Loading...
HomeMy WebLinkAboutDWG 505-5A; DEV 2016-0043; VAUGHN RESIDENCE; 01-05GRADING NOTES (IN ADDITION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE CARLSBAD MUNICIPAL CODE.) 1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS. 2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED. 3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-OF- WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR APPROVAL. 4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A CERT/FICA TE OF INSURANCE AS WELL AS ADDITIONAL INSURED ENDORSEMENT MUST BE FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH OCCURRANCE OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST HAVE A RA TING OF "A-" OR BETTER AND A SIZE CATEGORY OF CLASS VII OR BETTER AS ESTABLISHED BY "BESTS" KEY RA TING GUIDE. 5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM THE CITY AND OTHER APPROPRIATE AGENCIES. 6. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK OR GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS BEEN OBTAINED AND A VALID GRADING PERMIT HAS BEEN ISSUED. 7. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS AND THE TITLE SHEET. 8 ORIGINAL DRAWINGS SHALL BECOME THE FROPERTY OF THE CITY UPON BEING SIGNED BY THE CITY ENGINEER. 9 THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BU/LT CONDITIONS BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY. 10. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION. 11. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF: (A) SUMMARY SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STATE OF CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. THE SOILS REPORT WILL BE SUBMITTED TO THE CITY ENGINEERING INSPECTOR WITHIN TWO WORKING DAYS OF THE COMPLETION OF FIELD TESTS. 12. A SOILS COMPACTION REPORT AND COMPLIANCE VERIFICATION REGARDING ADHERENCE TO RECOMMENDATIONS OUTLINED IN THE SOILS REPORT IS REQUIRED PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING SHALL BE DONE UNDER THE DIRECTION OF A PROFESSIONAL ENGINEER OF THE STA TE OF CALIFORNIA PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD SPECIF/CATIONS ANO THE " EARTHWORK SPECIFICATIONS " A TT ACHED TO THE PRELIMINARY SOILS INVEST/GA TION. DAILY FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE PROJECT INSPECTOR. 13. A PRECONSTRUCTION MITT/NG SHALL BE HEID AT THf SITE PRIOR TO THF RFGINNING OF WORK AND SHAii RF ATTFNDW BY All RFPRF5ENTAVYFS RESPONSIBLE FOR CONSTRUCTION INSPECTION, SUPERVISION. TESTING AND ALL OTHER ASPECTS OF THE WORK. THE CONTRACTOR SHALL REQUEST A PRECONSTRUCTION MEETING BY CALLING THE INSPECTION LINE AT (760) 438-3891 AT LEAST FIVE(5) WORKING DAYS PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR WILL THEN 8£ CONTACTED BY THE PROJECT INSPECTOR TO COORDINATE A DA TE AND TIME FOR THE PRECONSTRUCTION MEETING. APPROVED DRAWINGS MUST BE AVAILABLE PRIOR TO SCHEDULING. THE GRADING PERMIT WILL BE PROVIDED BY THE PROJECT INSPECTOR AT THE MEETING. 14. All INSPFCVON REQUESTS OTHER THAN FOR PRFCONSTRUCVON MfFVNG WIii BF MAQF BY CAI /ING THF FNGINFFRING 24 HOUR IN'iPFCTION RFQIIFST I IIYf AT (760) 438-3891. INSPECTION REQUEST MUST BE RECEIVED PRIOR TO 2:00 P.M. ON THE DAY BEFORE THE INSPECTION IS NEEDED. INSPECTIONS WILL 8£ MADE TH£ NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS MADE AFTER 2: 00 P.M. WILL BE SCHEDULED FOR TWO FULL WORK DAYS LATER. 15. THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTl)ACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INC~UOING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL. LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 16. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUB/AITTING A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING THE DESIGN OF SHORING. BRACING SLOPING OR OTHER PROVISIONS TO BE MADE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTAL/_A TION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR MOR£ IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, ,TITLE 8 CALIFORNIA ADMIN/STRA TIVE CODE THE PLAN SHALL BE PREPARED . BY A REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE: OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO EXCAVATION. 17 NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN OBTAINED FROM THE CITY OF CARLSBAD. SUBMIT APPLICATION FOR BLASTING PERMIT WELL IN ADVANCE OF THE SCHEDULING OF BLASTING OPERATIONS. 18. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORKI AREA DURING CONSTRUCTION, OPERATIONS WILL CEASE IMM£0/A TEL Y ANp TH£ PERM/TT££ WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT R/;START UNTIL THE PERMITTE£ HAS RECEIVED WRITTEN AUTHORITY FROM TH£ CITY ENGINEER TO DO SO. 19. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, JNciuD/NG WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, CONSTRUCT/ON EQUIPMENT AND ANY OTHER ASSQCIA TED GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 7: 00 A./,1. AND 6· 00 P.M. EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR Gf?ADING OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST QF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEERING DEPARTMENT COUNTER.) 20. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. ' 21. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHA~L BE DEPOSITED AT, A SITE APPROVED BY THE CITY ENGINEER. THF CONTRACTOR SHALL 8£ RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG TH/I HAUL ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION. 22. BRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE GRADED. NO TREES ARE TO BE REMOVED UNLESS SPECIF/CALLY NOTED ON THE PLAN. 23. ALL AREAS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THE PON[)ING OF WATER IS NOT PERMITTED. ALL EARTHEN SWALES AND DITCHES SHALL HAVE A MINIMUM ONE PERCENT SLOPE. 24. THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SWPPP AND/OR; SET OF EROSION CONTROL PLANS. EROSION CONTROL SHALL BE AS SHOWN AND AS ~PPROVED BY THE CITY ENGINEER OR AS DIRECTED BY THE PROJECT INSPECTOR 25. ALL SLOPES SHALL BE TRIMMED TO A FINISH GRADE TO PRODUCE A 1.JNIFORM SURFACE AND CROSS SECTION. THE SITE SHALL BE LEFT IN A NEAiT AND ORDERLY CONDITION. ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE Rf,MQVED AND DISPOSED OF AT A SITE APPROVED OF BY THE CITY ENGINEER. 26. ALL SLOPES SHALL BE /RR/GA TED, STABILIZED, PLANTED AND/OR HYDROt,EEDED WITHIN TEN (10) DAYS OF THE TIME WHEN EACH SLOPE IS BROUGHT TO .GRADE AS SHOWN ON THE APPROVED GRADING PLANS. . • 27. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS RfQU/RED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLAN,$ FOR THIS PROJECT, DRAWING NO. NIA , AND/OR AS DIRECTED BY THf CITY ENGINEER OR PLANNING DIRECTOR. D \DRA'MNG FILES\TITLE SHEETS\GRAOING Tln.E SHEET DWG REV1SEO 02/15/17 • 28. THE OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACTORS SHALL COORDINATE THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPE AND /RR/GA TION PLANS AND TH£ IMPROVEMENT PLANS AS REQUIRED FOR THIS WORK IN ACCORDANCE WITH THE LANDSCAPE MANUAL TIME REQUIREMENTS 29. WHERE AN EXISTING PIPE LINE IS TO BE ABANDONED AS A RESULT OF THE GRADING OPERATION, IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING OR STREET AREAS AND REPLACED WITH PROPERLY COMPACTED SOILS. IN OTHER AREAS THE PIPE WILL BE PLUGGED WITH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER. 30. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES ( ABOVE GROUND AND UNDER GROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY AHEAD OF GRADING TO PERMIT THE REVISION OF THE GRADING PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED WORK. 31. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK Wini A COMPANY REPRESENTATIVE UNDERGROUND SERVICE ALERT (DIG ALERT) 811 SDG&E (800)411-7343 AT&T (619)237-2787 SPECTRUM CABLE (800)227-2600 COX COMMUN/CA T/ONS (619)262-1122 CITY OF CARLSBAD(STREETS & STORM DRAIN) (760)434-2980 'CITY OF CARLSBAD(SEWER, WATER & RECLAIMED WATER) (760)438-2722 *SAN 0/EGU/TO WATER DISTRICT (760)633-2650 'LEUCADIA WASTEWATER DISTRICT (760)753-0155 *VALLECITOS WATER DISTRICT (760)744-0460 'OLIVENHAIN WATER DISTRICT (760)753-6466 'BUENA SANITATION DISTRICT (760)726-1340 x/330 *AS APPROPRIATE 32. PERMIT COMPLIANCE REQUIREMENTS. A. FOR CONTROLLED GRADING -THE APPLICANT HIRES A CIVIL ENGINEER, SOILS ENGINEER, AND/OR GEOLOGIST TO GIVE TECHNICAL ADVICE, OBSERVE AND CONTROL THE WORK IN PROGRESS {15 16.120 A.BJ CARLSBAD MUNICIPAL CODE. B PRIOR TO COMPLETION OF GRADING WORK -THE FOLLOWING REPORTS MUST BE SUBMITTED TO THE CITY ENGINEER VIA THE PROJECT INSPECTOR PER SECTION 15.16.120 OF THE CARLSBAD MUNICIPAL CODE: (I) FINAL REPORT BY SUPERVISING GRADING ENGINEER STA TING ALL GRADING IS COMPLETE. ALL EROSION CONTROL, SLOPE PLANTING AND /RR/GA TION ARE INSTALLED IN CONFORMANCE WITH CITY CODE AND THE APPROVED PLANS (OBTAIN SAMPLE OF COMPLIANCE LETTER FROM CITY ENGINEERING DEPARTMENT). (2) AS-BUILT GRADING PLAN (3) REPORT FROM THE SOILS ENGINEER, WHICH INCLUDES RECOMMENDED SOIL BEARING CAPACITIES, A STATEMENT AS TO THE EXPANSIVE QUALITY OF THE SOIL, AND SUMMARIES OF FIELD AND LABORATORY TESTS. THE REPORT S/-IALL ALSO INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE GRADING WAS DONE IN ACCORDANCE WITH THE REQUIREMENTS AND RECOMMENDATIONS OUTLINED IN n!E PRELIMINARY SOILS REPORT ANO ANY SUPPLEMENTS THERETO. ( 4) REPORT WITH AS-BUILT GEOLOGIC PLAN, IF REQUIRED BY THE CITY (5) PERMANENT STRUCTURAL BMP INSTALLATION CERT/FICA TE (6) PERMITTED WALL FINAL INSPECTION REPORT 33. UNLESS A GRADING PERMIT FOR THIS PROJECT IS ISSUED WITHIN ONE (1) YEAR AFTER THE CITY ENGINEER'S APPROVAL, THESE PLANS MAY BE REQUIRED TO BE RESUBMITTED FOR PLANCHECK. PLANCHECK FEES WILL BE REQUIRED FOR ANY SUCH RECHECK. 34. IN ACCORDANCE WITH THE CITY STORM WATER STANDARDS, ALL STORM DRAIN INLETS CONSTRUCTED BY THIS PLAN SHALL INCLUDE "STENCILS" BE ADDED TO PROHIBIT WASTEWATER DISCHARGE DOWNSTREAM. STENCILS SHALL BE ADDED TO THE SATISFACTION OF THE CITY ENGINEER. "DECLARATION OF RESPONSIBLE CHARGE" I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6 703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY CITY OF CARLSBAD DOES NOT RELIEVE ME, AS ENGINEER OF WORK. OF RESPONSIBILITIES FOR PROJECT DESIGN. FIRM: _C~O~F'~FE,,_Y,_.,.ENccGeclN""E""E"'R"'IN"'G'-"-IN,.,C~. _______ _ ADDRESS: 9666 BUS/NESSPARK A VE. SUITE 210 CITY, STATE: SAN DIEGO CA 92131 TELEPHONE: (858) 831-0111 BY: DANIEL VALDEZ PE DATE: 10/5/17 (NAME OF ENGINEER) R.C.E. N0.:_7~6=0~74~------------ REGISTRA TION EXP/RATION DA TE. ~6,,.,/~3~0'--'/2~0~1~8 ___ _ SOILS ENGINEER'S /, MARK D. HETHERINGTON , A REGISTERED CIVIL ENGINEER OF THE STATE OF CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS, HEREBY CERTIFY THAT THE MY A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN Tl:-I/S._ ... EROSION CONTROL NOTES 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT TOM ERICKSON AT (858/842-1939 (PHONE NUMBER) 2. EQUIPMENT ANO WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FAG/LITA TE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. 3 FOR PROJECTS COVERED BY STA TE SWPPP /WDID, IN ACCORDANCE WITH THE CONSTRUCTION ORDER ISSUED BY THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, THE QUALIFIED SWPPP PRACTITIONER (QSP) SHALL UPDATE AND MAINTAIN THE WATER POLLUTION CONTROL (WPC) PLAN TO ADDRESS UPDATED SITE CONDITIONS OF THE PROJECT. THE UPOA TED WPC PLAN AND UPDATED SWPPP SHALL BE KEPT AT THE PROJECT SITE AND MADE AVAILABLE TO THE CITY INSPECTOR. ADDITIONAL CONSTRUCTION BMP'S BEYOND THE ORIGINAL APPROVED SWPPP SHALL BE PROVIDED TO ADDRESS SITE CONDITIONS NOT ANTICIPATED. THE QSP SHALL REPORT BMP DEFICIENCIES TO THE CITY INSPECTOR. THE QSP SHALL OBTAIN APPROVAL FROM THE QUALIFIED SWPPP DEVELOPER AND THE CITY INSPECTOR REGARDING ANY SIGNIFICANT CHANGES TO BMP DEPLOYMENT. 4 THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5 THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR S/-IALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION 7 ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED SWPPP AND/OR EROSION CONTROL PLAN SHALL BE IN CORPORA TED HEREON. 