Loading...
HomeMy WebLinkAbout1742 SORREL CT; ; CB140403; PermitCity of Carlsbad • 1635 Faraday Av Carlsbad, CA 92008 06-16-2015 Residential Permit Permit No: CB 140403 Building Inspection Request Line (760) 602-2725 Job Address: 1742 SORREL CT CBAD Permit Type: RESDNTL Sub Type: RAD Status: ISSUED Parcel No: 2155161500 Lot #: 0 Applied: 02/21/2014 Valuation: $41,627.00 Constuction Type: 5B Entered By: JMA Occupancy Group: Reference #: Plan Approved: 06/16/2015 # Dwelling Units: I Structure Type: Issued: 06/16/2015 Bedrooms: 0 Bathrooms: 0 Inspect Area: Orig PC #: Plan Check #: Project Title: ELPERS: 316 SF BED/BATH ADDITION Applicant: Owner: JAMES CHINN DAVID ELPERS #114 2120 JIMMY DURANTE 1742 SORREL CT DEL MAR CA 92014 CARLSBAD CA 92011 858-755-5863 Building Permit $394.06 Meter Size Add'l Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00 Plan Check $275.84 Meter Fee $0.00 Addi Plan Check Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $4.16 PFF (3105540) $0.00 Park in Lieu Fee $0.00 PFF (4305540) $0.00 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $0.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $0.00 Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $61.00 Renewal Fee $0.00 ELECTRICAL TOTAL $43.00 Add'l Renewal Fee $0.00 MECHANICAL TOTAL $42.45 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing lnLieu Fee $0.00 Pot. Water Con. Fee $0.00 Housing Credit Fee $0.00 Meter Size Master Drainage Fee $0.00 Add'l Pot. Water Con. Fee $0.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (5B1473) Fee $1.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $821.51 Total Fees: $821.51 Total Payments to Date: $821.51 Balance Due: $0.00 111 FINAL APPROVAL Inspector: { 1/) Date: ______________ Clearance: -______________ NOTICE: Please take NOTIC! thapproval of your project includes the imposition 61 fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions. You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and the the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your fight to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any N City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 06-16-2015 Permit No:SW140061 Job Address: 1742 SORREL CT CBAD Permit Type: SWPPP Status: ISSUED Parcel No: 2155161500 Lot #: 0 Applied: 02/21/2014 Reference #: Entered By: JMA CB#: CB140403 Issued: 06/16/2015 Inspect Area: Project Title: ELPERS: Tier: I 316 SF BED/BATH ADDITION Priority: L Applicant: JAMES CHINN #114 2120 JIMMY DURANTE DEL MAR CA 92014 858-755-5863 Emergency Contact: DAVID ELPERS Owner: DOMIS ASHLEY K 1742 SORREL CT CARLSBAD CA 92011 760-815-0805 SWPPP Plan Check $48.00 SWPPP Inspections $57.00 Additional Fees $0.00 TOTAL PERMIT FEES $105.00 Total Fees: $105.00 Total Payments To Date: $105.00 Balance Due: $0.00 FINAL APP DPrE/LL/fCLEAR/ SIGNATURE__f THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING 0 ENGINEERING 0 BUILDING DARE 0 HEALTh 0 HAZMAT/APCD Building Permit Application < 1635 Faraday Ave., Carlsbad, CA 92008 CITY OF Ph: 760-602-2719 Fax: 760-602-8558 CARLS BAD email: building@carlsbadca.gov www.carlsbadca.ov Plan Check No. C13t L4 £103 Est. Value 22. O"D Plan Ck. Deposit Date ( c' Isw JOB ADDRESS 41 c c.— 71 1SUrrE#/SPACE#/UNIT# APN Co (Y CT/PROJECT C j;j4f ;c3 LOT PHASE# #OF UNITS I # BEDROOMS I # BATHROOMS TENANT BUSINESS NAME I I CONSTR. TYPE I OC GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) 1?) 1 s OYc (%4zi., /s_p O(fl O SE PROPOSED USE I GARAGE (SF) I I PATIOS (SF) I DECKS (SF) I FIREPLACE YES 0 # NO I AIR CONDITIONING YES Cl NO I FIRE SPRINKLERS YES 0 NY.9 APPLICANT NAME (Primary Conte APPLICANT APPLICANT NAME (Secondary Contact) ADDRESS ADDRESS CITY STATE ZIP !C - CIlY STATE ZIP PU. M I IFAX PHONE . I FAX EMAIL fl4Ks4 t44.f.Cc/fr1 EMAIL PROPERTY JAM CONTRACTOR BUS. NAME ADDRESS. 174-2 Z-( !-T ADDRESS ____________ CITY _STATE _ CITY. STATE ZIP PH 7i5o FNC I PHONE I FAX EMAIL EMAIL ARCHES1GNE 5T _ II LIU.c-__ ADDR( rr -i .3TATEUC.# CUY Duo. UC.# (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he Is licensed pursuant to the provisions of the Contractors License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). Workers' Compensation Declaration: I hereby allfrm under penalty of perjury one'of the following declarations: I have and will maintain a certificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co._______________________________________________________ Policy No. Expiration Date This section need not be completed if the permit is for one hundred dollars ($100) or less. O Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall sibject an employer to criminal penalties and civil fines up to one hundred thousand dollars (11,100,000), in addition to the cost of compensation, damages as provided for in Section 370601 the Labor code, Interest and attorney's fees. CONTRACTOR SIGNATURE DAGENT DATE - Ihereby affirm that lam exempt from Contractors Ucense Law for the following reason: 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve far the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law doss not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). O I am exempt under Section _____________Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. DYes 0 No 2.1(have / have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address! phone/contractors' license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name! address! phone! contractors' license number): 5.1 will provide some of the walk, but have contracted (hired) the following persons to provide the work indicated (include name/address! phone/type of work): ,fl 'PROPERTY OWNER SIGNATURE _) , OAGENT DATE OWN Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 Yes 0 No lathe applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 Yes 0 No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 Yes 0 No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. _________ I hereby affirm that there is a construàtion lending agency for the performance of the work this permit is issued (Sec. 3097 (I) Civil Code). Lender's Name Lenders Address I certifythatl have mad the application andstatethattheabove information isconectand thatthe information on the plans Is accurate. l agree to complywlth all City oidinancesand State laws relatinglo buildingconstnrction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID diV IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA An OSHA permit is required for excavations over 50' dee and demolition or construction of structures over 3 stories in height EXPIRATION: Every permit issu Building n provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such mtit or if buil it is suspended or abandoned at any time after the work is commenced bra period of 180 days (Section 106.44 Uniform Building Code). 