Loading...
HomeMy WebLinkAbout1950 CAMINO VIDA ROBLE; ; CBC2020-0156; RecycleNONRESIDENTIAL GREEN Development Services &( City of BUILDING CODE STANDARDS Building Division d MANDATORY MEASURES 1635 Faraday Avenue Cdri CERTIFICATION CHECKLIST 760-602-2719 i a B-52 www.carlsbadca.gov Tliiiform, slgñiiIiWd completed, andill receipts for the recycled materials shall be Thubmitted to the Building Inspector prior to Final Inspection Site Development Mandatory 5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (x) the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is required for projects over one acre. The plan should cover prevention of soil loss by storm water run-off and/or wind erosion, of sedimentation and/or of dust/particulate matter air pollution. 5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (X) meet local ordinance, whichever is stricter. 5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X) passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two- bike capacity rack. 5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (x) of one space. 5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (X) 5.106.8 Light pollution reduction. Comply with lighting power requirements in the California Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (X) site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in Chapter 10 of the California Administrative Code, using the following strategies: Shield all exterior luminaries or use cutoff luminaries (X) Contain interior lighting within each source (X) Allow no more than .01 horizontal foot candle 15ft. beyond the site (X) Contain all exterior lighting within property boundaries (X) Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking facilities and walkways. 5.10610 Grading and paving. The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how site grading or drainage system will (X) manage all surface water flows. Water Efficiency and Conservation Indoor Water Use 5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503. 1.1 (x) through 503.1.3. 5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as follows: For each individual leased, rented, or other tenant space within the building projected to ,.. (X) consume more than 100 gal/day. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office, laboratory or beauty salon or barber shop projected to consume more than 100 gal/day. B-52 Page 1 of 5 Rev. 5/17 5.303.1.2 Excess consumption. Any building within a project or space within a building that is projected to consume more than 1,000 gal/day. (X) 5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the overall use of potable water within the building by 20 percent shall be provided (Calculate (X) savings by Water Use Worksheets or utilize Table 5.303.2.3). 5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are served by more than one showerhead, the combined flow rate of all the showerheads shall not (x) exceed the maximum flow rates specified in the 20 percent reduction column contained in Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in operation at a time. 5.303,6 Plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable for each type in items listed in Table 5.303.6. Water closets (toilets) - flushometer type (X) Water closets (toilets) - tank type (X) Urinals (X) Public lavatory faucets (x) Public metering self-closing faucets (X) Residential bathroom lavatory sink faucets (x) Residential bathroom lavatory sinks (X) Residential showerheads (X) Single shower fixtures served by more than one showerhead (X) Outdoor Water Use 5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X) 5.304.2 Outdoor potable water use. For new water service, separate meters or submeters shall be installed for indoor and outdoor potable water use for landscaped areas between 1,000 and 5,000 square feet. (x) 5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500 square feet of landscaped area (the level at which the MLO applies), install irrigation controllers and sensors which include the following criteria and meet manufacturer's recommendations. 