Loading...
HomeMy WebLinkAbout2022-04-06; Planning Commission; ; CDP 2021-0035/HMP 2021-0005 (DEV 2020-0283) - SOUTHERN CALIFORNIA GAS COMPANY MAINLINE PIPE REPAIRItem No. Application complete date: Jan. 13, 2022 P.C. AGENDA OF:April 6, 2022 Project Planner: Scott Donnell Project Engineer: Tim Carroll SUBJECT: CDP 2021-0035/HMP 2021-0005 (DEV 2020-0283) - SOUTHERN CALIFORNIA GAS COMPANY MAINLINE PIPE REPAIR - Request for approval of a post-emergency Coastal Development Permit and a Habitat Management Plan Permit for the repair of a segment of a Southern California Gas Company (SoCal Gas) mainline pipe generally located north of Avenida Encinas and between Carlsbad Boulevard and Ponto Drive, within a SoCal Gas maintenance easement and within the city’s right of way. The project is located within the Mello II Segment of the city’s Local Coastal Program and within Local Facilities Management Zone 9. The project site is within the appealable area of the California Coastal Commission. The City Planner has determined that the project belongs to a class of projects that the State Secretary of Resources has found do not have a significant effect on the environment, and it is therefore categorically exempt from the requirement for the preparation of environmental documents pursuant to Section 15302, Replacement or Reconstruction, of the state California Environmental Quality Act (CEQA) Guidelines. I.RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7445 APPROVING a post emergency Costal Development Permit (CDP 2021-0035) and Habitat Management Plan Permit (HMP 2021-0005) to permit the completed emergency repairs that were conducted under Emergency Coastal Development Permit (CDP 2020-0049) based upon the findings and subject to the conditions contained therein. II.PROJECT DESCRIPTION AND BACKGROUND Project Site/Setting: The segment of mainline pipe repairs is located along and on either side of Ponto Drive, north of Avenida Encinas and east of Carlsbad Boulevard. It is on vacant land within a maintenance easement managed by SoCal Gas and entirely within the public right of way as shown on the attached location map (Attachment 2). The topography of the site is a relatively flat and its vegetation includes non-native and native plants. Table “A” below identifies the General Plan designations, zoning and current land uses of the project site and surrounding properties. 3 Staff Report 0 CDP 2021-0035, HMP 2021-0005 (DEV 2020-0283) - SOUTHERN CALIFORNIA GAS COMPANY MAINLINE PIPE REPAIR April 6, 2022 Page 2 TABLE A SITE AND SURROUNDING LAND USE Location General Plan Designation Zoning Current Land Use Site Right of Way, General Commercial (GC), Residential (R-23) Right of Way and Planned Community (P-C) Ponto Drive, Undeveloped North Residential (R-15) and R-15 and Visitor Commercial (VC) Commercial Tourist/Residential Density –Multiple (RD-M-Q/C-T-Q) Ponto Self Storage facility, scattered buildings, vacant South Visitor Commercial (VC) Planned Community (P-C) Undeveloped East Transportation Corridor (TC) Planned Community (P-C) Railroad West Right of way, OpenSpace (O-S) Open Space (O-S) Carlsbad State Beach and campground Project Background: Southern California Gas Mainline 1026, a portion of which was the subject of the emergency repair, traverses from Orange County and extends south through Carlsbad to San Diego. In the project vicinity, the gas line bisects Ponto Drive to the north of Avenida Encinas and to the east of Carlsbad Boulevard. The gas line is entirely within public right of way. During the 1930’s the gas line was installed and a maintenance easement established. SoCal Gas has monitored and conducted regular maintenance on the line since its installation. In 2020, during one of its routine maintenance procedures, the utility discovered a leak in a segment of main line 1026. This segment extends from just north of the Avenida Encinas/Carlsbad Boulevard intersection to a point about 1,000 feet north where Ponto Drive turns sharply west. The leak was determined to need an urgent response and thus an emergency permit was requested, which the city granted in November 2020. Emergency work, which included excavation of 1,000 feet of pipeline, was completed in March 2021. Project Description: The subject Coastal Development Permit (CDP) application is the follow-up application to make permanent the work conducted under the emergency permit. The basis for a follow-up, “regular” CDP is found in Carlsbad Municipal Code Section 21.201.190(D). A Habitat Management Plan Permit is also required due to the project’s temporary impacts to 0.66 acre of Diegan Coastal Sage Scrub. On Nov. 12, 2020, SoCal Gas notified the city (Attachment 4) of an immediate need to access and repair a gas leak in their mainline pipe that is generally located north of Avenida Encinas between Carlsbad Boulevard and Ponto Drive. Because the repair work is located within the Coastal Zone, an emergency coastal development permit was required. On November 19, 2020, the City Planner approved the request for the Emergency Coastal Development Permit (CDP), determining an emergency existed that required action more quickly than possible under the regular permitting process (Attachment 5). The approval conditioned that a regular CDP application