'APPLICANT'S SIGNATURE . DATE z..fz_.i Ll < LI Inspection List Permit#: CB140403 Type: RESDNTL 'RAD ELPERS: 316 SF BED/BATH ADDITION Date Inspection Item 02/05/2016 89 Final Combo 02/05/2016 89 Final Combo 08/20/2015 17 Interior Lath/Drywall 08/14/2015 84 Rough Combo 08/13/2015 84 Rough Combo 07/24/2015 13 Shear Panels/HD's 07/24/2015 15 Roof/Reroof 07/02/2015 11 Ftg/Foundation/Piers 06/26/2015 21 Underground/Under Floor 06/25/2015 21 Underground/Under Floor Inspector Act Comments - RI PY AP PB AP PB AP PB NR PD AP PD AP PB AP PB AP Pb NR Monday, February 08, 2016 Page 'l of 1 Carlsbad 14-0403 3/4/14 40, CITY OF CARLSBAD SPECIAL INSPECTION AGREEMENT B-45 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed requires special Inspection, structural observation and construction material testing. 'roject/Permit 14 Project Address- 11 4'z THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNER/AUTHORIZED AGENT. Please check it you are Owner-Builder Q. (If you checked as owner-builder you must also complete Section B of this agreement) Name: (Please print) CAW-K, Mailing Address Phone: - .?c. 42c3 lam: OProperty Owner L3 Property Owner's Agent of Record Xrchitectof Record []Engineer of Record State of California Registration Number, ('S1 ' 1 Expiration Date: _I/I AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read, understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections, structural observations, truction te testing and off-site fabrication of building components, as prescribed in the statement of special insp tions ot on o lins and, as required by the California Building ode. Signature: Date: CONTRACTO $ /STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the contractor! builder! owner-builder. Contractors Company Name: _S ë/.S C0A93JCT1O1J Please check if you are Owner-Builder 0 Name: (Please print) 4 (First) (Ml.) (Last) Mailing Address: i12 fZ2C CT. Email:_ . Et..PEiS 'fIL Phone: State of California Contractor's License Number: _3'f - Expiration Date: I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on the approved plans; I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the building official; I will have in-place procedures for exercising control within our (the contractor's) organization, for the method and frequency of reporting and the distribution of the reports; and I certify that I will have a qualified person within our (the contractor's) organization to exercise such control fl,o,, M_~Z~ Signature: Date: _6Lfa CIA (2oS 35 5-45 Page 1 of 1 Rev. 08/11 EsGil Corporation In (Partners/Up with government for (Building Safety DATE: 10/13/14 JURISDICTION: Carlsbad PLAN CHECK NO.: 14-0403 PROJECT ADDRESS: 1742 Sorrel Ct. PROJECT NAME: Elpers SFD Addition SET: III U APPLICANT JU R U PLAN REVIEWER U FILE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete. recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: Mail Telephone Fax In Person REMARKS: 1) Please place rWQAa 2) Part B Program which is rolled in the pIns needs to be completed. 3) For the City set of truss calcs: The last 6 pages of the set II truss packet neelibin ap bi ed with the Ill revised truss sheets (Layout, truss A and Truss Al) to make a corzIpftrove russ packet. I have done this with the Owner set. Thank you. By: Tamara Fischer Enclosures: EsGil Corporation 0 GA 0 EJ I MB 0 PC 10/6/14 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In (Partners/lip wit/i government for Building Safety DATE: 9/9/14 U APPLICANT 'JURIS. JURISDICTION: Carlsbad U PLAN REVIEWER U FILE PLAN CHECK NO.: 14-0403 SET: II PROJECT ADDRESS: 1742 Sorrel Ct. PROJECT NAME: Elpers SFD Addition The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your.information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: James Chinn EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: James Chinn Telephone #: 858 755-5863 Date contacted: O (byy) Email: jameschinn400gmail.com Fax #: Mail Telephone Fax In Person LI REMARKS: By: Tamara Fischer Enclosures: EsGil Corporation 0 GA 0 EJ 0 MB 0 Pc 9/2/14 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 14-0403 9/9/14 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. PLANS Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. FOUNDATION AND STRUCTURAL Truss calcs need to be updated to the current code which adopts ASCE 7-10 and should specify the ultimate wind speed of 110 mph. The truss calcs are still based on ASCE 7-05. Please provide updated truss calcs with architect's review stamp. Please complete shear transfer at details 3 (gable) and 4 on sheet 4 as these trusses do not appear to have been designed as drag trusses. a) Truss Al shown as a drag truss on the revised truss layout, but I don't see where the drag load is included in the calculation for truss Al. b) Detail 4/4 still needs to show the shear transfer from upper roof to the shear wall (ie. A35s between blocking and top plates. Also a plywood shear panel needs to be shown on face of truss at that detail unless a drag truss is provided at that location as well). 