5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of final inspection shall comply with the following: Controllers shall be weather- or soil moisture-based controllers that automatically adjust irrigation in response to changes in plant's needs as weather conditions change. (x) Weather based controllers without integral rain sensors or communication systems that As applicable account for local rainfall shall have separate wired or wireless rain sensors which connects or (x) communicates with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. Construction Waste Management Plan (X) 5.408.1 Construction waste diversion. Establish a construction waste management plan or meet local ordinance, whichever is more stringent. (X) 5.4082 Construction waste management plan. Submit plan per this section to enforcement authority within the city. 5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (x) B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is accessible to the enforcement authority. 5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of nonhazardous construction and demolition debris or meet local ordinance, whichever is more stringent. (X) Exceptions: Excavated soil and land-clearing debris Alternate waste reduction methods, developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist. 5.408.3 Excavated soil and land clearing debris. 100 percent of trees. Stumps, rocks and I B-52 Page 2 of 5 Rev. 5/17 associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. Building Maintenance and Operation 5410.1 Recycling by occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of nonhazardous materials (x) for recycling. 5410.2 Commissioning. For new buildings 10,000 square feet and over, building (X) commissioning for all building systems covered by T24, Part 6, process systems and renewable energy systems shall be included in the design and construction processes of the building project. Commissioning requirements shall include items listed in Section 5.410.2. - 5.410.2.6 (X) 5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of the project begins the OPR shall include items listed in Section 5.41 0.4. (X) 5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project and updated periodically to cover the systems listed in Section 5.410.2.2. (X) 5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be commissioned shall be started during the design phase of the building project and shall include items listed in Section 5.410.2.3. (X) 5.410.2.4 Functional performance testing shall demonstrate the correct installation and operation of each component, system and system-to-system interlace in accordance with the (x) approved plans and specifications. 5.410.2.5 Documentation and training. A Systems manual and systems operations training are required. (X) 5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. (X) 5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. (X) 5.410.2.6 Commissioning report. A complete report of commissioning process activities undertaken through the design, construction and reporting recommendations for post construction phases of the building project shall be completed and provided to the owner or representative. 5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X) buildings less than 10,000 square feet. 5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X) Systems to be included for testing and adjusting shall include, as applicable to the project, the systems listed in Section 5.410.3.2. (X) 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry best practices and applicable national standards on each system. (X) 5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or space is operated for normal use, the system should be balanced in accordance with the procedures defined by national standards listed in Section 5.410.3.3.1. (X) 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X) of testing signed by the individual responsible for performing those services. maintenance instructions and copies of guaranties/warranties for each system prior to final inspection. 