Loading...
HomeMy WebLinkAboutSDP 11-04; LA COSTA BLUFFS LOT 406; FINAL SOILS REPORT; 2021-11-12., EAST COUNTY SOLL CONSULTATION AND ENGINEERING, INC Diversified Development 10925 HARTLEY ROAD, SUITE "l" SANTEE, CALIFORNIA 92071 TEL. 619-258-7901 7668 El Camino Real, I 04-280 Carlsbad, California 92009 November 12 , 2021~- Project No. 0l-l l47H 1(1) Subject: Final As-Graded Soil Report for La Costa Bluffs Apartments 2930, 2936, 2940 & 2946 La Costa A venue City of Carlsbad, California 92009 References: See Attached Ladies & Gentlemen: In accordance with your request, we have prepared this final, as-graded soil report for the La Costa Bluffs Apartment project at the subject site. Based on our field observations and referenced Reports of Field Density Tests (References 1-4, 6, 7, 9, l 0, 12 and 13), it is our opinion that the soil engineering and engineering geologic aspects of the site grading were performed in accordance with the referenced limited geotechnical investigation and updates (References 17, 19 and 23), local grading ordinances and the project grading plans. In addition, footing excavations, soil expansion characteristics and soil bearing capacity are all in conformance with the approved plans and specifications. This opportunity to be of service is appreciated. If you have any questions, or we can be of further service, please do not hesitate to call or contact us. Respectfully Submitted, Martin R. Owen, PE, GE Geotechnical Engineer Attachment: References Final As-Graded Soil Report for La Costa Bluffs Apartments 2930, 2936, 2940 & 2946 La Costa A venue Carlsbad, California 92009 REFERENCES Page 2 November 12, 2021 Project No. 01-1147111(1) I. "Report of Field Density Tests, Additional Retaining Walls, La Costa Bluffs Apartments, Lots 406 and 407, 2930 La Costa Avenue, City of Carlsbad, Ca lifornia 92008", Project No. 01-1 14 7G I (I), Prepared by East County So il Consullation and Engin eering, Inc., Dated October 2, 20 13. 2. "Report of Field Density Tests, Water Linc Trench Backfill, La Costa Bluffs Apartrnents 2930 La Costa Avenue, City of Carlsbad, California 92008", Project No. 0l-1147Gl(l), Prepared by East County Soil Co nsultati on an d Engineering, lnc., Dated June J I, 20 13. 3. "Report of Field Density Tests, Sewer Trench Backfill, La Costa Bluffs Apartments, 2930 La Costa Avenue, City of Carlsbad, Ca lifornia 92008", Project No. 01-114 7G I (I), Prepared by East County Soil Consultation and Engineering, lDc., Dated April 4, 20 13. 4. "Report of Field Density Tests, La Costa Bluffs Apartments, Lot 409, SDP 11 -07, 2930 La Costa Avenue, City of Carl sbad, California 92008", Project No. 0 l -I 147G 1( I), Prepared by East County Soil Co nsultation and Engineering, In c., Dated January 30, 2012. 5. "Foundation Excavation Observation, La Costa Bluffs Apartments, Loi 409, SDP 11 -07, 2930 La Costa AveDue, City of Carlsbad , Ca li fornia 92008'', Proj ect No. 01-l 147G l(l ), Prepared by East County Soil Consultation and Engineering, Inc., Dated February 14, 201 2. 6. "Report of Field Density Tests, Proposed Retaining Wall, La Costa Bluffs Apartments, Lot 409, SDP 11-07, 2930 La Costa Avenue, City of Carlsbad, California 92008", Project No. 0l-1147Gl(l), Prepared by East County Soil Consultation and Engineering, Inc ., Dated February 14, 2012. 