14. Please detail bay window projection and shed roof above front window pop-out. Unable to locate a detail for the bay window projection on the east side of the addition. Carlsbad 14-0403 9/9114 MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes L3 No U The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Tamara Fischer at EsGil Corporation. Thank you. EsGil Corporation In cPartnersliip with government for Mudding Safety DATE: 3/6/14 JURISDICTION: Carlsbad PLAN CHECK NO.: 14-0403 PROJECT ADDRESS: 1742 Sorrel Ct. PROJECT NAME: Elpers SFD Addition U APPLICANT ,J"JURI S. U PLAN REVIEWER - U FILE SET: I (Amended List) The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. LII The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: James Chinn EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: James Chinn Telephone #: 858 755-5863 Date contacte, (by :}j Email: jameschinn400©gmail.com Fax #: Mail Telephone Fax In Person REMARKS: "Please see added correction #35; By: Tamara Fischer Enclosures: EsGil Corporation 0 GA 0 EJ 0 MB 0 PC 2/25/14 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 14-0403 3/6/14 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 14-0403 JURISDICTION: Carlsbad PROJECT ADDRESS: 1742 Sorrel Ct. FLOOR AREA: 316 sq ft SFD Add STORIES: 1 HEIGHT: 14' approx (exist) REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 3/6/14 DATE PLANS RECEIVED BY ESGIL CORPORATION: 2/25/14 PLAN REVIEWER: Tamara Fischer FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2013 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2012 IRC, 2012 IBC, 2012 UPC, 2012 UMC and 2011 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad 14-0403 3/6/14 . PLANS Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. . FIRE PROTECTION I GENERAL RESIDENTIAL 2. Specify on the plans that any existing smoke alarms that are more than 10 years old will be replaced. Section R314.3.2. Please dimension the ceiling height on the section. . ROOF Note on the plans: "Attic ventilation openings shall be covered with corrosion-resistant metal mesh with 1/16" minimum to 1h" maximum openings. Section R806.1. Show location of attic access with a minimum size of 22"x30", unless the maximum vertical headroom height in the attic is less than 30". Access must be provided to each separated attic area (if over 30 sq. ft.), shall be located in a hallway or other readily accessible location and 30" headroom clearance is required above the opening. Section R807.1. (New portion of attic) . FOUNDATION AND STRUCTURAL Provide detailing on the plans to show veneer attachment to the stud walls, in accordance with the provisions of Section R703.7. Or specify adhered veneer. Applicant to sign City soils stamp at permit issuance agreeing to obtain a soil report if the inspector detects problems. Carlsbad 14-0403 3/6/14 8. Note on plans that surface water will drain away from building and show drainage pattern. The grade shall fall at minimum of 2%. City Policy. 9. Please detail retrofit anchor bolts for the shear panels at wall line between existing and addition. 10. Please provide and detail hold downs capable of resisting 1800 lbs of uplift for 3' alternate braced panel at wall line between existing and addition and specify special inspection for epoxy anchors. R602.10. 11. Truss calcs need to be updated to the current code which adopts ASCE 7-10 and should specify the ultimate wind speed of 110 mph. 12. Please complete shear transfer at details 3 (gable) and 4 on sheet 4 as these trusses do not appear to have been designed as drag trusses. 13. Please complete the attached special inspection agreement. City Policy. 14. Please detail bay window projection and shed roof above front window pop-out. . ELECTRICAL AND PLUMBING 15. Show on the plan the amperage of the electrical service, the location of the service panel and the location of any sub-panels. If the service is over 200 amperes, submit a single line diagram, panel schedules, and provide service load calculations. 16. Please add an additional electrical outlet on the south wall of the addition. CEC Article 210.52. 17. Include on the plans the following specifications for electrical devices installed in dwellings: CEC Article 210 & 406 a. Tamper resistant receptacles for all locations described in 210.52 (i.e., all receptacles in a dwelling). 18. Per CEC Article 210.11(C)3, note on the plans that bathroom circuiting shall be either: A 20 ampere circuit dedicated to each bathroom, or At least one 20 ampere circuit supplying only bathroom receptacle outlets. 19. Provide a note on the plans: The control valves in showers and bathtubs must be pressure balanced or thermostatic mixing valves. CPC Sections 408, 409, 410. 20. Specify on the plans: Water conserving fixtures: New water closets shall use no more than 1.28 gallons of water per flush, kitchen faucets may not exceed 1.8 GPM, lavatories are limited to 1.5 GPM, and showerheads may not exceed 2.0 GPM of flow. CPC Section 403 and 408. Carlsbad 14-0403 3/6114 Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California S13407. . RESIDENTIAL GREEN BUILDING STANDARDS The California Building Standards Commission has adopted the Green Building Standards Code which became effective January 1, 2011 and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC Section 101.3. The Standards apply to newly constructed residential buildings, along with additions/alterations that increase the building's conditioned area, volume or size. CGC Section 303.1.1. Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. Storm water drainage/retention during construction. Note on the plans: Projects which disturb less than one acre of soil shall manage storm water drainage during construction by one of the following: A. Retention basins. B. Where storm water is conveyed to a public drainage system, water shall be filtered by use of a barrier system, wattle or other approved method. CGC 4.106.2. Grading and paving. Note on the plans that site grading or drainage system will manage all surface water flows to keep water from entering buildings (swales, water collection, French drains, etc.). CGC 4.106.3. Exception: Additions not altering the drainage path. Note on the plans that landscape irrigation water use shall have weather or soil based controllers. CGC 4.304.1. Recycling. Note on the plans that a minimum of 50% of construction waste is to be recycled. CGC 4.408.1. Recycling. Note on the plans that the contractor shall submit a Construction Waste Management Plan to the jurisdiction agency that regulates waste management, per CGC 4.408.2. Operation and maintenance manual. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC 4.410.1. Pollutant control. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 4.504.1. Carlsbad 14-0403 3/6/14 Pollutant control. Note on the plans that VOC's must comply with the limitations listed in Section 4.504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and 4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood Products. CGC 4.504.2. Interior moisture control. Note on the plans that concrete slabs will be provided with a capillary break. CGC 4.505.2.1. Interior moisture control. Note on the plans that the moisture content of wood shall not exceed 19% before it is enclosed in construction. The moisture content needs to be certified by one of 3 methods specified in Section 4.505.3. Building materials with visible signs of water damage should not be used in construction. The moisture content must be determined by the contractor by one of the methods listed in CGC 4.505.3. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star rated, vented directly to the outside and controlled by a humidistat. CGC 4.506.1. Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions from the Green Building Standards Code have been implemented as part of the construction. CGC 102.3. ENERGY CONSERVATION Specify, on the plans, that the duct insulation must be a minimum of R 4.2 for extended ducts. (Prescriptive requirement): . AMENDED CORRECTION Eaves within 5' of the property line require one hour on the underside or heavy timber per sec R302.1. Please show how this will be achieved. MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes L3 No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Tamara Fischer at EsGil Corporation. Thank you. EsGil Corporation In cPartnersliip with government for CBui(iing Safety DATE: 3/4/14 JURISDICTION: Carlsbad PLAN CHECK NO.: 14-0403 PROJECT ADDRESS: 1742 Sorrel Ct. PROJECT NAME: Elpers SFD Addition SET:I U,APPLICANT JURIS. U PLAN REVIEWER U FILE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by-building department staff. LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. fl The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: James Chinn EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: James Chinn Telephone #: 858 755-5863 Date contacted: (by:blA) Email: jameschinn400gmail.com Fax #: C-3 Iq 14 Mail Telephone Fax In Person LI REMARKS: By: Tamara Fischer Enclosures: EsGil Corporation 0 GA 0 EJ 0 MB 0 PC 2/25/14 9320 Chesapeake Drive, Suite 208• San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 14-0403 3/4/14 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 14-0403 JURISDICTION: Carlsbad PROJECT ADDRESS: 1742 Sorrel Ct. FLOOR AREA: 316 sq ft SFD Add STORIES: 1 HEIGHT: 14' approx (exist) REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 3/4/14 DATE PLANS RECEIVED BY ESGIL CORPORATION: 2/25/14 PLAN REVIEWER: Tamara Fischer FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2013 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2012 IRC, 2012 IBC, 2012 UPC, 2012 UMC and 2011 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad 14-0403 3/4/14 . PLANS 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. . FIRE PROTECTION I GENERAL RESIDENTIAL 2. Specify on the plans that any existing smoke alarms that are more than 10 years old will be replaced. Section R314.3.2. 3. Please dimension the ceiling height on the section. . ROOF 4. Note on the plans: "Attic ventilation openings shall be covered with corrosion-resistant metal mesh with 1/16" minimum to 1/4" maximum openings. Section R806.1. 5. Show location of attic access with a minimum size of 22"x30", unless the maximum vertical headroom height in the attic is less than 30". Access must be provided to each separated attic area (if over 30 sq. ft.), shall be located in a hallway or other readily accessible location and 30" headroom clearance is required above the opening. Section R807.1. (New portion of attic) . FOUNDATION AND STRUCTURAL 6. Provide detailing on the plans to show veneer attachment to the stud walls, in accordance with the provisions of Section R703.7. Or specify adhered veneer. 7. Applicant to sign City soils stamp at permit issuance agreeing to obtain a soil report if the inspector detects problems. Carlsbad 14-0403 3/4/14 8. Note on plans that surface water will drain away from building and show drainage pattern. The grade shall fall at minimum of 2%. City Policy. 9. Please detail retrofit anchor bolts for the shear panels at wall line between existing and addition. 10. Please provide and detail hold downs capable of resisting 1800 lbs of uplift for 3' alternate braced panel at wall line between existing and addition and specify special inspection for epoxy anchors. R602.10. 11. Truss calcs need to be updated to the current code which adopts ASCE 7-10 and should specify the ultimate wind speed of 110 mph. 12. Please complete shear transfer at details 3 (gable) and 4 on sheet 4 as these trusses do not appear to have been designed as drag trusses. 13. Please complete the attached special inspection agreement. City Policy. 14. Please detail bay window projection and shed roof above front window pop-out. . ELECTRICAL AND PLUMBING 15. Show on the plan the amperage of the electrical service, the location of the service panel and the location of any sub-panels. If the service is over 200 amperes, submit a single line diagram, panel schedules, and provide service load calculations. 16. Please add an additional electrical outlet on the south wall of the addition. CEC Article 210.52. 17. Include on the plans the following specifications for electrical devices installed in dwellings: CEC Article 210 & 406 a. Tamper resistant receptacles for all locations described in 210.52 (i.e., all receptacles in a dwelling). 18. Per CEC Article 210.11(C)3, note on the plans that bathroom circuiting shall be either: A 20 ampere circuit dedicated to each bathroom, or At least one 20 ampere circuit supplying only bathroom receptacle outlets. 19. Provide a note on the plans: The control valves in showers and bathtubs must be pressure balanced or thermostatic mixing valves. CPC Sections 408, 409, 410. 20. Specify on the plans: Water conserving fixtures: New water closets shall use no more than 1.28 gallons of water per flush, kitchen faucets may not exceed 1.8 GPM, lavatories are limited to 1.5 GPM, and showerheads may not exceed 2.0 GPM of flow. CPC Section 403 and 408. Carlsbad 14-0403 3/4/14 Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California S13407. . RESIDENTIAL GREEN BUILDING STANDARDS The California Building Standards Commission has adopted the Green Building Standards Code which became effective January 1, 2011 and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC Section 101.3. The Standards apply to newly constructed residential buildings, along with additions/alterations that increase the building's conditioned area, volume or size. CGC Section 303.1.1. Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. Storm water drainage/retention during construction. Note on the plans: Projects which disturb less than one acre of soil shall manage storm water drainage during construction by one of the following: A. Retention basins. B. Where storm water is conveyed to a public drainage system, water shall be filtered by use of a barrier system, wattle or other approved method. CGC 4.106.2. Grading and paving. Note on the plans that site grading or drainage system will manage all surface water flows to keep water from entering buildings (swales, water collection, French drains, etc.). CGC 4.106.3. Exception: Additions not altering the drainage path. Note on the plans that landscape irrigation water use shall have weather or soil based controllers. CGC 4.304.1. Recycling. Note on the plans that a minimum of 50% of construction waste is to be recycled. CGC 4.408.1. Recycling. Note on the plans that the contractor shall submit a Construction Waste Management Plan to the jurisdiction agency that regulates waste management, per CGC 4.408.2. Operation and maintenance manual. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC 4.410.1. Pollutant control. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 4.504.1. Carlsbad 14-0403 3/4/14 Pollutant control. Note on the plans that VOC's must comply with the limitations listed in Section 4.504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and 4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood Products. CGC 4.504.2. Interior moisture control. Note on the plans that concrete slabs will be provided with a capillary break. CGC 4.505.2.1. Interior moisture control. Note on the plans that the moisture content of wood shall not exceed 19% before it is enclosed in construction. The moisture content needs to be certified by one of 3 methods specified in Section 4.505.3. Building materials with visible signs of water damage should not be used in construction. The moisture content must be determined by the contractor by one of the methods listed in CGC 4.505.3. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star rated, vented directly to the outside and controlled by a humidistat. CGC 4.506.1. Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions from the Green Building Standards Code have been implemented as part of the construction. CGC 102.3. . ENERGY CONSERVATION Specify, on the plans, that the duct insulation must be a minimum of R 4.2 for extended ducts. (Prescriptive requirement): . MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes El NoD The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Tamara Fischer at EsGil Corporation. Thank you. Carlsbad 14-0403 3/4/14 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 14-0403 PREPARED BY: Tamara Fischer DATE: 3/4/14 BUILDING ADDRESS: 1742 Sorrel Ct. BUILDING OCCUPANCY: R3 / U TYPE OF CONSTRUCTION: V BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) SFD ADD 316 131.73 41,627 Air Conditioning Fire Sprinklers TOTAL VALUE 41,627 Jurisdiction Code Icb IBY Ordinance I Bldg. Permit Fee by Ordinance V Plan Check Fee by Ordinance V Type of Review: E Complete Review D Structural Only U Other U Repetitive Fee Repeats Hourly Hr. © * EsGil Fee Comments: Additional 1/2 hour at $86 = $43 for Cal Green. I $394.061 I $256.141 I $220.67 Sheet I of I macvalue.doc + 4 ^A, 1.z?1~7 CITY OF CARLSWAD1) A PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE:03/11/14 PROJECT NAME: ELPERS RESIDENCE PROJECT ID: CB14-403 PLAN CHECK NO: 1 SET#: 1 ADDRESS: 1742 SORREL CT APN: 215-516-15 VALUATION: $41,627 316 SFADDITION /1 This plan check review is complete and has been APPROVED by the ENGINEERING I Division. By: K LAWRENCE 03/11/14 A Final Inspection by the Division is required [']Yes iL'No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. ONLY ITEMS MARKED 'X' NEED CORRECTION/CLARIFICATION Plan Check Comments have been sent to: JAMESCHINN400@GMAIL.COM You may also have corrections from one or more of the divisiohslisted below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton Kathleen Lawrence Greg Ryan Ej 760-602-4624 -- 760-602-2741 760-602-4663 Chris.Sexton@carIsbadca.gov KathIeen.Lawrence@carIsbadca.gov Gregorv.Rvan@carIsbadca.gov Gina Ruiz fl Linda Ontiveros ri Cindy Wong 