Loading...
HomeMy WebLinkAboutSDP 16-19; DISTRIBUTE LOTS 13-15 SHELL BUILDING; PRIORITY DEVELOPMENT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP); 2021-08-04CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR &$5/6%$'5$&(:$</276$'-PROJECT ID 6'3 ':*$*5 ENGINEER OF WORK: :LOOLDP%%HDPDQ$(&203(([SLUHV PREPARED FOR: $PD]RQ 7HUU\$YHQXH1 6HDWWOH,:$  PREPARED BY: $(&20 /DNHVLGH 2DNODQG&$   5(9,6(': $XJ ADDENDUM NO.1 TABLE OF CONTENTS Certification Page Project Vicinity Map FORM E-34 Storm Water Standard Questionnaire Site Information FORM E-36 Standard Project Requirement Checklist Summary of PDP Structural BMPs Attachment 1: Backup for PDP Pollutant Control BMPs Attachment 1a: DMA Exhibit Attachment 1b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1c: Harvest and Use Feasibility Screening (when applicable) Attachment 1d: Categorization of Infiltration Feasibility Condition (when applicable) Attachment 1e: Pollutant Control BMP Design Worksheets / Calculations Attachment 2: Backup for PDP Hydromodification Control Measures Attachment 2a: Hydromodification Management Exhibit Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design Attachment 3: Structural BMP Maintenance Thresholds and Actions Attachment 4: Single Sheet BMP (SSBMP) Exhibit ________________________________________________________ Engineer of Work's Signature, PE Number & Expiration Date ________________________________________________________ Print Name ________________________________________________________ Company ____________________________ Date Bill Beaman AECOM 05/10/21 53930 12/31/21 CERTIFICATION PAGE Project Name:&$5/6%$'5$&(:$</27 Project ID:6'3$0(1' I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. PROJECT VICINITY MAP Project Name: CARLSBAD RACEWAY LOT 15 Project ID: AMEND2021-0004SDP 16-19/AMEND2021-0004 CITY PACI FIC OCEAN VICINITY AP SIDE CITY or ENC INITAS NOT TO SC LE VISTA SITE f MARCOS E-34 Page 1 of 4 REV 02/16 Development Services Land Development Engineering 1635 Faraday Avenue (760)602-2750 www.carlsbadca.gov STORM WATER STANDARDS QUESTIONNAIRE E-34 INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be PRIORITY requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME:PROJECT ID: ADDRESS:APN: The project is (check one):New Development Redevelopment The total proposed disturbed area is: _______ ft 2 (________) acres The total proposed newly created and/or replaced impervious area is: ______ ft 2 (________) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP #: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. 32,050 0.74 27,539 0.63 GR2017-0004SDP 16-19 AMEND2021-0004 32,981 0.76 28,064 0.64 C cityof Carlsbad DEVELOPMENT PROJECT' (PDP) DGB6 3266 Lionshead Avenue □ subject to 'STANDARD PROJECT' requirements or be subject to ' 2218811600 ~ - E-34 Page 2 of 4 REV 04/17 STEP 1 TO BE COMPLETED FOR ALL PROJECTS YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? , provide justification below then go to Step 5 project is information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): development project go to Step 2. STEP 2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; b) Designed and constructed to be hydraulically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? go to Step 5, mark EXEMPT Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): go to Step 3. GR2017-0004SDP 16-19 THE PROJECT IS NOT A NEW DEVELOPMENT AND ENTAILS TENANT IMPROVEMENTS AND CHANGES TO THE PARKING LAYOUT To determine if your project is a "development project", please answer the following