HomeMy WebLinkAboutCDP 2016-0006; MDI-1 - 4 UNIT APARTMENT COMPLEX - JEFFERSON STREET; FINAL SOILS REPORT; 2021-04-28Project No. FC-18-11-154 February 25, 2019 Mr. Jose Luis Arellano 835 Ladybug Lane San Marcos, CA 92069 §M§ GEOTECHNICAL SOLUTIONS, INC. Consulting Geotechnical Engineers & Geologists 5931 Sea Lion Place, Suite 109 Carlsbad, California 92010 Office: 7 60-602-7815 smsgeosol.inc@gmail.com Report of Geotechnical Engineering Observations And Compaction Testing, Remedial Pad Grading, Proposed Arellano 4-Unit Apartments, 2637 Jefferson Street, Carlsbad, California (Project No. CDP 2016-006, Drawing No. 509-4A) Submitted herewith please find the following summary report of our geotechnical engineering observations and compaction testing completed by our firm in connection with the remedial building pad grading at the above-referenced property. Approximate limits of the compacted fill areas at the property are delineated on the enclosed Approximate Compaction Tests Location Map (Figure 1 ), reproduced from the project Precise Grading Plan (Sheet 3 of 5). Overall, remedial grading operations at the project site chiefly consisted of preexisting pool demolition and backfill works, wall backfill compaction, and remedial building pad grading and reestablishing final design grades. Earthworks and remedial building pad grading operations within the designated limits were performed under engineering observations and compaction testing services provided by this office from November 16, 2018 through February 20, 2019. I. REFERENCES The following pertinent reports and documents were used as a basis of our engineering observations and compaction testing services. 1. "Precise Grading Plan for MFD-01 ( 4-Units Apartment Complex)," (Sheet 3 of 5), Prepared by Victor Rodriguez-Fernandez. 2. "Geotechnical Update, Proposed Arellano 4-Unit Apartments, 2637 Jefferson Street, Carlsbad, California," Prepared by SMS Geotechnical Solutions, Inc., dated March 15, 2018. Report of Geotechnical Engineering Observations And Compaction February 25, 2019 Testing, Remedial Pad Grading, 2637 Jefferson Street, Carlsbad, California Page 2 3. "Geotechnical Plan Review, Proposed Arellano 4-Unit Apartments, 2637 Jefferson Street, Carlsbad, California," SMS Geotechnical Solutions, Inc., dated May 8, 2017. 4. "Revised PICP Construction Procedure Alternative, Proposed Arellano 4-Unit Apartments, 2637 Jefferson Street, Carlsbad," SMSGeotechnical Solutions, Inc., dated April 10, 2017. 5. "Alternative PICP Construction Procedure, Proposed Arellano 4-Unit Apartments, 2637 Jefferson Street, Carlsbad, California," SMSGeotechnical Solutions, Inc., dated February 14, 2017. 6. "Geotechnical Plan Review Update, Proposed Arellano 4-unit Apartments, 2637 Jefferson Street, Carlsbad, California," SMSGeotechnical Solutions, Inc., dated October 24, 2016. 7. "Geotechnical Investigation, Proposed 3-story 4-Unit Residence, 2637 Jefferson Street, Carlsbad, California," SMSGeotechnical Solutions, Inc., dated January 11, 2016. II. GEOTECHNICAL CONDITIONS Geotechnical conditions at the project site were found to be substantially the same as described in the referenced Geotechnical Investigation report (Referenced 7). In general, pre-remedial grading conditions consisted of an existing older development which supported a single-story residence with the associated structures and improvements including a rear yard swimming pool. The pre-existing building was demolished and the swimming pool backfilled as part of the project redevelopment. An existing approximately 5 feet high CMU retaining wall which marked the western property line continues to remain and a new retaining wall was constructed behind the existing wall along the majority if the property line, as shown on the project plans. The project property was generally underlain by a section ofloose and compressible undifferentiated fill/topsoil deposits mantle, on the order of2.5 feet thick, over dense to very dense silty sandstone Terrace Deposits. III. LABO RA TORY TESTING Pertaining maximum dry densities and optimum moisture contents (ASTM D1557) for the onsite representative soil types were obtained from the project Geotechnical Investigation report, dated January 11, 2016 (Reference 7), and performing additional testing on the manufactured fill mixture and import soils. Pertinent test results are summarized on the attached Maximum Dry Density & Optimum Moisture