5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed operating and maintenance manual 5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports required by the enforcing agency. B-52 Page 3015 Rev. 5/17 Environmental Quality Fireplaces 5503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (X) sealed woodstove and refer to residential requirements in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150. As Applicable 5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA Phase Ii emission limits. (x) Weather Resistance and Moisture Management 5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope as required by California Building Code Section 1403.2 and California Energy Code Section 150, (X) manufacturer's installation instruction instructions or local ordinance, whichever is more stringent. 5407.2 Moisture control. Employ moisture control measured by the following methods: 5.407.2.1 Sprinklers. Prevent irrigation spray on structures. (x) 5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X) into buildings. Pollution Control 5.504.3 Covering of duct openings and protection of mechanical equipment during construction. At the time of rough installation or during storage on the construction site and until final start up of the heating and cooling equipment, all duct and other related air distribution (x) component openings shall be covered with tape, plastic, sheet metal or other methods to reduce the amount of debris or duct which may collect in the system. 5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the building with outside and return air prior to occupancy that provides at least a MERV of 8. 5,504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1 through 5.504.4.6 5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet the requirements of the following standards: (X) Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 VOC limits as shown in Tables 5.504.4.1 and 5.504.4.2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507. 5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3 5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product- Weighted MIR limits for ROC in Section 94522 (a)(3) and other requirements, including prohibition on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520 et seq.). 5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and product requirements of one of the standards listed in Section 5.504.4.4. 50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the Carpet and Rug Institute Green Label Program. 5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1. 5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in Table 5.504.4. 5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: Product certification and specifications Chain of custody certifications Other methods acceptable to the enforcing agency 5.504.4.6 Resilient flooring systems. Comply with the VOC emission limits defined in the 2009 (X) CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under the _FloorScore_ program _of the _Resilient _Floor Covering Institute. B-52 Page 4 of 5 Rev. 5/17 Indoor Moisture and Radon Control 5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California Building Code, Title 24 Part 2, Sections 1203 (Ventilation) Chapter 14.1. (x) Air quality and Exhaust 5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (X) minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent. 5506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation, CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X) requirements of the latest edition of the California Energy Code, Title 24, Part 6, Section 120.1.