valves. Instantaneous water heaters with an input rating greater than 6.8 kBTU/hr (2 kW) must have isolation valves with hose bibbs
or other fittinas on both cold water and hot water lines of water heatina svstems to allow for water tank flushinQ when the valves are closed.
§ 110.5: Pilot Lights. Continuously burning pilot lights are prohibited for natural gas: fan-type central furnaces; household cooking appliances (appli-
ances without an electrical sunnlv voltaQe connection with pilot liQhts that consume less than 150 Btu/hr are exemoO: and oool and soa heaters.'
§ 150.0(h)1:
Building Cooling and Heating Loads. Heating and/or cooling loads are calculated in accordance with ASHRAE Handbook, Equipment
Volume, Applications Volume, and Fundamentals Volume; SMACNA Residential Comfort System Installation Standards Manual; or ACCA
Manual J usina desian conditions specified in§ 150.0(h)2.
• 2016 Low-Rise Residential Mandatorv Measures Summary
§ 150.0(h)3A: Clearances. Installed air conditioner and heat pump outdoor condensing units must have a clearance of at least 5 feet from the outlet of any
druarvent.
§ 150.0(h)3B: Liquid Line Drier. Installed air conditioner and heat pump systems must be equipped with liquid line filter driers if required, as specified by
manufacturer's instructions.
§ 150.0(i)1: Storage Tank Insulation. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water-heating systems, must have
R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank.
Water piping and cooling system line Insulation. For domestic hot water system piping, whether buried or unburied, all of the following must
be insulated according to the requirements of TABLE 120.3-A: the first 5 feet of hot and oold water pipes from the storage tank; all piping with a
§ 150.00)2A: nominal diameter of 3/4 inch or larger; all piping associated with a domestic hot water recirculation system regardless of the pipe diameter;
piping from the heating source to storage tank or between tanks; piping buried below grade; and all hot water pipes from the heating source to
kitchen fixtures:
§ 150.00)28: Water piping and cooling system line insulation. All domestic hot water pipes that are buried below grade must be installed in a water proof
and non-crushable casino or sleeve:
§ 150.00)2C: Water piping and cooling system line Insulation. Pipe for cooling system lines must be insulated as specified in § 150.00)2A. Distribution
niniM for steam and hvdronic heatinn svstems or hot water svstems must meet the rAnUirements in TABLE 120.3-A.'
§ 150.00)3: Insulation Protection. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
Insulation Protection. Insulation exposed to weather must be installed with a cover suitable for outdoor service. For example, protected by
§ 150.00)3A: aluminum, sheet metal, painted canvas, or plastic cover. The cover must be water retardant and provide shielding from solar radiation that can
cause dearadation of the material.
§ 150.00)38: Insulation Protection. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space must have a
Class I or Class II va=r retarder.
Gas or Propane Systems. Systems using gas or propane water heaters to serve individual dwelling units must include all of the following: a
§ 150.0(n)t 120V electrical receptecle within 3 feet of the water heater, a Category Ill or IV vent, or a Type B vent with straight pipe between the outside
termination and the space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the
water heater and allows natural draininn without numn assistance; and a nas suoolv line with a caMcitv of at least 200.000 Btu/hr.
§ 150.0(n)2: Recirculating Loops. Recirculating loops serving multiple dwelling units must meet the requirements of§ 110.3(c)5.
§ 150.0(n)3: Solar Water-heating Systems. Solar water-heating systems and oollectors must be certified and rated by the Solar Rating and Certification
Comnration (SRCCfor bv a lislinn anenev that is annroved bv the Executive Director.
Ducts and Fans Measures:
§ 110.8(d)3: Ducts. Insulation installed on an existing space-conditioning duct must oomply with§ 604.0 of the California Mechanical Code (CMC). If a
contractor installs the insulation. the contractor must certifv to the customer in writina that the insulation meets this renuirement.