Content sheet, Figure 2. Report of Geotechnical Engineering Observations And Compaction February 25, 2019 Testing, Remedial Pad Grading, 2637 Jefferson Street, Carlsbad, California Page 3 IV. GROUND PREPARATION AND GRADING OPERA TIO NS Prior to the remedial grading operations, any surface vegetation, roots and tree stumps, old foundation, pool shell, surface improvements and buried structures were removed and cleared for the project areas, as appropriate. Upper surficial loose and compressible undifferentiated fill/topsoil deposits mantle within the Approximate Limits of Grading areas (see attached Approximate Compaction Tests Location Map, Figure 1) encompassing the building envelope plus a minimum of 3 feet outside the perimeter were then stripped and removed. Removals were extended to a minimum depth of 3 feet below rough finish pad grade, exposing the underlying dense natural Terrace Deposits throughout. All exposed bottom ofremovals and over-excavations were visually examined, and probed to assure competent Terrace Deposit exposures suitable for receiving new fills. Import soils were required to complete the new wall backfilling along the western perimeter and achieve final design grades. Import soils consisted of fine to coarse grained sandy materials. Earth deposits generated from the onsite removals and over-excavations as well as the import soils used as new fills and backfills predominantly consisted of silty sand to sandy (SM/SW-SP) deposits, ranging to very low expansion potential ( expansion index less than 20, based on ASTM D4829 classification). Site new fills and backfills were properly processed, moisture conditioned to near optimum moisture ievels, manufactured into a uniform mixture, placed in thin (approximately 8 inches thick) horizontal lifts and mechanically compacted with a hand whacker, a mini tractor (Kubota23901), a backhoeloader(CAT 430E), and a double-drum vibratoryroller(CAT CB 214E) to at least 95 percent and 90 percent of the corresponding laboratory maximum density per ASTM D 1557, as required and where specified in the project soils report (minimum 95 percent compaction was specified for pool backfill and building pad areas while minimum 90 percent compaction was required for the western retaining_ wall backfill). Bottom of stripping, removals and over- excavations were additionally ripped, processed and recompacted to a minimum depth of 6 inches as a part of initial fill lift placement. Water was provided with a water hose. Engineering observation and compaction testing of the swimming pool and wall backfilling, and remedial pad grading operations placed within the designated areas of the property were provided by this office from November 16, 2018 through February 20, 2019. Approximate limits of the pool and wall backfilling and remedial pad grading works, and field compaction test locations, as roughly established in the field by a hand level and pacing/tap measure form staking provided by others, or relative to identifiable features located at the site and noted on the project plans are shown on the enclosed Approximate Compaction Tests Location Map, Figure 1. Field density tests establishing both the in-place dry densities and moisture contents were performed in accordance with the ASTM D6938 (Nuclear Gauge) test methods, as the fill placement progressed. Test locations were placed to provide the best possible coverage. Areas of low compaction, as indicated by the field density tests, were brought to the attention of the project contractor. These areas were reworked by the contractor and retested. Field compaction test results Report of Geotechnical Engineering Observations And Compaction February 25, 2019 Testing, Remedial Pad Grading, 2637 Jefferson Street, Carlsbad, California Page 4 including pertinent bottom of over-excavation and test elevations are tabulated on the enclosed Compaction Test Results, Figures 3 and 4. Engineering observations and compaction test results indicated that the new fills and backfills within the approved areas (see Approximate Limits of Grading on the enclosed Approximate Compaction Tests Location Map, Figure 1) were properly placed and compacted to at least 95 percent and 90 percent of the corresponding maximum dry density at the tested locations, as required and where specified. Site preparations and remedial pad grading were conducted in substantial conformance with Chapter 18 (Soils and Foundations) and