be submitted to the city for the emergency work completed and any follow up permanent repairs. The necessary repair work on the mainline pipe occurred between November 10, 2020 and March 15, 2021. The remedial, protective work required to deal with the emergency included performing an immediate pressure reduction. Due to the leak, it was determined that pressure control fittings would need to be installed to isolate the mainline instead of going to the next mainline valve which would have caused CDP 2021-0035, HMP 2021-0005 (DEV 2020-0283) - SOUTHERN CALIFORNIA GAS COMPANY MAINLINE PIPE REPAIR April 6, 2022 Page 3 customer impacts during the isolation. All work remained within the existing easement. Without this repair, service to customers would have been affected. Pursuant to Carlsbad Municipal Code Section 21.201.190(E)., the City Planner is required to report to the California Coastal Commission through its executive director and to the City Council at the first scheduled meeting after the emergency CDP has been issued, the nature of the emergency and the work involved. The Coastal Commission and the City Council were both informed of the nature of the emergency and the scope of the emergency work involved. The Coastal Commission was mailed the notice of emergency on Nov. 19, 2020 and the City Council received a memorandum report on Aug. 26, 2021 (Attachment 6). The proposed CDP 2021-0035 and HMP 2021-0005 would permanently authorize the improvements that were completed by the SoCal Gas under the emergency CDP 2020-0049. No further work is proposed. The project complies with all applicable city standards and staff’s recommendation of approval with conditions is supported by the analysis as follows. Unless the permit is appealed, the Planning Commission’s action will be final. III.ANALYSIS The proposed project is subject to the following plans, ordinances, standards, and policies: A.General Plan B.Mello II segment of the Local Coastal Plan (LCP), Coastal Development Permit regulations (Chapter 21.201) and the Coastal Resource Protection Overlay Zone (Chapter 21.203) C.Habitat Management Plan and Chapter 21.210 Habitat Preservation and Management Requirements The recommendation for approval for this project was developed by analyzing the project’s consistency with the applicable regulations and policies. This section discusses compliance with each of these regulations/policies utilizing both text and tables. A.General Plan The project is within public with right of way and bordered by streets and vacant and underutilized land designated for residential and commercial uses. As the table below demonstrates, repair of the pipeline is consistent with General Plan objectives and will not interfere with overall development of the area. Element Standard Project Compliance Land Use & Community Design Policy 2-P.89: Allow development of the Ponto area with land uses that are consistent with those envisioned in the Ponto Beachfront Village Vision Plan. The emergency repair was necessary to fix a leak on a gas mainline and enable safe and continued operation of an essential public service. The pipeline, constructed in the 1930s, is in public right of way. Yes CDP 2021-0035, HMP 2021-0005 (DEV 2020-0283) - SOUTHERN CALIFORNIA GAS COMPANY MAINLINE PIPE REPAIR April 6, 2022 Page 4 B.Local Coastal Program (Mello II and West Batiquitos Lagoon/Sammis Properties segments), Coastal Development Permit Regulations and the Coastal Resource Protection Overlay Zone The project site straddles the boundary between the Mello II and West Batiquitos Lagoon/Sammis Properties segments of the Local Coastal Program. All Coastal Zone properties are also within the Coastal Resource Protection Overly Zone, which in part provides standards to help protect the city’s lagoons. Further, the portion of the project closest to the Carlsbad Boulevard/Avenida Encinas intersection is within the appeal jurisdiction of the California Coastal Commission. The project was authorized, and the emergency work was completed pursuant to emergency CDP 2020- 0049 as authorized by the city’s Coastal Development Permit regulations. Consistent with those regulations, the applicant is requesting an after-the-fact approval through a regular Coastal Development Permit to make permanent the work conducted under that emergency. The project is consistent with the relevant policies of the Mello II and West Batiquitos Lagoon/Sammis Properties segments and the Coastal Resource Protection Overlay Zone as the following demonstrate: •As a repair to an existing pipeline in the public right of way, the project does not conflict with Coastal Zone land use and zoning designations which are the same as the city General Plan designations and zoning listed in Table A above. •As a repair to an underground pipeline, the project does not obstruct views of the coastline as seen from public lands or the public right-of-way nor otherwise damage its visual beauty. •No agricultural uses exist on the site. •Since the site does not have frontage along the coastline, no public opportunities for coastal shoreline access are available from the subject site. Furthermore, the project does not preclude such potential opportunities in the future. •Removal of native vegetation due to the