Loading...
HomeMy WebLinkAbout1604 STARLING CT; ; CB153038; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 11-20-2015 Residential Permit Permit No: CB153038 Building Inspection Request Line (760) 602-2725 Job Address: 1604 STARLING CT CBAD Permit Type: RESDNTL Sub Type: RAD Status: ISSUED Parcel No: 2155906300 Lot #: 0 Applied: 09/16/2015 Valuation: $20,334.00 Constuction Type: 5B Entered By: JMA Occupancy Group: Reference #: Plan Approved: 11/20/2015 # Dwelling Units: 0 Structure Type: Issued: 11/20/2015 Bedrooms: 0 Bathrooms: 0 Inspect Area: Orig PC #: Plan Check #: Project Title: COHEN: REMODEL 180 SF MASTER BATH II ENCLOSE EXIST 99 SF DECK AS PART OF MBATH Applicant: Owner: WHITE CONSTRUCTION COHEN ROBERT A&CANDACE M 2540 GATEWAY RD 1604 STARLING CT. CARLSBAD CA 92009 CARLSBAD CA 92011 760-931-1130 Building Permit $212.16 Meter Size Add'l Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00 Plan Check $148.51 Meter Fee $0.00 AddI Plan Check Fee $0.00 SDCWA Fee - $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $2.64 PFF (3105540) $0.00 Park in Lieu Fee $0.00 PFF (4305540) $0.00 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $0.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $0.00 Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $67.00 Renewal Fee $0.00 ELECTRICAL TOTAL $46.00 Add'l Renewal Fee $0.00 MECHANICAL TOTAL $0.00 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing lnLieu Fee $0.00 Pot. Water Con. Fee $0.00 Housing Credit Fee $0.00 Meter Size Master Drainage Fee $0.00 Add'I Pot. Water Con. Fee $0.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB 1473) Fee $1.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $477.31 Total Fees: $477.31 Total Payments to Date: $477.31 Balance Due: $0.00 FINAL APPROVAL Inspector: Date: /1f72tf Clearance: NOTICE pease take NOTICE that aççxwal of your prqed includes the "Irrpssillon" cf fees, dedcatia, reservatiens, orWwoodons heeafterulediveIy referred to as 'fees/exaiais. You bave 90 days frorn the date this pemit vas issued to protest irrpotion of these feesIdima lfc4J protest ther ai rnt fltle protest procedures set forth in (errviwit Cede Section 690(a), and file the protest and" other required infanar Wth the City Perfa pssing in aax*tlancewth CalsbaJ Minicipal Cede Section Failure to trrrely follow that procuñrewll bar arr/subeeqJert legeJ action to attadc re%Aew, set aside, void, or annul their irTort You are hereby FURTHER NOTIFIED that uir right to protest the specified fass/exediore DOES NOT APR-Ytoeter and seerconnection fees and capacity charges, nor planning, zoring, actng or other eãn-iIarapcicetiar processing or service fees in ,rediarwth this project. NCR DOES IT APR.Y to any foes/iae chkidr you ham amasiIv been czen a NOTiCE siniia to this, or astod, the statute ef Imitations has orw4czmlv dherise ered ITHE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: DPLANNING DENGINEERING DBUILDING DFIRE DHEALTH DHAZMATIAPCD CCity of Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Cdrisbad. Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov Plan Check No. C Est. Value Plan Ck. Deposit Date 16 1 f Iswppp I JOB ADDRES o-'1-' (4-ct U (..riu..r- 4 APN - - - CT/PROJECT # LOT C PHPS) I C OF UNITS C BEDROOMS C BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE 0CC. GROUP DESCRIPTION OF WORK: include Square Feet of Affected Area(s) CLI ct ' Ot O '-c lcLJ EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) I FIREPLACE ksD#. No[:] I AIR CONDITIONING YES [:]NO i:i I FIRE SPRINKLERS YES[—] NO APPLICANT NAME Primary Contact L3\'l't\IL PROPERlY OWNER ''R (jkLV\ ADDRESS ADDRES t. & CITY ( s2 EL R ocici STA ZIP Cl ZIP STATI 9(l FAX PHONE o °a\ —ì FAX - PHONE EMAIL Uffig, EMAIL DESIGN PR9ESSIONAL ADDRESS ADDRESS 252_ CITY STATE ZIP Cl ZIP PHONE jFAX PHP4,L %r OC EMAIL EMAIL I ITY STTELI BUS. LIC.# (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its Issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractors License Law (Chapter 9. commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil nensltv of not more than five hundred dollars 1550011. t!9®Ci Workers' Compensation Declaration: I hereby affirm under penally of perjury one of the following declarations: i:i I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain ersompen, e sctbn 370\Of t,ASbor Co the per ormance ork for.whicP4ti \MY workers' comenstirin his iance carC policy AIN) Policy No. 7, Exp number are: Insurance Co. ~In section need not be completed if the permit is for one hundred dollars ($i) or less. Certificate of Exemption: I certify that in the performance of the worlj for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation cderag s unlwftI, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (11,100,000), in addition to the cost of compensation, damages as provided for In Se o 3706 of th' Labor code, Interest and attorney's fees. AS CONTRACTOR SIGNATURL."2#'S( JVN\ .L. 0 AGENT DATE thereby affirm that lam exempt from Contract'(License Law for the following reason: [] I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. It, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044. Business