Loading...
HomeMy WebLinkAboutDWG 458-3A; CDP 06-25; HAGEY RESIDENCE; 01-02GRADING NOTES (IN ADDITION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE CARLSBAD MUNICIPAL CODE,) 1. THIS PLAN. SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING GRADING SHOWN ,ON THIS SET OF PLANS. 2. APPROVAL OF THIS PLAN DOES NOT LE:SSEN OR WAIVE ANY PORTION OF THE CARLSBAD MUNICIPAL CODE, RESOLUTION .. OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE JS DISCOVERED. 3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGJNEER-OF- WORK FROM RESPONSIBILITY.:' FOR THE, CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTR'uCTION, :'.'ALL : PLAN REVISIONS SHALL BE PROMPT!. Y SUBMITTED TO THE CITY ENGINEER FOR APPROVAL. 4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER W1LL BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A CERT/FICA TE OF INSURANCE AS WELL AS ADDITIONAL INSURED ENDORSEMENT MUST BE FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH OCCURRANCE OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST HAVE A RATING OF "A-" OR BETTER AND ASIZE CATEGORY OF CLASS V OR BETTER AS ESTABLISHED BY "BESTS" KEY RA TING' GUIDE. 5. UNLESS EXEMPTED BY SECTION 301.(b)5 OF THE UNIFORM BUILDING CODE, RETAINING WALLS OUTSIDE OF PUBLIC RIGHT OF WAY REQUIRE SEPARATE PERMITS FROM THE BUILDING DEPARTMENT. 6. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HA VE BEEN OBTAINED FROM THE CITY AND OTHER APPROPR/A TE AGENCIES. 7. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK OR GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS BEEN OBTAINED AND A VALID GRADING PERMIT HAS BEEN ISSUED. 8. NO REVISIONS W1LL BE MADE TO THESE PLANS W1THOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED W1THIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS AND THE TITLE SHEET. 9. ORIGINAL DRAW1NGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING SIGNED BY THE CITY ENGINEER. 10. THE ORIGINAL DRA W1NG SHALL BE REVISED TO REFLECT AS-BU/LT CONDITIONS BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY. 11. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCT/ON. 12. WHERE TRENCHES ARE W1THIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF: (A) SUMMARY SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STATE OF CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. THE SOILS REPORT W1LL BE SUBMITTED TO THE CITY ENGINEER/NG INSPECTOR WITHIN TWO WORKING DAYS OF THE COMPLETION OF FIELD TESTS. 13. A SOILS COMPACTION REPORT AND COMPLIANCE VERIFICATION REGARDING ADHERENCE TO RECOMMENDATIONS OUTLINED IN THE SOILS REPORT JS REQUIRED PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING SHALL BE DONE UNDER THE DIRECTION OF A PROFESSIONAL ENGINEER OF THE STA TE OF CALIFORNIA PR/NC/PALLY DOING BUSINESS IN THE FJELD OF APPLIED SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED IN ACCORDANCE W1TH THE CITY OF CARLSBAD STANDARD SPECIF/CATIONS AND THE " EARTHWORK SPECIF/CATIONS " ATTACHED TO THE PRELIMINARY SOILS JNV£$TIGA TION. DAILY FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE PROJECT INSPECTOR. 14. A PRECONSTRUCTION MEETING SHALL BE HELD AT THE SITE PRIOR TO THE BFGINNING OE WORK AND SHAii BE ATTENQW RY All REPRE5ENIADVE5 RESPONSIBLE FOR CONSTRUCTION, INSPECTION, SUPERVISION, TESTING AND ALL OTHER ASPECTS OF THE WORK. THE CONTRACTOR SHALL REQUEST A PRECONSTRUCTJON MEETING BY CALLING THE INSPECTION LINE AT (760) 4JB-J891 AT LEAST FIVE(5) WORKING DAYS PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR W1LL THEN BE CONTACTED BY THE PROJECT INSPECTOR TO COORDINATE A DA TE AND TIME FOR THE PRECONSTRUCTION MEETING. APPROVED DRA W1NGS MUST BE AVAILABLE PRIOR TO SCHEDULING. THE GRADING PERMIT W1LL BE PROVIDED BY THE PROJECT INSPECTOR AT THE MEETING. 