8 GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FIFTY PERCENT (50%) SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 10 ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGRATE 11 SHOULD GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15. THE SLOPES SHALL BE STABILIZED BY PUNCH STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION, STA TE OF CALIFORNIA. TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND /RR/GA TION SHALL BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPECIF/CATIONS AND THE FOLLOWING: A HYDROSEEO/NG SHALL BE APPLIED TO: I ALL SLOPES THAT ARE GRADED 6: 1 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN THEY ARE a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO A PUBLIC WALL OR STREET. b ALL SLOPES 4 FEET OR MORE IN HEIGHT. 2 AREAS GRADED FLATTER THAN 6 1 WHEN ANY OF THE FOLLOWING CONDITIONS EXIST. a. NOT SCHEDULED FOR IMPROVEMENTS(CONSTRUCTION OR GENERAL LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING b IDENTIFIED BY THE PARKS AND RECREATION DIRECTOR AS HIGHLY VISIBLE TO THE PUBLIC. c HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEDIATE TREATMENT. B HYDROSEEDED AREAS SHALL BE /RR/GA TED IN ACCORDANCE WITH THE FOLLOWING CRITERIA- 1 ALL SLOPES THAT ARE GRADED 6: I OR STEEPER ANO THAT ARE: a THREE TO EIGHT FEET IN HEIGHT SHALL BE /RR/GA TED BY HAND WA TERI NG FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECIPITA T/ON SPRINKLER HEADS PROVIDING 100% COVERAGE b GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTIONAL SYSTEM OF LOW PREC/P/TA TION SPRINKLER HEADS PROVIDING 100% COVERAGE. 2 AREAS SLOPED LESS THAN 6: 1 SHALL BE /RR/GA TED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE /RR/GA TION TO THE CITY ENGINEER THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPES AND COSTS OF THE ELEMENTS OF THE THE PROPOSED SYSTEM. 3. /RR/GA TION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GROWTH OF THE HYOROSEEDED GROWTH. C HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 1. SEED MIX SHALL CONSIST OF NO LESS THAN: a. 20 lbs. PER ACRE OF ROSE CLOVER b. 20 lbs. PER ACRE OF ZORRO FESCUE c 3 lbs. PER ACRE OF E SCHOOL CIA CALIFORN/CA d 4 lbs. PER ACRE OF ACHILLEA MILLEFOLIA e 3 lbs. PER ACRE OF AL YSSUM (CARPET OF SNOW) f 1 /2 lb. PER ACRE OF DIMORPHOLFCA g. ITEMS c,d,e, AND f OF THIS SUBSECTION MAY BE OMITTED ON LOCATIONS WHERE THE AREA BEING HYDROSEEDED IS NOT VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENT/AL STRUCTURES. h ITEM a OF THIS SUBSECTION MUST BE INOCULATED WITH A NITROGEN FIXING BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROADCASTING BEFORE HYDROSEEDING. SITE WAS MADE BY ME OR UNDER MY DIRECTION ON THE DA TE OF' ~\•SJfESsii{}·.-, SEPTEMBER 18 , 2017. TWO COPIES OF THE SOILS REPORT. r,.,<;S> \\f.T/1~,j-\',·_,, 1. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE CERT/FICA TION TAG A TT ACHED TO, OR PRINTED ON SAID CONTAINERS. j NON-P/-IYTO-TOXIC WETTING AGENTS MAY BE ADDED TO THE 1-IYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR. COMPILED F'ROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS 1ci>7.__,;,• 1,1(;\< ,\~ BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER 1i!' '1 No.397 ·'::_·:;\; 2. TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS THAN 2000 lbs PER ACRE. ~ESSIOI,,' ~/✓,rLij-//7/ up.Dilt•~-} // ~<J.\\E'TH~ "1( 6' SIGNED, d lfw ~ ,,. o,.,-·"' .. • ;{ TYPE 6 MULCH (STRAW) MAY BE SUBSTITUTED, ALL OR PART, FOR HYORAULICALL Y APPLIED FIBER MATERIAL WHEN STRAW IS USED IT MUST BE ANCHORED TO THE SLOPE BY MEGHAN/CALLY PUNCHING NO LESS THAN 50% OF THE STRAW INTO THE SOIL §II,;;-'%,~~t GE /p E NO· 397 / ,;,o4 f?(? ~,,PiEc~~~l / "' -"<' '8 . . / ' . . . «-0F-cALl'i\J · · ~ ;:,; No. 397 z , ~ * EXP. * DA TE. J FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFATE, 16-20-0, WITH 15% SULPHUR APPLIED AT THE RA TE OF 500 lbs. PER ACRE. v> "'->-"<' LICENSE EXP/RATION DA TE: ~ <<01tC1-1t1\c,l' ~ l'e~~~•o'<' OF CA\.\~ OWNER'S CERTIFICATE 3/31/18 I ( WE ) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER-ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THIS SITE. IF THIS PROJECT/DEVELOPMENT IS SUBJECT TO A STA TE- REGULATED SWPPP, I (WE) ALSO AGREE A QUALIFIED SWPPP PRACTITIONER (OSP) HAS BEEN OR WILL BE RETAINED TO SUPERVISE IMPLEMENTATION OF THE SWPPP IN ACCORDANCE WITH THE CALIFORNIA CONSTRUCT/ON ORDER AND MUNICIPAL PERMIT, ~ES1 VERSION. K IO· r. · L-:J.,___ 1Yf\N"VAUGHN DATE SOURCE OF TOPOV.RAPHY TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERATED BY HANDSHOT METHODS FROM INFORMATION GATHERED IN ARPIL 2017 BY COFFEY ENGINEERING, INC. TOPOGRAPHY SHOWN HEREON CONFORMS TO NATIONAL MAP ACCURACY STANDARDS. PROJECT LOCATION THIS PROJECT IS LOCATED WITHIN ASSESSORS PARCEL NUMBER(S) 156-152-29 THE CALIFORNIA COOROINA TE INDEX OF THIS PROJECT IS: N 366 E~1~66~5~-------- D AREAS TO BE HYOROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING BY: 1 FIOUGHENING THE SURFACE TO BE PLANTED BY ANY OR A COMB/NATION OF: a. TRACK WALKING SLOPES STEEPER THAN 6: I b HARROWING AREAS 6: 1 OR FLATTER Tl-IA T ARE SUFFICIENTLY FRIABLE. c RIPPING AREAS THAT WILL NOT BREAK UP USING ITEMS a OR b ABOVE. 2 CONDITIONING THE SOILS SO THAT IT IS SUITABLE FOR PLANTING BY. a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT NOT SATURATED SEED BED. b n!E ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR GROWTH. E HYDROSEEDED AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE THE PROJECT IS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING IS THE Tl-IE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS RELEASED. F ALL SLOPES SHALL HAVE IRRIGATION INSTALLED AND BE STABILIZED, PLANTED AND/OR HYDROSEEDED WITHIN TEN (IO) DAYS OF THE TIME WI-JEN EACH SLOPE IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS. AN APPROVED EROSION CONTROL PRODUCT (RECP) SHALL BE INSTALLED PER EC-7 IF THIS REQUIREMENT CANNOT BE MET. JUTE, EXCELSIOR OR STRAW BLANKET IS UNACCEPTABLE. G. SHOULD GERM/NATION OF HYDROSEED FAIL TO PROVIDE EFFICIENT COVERAGE (NO LESS THAN 70%) PRIOR TO OCTOBER I, THE SLOPES SHALL BE STABILIZED BY AN APPROVED RECP JUTE, EXCELSIOR AND STRAW BLANKET IS UNACCEPTABLE. H LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY LANDSCAPE MANUAL, THE LANDSCAPE PLANS FOR THIS PROJECT DR AS DIRECTED BY Tl-IE CITY ENGINEER OR CITY PLANNER. VICINITY I SITE, MAP NOT TO SCALE CITY OF VISTA PACIFIC OCEAN AVE J? ~ a! __,...