Loading...
HomeMy WebLinkAboutPD 2021-0033; 3357 ADAMS STREET; DRAINAGE STUDY; 2022-01-09 DRAINAGE STUDY FOR 3357 Adams St APN No.: 205-112-2100 Carlsbad, California GR2021-0030 DWG 533-2A Engineer: Trelos Engineering, Inc. 8605 Santa Monica Blvd #73703 West Hollywood, California 90069 P: 760-809-4714 Prepared by: ____________________________________ Date: _________ Michael B Leeper RCE# 83930 Exp. 9-30-23 Original: 10/25/21 2nd Submittal: 12/6/21 3rd Submittal: 1/9/22 1/9/22 TABLE OF CONTENTS 1.0 PROJECT DESCRIPTION ................................................................................................... 1 2.0 PURPOSE ............................................................................................................................ 2 3.0 METHODOLOGY ................................................................................................................. 2 4.0 HYDROLOGY ...................................................................................................................... 2 4.1 Pre-Development Condition ..................................................................................... 2 4.2 Post-Development Conditions ................................................................................. 2 5.0 CONCLUSION ..................................................................................................................... 3 APPENDICES Appendix A – Reference Charts Table 3-1 Runoff Coefficients for Urban Areas Figure 3-1 Intensity- Duration Design Chart Soil Hydrologic Groups Map 100 Year Rainfall Event – 6 Hours (P6 Rainfall Isopluvials) 100 Year Rainfall Event – 24 Hours (P24 Rainfall Isopluvials) Appendix B – Pre-Development Hydrology Calculations Appendix C – Post-Development Hydrology Calculations EXHIBITS Exhibits A & B – Pre and Post Development Hydrology Map 1.0 PROJECT DESCRIPTION The proposed project is a single family home on ~0.45 acres. The project proposes a total of one single family home and an attached garage. In addition, the project has an existing pool area. The project access will be provided on Adams. The existing, pre development, site contains a single family home, driveway and pool area, but will be modeled as undisturbed natural habitat. 2.0 PURPOSE The purpose of this study is to determine the peak runoff rates and velocities for the pre- development and post-development conditions. Comparisons will be made at the same discharge points for each drainage basin affecting the site and adjacent properties. The adequacy of existing and proposed conveyance facilities affected by the project will be determined. 3.0 METHODOLOGY The Rational Method as outlined in the San Diego County Hydrology Manual, dated June 2003, was used to determine the runoff flow rate. The 100-year frequency storm event was analyzed to determine peak runoff rates discharging the site for both the existing and post-development condition. Precipitation rates of 2.5” (6 hour) and 4.5” (24 hour) were used. Soil type was determined to be type B from the Soil Hydrologic Groups map (see Appendix A). The runoff coefficient “C” was determined using Table 3-1 (see Appendix A) using existing and proposed development type. Runoff coefficients, “C” are summarized below:  Pre-Development o Undisturbed Natural Terrain 0.25  Post-Development o Low Density Residential 0.32 Intensity I = 7.44 ( P6) (D ^(-.645)) P6 = 2.5” D= 5 min I = 8.958 in/Hr 4.0 HYDROLOGY 4.1 Pre-Development Conditions Currently the site sheet drains from East to West down the existing slope. This sheet flow leaves the property to the neighboring property to the west. A pre-development hydrology map delineating basin areas, flow paths, and concentration points has been prepared and is attached to this report as Exhibit “A”. Pre-development hydrology calculations can be found in Appendix “B”. 4.2 Post-Development Conditions The post-development condition will match the pre-development condition, with runoff directed off of the property on the west side. Water from the SFH pad area will be directed around the house and disbursed before leaving the property using rip rap to slow the flow and a rip rap swale to disburse the concentrated flow. Minimal increase in impervious area will help to reduce any increase in runoff. There is no negative impact to any adjacent properties. A post-development hydrology map delineating basin areas, flow paths, and concentration points has been prepared and is attached to this report as Exhibit “B”. Post-development hydrology calculations can be found in Appendix “C”. 