15. All INSPECTION REOIIESTS OTHER THAN FOR PRFCONSTRUCTTON MEETING l'ALL BE MADE RY CAIi/NG THE ENG/NEERING 2_'(-HOl/B INSl'FCTTON REOUFST LINE_ llI (760) 438-3891. INsPECTION REQUEST MUST BE RECEIVED PRIOR TO 2: 00 P.M. ON THE DAY BEFORE THE INSPECTION IS NEEDED. INSPECTIONS W?LL BE MADE THE NEXT WORK DAY UNLESS YOU REQUEST OTHERW?SE. REQUESTS MADE AFTER 2: 00 P.M. W?LL BE SCHEDULED FOR TWO FULL WORK DAYS LATER. 16. THE OWNER ANO/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS. LAWS AND REGULATIONS. 17. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A . DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOW?NG THE DESIGN DF SHORING, BRACING SLOPING OR OTHER PROVISIONS TO BE MADE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8 CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A REG/STFRED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO EXCA VAT/ON. 18. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN OBTAINED FROM THE CITY OF CARLSBAD. SUBMIT APPL/CATION FOR BLASTING PERMIT WELL IN ADVANCE OF THE SCHEDULING OF BLASTING OPERATIONS. 19. IF ANY ARCHAEOLOGICAL OR PALEONTOLOGJCAL RESOURCES ARE DISCOVERED W1THIN ANY WORK AREA DURING CONSTRUCTION. OPERATIONS W?LL CEASE IMMEDIATELY, AND THE PERMITTEE W?LL NOTIFY THE CITY ENGINEER. OPERA T/ONS W?LL NOT RESTART UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DO SO. A. THE FOLLOW1NG PALEONTOLOGICAL MIT/GA TION MEASURES SHALL BE IMPLEMENTED: 1) THE DEVELOPER SHALL RETAIN A QUALIFIED PALEONTOLOGIST TO CARRY OUT THE MIT/GA TION PROGRAM OUTLINED HERE. (A QUALIFIED PALEONTOLOGIST IS DEFINED AS AN INDIVIDUAL W?TH A MS OR Ph.D IN PALEONTOLOGY OR GEOLOGY THAT IS FAMILIAR WITH PALEONTOLOG/CAL PROCEDURES &: TECHNIQUES) 2) A QUALIFIED PALEONTOLOGIST SHALL BE AT THE PRE-CONSTRUCTION MEETING TO CONSULT W?TH THE GRADING &: EXCAVATION CONTRACTORS. J) A PALEONTOLOGICAL MONITOR SHALL BE ONSITE AT ALL TIMES DURING MASS GRADING &: EXCAVATION ACTIVITIES, INCLUDING UTILITY TRENCHING, ETC. (A PALEONTOLOGICAL MONITOR IS DEFJENED AS AN INDIVIDUAL WHO HAS EXPERIENCE IN THE COLLECTION &: SALVAGE OF FOSSIL MATERIALS. THE PALEONTOLOGJCAL MONITOR SHALL WORK UNDER THE DIRECTION OF A QUALIFIED PALEONTOLOGIST). 4) WHEN FOSSILS ARE DISCOVERED, THE PALEONTOLOGIST (OR PALEONTOLOGIST MONITOR) SHALL RECOVER THEM. IN MOST CASES THIS FOSSIL SALVAGE CAN BE COMPLETED IN A SHORT PERIOD OF TIME. HOWEVER, SOME FOSSIL SPECIMENS (SUCH AS A COMPLETE LARGE MAMMAL SKELETON) MAY REQUIRE AN EXTENDED SALVAGE PERIOD. IN THESE INSTANCES THE PALEONTOLOGIST (OR PALEONTOLOGIST MONITOR) SHALL BE ALLOWED TO TEMPORARILY DIRECT, DIVERT OR HALT GRADING TO ALLOW RECOVERY OF FOSSIL REMAINS IN A TIMELY MANNER. BECAUSE OF THE POTENTIAL FOR THE RECOVERING OF SMALL FOSSIL REMAINS, SUCH AS /SOLA TED MAMMAL TEETH, IT MAY BE NECESSARY TO SET UP A SCREEN-WASHING ON THE SITE. 5) FOSSIL REMAINS COLLECTED DURING THE MONITORING AND SALVAGE PORTION OF THE MIT/GA TION PROGRAM SHALL BE CLEANED, REPAIRED, SORTED AND CATALOGED. 6) PREPARED FOSSILS, ALONG W?TH COPIES OF ALL PERTINENT FIELD NOTES, PHOTOS AND MAPS SHALL BE DEPOSITED (A$ A DONATION) IN A SCIENTIFIC INSTITUTION WITH PERMANENT PALEONTOLOGJCAL COLLECTIONS SUCH AS THE SAN DIEGO NATURAL HISTORY MUSEUM. DONATION OF THE FOSSIL SHALL BE ACCOMPANIED BY FINANCIAL SUPPORT FOR INITIAL SPECIMEN STORAGE. 