____r---.-«. '--"-. -CITY OF ENCINITAS "'-,----'.___, INDEX OF SHEETS SHEET 1 .................... TITLE SHEET & NOTES SHEET 2 .................... GRADING & DRAINAGE PLAN SHEET 3 .................... BMP PLAN SHEET 4 .................... CITY TIER 2 SWPPP TITLE SHEET SHEET 5 .................... EROSION CONTROL & BMP PLAN LEGAL DESCRIPTION A PORTION OF LOT 15 OF WILSON/A TRACT, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE MAP THEREOF 2169, FILED IN THE OFFICE OF THE COUNTY RECORDER, COUNTY OF SAN DIEGO, AUGUST 13, 1929 OF O.R. APN: 156-152-29 PROJECT ADDRESS 2605 CREST STREET CARLSBAD, CA 92008 DEVELOPER NAME: RYAN & SUE VAUGHN ADDRESS: P.O. BOX 4415 CALRSBAD, CA 92018 PHONE NO.: ( 415) 420-5350 REFERENCE DRAWINGS DWG 485-4 DWG 485-4A //OS 21827 EARTHWORK QUANTITIES CUT: 30 CY CY FILL: 30 CY CY IMPORT: -0-CY CY EXPORT: -0-CY CY REMEDIAL: 450 CY CY BENCH MARK DESCRIPTION: 2 1 /2" DISK STAMPED LS 6215 LOCATION: IN CROSS GUTTER: CLSB-12 7, (pT If 12 7) RECORDED: FEBRUARY 8. 2002 AS FILE NO. 2002-0112862 OF 0.R. ELEVATION: PER ROS 17271 ELEVATION: 148.059 DATUM: NGVD29 WORK TO BE DONE THE GRADING WORK SHALL CONSIST OF THE CONSTRUCT/ON OF ALL CUTS AND FILLS, REMEDIAL GRADING, DRAINAGE FACILITIES, EROSION CONTROL FACILITIES, AND PLANTING OF PERMANENT LANDSCAPING AND PREPARATION OF AS-BUILT GRADING PLANS, AS-BUILT GEOLOGIC MAPS AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET OF PLANS AND THE CITY STANDARDS, SPECIF/CATIONS, REQUIREMENTS, RESOLUTIONS AND ORDINANCES CITED ON THESE PLANS. THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER. I. CARLSBAD MUNICIPAL CODE 2. CITY OF CARLSBAD ENGINEERING STANDARDS 3. THIS SET OF PLANS 4. RESOLUTION NO. N/A DATED ___ _ 5. THE STANDARD SPECIF/CATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK). 6. SOILS REPORT AND RECOMMENDATIONS BY B&B ENGINEERING INC. DATED FEBRUARY 24, 2015 AND UPDATE BY HETHERINGTON ENGINEERING INC. DA TED SEPTEMBER I 8 2017 7. THE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS. 8. CALIFORNIA COASTAL COMMISSION DEVELOPMENT PERMIT CONDITIONS DATED __________ _ 9. ENVIRONMENTAL APPROVAL DOCUMENTS DA TED _______ _ 10. STORM WATER POLLUTION PREVENTION PLAN (TIER 2) 11. STORl,f ,WATER QUALITY MANAGEMENT PLAN PREPARED BY N,A DATED ~N=/.~A~-- 12. CALIFORNIA STORM WATER QUALITY ASSOC/AT/ON BMP CONSTRUCTION HANDBOOK AND CAL TRANS CONSTRUCTION SITE BMP MANUAL. DESCRIPTION ----- PROPERTY LINE BUILDING FOOTPRINT DIRECTION OF FLOW/ EARTHEN SWALE (E) SPOT ELEVATION (P) SPOT ELEVATION (E) CONTOUR (P) CONTOUR EX. WATER LATERAL EX. SEWER LATERAL LEGEND -- D W G. NO. (BY SEPARATE PERMIT) CMWD W-3A (PER DWG 485-4) CITY STD. 5-13 (PER DWG 485-4) SYMBOL QUANTITY N45"45'45"W ------- ~ ---90--- ------1® 1 E.A. --------<@ 1 E.A. STHUCTURAL (POST-CONSTRUCTION) BMP TABLE STORM WA r£R REQU/Rf.M[N rs THAT APPL y EXEMPT FROM f/YOROMOD!r/CA T/QN? [5<J YES TYPE S (ANO ARO STORM WA TE.R REQUIREMENTS PRIORITY PROJECT REQUIREMENTS DESCRIPTION OWNERSHIP □ NO MAINTENANCE AGREEMENT SHEET NO. MAINTENANCE FREQUENCY --f----------+------+-------+-----+-------- TOTAL LOT AREA =_0~·~28~A-C-RE~S~------- TOTAL DISTURBED AREA = 0.16 ACRES (THIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE ANO EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFIC, SOIL/GRAVEL PILES, UTILITY TRENCHES, BACKFILL CUTS AND SLOPE KEYWAYS) TOTAL REPLACED IMPERVIOUS AREA =---~O-__ _ 11 AS BUIL T 11 ~/---3lLJIJJ_"}__ ~CE _1:f&l..'/ EXP _fzl$o/zo DATE REI/I[wED BY, TOTAL PROPOSED IMPERVIOUS AREA -4 063 '½✓'c.vJ&/4,.,.._..____ v7s° _PE C µJR ~-~-----------------------------~-----'-:-c:·::-·==:z==========::::::-:===~ i-----t------j------~~~+------+-----+-------+----l w CITY OF' CAf~LSBi-\D ENGINEERING DEPARTMENT SHEETS 5 ~- i------t---------t--------------------j------j---f------+---< GRADING PLANS FOR 1-----t------+---------------- VAUGHN RESIDENCE 2605 Cf~EST DRIVE GR2017-0040 TITLE SHEFT APPROVED // -I){), J JJ.._ -JASON S GELDERT U.<W<.N.A' /IJ.twvt Jo.)!'< lu1+ CITY ENGlflEER RCE 63912 EXPIF,ES 9/30/18 lfATE 13!li!M T'-"L 11\ 4s -·/3.\.lu.:_, ---------+---1-----+---+---1 DWN-BY o~ PRo.JEcT No oRAw1Nc No DATE INITIAL DA rE INITJA:_ DATE INITIAL Pf'../L -EN-GINEER OF WORK RE\/ISI01\I DESCRIPTI01\I OTHER APPROVAL CITY APPROVAi ~~~g ~~ ---DEV2016-0043 505-5A I ! I ' ' I m p ~ n 0 I " cu rilo , □o -:;::gc 'm@ :' ::o- :~ -' lJ • -: !> -:::lz . m -: f ::i: I ffiI -, ~ ~ Ul fTl I (JI:;;: F g] z z m § p en l> ~ n 0 -u ·-U-U 1mO JQO J~~ :' JJ ---, ~-r_n UJ _; --< • -u • -: F' o~z ;z~ _] ~ : w. a --u -u ;::-OJ fTl ' 8l 5". 1wz ' z Ill ~ ..,;a,, 0 ..... 01 CJ :0 ~ 2 GJ 2 C ~ Cll m :0 □ :0 i 2 GJ 2 C ~ Cll m :0 CJ :0 l> ~ 2 GJ 2 C ~ Cll m lJ Q ! <ii Q QI ~ DRAINAGE NOTES: 1 ALL MAIN DRAIN LINES SHOWN TO BE 6" PVC @ 1 % MINIMUM SLOPE UNLESS OTHERWISE NOTED. 2. ALL CATCH BASIN LEADS TO B[ 4" PVC @ 2% MINIMUM SLOP[ UNL[SS OTH[RWIS[ NOT[D. J HARDSCAPE GRADES TO BE 2% MINIMUM TO DRAINS AND AWAY FROM STRUCTURE. 4. SOFTS CAPE GRADES TO BE 5% MINIMUM TO DRAINS (1 % WHERE FLOW IS CONCENTRATED) AND 5% MINIMUM AWAY FROM STRUCTURE 5. SOIL COVER ABOVE DRAIN LINES SHALL BE 12" MINIMUM UNLESS OTHERWISE NOTED. 6. NOTIFY CIVIL ENGINEER IF ANY NON-DRAINING SUMP CONDITIONS BECOME APPARENT DURING CONSTRUCTION. 7. AT ALL STORM WATER DISCHARGE LOCATIONS, SUITABLE ENERGY DISSIPATERS ARE TO BE INSTALLED TO RE:DUCE THE DISCHARGE TO NON-ERODIBLE VELOCITIES. 8. NO ADDITIONAL RUN-OFF IS PROPOSED FOR THE DISCHARGE LOCATIONS. 9. THE EXISTING WATER AND SEWER SERVICES WILL REMAIN. 8.5' GRAVEL OR PC C -6" -2' VEG. SWALE BAND (PER PLAN) -PER DET 'A' JO' PC C WALKWAY\ f----+~~r-------~----~+---'---+--~-------, ' · r1 l,0(.,..."' , .,_ 7,,Y/;Y TYPCIAL DRIVEWAY SECTION N.T.S. 2.0' SWALE 6" ~VEGETATED COVER (MIN. 4" GRASS) DETAIL '.A'-VEGETATED SWALE NOT TO SCALE D.\DRAWING FlLES\TITLE SHEETS\GRADING TITLE SHEETOWG REVISED 02/15/17 185 180 EXISTING GARAGE I I If_ FF= 185.00 185 f-------6.0'------1 I I I I /?s I I I ?s I I I I 1477 ' ~ C) Q:- , 4 O' TO ~2.o ~r!f SWALE ___ ,_ ~STEM WALLS & FOUNDATION -.