and Professions Code: The Contractor's License Law does not apply loan owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section _____________Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. DYes DNo I (have! have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address! phone! contractors' license number): I plan to provide portions of the work, bull have hired the following person to coordinate, supervise and provide the major work (include name! address! phone! contractors' license number): twill provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name! address! phone! type of work): ..PROPERTY OWNER SIGNATURE []AGENT DATE A3000)W]90 VU108 OCROV000 O®I O(ME)O()® 000096 ®S7 Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Yes No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? Yes No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Yes No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. O(J@ thereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (I) Civil Code). Lender's Name Lender's Address al]OPM(Ba0v OlOI?O®(ZI IcertifythatI have read the application and state thatthe above information is conectand thatthe InfOrmation on the plans Is accurate. I agree to complywlth all City ordinances and State laws retatlngto building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHApermti is required for excavations over 50' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become nut and void If the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building orwork authorized by such permit is suspended or abandoned at any time after the work is commenced fora period of 180 days (Section 106.4.4 Uniform Building Code). ..'APPLICANT'S SIGNATURE DATE QC- STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. ICERTIFICATE OF .X4uIcMIr(Commercial-Proje cts Only)J Fax (760) 602-8560, Email buiIdinpä).casbadca.qov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. CO#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad CA PHONE FAX EMAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPTIONS PICK UP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On P. 1.) ASSOCIATED CB# MAIL TO: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) NO CHANGE IN USE / NO CONSTRUCTION MAIL/ FAX TO OTHER: CHANGE OF USE / NO CONSTRUCTION ..'APPLICANT'S SIGNATURE DATE Inspection List Permit#: CB153038 Type: RESDNTL RAD COHEN: REMODEL 180 SF MASTER BATH I! ENCLOSE EXIST 99 SF DECK AS Date Inspection Item Inspector Act Comments - 03/11/201689 Final Combo - RI 03/11/2016 89 Final Combo AEK Fl 02/05/2016 27 Shower Pan/Roman Tubs AEK AP 01/25/2016 16 Insulation AEK AP 01/25/2016 82 Drywall/Ext Lath/Gas Test AEK AP 01/21/2016 34 Rough Electric AEK AP 12/09/2015 13 Shear Panels/HD's AEK AP 12/09/2015 14 Frame/Steel/Bolting/Weldin AEK AP 12/09/2015 15 Roof/Reroof AEK AP 12/09/2015 21 Underground/Under Floor AEK AP Monday, March 14, 2016 - Page 1 of 1 (Last) (City of Carlsbad SPECIAL INSPECTION AGREEMENT B-45 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed requires special inspection, structural observation and construction material testing. Project/Permit: CB153038 I ProjectAddress:_1604 Starling Court A. THIS SECTION MUST BE COMPLETED BYTHE PROPERTY OWNER!AUTHORIZED AGENT. Please check if you are Owner-Builder 0. (If you checked as owner-builder you must also complete Section B of this agreement.) Name: (Please print) (First) Mailing Address: SkG \fM. L -( A t ACi4 C, Email: -D'1 41C41 11iW1 Phone: IL°I I am: OProperty Owner UProperty Owner's Agent of Record 14Architect of Record DEngineer of Record State of California Registration Number: Expiration Date:_________________ AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read, understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections, structural observations, construc on materials ting and off-site fabrication of building components, as prescribed in the statement of special inspections n d on appro ed plans and, as required by the California Building Code. Signature Date: I I 1 B. CONTRACTOR'S STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the contractor I builder I owner-builder. Contractor's Company Name: S P White Construction Please check if you are Owner-Builder Name: (Please print) Travis Sham (First) (Last) Mailing Address:_2524 Gateway Road, Carlsbad, CA 92009 Email: _travis@whiteconstructioninc. corn Phone. 