(C) (4). Outdoor Air Quality 5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As 5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable 5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X) (x) I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: 1950 Camino Vida Roble, Carlsbad Plan Check Number: CBC20200 156 Print Name: Marianne Lamoureux License Number: 444203 Date: 01/25/2021 B-52 Page 5 of 5 Rev. 5/17 EDCO Station 8184 Commercial St. La Mesa, CA 91942 (619) 466-3355 Customer: 0285 Ticket: 25299 Date: 12/07/20 BYCOR GEN.:: CONTRACTOR 6490 MARINDUSTRY PLACE #A SAN -'DIEGO CA 92121 INVOICE In: 11:53 Truck: 7812/7812 Out: 11:53 Container: Route: 02020 Origin: 020 SAN DIEGO Commodity Units 20 Commercial Refuse .87 [Gross (In): 6.95 tons Man Wt Rate Tare 6.08 tons Stored Net: TOTAL DUE. Extended Charge 76.56 .87 tons] 76.56 Miguel E. Driver H SANCO Resource Recovery 6750 Federal Blvd. Lemon Grove, CA 91945 (619) 287-7555 Customer: 0548 Ticket: 8623 Date: 07/30/20 BYCOR GEN. CONT., INC. 6490. MARINDUSTRY PLACE *A SAN DIEGO, CA. 92121 INVOICE In: 8:39 Truck: 7812 Out: 8:39 Container: Route: 02034 Origin: 020 SAN DIEGO Extended Commodity Units Rate Charge 34 CONSTRUCTION / DEMOL .55 73.00 per TON 55.00 [Gross (In): 13,500. lbs Scl#1 Tare 12,400. lbs Stored Net: 1,100. lbs] TOTAL DUE 55.00 Construction & Demolition Diversion Certificate -• Diversion Percentage 71% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. EDUARDO MEZA Driver MOODY' S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760) 433-3316 ° FAX (760) 433-6691 ' cç 1)tf JOB LOCATION / PU BOBTAIL -WHEEL 1TRAILER 1FLATBED 110 JENDDLIMP JT&T MATERIALL LOAD COUNT 1 2 3 4 5 6 7 8 9 10 # LOADS X PRICE OTHER CHARGES ( ?0 CL TOTAL SIGNATURE TRUCK # All bills due upon presentation unless otherwise MOODY'S is not responsible for damage to arranged in advance. Open accounts subject to vehicle while being loaded or unloaded in 1 1/2% month, charge after 30 days unpaid yard. balance. 2' JOB COPY MOODY'S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760) 433-3316 • FAX (760) 433-6691 PU 1TRAILER LATSED IO8TA,L. lo -WHEEL No DUMP & T JMATERY? LOAD COUNT 1 2 3 45 6 7 8 9 10 #LOADS X PRICE OTHER CHARGES $ TOTAL SIGNA URE TRUCK # All bills due upon presentation unless otherwise MOODY'S is not responsible for damage to arranged in advance. Open accounts subject to vehicle white being loaded or unloaded In 1 1120/6 month, charge after 30 days unpaid yard. balance. JOB COPY 2.77212 9 MOODY'S F.I. CORAZON RECLAMATION P0 BOX 969 jCy: BONSALL, CA 92003 (760) 433-3316 ° FAX (760) 433-6691 PU TRAILER I JFLATBED 8OaTfl' ge "; 110-WHEEL el, Azoo jEND DUMP 1/ I T & I LOAD CO MATER7'"j/i, _____ UNT 1 2 3 4 if 8 7 8 9 10 #LOADS X PRICE OTHER CHARGES TOTAL SIGNATURE All buffs due upon presentation unless otherwise MOODY 'S i s n o t r e s p o F f o r d a m a g e t o arranged in advance. Open accounts subject to vehicle while being loaded or unloaded in 1 1/204 month, charge after 30 days unpaid yard. balance. JOB COPY -27711 i b MOODY'S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760)433-3316° FAX (760) 433-6691 PU 1TRAILER FLATBED JBOBJ 110-WHEEL JENDOUMP IT&T LOAD COUNT MATE ?(7 1 2,.,3 4 5 6 7 8 9 10 # LOADS X PRICE $ ORES TOTAL SIGNATURE • T UCK U All bills due upon presentation unless otherwise MOODYS is not responsible for damage to arranged In advance. Open accounts subject to vehicle while being loaded or unloaded In 1 1/2% month, charge after 30 days unpaid yard. balance. JOB COPY 277389 SANCO Resource Recovery 6750 Federal Blvd. Lemon Grove, CA 91945 INVOICE (619) 287-7555 Customer: 0567 Ticket: \2530 Date: '06/10/20 DEMKO DRYWALL 419 S. MARSHALL AVENUE EL CAJON CA 92020 CARLSBAD In:13:44 Truck: 5397/5397 Out: 13:45 Container: G Route: 02034 Origin: 020 SAN DIEGO Commodity Units 34 CONSTRUCTION / DEMOL '3 .45 [Gross(In): 25,360. lbs Sc].#1 Rate 68.00 per TON Tare 18,460. lbs Stored 1 n j Ur' Extended 9 Q ( (C Charge ') 234.60 Net: 6,900. lbs] TOTAL DUE 234.60 Construction & Demolition Diversion Certificate -- Diversion Percentage 681/c This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. 