CMC Compliance. All air-distribution system ducts and plenums must be installed, sealed, and insulated to meet the requirements of CMC
§§ 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Portions
of supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0 (or higher if required by CMC § 605.0) or
a minimum installed level of R-4.2 when entirely in conditioned space as confirmed through field verification and diagnostic testing
§ 150.0(m)t (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts must be mechanically fastened. Openings must be sealed with
mastic, tape, or other duct-closure system that meets the applicable requirements of UL 181, UL 181A, or UL 1818 or aerosol sealant that
meets the requirements of UL 723. If mastic or tape is used to seal openings greater than¼ inch, the combination of mastic and either mesh or
tape must be used. Building cavities, support platforms for air handlers, and plenums designed or constructed with materials other than sealed
sheet metal, duct board or flexible duct must not be used for conveying conditioned air. Building cavities and support platforms may contain
ducts. Ducts installed in cavities and SU"""rl olatforms must not be comoressed to cause reductions in the cross-sectional area of the ducts.·
§ 150.0(m)2:
Factory-Fabricated Duct Systems. Factory-fabricated duct systems must comply with applicable requirements for duct construction,
connections, and closures: joints and seams of duct systems and their components must not be sealed with cloth back rubber adhesive duct
lanes unless such tane is used in combination with mastic and draw bands.
§ 150.0(m)3: Field-Fabricated Duct Systems. Field-fabricated duct systems must comply with applicable requirements for: pressure.sensitive tapes,
mastics sealants. and other reauirements soecified for duct construction.
§ 150.0(m)7: Backdraft Dampers. All fan systems that exchange air between the oonditioned space and the outside of the building must have back draft or
automatic damoers.
§ 150.0(m)8: Gravity Ventilation Dampers. Gravity ventilating systems serving conditioned space must have either automatic or readily accessible,
manuallv ooerated damoers in all ooeninns to the outside, excent combustion inlet and outlet air ooeninos and elevator shaft vents.
§ 150.0(m)9:
Protection of Insulation. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and
wind. Insulation exposed to weather must be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or
plastic cover. Cellular foam insulation must be protected as above or painted with a coating that is water retardant and provides shielding from
solar radiation.
§ 150.0(m)10: Porous Inner Core Flex Duct Porous inner core flex duct must have a non-porous layer between the inner core and outer vapor barrier.
Duct System Sealing and Leakage Test. When space conditioning systems use forced air duct systems to supply conditioned air to an
§ 150.0(m)11: occupiable space, the ducts must be sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in
accordance with & 150.0fm\11and Reference Residential A""endix RA3.
Air Filtration. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal
§ 150.0(m)12: conditioning component, except evaporative coolers, must be provided with air filter devices that meet the design, installation, efficiency,
oressure droo. and labelina reouirements of• 150.0lml12.
• 2016 Low-Rise Residential Mandatorv Measures Summarv
Duct System Sizing and Air FIiter Grille Sizing. Space conditioning systems that use forced air ducts to supply cooling to an occupiable
space must have a hole for the placement of a stalic pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the
§ 150.0(m)13: supply plenum. The space conditioning system must also demonstrate airflow ~ 350 CFM per ton of nominal cooling capacily lhrough the return
grilles, and an air-handling unit fan efficacy s 0.58 W/CFM as confirmed by field verification and diagnostic testing, in accordance with
Reference Residential Appendix RA3.3. This applies to both single zone central forced air systems and every zone for zonally controlled central
forced air svstems.'
Ventilation for Indoor Air Quality. All dwelling units must meet the requirements of ASHRAE Standard 62.2. Neither window operation nor
§150.0(o): continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are pennissible methods of
nrovidinn whole-buildina ventilation.
§ 150.0(o)1A: Field Verification and Diagnostic Testing. Whole-building ventilation airllow must be confirmed through field verification and diagnostic
testinn in accordance with Reference Residential Annendix RA3.7.
Pool and Spa Systems and Equipment Measures:
Certification by Manufacturers. Any pool or spa healing system or equipment musl be certified lo have all of the following: a lhermal efficiency
§ 110.4(a): that complies with the Appliance Efficiency Regulations; an on-off switch mounted outside of the heater that allows shutting off the heater
without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and must not use electric
resistance heatinn.'