___/ PER STRUCTURAL PLANS VEG. SWALE PER__ I DETAIL 'A' _J®. ___ I? c--- 1 o· ' _____ T --~ ---=~,r,:,;,:~bv- -EX. GRADE I ~---~ PAD=/82.00 ------------ SECTION '.A-A' 20 JO , SCALE: 1"=10' 180 t-------t---+--------------+---t--+---f---•~2 · ,,_ci'TY OF CARLSBAD_ [_s_H5E--ETs ~-ENGINEERING DEPARTMENT :===-___'_'_:===========-_:'_':_~_; ,---t----t-----------------+---+---+---t----1 GRADING PLANS FOR VAUGl-IN RESIDENCE 2605 CREST DRIVE _ >-------------·------+---+---+------+----l =;C=R=2=0=-I i"-:---"0=0=4=0~==;M;=A=;I N,==G;=R A=D=I N=c=· =P=I =;\N====-'-==--'"-'---=---; APPROVED~' / L JASON s P~LDERT I-----+---+------------------- ~1 _____ /~~ CITY ENCINEt' RCE 6 3912 EXPIRES 9 /30 /18 -DATE DWN BY DI/ ~00Jll6CT_N00043 DRAWl~IG NO CHKD BY i)E'/1._ 5Qt:;-5A fNWD BY v ------f-----+------l---+-- 'JA TE INITIAL ENGINEER OF WORK /1\ f.)S-BUI L--r REVISIO~I DESCRIPTION DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL m l> ~ " 0 " D CO ~o DO 0 C '~~ ~ 0 • 0 ~z i'~ <I -] il J) rn ~,: .u z z m m SI l> ' CJ ll ~ 2 GJ 2 C ~ ca m ll 111017 ~ 0 ...., U1 CJ ll l> ~ 2 GJ 2 C ~ ca m ll CJ ll ~ 2 GJ 2 C ~ ca m ll CJ C:::,JJ ~ ~ ~ o= Ul"?: I DJ ~ )> ---r- l I I I I -I -t I SC-1 I -2,. t') I c:i + 'D ~ ' I SD-2 I SD-6 I I SD-7 I ISC-6.15I I l I I I I l I 0 ' " --------T-- BMP ID# I BMP TYPE SYMBOL CASQA NO QUANTITY ! TREATMENT CONTROL & HYDROMODIFICATION I ·--! NIA NIA I NIA I I I ; ' : ' i i I LOW IMPACT DESIGN (L.1.O.) (i}) RAIN CISTERN ® VEGETATED SWALE SOURCE CONTROL Vc1/ AREAS NIA TC-12 TC-30 SD-32 NIA 1 EA. 2 EA BMP TABLE DRAWING NO SHEET NO (S) NIA NIA INSPECTION FREQUENCY NIA ---~------- I MAINTENANCE : FREQUENCY NIA CONSTRUCTION SIGN OFF NIA ------------ -------------------------- 3 (DETAIL 'A') QUARTERLY ANNUALLY ' ----+------------ 2 QUARTERLY ANNUALLY C1 WEEKLY WEEKLY "23\ '1 TRASH STORAGE ·-------------i--------·-· -----t----c---------,~-----,--------, ---____ I__ ---- PERMANENT BMP LEGEND SITE DESIGN BMPS CONSERVE NATURAL DRAINAGE PATHWAYS CONSERVE NATURAL AREAS, SOILS AND VEGETATION MINIMIZE IMPERVIOUS AREA MINIMIZE SOIL COMPACTION IMPERVIOUS AREA DISPERSION RUNOFF COLLECTION NATIVE OR DROUGHT TOLERANT VEGETATION I SD-7 I I SD-21 I so-JI I SD-4 I I SD-5 I I SD-6 I I SD-71 SOURCE CONTROL BMPS PREVENTION OF ILLICIT DISCHARGES I SC-/ I PROTECT TRASH I SC-5 I STORAGE AREAS LANDSCAPE/OUTDOOR ISC-6.~ PESTICIDE USE FIRE SPRINKLER ISC-6, I 51 TEST WATER *SOURCE CONTROL BMPS CAN BE FOUND IN THE CITY OF CARLSBAD STORM WATER STANDARDS MANUAL 2016 lf) t') I t / I SD-6 I ! I I~ I I C I SD-8 I 9' HARVESTING AND a I t') 'i-!~ t') < ! I \ \ \ V \ ' -\ -·- ~-c--__ 1_:__··L,, _l_,~lS_D_-cl_c_l-·L ___ L,--l ___ _J_o ·__j·::::::~i==~¥==~===,=~=;=========¥==~========~~==~~=---;=-7"'~~';=-~=----:;=-=--:=:.=----=r~~=,=--:_ ==--_ -=!'. =~. C..:-==--~-.;=. /& ----+~----·.--"-,.----,,--.-----,-_-.---"I---.--------';-+---h----.-----'--------.-'r'---+----,---,--'----+----,---i-"----h',--~-----ie,---~-,-J;----~-·!T~-~--~' n · . _ --I : I I ~ '-S{!)-7 \ \ ---sq 6.: ---, -,, ' -' -' . i -_, Q -I ----, -, -\~ ,, -i -' --• ' -" ! ~~~ " \c ' ' " " " " \ d , -\ ~ , i,, I SD-1 I \ ~ -- --. co \ ' ' ' \ \ 3.8% --- GUTTER WITH LEAF GUARD - " J en . 0 I • I I -' ~i -- "I" I SD-, I D-3 --- DOWNSPOUT r/0.75'-----j BUSHMAN 5050 I GALLON RAINWATER CISTERN {!HARVESTING ACCESS~ TANK 8' CLEANOUT r DETAIL '.A' -CISTERN LAYOUT NOT TO SCALE D \DRAWING FlLES\llTLE SHEETS\GRAOING TITLE SHEET.OWG REVISE0:02/15/17 I I V JOUTLET -=tllm,Llrjjl!!,,cl' 'cs'-Umllt --JI 1-· -· ' ' --' --' ' I ~! \ I "I"'. O'r fl ~ l -I SD-5 I SD-3 ~ • en -N v' 1 \ j\ I ' I \, r "< I~ "I" -- -,, ', f j • /%: •,,,M ?%, I SD-5 I SDtll _.· __ -~ __ .l, ~t ' -', en "' ,, -- 10 0 i..-~ -- I I I I 10 20 ---- SCALE: 1 "= 10' USING PRECIPITATION *SITE DESIGN (LID) BMPS CAN BE FOUND IN THE err( OF CARLSBAD STORM WATER STANDARDS MANUAL 2016 ,---,--------------------------- GR NO. 2017-0040 MAINTENANCE AGREEMENT DOCUMENT: YES __ NO X RECORDATION NO. ____ _ PARTY RESPONSIBLE FOR MAINTENANCE: NAME _ ___:..:RY-"-A"-'N-=&--=S-"'UE=-V'-'-A=-UG=H_:c_Nc___ ADDRESS P O Box 4415 CARLSBAD CA 92018 PHONE NO (415) 420-5350 PLAN PREPARED BY· NAME _ __;:_DA--=N--=IE""L-'-VA--=L=-D=EZ'----- COMPANY COFFEY ENGINEERING, INC CONTACT RYAN VAUGHN • IJ ADDRESS 9666BUSINESSPARKAVE SUITE210 '%,h C~t•· \, , ,:-:) J/_11 ,i SAN DIEGO, CA ' 0ft C /()ti? f 92131 --"'""·" PHONE NO (858) 831-0111 CERTIFICATIO~ 76074 [J SHlE:: r SHEET'.) [tl1"Y -'oF' CAI{LSFJAD ___ E~GINEERING DE?ART~ENT '·---+-----t----t----t :=====c===---=========c~--=--=--=--=--=--=-=---~ 0----+-----t---+----t '.3 5 --+----+-----------------------+----+----t------i GRADING PLANS F'OR 1-------t-----------c-------------------,-----,--·-------i----, VAUGI--TN RESIDENCE 2605 Cf{EST DRIVE -. ·---+-----1 -.. --+-------------------+----+--GR2J17-:JU4CJ /I BlvlP PLAN 30 --------,-APPROVED IL,v1Jt/;J;t; JASGN 5~2~7~~~; ' __ c11v rnGIMEEF/ RCE 5,912 EXPIRES 9/30/18 L/AlE t~~1'1',/'Jd~l~/'i_ijJ,irY,"'!2l11s=\A~S2iB~UUILL!]====-:--=--=--=--=----+---+---+---c-----DW~I BY DV PROJECT ~I□--': ORA.WING _NCI [)AIE INlfi,'L ~"-''_TE~_'_H_A_l_-+-_DA_T_E~_IN_IT_IA-JL CHKD BV _i)E/2,., __ DE\"')016 00401' '0' h ,\ ENG1Ncrnoe 11,-oeK RE\/ISIO~I DESCRIPTION 'oTHERAPf'11cvAL c1TYAPPROVAL l<VWO BY 11--cJII;) J-,J,4; I ' I ' □ :0 ~ 2 (j) 2 C s: ca m :0 □ I 2 (j) 2 C s: ca m :0 □ :0 ~ 2 (j) 2 C s: ca m :0 TIER 2 CITY STORM WATER POLLUTION PREVENTION PLAN (TIER 2 SWPPP) STORM WATER POLLUTION PREVENTION NOTES GENERAL SITE MANAGEMENT REQUIREMENTS THE FOLLOWING GENERAL SITE MANAGEMENT REQUIREMENTS SHALL BE ADHERED TO THROUGHOUT THE DURATION OF THE CONSTRUCTION WORK (YEAR ROUND). 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT.· TOM ERICKSON FROM-HULTON DEV. AT (TEL.NO.} (858)842-1939 . 2. DEVICES SHOWN ON CITY APPROVED PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. J. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORSEEN CIRCUMSTANCES WHICH MAY ARISE. 5. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. 6. GRADING AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 7. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT ANO OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 8. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE. 9. ALL EXPOSED DISTURBED AREAS MUST HA VE EROSION PROTECTION BMPs PROPERLY INSTALLED. THIS INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, ANO SLOPES. 10. ADEQUATE PERIMETER PROTECTION BMPs MUST BE INSTALLED ANO MAINTAINED ANO WILL 8£ UPGRADED, IF NECESSARY, TO PROVIDE SUFFICIENT PROTECTION FROM RUNOFF DURING RAIN EVENTS. 11. ADEQUATE SEDIMENT CONTROL BMPs MUST BE INSTALLED ANO MAINTAINED. 12. ADEQUATE BMPs TO CONTROL OFFS/TE SEDIMENT TRACKING MUST BE INSTALLED AND MAINTAINED. 13. A MINIMUM OF 125% OF THE MATERIAL NEEDED TOD INSTALL STANDBY BMPs TO PROTECT THE EXPOSED AREAS FROM EROSION AND PREVENT SEDIMENT DISCHARGES, MUST BE STORED ONSITE. AREAS ALREADY PROTECTED FROM EROSION USING PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION STAB/LIZA T/ON BMPs ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. 14. THE OWNER/DEVELOPER/CONTRACTOR MUST FOLLOW "WEATHER TRIGGERED" ACTION PLAN AND BE ABLE TO DEPLOY STANDBY BMPs TO PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT (A PREDICTED STORM EVENT IS DEFINED AS A 40% CHANCE OF RAIN WITHIN A 5-DA Y NATIONAL WEATHER SERVICE FORECAST). ON REQUEST, THE OWNER/DEVELOPER/CONTRACTOR MUST PROVIDE PROOF OF THIS CAPABILITY. 15. DEPLOYMENT OF PHYSICAL OR VEGETATION EROSION CONTROL BMPs MUST COMMENCE AS SOON AS SLOPES ARE COMPLETED. THE OWNER/DEVELOPER/CONTRACTOR MAY NOT RELY ON THE ABILITY TO DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT HA VE BEEN COMPLETED. 16. THE AREA THAT CAN BE CLEARED, GRADED, AND LEFT EXPOSED AT ONE TIME IS LIMITED TO THE AMOUNT OF ACREAGE THAT THE CONTRACTOR CAN ADEQUATELY PROTECT PRIOR TO A PREDICTED RAIN EVENT. FOR LARGER SITES, GRADING SHOULD BE PHASED. IT MAY BE NECESSARY TO DEPLOY EROSION AND SEDIMENT CONTROL BMPs IN AREAS THAT ARE NOT COMPLETED, BUT ARE NOT ACTIVELY BEING WORKED BEFORE ADDITIONAL GRADING IS ALLOWED TO PROCEED, AT THE DISCRETION OF THE CITY INSPECTOR. 17. ALL DISTURBED AREAS THAT ARE NOT COMPLETED AND/OR NOT BEING ACTIVELY GRADED MUST BE FULLY PROTECTED FROM EROSION IF LEFT FOR 14 OR MORE DAYS. THE ABILITY TO INSTALL BMP MATERIALS IN A PROMPT MANNER IS llfJI. SUFFICIENT. BMPs NEED TO BE INSTALLED IN THESE AREAS. 18. BMPs MUST 8£ STOCKPILED AT VARIOUS LOCA T/ON THROUGHOUT THE PROJECT SITE THROUGHOUT THE YEAR. WHENEVER THERE IS A 40% CHANCE OR CREA TER OF A RAIN WITHIN A THREE (3) DAY FORECAST, THE INSPECTOR WILL VERIFY THAT BMPs ARE AOEQUA TEL Y STOCKPILED. BMPs MUST BE STOCKPILED AND READY FOR DEPLOYMENT ,WHEN THERE IS 50% CHANCE OF RAIN WITHIN A 48 HOUR FORECAST. FAILURE TO COMPLY WITH THIS REQUIREMENT COULD RESULT IN THE ISSUANCE OF A STOP WORK NOTICE OR OTHER ENFORCEMENT ACTION, 19. ALL TREATMENT ANO EROSION CONTROL BMPs MUST BE INSPECTED WEEKLY ANO PRIOR TO A FORECASTED RAIN EVENT OF GREATER THAN 50%, AND AFTER A RAIN EVENT. IN ADDITION, TREATMENT CONTROL BMPs MUST BE SERVICED AS NEEDED THROUGHOUT THE YEAR. I 20. IF SELECTED BMP FAILS DURING A RAIN EVENT, IT MUST BE REPAIRED OR IMPROVED OR REPLACED WITH AN ACCEPTABLE ALTERNATE AS SOON AS IT IS SAFE TO DO SO. . THE FAILURE OF A BMP INDICATES IT WAS NOT AOEQUA TE FOR THE CIRCUMSTANCES IN WHICH IT WAS U:,EO. REPAIRS AND REPLACEMENT MUST THEREFORE PUT A MORE ROBUST B/IP MEASURE IN PLACE. 21. ALL CONSTRUCT/ON EMPLOYEES MUST BE TRAINED ON THE IMPORTANCE OF STORM WATER POLLUTION PREVENTION AND BMP MAINTENANCE. WEATHER TRIGGERED ACTION PLAN I THE DEVELOPER SHALL DEPLOY STANDBY BEST MANAGEMENT PRACTICE MEASURES Tq COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A I PREDICTED STORM EVENT ( A PREDICTED STORM EVENT IS DEFINED AS A FORECAST{D, 40% CHANCE OF RAIN BY THE NATIONAL WEATHER SERVICE), IN ADDITION TO BMPs IMPLl;MENTEO YEAR-ROUND INCLUDING PERIMETER CONTROL, WINO EROSION CONTROL, TRACKING, I NON-STORM WA T[R CONTROL, WASTE MANAGEMENT, ANO MATERIALS POLLUTION CONTROL. ' THE NATIONAL WEATHER SERVICE FORECAST SHALL BE MONITORED ANO USED BY ! THE DEVELOPER ON A DAILY BASIS. IF PRECIPITATION IS PREDICTED (40% CHANCE Of RAIN), THEN THE NECESSARY WATER POLLUTION CONTROL PRACTICES SHALL BE DEP40Y£0 WITHIN 48 HOURS AND PRIOR TO THE ONSET or THE PRECIPITATION. I THE DEPLOYMENT OF THE BMPS SHALL INCLUDE BUT NOT BE LIMITED TO GRAVEL BAqS ANO SILT FENCES. A MINIMUM OF 125% OF THE MATERIAL NEEDED TO INSTALL STANDBY BEST MANAGEMENT PRACTICES MEASURES TO PROTECT THE EXPOSED AREAS FORM EROSION AND PREVENT SEDIMENT DISCHARGES MUST BE STORED ON-SITE. AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING PHYSICAL STAB/LIZA TION OR ESTABLISHED VEGETATION STABILIZATION BMPS AS DETERMINED BY THE CITY OF CARLSBAD ARE NOT CONSIOEREO TO BE "EXPOSED" FOR THE PURPOSES OF "WEATHER TRIGGERED ACTION PLAN". AN ADEQUATE SOURCE or EQUIPMENT AND WORKERS SHALL 8£ AVAILABLE FOR DEPLOYMENT or "WEATHER TRIGGERED BMPS". 0 \DRAWING FILES\TITI.E SHEETS\GRADlNG 11TLE SHEET,OWG REVISE0,02/15/17 EROSION CONTROL HYOROSEEDING, PLANTING ANO IRRIGATION 1. ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING ANO IRRIGATION SHALL 8£ INSTALLED ANO MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPECIF/CATIONS ANO THE FOLLOWING: A HYDROSEEDING SHALL BE APPLIED TO: 1 ALL SLOPES THAT ARE GRADED 6: 1 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN THEY AR£· a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO PUBLIC WALL OR STREET. b. ALL SLOPES 4 FEET OR MORE IN HEIGHT. 2 AREAS GRADED FLATTER THAN 6: I WHEN ANY OF THE FOLLOWING CONDITIONS EXIST.· a. NOT SCHEDULED FOR IMPROVEMENTS (CONSTRUCT/ON OR GENERAL LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING. b. IDENTIFIED BY THE PARKS AND RECREA T/ON DIRECTOR AS HIGHL Y VISIBLE TO THE PUBLIC. c. HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEOIA TE TREATMENT. 8 HYDROSEEOING AREAS SHALL BE /RR/GA TED IN ACCORDANCE WITH THE FOLLOWING CRITERIA: 1 ALL SLOPES THAT ARE GRADED 6: 1 OR STEEPER ANO THAT ARE: a. THREE TO EIGHT FEET IN HEIGHT SHALL BE IRRIGATED BY HANO WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100% COVERAGE. b. CREA TER THAN 8 FEET IN HEIGHT SHALL BE WA TEREO BY A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100% COVERAGE. 