7) A FINAL SUMMARY REPORT SHALL BE COMPLETED THAT OUTLINES THE RESULTS OF THE MIT/GA TION PROGRAM. THIS REPORT SHALL INCLUDE DISCUSSIONS OF THE METHODS USED, STRATIGRAPHIC SECTION(S) EXPOSED, FOSSILS COLLECTED, AND SIGNIFICANCE OF RECOVERED FOSSIL. C:\DRAWING fllES\TIIl.E SHEETS\Cl.SB-GP.DWG 11/14/06 B. ARCHEOLOGJCAL MIT/GA TION M[ASURES SHALL BE REFLECTED ON THE FINAL GRADING PLANS AND IMPLEMENTED AS FOLLOWS : 1) PRIOR TO ISSUANCE OF GRADING PERMIT, THE PROJECT DEVELOPER SHALL RETAIN A QUALIFIED ARCHEOLOGIST TO MONITOR ALL GROUND DISTURBING ACTIVITIES AND . CARRY OUT THE MJTIGA TION PROGRAM OUTLINED HERE 2) A QUALIFIED ARCHEOLOGIST SHALL BE PRESENT AT THE PRE-CONSTRUCTION MEETING TO CONSULT WITH THE GRADING AND EXCAVA T/ON CONTRACTORS. 3) IN THE EVENT THAT ANY CULTURAL RESOURCES, CONCENTRATION OF ARTIFACTS, OR CULTURALLY MODIFIED SOIL DEPOSITS ARE DISCOVERED W?THIN THE PROJECT AREA AT ANY TIME DURING CONSTRUCTION, ALL WORK SHALL BE HAL TED NEAR THE DISCOVERY AND A QUALIFIED ARCHEOLOGIST SHALL RECORD AND EVALUATE THE DISCOVERY UNDER CEQA. 4) THE DISCOVERY OF ANY RESOURCE SHALL BE REPORTED TO THE CITY OF CARLSBAD PLANNING DIRECTOR PRIOR TO ANY EVALUATION TESTING. 5) IF ANY DEPOSITS ARE EVALUATED AS SIGNIFICANT, FURTHER MIT/GA TION MEASURES SHALL BE REQUIRED AS RECOMMENDED BY THE QUALIFIED ARCHEOLOGJST. 20. MIT/GA TION FOR IMPACTS TO 0.06 AC OF GROUP-£ NON-NATIVE GRASSLAND, AND 0.20 AC OF GROUP-F DISTURBED HABITATS SHALL BE MITIGATED BY PAYMENT OF AN IN-LIEU MIT/GA TION FEE. 21. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, CONSTRUCT/ON EQUIPMENT AND ANY OTHER ASSOC/A TED GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 7: 00 A.M. ANO SUNSET EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT COUNTER.) 22. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. 2J. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE DEPOSITED AT, A SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERA /ION. 24. BRUSH SHALL BE REMOVED ONLY W?THIN THE AREA TO BE GRADED. NO TREES ARE TO BE REMOVED UNLESS SPECIF/CALLY NOTED ON THE PLAN. 25. ALL AREAS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THE PONDING OF WATER JS NOT PERMITTED. ALL EARTHEN SWALES AND DITCHES SHALL HA VE A MINIMUM ONE PERCENT SLOPE. 26. THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SET OF EROSION CONTROL PLANS. EROSION CONTROL SHALL BE AS SHOWN AND AS APPROVED BY THE CITY ENGINEER OR AS DIRECTED BY THE PROJECT INSPECTOR. 27. ALL SLOPES SHALL BE TRIMMED TO A FINISH GRADE TO PRODUCE A UNIFORM SURFACE AND CROSS SECTION. THE SITE SHALL BE LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE REMOVED AND DISPOSED OF AT A SITE APPROVED OF BY THE CITY ENGINEER .. 28. ALL SLOPES SHALL BE IRRIGATED, STABILIZED, PLANTED AND/OR . HYDROSEEDED W?THIN TEN (10) DAYS OF THE TIME WHEN EACH SLOPE IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS. 29. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT, DRAW?NG NO. 458-JL AND/OR AS DIRECTED BY THE CITY ENGINEER OR PLANNING DIRECTOR. JO. THE OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACTORS SHALL COORDJNA TE THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPE AND /RR/GA TION PLANS AND THE IMPROVEMENT PLANS AS REQUIRED FOR THIS WORK IN ACCORDANCE W?TH THE LANDSCAPE MANUAL TIME REQUIREMENTS. 