7. "Report of Field Density Tests, La Costa Bluffs Apartments, Loi 408, SDP 11 -06, 2930 La Costa Avenue, City of Carlsbad, California 92008", Proj ect No. 01-11470 I (I), Prepared by East County Soil Consultation and Engineering, Inc., Dated February 8, 20 12. 8. "Foundat ion Excavation Observation, La Costa Blu ffs Apartments, Lot 408, SDP 11 -06, 2930 La Costa Avenue, City of Carlsbad, California 92008", Project No. 01-11470 I (I), Prepared by Eas t Co unty Soil Consultation and Engineering, Inc., Dated May 2, 2012. 9. "Report of Field Density Tests, Proposed Retaining Wall, Ln Costa Bluffs Apartments, Lot 408, SDP 11-06, 2930 La Costa Avenue, City of Carlsbad, Ca lifornia 92008'', Project No. 0l-l 147Gl(I), Prepared by East County So il Consultation and Engineering, Inc., Dated February 14, 201 2. 10. "Report of Field Density Tests , La Costa Bluffs Apartments, Lot 407, SDP 11-05, 2930 La Costa Avenue, City of Carlsbad, Ca lifornia 92008", Project No. 01-114 7G I (I), Prepared by East County Soil Consultation and Engineering, Inc. Dated March 20, 2012. I I. "Foundation Excavation Observation, La Costa Bluffs Apartments, Lot 407, SDP 11-05, 2930 La Costa Avenue, City or Carlsbad, California 92008'', Projec t No. 01-1 147G I (I), Prepared by East County Soil Consultation and Engineering, In c., Dated June 19, 20 12. 12. ''Report of Field Density Tests, Proposed Retaining Wall, La Costa Bluffs Apartments, Loi 407, SDP 11-05, 2930 La Costa Avenue. City of Carlsbad, California 92008'', Project No. 0 l -I I 47G I (I), Prepared by East Co unty Soil Consultation and Engineering, Inc., Dated February 14, 20 12. 13. "Report of Field Density Tests, La Costa Bluffs Apartments, Loi 406, SDP 11-04, 2930 La Costa A venue, City of Carlsbad, California 92008", Project No. 01-11470 I (I), Prepared by East County Soil Co nsultation and Engineering, Inc., Dated April 2, 201 2. EAST COUNTY SOIL CO SULTATION AND ENG INEERING, I C. Final As-Graded Soil Repol't fol' La Costa Blnffs Apartments 2930, 2936, 2940 & 2946 La Costa Avenue Cal'lshad, California 92009 REFERENCES (Continued) Page 2 Novemhel' 12, 2021 Project No. 0l-1147Hl(I) 14. "Foundation Excavati on Observation, La Costa Bluffs Apartments, Lot 406, SDP I 1-04, 2930 La Costa Avenue, City of Carlsbad, California 92008'', Project No. 01-114 7G I (I), Prepared by East County Soil Consultation and Engineering, In c., Dated July 26, 20 12. 15. "Response to City of Carl sbad's Review o f Documents, 4 Proposed 6-Unit Residential Buildings, (La Costa Bluffs, LLC Apartments), Lots 406 th ro ugh 409, Map No. 6600, La Costa Avenue, City of Carlsbad, California'', Project No. 01-11470 I (I), Prepared by East County Soil Consultation and Engineering, Inc., Dated December 6, 20 I I. 16. "Grading Plan, Foundation Plan and Details Review, 4 Proposed 6-Unit Residential Buildings, Lots 406 through 409, Map No. 6600, La Costa Avenue, City of Carlsbad, Cali fornia", Project No. 0 I-I I 47G I (I), Prepared by East County Soil Consultation and Engineering, Inc., Dated December 6, 2011 . 