760.931.1130 State of California Contractor's License Number _452513 Expiration Date: 2/28 /16 I acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on the approved plans; I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the building official; I will have in-place procedures for exercising control within our (the contractor's) organization, for the method and frequency of reporting and the distribution of the reports; and I certify that I will have a qualified person within our (the contractor's) organization to exercise such control. I will nrovide a final renort / letter in comIiance with CBC Section 1704.1.2 Drior to reauestina final inspection. Date: 11/19/2015 Signature: 8.45 Page 1 of I Rev. 08/11 EsGil Corporation In (Partners/lip wit/i government for (Building Safety DATE: 11/17/15 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-3038 PROJECT ADDRESS: 1604 Starling Court SET: III O APPLICANT U JURIS. U PLAN REVIEWER U FILE PROJECT NAME: Cohen Addition and Remodel to SFD The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. Eli The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. REMARKS:Lj(he applicant came to our office to slip sheet the revised sheet.into Setll to make a complete Set III and left one additional set of slip sheets for the City Set which I have enclos d. It appears he will need to provide an additional set 0f.slip 9lets for the 3rd set of 2) heets 1D02 and IDO3 need the signature of the designer.3Yheets SNI, SI and SDIne the seal and signature of the Engineer.(City,peciaI InsptTn Agreement needs to be completed for epoxy anchors. Thank you! \JJ By: Tamara Fischer Enclosures: EsGil Corporation LI GA LI EJ LI MB LI PC 11/9/15 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation In tPartnersfiip with government for tBuilding Safety DATE: 11/2/15 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-3038 PROJECT ADDRESS: 1604 Starling Court SET: II O APPLICANT 7JU RIS. /0 PLAN REVIEWER O FILE PROJECT NAME: Cohen Addition and Remodel to SFD The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: White Construction LI EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: White Construction Telephone #: 760 931-1130 ;,at contted:\ ( j (by: Email: 'yvonnewhiteconstructioninc.com "iViaii Vfephone Fax In Person C\9QkA LII REMARKS: By: Tamara Fischer Enclosures: EsGil Corporation D GA i:i EJ EJ MB EJ Pc 10/27/15 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 15-3038 11/2/15 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. PLANS All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). ID sheets need a signature and the CFI-R needs the signature of the designer. Plans deviating from conventional wood frame construction shall have the structural portions signed and sealed by the California state licensed engineer or architect responsible for their preparation, along with structural calculations. (California Business and Professions Code). (All sheets showing structural information).Current structural portions are sealed and signed. This will be verified on the final sets. CONTINUED Carlsbad 15-3038 1112/15 GENERAL REQUIREMENTS 9. Sleeping rooms shall have a window or exterior door for emergency escape. Section R310. Door in existing master is being filled-in. Please show a complying emergency escape window in this room. Please note that the retreat window may not be used unless the wall between the master and retreat is 50% open which it does not appear to be. Section R303.2 a) Windows must have an openable area of at least 5.7 square feet, with the minimum openable width 20" and the minimum openable height 24". If the dimensions of the casement windows shown on the floor plan are the clear openable dimensions , please indicate this. Other wise, provide the clear openable dimensions to show compliance with the required 20" width. 12. Please show compliance with section 2405.1 CBC for sloped glazing. (Specify that glass is fully tempered and has a minimum thickness of 3/16" to comply with exception 4 to the screening requirement in section 2405.3 CBC). I see that the plans now show 2'x 2' Velux skylights. If these are to be used, please specify on the plans .IAMPO approval ER 0199. This approval requires a minimum roof slope of 3:12. The plans show a roof slope of 2:12. Additionally, the 3/16" minimum glass thickness needs to be specified. Structural plans need to be revised to show the correct size of the skylights. STRUCTURAL The floor framing plan on sheet S03 is confusing. Please provide a framing plan which clearly identifies the existing and new framing elements. Please clarify the new TJls in the existing interior area. Are they replacing floor joists of the same span. What is supporting them? Please provide a detail of their connection to the supporting member. 2/S03 shows more panes in the roof glazing system than the architectural plans. Please coordinate. I see skylights are being used, but the size shown on the framing plan does not match the architectural plans! energy calcs. The plans do not show how the glass roof panels are being supported. Please show the framing members supporting the glass and provide complete connection details for glass panels and supporting framing. Please show roof framing around the skylights on the roof framing plan. CONTINUED Carlsbad 15-3038 11/2/15 20 psf roof live load needs to be included at glass roof panels. Section 2405.4 CBC. Please see the caic for the roof beam on sheet 5 of calcs. The load from the roof over the newly enclosed deck (which is a tile roof with (2) 2x2 skylights) should include full roof live and dead loads (only 7psf dead load was used). Please clarify why the loading for deck live load is input as roof live load in the calculations. Please see pgs. 8 & 10 of calculations which still shows that the floor live load is input as roof live load. The roof loads were not included in the