77> VICENTE RUIZ Driver A 1111110 NIIIIIIIJ11 Iran No 434117 6/5/2020 11:46:34 A ALL WAYS METAL RECYCLING U 1425 N MAGNOLIA AVE EL CAJON,CA 92020 Phone 619-390-6637 RC-260418.001 J-0197'** '5. I Seller ID DriverLic PAID BY C Veh Plate Material Grosa Tare Net $ILb Shk% Amount 611 B!XWIRE 492.80 16060.0 14,940.0 1,120.0 0.220 0. $;p M1rP1. Mir IN'., PRICE: FLu:TI 'CTE DAILY ECl iN MApIE1S. ..4' :f RaP I1Er.'J. FIJRC IjI A$ THAT nEri r.: BE ''PtD BY OUR EMPLOYEE" WILL RE. IEVE LE'VOMICE iiri i MMEFdPL i ..:RTEDAI.c.RE,'L,i r': BE Pl.Esa.ErANL. VYICIClir. n, ...i1riii.:. THI b'E':IEpI • a: ACPI':l.er(.E THE FACT wF.iHT ;ER ':aRrIFI:ATE. Jill: l_ TO CERTIFY 1113 they tk4uICJ .JeCnb.,1 .: writtidily I. C '4ial. Ifl,d'tiIad. UI iAmlid liv a wUiI,rnasI.sr, v4IUe .t'3iUkhIa , us, this tertilicale. Oio I, a rCO.lUUI aulbunty of ac, urjc#. as r',1L6'1 by I1ab,e 7 ('.'Anlnalb:ln. MIr Suction IflOCi vi 174visdon Gui the CaIfrjjflia 0u51fli5S anCi Prcdssins ':i. a,liUln,atere4 by Ibu Djvs,,,us UI MeauiC.ment war,Jarj'. of the Cetilutnia C'etut1,nai,I ul Fu..J anuiVjflualure BILL I.T &LE - I ,ian1 thaI i ,n the .rnner for ames's reps esenlatea) UI Ir,e matvs,.d dSEIibCd bUraUll a?nl It.. the right (6 sell -:-rne. thaI its mlis.,5 n. Ila2anlr.us. t.iate,iats .s defined li, any federal us elate law and trial (a, .syliiCfll here'.v ra.:eev&1. I sell arel mftv.tv tills, 16 this Re:,, tin. Cank,r Is,Lrj HPRMLE.S /U:-F5EEMEI4T. eter etC irnbirnsry cr51 Iir4sl buyer hatmiess froindanagos. (litr,ulflds and lidbitllec. including rcatunat4 aEs nay'S (uIs. I tutfirl5j tiwn the broxli .,f any I. grady heaunder and dner agfaas to ha I 4a1sb1& ((.1 diailbijr to v6racle dl4illig ufllUilCIlrlg. 16 l EXECUTED AT EL CAJON, CA 615/202tf I received from ALL WAYS METAL RECYCLING the amount of x Seller's Signature PRINT NAME Deputy LINDS Weight Master WEIGHED AT 1425 N MAGNOLIA AVE EL CAJON, CA 92020 THANK YOU. 3-day hold ticket must be redeemed within 90 days. 9020-608 i Iii.j RECOV TRANSFER ESOURU E ANO WASTE 14165 "We'll Take Care of It" Construction & Demolition Diversion Certificate Date: 6129J7() CDI San Marcos, CA TO Ve.)X 9 1 5T Received at :Escondido Resource Recovery Processed At: SRR Lemon Grove, CA I I Customer: Ticket # Project: Number/Description Total Tons Received: 1.2Tons Diversion Percentage: % Scale house Operators 01 This certifies that the company listed above has utilized' ~ anove to divert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based -tonnage percentage of the respective EDCO facility. LEscoridfdoR&source Recovery ç 1021 W Mission Ave 0 Escondido, CA 92025 (760) 745-3203 Customer: 0159 Ticket:( 6762 In: 9:40 Date: 05/28/20 Out: 10:05 DEMKO DRYWALL CO. INC 419 S MARSHALL AVE EL CAJON, CA 92020 Commodity Units Rate 14 MIXED C & D 1.87 92.00 per TON [Gross(In): 21.920. lbs Man Wt Tare 18.180. lbs Scl#5 Y"y 9 / INVOICE Truck: 9999 Container: Route: 03014 Origin: 030 COUNTY Un Extended Charge 172.04 Net: 3.740. lbs] TOTAL DUE t 172.04 Driver I . . I MOODY'S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760) 433-3316 • FAX (760) 433-6691, 51 PU FLATBED J80)IL 10-WHEEL 1TRAILER JENODUMP ITAT I MATERIAL (!CfQ'd7 LOAD CUNT 1 2 1 3,4 5 d 7 89 10, 4 ' \5' -\ S \2 \S \ 1Ut #LOADS, X PRICE OTHER CHARGES $ //7 .oca'viro 15 SIGNATURE All bills due upon presentation unless otherwise I MOODY'S is nk?esponsiie for damage to 10 2 arranged in advance. Open accounts subject to vehicle while being loaded or unloaded in 1 1/2% month, charge after 30 days unpaid yard. balance. I JOB COPY •... 27506-9 9020-608 ESCONDODO RESOURCE ECOVERY AND WASTE TRANSFER SERVICE "We'll Take Care of It" Construction & Demolition Diversion Certificate 6607 Received at :Escondido Resource Recovery Date: 4i99 9Q Processed At: SRR Lemon Grove, CAI I CDI San Marcos, CA Et? Customer: Ticket # 341/ Project:Number/Description Total Tons Received: ::?7( S Percentage: 11K % Scale house Operators Signature:_____________________ This certifies that the company listed above has utilized a ED facility tivert construction demolition materials in accordance with LEED requirements. The diversion tonnage is based a n overall ti nage percentage of the respective EDCO facility. E scond do Resource Recovery .i02i W Mission Ave Econdido, CA 92025 INVOICE t7t) '45-3203 uomer: 0159 Ticket: 89341 In: 12:23 Truck: 5397/5397 Date: 04/29/20 Out: 12:52 Container: LiKfl DRYWALL CO. INC 419 S MARSHALL AVE FL. CAJUN, CA 92020 Crnod; ty Uni ts 1.4 MIXED C & D 3.70 s(In): 25,460. lbs Sc1#5 Route: 08614 Origin: 086 Carlsbad 'Extended Rate lroos7s-",Charge 92.00 per TON 340.40 Tare 18.060. lbs Scl#5 Net: 7ç400. lbs] TOTAL DUE \hl 340.40 EDCO WASTE & RECYCLING