760-602-4675 - - 760-602-2773 760-602-4662 Gina.Ruiz@carIsbadca.gov Linda.Ontiveros@carIsbadca.gov Cynthia.Won@carIsbadca.ov E1 Dominic Fieri L. L.J 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: 1 Set# r Any outstanding issues will be marked with 1 . Make the necessary corrections for - compliance with applicable codes and standards. Submit corrected plans and/or specifications to the Building division for re-submittal to the Engineering division. Items that conform to permit requirements are marked with, J p 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: LJ i:z North arrow Driveway widths EJ EZJ Existing & proposed structures i:: EJ Existing or proposed sewer lateral EJ EZJ Existing street improvements E1 Existing or proposed water service L1 EZ:I Property lines (show all dimensions) :j EJ Submit on signed approved plans: c:i c:z:i Easements DWG No. Right-of-way width & adjacent streets Show on site plan: Drainage patterns 1J Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. J ADD THE FOLLOWING NOTE: Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building". c:i J Existing & proposed slopes and topography FJ =Size, location, alignment of existing or proposed sewer and water service(s) that serves the project. Each unit requires a separate service; however, second dwelling units and apartment complexes are an exception. c:j Ei Sewer and water laterals should not be located within proposed driveways, per standards. Include on title sheet: EZJ Site address i: Assessor's parcel number QJ Legal description/lot number LJ For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the Square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. J Show all existing use of SF and new proposed use of SF. Example: Tenant improvement for 3500 SF of warehouse to 3500 SF of office. Lot/Map No.: LOT 282 Subdivision/Tract: CT 72-34-4 Reference No(s): E-36 . Page 2 of 6 REV 6/01/12 Set # DISCRETIONARY APPROVAL COMPLIANCE I .1 L1 Project does not comply with the following engineering conditions of approval for project no.: DEDICATION REQUIREMENTS NIA CT 72.34.4 Dedication for all street rights-of-way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ 20,000.00 , pursuant to Carlsbad Municipal Code Section 18.40.030. For single family residence, easement dedication will be completed by the City of Carlsbad, cost$605.00. -I EJ Dedication required as follows: IMPROVEMENT REQUIREMENTS All needed public improvements upon and adjacent to the building site must be constructed SIDEWALK at time of building construction whenever the value of the construction exceeds EXISTING $100,000.00, pursuant to Carlsbad Municipal Code Section 18.40.040. LJ EJ Public improvements required as follows: Curb, gutter, sidewalk, underground utilities. Construction of the public improvements must be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of..$ -so we may prepare the necessary Neighborhood Improvement Agreement.. This agreement must be sigiiCd, notarized and approved by the city prior to issuance of a building permit. Processing fee $157.00. U. J Future public improvements required as follows: CURB, GUTTER, SIDEWALK UNDERGROUND UTILITIES E-36 Page 3 of 6 REV 6/30110 Set# 1 I S. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 15.16 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" Grading Permit required. NOTE: The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) All required documentation must be provided to your Engineering Construction Inspector . The inspector will then provide the engineering counter with a release for the building permit. EJ LZI No grading permit required. Minor Grading Permit required. See attached marked-up submittal checklist for project- specific requirements. 6. MISCELLANEOUS PERMITS RIGHT-OF-WAY PERMIT is required to. do work in city right-of-way and/or private work N/A adjacent to the public right-of-way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. EJ Right-of-way permit required for: Driveway E-36 Page 4 of 6 REV 6/01/12 1 Set# 1 7. STORM WATER Construction Compliance fJ Project Threat Assessment Form complete. c: Enclosed Project Threat Assessment Form incomplete. Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW 14-061 Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance EJ LZJ Storm Water Standards Questionnaire complete. EJ Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign the questionnaire and resubmit with next submittal. EJ Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http:I/www.carlsbadca.Qov/business/buildinp/Documents/EnpStandsw-stds-v014-ch2.Ddf LJ Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof - IJ Bio-retentions cell/rain garden El Pervious pavement/payers EJ Flow-through planter/vegetated or rock drip line J Vegetated swales or rock infiltration swales JJ Downspouts disconnect and discharge over landscape El Other: E-36 Page 5 of 6 REV 6/01/12 1 Set# 1 9. WATER METER REVIEW Domestic (potable) Use EI I EJ What size meter is required? fJ fl Where a residential unit is required to have an automatic fire extinguishing system, the minimum meter size shall be a 1" meter. NOTE: the connection fee, SDCWA system capacity charge and the water treatment capacity charge will be based on the size of the meter necessary to meet the water use requirements. EJ For residential units the minimum size meter shall be 5/8", except where the residential unit is larger than 3,500 square feet or on a lot larger than one quarter (1/4) acre where the meter size shall be %". 