Appendix "J" (Grading) of the 2016 California Building Code (CBC), applicable codes, the Grading Ordinances for the city of Carlsbad and current engineering standards, as appropriate. All observations and testing were conducted by a representative from this office under direct supervision of the project geotechnical engineering. V. CONCLUSIONS AND RECOMMENDATIONS In our opinion, all site excavations, swimming pool and wall backfilling and remedial building pad grading operations, fill/backfill placement and compaction procedures were completed in substantial conformance with the project soils reports (see References), approved plans, city of Carlsbad grading ordinances, applicable codes and current engineering standards, and are acceptable for their intended use. All conclusions and recommendations including soil design parameters, geotechnical foundation/slab designs and improvement sections provided in the referenced reports (see References) stay unchanged, as specified therein and should be considered in the final designs and implemented during the construction phase, where applicable and as appropriate. VI. ADDITIONAL GEOTECHNICAL OBSERVATIONS AND TESTING This office should be notified before any of the following operations begin in order to schedule appropriate testing and/or field observations for confirmation and approval of the completed work: 1. Foundations and Utility Trenches: Engineering observations or testing will also be required for the following work prior to foundation and slab concrete pours: a) Observe the plumbing and utility trenches after the pipes are laid and prior to backfilling. Backfill soils within trenches 12 inches or more in depth shall be compacted by mechanical means to a minimum of 95 percent ( or 90 percent where permissible) of the corresponding maximum dry density, unless otherwise specified. Jetting or flooding of the backfill is not allowed. Care should be taken not to crush the utilities or pipes during the compaction of the trench backfill. Report of Geotechnical Engineering Observations And Compaction February 25, 2019 Testing, Remedial Pad Grading, 2637 Jefferson Street, Carlsbad, California Page 5 b) Test the plumbing trenches beneath the floor slabs for minimum compaction requirements prior to sand and moisture barrier placement. c) Confirm minimum foundation embedment requirements and observe bottom of the footing trenches for proper compaction levels, including design foundation widths and embedment depths. Building foundations adjacent to the PICP pavements should be extended a minimum of 18 inches below the bottom of the paver section, or at least 42 inches below pad finish rough grade, whichever is more (see report dated February 14, 2017, Reference 5). d) Confirm footing reinforcement size and placement, slab thickness and reinforcing, sand thickness and moisture barrier placement. 2. Fine Grading and Improvements: a) Observe placement and perform compaction testing for fills placed under any conditions 12 inches or more in depth, to include: • • • Pad perimeter contour grading for establishing positive (minimum 2 percent) drainage away from the building. Utility and storm trench backfills . Spreading or placement of soil obtained from any excavation ( spoils from footings, underground utilities, etc.). b) Any operation not included herein which requires our testing, observation, or conformation for submittal to the. appropriate agencies. VII. DRAINAGE The owner/developer is responsible for insuring adequate measures are taken to properly finish grade the building pad after the structures and other improvements are in-place so that the drainage waters from the graded pad and improved sites as well as adjacent properties are directed away from the new building foundations. Storm water and surface run off water should not be allowed to flow over the top of perimeter retaining walls, nor impact or saturate natural and graded ground surfaces, fills and backfills, foundation bearing and subgrade soils. Only the amount of water to sustain vegetation should be provided. A minimum of 2 percent gradient should be maintained away from all foundations. Roof gutters and downspouts should be installed and all discharge from downspouts should be led away from the foundations and slab to a suitable location. Install area drains in the yards for collection and disposal of surface water. Report of Geotechnical Engineering