question: □ ~ If you answered "yes" to the above question , mark the third box stating "my not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant If you answered "no" to the above question, the project is a ' , , □ ~ □ ~ □ 18: If you answered "yes" to one or more of the above questions, provide discussion/justification below, then the second box stating "my project is from PDP ... " and complete applicant information. If you answered "no" to the above questions, your project is not exempt from PDP, E-34 Page 3 of 4 REV 04/17 STEP 3 TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site?This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface?This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site?A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)?cludes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop?An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)?This category includes are feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21.203.040) PDP. If your project is a redevelopment project,go to step 4. If your project is a new project,go to step 5,PDP and complete applicant information. STANDARD PROJECT.Go to step 5, check the □ ~ ~ □ □ ~ □ ~ ~ □ ~ □ "Discharging Directly to " in □ ~ □ ~ RGO's that meet the following criteria: (a) 5,000 squ □ ~ □ ~ □ ~ If you answered "yes" to one or more of the above questions, your project is a check the first box stating "My project is a " ... If you answered "no" to all of the above questions, your project is a ' , second box stating "My project is a 'STANDARD PROJECT' ... " and complete applicant information. E-34 Page 4 of 4 REV 04/17 STEP 4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = __________________________ sq. ft. Total proposed newly created or replaced impervious area (B) = _________________________sq. ft. Percent impervious area created or replaced (B/A)*100 = __________% surface and not the entire development.Go to step 5,PDP applicant information. Go to step 5, check the PDP STEP 5 CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP)for submittal at time of application. My project OR EXEMPT stormwater requirements of the BMP Manual. As part of these requirements Standard Project Requirement Checklist Form E-36 Note:For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations My Project is Applicant Information and Signature Box Applicant Name: Applicant Title: Applicant Signature:Date: * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of SpecialBiological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Only City Concurrence: YES NO By: Date: Project ID: Alexandria Smille Project Manager - Applicant 02/09/2021 379,867 379,714 99.95 28,064 7.4 □ ~ If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious check the first box stating "My project is a ... " and complete If you answered "no," the structural BMP's required for PDP apply to the entire development. check the first box statinq "My project is a ... " and complete applicant information. 181 □ is a 'STANDARD PROJECT' from PDP and must only comply with 'STANDARD PROJECT' , I will submit a " " and incorporate low impact development strategies throughout my project. and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. □ NOT a 'development project' and is not subject to the requirements of the BMP Manual. ,-··-··-..., ...... - /l~S~ □ □ SITE INFORMATION CHECKLIST Project Summary Information Project Name Project ID Project Address Assessor's Parcel Number(s) (APN(s)) Project Watershed (Hydrologic Unit)Carlsbad 904 Parcel Area ________ Acres (____________ Square Feet) Existing Impervious Area (subset of Parcel Area)________ Acres (____________ Square Feet) Area to be disturbed by the project (Project Area)________ Acres (____________ Square Feet) Project Proposed Impervious Area (subset of Project Area)________ Acres (____________ Square Feet) Project Proposed Pervious Area (subset of Project Area)________ Acres (____________ Square Feet) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. Area to be disturbed by project (Project Area) ________ Acres (____________ Square Feet) Project Proposed Impervious Area (subset of Project Area) ________ Acres (____________ Square Feet) Project Proposed Pervious Area (subset of Project Area)________ Acres (____________ Square Feet) CARLSBAD RACEWAY LOT 15 16-024 3266 Lionshead Avenue, Carlsbad, CA 92010 221-881-16 11.46 499,150 10.58 8.72 1.86 0 0 460,821 379,867 80,954 32,050 379,714 81,107 0.74 8.72 1.86 Revised Summary Information AMEND2021-0004 32,9810.76 378,783 82,0381.88 8.70 904.31 SDP 16-19/AMEND2021-0004 * ** *** Revised new * Revised ** Revised *** AECOM 300 Lakeside Dr., Ste. 400 Oakland, CA 94612 www.aecom.com 510 893 3600 tel 510 874 3268 fax March 24, 2021 City of Carlsbad Land Development Engineering 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Letter Amendment-Storm Water Quality Management Plan (SWQMP), Permit No. GR2017-0004, Site Address 3266 Lionshead Avenue, Carlsbad, CA Attn: Land Development Engineering Department AECOM is pleased to provide the City of Carlsbad with this written correspondence regarding our review of the proposed improvements relative to the existing SWQMP for Permit No. GR2017-0004. Please note, given the insignificant nature of this change, this update or amendment is being provided mainly for purposes of record keeping so as to document that a very minor change was made to the parking lot but given the small relative decrease, no change to the amount of runoff for this area was recognized. The information below summarizes the background and conclusion associated with this change. Per the attached Figure 1, AECOM is to remove 29,281 s.f. of existing asphaltic pavement and replace it with a slightly lesser amount of 28,064 s.f. of proposed asphaltic pavement, resulting in a small net decrease to the impervious area of 1217 s.f. for this localized area of the site. The location of the new asphalt is in the exact same location (see Figure 1) as it was previously defined in SWQMP Permit No. GR2017-0004. As a result of this very small relative change (Existing Area minus Proposed Area) of (-) 1217 s.f. which equates to (-) 0.028 acres reduction in area, it would potentially decrease the proposed amount of runoff for this area. However, given the small magnitude of this reduction in area, the associated runoff that would result is insignificant. With this in mind there is no change to the runoff amount that gets directed toward the bioretention facility located on the northwest side ot the parking lot and therefore no change to the SWQMP will be required for Permit No. GR2017-0004. Sincerely, William Beaman Principal Civil Engineer A:COM OJ 5 L) <o "'W -"' Q/ ~~ 0 LJ I~ u LL ~ I U) i:ri LJ r::1 ./ a;(/) ~w D.Q/ Q. <( ::J LJ ~ LL / (/) D f--- .l, w u j!!W u:r: (/) I C) -/ .r::1 "<[ §,u -~ I 00 sc-i O' / U) i:ri 00 L'J ro r::1 cg/ :;: u ~ I ~ (1j :l'□ c/ ,:1 C U 0 v--o'+' 0: d '-0 _Q d 0 u C OJ IJ1 ClJ r::1 C) C) O' / IJ1 ClJ LL +' u ClJ ---, 0 '-Q_ / U) i:ri LJ r::1 I r----.,..-, .,..