31. STORM DRAIN PIPE SHALL BE REINFORCED CONCRETE PIPE WITH A MINIMUM D-LOAD OF 1,350. FOR PRIVATE STORM DRAIN PIPES, UP TO 15" PVC MAY BE UTILIZED PROVIDED DEPTH IS LESS THAN 15 FEET AND BACKFILLED W?TH 3/4" ROCK PER SDRSD S-4 TYPE "C" AND PIPE MEETS ASTM STANDARD 30J4 FOR SOR 35 SOLID WALL PIPE. J2. WHERE AN EXISTING PIPE LINE IS TO BE ABANDONED AS A RESULT OF THE GRADING OPERATION, IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING OR STREET AREAS AND REPLACED W?TH PROPERLY COMPACTED SOILS. IN OTHER AREAS THE PIPE WILL BE PLUGGED W?TH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER. JJ. THE CONTRACTOR SHALL VERIFY THE LOCA T/ON OF ALL EXISTING FACILITIES ( ABOVE GROUND AND UNDER GROUND ) W1THIN THE PROJECT SITE SUFFICIENTLY AHEAD OF GRADING TO PERMIT THE REVISION OF THE GRADING PLANS IF IT IS FOUND THAT THE ACTUAL LOCA T/ONS ARE IN CONFLICT WITH THE PROPOSED WORK. 34. TH£ CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR FACILITIES AND SHALL COORDJNA TE THE WORK W?TH A COMPANY REPRESENTATIVE. UNDERGROUND SERVICE ALERT SDG&E PACIFIC BELL TIME WARNER CABLE COX COMMUN/CATIONS CITY OF CARLSBAD(STREETS & STORM DRAIN) CITY OF CARLSBAD(SEWER, WATER & RECLAIMED WATER) .SAN DIEGUITO WATER DISTRICT ,LEUCADIA WASTEWATER DISTRICT ,VALLECITOS WATER DISTRICT .OLIVENHAIN WATER DISTRICT ,BUENA SAN/TA TION DISTRICT • *AS APPROPRIATE J5. PERMIT COMPLIANCE REQUIREMENTS: (800)422-4133 (806}660-7J4J (800)892-0123 (760)438-7741 (760)806-9809 (760)434-2980 (760)438-2722 (760)633-2650 (760)753-0155 (760)744-0460 (760)753-6466 (766)726-1340 A. FOR CONTROLLED GRADING -THE APPLICANT HIRES A CIVIL ENGINEER, SOILS ENGINEER, AND/OR GEOLOGIST TO GIVE TECHNICAL ADVICE, OBSERVE AND CONTROL THE WORK IN PROGRESS /15.16.120 A.8} CARLSBAD MUNICIPAL CODE. B. PRIOR TO FINAL APPROVAL OF A GRADING PERMIT -THE FOLLOW?NG REPORTS MUST BE SUBMITTED TO THE CITY ENGINEER VIA THE PROJECT INSPECTOR /15.16.120 A.10} CARLSBAD MUNICIPAL CODE: (1) FINAL REPORT BY SUPERVISING GRADING ENGINEER STA TING ALL GRADING IS COMPLETE. ALL EROSION CONTROL, SLOPE PLANTING AND IRRIGATION ARE INSTALLED IN CONFORMANCE WITH CITY CODE AND THE APPROVED PLANS ( OBTAIN SAMPLE OF COMPLIANCE LETTER FROM CITY ENGINEERING DE PAR TMEN T). (2) AS-BUILT GRADING PLAN. (3) REPORT FROM THE SO/LS ENGINEER, WHICH INCLUDES RECOMMENDED SOIL ·BEARING CAPACITIES. A STATEMENT AS TO THE EXPANSIVE QUALITY OF THE SOIL, AND SUMMARIES OF FJELD AND LABORATORY TESTS. THE REPORT SHALL ALSO EROSION CONTROL NOTES 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT EDWARD HAGEY AT 858/361-4249 2, EOUIPME:NT ANO WORKERS FOR EMERGENCY WORK SHALL BE MADE A VA/LABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FAG/LITA TE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED W?THOUT THE APPROVAL OF THE ENG/NEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERA T/ONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREA TE A HAZARDOUS CONDITION. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT ( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 10. ALL GRAVEL BAGS SHALL BE BURLAP TYPE W1TH 3/4 INCH MINIMUM AGGREGRATE. 11. SHOULD GERM/NAT/ON OF HYDROSEEDEO SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE STABILIZED BY PUNCH STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVA T/ON, STA TE OF CALIFORNIA. TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION SHALL BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPECIF/CATIONS AND THE FOLLOW?NG: A. HYDROSEEDING SHALL BE APPLIED TO: 1. ALL SLOPES THAT ARE GRADED 6: 1 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN THEY ARE: 2. a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO A PUBLIC WALL OR STREET. b. ALL SLOPES 4 FEET OR MORE IN HEIGHT. AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOW?NG CONDITIONS EXIST: . a. NOT SCHEDULED FOR IMPROVEMENTS(CONSTRUCTION OR GENERAL LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING, b. IDENTIFIED BY THE PARKS AND RECREATION DIRECTOR AS HIGHLY VISIBLE TO THE PUBLIC. c. HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEDIATE TREATMENT. B. ~~~f1/i1J.