calculations for the double 2x1 Os and the 6x14 beam. Please include them. Please explain the point loads used for the calculations of these beams and provide a calculation for the double TJls now shown to support the point load from the roof beam above. Please provide complete lateral calculations for both levels at the newly enclosed deck (including the grid line between the existing building and newly enclosed balcony). Show all required lateral resisting elements on the plans and provide appropriate shear transfer detailing. By enclosing the existing deck with a roof and walls, you are increasing the wind and seismic loads to the building. Provide a design showing that the straps shown (it appears an additional strap will be needed at the floor level) are adequate to transfer the loads into the existing structure and to show that the existing shear walls at both levels are adequate to resist the increased lateral loads due to enclosing the deck. If epoxy anchors are required for retrofit anchor bolts, specify special inspection and complete the enclosed City Special Inspection Agreement. May still apply. ENERGY CONSERVATION 35. For plans submitted for plan check on or after 7/1/14, provide a Prescriptive or Performance energy design, demonstrating compliance with current 2013 energy efficiency standards. Due to the large amount of new glazing being added, the addition will not comply with the prescriptive requirements, so a performance design must be provided. (Existing glazing being removed cannot be deducted from new glazing in determining compliance). The energy calculations were received, but they appear to have used the incorrect total conditioned floor area. 39. Residential energy lighting recjuirements: ES 150.0(k) In bathrooms, at least one fixture shall be high efficacy and all remaining fixtures shall be high efficacy or be controlled by a vacancy sensor. Response referenced electrical note #3! A201 which does not include the italicized portion of the correction above. Carlsbad 15-3038 11/2/15 MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No L3 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Tamara Fischer at EsGil Corporation. Thank you. EsGil Corporation In Partners/lip wit/i government for Bui Wing Safety DATE: 9/30/15 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-3038 SET: I PROJECT ADDRESS: 1604 Starling Court PROJECT NAME: Cohen Addition and Remodel to SFD U,APPLICANT 6 JURIS. 'U PLAN REVIEWER U FILE LI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. LI The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: White Construction LI EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: White Construction ,,/bate cacted: 1/'&y? (by:)4)— Email: MaiI Telephone Fax In Person LI REMARKS: Telephone #: 760 931-1130 yvonne©whiteconstructioninc.com By: Tamara Fischer Enclosures: EsGil Corporation El GA DEJDMB DPC 9/21/15 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 Carlsbad 15-3038 9/30/15 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 15-3038 JURISDICTION: Carlsbad PROJECT ADDRESS: 1604 Starling Court FLOOR AREA: 99 sq ft SFD Addition 180 sq ft SFD Remodel REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 9/30/15 STORIES: N/C HEIGHT: N/C DATE PLANS RECEIVED BY ESGIL CORPORATION: 9/21/15 PLAN REVIEWER: Tamara Fischer FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2013 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2012 IRC, 2012 IBC, 2012 UPC, 2012 UMC and 2011 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad 15-3038 9/30/15 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. . PLANS All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). Plans deviating from conventional wood frame construction shall have the structural portions signed and sealed by the California state licensed engineer or architect responsible for their preparation, along with structural calculations. (California Business and Professions Code). (All sheets showing structural information). Specify on the Title Sheet of the plans the gross floor area of each element of this project, including enclosed deck and remodel area. Section R106.2. Please add the 2013 California Residential Code to the applicable codes list on sheet TS. Please provide a north arrow on the site plan. CONTINUED 'Carlsbad 15-3038 9/30/15 . FIRE PROTECTION 6. Please indicate on the plans whether the existing residence has a fire sprinkler system installed. If so, then provide a note stating that any additions/alterations will be provided with an automatic residential fire sprinkler system. On the cover sheet of the plans, specify that fire sprinklers will be a deferred submittal. Additionally, provide the following note on the plans: "Submittal documents for deferred submittal items shall be submitted to the registered design professional in responsible charge, who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and that they have been found to be in general conformance with the design of the building. The deferred submittal items shall NOT be installed until their design and submittal documents have been approved by the building official." Section R313.2. 