Loading...
HomeMy WebLinkAbout6628 SANTA ISABEL; ; AS100089; PermitUlty 01 Uarlsbad Sprinkler Permit Permit No: AS100089 6628 SANTA ISABEL Job Address: Status: ISSUED ST Permit Type: SPRINK Applied 7/19/2010 Parcel No: 2153300100 Approved: 7/19/2010 Lot #: 0 Reference No.: Issued: 7/19/2010 PC #: Inspector: Project Title: ST ELIZABETH SETON CATHOLIC CH ALGA RD AND EL FUERTE ST Applicant: Owner: ROMAN CATHOLIC BISHOP OF SAN DIEGO P 0 BOX 85728 SAN DIEGO CA Fees ($) Add'I Fees ($) Total ($) Balance ($) 165 0 165 0 AS~u oSl UNDERGROUND PIPING 24-17 Contractor's Material and Test Certificate for Underground Piping PROCEDURE Upon completion of work, inspection and tests shalt be made by the contractor's representative and witnessed by an owner's representative. All defects shalt be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. . Property name ,,. jLJA$Th' 5166 1?L- Date Property address fr\77 41 1216,41 ,Accepted by approving authorities (names) Address Plans . ''55 &4l.1 Installation conforms to accepted plans Yes U No Equipment used is approved Yes . U No If no, state deviations Has person in charge of fire equipment been instructed as to location of Yes U No control valves and care and maintenance of this new equipment? If no, explain Instructions Have copies of appropriate instructions and care and maintenance Yes EJ No charts been left on premises? If no, explain Location - Supplies buildings /Ljt:ib i:1 /Hi Pipe types and class Type joint Pipe conforms to standard JEN, U No Underground Fittings conform to _Av standard U No pipes and joints If no, explain Joints needing anchorage clapped, strapped, or blocked in Yes U No accordance with ck.1/&andard If no, explain I Etu..hJn.gi Flow the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as hydrants and blow-offs. Flush at flows not toss than 390 gpm (1476 Umin) for 4 in. pipe, 880 gpm (3331 Umin) for 6 in. pipe, 1560 gpm (5905 Umin) for 8 in. pipe, 2440 gpm (9235 Umin) for 10 in, pipe, and 3520 gpm (13,323 Umin) for 12 in. pipe. When supply cannot ILA", .i.Jpulated flow rates, obtain maximum available. .Jydrosta All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi Test or 50 psi (3.4 bar) in excess of the system working pressure, whichever is greater, and shall maintain that pressure ± 5 psi description for 2 hours. Hydrostatic Testing Allowance: Where additional water is added to the system to maintain the test pressures required by 10.10.2.2.1, the amount of water shall be measured and shall not exceed the limits of the following equation (For metric equation, see 10.10.2.2.4): L = testing allowance (makeup water), in gallons per hour SNTP L = S = length of pipe tested, in feet 148,000 D = nominal diameter of the pipe, in inches P = average test pressure during the hydrostatic test, in pounds per square inch (gauge) MALN w underground piping flushed according to 7ës U No AaL- -_______ standard by (company) If no, explain How flushing flow was obtained Through what type opening Flushing 4j-Public water U Tank or reservoir ' U Fire pump U Hydrant butt E-.epen pipe tests Lead-ins flushed according to vr standard by (company) U Yes U No. If no, explain How flushing flow was obtained Through what type opening U Public water U Tank or reservoir U Fire pump U Y connection to flange U Open pipe and spigot © 2007 National Fire Protection Association NFPA 24 (p. 1 of 2) FIGURE 10.10.1 Sample of Contractor's Material and Test Certificate for Underground Piping. 