Loading...
HomeMy WebLinkAboutPD 2019-0015; CARLSBAD INN MITIGATION PHASE 2-4; FINAL SOILS REPORT; 2022-04-06Page 1 GEOTECHNICAL ENGINEERING CONSTRUCTION INSPECTION MATERIALS TESTING ENVIRONMENTAL OFFICE LOCATIONS ORANGE COUNTY CORPORATE BRANCH 2992 E. La Palma Avenue Suite A Anaheim, CA 92806 Tel: 714.632.2999 Fax: 714.632.2974 SAN DIEGO IMPERIAL COUNTY 6295 Ferris Square Suite C San Diego, CA 92121 Tel: 858.537.3999 Fax: 858.537.3990 INLAND EMPIRE 14467 Meridian Parkway Building 2A Riverside, CA 92518 Tel: 951.653.4999 Fax: 951.653.4666 OC/LA/INLAND EMPIRE DISPATCH 800.491.2990 SAN DIEGO DISPATCH 888.844.5060 www.mtglinc.com April 6, 2022 MTGL Project No.: 1916A15 Mr. Houston Arnold Director of Development & Construction MTGL Log No.: 22-0298R1 Grand Pacific Resort Services, LP MTGL Branch: San Diego 5900 Pasteur Court, Suite 200 Carlsbad, CA 92008 Subject: SOILS COMPACTION REPORT Carlsbad Waterproofing Replacement 609-022 3075 Carlsbad Inn Boulevard Carlsbad, CA 92008 References: 1. Excel Engineering, (2019) Carlsbad Inn Mitigation, Phase 2-4, Grading Plan-1, Drawing No. 518-3A, Sheet No. 3 & 4, approved December 20. 2. Standard Specifications for Public Works Construction, “Greenbook” (2018). Dear Mr. Arnold, This final report presents the results of the compaction testing at the subject project. Observation and testing was generally performed for flatwork and minor site improvements in the center courtyard of the site. Compaction tests were taken on the subject improvements on a periodic basis, as directed by your field representative during the period of December 8th, 2020, through March 31st, 2021. A field daily report was prepared by our soil’s technicians for each day of testing and a copy was provided to the jobsite superintendent. Field density testing was performed using direct transmission nuclear methods, ASTM D6938/D2950. The maximum density – optimum moisture relationship for the soil was established in the laboratory by the ASTM D1557 test method. In-place density tests indicated relative compaction of 90% or greater was achieved. This meets the Standard Specifications for Public Works Construction for areas not receiving vehicular loads. A figure showing approximate in-place density test locations and a summary of all field and laboratory tests performed is attached to this report. This report does not constitute certification of compaction of the subject improvements. We have performed the tests, as previously described, in accordance to generally accepted soil Grand Pacific Resort Services, LP MTGL Project No. 1916A15 Carlsbad Water Proofing Replacement 606-022 MTGL Log No. 22-0298R1 Carlsbad, California April 6, 2022 Page 2 testing practices. No other warranty, express or implied, is made. MTGL, Inc. appreciates this opportunity to be of continued service to you on this project. Should you have any questions regarding this report, please do not hesitate to contact us at your convenience. Respectfully Submitted, MTGL, Inc. Daniel Richardson, P.E. Senior Engineer Distribution: Addressee via email - HArnold@gpresorts.com Attachments: Figure 1 – In-Place Density Test Map Appendix A – Laboratory Test Results Appendix