~DED AREAS SHALL BE IRRIGATED IN ACCORDANCE W1TH THE FOLLOW/NG 1. ALL $LOPES THAT ARE GRADED 6: 1 OR STEEPER AND THAT ARE: a. THREE TO EIGHT FEET IN HEIGHT SHALL BE IRRIGATED BY HAND WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECJPITA TION SPRINKLER HEADS PROVIDING 100% COVERAGE. b. GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100% COVERAGE. AREAS SLOPED LESS THAN 6: 1 SHALL BE IRRIGATED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEDJNG. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE IRRIGATION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPES AND COSTS OF THE ELEMENTS OF THE THE PROPOSED SYSTEM. J. IRRIGATION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GROWTH OF THE HYDROSEEDED GROWTH. C. HYDROSEED/NG MIX SHALL CONSIST OF ALL OF THE FOLLOW?NG: 1. 2. 3. SEED MIX SHALL CONSIST OF NO LESS THAN: a. 20 lbs. PER ACRE OF ROSE CLOVER b. 20 lbs. PER ACRE OF ZORRO FESCUE c. J lbs. PER ACRE OF E SCHOOL CIA CALIFORNICA d. 4 lbs. PER ACRE OF ACHILLEA MILLEFOLIA e. 3 lbs. PER ACRE OF AL YSSUM (CARPET OF SNOW) f. 1/2 lb. PER ACRE OF DIMORPHOLECA g. ITEMS c,d,e, AND f OF THIS SUBSECTION MAY BE OMITTED ON LOCA T/ONS WHERE THE AREA BEING HYDROSEEDED IS NOT VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENTIAL STRUCTURES. h. ITEM a OF THIS SUBSECTION MUST BE INOCULATED W?TH A NITROGEN FIXING BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROADCASTING BEFORE H YDROSEEDING. i. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE IN UNOPENED CONTAINERS W?TH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRJCUL TUR£ CERT/FICA TION TAG ATTACHED TO, OR PRINTED ON SAID CONTAINERS. j. NON-PHYTO-TOX/C WETTING AGENTS MAY BE ADDED TO THE HYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR. TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS THAN 2000 lbs PER ACRE. TYPE 6 MULCH (STRAW) MAY BE SUBSTITUTED, ALL OR PART, FOR HYDRAULICALLY APPLIED FIBER MATERIAL. WHEN STRAW IS USED IT MUST BE ANCHORED TO THE SLOPE BY MEGHAN/CALLY PUNCHING NO LESS THAN 50% OF THE STRAW INTO THE SOIL. FERTILIZER CONSISTING OF AMMONIUM. PHOSPHATE SULFATE, 16-20-0, W?TH 15% SULPHUR APPLIED AT THE RA TE OF 500 lbs. PER ACRE. D. AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEED/NG BY: 1. ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A COMBINATION OF: a. TRACK WALKING SLOPES STEEPER THAN 6: 1 b. HARROW?NG AREAS 6: 1 OR FLATTER THAT ARE SUFFICIENT!. Y FRIABLE. c. RIPPING AREAS THAT W?LL NOT BREAK UP USING ITEMS a OR b ABOVE 2. CONDITION/NG THE SOILS SO THAT IT IS SUITABLE FOR PLANTING BY: a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT NOT SATURATED SEED BED. b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR GROWTH. E. HYDROSEEDED AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE THE PROJECT IS PERMANENT!. Y LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING JS THE SITE LAGUNA DR CITY OF . OCEANSIDE HIGHWAY la PACIFIC OCEAN cosr. AVE CITY OF ENCINITAS VICINITY MAP CITY OF VISTA SOILS ENGINEER'S CERTIFICATE I, DAVID SK[LLY ~Alf,~ <,,~'!,O\l.S 'X..X:., A REGISTERED (CIVIL/ GEO TECHNICAL) ENGINEER OF THE STATE OF CALIFORNIA, PRING/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS, HEREBY CERT/FY* THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY GSI OR UNDER MY DIRECTION ON THE DATE OF SEPTEMBER , 2003 , AN UPDATED LETTER DA TED NOVEMBER 20, 2006 AND UPDATED PRELIMINARY GEOTHECHNICAL EVALUATION DA TED JUNE 17, 2008 TWO COPIES OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH • MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. GtC'IJ,o, ,7o/-A4~~~~~ (THE TERM "CERTIFY IS USED HEREIN AS DEFINED IN DIV. J, CHAP. 7 ART/CJ ~a.,.' 