2 AREAS SLOPED LESS THAN 6: 1 SHALL BE IRRIGATED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEOING. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE /RR/GA TION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPE, AND COSTS OF THE ELEMENTS OF THE PROPOSED SYSTEM. J /RR/GA TION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GRADING OF THE HYOROSEEOED GROWTH. C HYOROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 1 SEED MIX SHALL CONSIST OF NO LESS THAN. a. 20 lbs. PER ACRE OF ROSE CLOVER b. 20 lbs PER ACRE OF ZORRO FESCUE c. Jibs PER A CR£ OF £ SCHOOL CIA CALIFORNICA d. 4 lbs PER ACRE OF ACHILLEA MILLEFOLIA e. Jibs PER ACRE OF ALYSSUM (CARPET OF SNOW) f. 1 /2 lb. PER ACRE IF 0/MORPHOLECA g. ITEMS c, d, e, AND f OF THIS SUBSECTION MAY BE OMITTED ON VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENTIAL STRUCTURES. h. ITEM a OF THIS SUBSECTION MUST BE INOCULA TEO WITH A NITROGEN FIXING BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROAOCAS/NG BEFORE HYDROSEEOING. i. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT OF FOOD ANO AGRICULTURE CERTIFICATION TAG ATTACHED TO, OR PRINTED ON SAID CONTAINERS. j NON-PHYTO-TOXIC WETTING AGENTS MAY BE ADDEO TO THE HYDROS[EO SLURRY AT THE DISCRETION OF THE CONTRACTOR. 2 TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS HAN 2000 lbs PER ACRE TYPE 6 MULCH {STRAW) MAY BE SUBSTITUTED, WHEN STRAW IS USED, IT MUST BE ANCHORED TO THE SLOPE BY MECHANICALLY PUNCHING NO LESS THAN 50% IF THE STRAW INTO THE SOIL J FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFATE, 16-20-0 WITH 15% SULPHUR APPLIED AT THE RATE OF 500 lbs. PER ACRE. 0 AREAS TO 8£ HYDROSEEDED SHALL 8£ PREPARED PRIOR TO HYDROSEEDING: I ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A COMB/NATION OF: a. TRACK WALKING SLOPES STEEPER THAN \6: 1. b. HARROWING AREAS 6: 1 OR FLATTER THA',T ARE SUFFICIENTLY FRIABLE 2 AREAS GRADED FLATTER THAN 6: 1 WHEN ANY or TH[ FOLLOWING CONDITIONS EXIST: a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BIT NOT SATURA TEO SEED BED. b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR GROWTH. E HYDROSEEOING AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE PROJECT IS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEOING IS THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS RELEASED. 2. ALL SLOPES SHALL HAVE /RR/GA TION INSTALLED AND BE STABILIZED, PLANTED AND/OR HYDROSEEOEO WITHIN TEN (10) DAYS OF THE TIME WHEN EACH SLOP[ IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS. J. SHOULD GERM/NATION OF HYOROSEEDED SLOPES FAIL TO PROVIDE EFFICIENT COVERAGE OF GRADING SLOPES (90% COVERAGE) PRIOR TO OCTOBER 1, THE SLOPES SHALL BE STABILIZED BY AN APPROPRIATE EROSION CONTROL MATTING MATERIAL APPROVED BY THE PUBLIC WORKS INSPECTOR. 4. LANDSCAPING SHALL 8£ ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT OR AS DIRECTED BY THE CITY ENGINEER OF PLANNING DIRECTOR. 5. THE OWNER/APPLICANT SHALL ENSURE THAT ALL CONTRACTORS SHALL COOROINA TE THE WORK OF THIS CONSTRUCT/ON SWPPP SHOWN ON ANY GRADING PLANS, LANDSCAPE AND IRRIGATION PLANS, ANO IMPROVEMENT PLANS AS REQUIRED FOR THIS PROJECT WORK. VICINITY MAP CITY OF OCEANSIDE HIGHWAY, 78 Best Management Practice' (BMP) Description ➔ CASQA Oes,gnat,on ➔ I Construction Activity X Crad1ng/So1/ D1sturbonce __ Trenchmg/Exccvatlon X Stockp1l1nq C Q ~ 0 0 -~ '" 0 CCI, -8 l;: 0 > en c C Q> -V, V, " ~ ~ Q '-'-' '" I u Lu X o, C ·a •o "' V, 0 ~ -~ =c ,, I u Lu BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE Erosion Control BMPs .;'! D ~ ·o "' 'o, C CD 'd s oo •a s .c "' 0 Q> VJ ~ '" C, 6 SD :, o, ~ 0 .:'c 0 E s Q 0 ii 0 '" ~ ~ u LLJ Ci , .. 'D o, I I I u 0 u Lu •-u c_, X Q "' s 0 c Cl "' 0 "' <D ., 0 C C "' "' E ,~ Q 0 Vi i3 "' U) v, ---"') I I I u Lu Lu l--W V, Ln X Sediment Control BMPs I D C 0 E 0, L L C <D '" C OJ Q L "' D E "' (D -::2 o, On Co $ 0 ?:i s C, OJ VJ '" E Qc 0 ~ "' D .Q 0 L <D " ·a ' •o <D <D 0 0 0 -CC .Q ~ .;o 0 0 u L~ co VJ> VJ "'" ~, <o " co I I I I I Lu Lu Lu c., Lu Ln v; en v; V) X X X X Trackmg Non-Storm Water Conlrol 8MPs Management BMPs C -C C 0 0 2 -C -0, Q <D 0 0 0 ~ 0, E 0 0 _g E g. -~ L .;o .'!' ~ C "'-" 0 "' "' "' 0 C er , C C > L Lu 0 "' 0 c (.') -~ '" <D 0 u L u "' ·c, -S' t, 6 0 0, C "' C ~~ C s ~ 0 ·a 0 "' 0 0 a <D " u '" 0 0 D, Q .'!' C, "" -~ s 0 Q)__;:: '" s E u "' ,.CC .q 0 "' 0 0 C 1:' -·o <D 0 L ·- .q .Q Q 3: Ql .~ 0 "" D .i' 0 0 0 D; ..2 0 L 07 _t: ~Q Q Cl a QJ _':!:J VJQ Ln Q QC) Q >U C, ~ "') " C<J -. .., I I I I I I I Lu i'c ~ Ln Ln Ln v, V) 2 < 2 2 I-· "" -.. .. X X X I SITE: Waste Management and Materials Pollution Control BMPs ~ C ·o <D ·o C E C 0 0 "" .:'o C' 0, 0 0 "' "' "' 2 .s, ~ C "' "' 0 -s-~ 0 -T~ '" "' "' C "' C C s ~ c:, ::, <D -cc "' <D '" ~ ill E a E E ~ <D 0 '" 0 ~ -<D Q " "' t, "' C o, C Q Q_ _g D, ' en ' D• 0 -"' 2 0 0 Q 0 0 <D c 0 -2 C: "" 0 ~ I::: ., 0 C 0 .2 0 "" 0 QO 0 0 0 a 0 0 :, Ln "' Ln LnU v, :."I ::.r:::.~ u:, ~ "" ~, " LC, <o co I I I I I I I ,-;,c ~ i ~ ;,c ~ "" ~ ± s s s s s X X X X X X X X X X r-.. Dnllm_q/BonQSJ_ ______ ---+--+---+--f--+--+---+---t-+---+---t-+---+----+---t--+-+--+--c---+--+--+---+----+--+--+-+--+---+--+--+--+--, Concrete/Asphalt Sowcutting X Concrete Flatwo.rk X X X Pov1n9 X Condu1t;~P1pe instollot1on X f'-x--+-s_tu_c_c~o /,_M_o_rt_o_r _vV_~r_k_-_-_-_-_-_-_-_-_-_-:_-_-_-...,-+_-_-++-_-:__-:--l---+-+--+---+-+--+---+-+--+--+---+--+--+---+--f---'-'x._,_-+-+--f---+--+---+---+~X,__,_-+~X-+---+---l . -+-+--+--+-+--+--+-+---·-f--+--+---+----+---+--+--+---+--f----t-+--+---+--+--+--+--t---+-----, X Wuste 01sposrn' X y y y X: Sluoino/Luy Down Area X X X . Eoumment i1.1mntenonce and Fuelino ·; Hozordous Substance Use/Storoc1e f--½------··· -+---+----+-----,-+---+---+---+-+--+---+-+---+---+--+-+--+--+---+--+---+----+---+---+--+-+--f----+--+--1---+---+---+--, i Dewotenng Xi Site Access Across DI(/ X Otner (/1st) ~-~-~~--------~-~-+-~-~-~-+--+-~--+-~-~--+--+---+-~-~~-~-~-~--+-~--+---+-~-~~-~-~--+-~-~~ lnc;tructwns I Check the box to the le.ft of all applicable construction activity (first column) expected to occur during construction 2 Located olonrJ the top of the BMP Tobie ;s a list of BMP's with it's correspondrng Coldorn,o Storm·,voter Quality Assoc1ohon (CASOA) des19nat,on number Choose one or more Bfv/Ps you in.tend to use durrng construct/On from the /1st Check the b-:ix where fhe chosen oct1v1ty row intersects with the BMP column 3 Hefer to the CASOA construction handbook for information and detmis of the chosen BMPs and how to apply them to the pro"1ect OWNER'S CERTIFICATION· I UNDERSTAND AND ACKNOWLEDGE THAT I MUST.