17. "Limited Site Investigation Update, 4 Proposed 6-Unit Residential Buildings, Lots 406 through 409, Map No. 6600, La Costa Avenue, C ity of Carlsbad, California", Project No. 0 1-11470 I (I), Prepared by East County Soil Consultation and Engineering, Inc., Dated August 3, 2011 . 18. "Addendum to Limited Site In vestigation Update, Proposed 26-Unit Residential Development, North Side of La Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No.01-l 147G I (IE), Prepared by East County Soil Consultation and Engineering, Inc., Dated November 6, 2007. 19. "Limited Site Investigation Update, Proposed 26-Unit Apartment Complex, North Side of La Costa Avenue West of Romeria Street, City of Carlsbad, California", Project No. 0 I -I 147G I (ID), Prepared by East County Soil Consultation and Engineering, Inc., Dated March 5, 2007. 20. "Drainage Swale Clarification, Proposed Apartment Complex, Units No. 4 and 5, North Side of La Costa Avenue West of Romcria Street, City of Carlsbad, California", Project No. 01-114 7G I (IC), Prepared by East County Soil Consultation and Engineering, Inc., Dated February 17 , 2004. 2 1. "Drainage Swale Assessment, Proposed 5-Unit Apartment Building, Lot 409, North Side of La Costa Avenu e, West of Romeria Street, City of Carl sbad, California", Project No. 01-11470 I ( I B), Prepared by East County Soil Consultation and Engineering, lnc., Dated December 8, 2003. 22 . "Addendum to Limited Site lnvestigation, Slope Stability Analysis and Drainage Swale Location, Proposed 26- Unit Apartment Complex, 4 Vacant Lots, North Side of LA Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. Ol-l 147G l(IA), Prepared by East County Soil Consultation and Engineering, Inc., Dated May 20, 2003. 23. "Limited Site In vestigation, Proposed 26-Unit Apartment Complex, North Side of LA Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 01-11470 I (I), Prepared by East County Soil Consultation and Engineering, Inc., Dated June 9, 200 I. EAST COUNTY SOIL CO SULTATION AND ENGIN EERING, LNC. -1 EAST COUNTY SOIL CONSULTATION AND ENGINEERlNG, INC. 10925 .HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071 (619) 258-7901 Fax 258-7902 Diversified Development 24335 Prielipp Road, Suite 112 Wildomar, California 92595 Sul~ject: Report of Field Density Tests La Costa Bluff:-;; Apartments Lot Nt>. 406, SDP 11-04, 2930 La Costa Avenue City of Carlsbad, California 92008 Ladies & Gentlemen: April 2, 2012 Project No. 0l-1147HJ(l) This is to present the results of field density tests performed on the building pad for the proposed two-story, apartment building on Lot No. 406 at tJie subject site. In accordance with your request, in-place field density tests were performed in accordance with ASTM D1556 (Sand Cone I\,1ethod). Grading was conducted bet\.veen January 26, 2012 and March 8, 2012 under the observution and testing of a representitive of East County Soil Consultation & Engineering Inc. The results of the field density tests are presented on Page T-1 under "Table of Test Results". The laboratory determinations of the maximum dry densities and optimum moisture contents of the fill soils as weB as the expansion index test results are set forth on Page Lw l under "Laboratory Test Results". Direct