7. In existing buildings, when alterations, repairs or additions requiring a permit occur (or when one or more sleeping rooms are added), the dwelling unit shall be provided with smoke alarms and carbon monoxide alarms located as required for new dwellings; the alarms shall be interconnected and hard wired. Exception: Alarms in existing areas need not be interconnected and hard wired where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure, unless there is an attic, crawl space, or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Section R314.3.1. Please show on the existing floor plans for the following areas: Inside each bedroom. (Smoke alarms required) Outside each separate sleeping area in the immediate vicinity of the bedrooms. (Smoke and carbon monoxide alarms required). On each story, including basements. (Smoke and carbon monoxide alarms required). 8. Specify on the plans that any existing smoke alarms that are more than 10 years old will be replaced. Section R314.3.2. CONTINUED 'Carlsbad 15-3038 9/30/15 GENERAL REQUIREMENTS 9. Sleeping rooms shall have a window or exterior door for emergency escape. Section R310. Door in existing master is being filled-in. Please show a complying emergency escape window in this room. Please note that the retreat window may not be used unless the wall between the master and retreat is 50% open which it does not appear to be. Section R303.2 Windows must have an openable area of at least 5.7 square feet, with the minimum openable width 20" and the minimum openable height 24". The bottom of the clear opening shall not exceed 44" above the floor. Do not measure to the window sill. This generally applies to windows that have a height of 3' or less. 10. Natural ventilation shall be provided for all habitable rooms, with the minimum openable area to the outdoors of 4% of the floor area being ventilated. Section R303.1. Door in existing master is being filled-in. Please adequate natural ventilation in this room. Please note that the retreat window may not be used unless the wall between the master and retreat is 50% open which it does not appear to be. Section R303.2 11. Please specify the height of the new windows and dimension minimum 24" from the bottom of the windows to the finished floor to comply with Section R312.2. 12. Please show compliance with section 2405.1 CBC for sloped glazing. (Specify that glass is fully tempered and has a minimum thickness of 3/16" to comply with exception 4 to the screening requirement in section 2405.3 CBC). CONTINUED Carlsbad 15-3038 9/30/15 13. Glazing in the following locations should be shown on the plans as safety glazing material in accordance with Section R308.4: a) Glazing in the walls/doors facing or containing bathtubs where the bottom exposed edge of the glazing is less than 60" above the standing surface. Exception: Glazing that is more than 60", measured horizontally, from the water's edge of a bathtub. See the figure below. (All new windows are within 60" of the water's edge and must be safety glazed. Please specify this on the plans). Bathtub, whirlpool tub #., h,.t fisk Sc S( oin. or Section view SG = Safety glazing required Measurements are to exposed glazing . STRUCTURAL Specify nail size and spacing for the new floor diaphragm on the plans. Table R602.3(1). Specify plywood and/or particle board thickness, grade and panel span rating. Table R503.2.1(1). The floor framing plan on sheet S03 is confusing. Please provide a framing plan which clearly identifies the existing and new framing elements. 2/S03 shows more panes in the roof glazing system than the architectural plans. Please coordinate. The plans do not show how the glass roof panels are being supported. Please show the framing members supporting the glass and provide complete connection details for glass panels and d supporting framing. CONTINUED Carlsbad 15-3038 9/30/15 20 psf roof live load needs to be included at glass roof panels. Section 2405.4 CBC. Please clarify why the loading for deck live load is input as roof live load in the calculations. The roof loads were not included in the calculations for the double 2x1 Os and the 6x14 beam. Please include them. Please specify header sizes for new windows. Please specify bolt size and spacing at ledger connection 1/S03. Please show the posts to support the new 4x12 roof beam on the roof and floor framing plans. Provide roof framing plan to substantiate the 7.5' tributary area to the 4x12 beam from the existing roof which was used in the calcs. Section RI 06.1. Please provide complete output for the computer calc on the 6x14 beam. Please provide complete lateral calculations for both levels at the newly enclosed deck (including the grid line between the existing building and newly enclosed balcony). Show all required lateral resisting elements on the plans and provide appropriate shear transfer detailing. If epoxy anchors are required for retrofit anchor bolts, specify special inspection and complete the enclosed City Special Inspection Agreement. The City of Carlsbad requires the use of a maximum allowable soil bearing value of 1000 psf without current