8770.6, OF THE CAL/FOR BUSINESS AND PROFES ONS CODE (2007)") r ,~'-' :0 w, s,,_-::,"'<<!. <' c:.' "f -... ;,, t., tfj qlf' '<..(. ~ W. ~ No. ACE 4785] 1; i, Exp. µJo). * SIGNED: R.C.E. ('10.: 4~R57 DATE: J/2-3 P I LICENSE EXP/RATION DA TE: 12/09 SIGNED: C.E. G./P.E. N0,-.:--'-/__,_7-=3'---~'---------- DA TE: ~-z. ;1-0"f LICENSE EXPIRATION DA TE: OWNER'S CERTIFICATE '%,1: C/V\L ~Ji!!" ~OFc,,,Ll~O I HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETA/NED TO SUPERVISE OVER-ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THIS SITE. ADD/TIONALL Y A QUALIFIED PALEONTOLOGIST ANO ARCHEOLOGIST HAS BEEN OR WILL BE RETAINED TO MONITOR ALL GRADING ACTIVITIES AND CARRY OUT THE MIT/GA T/ON MEASURES SPECIFIED HEREIN. EDWARD H. HAGEY SOURCE OF TOPOGRAPHY TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERA TED BY FIELD SURVEYING METHODS FROM INFORMA T/ON GATHERED ON NOVEMBER 20, 200J BY SAMPO ENGINEERING, INC. TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP ACCURACY STANDARDS. PROJECT LOCATION THIS PROJECT IS LOCATED W?THIN ASSESSORS PARCEL NUMBER(S) 155-140-37 &: J8 THE CALIFORNIA COORDINATE INDEX OF THIS PROJECT IS: N J66 E, __ u,;;i:t_ ______ _ BENCH MARK QESCRIPTION: SURVEY CONTROi STATION NO 1.39, "5 50 7" LOCATION: INVERT ELEVATION OF CADT DISC IN THE SOUTH SIDEWALK OF THE EAST END OF LAS FLORES DRIVE , DATE TYPE PERMEABLE PAVERS TERRACED GRASS SWALE -, -~••a ••~n •~ .. WORK TO BE DONE THE GRAD/NG WORK . SHALL CONS/ST OF THE CONSTRUCTION OF ALL CUTS AND FILLS, REMEDIAL GRADING, " DRAINAGf FACILIT/f.S, EROSION CONTROL FACILITIES, AND PLANTING OF PERMANENT LANDSCAPING AND PREPARATION OF AS-BUILT GRADING PLANS, AS-BUILT GEOLOGIC MAPS AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET OF PLANS AND THE CITY STANDARDS, SPECIF/CATIONS, REQUIREMENTS, RESOLUTIONS AND ORDINANCES CITED ON THESE PLANS. ' ' THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOW1NG DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER. 1. CARLSBAD MUNICIPAL CODE 2. CITY OF CARLSBAD ENGINEERING STANDARDS 3. THIS SET OF PLANS 4. RESOLUTION NO. 6J69 & 6J70 DA TED 1116/08 5. THE STANDARD SPECIF/CA T/ONS FOR PUBLIC WORKS CONSTRu'cnoN (GREEN BOOK) 6. SOILS REPORT AND RECOMMENDATIONS BY ,GEO SOILS, INC. DATED 9/18/0J & UDATED REPORT BY GEO SOILS INC., DATED JUNE 17, 2008 7. THE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS. 8. CALIFORNIA COASTAL COMMISSION DEVELOPMENT PERMIT CONDITIONS DATED 1/16/08, PC RESO NO. 6J70 9. ENVIRONMENTAL APPROVAL DOCUMENTS DA TED 1116 /OB, PC RESO NO. 6369 10. STORM WATER POLLUTION PREVENTION PLAN PREPARED BY SAMPO ENGINEERING, INC. DATED 11/04/08 -SWMI' no· 08002'f , WID NO. 9 J75 _,.,,=---------~--'----- 11. STORM-WATER MANAGEMENT PLAN PREPARED . " BY SAMPO ENGINEERING INC. DATED 11/04/08 ,. 12. CALIFORNIA STORM WATER QUALITY ASSOC/A TION BMP CONSTRUCTION HANDBOOK AND CAL TRANS CONSTRUCTION SITE BMP MANUAL. LEGEND ~• - DESCRIPTION . DWG.NO. SYMBOL •QUANTITY PROPERTY BOUNDARY ---- EXISTING CONTOUR ---65-- EXISTING ElEVA TION X 48.4 / (J9.0} I -I NEW CONTOUR ~/ NEW El£VA TION AT GRADE 62.4 NE;W El£VA TION ABOlf GRADE [ 62.5] J DA )1/GHT LINE -·· 11-11-11-11- DIRECTION OF fl.OW .;f' PCC HARDSCAPE PER PLAN I ·1 . ; '"I 4• PRIVATE STORM DRAIN PIPE SOLID WAU PVC, SDR-J5 -SD--SD-20 L.F. •' 4" SUBDRAIN PERFORATED PVC, 'SDR-J5 -SUB--SUB-; 220 L.F. PRIVATE CATCH BASIN BY 'NDS' -SD-®---1 EA GRASS UNED SWAl£ PER PLAN 56 L.F. RIP RAP ENERGY DISS/PATOR SDRSD-40, TYPE 1 ~ 1.9 CY ;.