§ 110.4(b)1: Piping, Any pool or spa heating equipment must be installed with at least 36 inches of pipe between the filter and the healer, or dedicated
suction and return lines, or built-in or built-uo connections to allow for future solar heatina.
§ 110.4(b)2: Covers. Outdoor pools or spas that have a heat pump or gas heater must have a cover.
§ 110.4(b)3: Directional Inlets and time switches for pools. Pools must have directional inlets that adequately mix the pool water, and a time switch that
will allow all numns to be set or oroarammed to run onlv durina off-neak electric demand oeriods.
§ 110.5: PIiot Light. Nalural gas pool and spa heaters musl not have a continuously burning pilot light
§ 150.0(p): Pool Systems and Equipment Installation. Residential pool systems or equipment must meet the specified requirements for pump sizing, flow
rate, nirinn, filters and valves.'
Lighting Measures:
§ 110.9: Lighting Controls and Components. All lighting control devices and systems, ballasts, and luminaires must meet the applicable requirements
of• 110.9.'
§ 110.9(e): JA8 High Efficacy Light Sources. To qualify as a JAB high efficacy light source for compliance with§ 150.0(k), a residential light source must
be certified to the Ene,.,,., Commission accordina to Reference Joint Annendix JAB.
§ 150.0(k)1A: Lumlnalre Efficacy. All installed luminaires must be high efficacy in accordance wilh TABLE 150.0-A.
Blank Electrical Boxes. The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or
§ 150.0(k)1B: other device must be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or
fan S"""'ed control.
Recessed Downlight Lumlnalres In Ceilings. Luminaires recessed into ceilings must meet all of the requirements for: insulation contact (IC)
§ 150.0(k)1C: labeling; air leakage; sealing; maintenance; and socket and light source as described in§ 150.0(k)1C. A JAB-2016-E light source rated for
elevated temMrature must be installed bv final insnection in all recessed downliaht luminaires in ceilinas.
§ 150.0(k)1D: Electronic Ballasts. Ballasts for fluorescent lamps rated 13 watts or greater must be electronic and must have an output frequency no less than
20 kHz.
Night Lights. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans must be rated to consume no
§ 150.0(k)1E: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with§ 130.0(c). Night lights do not need lo be conlrolled
bv vacan~ sensors.
§ 150.0(k)1F: Lighting Integral to Exhaust Fans. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods)
must meet the an, licable renuirements of 8150.0lkl.'
Screw based luminalres. Screw based luminaires must not be recessed downlight luminaires in ceilings and must contain lamps that comply
§ 150.0(k)1G: with Reference Joint Appendix JAB. Installed lamps must be marked with "JAB-2016" or "JAB-2016-E" as specified in Reference Joint Appendix
JA8.'
§ 150.0(k)1H: Enclosed Lumlnalres. Light sources installed in enclosed luminaires must be JAB compliant and must be marked with "JAS-2016-E."
§ 150.0(k)ZA: Interior Switches and Controls. All forward phase cut dimmers used with LED light sources must comply with NEMA SSL 7A.
§ 150.0(k)2B: Interior Switches and Controls. Exhaust fans must be switched separately from lighting systems.'
§ 150.0(k)2C: Interior Switches and Controls. Luminaires must be switched with readily accessible controls that permit the luminaires to be manually
switched ON and OFF.
§ 150.0(k)2D: Interior Switches and Controls. Controls and equipment must be installed in accordance with manufacturer's instructions.
§ 150.0(k)2E: Interior Switches and Controls. No control musl bypass a dimmer or vacancy sensor function if the control is installed lo comply with
8150.0lkl.
§ 150.0(k)2F: lntertor Switches and Controls. Lighting controls must comply with the applicable requiremenls of§ 110.9.