shear and consoiidation tests results are also attached. The approximate test locations are shown on Plate No. I. Following clearing and grubbing. i.e. the removal of vegetation and deleterious materials, subgrade soils were overexcavated to depths ranging between approximately 10 and 31 feet below existing grade into the dense sandstone of the Santiago Formation. Prior to the placement of new fill, the bottom of the excavation was scarified to a depth of approximately 12 inches, moisture conditioned and compacted. On-site fill soils consisting of clayey sand were placed in thin lifts, moisture conditioned generally above optimum and compacted to a minimun1 of 90 percent relative compaction. Compaction was achieved with the use of a Caterpillar 9500 loader, a Caterpillar 977 trackloader and a sheepsf:oot roller. DIVERSIFIED DEVELOPMEN71 LA COSTA BLUPFS PROJECT NO. DI-I J47Hl(/j Based on our field observations and density test results, it is our oprmon that the grading operation for the proposed residential project was performed in accordance with the referenced geotechnica1 report (Reference No. 9) and local grading ordinances. Furthermore, we have reviewed the referenced reports and evaluated the new soil conditions following the grading operation on Lot 406. Based upon the "medium" expansion potential of the surfical fill soils, the deptbs of of fill and the adjacent slope to the north, the foundation and slab recommendations are updated as follows: a. Continuous footings are suitable for use and should extend to a minimum depth of 24 inches below the lowest adjacent grade for the proposed two-story structure into the properly compacted fill soils. These footings should be at least 15 inches in width and reinforced with four #5 steel bars; two bars placed near the top of the fbotings and the other t\vo bars placed near the bottom of the footings. In addition, bearing wall footings that are to be located near the top of the adjacent slope should be deepened to allow a minimum daylight distance of l 0 feet laterally from the outside edge of the footing to the slope face. b. Interior co11crete floor slabs should be a minimum 4 inches thick. Reinforcement should consist of #3 bars placed at 12 inches on center each way within the middle third of the slabs by supporting the steel on chairs or concrete blocks "dobies'1• The slabs should be underlain by 2 inches of clean sand over a 10-mil visqueen moisture barrier and ,'l capillary break at least 4 inches thick, consisting of coarse sand, gravel or crushed rock not exceeding 3/4 inch in size with no more than 5 perceIJt passing the #200 sieve. c. An allowable soil bearing value of 2,000 pounds per square foot may be used for the design of the above footings founded into the compacted fiJ] soils. This value may be increased by 700 psf and 300 psf for each additional foot of depth and width respectively to a maximum of 3,000 psf due to settlement limitations. The allowable bearing value may be also increaded by one-third for transient loading, such as wind or seismic load. d. Lateral resistance to horizontal movement may be provided by the soil passive pressure and the friction of concrete to soil. An allowable passive pressure of 250 psf/ ft of depth may be used. A coefficient of friction of 0.35 is recommended. The soils passive pressure may be increased by 1/3 for wind and seismic loading. e. Perimeter foundations and interior slabs should be thoroughly saturated for at least 24 hours prior to placement. 