or updated soil report (within 3 years). Please show that this will not be exceeded at all existing footings where loads are being added and show the sizes of the existing footings on the plans. . MECHANICAL I ELECTRICAL I PLUMBING It is assumed that the existing HVAC and water heating systems in their original locations are to be used for the addition I remodel. If this is the case, please indicate this on the plans. If this is not the case, provide complete information for new or relocated systems and additional requirements will apply. CONTINUED Carlsbad 15-3038 9/30/15 30. Include on the plans the following specifications for electrical devices installed in dwellings: CEC Article 210 & 406: Tamper resistant receptacles for all locations described in 210.52 (i.e., all receptacles in a dwelling). 31. Per CEC Article 210.11(C)3, note on the plans that bathroom circuiting shall be either: A 20 ampere circuit dedicated to each bathroom, or At least one 20 ampere circuit supplying only bathroom receptacle outlets. 32. Provide a note on the plans: The control valves bathtubs must be pressure balanced or thermostatic mixing valves. CPC Sections 408, 409, 410. 33. Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 19941 note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California S13407. . RESIDENTIAL GREEN BUILDING STANDARDS 34. The California Building Standards Commission has adopted the Green Building Standards Code which became effective January 1, 2011 and must be enforced by the local building official. The following mandatory requirements for residential construction must be included on your plans. CGC Section 101.3. The Standards apply to newly constructed residential buildings, along wit add itionslaIterations that increase the building's condifioned area, volume or size. CGC Section 303.1.1. Provide a sheet on the plans labeled "Green Building Code Requirements" and include the following notes as applicable. a) FIXTURE FLOW RATES FIXTURE TYPE MAXIMUM FLOW RATE Water closets 1.28 gallons/flush Urinals 0.5 gallon/flush Showerheads 2 gpm @ 80 psi Lavatory faucets 1.5 gpm @ 60 psi' Kitchen faucets 1.8 gpm @ 60 psi Metering faucets 0.25 gallons per cycle 1. Lavatory faucets shall not have a flow rate less than 0.8 gpm at 20 psi. CONTINUED Carlsbad 15-3038 9/30/15 Note on the plans that when a shower is provided with multiple shower heads, the sum of flow to all the heads shall not exceed 2.0 gpm @ 80 psi, or the shower shall be designed so that only one head is on at a time. CGC 4.303.1. Indoor water use. Show compliance with the following table for new/replaced fixtures, per CGC 4.303.1.3.2. Recycling. Note on the plans that a minimum of 50% of construction waste is to be recycled. CGC 4.408.1. Recycling. Note on the plans that the contractor shall submit a Construction Waste Management Plan to the jurisdiction agency that regulates waste management, per CGC 4.408.2. Operation and maintenance manual. Note on the plans that the builder is to provide an operation manual (containing information for maintaining appliances, etc.) for the owner at the time of final inspection. CGC 4.410.1. Pollutant control. Note on the plans that during construction, ends of duct openings are to be sealed, and mechanical equipment is to be covered. CGC 4.504.1. Pollutant control. Note on the plans that VOC's must comply with the limitations listed in Section 4.504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and 4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood Products. CGC 4.504.2. Interior moisture control. Note on the plans that the moisture content of wood shall not exceed 19% before it is enclosed in construction. The moisture content needs to be certified by one of 3 methods specified in Section 4.505.3. Building materials with visible signs of water damage should not be used in construction. The moisture content must be determined by the contractor by one of the methods listed in CGC 4.505.3. Indoor air quality. Note on the plans that bathroom fans shall be Energy Star rated, vented directly to the outside and controlled by a humidistat. CGC 4.506.1. J) Note on the plans that prior to final inspection the licensed contractor, architect or engineer in responsible charge of the overall construction must provide to the building department official written verification that all applicable provisions from the Green Building Standards Code have been implemented as part of the construction. CGC 102.3. CONTINUED Carlsbad 15-3038 9/30/15 . ENERGY CONSERVATION 35. For plans submitted for plan check on or after 7/1/14, provide a Prescriptive or Performance energy design, demonstrating compliance with current 2013 energy efficiency standards. Due to the large amount of new glazing being added, the addition will not comply with the prescriptive requirements, so a performance design must be provided. (Existing glazing being removed cannot be deducted from new glazing in determining compliance). Information and Forms are available at: www.ener-gy.ca.gov/title24/2013standards o Current Performance energy design versions are: CBECC-Res V4, V3, V3b1 and V3c (Public Domain software) (New permits after 07/31/2015 must be V4) hftp://www.bwilcox.com/BEES/BEES.html EnergyPro V6.6, (After 07/31/2015 must be V6.6) www.enerqysoft.com Right-Energy Title 24 V1.4, V1. 