Interior Switches and Controls, An energy management control system (EMCS) may be used to comply with dimmer requirements if it:
§ 150.0(k)2G: functions as a dimmer according lo § 110.9; meets lhe lnslallation Certificate requirements of§ 130.4; meets the EMCS requirements of§
130.5'"· and meets all other renuirements ins 150.0lk\2.
Interior Switches and Controls. An EMCS may be used to comply with vacancy sensor requirements in§ 150.0(k) if it meets all of lhe
§ 150.0(k)2H: following: it functions as a vacancy sensor according lo§ 110.9; the Installation Certificate requirements of§ 130.4; the EMCS requirements of§
130.5'"· and all other renuirements ins 150.0lk\2.
§ 150.0(k)2I: Interior Switches and Controls. A multiscene programmable controller may be used to comply with dimmer requirements in § 150.0(k) if it
nrovides the functionalitv of a dimmer accordina to & 110.9, and come lies with all other anr licable renuirements in s 150.0lk\2.
• 2016 L ow-R' 1se R 'd f IM d t es1 en 1a an a ory M easures s ummary
§ 150.0(k)2J: Interior Switches and Controls. In bathrooms, garages, laundry rooms, and utility rooms, at least one luminaire in each of these spaces must
be controlled bv a vacanl"V sensor.
§ 150.0(k)2K: Interior Switches and Controls. Dimmers or vacancy sensors must control all luminaires required to have light sources compliant with
Reference Joint Annendix JA8 exceot luminaires in closets less than 70 sauare feet and luminaires in hallwavs.'
§ 150.0(k)2L: Interior Switches and Controls. Undercabinet lighting must be switched separately from other lighting systems.
Residential Outdoor Lighting. For single-family residential buildings, outdoor lighting permanently mounted to a residential building, or to other
§ 150.0(k)3A: buildings on the same lot, must meet the requirement in item§ 150.0(k)3Ai (ON and OFF switch) and the requirements in either item
§ 150.0(k)3Aii (photocell and motion sensor) or item§ 150.0(k)3Aiii (photo control and automatic time switch control, astronomical time clock, or
EMCS\.
Residential Outdoor Lighting. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies,
§ 150.0(k)3B: and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site must comply with
either & 150.0{kl3A or with the aoolicable reouirements in« 110.9, 130.0, 130.2, 130.4 140.7 and 141.0.
§ 150.0(k)3C: Residential Outdoor Lighting. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by
& 150.0{k\38 or & 150.0(k\3D must comnlv with the annlicable reauirements in 66110.9 130.0, 130.2, 130.4, 140.7 and 141.0.
§ 150.0(k)3D: Residential Outdoor Lighting. Outdoor lighting for residential parking lots and residential carports with a total of eight or more
vehicles oer site must comnlv with the aoolicable reauirements in« 110.9, 130.0 130.2, 130.4 140.7 and 141.0.
§ 150.0(k)4: Internally illuminated address signs. Internally illuminated address signs must comply with§ 140.8: or must consume no more than 5 watts of
nnwer as determined accordina to§ 130.0(cl.
§ 150.0(k)S: Residential Garages for Eight or More Vehicles. lighting for residential parking garages for eight or more vehicles must comply with the
aoolicable reauirements for nonresidential oaraoes in« 110.9 130.0 130.1 130.4 140.6 and 141.0.
Interior Common Areas of Low-rise Multi-Family Residential Buildings. In a low-rise multifamily residential building where the total interior
§ 150.0(k)6A: common area in a single building equals 20 percent or less of the floor area, permanently installed lighting for the interior common areas in that
buildinQ must be hiQh effica"" luminaires and controlled bv an occuoant sensor.
Interior Common Areas of Low-rise Multi-Family Residential Buildings. In a low-rise multifamily residential building where the total interior
common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building must:
§ 150.0(k)6B: i. Comply with the applicable requirements in§§ 110.9, 130.0, 130.1, 140.6 and 141.0; and
ii. Lighting installed in corridors and stairwells must be controlled by occupant sensors that reduce the lighting power in each space by at least
50 n,::ircent. The occuoant sensors must be caoable of turnino the lioht fullv on and off from all desioned oaths of inaress and earess.