5.0 CONCLUSION Development of the project site will result in a slight increase in the runoff from the pre- developed condition due to the minimal increase in impermeable area. Existing flow patterns will be maintained, with runoff directed towards the neighbor to the west. The design is consistent with the requirements of the Storm Water Standards, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 as amended by R9-2015-0001 and R9-2015-0100 (MS4 Permit). The design being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. This project development is not required to obtain approval from the Regional Water Quality Board under the Federal Clean Water Act section 401 or 404 as the proposed site is not located within, and does not drain directly to a wetland area. In addition, erosion control mitigation will protect construction site such that no dredged or fill material will be allowed to run off project site. Table 1 – Pre-Development Areas and Flows Area (ac) Q100 (cfs) Basin / Node Pre-Dev Pre- Dev Impervious % 100 .45 0.59 0 TOTAL .45 0.59 0 Table 2 – Post-Development Areas and Flows Area (ac) Q100 (cfs) Basin / Node Post-Dev Post- Dev Impervious % 100 .32 .40 10 200 .13 .23 10 TOTAL .45 .63 10 REFERENCES San Diego County Hydrology Manual, dated June 2003 APPENDIX A Reference Charts Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/25/2021 Page 1 of 436691003669110366912036691303669140366915036691603669100366911036691203669130366914036691503669160468460468470468480468490468500468510468520468530468540468550 468460 468470 468480 468490 468500 468510 468520 468530 468540 468550 33° 9' 38'' N 117° 20' 17'' W33° 9' 38'' N117° 20' 13'' W33° 9' 36'' N 117° 20' 17'' W33° 9' 36'' N 117° 20' 13'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 20 40 80 120 Feet 0 5 10 20 30 Meters Map Scale: 1:462 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: San Diego County Area, California Survey Area Data: Version 16, Sep 13, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jan 24, 2020—Feb 12, 2020 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/25/2021 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI MlC Marina loamy coarse sand, 2 to 9 percent slopes B 0.9 100.0% Totals for Area of Interest 0.9 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/25/2021 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—San Diego County Area, California Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/25/2021 Page 4 of 4 APPENDIX B Pre-Development Hydrology Calculations San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991‐2019 Version 9.1 Rational method hydrology  program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study        Date: 12/07/21 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 100adams100pre                                                                                                                                                                                                                                              ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  *********   Hydrology Study Control Information ********** ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Program License Serial Number 6515 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Rational hydrology study storm event year is   100.0 English (in‐lb) input data Units used Map data precipitation entered: 6 hour,  precipitation(inches) =  2.500 24 hour precipitation(inches) =  4.500 P6/P24 =    55.6% San Diego hydrology manual 'C' values used ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      101.000 to Point/Station      102.000 **** INITIAL AREA EVALUATION **** ______________________________________________________________________ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN                 ]  (Permanent Open Space   )  Impervious value, Ai = 0.000 Sub‐Area C Value = 0.250 Initial subarea total flow distance  =   40.000(Ft.) Highest elevation =  120.000(Ft.) Lowest elevation =  116.000(Ft.) Elevation difference =    4.000(Ft.) Slope = 10.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of  10.00 %, in a development type of  Permanent Open Space    In Accordance With Figure 3‐3  Initial Area Time of Concentration =   7.10 minutes TC = [1.8*(1.1‐C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1‐0.2500)*( 100.000^.5)/(  10.000^(1/3)]=   7.10 Rainfall intensity (I) =      5.253(In/Hr) for a   100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.250 Subarea runoff =      0.131(CFS) Total initial stream area =        0.100(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      102.000 to Point/Station      100.000 **** SUBAREA FLOW ADDITION **** ______________________________________________________________________ Rainfall intensity (I) =      5.253(In/Hr) for a   100.0 year storm Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [UNDISTURBED NATURAL TERRAIN                 ]  (Permanent Open Space   )  Impervious value, Ai = 0.000 Sub‐Area C Value = 0.250 Time of concentration =     7.10 min. Rainfall intensity =      5.253(In/Hr) for a   100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.250  CA =      0.112 Subarea runoff =      0.460(CFS) for      0.350(Ac.) Total runoff =      0.591(CFS) Total area =       0.450(Ac.) End of computations, total study area =           0.450 (Ac.) APPENDIX C Post-Development Hydrology Calculations San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991‐2019 Version 9.1 Rational method hydrology  program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study        Date: 01/09/22 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 100adams100post                                                                                                                                                               ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  *********   Hydrology Study Control Information ********** ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Program License Serial Number 6515 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Rational hydrology study storm event year is   100.0 English (in‐lb) input data Units used Map data precipitation entered: 6 hour,  precipitation(inches) =  2.500 24 hour precipitation(inches) =  4.500 P6/P24 =    55.6% San Diego hydrology manual 'C' values used ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      101.000 to Point/Station      102.000 **** INITIAL AREA EVALUATION **** ______________________________________________________________________ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [LOW DENSITY RESIDENTIAL                     ]  (1.0 DU/A or Less       )  Impervious value, Ai = 0.100 Sub‐Area C Value = 0.320 Initial subarea total flow distance  =   30.000(Ft.) Highest elevation =  116.500(Ft.) Lowest elevation =  114.000(Ft.) Elevation difference =    2.500(Ft.) Slope =  8.333 % Top of Initial Area Slope adjusted by User to 10.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of  10.00 %, in a development type of  1.0 DU/A or Less        In Accordance With Figure 3‐3  Initial Area Time of Concentration =   6.52 minutes TC = [1.8*(1.1‐C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1‐0.3200)*( 100.000^.5)/(  10.000^(1/3)]=   6.52 Rainfall intensity (I) =      5.552(In/Hr) for a   100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.320 Subarea runoff =      0.178(CFS) Total initial stream area =        0.100(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      102.000 to Point/Station      103.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ______________________________________________________________________ Upstream point/station elevation =   114.000(Ft.) Downstream point/station elevation =   107.000(Ft.) Pipe length  =   180.00(Ft.) Slope =   0.0389  Manning's N = 0.013 No. of pipes = 1  Required pipe flow  =     0.178(CFS) Given pipe size =      4.00(In.) Calculated individual pipe flow  =     0.178(CFS) Normal flow depth in pipe =    1.94(In.) Flow top width inside pipe =    4.00(In.) Critical Depth =    2.85(In.) Pipe flow velocity =      4.24(Ft/s) Travel time through pipe =    0.71 min. Time of concentration (TC) =     7.22 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      103.000 to Point/Station      103.000 **** CONFLUENCE OF MINOR STREAMS **** ______________________________________________________________________ Along Main Stream number: 1 in normal stream number 1 Stream flow area =      0.100(Ac.) Runoff from this stream =      0.178(CFS) Time of concentration =    7.22 min. Rainfall intensity =     5.195(In/Hr) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      104.000 to Point/Station      105.000 **** INITIAL AREA EVALUATION **** ______________________________________________________________________ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [LOW DENSITY RESIDENTIAL                     ]  (1.0 DU/A or Less       )  Impervious value, Ai = 0.100 Sub‐Area C Value = 0.320 Initial subarea total flow distance  =   25.000(Ft.) Highest elevation =  110.500(Ft.) Lowest elevation =  110.000(Ft.) Elevation difference =    0.500(Ft.) Slope =  2.000 % Top of Initial Area Slope adjusted by User to  1.538 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 85.00 (Ft) for the top area slope value of   1.54 %, in a development type of  1.0 DU/A or Less        In Accordance With Figure 3‐3  Initial Area Time of Concentration =  11.21 minutes TC = [1.8*(1.1‐C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1‐0.3200)*(  85.000^.5)/(   1.538^(1/3)]=  11.21 Rainfall intensity (I) =      3.912(In/Hr) for a   100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.320 Subarea runoff =      0.275(CFS) Total initial stream area =        0.220(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      105.000 to Point/Station      103.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ______________________________________________________________________ Upstream point/station elevation =   110.000(Ft.) Downstream point/station elevation =   107.000(Ft.) Pipe length  =   200.00(Ft.) Slope =   0.0150  Manning's N = 0.013 No. of pipes = 1  Required pipe flow  =     0.275(CFS) Given pipe size =      4.00(In.) NOTE: Normal flow is pressure flow in user selected pipe size. The approximate hydraulic grade line above the pipe invert is      1.419(Ft.)  at the headworks or inlet of the pipe(s)  Pipe friction loss =      4.187(Ft.)  Minor friction loss =      0.232(Ft.) K‐factor =   1.50 Pipe flow velocity =      3.16(Ft/s) Travel time through pipe =    1.06 min. Time of concentration (TC) =    12.27 min. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      103.000 to Point/Station      103.000 **** CONFLUENCE OF MINOR STREAMS **** ______________________________________________________________________ Along Main Stream number: 1 in normal stream number 2 Stream flow area =      0.220(Ac.) Runoff from this stream =      0.275(CFS) Time of concentration =   12.27 min. Rainfall intensity =     3.692(In/Hr) Summary of stream data: Stream   Flow rate      TC            Rainfall Intensity  No.       (CFS)       (min)                 (In/Hr) 1        0.178      7.22          5.195 2        0.275     12.27          3.692 Qmax(1) =    1.000 *    1.000 *     0.178) +    1.000 *    0.589 *     0.275) + =       0.340 Qmax(2) =    0.711 *    1.000 *     0.178) +    1.000 *    1.000 *     0.275) + =       0.402 Total of 2 streams to confluence: Flow rates before confluence point:        0.178       0.275 Maximum flow rates at confluence using above data:         0.340        0.402 Area of streams before confluence:         0.100        0.220 Results of confluence: Total flow rate =      0.402(CFS) Time of concentration =    12.270 min. Effective stream area after confluence =      0.320(Ac.) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      103.000 to Point/Station      100.000 **** PIPEFLOW TRAVEL TIME (User specified size) **** ______________________________________________________________________ Upstream point/station elevation =   107.000(Ft.) Downstream point/station elevation =   101.000(Ft.) Pipe length  =    55.00(Ft.) Slope =   0.1091  Manning's N = 0.013 No. of pipes = 1  Required pipe flow  =     0.402(CFS) Given pipe size =      4.00(In.) Calculated individual pipe flow  =     0.402(CFS) Normal flow depth in pipe =    2.33(In.) Flow top width inside pipe =    3.95(In.) Critical depth could not be calculated. Pipe flow velocity =      7.64(Ft/s) Travel time through pipe =    0.12 min. Time of concentration (TC) =    12.39 min. End of computations, total study area =           0.320 (Ac.) San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991‐2019 Version 9.1 Rational method hydrology  program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study        Date: 12/07/21 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 200adams100post                                                                                                                                                               ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  *********   Hydrology Study Control Information ********** ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Program License Serial Number 6515 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Rational hydrology study storm event year is   100.0 English (in‐lb) input data Units used Map data precipitation entered: 6 hour,  precipitation(inches) =  2.500 24 hour precipitation(inches) =  4.500 P6/P24 =    55.6% San Diego hydrology manual 'C' values used ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station      201.000 to Point/Station      200.000 **** INITIAL AREA EVALUATION **** ______________________________________________________________________ Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 1.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 0.000 [LOW DENSITY RESIDENTIAL                     ]  (1.0 DU/A or Less       )  Impervious value, Ai = 0.100 Sub‐Area C Value = 0.320 Initial subarea total flow distance  =  110.000(Ft.) Highest elevation =  109.000(Ft.) Lowest elevation =   97.850(Ft.) Elevation difference =   11.150(Ft.) Slope = 10.136 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of  10.14 %, in a development type of  1.0 DU/A or Less        In Accordance With Figure 3‐3  Initial Area Time of Concentration =   6.49 minutes TC = [1.8*(1.1‐C)*distance(Ft.)^.5)/(% slope^(1/3)] TC = [1.8*(1.1‐0.3200)*( 100.000^.5)/(  10.136^(1/3)]=   6.49 Rainfall intensity (I) =      5.568(In/Hr) for a   100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.320 Subarea runoff =      0.232(CFS) Total initial stream area =        0.130(Ac.) End of computations, total study area =           0.130 (Ac.) EXHIBITS A & B Pre and Post Development Maps 3357 ADAM STREETAPN 205-112-21>>>>>0.10EL.120.0EL.116.0>>>>>>>>>>>>>>>>>>>>>>>>>>EL.97.850.358605 Santa Monica Blvd, Suite 73703West Hollywood, CA 90069P: 760-809-4714DATE: Dec 07, 21 10:34pm by:MLFILE:D:\Dropbox (MLE)\Trelos\Projects\2021\3357 Adams St\Hydrology\CAD\3357 Adams Pre.dwgHYDROLOGY MAPPRE-DEVELOPMENTEXHIBIT 'A'HYDROLOGY MAP3357 ADAMS STREET3357 ADAMS STREETLEGEND100-YEAR FREQUENCY DISCHARGE (CFS)FLOW PATH>MAJOR BASIN BOUNDARYNODEBASIN AREA (ACRES)10-YEAR FREQUENCY DISCHARGE (CFS)2-YEAR FREQUENCY DISCHARGE (CFS)POINT OF CONCENTRATION - NODESUB-BASIN BOUNDARY 0.00TRELOS ENGINEERING, INC.SCALE: PLPLPLPLPLPLPLPLPLPLPLWWWWWSSSSSSSSSSGGGGGG********* ****3357 ADAM STREETAPN 205-112-210.10EL.116.5EL.101.00.13>>>0.22>>>>>>>>>>>>>>>>>>>>>>>EL.107.0EL.109.0EL.97.85>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>EL.114.0>>>>>>>>>>>>>>>>>>>>>>>>>>>>>EL.110.5EL.110.08605 Santa Monica Blvd, Suite 73703West Hollywood, CA 90069P: 760-809-4714DATE: Jan 09, 22 1:34pm by:MLFILE:D:\Dropbox (MLE)\Trelos\Projects\2021\3357 Adams St\Hydrology\CAD\3357 Adams Post.dwgHYDROLOGY MAPPOST-DEVELOPMENTEXHIBIT 'B'HYDROLOGY MAP3357 ADAMS STREET3357 ADAMS STREETLEGEND100-YEAR FREQUENCY DISCHARGE (CFS)FLOW PATH>MAJOR BASIN BOUNDARYNODEBASIN AREA (ACRES)10-YEAR FREQUENCY DISCHARGE (CFS)2-YEAR FREQUENCY DISCHARGE (CFS)POINT OF CONCENTRATION - NODESUB-BASIN BOUNDARY 0.00TRELOS ENGINEERING, INC.SCALE: