Loading...
HomeMy WebLinkAboutCT 97-06; CARLSBAD SEAPOINTE RESORT PHASE II CARLSBAD, CA; RESPONSE TO PLANCHECK COMMENTS REGARDING SLOPE STABILITY; 1998-04-04,-*-!J~ g __ c_~_9_P_9_R_?_T_~_o __ , __ ,, ____________ G~-:-~-H-N-ICA_L_C_O_N_SU-LT-AN-TS 0 Project No. 05343-12-04 April 6, 1998 Continental Commercial Corporation 5050 Avenida Encinas, Suite 200 Carlsbad, California 92008 Attention: Mr. Tim J. Stripe Subject: CARLSBAD SEAPOINTE RESORT PHASE II CARLSBAD, CALIFORNIA PLAN CHECK RESPONSE Reference: 1. Geotechnical Investigation, Carlsbad Seapointe Resort Addition, Carlsbad, Gentlemen: California, prepared by Geocon Incorporated, dated January 27, 1997. 2. Grading and Erosion Control Plans for: Carlsbad Seapointe Resort Phase IL prepared by O'Day Consultants, dated March 5, 1998 (signature date of engineer ofrecord). In accordance with the request of Mr. George O'Day, O'Day Consultants, we have reviewed the referenced grading plans to update the referenced project soils report in response to a city plan check comment regarding slope stability. Section 6.4 of the soils reports states that no cut or fill slopes were planned for the project. This was based on our understanding of the development of that time and without the benefit of grading plans. Review of the referenced grading plans now indicates that fill slopes are planned at a maximum inclination of 2: 1 (horizontal:vertical) with a maximum height of 5 feet. These slopes are considered minor due to a height of less than 10 feet. Therefore, based on our experienced with the on-site soils during grading of Phase I of the project, it is our opinion that the planned slopes will be grossly and surficially stable. If you have any questions regarding this letter, or ifwe may be of further service, please contact the u.,dersigned at your convenience. DFL:sc (1) Addressee (2) O'Day Consultants / / Attention: Mr. George O'Day 6960 Flanders Drive ■ San Diego, California 92121-2974 ■ Telephone (619) 558-6900 ■ Fox (619) 558-6159