• C C BU/WING WAU PER ARCHITECTURAL PLANS [ / / / 7 / 7 71 PCC DR/vEWAY APRON PER CITY CARLSBAD GS-12 ;j : ~ 114 SF PRIVATE PRESURE SEllfR 2• SCH 80 PVC . --PS----·' 97 L.F. EARTHWORK QUANTITIES cu~ __ 4=5=o ___ cy \ \ FILL: 100 CY EXPORT: J50 CY REMEDIAL: 250 CY LEGAL DESCRIPTION · f THAT PORTION OF TRACT NO. j OF LAGUNA MESA TRACT, ACCORDING TO MAP NO. 1719, FILED 6/20/1921 REQUIRED TREATMENT CONTROL BM:\' TABLE DESCRIPTION OWNERSHIP MAINTENANCE SHEET NO. MAINTENANCE AGREEMENT FREQUENCY •· DRIVEWAY /PARKING PRIVATE l!,f,f P it}NJE'NilWQ, 2 $.'iE"trEVERY I VI,( WV.", AREA = 788 SF ,4GRE-l11i111'1Nf OTHER WEEK ,ANIJM A i:LY. GRASS LINED-SWALE 8MP ~/Nf!;NA~E ·, MOW & IRRIGATE GRASS AREA = 196 SF PRIVATE ,IG Re i;.M,1:N r 2 EVERY OTHER WEEK BRIDGE OVER INTERSTATE 5 SUSMP PROJECT PRIORITY P1!16Rl'l'f PRBIIECT l:IIGH RECORDED: --"Cl TY OF CARLSBAD VFR T (;(JN TR/Ji ' ELEVATION: 8 2.221' DATUM: NGVD 29 P~NING DEPARTMENT APPROVAL "AS BUILT" DRAWINGS 21« DATE:0j'/8' /O'f (/._ . i ot,',l=r' 3/z4ft7 LAN NO. 146 -7 & 8 (SIGNED) PLANNIN DIRECTOR : DON NEU RCE lf:.t.//'7J. EXP. uLio /t7. DATE .. , •) DATE: !5 /1'1 /o1 : --,, I ' •-·@-< SAMPO ENGINEERING, INC. V (SIGNE REVIE\,/ED BY• I A~1.4r£ 'Pc..NJ1Je1t.. REFERENCE IMPROVEMENT P ' INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE GRADING WAS DONE IN ACCORDANCE W?TH THE REQUIREMENTS AND RECOMMENDA T/ONS OUTLINED IN THE PRELIMINARY SOILS REPORT THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS RELEASED. "'-'' .•,:.1,vm.1 ~11(,:.,:.1 ,:.nc""'"-', "" ,~-~ RECOIIMENDED BY: Ill.: (16/J) 4J6-0660 FAX: {160) 1JH'65'1 -.:d. .... , -A J,..~ G,oF""F" ·-t.l-y;1 (PRINT NAIIE) IN9PE T □R' ' AND ANY SUPPLEMENTS THERETO. ( 4) REPORT W?TH AS-BUILT GEOLOGIC PLAN, IF REQUIRED BY THE CITY. 36. UNLESS A GRADING PERMIT FOR THIS PROJECT JS ISSUED WITHIN ONE (1) YEAR AFTER THE CITY ENGINEER'S APPROVAL, THESE PLANS MAY BE REQUIRED TO BE RESUBMITTED FOR PLANCHECK. PLANCHECK FEES W?LL BE REQUIRED FOR ANY SUCH RECHECK. J7. THE SOILS REPORT TITLED "PRELIMINARY GEOTHECNICAL EVALUATION APN'S 155 140 J7 &: JB CITY OF CARLSBAD SAN DIEGO CO. CA. FOR EDWARD HAGEY P.O. BOX 99961 SAN DIEGO, CA. 92169-3961 PREPARED BY GEOTECHNICAL SOILS. INC., DATED 9/1/0J, AN UPDATED LETTER DATED 11/20/06 AND UPDATED PRELIMINARY GEOTECHNJCAL EVALUATION APN'S 155-140-37 &: J8, 'JEFFERSON ST. CITY OF CARLBAD, SAN DIEGO COUNTY DATED 2008 BY GEO SOILS INC. SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE W?TH THE RECOMMENDATIONS AND SPECIF/CATIONS CONTAINED IN SAID. SOILS REPORT. - \ \ "DECLARATION OF RESPONSIBLE CHARGE" I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS QEFJNED IN SECTION 670J OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN JS CONSISTENT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAW?NGS AND SPECIFICATIONS BY THE CITY OF CARLSBAD DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN. FIRM: SAMPO ENGINEERING INC. ADDRESS: 10J4 SECOND STREET CITY, STA TE: ENCINITAS CA. 92024 TELEPHONE:~~~~~~--------- BY. ~=Ld~.