2 DJVERS'IFJED DEVELOPA1ENT/ LA COSTA BLUFFS PROJECT NO. 01-1 l47Hl(l) If we can be of fmther assistance, please do not hesitate to contac t our office. Pages T~ 1, L~ I and Plate No. 1 are attached. Respectfully Submitted, Mamadou Saliou Diallo, P.E. RCE 54071, GE 2704 l'v1SD/md ---····························••'-••--· ·······························'-······ TEST SOIL NO. TYPE l 2 ,., _, 4 5 1 6 2 '7 2 J 8 3 9 3 JO l ll 3 12 2 ]3 3 14 3 15 ., .) 16 3 17 3 18 3 19 3 20 3 21 3 22 2 23 2 24 2 25 26 3 DJVERSJF!ED DEVELOPMENT! LA COSTA BLUFPS PROJECT NO O i-1 I 47H l (/) DEPTH OF :FILL IN FEET 2 4 6 7 9 11 13 14 15 17 18 19 21 23 24 25 26 l 2 3 5 6 ,., ! 8 2 3 TABLE O.F TEST RESULTS ASTMD1556 MAXIMUM FI.ELD DRY DRY MOISTURE DENSITY DENSITY %DRY WT. P.C.F. P.C.F 16.9 109.7 118.5 16,2 107.7 118.5 18.8 107.4 118.5 18.7 1.11.9 118,5 .19.5 111.5 l J 8.5 20.2 106.7 l 16 .5 19.2 106.2 116.5 16,7 109.3 118.0 l 7.1 109. l l 18,0 16.l 110.6 118.5 18,2 105.4 118.0 17.7 106.3 116.5 17.6 ll l.3 1.18.0 17.3 108.7 l 18.0 ] 8.3 J 06.S l l 8.0 16.7 11 J.l l 18.0 l 7.1 U0.5 118.0 18.7 106.0 l 18.0 18.5 1 J 2.5 118.0 19.5 108.8 118.0 l 8.2 111.1 l J 8.0 15.9 106.8 116.5 15.7 106.5 116.5 16.2 l 07.4 l 16.5 17,6 109.4 118.5 16.2 107.7 118.0 4 PERCENT COMPACTION 93 91 91 94 94 92 91 93 92 93 90 91 94 92 90 94 94 90 95 92 94 92 92 92 92 91 REMARKS TEST SOIL NO. TYPE 27 3 28 29 3 30 3 31 4 ~., ,;k 3 33 3 34 3 35 .., ., 36 3 37 ,, .) 38 l 39 40 41 2 42 4- 43 4 44 4 45 1 46 .., _, 47 48 ,, .) 49 3 50 51 4 D!VER.'-i'lFIED DEVELOPMENT/ LA COSTA BLUfl'S PROJECTNO.01-11471110) DEPTH OFFILL IN FEET 5 6 JO 12 13 2 15 10 17 4 19 8 2 4 6 8 10 7 4 8 5 10 12 14 15 PAGE T-1 (Continued) TABLE OF TEST RESULTS ASTM D1556 MAXIMUM FIELD DRY HRY MOISTURE DKNSJTY DENSITY %DRY WT. P.C.:F. P.C.:F 19.5 110.2 118.0 19.3 108.0 118.5 18.2 108.7 118.0 17,9 108.7 l] 8.0 ]6.7 107.1 115.0 18.7 107.5 118.0 15.8 107,9 l l 8.0 15.4 108.1 118.0 15.9 107.9 l 18.0 18.2 106.8 118.0 17.6 110.1 118.0 16.6 ll 1.7 118.5 18.7 110.4 118.5 18.5 108.4 118.5 16.4 106.0 116.5 19.7 105.3 115.0 17.3 103.8 ll5.0 20.0 106.4 115.0 19.8 107.0 118.5 16.2 107.4 l lS.O 17.8 108.5 118.5 15.6 109.3 118.0 l 8.2 108.5 118.0 18 .5 109.9 1 l 8.5 17.3 109.7 I 15.0 5 PERCENT COMPACTION 93 91 92 92 93 91 91 92 91 90 93 94 93 92 91 92 90 93 90 91 92 93 92 93 95 REMARKS TEST SOIL NO. TYPE 52 4 53 ,, :, 54 3 55 3 56 3 57 58 ,, .) 59 2 60 2 61 2 62 ., .) 63 3 64 3 65 3 66 3 67 l 68 69 3 70 71 "' ·' 72 4 73 3 74 3 75 3 76 -~ ., DlVERSlF!ED DEVELOPMENT/LA COSTA BLUFFS PROJECT NO. OJ-I /47HJ(l) DEPTH OF .FILL INF.EET 2 4 6 '1 .. 