8. FEES E:J I [TJ Required fees have been entered in building permit. Drainage fee applicable Added square feet Added square footage in last two years? Dyes El no Permit No. Permit No. Project built after 1980 yes El no Impervious surface >50% ayes no Impact unconstructed facility El yes El no EJ LJ Fire sprinklers required Dyes E] no (is addition Upgrade El yes EZJ No fees required over 150' from centerline) 10. Additional Comments Attachments: Engineering Application T Storm Water Form Li Right-of-Way Application/Info. L Reference Documents E-36 Page 6of6 REV 6/01/12 1541k V CITY OF C&?LM40 STORM WATER STANDARDS QUESTIONNAIRE E-34 Develooment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov I INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices(BMP's) into the project design per the City's Standard Urban Stormwater Manégement Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.Qov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development Or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm.water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step I and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. STEP • TO BE COMPLETED FOR ALL PROJECTS 3 To determine if your project is a priority development project, please answer the following questions: YES NO Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved-streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. If you answered "no" to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6/27/13 CITY OF Ll,,X~ Lltm STORM WATER STANDARDS QUESTIONNAIRE E-34 DeveloDment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STEP.2 TO BE CQMPLETEDFQR ALINEW:.ORREDEVELdPMENTPROJEcTS To determine if your project is a priority development project, please answer the following questions: YES NO Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public tw development projects on public or private land. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, publicdevelopment projects on publicor private land. _residential, _mixed-use,_and Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storageof motor vehiclesused personally for businessor for commerce. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of .200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA commingles flows from adjacent lands).* _(i.e._not _with Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and. are expected to generate pollutants post construction? $ Is your pràject located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervioussurface or (2)_ increases on_ the by more than _impervious _surface _property _10%? If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant information. E-34 Page 2 of 3 Effective 6127113 4,0* \V CITY OF BE, STORM WATER STANDARDS QUESTIONNAIRE E-34 Develonment Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STEP 3 TO,BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPEMENT PROJECTS ONLY Complete the questions below regarding your redevelopment project: YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. STEP4 CHECK THE APPRQPRIATE BOX AND COMPLETE APPLICANT INFORMATION IJ My project meets PRIORITY DEVELOPMENT PROJECT (POP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. 41 My project does not meet PD! requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: 174i 4--L C-T Accessor's Parcel Number(s): c - Applicant ,.., Applicant Title: Applicant Date: This Box for City Use Only City Conc ence: YO I NO By: Date: Project ID: * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 STORM WATER POLLUTION PREVENTION NOTES ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Site Address-1-1 4.z T' Assessor's Parcel Number: Project ID: / Construction Permit No.: (! ( g 03 Estimated Construction Start Date 2A'J _1 4- Project Duration Months Emergency Contact: Name:60 24 hour Phone: 7 (O - i SO S. Perceived Threat to Storm Water Quality Medium 0 Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY OF AII\D STANDAPD(rIT 1 WPPP Approved By: Date:____________ 4 lh> CITY OF L 'j 9 9 & 40MM 0 STORM WATER COMPLIANCE FORM TIER I CONSTRUCTION SWPPP E-29 This form is required for all pools, retaining walls or whenever a building footprint is enlarged. Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov STORM WATER COMPLIANCE CERTIFICATE / My project is not in a category of permit types exempt from the Construction SWPPP requirements V My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) I My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, disturbed area is located on a slope with a grade at or exceeding 5 horizontal to I vertical; and/or disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or construction will be initiated during the rainy season or will extend into the rainy season (Oct 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE .TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. .'_ Jafiwls <f4+ f1w NE ' A T NAME (PRINT) /zt // ç OWNE!NER'S AGENT NAME (SIGNATURE) DATE E-29 Page 1 of 3 REV 4/30/10 Erosion Control Sediment Control BMP Tracking Non-Storm Water Waste Management and Materials BMPs 'II ntrol Management BMPs Pollution Control BMPs 0 .2 .2 . g U) U) 16 2 2 g 2 E E U 2 0) Best Management Practice . Cft 0) .E co . L (BMP) Description 3 . I— E , 0) o .E 0 0 CU U) U) .5 U ) i C WE ) w ° 2 > c W w Ad 2 °• 2 .2 '. 0 f. . .2 '- i 2 St • € .1 : g =. :2 o WO 11) i Cl) Cl) C.) g LL 0 .o Cl)> m Cl) COO co.E .50.So coC Cot. a CO ci( a. U. >0 j. ~c CO c a.c cl?( 5l Cl); (OC I 01 Q CASQA Designation-) ' °,.' — 'r C? 1 I? C€) 9 . ? C?? 19 '9 '9 0 w 0 w C) w • 0 W Cl) W U) W Cl) W Cl) W Cl) W Cl) W Cl) • W — — Cl) z Cl) z Cl) z (l) z Construction Activity W Cl) Grading/Soil Disturbance Trenching/Excavation _Stockpiling Drilling/Boring Concrete/Asphalt Saw _cutting _Concreteflatwork _Paving _Conduit/Pipelnstallation -- Stucco/Mortar Work Waste Disposal --- Staging/Lay Down Area 3' Equipment Maintenance -- and Fueling Hazardous Substance --— Use/Storage Dewatering Site Access Across Dirt - Other (list): Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example — If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 PLANNING DIVISION Development Services le1w:41> BUILDING PLAN CHECK Planning Division CITY OF REVIEW CHECKLIST 1635 Faraday Avenue )602-4610 CARLSBAD P28 DATE: --24444. PROJECT NAME: PROJECT ID: X PLAN CHECK NO: CB 14-0403 SET#: I ADDRESS: 1742 Sorrel Ct APN: 215-516-15 This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required j Yes Z No - You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required'. Plan Check Comments have been sent to: jameschinn400@gmail.