3, VI.2, VI.I (After 07/31/2015 must be V1.4) www.wriqhtsoft.com Include on the Title Sheet of the plans the following statement: "Compliance with the documentation requirements of the 2013 Energy Efficiency Standards is necessary for this project. Registered, signed, and dated copies of the appropriate CFIR, MR, and CF3R forms shall be made available at necessary intervals for Building Inspector review. Final completed forms will be available for the building owner." Include all applicable sections of the ME-I R form with the plans. All hot water piping sized %" or larger is required to be insulated as follows: 1" pipe size or less: I" thick insulation; larger pipe sizes require 11/2 ' thick insulation. Note: In addition, the 1/2" size hot water pipe to the kitchen sink is required to be insulated. ES 150.00)2 Residential energy lighting requirements: ES 150.0(k) In bathrooms, at least one fixture shall be high efficacy and all remaining fixtures shall be high efficacy or be controlled by a vacancy sensor. 40. Bathroom exhaust fans must be specified at minimum 50 cfm and specified at a noise rating of a maximum 3 "Sone" (for the intermittent use calculation). Energy Standards. CONTINUED Carlsbad 15-3038 9/30/15 . MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Tamara Fischer at EsGil Corporation. Thank you. Carlsbad 15-3038 9/30/15 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 15-3038 PREPARED BY: Tamara Fischer DATE: 9/30/15 BUILDING ADDRESS: 1604 Starling Court BUILDING OCCUPANCY: R3 /U BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) SFD ADD solari 99 141.03 13,962 mt remodel 180 68.98 12,416 Air Conditioning _ Fire Sprinklers TOTAL VALUE 26,378 Jurisdiction Code Icb IBY Ordinance I Bldg. Permit Fee by Ordinance V I $259.29 I Plan Check Fee by Ordinance I $168.541 Type of Review: Complete Review fl Structural Only Repetitive Fee El Other Repeats El Hourly Hr. © * EsGil Fee I $145.201 Comments: In addition to the above fee, an additional fee of is due (.5 hour _@ $86/hr.) for the CalGreen review. Sheet I of I macvalue.doc + PLANNING DIVISION 404h> BUILDING PLAN CHECK Development Services Planning Division CITY OF APPROVAL 1635 Faraday Avenue CARLSBAD P-29 (760)602-4610 www.carlsbadca.20v DATE: 9/17/15 PROJECT NAME: BALCONY ENCLOSURE PROJECT ID: PLAN CHECK NO: CB153038 SET#: ADDRESS: 1604 STARLING CT APN: This plan check review is complete and has been APPROVED by the PLANNING Division. By: GINA RUIZ A Final Inspection by the PLANNING Division is required D Yes N No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: YVONNE@WHITECONSTRUCTIONINC.COM For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton Chris Glassen Greg Ryan 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carIsbadca.gov ChristoDher.Glassen©carIsbadca.ov Gregory.Ryan@carlsbadca.gov Gina Ruiz ValRay Marshall Cindy Wong 760-602-4675 760-602-2741 760-602-4662 Gina.Ruiz@carIsbadca.gov VaIRay.MarshaII@carIsbpdca.gov Cynthia.Won@carIsbadca.Eov Linda Ontiveros Dominic Fieri 760-602-2773 760-602-4664 Linda.Ontiveros@carIsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: (city of Carlsbad RESIDENTIAL GREEN BUILDING CODE STANDARDS MANDATORY MEASURES CERTIFICATION CHECKLIST B-51 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov This form, signed and completed, shall be submitted to the Building Inspector prior to Final Inspection Site Development Mandatory 4.106.2 A plan is developed and implemented to manage storm water drainage during (X) construction. (X) 4.106.3 The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. Energy Efficiency 4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design (X) required by the California Energy Standards. Water Efficiency and Conservation Indoor Water Use 4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following (X) methods: 7/01/2011 Water saving fixtures or flow restrictors shall be used. A 20 percent reduction in baseline water use shall be demonstrated. (X) 4303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads 7/01/2011 shall not exceed maximum flow rates. (x) 4.3033 Plumbing fixtures (water closets* and urinals) and fittings (faucets and shower heads) 7/01/2011 shall comply with specified performance requirements. Outdoor Water Use 4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be (X) weather-based. Enhanced Durability and Reduced Maintenance 4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings in plates at exterior walls shall be protected against the passage of rodents by closing (x) such openings with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. Construction Management Plan 4.408.1 A minimum of 50 percent of the construction waste generated at the site is diverted to (X) recycle of salvage. 