Solar Ready Buildings:
Single Family Residences. Single family residences located in subdivisions with ten or more single family residences and where the
§ 110.10(a)1: application for a tentative subdivision map for the residences has been deemed complete by the enforcement agency must comply with the
=uirements of & 110.10{bl throuah & 110.10{el.
§ 110.10(a)2: Low-rise Multi-family Buildings. Low-rise multi-family buildings must comply with the requirements of§ 110.10(b) through§ 110.10(d).
Minimum Area. The solar zone must have a minimum total area as described below. The solar zone must comply with access, pathway, smoke
ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local
jurisdiction. The solar zone total area must be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet
each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas
§ 110.10(b)1: greater than 10,000 square feet.
For single family residences the solar zone must be located on the roof or overhang of the building and have a total area no less than 250
square feet. For low-rise multi-family buildings the solar zone must be located on the roof or overhang of the building, or on the roof or overhang
of another structure located within 250 feet of the building, or on covered parkin9 installed with the building project, and have a total area no less
than 15 norcent of the total roof area of the buildina excludina anv skvliaht area.
§ 110.10(b)2: Orientation. All sections of the solar zone located on steep-sloped roofs must be oriented between 110 degrees and 270 degrees of true north.
§ 110.10(b)3A: Shading. The solar zone must not contain any obstructions, including but not limited to: vents, chimneys, architectural features, and roof
mounted eauioment.'
Shading. Any obstruction located on the roof or any other part of the building that projects above a solar zone must be located at least twice the
§ 110.10(b)38: distance, measured in the horizontal plane, of the height differenc~ between the highest point of the obstruction and the horizontal projection of
the nearest point of the solar zone measured in the vertical olane.
§ 110.10(b)4: Structural Design Loads on Construction Documents. For areas of the roof designated as solar zone, the structural design loads for roof
dead load and roof live load must be clearly indicated on the construction documents.
Interconnection Pathways. The construction documents must indicate: a location for inverters and metering equipment and a pathway for
§ 110.10(c): routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of
interconnection will be the main service oaneh; and a oathwav for routine of olumbina from the solar zone to the water-heatina svstem.
§ 110.10(d): Documentation. A copy of the construction documents or a comparable document indicating the information from§ 110.10(b) through
& 110.10fcl must be orovided to the occuoant.
§ 110.10(8)1: Main Electrical Service Panel. The main electrical service panel must have a minimum busbar rating of 200 amps.
Main Electrical Service Panel. The main electrical service panel must have a reserved space to allow for the installation of a double pole circuit
§ 110.10(e)2: breaker for a future solar electric installation. The reserved space must be: positioned at the opposite (load) end from the input feeder location or
main circuit location; and oermanentlv marked as "For Future Solar Electric".
Project No. Gl-15-12-50
November 26, 2018
Ohms Collaborative
Mr. Hector Aramburo
536 Sears Avenue
San Diego, California 92114
6116 GEOTECHNICAL SOLUTIONS, INC.
Consulting Geotechnical Engineers & Geologists
5931 Sea Lion Place, Suite I 09
Carlsbad, California 92010
760-602-7815
smsgeosol.inc@gmail.com
CBR2018-3291
2637 JEFFERSON ST
MFD-01 (JEFFERSON ST APARTMENTS) 4,886 SF//
4-UNITS
1551702500
11/28/2018
CBR2018-3291
Geotechnical Plan Review, Proposed Arellano 4-Unit Apartments, 2637 Jefferson Street,
Carlsbad California
Project most current Drainage & BMP Plan (Sheet 2 of3), prepared by Victor Rodriguez-Fernandez,
dated April 6, 2017, and foundation plan and details, prepared by GAMA Engineering, Inc. dated
Novemver 12, 2018, for the proposed multi-unit residential development at the above-referenced
property, were provided to us for review and comments.