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: , ? - . i..; . " • ,.. PLANNING. . U\• •4 i • •. 'I . • - " '.ENGINEERING 4•r- ..: . . . ii:. . . RE PREVENTION FI , , 7606024610 - - 7606022750 , 7606024665 . .- . .. • . : '.:--. ..::•. '. - ' ' • _-..- - .- .. VNIJ Chris Sexton Kathleen Lawrence Greg Ryan 760-602-4624 760-602-2741 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthia.Won@carlsbadca.ov Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: Plan Check No. CB 14-0403 Address 1742 Sorrel Ct Date 2-24-14 Review #1 Planner Chris Sexton Phone (760) 602-4624 APN: 215-516-15 Type of Project & Use: addition Net Project Density: 1.0DU/AC Zoning: General Plan: RLM Facilities Management Zone: CFD (in/out) #_Date of participation: Remaining net dev acres:_____ (For non-residential development: Type of land use created by this permit: REVIEW #: 1 2 3 Legend: Item Complete El Item Incomplete - Needs your action Z El El Environmental Review Required: YES El NO El TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Z El El Discretionary Action Required: YES El NO El TYPE APPROVALIRESO. NO. DATE - PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: 0 0 Coastal Zone AssessmentlCompliance Project site located in Coastal Zone? YES NO 0 CA Coastal Commission Authority? YES 0 NO 0 If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Exempt El El Habitat Management Plan Data Entry Completed? YES El NO El If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (NP/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) Inclusionary Housing Fee required: YES El NO El (Effective date of Inclusionary Housing Ordinance - May 21, 1993.). Data Entry Completed? YES 0 NO El (AIPIDs, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Housing Tracking Form (form P-20) completed: YES El NO El N/A El P-28 Page 2 of 3 07/11 4 Site Plan: zoo Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44— Neighborhood Architectural Design Guidelines Applicability: YES El NO El Project complies: YES 0 NOD 1•1•1•1 Zoning: 1. Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required 20 Shown 26 Required j.Q" Shown Required Shown Required Shown Required Shown z 0 0 2. Accessory structure setbacks: Front: Required Shown Interior Side: Required Shown Street Side: Required Shown Rear: Required Shown Structure separation: Required Shown 0 El 3. Lot Coverage: Required <40% Shown <40% El El 4. Height: Required Q Shown Z El 0 5. Parking: Spaces Required 2 Shown (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown El El El Additional Comments 1) Is the setback dimension shown on the plans of the bay window suose to be 69" instead of 69"? Sheet 2 shows the bay window only proiectinp one foot. OK TO ISSUE AND ENTERED APPROVAL INTO tA1 P-28 Page 30f3 07/11 2120 Jimmy Durante Blvd., Suite 114 Del Mar, CA 92014 Phone (858) 755-5863 Email :jamesch1nn400©gmail.com rfr/i tr tVQiflc4. ... l.J4A., MODi CL\TIor: cI/I(A1l1/St 1?L-.• 9TU77 II4eN- LlMc5 T1'P Jameli.clflirn,lrchltect 4Q) 45 h> CITY OF CARLSBAD PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Develonment Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Building@ycarIsbadca.gov Project Address: Permit No.: Information provided below refers to work being done on the above mentioned permit only. This form must be completed and returned to the Building Division before the permit can be issued. Building Dept. Fax: (760) 602-8558 Number of new orrelocated fixtures, traps, or floor drains ....................................................... _ New building sewer line? ............................................................ . ............................ Yes No Numberof new roof ............................................................................................................ C Install/otter water line? .......................................................................................................................... _____ Numberof new water heaters? ......................................................................................................... Number of new, relocated or replaced gas outlets? ........................................ . ........................... P Number of new hose bibs .................................................................................................................. Residential Permits: New/expanded service: Number of new amps: Minor Remodel only: Yes No Commercial/Industrial: Tenant Improvement: Number of existing amps involved/n this project: Number of new amps involved/n this project: New Construction: Amps per Panel: Single Phase Number of new amperes_______________ Three Phase ................................................................. Number of new amperes________________ ThreePhase 480 ............................ ........................... Number of new amperes Number of new furnaces, A/C, or heat pumps? ru New or relocated duct work? .......................................................................... Yes No Number of new fireplaces? ................................................................................................................. _____ Numberof new exhaust fans? ............................................................................................................ Relocate/install vent? ............................................................................................................................ Number of new exhaust hoods? ....................................... . ............................................................... Number of new boilers or compressors? ........................................................... Number of HP B-18 Page 1 of 1 Rev. 03/09