2007 Edition 24-18 INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES All new underground piping hydrostatically tested at Joints covered Hydrostatic test gao psi for ________ hours -0--Yes U No Total amount of leakage measured Leakage gallons hours test Allowable All gallons hours Number installed Type and make All operate satisfactorily Hydrants J Yes Q No Water cntrol valves left wide open J Yes U No If no, state reason Control valves Hose threads of fire department connections and hydrants interchangeable with Yes U No those of fire department answering alarm Date left in service Remarks Name of installing contractor Tests witnessed by Signatures For pdperty owner (signe Title Date £alli / acto (signed) Title Date Additional explanation and notes © 2007 National Fire Protection Association NFPA 24 (p. 2 012) FIGURE 10,10.1 Continued 2007 Edition UNDERGROUND PIPING FILE P 24-17 Contractor's Material and Test Certificate for Underground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shalt be filled Out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authority's requirements or local ordinances. Property name -T -fZi4 2Ttv/ Date Property address 21' r Accepted by approving authorities (names) Z.-7lt(&A.9 r .1E9~ Address A-' Plans /(035 izj'1,' Installation conforms to accepted plans iJ Yes Q No Equipment used is approved 12 Yes U No If no, state deviations Has person in charge of fire equipment been instructed as to location of Yes U No control valves and care and maintenance of this new equipnent? If no, explain Instructions Have copies of appropriate instructions and care and maintenance ! Yes No charts been left on premises? If no, explain Location Supplies building Pipe types and class 01 . q00 NP Type joint Pipe conforms to ___ standard U Yes U No Underground Fittings conform to Al J. 4_. standard lles U No pipes and joints If no, explain o€n U Yes U No accordance with standard If no, explain 6K 51114 fA:*k< )q,ng;\ low the required rate until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as sand blow-offs. Flush at flows not less than 390 gpm (1476 Limin) for 4 in. pipe, 880 gpm (3331 Llmin) for 6 in. pipe, 1560 gpm (5905 Limin) for 8 in. pipe, 2440 gpm (9235 L/min) for 10 in, pipe, and 3520 gpm (13,323 Llmin) for 12 in. pipe. When supply cannot produce stipulated flow rates, obtain maximum available. Hydrostatic: All piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi Test (13.8 bar) or 50 psi (3.4 bar) in excess of the system working pressure, whichever is greater, and shall maintain that pressure ± 5 psi description for 2 hours. yrostatic Testing Allowance: Where additional water is added to the system to maintain the test pressures required by 10.10.2.2.1, the amount of water shall be measured and shall not exceed the limits of the following equation (For metric equation, see 10.10.2.2.4): L = testing allowance (makeup water), in gallons per hour SD 1P S = length of pipe tested, in feet L - - 148,000 D = nominal diameter of the pipe, in inches P = average test pressure during the hydrostatic test, in pounds per square inch (gauge) Mpw undçgrjd,pping flushed according to Yes U No by (company) If no, expla(n How flushing flow was obtained Through what type opening Flushing =E.iibIic water U Tank or reservoir U Fire pump U Hydrant butt 19 Open pipe tests I %'r Lead-ins flushed according 1oAi'.1iA 9I%JrP,4 standard by (company) I Yes No It no, explain How flushing flow was obtained Through what type opening CA Public water U Tank or reservoir Fire pump U Y connection to flange Open pipe and spigot © 2007 National Fire Protection Association NFPA 24 (p. 1 of 2) FIGURE 10.10.1 Sample of Contractor's Material and Test Certificate for Underground Piping. 2007 Edition 24-18 INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES Hydrostatic All new underground piping hydrostatically tested at Joints covered I test psi for ____________ hours Yes LI No Total amount of leakage measured Leakage gallons hours test Allowable leakage gallons hours Number installed I Type and make I All operate satisfactorily Hydrants Yes Ej No Water control valves left wide open Yes LI No If no, state reason Control valves "Yes LI No Hose threads of fire department connections and hydrants interchangeable with those of fire department answering alarm D tel Remarks Name of installing contractor Cr - Tests witnessed by Signatures F r pr rty igd ç>N Tjt I P,Date vg- alling contractor (signed) The Date Additional explanation and notes © 2007 National Fire Protection Association . NFPA 24 (p.2 of 2) FIGURE 10.10.1 Continued 2007 Edition