4 6 8 10 2 12 13 15 7 9 16 ]2 2 4 6 2 4 6 8 27 FG 10 FG TABLE OF TEST RESULTS ASTMD1556 MAXIMUM FIELD DRY DRY MOISTURE .DENSITY JJENSITY %DRY WT. P.C.F. P.C.F .17.8 108. l 115.0 17.4 !09.7 J 18.0 18.7 l I 0.1 118.0 17.8 108.9 118.0 19.0 109.3 118.0 19.6 111 .5 118.5 19.4 106.4 118.0 17.2 104.7 116.5 18.2 106,7 116.5 17.2 108.9 116.5 19.5 106.6 118.0 16.9 112.3 118.0 18.9 106.8 118.0 18.1 109.4 l J 8.0 18.2 110.7 118.0 17.6 109.J 118.5 18.5 J 08.3 118.5 18.2 109.1 118.0 18.4 111.7 118.5 18.3 110.7 118.0 l 6.1 108.0 115.0 17. l 109.1 118.0 17.4 108.9 118.0 16.8 11 O. l 118.0 16.9 110.5 118.0 FG = FJNISH GRADE " PERCENT COMPACTION 94 93 93 92 93 94 90 90 92 93 90 95 91 93 94 92 91 92 94 94 94 92 92 93 94 REMARKS DIVERS'.JFJED DEVELOPlvfENTI LA COSTA BLUFFS PROJECT NO OJ-l l47HJ(l) PAGEL-1 LABORATORY TEST RESULTS RESULTS OF MAXIMUM DENSITY AND Ol)TIMUM 1\1:0ISTURE The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM D 1557, Procedures A and 8 which use 25 blows of a 10-pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 4-inch diameter J /30 cubic foot compaction cylinder and Procedure C which uses 56 blows of a 10-pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 6-inch diameter 1/l3.3 cubic foot compaction cyl inder are presented as follows: OPTIMUM MAXIMUM MOISTURE SOIL TYPE/ DRY DENSITY CONTENT PROCEDURE DESCI{J.=-PT .... I=O=N-' -------=LB=/~C~-L~l·~F~T~. ----'-o/c~o =D=R~Y-'\:-'-V1~'-'-- 1/ A BLUEISH GRAY CLAYEY SAND 2/ A LIGHT BROWN CLAYEY SAND 3/A LIGHT GRAY CLAYEY SAND 4i A LIGHT REDDISH BROWN CLAYEY SAND 118.5 l 16.5 118.0 115 .0 EXPANSION INDEX TEST (ASTM. ])4829) INITIAL SATURATED IN ITJAL DRY MOISTURE MOISTURE DENSITY EXPANS ION 13.0 13.5 14.8 14.0 CONTENT(%.,_) ___ C~ONTENT(o/<.,,,_,.o)'--____ _,(=-PC-=--'IJ. __ __.:I~N=:D=E=·x"------"'S'-=O=IL=· ·~T~Y~P=E 11.9 25.5 102.0 80 3 _;:.,,C,IJ(_E. I II,,;. 35,:;:/ ~F'-fO>:,) --. ; l I ' @ /=!Cl~---t::> £':::~!/>51'/)/ ,7c? /T 1-·1r-l t t Ac.~ /f,.,f,54 l.1---1.i EAST COUNTY SOIL CONSULTATION & ENGINEERING, lNC. 10925 HARTLEY RD .. SUITE!. SANTEE. CA 92071 (6 l 9) 251\-790 I F:i.x (6 l 9) 25~!-7902 i I I { l 1( 11 I ' --==· ==·,=•· ==-==--=== Direct Shear Test Results 4.0 •········· ········· L .. Ill Shear Strength at 0.2 inches l of Oeformalion i i;::-~.0 1----1----+----+---.----+---+---+------;----1---·····l ~ j (I) 2.0 ------- I 00 -!----..---'----+--------------..,__ __ ,__ ____ ___, 0.0 o., 1.U 1.S 2.0 i.5 'I.fl Confining Pressure (ksf) SAMPLE 409 La Costa Shear Strength at DESCRIPTION Tan Silty Sand w/Trace Clay (Remold to 90%) 0.2 inches of Deformation SOUTHERN CALIFORNIA SOIL & TESTING INTERNAL FRJCTION ANGLE(DEG.) By: Job Number: 45 5.0 COHESION 1NTERCEPT (PSF) 319 East Co Soil CA !Date: 1212031 I 1/24/2012 C 0 i -a Consolidation Sample Location La Costa Avenue 0 ~--,~~~~~~····•···•·--- 0.5 1 ~ ~ 1 0 1 . 5 .. ; ................... ---!---l---4----J.--,., :~ 0 -C: OJ I: ll) ll. 2 •·-----+··············••;••········••i•-~i••-k--•···•·················---'-~,,--'-,+f ·•··· !\ 1!1: '--i--+-l---l····+····•···-1··1·········· ........ -i---+•··-···+ ··H\, .. , .... ~ I LI Wat•., r Ad,r•1t i i IJ ... I_ ---' ~· l 3 0.1 SOUTHERN CALIFORNIA 1 10 Load Kips/Sq.Ft. EAST COUNTY SOILS ! I I I 100 12/6/2011 SOIL & TESTING, INC. Sy: DRB!EL Date: 1-------~----.........-.il-----~---~ Job No.: 1112031 Figure: i DIVERS/Fl ED DEVELOPkfENT/ LA COSTA BLUFFS PROJECT NO. 0l-l l47H!(I) REFERENCES l. "Response to City of Carlsbad's Review of Documents, 4 Proposed 6-Unit Residential Buildings, (La Costa Bluff..'