Loading...
HomeMy WebLinkAboutSDP 2016-0001; CARLSBAD OAKS NORTH LOT 24; ADDENDUM SWQMP FOR CARLSBAD OAKS NORTH LOT 24; 2020-12-14 SWQMP Addendum for Carlsbad Oaks North, Lot 24 TO: City of Carlsbad DATE: 12-14-2020 FROM: Michael Baker International SUBJECT: PROJECT ID: RELATED PROJ. ID: DRAWING NO: PERMIT NO: SWQMP Addendum SDP 2016-0001 CD 2019-0024 DWG 502-3A GR2017-0015 Introduction This technical memorandum serves as an addendum to the approved SWQMP prepared by Excel Engineering for the Carlsbad Oaks North, Lot 24 project. The original SWQMP was approved by the City of Carlsbad in 2017 (DWG 502-3A). The project represents, construction change number 2 for drawing. The change includes converting recently completed parking stalls and landscape areas into a building extension. This addendum includes a description of the proposed changes, as compared to the approved SWQMP, as well as supporting calculations. Approved SWQMP The approved SWQMP is for the entire site and utilizes the City’s pollutant control worksheets and a SWMM analysis to show compliance with water quality and hydromodification requirements. BMP-E has two tributary drainage areas (DMA 5 & 11). The focus of this addendum is expansion of BMP-E to accommodate a slight increase in impervious area within DMA 5. No other DMA or BMP will be updated in this construction change. Proposed Revision This construction change will increase the building footprint that is within DMA 5 by an additional 6,400 square feet. The expanded footprint will encroach onto parking/landscaped areas that have recently been built and will increase the overall imperviousness of DMA 5 by 1,400 square feet. Drainage patterns will not be altered as a result of the proposed improvements. BMP-E will be modified to provide additional storage to meet water quality and HMP requirements for the additional 1,400 square feet of impervious area associated with this construction change. BMP-E will be expanded by 115 square feet and the recently constructed riser will be retrofitted with a 1” orifice 0.2’ above the basin’s surface area. The SDHM analysis maintains the low flow orifice diameter and the expanded basin area have an underdrain that connect to the existing perforated PVC underdrain. Michael Baker We Make a Difference INTERNATIONAL Technical Memo: SWQMP Addendum for Carlsbad Oaks North, Lot 24 Page 2 Worksheets B-2.1 (for Design Capture Volume) and B-5.1 (Simple Sizing Method for Biofiltration) have been used to re-size BMP-E based on the newly added area from DMA 5. By modifying the layout, increasing the surface area, BMP-E will adequately treat the 85th percentile storm water volume generated from the proposed improvements (See attached worksheets). The San Diego Hydrology Model (SDHM) has been used to analyze the hydromodification storage provided by BMP-E. The SDHM input and output is included herein. Results & Conclusions The proposed improvements described in this addendum will occur within DMA-5. DMA’s 1-4 and DMA’s 6-14 will remain unchanged. BMP-E has been increased by 115 square feet and the riser has been modified to now include a 1” orifice located 0.2’ from the basin bottom. This new basin size adequately treats and mitigates the water from the added 1,400 square feet. The new biofiltration footprint area for BMP-E has increased from 4,199 square-feet to 4,314 square-feet. The DMA Exhibit from the approved SWQMP has been included herein with revisions added to clarify the newly proposed modifications. An excerpt from the construction change is also provided showing the newly proposed BMP. Technical Memo: SWQMP Addendum for Carlsbad Oaks North, Lot 24 Page 3 Certification I hereby declare that I am the engineer of work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the business and professions code, and that the design is consistent with current standards. I understand that the check of project drawings and specifications by the City of San Diego is confined to a review only and does not relieve me, as Engineer of Work, of my responsibilities for the project design. December 14, 2020 Brian Oliver RCE 45045 Date