Observations And Compaction February 25, 2019 Testing, Remedial Pad Grading, 2637 Jefferson Street, Carlsbad, California Page 6 Planter areas adjacent to foundations should not be allowed. Site retaining walls should be provided with well-constructed back drainage. Planting large trees behind site retaining walls and near the building foundations should be avoided. It should be noted that shallow groundwater conditions may develop in areas where no such conditions existed prior to site development. This can be contributed to by substantial increases of surface water infiltration resulting from landscape irrigation which was not present prior to the site redevelopment. It is almost impossible to absolutely prevent the possibility of shallow water conditions developed from excessive landscape irrigation over the entire site, onsite drainage facilities and site flooding due to a major storm event. Street runoff flow shall be diverted from entering the property. We also recommend that shallow water conditions, if developed, be immediately remedied by implementing appropriate measure, which may include the installation of additional sub-drain(s) consisting of a 4-inch diameter perforated pipe (SDR 35) surrounded in ¾-inch rocks all wrapped in filter fabric. The property owner(s) should be made aware that altering drainage patterns, landscaping, the addition of patios, planters, and other improvements, as well as over-irrigation and variations in seasonal rainfall, all affect subsurface moisture conditions, which in tum affect structural and overall slope performance. Project development includes the installation ofPervious (Permeable) Interlocking Concrete Pavers (PICP) driveway with a large storage capacity for retaining all storm waters onsite, as part of the stormwater BMP designs (see project plans). The PICP pavers require periodic monitoring and some maintenance that is the responsibility of the current and future property owner(s), in order to prevent any potential for failures or impacts on the nearby structures and improvements. Prolonged excessive accumulation of water collected in the storage zone of PICP driveway, if it is allowed to occur, can have a major adverse impact on the stability of on and off site adjacent structures and improvements, and shall not be permitted. To reduce potential problems associated with project PICP driveway, the following recommendations are presented: I. Establish and carry out periodic maintenance/monitoring of the PICP driveway and associated drainage facilities by qualified personnel. For this purpose, a regular maintenance, upkeep, and repair program should be considered and implemented, as necessary and appropriate. As a minimum, monitoring, and maintenance if needed, on a semi-annual basis (before and after the rainy season) and immediately after a major storm event should be considered. 2. Provide landscaping and slope vegetation cover consisting of drought resistant plants and monitor the amount ofirrigation that is suggested. Irrigation should be limited to the amount of water necessary to sustain plant life. A landscape architect may be consulted, in this regard. Report of Geotechnical Engineering Observations And Compaction February 25, 2019 Testing, Remedial Pad Grading, 2637 Jefferson Street, Carlsbad, California Page 7 3. Should any saturated surfaces or seepage conditions occur, the project design consultant should be immediately notified. Additional recommendations and mitigation measures may be necessary and should be provided at that time which may be expected to include the installation of a subsurface or pavement underdrain(s) consisting of a 4-inch diameter (Sch 40) perforated pipe with a filter sock to allow relief from excessive accumulation of collected water in the PICP driveway storage zone. VIII. LIMITATIONS Our description of the remedial grading operations, as well as observations and testing services described herein, are limited to the work performed by this office during the period from November 16, 2018 to February 20, 2019. The recommendations provided herein have been based on our field observations and testing, as noted. No representations are made as to the quality or extent of materials not observed and tested. All geotechnical information, test location and mapping on the enclosed Approximate Compaction Tests Location Map are based on rough field measurements for the purpose of geotechnical