B – Field Density Test Results APPENDIX A LABORATORY TEST RESULTS Grand Pacific Resort Services, LP MTGL Project No. 1916A15 Carlsbad Water Proofing Replacement 606-022 MTGL Log No. 22-0298R1 Carlsbad, CA April 6, 2022 Page A1 APPENDIX A - LABORATORY TEST RESULTS Maximum Density – Optimum Moisture Content Lab No. Sample Date Sample Location Material Description Max Density (pcf) Opt Moist (%) 572 12/4/20 On-Site, South SILTY SAND (SM), trace gravel, brown 126.1 10.1 573 12/4/20 On-Site, North SILTY SAND (SM), trace gravel, brown 127.0 9.9 578 12/7/20 On-Site, East SILTY SAND (SM), dark brown 114.0 13.2 59 2/18/21 Import- Marbrisa SILTY SAND (SM), brown 126.0 10.5 61 2/19/21 Import- Marbrisa SILTY SAND (SM), brown 125.8 9.9 Test Method: ASTM D1557 – Maximum Density – Optimum Moisture Content Relationship APPENDIX B FIELD DENSITY TEST RESULTS Grand Pacific Resort Services, LP MTGL Project No. 1916A15 Carlsbad Water Proofing Replacement 606-022 MTGL Log No. 22-0298R1 Carlsbad, CA April 6, 2022 APPENDIX B - FIELD DENSITY TEST RESULTS Test No. Date Test Location Test Elev or Depth (ft) Moist Content (%) Dry Density (pcf) Max No. Rel Comp (%) Req’d Comp (%) Test Type Remarks Page B1 1 12/8/20 South Side of Hotel Center Court -1.5 16.2 105.3 578 92 90 NU 2 12/8/20 South Side of Hotel Center Court -1.5 14.5 110.3 578 97 90 NU 3 12/8/20 South Side of Hotel Center Court -1.5 15.7 110.7 578 97 90 NU 4 12/8/20 South Side of Hotel Center Court -1.5 15.5 107.8 578 95 90 NU 5 12/8/20 South Side of Hotel Center Court -1.5 15.0 107.2 578 94 90 NU 6 12/9/20 South Side of Hotel Center Court -0.5 16.0 106.2 578 93 90 NU 7 12/9/20 South Side of Hotel Center Court -0.5 15.1 106.6 578 94 90 NU 8 12/9/20 South Side of Hotel Center Court -0.5 14.3 107.6 578 94 90 NU 9 12/9/20 South Side of Hotel Center Court -0.5 14.6 107.7 578 94 90 NU 10 12/9/20 South Side of Hotel Center Court -0.5 14.7 109.8 578 96 90 NU 11 12/9/20 South Side of Hotel Center Court -0.5 15.4 108.6 578 95 90 NU 12 2/18/21 North Side of Hotel Center Court -0.5 9.5 116.1 59 92 90 NU 13 2/18/21 North Side of Hotel Center Court -0.5 9.6 115.5 59 92 90 NU 14 2/18/21 North Side of Hotel Center Court -0.5 10.4 117.9 59 94 90 NU 15 2/22/21 North Side of Hotel Center Court SG 11.2 116.3 59 92 90 NU 16 2/22/21 North Side of Hotel Center Court SG 10.7 114.8 59 91 90 NU 17 2/22/21 North Side of Hotel Center Court SG 9.8 116.5 59 92 90 NU 18 2/23/21 North Side of Hotel Center Court - East of Center Wall -1.0 9.8 114.9 59 91 90 NU 19 2/23/21 North Side of Hotel Center Court - East of Center Wall -1.0 10.0 116.8 59 93 90 NU 20 2/23/21 North Side of Hotel Center Court - East of Center Wall -1.0 10.2 116.2 59 92 90 NU 21 2/24/21 North Side of Hotel Center Court - East of Center Wall SG 10.5 118.5 59 94 90 NU 22 2/24/21 North Side of Hotel Center Court - East of Center Wall SG 11.2 120.2 59 95 90 NU 23 2/24/21 North Side of Hotel Center Court - East of Center Wall SG 10.8 120.0 59 95 90 NU 24 3/31/21 Sidewalk West Side of Existing Pool Area SG 9.2 122.0 573 96 90 NU 25 3/31/21 Sidewalk West Side of Existing Pool Area SG 9.0 123.1 573 97 90 NU NU - Nuclear Gauge Test (ASTM D6938 / D2950) SG - Subgrade