SERVICES, INC 224 S. LAS POSAS RD SAN MARCOS, CA 92078 INVOICE (760) 744-2700 Commodity Units 45C&DMIX 4.08 [Gross (In) : 26,620. lbs Sc1#1 In: 8:35 Truck: 0987/0987 Out: 8:43 Container: Route: 08145 Origin: 081 ALL COUNT j3ox I I Extended Rate e*1 oQ53T Charge 72.00 per TON 293.76 Tare 18,460. lbs Sc1#1 7 60. lbs] 1: TOTAL DUE Customer: 1038 DEMKO DRYWALL 419 S MARSHALL AVE EL CAJON, CA 92020 Ticket: 16010 Date: 04/28/20 Construction & Demolition Diversion Certificate Diversion Percentage 88% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition fâterials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. CRUZ 1DtmkO • Demolition 419 S. Marshall Avenue El Cajon California 92020 P. 619.590.0025 F. 619.590.0028 Construction and Demolition Debris Recycling Log Daily Log of Construction and Demolition (C&D) Materials Removed of Reused on Job Site Name of Person Verifying Accuracy: Kathy Oakley Telephone: 619-590-0025 General Contractor: Bycor Project Name: Atec Job #: 0055 ProjectAddress: 1950 Camino Vida Roble Carlsbad, CA 92008 The County of San Diego C&D ordinance requires recvclinq of 909A inerts & 70% of remaining material Remaining Materials . Inerts Cabinets, Doors, Windows, Fixtures Mixed Recyclables Asphalt Cardboard Roofing Materials Concrete Carpet Scrap Metal Brick PaddinglFoam (carpet) Stucco Masonary Ceiling Tile (accoustic) Cement (no wire) Tile Drywall (used) Unpainted Wood & Pallets Dirt Drywall (new, unpainted or scrap) Trash Mixed Inerts Landscaping (brush, trees, stumps, etc.) Other (describe) Other (describe) Date Time Destination Location Job # Weight Ticket # Diversion % Material Type 4/28/20 8:35 EDCO SAN MARCOS 0055 4.08 16010 88% C&D MATERIAL 4/29/20 12:23 ESCON RES REC ESCONDIDO 0055 3.70 89341 68% C&D MATERIAL 5/16/20 7:57 MOODY'S BONSALL 0055 275069 100% CONCRETE 5/28/20 9:40 ESCON RES REC ESCONDIDO 0055 1.87 6762 68% C&D MATERIAL 6/5/20 11:46 ALL WAYS METALS EL CAJON 0055 0.56 434117 100% B/X WIRE 6/10/20 13:44 SANCO LEMON GROVE 0055 3.45 2530 68% C&D MATERIAL 6/16/20 8:02 MOODY'S BONSALL 0055 277117 100% CONCRETE 6/17/20 7:57 MOODY'S BONSALL 0055 277212 100% CONCRETE 6/19/20 8:00 MOODY'S BONSALL 0055 277389 100% CONCRETE 7/10/20 9:24 MOODY'S BONSALL 0055 278622 100% CONCRETE Mixed Items must be taken to an approved mixed processing facility Asbestos. Hazardous Debris. Treated Wood, Contaminated Soil and other restricted materials require special handling. t . ....' MOODY' S EL CORAZON RECLAMATION o5S P0 BOX 969 BONSALL, CA 92003 (760) 433-3316 FAX (760) 433-6691 %IUD LUA I IUI . , PU TRAILER FLATBED BOBTA5f 10WHEEL END DUMP JT&T MATER LOAD CC UNT 5 8 7 .8 9 10 iI Ll 2 -1 C-g1 ci,4€ 4 61 ft T 6_x)s'' - # LOADS. X. PRICE OTHER VHARGES 3 LO $ ,- TOTAL SIGNATURE 3 T/UC./(b All bills due upon presentation unless otherwise MOODY'S is i'esçonsi e for mage to arranged in advance. Open accounts subject to I vehicle while being loadeQr unloaded In 1 1/2% month, charge after 30 days unpaid . yard. .,5 balance. JOBCOPY 283195. U 0 MOODY'S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760) 433-3316 • FAX (760) 433-6691 c MO rc() LV\ C CITY OF ORIGIN • C ce .108 LOCATION PU I TRAILER IFLATBED BOBTAIL 110-WHEEL JENDDLIMP IT&T MATERIAL LOAD COUNT 1 2 3 4 5 6 7 8 9 10 #LOADS X PRICE OTHER CARGES O 0S5 $ 2c7c) - TOTAL SIGNATURE . . fresiasIl 9All bills due upon presentation unless otherwise MOODY S Is no Meor amagTto arranged in advance. Open accounts subject to vehicle while being loaded or unloaded in 1 1/2% month, charge after 30 days unpaid yard. - balance. 4. JOB COPY 2122O MOODY'S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760)433-3316° FAX (760) 433-6691 Sr) JOB LOCATION Pu TRAILER O E5511—' -WHEEL I 1FLATBED 110 1ENODUMP IT&T MATERIAL LOAD COUNT 2 3 4 5 6 7 8 9 10 I LOADS X PRICE OTHER CHARGES QQ5 5141 $ TOTAL lytiU V SIGNATURE TRUCK I All bills due upon presentation unless otherwise MOODY'S is not responsible for damage to arranged In advance. Open accounts subject to vehicle while beIng loaded or unloaded in 1 112% month, charge after 30 days unpaid yard. balance. JOB COPY • 211B5 r MOODY'S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760) 433-3316 • FAX (760) 433-6691 PU I TRAILER IFLAT8150 1BOB L 110.WHEEL lEND DUMP IT&T MATE/I!!SQ g4 • LOAD .. 