>, LLC Apartments), Lots 406 through 409, Map No. 6600, La Costa Avenue, City of Carlsbad, California", Project No. 0l-1147Gl(J), Prepared by East County Soil Consultation and Engineering, Inc., Dated December 6, 2011. 2. "Grading Plan, Foundation Plan and Details Rcvi.cw, 4 Proposed 6-Unit Residential Buildings, Lots 406 through 409, Map No. 6600, La Costa Avenue, City of Carlsbad, California'', Project No. 01-114701(1), Prepared by East County Soil Consultation and Engineering, Inc., Dated December 6, 2011. 3. "Limited Site Investigation Update, 4 Proposed 6-Unil Residential Buildings, Lots 406 through 409, Map No. 6600, La Costa A venue, Chy of Carlsbad, California", Project No. 01-I l 4 7G l (l ), Prepared by East County Soil Consultation and Engineering, Inc., Dated August 3, 2011. 4. "Addendum to Limited Site Investigation Update, Proposed 26-Unit Residential Development, North Side of La Costa Avenue, West of R.omeria Street, City of Car.lsbad, California", Project No. 01-1147GJ(lE), Prepared by East County Soil Consultation and Engineering. Inc., Dated November 6, 2007. 5. "Limited Site Investigation Update, Proposed 26-Unit Apertment Complex, North Side of La Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 0l- l l47G1(LD), Prepared by East County Soil Consultation and Engineering, Inc., Dated March 5, 2007. 6. "Drainage Swale Clarification, Proposed Apartment Complex; Units No. 4 and 5, N01th Side of La Costa Avenue, West of Romeria Street, City of Carlsbad, Califrm1ia", Project No. 0l- l 147G 1 (l C), Prepared by East County Soil Consultation and Engineering, Inc., Dated February 17, 2004. 7. "Drainage Swale Assessment, Proposed 5-Unit Apartment Building, Lot 409, North Side of La Costa A venue, West of Romeria Street, City of Carlsbad, California", Project No. 0 l ~ l 147Gl(IB), Prepared by East County Soil Consultation and Engineering, Inc., Dated Dec.ember 8, 2003. 8. "Addendum to Limited Site Investigation, Slope Stability Analysis and Drainage Swale Location, Proposed 26-lJnit Apatiment Complex, 4 Vacant Lots, North Side of LA Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 0l~J 147Gl(JA), Prepared by East County Soil Consultation and Engineering, Inc., Dated May 20, 2003. 9. "Limited Site Investigation, Proposed 26-Unit Apartment Complex, North Side of LA Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 0I-l l47Gl(l), Prepared by East County Soil Consultation and Engineering, Inc., Dated June 9, 2001. 8 EAST COUNTY SOIL CONSULTATION AND :ENGINEERING, INC. 10925 HARTLEY ROAD SUITE I SANTEE CALIFORNIA 92071 619 258~7901 Fax 619 258-7902 Diversified Development 24335 Prielipp Road , Suite 112 Wildomar, California 92595 Subject: Foundation Excavation Observation La Costa Bluffs Apartments Lot No. 406, SDP 11-04, 2930 La Costa Avenue City of Carlsbad, California 92008 Ladies & Gentlemen: July 26, 2012 Project No. 01-l 147Hl(l) In accordance v.rith your request, we have observed the foundation excavations for the proposed two-story, apartment building on Lot No. 406 of the La Costa Bluffs A.partments project. The footings have been excavated to the proper depth and width into compete.nt bearing soils and are in compliance \Vith the