Project property was the subject of a detail surface and subsurface geotechnical study completed by
this office in connection with the proposed development. The following reports pertinent to the
project development are available and were reviewed as a part of this effort:
I. Revised PICP Construction Procedure Alternative, Proposed Arellano 4-Unit Apartments,
2637 Jefferson Street, Carlsbad," dated April 10, 2017.
2. "Alternative PICP Construction Procedure, Proposed Arellano 4-Unit Apartments, 263 7
Jefferson Street, Carlsbad, California," dated February 14, 2017.
3. "Geotechnical Plan Review Update, Proposed Arellano 4-unit Apartments, 2637 Jefferson
Street, Carlsbad, California," dated October 24, 2016.
4. "Geotechnical Investigation, Proposed 3-story 4-Unit Residence, 2637 Jefferson Street,
Carlsbad, California," dated January 11, 2016.
Ohms Collaborative
Geotechnical Plan Review
May 8, 2017
Pagel
The purpose of this effort was to review the project Drainage & BMP Plan, and building foundation
plan and details, from a geotechnical engineering viewpoint, and confirm their compatibility with
the site indicated geotechnical conditions, and recommendations given in the referenced reports.
Based on our review, the project Drainage & BMP Plan, and foundation plan and details are
generally considered in substantial conformance with the referenced Geotechnical Investigation
report and subsequent updates and addendum letters, provided the following comments are also
considered and reflected on the final plans, where appropriate and as applicable:
I. The referenced reports (References I through 4) and this plan review letter should be noted
on, and shall be considered a part of the project Drainage & BMP Plan, and foundation plan
and details.
2. Due to the planned site BMP designs, pool backfill soils should be compacted to minimum
95% compaction levels.
3. Pavement section ground preparations should completed as recommended in the Reference
1 report (see Page 2, Item I). As noted, and based on the proposed BMP designs, permeable
pavement section should consist of removals of upper fill/topsoil section to expose the
underlying undisturbed ("uncompacted") native Terrace Deposits. An increased section of
well-consolidated pavement base materials (ASTM No. 57 stone base course) should then
be placed over the undisturbed ("uncompacted") native Terrace Deposits exposed at the
bottom of excavation to achieve finish pavement base grade levels. Since the perforated
underdrain pipe is eliminated, an adequate storage capacity (with a proper safety factor) of
the permeable pavement BMP facility should be confirmed by the project design consultant.
4. All foundations bearing and subgrade soils underneath the planned new building should be
compacted to minimum 95% compaction levels (see Page 2 of Reference I, Item 2).
5. All southern building foundations adjacent to the permeable pavers pavement section should
be extended as specified in the Referenced I report (Page 2, Item 3). Protection ofon and off
site improvements with concrete slurry cut-off wall (deepened edge restraint) should also be
considered, where necessary and as required, as specified.
6. Provided dowels where in the event a 2 pour system or a cold joint in the foundation and floor
slab construction, as recommended by the project design consultant.
7. Interior slabs should be a minimum of 5 inches in thickness reinforced with minimum #4
reinforcing bars spaced 18 inches on center maximum each way placed mid-height in the slab
Ohms Collaborative
Geotechnlcal Plan Review
MayS,2017
Page3
(see Reference 4, Page 17, Item 3). Use minimum JO-mil Stego moisture barrier/vapor
retardant as specified.
8. Considerations may be given to provide diagonally placed re-entrant comer reinforcement
consisting 2-#3 @ 12" on centers (minimum 5 feet long) for all interior slabs at 270°± comers
with the first rebarplaced 3 inches from the comer (see Figure 6 of the Reference 4 report).
9. Provide interior slabs saw cut control joints as specified in the Reference 4 report (Page 17).
We recommend considering to delineate the pattern and locations of the interior slab saw cut
joints on the project foundation plan.