4 5 6 7 8 9 10 oil '~P ____ U LOADS / X PRICE OTHER CHARGES 8 s) $ e-?elp- TOTAL .I - ' u, DAM 'd* lil( SIGNATURE TRUCK# All bills due upon presentation unless otherwise MOODY'S is not responsible for damaa arranged in advance. Open accounts subject to vehicle while being load d or unloaded in,, 1 1/2% month, charge after 30 days unpaid yard. _J (I balance. J / " TICKET TICKET Number: 41050 Ticket Date: 08/1412020 Payment Terms: Due on receipt Rock Ridge Crushing 13465 Camino Canada 106.501 El Cajon, CA 92021 US +16193750076 BILLING ADDRESS Demko Demolition Ticket Amount: $0.03 I ftem Name h' 1Jflil2H 1000-Clean Clean Concrete-Bobtail I C5.0 65.00 Concrete-Bobtail (Cten Concrete- Bobtail) Subtotal Sales Tax - Ticket Amount 60.0 Payment 65.00 130)( 93 Plate/Tag: 6007 Payment Method Carrier: Demko Job #: Carlsbad NOTICE: No claims allowed unless made when material is delivered and receipted for. A finance charge per month on the unpaid balance shall be charged on all accounts 30 days or more past due. Customers agrees to pay all costs and expenses of collection of any amount here-under. RRC will make all reasonable efforts to deliver all material to customer on the date and time specified by customer and in sufficient incremental quantity to meet customers specification therefore when customer order is placed. RRC however, disclaims any responsibility for late delivery or insufficient incremental quantity delivered and customer expressly waivers a claim of damages, right of offset or back charge as a result of late delivery or insufficient incremental quantities delivered. The above waiver of damages shall include actual or consequential damages or any damages under the California Commercial Code. Customer agrees to notify RRC in writing of any claims including claims of defects associated with the material delivered and or picked up here under within 72 hours after the first date and item set forth on the front of the certification and the afford RRC the opportunity to correct a such claims prior to customer incurring any cost or expense in attempting to correct sale. Customer acknowledges and accepts the health hazards associated with aggregates, asphalt, cement or other construction products. By acceptance of such materials customer releases RRC for all liability associated with such health hazards. Title passes to purchaser at the time of loading PROP 65 - Warning to customers and employees products sold or used on these premises may contain chemicals known to the state to cause cancer or birth defects. Seller makes no warranty as to suitability of material for an intended use by customer. MOODY'S EL CORAZON RECLAMATION P0 BOX 969 BONSALL, CA 92003 (760) 433.316 • FAX (760) 433-6691 I PU TRAILER I1O-WHEL 11&T I IFLATSED JENDOUMP MATERIAg2 / LOAD COUNT ' 2 4 5 6 7 8 9 10 kv L/ 1.. ' 0 #LOADS X PRICE OTHER CHARGS TOTAL SIGIIATURE '- TRUCK( All bills due upon presentation unlüss otherwise MOODVS is not responsible for 9e.t6) arranged in advance. Open accounts subject to vehicle while being loaded or unloaded in 1 1/2% month, charge after 30 days unpaid yard. balance. JOB COPY 281C08 EDCO Station 8184 Commercial St. La Mesa, CA 91942 (619) 466-3355 Customer: 0168 DEMKO DRYWALL 419 S . MARSHALL AVENUE EL CAJON, CA 92020 Ticket: 68758 In: 7:36 Date: 07/30/20 Out: 7:47 / Truck: Container: Route: Origin: INVOICE 3930/3930 02055 020 SAN DIEGO Extended Commodity Units Rate Charge 55 C&D Certified .58 56.84 (Gross (In): 8.02 tons Man Wt Tare 7.44 tons Sc1#2 Net: t tons] TOTAL DUE 84 Construction & Demolition Diversion Certificate -- Diversion Percentage 68% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. Miguel E. Driver / EL CORAZON RECLAMATION P0 BOX 969 BONSALL CA 92003 33-3316 ° FA( (760) 433-6691 .