-, U) '1- U) C) U) Q/ w :;;: <[ I Q_ i:ri / Q/ w ::,:: <[ I z N :;;: <[ I :;;: *EXISTING 29,281 SF IMPERVIOUS SURFACE RUNOFF FLOWS TO THE EXISTING BIORETENTION BMP SHOWN BELOW ... ....... . . . -. -.. . . . i;l\'-: . . ' . · 1--~ .... ••..• .,,,v,r;;; ••••••• . . . . ·'':<,{, ..... '• ,'(:_'\-,->1/N> •' • '• _._._. . _,c_._._._._. .. . . . . . . . . -. \· .· . . ' • ·, . . .. .. . . . . IMPERVIOUS AREA TO BE REMOVED 29,281 SQ.FT. DEMOLITION LEGEND •. 4 . ;, . ;t .·:\ .. ·" .... , . ' . , ~ .. V E . PARING A PVM " . . . . ' .. . ... .. .. .. ... . I'.':".".·."."·"! REMOVE PVMT/CONC. L,;:.,;.·.;,,;;,;J ' : : .... ::::::::~~~;~~~:: .v:-,; ·-, i·. .., • ~ i ".:I,~-.• 1 ·····~~-· • .. ..... -. -~_., .. qs;··.. . ••. ~-. ·, . .'.".".'.".°.':/·.~.'.".'. Jt>,,,...,.cS . :·" •·• . .0 • .. .. .. .. . .. I-".... .. .. ·- :. ::::::::::::::. :: "· -:4 -.. . ·- •· .. " •· . . : . . • . . .·¥..... . •--... ' :, ·,:;p_. . •• ~ . -~ ix . . . ..,_. . . "· -. . "-.., . ':, .. : ... . '. . . '~-. -. ..., . ,.. . ·"' 1 . • D u w <[ / IJ1 u 0 r::1 u u <I / C PRE-DEVELOPMENT CONDITIONS -PARKING LOT I f-ll'. 0 z '-d OJ E C O_ d lD E ~ '---ClJ ~ -- 0 E --~ (1j ClJ C) '-ru +' / ' IJ1 O' '-ru ClJ C IJ1 ::s ::J 7/ u Ii Printed on_% Post-Consumer Recycled Content PJper 30' ~ GRAPHIC SCALE 44E . . '< 60' ! *PROPOSED 28,064 SF IMPERVIOUS SURFACE RUNOFF WILL FLOW TO THE SAME BIORETENTION BMP SHOWN BELOW REDUCING THE NET RUNOFF TO THE BMP IMPERVIOUS AREA TO BE INSTALLED 28,064 SQ.FT. CONSTRUCTION LEGEND F\~/''!-\·:) t:.i:.:'.t.'":.i NEW CONCRETE -NEW PAVEMENT *PROPOSED PARKING REDUCES IMPERVIOUS AREA BY 1,217 SQ.FT. - --------- ..•. .. ., ~ \ ii:· :. ~:·· ~ . . •.4 ~·-~ ·: ..... ~· ·•~ .• ·•· •• d< . ·. . ·,· . . .. ,· ... .; . J · .• ' { I EX. PAI KING AC PVMT / 1B / EX. PARKIN( AC M T / I EX. TRUCK ROUTE AC / _ __....._......,_1.......,..,...-._PVMT---........ POST-DEVELOPMENT CONDITIONS -PARKING LOT I f-ll'. 0 z 0 30' ------ . . . ·. .. ... \' .. . . · .. ,-. / . .. . • • ·_ '-'!_ -. ... __ .. ' ' . .. . 60' GRAPHIC SCALE PROJECT DGB6 -Carlsbad, CA 3266 Lionshead Ave Carlsbad, CA 92010 CLIENT CONSULTANT AECOM 1255 Broad St, Suite 201 Clifton, NJ 07013, USA 973 883 8500 tel www.aecom.com Tl-IS DRAW NG --lAS BEEr-J PREPARED FOR THE USE OF A:CCOM'SCJENT A~ID MAY NOT 8E LSED. '<EP'<ODUCEC :JR RELIED UFON E,VTHIRD PARTIES, EXCEPT AS AG:ZEEJ BY AECot/ AI\C ITSCLIEN-, AS REOLIREC BY LAW:JR roR USC DY GOVCRt.JM[NTAL RO.'IONING AGrnCl[S. A[COM ACC[:lTS NO RESPOI\SIE:ILITY. AND DENIES ANY LIABILITv \1\/HATSC·EVER. T:J ANY PARTY Tl-AT MOD Fl ES TH S DRA\.Vl~JG wi-H OUT A:CCOM'S EXPRESS v,R1rrn CONSE\fT LlU NOi SCi\Uc I Hlb LJUGLM~~J I .~LL lvlb\bLf.1~M=Nlb MUSI 1::~Ul:ll/ll'ICLl 1-f-lUM ::ii Al Cll LllMCNi:ilU~J-::i IT S THE RESP:JNSIBILITi OFT-IE CONTRACTORS TO INFORM THEMSELVES OF TI-F FXAr:T I or:ATlm< OF A~J/ ASSIIMF A I I IARII IT"( FOR 1,/\MAGlFTO Al I UTILITIES. SERVICES AND STRLCTLRES VI.HETH ER ABOVE GROUND OR BELO'/v G-1/\Lk. l:lCI-Uf-<CCUMMCr-.JCING I Hie WUkK ::CUCH INI-Uf-<MI\I IUN IS N:..11 ~IECESSARILY SHOVW-.J ONTI-E JRAV\n~IG. AI\D'/vHERESH:J\/VN, -HE ACCURACY CAr-.JN:JT BE GJARAWEED . WITI I Tl [ SOL[ :XC[PTION or Tl I[ □[NCI IMARK(S) SP[ClrlCALL Y J[S::R10:o FOR THIS PROclECT. NO ELEVATlmJ IND CA TED OR ASSUl'1ED 1-EREON ISTO BE USED AS A REFEREI\CE ELE\'A-lor-.J FCR ANY PURPOS:C REGISTRATION ISSUE/REVISION 1 2021-06-29 2021-05-17 COMMENTS 0 2021-03-24 STORMWATER FIGURE 1/R DATE DESCRIPTION PROJECT NUMBER 60646117 SHEET TITLE SWQMP AMENDMENT FOR CARLSBAD RACEWAY LOTS 13-15 PERMIT NO. GR2017-0004 SHOWING PROPOSED IMPERVIOUS LESS THAN EXISTING SHEET NUMBER FIGURE 1