presentations only. This report is issued with the understanding that the owner or his representative is responsible for ensuring that the information and recommendations are provided to the project architect/structural engineer and respective contractors so that they can be incorporated into the plans and implemented at the site. Necessary steps shall be taken to ensure that the project general contractor and subcontractors carry out such recommendations during construction. The project geotechnical engineer should also be provided the opportunity to field verify the foundation trenching, and foundations/slab steel reinforcement prior to placing concrete. If the project geotechnical engineer is not provided the opportunity of making these reviews and observations, he can assume no responsibility for misinterpretation of his recommendations. This report should be considered valid for permit purposes for a period of six months and is subject to review by our firm following that time. IF ANY CHANGES ARE MADE IN THE FINAL PAD SIZE,LINESANDGRADES,BUILDINGLOCATION,ELEVATIONS,ETC.,PRIORTOTHE CONSTRUCTION, THIS REPORT WILL BECOME INVALID AND FURTHER ENGINEERING AND RECOMMENDATIONS WILL BECOME NECESSARY. If you have any questions or need clarification, please contact this office at your convenience. Reference to our Project No. FC-18-11-154 will help to expedite our response to your inquiries. Maximum Dry Density & Optimum Moisture Content (ASTM Dl557) PROJECT NO: FC-18-11-154 PROJECT NAME : Arellano 4-Unit Apartment Complex LOCATION: 2637 Jefferson Street, Carlsbad TEST RESULTS: Soil Type 1: Yellow to Orange-Brown Silty Sand Maximum Dry Density: 130.3 pcf Optimum Moisture: 9 % Soil Type 2: Tan-Gray to Medium Brown Fine to Coarse-Grained Sand (Import# 1) Maximum Dry Density: 139.0 pcf Optimum Moisture: 7 % Soil Type 3: Medium Brown to Brown Silty Fine Sand (On-Site Mixture) Maximum Dry Density: 127.4 pcf Optimum Moisture: 9 % FIGURE2 COMPACTION TEST RESULTS PROJECT NO: FC-18-11-154 PROJECT NAME: PROJECT LOCATION: Arellano 4-Unit Apartment Complex 2637 Jefferson Street, Carlsbad FIELD COMPACTION TEST RESULTS (ASTM D6938): Approximate Approximate Field Date Test Test Test Moisture No. Location Elevation (MSL) (%) (ft) 11/16/2018 I Pool Backfill, S. W. 51.00'± 9 11/19/2018 2 Pool Backfill, S. W. 53.00'± 10 11/19/2018 3 Pool Backfill, S. W. 53.00'± 10 11/20/2018 4 Pool Backfill, S. W. 54.00'± 15 11/28/2018 5 Pool Backfill, S. W. 54.00'± 10 12/04/2018 6 Pool Backfill, S. W. 55.50'± 10 12/04/2018 7 Pool Backfill, S. W. 55.50'± 11 12/12/2018 8 Pool Backfill, S. W. 55.50'± 11 12/18/2018 9 Pool Backfill, S. W. 55.50'± 11 12/18/2018 10 Pool Backfill, S. W. 55.50'± 9 01/02/2019 11 Wall Backfill, N. W. 52.70'± 6 01/02/2019 12 Wall Backfill, N. W. 52.70'± 7 01/04/2019 13 Wall Backfill, N. W. 54.70'± 6 01/04/2019 14 Wall Backfill, N. W. 54.70'± 6 01/11/2019 15 Wall Backfill, S. W. 52.70'± 7 01/11/2019 16 Wall Backfill, S. W. 52.70'± 8 01/22/2019 17 Wall Backfill, S. W. 56.70'± 10 01/22/2019 18 Wall Backfill, S. W. 56.70'± 8 Field Dry Soil Density Type (pct) 123.8 I 124.7 I 123.9 I 116.0 I 123.8 I 118.4 3 117.9 3 118.3 3 122.7 3 122.2 3 132.6 2 133.7 2 133.0 2 133.4 2 117.3 1 117.8 I 119.1 I 120.3 1 §MS GEOTECHNICAL SOLUTIONS, INC. Max. Dry Density (pct) 130.3 130.3 130.3 130.3 130.3 127.4 127.4 127.4 127.4 127.4 139.0 139.0 139.0 139.0 130.3 130.3 130.3 130.3 Relative Compaction Comments (%) 95 Bottom of Pool@ 49.00'± 96 95 89 Failure 95 Retest #4 93 Failure 93 Failure 93 Failure 96 Retest # 6, 7 & 8 96 Retest # 6, 7 & 8 95 Import Soils 96 Import Soils 96 Import Soils 96 Import Soils 90 90 91 92 FIGURE3 FIELD COMPACTION TEST RESULTS (ASTM D6938): Approximate Approximate Field Field Max. Relative Date Test Test Test Moisture Dry Soil Dry Compaction Comments No. Elevation (MSL) Density Type Density Location (ft) (%) (pcf) (pct) (%) 01 /31/2019 19 Pad Area, Easterly 55.50'± 8 123.9 I 130.3 95 Bottom of Over-Ex.@ 54.50'± 01/31/2019 20 Pad Area 55.50'± 8 123.8 1 130.3 95 01/31/2019 21 Pad Area, Westerly 55.50'± 8 121.6 3 127.4 95 01/31/2019 22 Pad Area 55.50'± 8 121.1 3 127.4 95 02/20/2019 23 Pad Area Finish Grade 9 122.7 3 127.4 96 02/20/2019 24 Pad Area Finish Grade 8 122.8 3 127.4 96 02/20/2019 25 Pad Area Finish Grade 8 121.5 3 127.4 95 02/20/2019 26 Pad Area Finish Grade 9 124.0 1 130.3 95 02/20/2019 27 Pad Area Finish Grade 10 124.2 1 130.3 95 S.MSGEOTECHNICAL SOLUTIONS, INC. FIGURE 4