· {I) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPs) DURING CONSTRUCT/ON ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO A VOID THE MOB/LIZA T/ON OF POLLUTANTS SUCH AS SEDIMENT ANO TO A VOID THE EXPOSURE OF STORM WATER TO CONSTRUCT/ON RELATED POLLUTANTS,· AND (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 2 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND SIGNED OFF BY THE CITY or CARLSBAD. RYAN VAUGHN OWNER(S. / OWNER'S AGENT NAME (PRINT) ~ I 0-oG-tl OWN£, '¢ l,tJ OWNER'S AGENT NAME (SIGNA TUR£) DATE '-1( NOT TO ~SCALE CITY OF VISTA APN: 156-152-29 SITE ADDRESS: 2605 CREST DRIVE CARLSBAD, CA 92008 AREA OF DISTURBANCE AREA OF DISTURBANCE 7000 S.F. (T/-IIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFI~ SOIL/GRAVEL PILE~ UTILITY TRENCHES, BACKFILL. CUTS ANO SLOPE KEYWA YS) CONSTRUCTION THREAT: CONSTRUCT/ON THREAT TO STORM WATER QUALITY (CHECK BOX): 00 HIGH □MEO/UM OWNER/APPLICANT: NAME: LA COSTA GREENS COMMUNITY ASSOC. C/0 WALTERS MANAGEMENT ADDR[;iS: 3207 GREY HAWK COURT, SUITE 140, ·cARLSBAD, CA 92010 TELEPHONE NO.: (760) 431-2522 EMERGENCY CONTACT: NAME: LA COSTA GREENS COMMUNITY ASSOC. C/0 WALTERS MANAGEMENT ADDRESS: 3207 GREY HAWK COURT, SUITE /40, CARLSBAD, CA 92010 TELEPHONE NO.: (760) 431-2522 --------------------1--+--+-------------+---+---f----+--__, I S4HEET I CITY OF CAR LS BAD , ENG!clEERING DEPART~IENT :=.:::=~c=======:::;=:========-====: SHEETS 5 NAME OF PREPAR~R:=D.~'AN~l=EL~VA~L=D=£Z~------- QUALIFICATION OF PREPARER· RC£ 76074, QSD 21156 ADDRESS: COFFEY ENGINEER/NG, INC. 9666 8US/NESSPARK AVENUE, SUITE 210 SAN D/EGO, CA 92131 76074 SIGNATURE R.C.£./CERT. NO. 6/J0/2018 DATE li\JITIAL / 0/6/11 ENGINEER OF WOC<K REVISION DESCRIPTION UC EXP. DAT£ DAT£ DArE INITIAL DA"fE l~IITIAL OTHER APPROVAL CITY APPROVAL GRADING PLANS FOR VAUGHJ-.1 RESIDENCE 2605 CREST DRIVE GR2017-0040 _ CITY SWPPP -TIER 2 APPROVED 71="7/r=;c/l=.~==,_========JA=S=O=N=S=~=l~=E=L~=E=R=T=; __ __!I,,-//....,_',t!_~LZ'M(.0."..l'.'W_~-----'6JL&'/2lll. CITY EflClflITR RCE 63912 EXPIRES 9/30/18 DATE OWN BY -□~V__ PRO,JECT clO DF,AWING NO ~~~lg~~ i)Z/\.. DEV2016-0043 505-5A 1110·17 w ,, ~ 0 D □ I :i: :/J ~□ o □o ~ ,~c '0 0 5 m---l •"w ~~ 2 ,n ·a • ' ,, (j) g .::lz 'z~ 2 ' r ! f I C E fll 0 •a-a ~ 'ii m-m 1~1 OJ m iJl Jl ~ DESCRIPTION PROPERTY LINE SILT FENCE STABILIZED CONSTRUCTION ENTRANCE GRAVEL BAG BERM/BARRIER DIRECTION/COURSE OF FLOW LEGEND STD owe-' SE-1; DET. 'R' TR-1; DET. 's' SE-6; DET. 'V/W' HAZARDOUS AND CONCRETE WM-6, WM-8; DET. 'Z' WASTE MANAGEMENT SANITARY WASTE WM-9; DET. 'T' (PORTABLE TOILET) MATERIALS DELIVERY AND STORAGE AREA WM-1 TEMPORARY TRASH/SOLID WASTE WM-5 STRfET SWEEPING SE -7 SYMBOL N45'45'45"W _..;.:.a __ ..... _ -0-----0--0---- I WM-6 I WM-8 I WM-91 I WM-1 I I WM-5 I (NO SYMBOL) " QUANTITY 450 LF 400 FT2 75 EA 1 [A 1 [A 1 [A 1 [A STANDARD DRAWINGS (SE-5, WM-5, ITC.) CAN BE FOUND AT THE CALIFORNIA STORMWATER QUALITY ASSOCIATION (CASQA) WEBSITE: https://www.casqa.org/resources/bmp-hondbooks/construction 1. SET POSTS AND EXCAVATE A 4 BY 4 IN (lo BY 10 CM) TRENCH UPSLOPE FROM AND ALONG THE LINE OF POSTS. 2. STAPLE WIRE FENCING TO THE POSTS. 4 IN (10 CM) --~-.. 8" MIN.: I PROFILE EXISTING GROUND \ ___J_ 81 20 'MIN. ____ I T sn' UIS PLAN I GRAVEL STONE SHALL BE t-3 INCHES I DETAIL'S' -I -"' I ,: + : t ~ I I I v-SILT FENCE g ,I ~ ♦ PER SE-1 . 'i-t<") < 5' EASEMENT FOR WATERLINE PURPOSES PER DOC. 1969-229692 PAVED SURFACE REMAINING I I \ ~~ •• ~~ i • • 0 3 -; ' I I I I \ \ GRAVEL BAGS OVERLAP £Nos----- I I II II STABILIZED CONSTRUCT/ON ENTRANCE (PVT) 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. NO SCALE TWO LEVELS OF SAND OR GRAVEL -BAGS -ONE BELOW VISQUEEN, ONE ABOVE (TO CONTAIN SPILLAGE) NO SCALE GRAVEL BAGS OVERLAP ONTO CURB OR SIDE --Bi;RM CURB OR S/DE,7 / OF TRAVELWAY ~ '-. ./ ---------------5 FT MIN. ' __, -RUNOFF ~ GAP BETWEEN BAGS '-------~ I I VISQUEEN SKIRT ACTS AS SPILLWAY THREE LAYERS OF GRAVEL BAGS WITH ENDS OVERLAPPED DETAIL 'T' DETAIL 'W' DETAIL 'R' SILT FENCE SANITARY TOILET (BIFFY) PROTECTION GRAVEL BAGS ON TRAVEL WAYS NO SCALE NO SCALE NO SCALE D•\ORAWING FILES\TITLE SHEETS\GRADING TITLE SHEET,DWG REV1SED·02/15/17 ' I I -m 0 \ ) "-~--. \ 1 ,. 1 TWO-STACKED 2x 10 ROUGH WOOD FRAM£ -·--I I I .\ / i I --m m "' ~ \ ----- 555' 23' 50"W 199,33' 10 mil VPLASTIC SECTION I - WOOD FRAME SECURELY FASTENED AROUND ENTIRE PERIMETER W/TWO STAKES l. 1 ' ,l ._--4-11-------a a----- t O ml/ PLASTIC LINING DETAIL Z' TOP VIEW VARIES (4' MIN) \wooo STAKE (TYP) CONCRETE WASHOUT-ABOVE GROUND NO SCALE ' SILT FENCE ~PER SE-1 - T II ~ _,_,-:::,-:::-~ 11 -:::----..... -:::- ~ IL~,;::.-:::-~ G "j::., ..... I I I I I I I I I ~,C;D ' , WM-9 WM-8 \. I I" --I \ I I\ r 11.5' GRAVEL DRIVEWA~ WITH CONCRETE BANDS--m ~ ,. SILT FENCE -PER SE-1 m \ r -- ---- 1477 j C) I J-___ 20' / -Row-...___________- --T -----_,, --; - I I /?s I I I I I I SCALE: 1 "= 1 O' SHEETS P1l CITY OF' C1\RLSB1\D t----+---+---------------·t----+--+------t----1 LQ_J ENGINEERING DEPARTMEclT ---i---,.----,---, t----i--+----------------+----t------t---t-------1 GRADING PLANS FOR 5 /[\ DA TE INITIAL ENGINEER OF WORK c<EVISIOi\l DESCRIPTION VAUGHN RESIDENCE 2605 CREST DRIVE GR2017-0040 EROSIOcl COl'HROI Pl AN . APPROVED ~r /.J LA._ JASON s __ f E! DERT ,.,...__ ,,{&,__ft1Y~ _____ lo//~20/r CITY ENCINEF RCE 6 3912 EXPIRES 9 /30 /18 -!\TE OWN BY ~□~V~_ DATE INITIAL DATE INITIAL CHKO BY \)£ ~ OTHER APPROVAL CITY APPrmVAL RVWD BY PROJECT NO DRAWlclG NO DEV2016-0043 505-5A , 1710 I 7 OI 0 -h OI □ JJ i 2 GJ 2 C s: CD m JJ □ JJ § 2 GJ 2 C s: CD m JJ 0, ~ ~ ~ ~ ~