approved building plans. Foundation excavations, soil expansion characteristics and soil bearing capacity are in accordance with the referenced soils report (Reference No. 1 ). Ifwe can be of further assistance, please do not hesitate to contact our office. Respectfolly Submitted, D!VERS!flED DEVELOPlvfENTI LA COSTA BLUFFS PROJECT NO. 0 I-1 I 47 fl 1 (J) REFERENCES 1. "Repo1t of Field Density Tests, La Costa Bluffs Apartments, Lot 406, SDP 11-04, 2930 La Costa Avenue, -City of Carlsbad, California 92008", Project No. 0 l -1147G 1 (!),Prepared by East County Soil Consultation and Engineering, foe., Dated Aptil 2, 2012. 2. "Response to City of Carlsbad's Review of Documents, 4 Proposed 6-Unit Residential Buildings, {La Costa Bluffs, LLC Apartments), Lots 406 through 409, Map No. 6600, La Costa Avenue, City of Carlsbad, California", Project No.01-114701(1), Prepared by East County Soil Con~ultation and Engineering, Inc., Dated December 6, 20 l l . 3. "Grading Plan, Foundation Plan and Details Review, 4 Proposed 6-Unit Residential Buildings, Lots 406 through 409, Map No. 6600, La Costa Avenue, City of Carlsbad, California", Project No. 0l-l l47G1(1), .Prepared by East County Soil Consultation and Engineering, Inc., Dated December 6, 20 l l . 4. "Limited Site Investigation Update, 4 Proposed 6-Unit Residential Buildings, Lots 406 through 4091 Map No. 6600, La Costa Avenue, City of Carlsbad, California", Project No. 01-114701(1), Prepared by East County Soil Consultation and Engineering, Inc., Dated August 3, 2011 . 5. "Addendum to Limited Site Investigation Update, Proposed 26-Unit Residential Development, North Side of La Costa A venue, West of Romcria Street, City of Carlsbad, California", Project No. 01-Il 4 70 l (l E), Prepared by East County Soil Consultation and Engineering, Inc., Dated November 6, 2007. 6. "Limited Site Investigation Update, Proposed 26-Cnit Apmtment Complex, North Side of La Costa Avenue, West of Romeria Street, City of Carlsbad, Califomia", Project No. 01-1147Gl(ID), Prepared by East County Soil Consultation and Engineering, Inc., Dated March 5, 2007. 7. "Drainage Swale Clarification, Proposed Apartment Complex, Units No. 4 and 5, North Side of La Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 01 • 11470 I (1 C), Prepared by East County Soil Consultation and Engineering, Inc., Dated Febrna1y 17, 2004. 8. "Drainage Swale Assessment, Proposed 5-Unit Apartment Building, Lot 409, North Side of La Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 0 l-1147G 1 (IB), Prepared by East County Soil Consultation and Engineering, Inc., Dated December 8, 2003. 9. "Addendum w Limited Site Investigation, Slope Stability Analysis and Drainage Swale Location, Proposed 26-Unit Apartment Complex, 4 Vacant Lots, North Side of LA Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 01-l l47Gl(lA), Prepared by East Co1mty Soil Consultation and Engineering, Inc., Dated May 20, 2003. JO. ,;Limited Site Investigation, Proposed 26-Unit Apartment Complex, North Side of LA Costa Avenue, West of Romeria Street, City of Carlsbad, California", Project No. 01-114701(1), Prepared by East CoW1ty Soil Consultation and Engineering, lnc., Dated June 9,2001. 2