LIMITATIONS
This geotechnical plan review is not a "Plan Check Review" and does not relieve the responsibility
of the project design consultant(s) and contractor(s) to get completely familiarized with the
requirements of the project soil report(s) and fully incorporate its recommendations into the project
design, plans and construction works, where appropriate, and as applicable. Our review and
comments are for general geotechnical conformance of the project plans with the intent of the project
soil report and design recommendations. Review of structural and civil engineering calculations,
architectural intent and structural and civil engineering design modeling and basis, verification of
set back requirements, easements and right-of-ways, as well as code, city and county compliance are
beyond geotechnical engineering services. It is the owner's or his (her) representative's
responsibility to provided copies of all pertinent soil report(s), updates, addendum letters and plan
review letters to respective design consultant( s ), and general contractor and his (her) subcontractor(s)
for full compliance.
We appreciate this opportunity to be of service to you. again. Should any questions arise concerning
this report, please do not hesitate to contact this office. Reference to our Project No. GI-15-12-50
will help to expedite our response to your inquiries.
Distribution: Addressee (2, e-mail)
SMS/vs
.6ll6GEOTECHNlCAL SOLUTIONS. INC.
{cityof
Carlsbad
CERTIFICATION OF SCHOOL FEES PAID
This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior
to issuing a building permit. The City will not issue any building permit without a completed school fee form.
Project No. & Name: _DE_V_2_01_6_-0_0_61-'-, _M_F_D-_0_1 --FR\--!EF=-1-C-=-+E-+f''Hvl'-IE=-FD""
Plan Check No.: CBR2018-3291 --------~~""'"'AAH,LR-f',6hf!6'--'2~0+fl-l9-
Project Address: 2637 JEFFERSON ST c1Iy OF CARLSBAD
Assessor's Parcel No.: 1551702500 BUILDING DIVISION __________________ ___;_
Project Applicant:
(Owner Name)
TRUST ARELLANO FAMILY TRUST 09-03-13
Residential Square Feet:
New/Additions: 4,886 ~------------------
Second Dwelling Unit:
Commercial Square Feet:
New/Additions:
City Certification:City of Carlsbad Building Division Date: 03/04/2019
Certification of ApplicanUOwners. The person executing this declaration ("Owner") certifies
under penalty of perjury that (1) the information provided above is correct and true to the
best of the Owner's knowledge, and that the Owner will file an amended certification of
payment and pay the additional fee if Owner requests an increase in the number of
dwelling units or square footage after the building permit is issued or if the initial
determination of units or square footage is found to be incorrect, and that (2) the Owner is
the owner/developer of the above described project(s), or that the person executing this
declaration is authorized to sign on behalf of the Owner.
Cl] Carlsbad Unified School District
6225 El Camino Real
Carlsbad CA 92009
Phone: (760) 331-5000
D Encinitas Union School District
101 South Rancho Santa Fe Rd
Encinitas, CA 92024
Phone: (760) 944-4300 x1166
D San Dieguito Union H.S. District
684 Requeza Dr.
Encinitas, CA 92024
Phone: (760) 753-6491 Ext 5514
(By Appt. Only}
D San Marcos Unified Sch. District
255 Pico Ave Ste. 100
San Marcos, CA 92069
Phone: (760) 290-2649
Contact: Katherine Marcelja
(By Appt.only)
D Vista Unified School District
1234 Arcadia Drive
Vista CA 92083
Phone: (760) 726-2170 x2222
SCHOOL DISTRICT SCHOOL FEE CERTIFICATION
(To be completed by the school district(s))
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS
FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED.
The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder,
or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1
has paid all amounts or completed other applicable school mitigation determined by the School District. The
City may issue building permits for this project.
Signature of Authorized School District Official: '\h , 'B-, A)£'~ ~ h .:iQ
(_ C:. I G '-'-"01=J....t \:"""Cl..""
Title: :==; \'t:,,~v",v'\.~k£,/\l'\j; Date: 3 -..S--j(j
Name of School District: CARLSBAD UNIFIED SCHOOL DISTRICT Phone: 1 kO 5 3 / -,\-060
6225 Et CAMINO AEAt
CARLSBAD, CA 92009
Building Division
1635 Faraday Ave nue Carlsbad, CA 92008 building@ca rlsbadca .gov