4.408.2 Where a local jurisdiction does not have a construction and demolition waste (X) management ordinance, construction waste management plan shall be submitted for approval to the enforcing agency. Building Maintenance and Operation 4.410.1 An operation and maintenance manual shall be provided to the building occupant or • (x) owner. Environmental Quality Fireplaces 4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. (X) Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. I __ Recycled material receipts from approved recyclers must be attached to this form. B-51 Page 1 of 2 Rev. 04/11 Pollutant Control 4.504.1 Duct openings and other related air distribution component openings shall be covered (x) during construction. 4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC and other toxic compound (x) limits. (X) 4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits. (x) 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MlR limits for ROC and other toxic compounds. X (X) 4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials have been used. (x) 4.504.3 Carpet and carpet systems shall be compliant with VOC limits. 4.504.4 50 percent of floor-area receiving resilient flooring shall comply with VOC-emission limits (x) defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RFCl) FloorScore program. (x). 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior finish systems shall-comply with low formaldehyde emission standards. Interior Moisture Control 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X) 4.505.3 Moisture content of building materials used in wall and floor framing is checked before (x) enclosure. Indoor Air Quality and Exhaust 4.506.1 Exhaust fans which terminate outside the building are provided in every bathroom. - (x) Environmental Comfort 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X) fan is off. Covers or louvers shall have a minimum insulation value of R-4.2. 4.507.2 Duct systems are sized, designed, and equipment is selected using the following methods: (X) Establish heat loss and heat gain values according to ACCA Manual J or equivalent. Size duct systems according to ACCA 29-D (Manual D) or equivalent Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent. Installer and Special Inspector Qualifications 702.1 HVAC system installers are trained and certified in the proper installation of HVAC (x) systems. 702.2 Special inspectors employed by the owner must be qualified and able to demonstrate (x) competence in the discipline they are inspecting. I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013 California Green Building Standards. Project Address: .()7 Plan ChopkNAbeef/4 0 39 Print Name: ? Signed: ...- License Number: Date: & B-51 Page 2 of 2 Rev. 04/11 r ' City of Carlsbad WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov For residential additions ;95 rojects w/valuation greater than or equal to $75,000 and all bemo permits Owner: l4waI6 Contractor: t2' A69 Job Address: /119' nAtmk Ar Phone Number:ZJJ '//31 Permit #: '4 /4T/.95 I Estimated Cost of Project: $_ /4hi7,2 k41 Type of Project: 0 New Construction E'modeI or 1.1. Residential J Commercial 0 Demolition (check all that apply) 0 Other Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables I & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area X 2 lbs. = lbs. of allowable waste. 0 I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 - Estimated Waste (To be filled out prior to permit issuance - refer to example on Page 2.) MATERIALS lbs. of waste to be taken to LANDFILL lbs. of waste to be RE-USED or RECYCLED Waste Hauling Company or Re-Use Method 4414 Brick/ Masonry Asphalt/ Concrete 7',, //444iiiø47 Cardboard Drywall AM Landscape Debris Lumber! Wood Metals Mixed Waste Trash/Garbage Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled_9# % on provided he in to the best of my knowledge, is true and correct. dAt 37 Date Official Use Only o Plan Approved 0 Plan Denied []Project Valuation Approved Reviewed / Approved by: Page lof 2 Table 2 -Actual Waste (To be completed after construction.) MATERIALS lbs. of waste taken to LANDFILL lbs. of waste RE-USED or RECYCLED Waste Hauling Company or Re-Use Method (complete only if different than Table i) Asphalt/ Concrete Brick / Masonry Cardboard Xw IF Drywall ______________ Landscape Debris j) Lumber/ Wood Metals Mixed Waste Trash / Garbage Other: TOTAL lbs.: 0 Actual Percentage Re-Used or Recycled % Official Use Only 0 50% Goal Achieved 050% Goal Not Achieved 0 Alternative Compliance Achieved Penalty Paid $ Reviewed / Approved by: EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to LANDFILL lbs. of waste to be RE-USED or RECYCLED Waste Hauling Company or Re-Use Method Asphalt / Concrete o 2000 ,kC -utlI.i Co. Brick/Masonry ioo 450 WM / R-14seG SrLo Ov%.-SLte Cardboard o 150 AC 1-taLALykcA Co. Drywall 0 50 ABC I-foikUyvq Co. Landscape Debris o 120 Mutic4eo( g i.e-t.sed on-sI.te Lumber/ Wood 500 0 Waste Mei'&et Metals 300 200 WM / AC H-avlg Mixed Waste 1500 0 WM Trash / Garbage 300 0 WM Other: Pool 4utvi.te 0 300 Rsec( as Crvse& B'ase o-sfte TOTAL lbs.: 200 370 Percentage to be Re-Used or Recycled 59 % Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) 3870 X 100 = 59% Re-Used or Recycled (2700+ 3870) Since 59% exceeds the minimum requirement of 50%, this plan complies. Page 2 of 2