- T -PRICE ER CHARGES SIGNATURE unless otherwise I M000Y•S is not responsible for damage to arranged in advance. Open 1 1/2% month, charge after 30 days unpaid All bills due upon Presentatuo S b. to / veijc while being loaded or unloaded In balance. JOB Copy. 277309 Est. 1973 IDI Vemk emolition 419 S. Marshall Avenue El Cajon California 92020 P. 619.590.0025 F. 619.590.0028 Construction and Demolition Debris Recycling Log Daily Log of Construction and Demolition (C&D) Materials Removed of Reused on Job Site Name of Person Verifying Accuracy: Kathy Oakley General Contractor: Bycor Project Name: Atec Project Address: 1950 Camino Vida Roble Carlsbad, CA 92008 Telephone: 619-590-0025 Job#: 0055 The county or San Diego CSU orcnnance requires recycling or sg'y, inens & io% or remaining material Remaining Materials - hteits Cabinets, Doors, Windows, Fixtures Mixed Recyclables Asphalt Cardboard Roofing Materials Concrete Carpet Scrap Metal Brick Padding/Foam (carpet) Stucco Masonary Coiling Tile (accoustic) Cement (no wire) Tile Drywall (used) Unpainted Wood & Pallets Dirt Drywall (new, unpainted or scrap) Trash Mixed Inerts Landscaping (brush, trees, stumps, etc.) Other (describe) Other (describe) Date Time Destination Location Job # Weight Ticket # Diversion ¶4 Material Type 6/18/20 8:00 MOODY'S BONSALL 0055 20.00 277309 100% CONCRETE 7/17/20 ROCKRIDGE EL CAJON 0055 5.00 14134 100% CONCRETE 7/30/20 7:36 EDCO LA MESA 0055 0.58 68758 68% C&O MATERIALS 8/13/20 1 8:43 MOODY'S BONSALL 0055 15.00 281008 100% CONCRETE 8/14/20 ROCKRIDGE EL CAJON 0055 5.00 41050 100% CONCRETE 8/14/20 8:01 MOODY'S BONSALL 0055 15.00 281084 100% CONCRETE 8/15/20 - 10:13 MOODY'S BONSALL 0055 10.00 281165 100% CONCRETE 8/17/20 8:31 MOODY'S BONSALL 0055 10.00 281220 100% CONCRETE 9/16/20 7:11 MOODY'S BONSALL 0055 20.00 283185 100% CONCRETE/DIRT Mixed items must be taken to an approved mixed processing facility Asbestos, Hazardous Debris, Treated Wood, Contaminated Soil and other restricted materials require special handling. TICKET TICKET Number: 14134 Ticket Date: 07/17/2020 Payment Terms: Due on receipt ~4 Ticket Amount: $0.00 Rock Ridge Crushing 13465 Camino Canada 106-501 El Cajon, CA 92021 US +16193750076 / BILLING ADDRESS Demko Demolition ITi10 Item IEName •TTTTIIIh' Unft Prloe Taxable LIIMJil 1000-Concrete- Concrete-Bobtail 1 65.00 65.00 Bobtail Concrete with Rebar-Surcharge Plate/Tag: Hino Carrier: Demko Job #: Encinitas 50.00 50.00 Subtotal Sales Tax Ticket Amount 115.00 NOTICE: No claims allowed unless made when material is delivered and receipted for. A finance charge per month on the unpaid balance shall be charged on all accounts 30 days or more past due. Customers agrees to pay all costs and expenses of collection of any amount here-under. RRC will make all reasonable efforts to deliver all material to customer on the date and time specified by customer and in sufficient incremental quantity to meet customers specification therefore when customer order is placed. RRC however, disclaims any responsibility for late delivery or insufficient incremental quantity delivered and customer expressly waivers a claim of damages, right of offset or back charge as a result of late delivery or insufficient incremental quantities delivered. The above waiver of damages shall include actual or consequential damages or any damages under the California Commercial Code. Customer agrees to notify RRC in writing of any claims including claims of defects associated with the material delivered and or picked up here under within 72 hours after the first date and item set forth on the front of the certification and the afford RRC the opportunity to correct a such claims prior to customer incurring any cost or expense in attempting to correct sale. Customer acknowledges and accepts the health hazards associated with aggregates, asphalt, cement or other construction products. By acceptance of such materials customer releases RRC for all liability associated with such health hazards. Title passes to purchaser at the time of loading PROP 65- Warning to customers and employees products sold or used on these premises may contain chemicals known to the state to cause cancer or birth defects. Seller makes no warranty as to suitability of material for an intended use by customer. no cr Pevr 1 isf 1