-_A="')1,_~ VINCENT L. SAMPO DATE: ~/·2.,1//01 I , R.C.E. NO.: 44173 REG/STRA T/ON EXPIRATION DA TE: 6/30/09 JN: o.:J-127 J/25/09 7f DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION ' ATE I SH~ET I CITY OF CARLSBAD I SH~ETS I ENGINEERING DEPARTMENT GR;\IJING PLANS FOR: HAGEY RESIDENCE . - - .. · ~ · ··TITLE SHEET-' APPROVED: D ~ER •, A (~ DEPUTY CITY Ef GINEER PE° 33081 EXPIRES 6/30/10-DA ,, : DWN BY: rgp PROJECT NO. DRAWING NO. DATE INITIAL DATE INITIAL CHKD BY:~ CDP 06-25. . OTHER APPROVAL CITY APPROVAL RVWD BY: 458-JA·· i l I\ i \ ) 'I , \ I , 1061209 .... SPECIAL NOTES: /, PRIOR TO CONS.TRUCT/ON, CONTI/ACTOR TO DEMOLISH EXISTING WALLS FENCES & ALL OTHER IMPROvfMfNTS LOCATED WITHIN THE LIMITS OF NEW DEvfLOPMfNT AS SHOWN HEREON, U.N.O. 2. EXTERIOR CONCRETE SLABS ON GRADE SHALL Bf 4" THICK (MIN} ON SUB GRAD£ REINFORCE WITH Na. J BARS (MIN) @ 18" o/c BOTH WAYS@ MID SLAB Hf/GHT OvfR 4• LAYER OF CRUSHED ROCK, GRAvfL OR CLEAN SAND. JOINTS PER SOILS ENG!NffR. J. DR/vfWA Y APRON PER GS-12 4. PRIVATE STORM DRAIN PIPE SHALL 8[ SOLID WALL PVC CLASS SDR-J5 U.N.O. AT 1.0% MINIMUM SLOPE, U.N.O. 5. GRASS SWALES & BMP AREAS ARE PR/VA TE, & SHALL BE MAINTAINED BY THE OKNER. 6. STORM WATER SHALL FLOW AWAY FROM STI/UCTIJRES & NOT BE ALLOWED TO POND ADJACENT TO STRUCTURES EX/SllNG BU/WING 7. NO GRADING SHALL OCCUR OUTSIDE THE LIMITS THE LIMITS OF PROJECT UNLESS A LETTER OF PERMISSION IS OBTAINED FROM THE OWNER OF AFFECTED PROPERTIES. ' KEY NOTES: I I I I I DEMOLISH EXISTING RETAINING WALL PR/VA TE 6" DIA. SPff-D DRAIN BY "Nos· OR APPROvfD EQUAL. X 20.6 EXISTING BU/WING X 20.9 .,,, .,,, APPROXIMATE UMTS OF 1® YEAR / / FLOOD PER FEMA PANEL l61 DA TED / / / .,,, JUNE 19,, 1997 ZONE A. Nl BASE / / _,,, ""' ""'""'.,, :] I I I I \ EXISTING OPEN SPACE EASEMENT GI/ANTED TO h THE CALIFORNIA COASTAL COMMISSION, RECORDED FEBRUARY 9, 1993 AS ALE ND. 1993-0083757, OF O.R. J ,J / SI LIMITS OF SOUTHERN WILLOW SCRUB 31.5 [X/ST PR/VA~ PATHWAY X 36.4 I .,.,., -~ !:, . I ~ I ~~~--~+7 ,___111 NO GRADING IN THIS AREA _ 28.0 I p I / I IO' I ----4.'o-- ~ "I 10' SETBACK UN£ TO SOUTHERN IIILLOW SCRUB PER REPORT BY HELIX EN~RONMENTAL PLANNING, INC. I --7--;-- "I ~ _"I it/ I / OPEN SPACfjEASEMENT G NTED 0 CITYpF CA1f1SBAfJ REC. l--'-'t~.J.~.l.~1 ~''-As qoc NO .:!'1:501-0.a.1.."is~"/ , / OF .R. P NO. 09 -07 I I 3279 I /fy I X 21.1 I I I /2ao TtT, /~ ;"' /~ /~ /~ X 21.8 X 21.1 CONCRETE EX T PRIVATE AC P. THWAY <11 I X 57.0 Dll\\ (,.~ i1\.\ y,.O \\. ,., .,,, X 4 .1 40.37 .,,. /is & .,,, 62.2\ G 111 E < pp TELECO!.l \ PEDESTAL TN 89'27/IJ'i w- 8.33 ~ Y,\~f,fo/,/1/AL'fK ~ I Rl ... I I I I I I I I cc 61.90 I C 6240 I \ I I I I <., I \'\iG//T,eQS 1...., X 62.4 \ :!hl,!f..-7-\ ~ : f'l I I I ~ ~ I I I X 62.~ ,1.., :S 62.2 fy, ~ I ,k) ~ C62. \I §\ I , "" I V) SECTION THROUGH BMP AREA NORTH OF BU/LD~f 0 V) J.5' GI/ASS UNEO SWALE. ,dJJ' ~ ., $; ,< ,< ,< TERRACED BMP AREA ' "' X 5 0 I ~ !.e"'1\w~4-1---~1+:L.1-~231•r ---1 I N.T.S ® ~ I PR/VA 7f PRESSUff SEl!a CLEA/-@UJT PER 6DRSD , S-16 IE 42.0 X .5 X 38. 64.02 X 64.2 /-5 LF ~ 4" P½ SEl!ff PIPE (GRA TY FLOW). CONN pT·to '{XIST {fltfR LATE, L. CON7R1CTOR fO vffffY _fl1VA 710 • \ ~ ~ \ +J-6' I \ I Fi " C. ol, RIVA PVcj PRESfURE ___.\.--:;~l"o 6" C{/vfR ~IN. -X 62., ~ SBA I 'M-t---f '£·-I-~ ':i<+n~ ·-+--RS·-r-',rr71 CONCRETE SLAB 11,\\· i r X 65.J I PROTEC EXIST. PCC : 5/DEWA IN-PLAf E I I I "' ' V) f 64.25 Fl Fl FL ~ SCALE: 1''=10' 0 5 10 'i \ ', 20 '' AS BUILT" v.. / .;1. ,I....,,,. 3 k'f /27 RCE'/'//7~ EXP. (R/:~J/7 DATE i , REVIEVED BY, ~-3-J] DATE l---+---~f--------------i---l----f----f----l I SH2EET I CITY OF CARLSBAD I SHE2ETS ~=='...'::::=::::E::N:::G:::IN:::E:::E::R:::IN:::G:::::::D:::E::P::::A::::RT::::M:::E::N::::T==::::'..':=== GRADING PLANS FOR: HAGEY RESIDENCE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DA TE INITIAL OTHER APPROVAL CITY APPROVAL DWN BY: E PROJECT NO. CHKD BY: CDP 06-25 RVWD BY: - DRAWING NO. 458-JA \ / l \061209 . ci ! z N (')-iti z a: "" J w ~ l 0 w ii ' z " ~ I (') i z "-) C, ! w ~ s. ~ 0 ""~ ~ UI n. ~~ ~ ii~ "-) t t <( ~ ! (J) 1 z )" ~-.Qi-.. 7 '