emergency repair will be mitigated through on-site restoration, ensuring no net loss of habitat in the Coastal Zone. Open Space Goal 4-G.3: Protect environmentally sensitive lands, wildlife habitats, and rare, threatened or endangered plant and animal communities. Completing the emergency repair required removal of native habitat. The project proposes to mitigate all habitat lost, which is a required condition and which is subject to a restoration plan. Yes Public Safety Goal 6-G.1: Minimize injury, loss of life, and damage to property resulting from fire, flood, hazardous material release, or seismic disaster The emergency repair was necessary to repair a leak on a gas mainline. Yes. CDP 2021-0035, HMP 2021-0005 (DEV 2020-0283) - SOUTHERN CALIFORNIA GAS COMPANY MAINLINE PIPE REPAIR April 6, 2022 Page 5 C.Habitat Management Plan and Chapter 21.210 Habitat Preservation and Management Requirements Pursuant to CMC Chapter 21.210, a Habitat Management Plan Permit is required for any development project which indirectly or directly impacts natural habitat. To approve the permit, findings must be made to demonstrate project consistency with applicable standards. Neither the public right of way in which the project is located nor adjacent property are part of the city’s existing or future habitat preserve system. The long, narrow project site that encompasses the portion of excavated and repaired pipeline and its surroundings are identified as “developed” by the Habitat Management Plan. Nevertheless, repairs to fix the gas leak resulted in the temporary removal of 0.66 acre of Diegan Coastal Sage Scrub in a long narrow strip following the pipeline and in between Ponto Drive and the Carlsbad Boulevard/Avenida Encinas intersection. Though temporary, this removal is subject to replacement. Besides habitat impacts, the project also impacted 0.41 acre of disturbed or developed land cover, which includes features such as dirt roads and ornamental vegetation. Impacts to the Diegan Coastal Sage Scrub are considered temporary because the area disturbed will be restored at a 1:1 ratio, resulting in no loss of habitat. As conditioned, SoCal Gas will submit a restoration plan for approval by the city prior to its implementation. The restoration plan will detail planting specifications, maintenance activities, monitoring methods throughout the establishment period, success criteria, and contingency actions to ensure a successful on-site restoration program. HMP findings for the project can be found within the Planning Commission Resolution (Attachment 1). IV.ENVIRONMENTAL REVIEW The California Environmental Quality Act (“CEQA”), and its implementing regulations (“CEQA Guidelines”) adopted by the Secretary of the California Natural Resources Agency, list classes of projects that have been determined not to have a significant effect on the environment and as a result are exempt from further environmental review under CEQA. City staff completed a review of the project and its potential environmental impacts pursuant to CEQA and concluded that the project qualified for an exemption pursuant to CEQA Guidelines section 15302(c) – replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. The proposed project meets the criteria of the Section 15302(c) exemption because the project involves no expansion of the utility system’s capacity and instead replaces habitat temporarily disturbed as part of emergency repairs. A notice of intended decision regarding the environmental determination was advertised on February 3, 2022 and posted on the city’s website. The notice included a general description of the project, the proposed environmental findings, and a general explanation of the matter to be considered. The findings and determination contained in that notice were declared as final on the date of the noticed decision, unless appealed as provided by the procedures commencing in Chapter 21.54 (Procedures, Hearings, Notices, and Fees) of the Zoning Ordinance. During the 10-day public review period, the city received no comment letters from the public regarding the prospective environmental determination. Since no appeal was filed and no substantial evidence was submitted that would support a finding that the exemption requirements would not be satisfied, the CDP 2021-0035, HMP 2021-0005 (DEV 2020-0283) - SOUTHERN CALIFORNIA GAS COMPANY MAINLINE PIPE REPAIR April 6, 2022 Page 6 project was determined by the city planner to be an project exempt from CEQA. The CEQA Determination letter is attached to this staff report as Attachment 7 and demonstrates that the project is categorically exempt from environmental review. The city planner’s written decision is final and the CEQA determination is not within the Planning Commission’s purview. With the appropriate environmental clearances in place, all of the city’s procedural requirements and relevant aspects of CEQA have been satisfied. ATTACHMENTS: 1.Planning Commission Resolution No. 7445 2.Location Map 3.Disclosure statement 4.Nov. 12, 2020, email from Southern California Gas Company requesting an emergency CDP 5.Nov. 19, 2020, City Planner letter approving Emergency Coastal Development Permit CDP 2020-0049 6.April 26, 2021, City Council Memorandum 7.CEQA Determination of Exemption 8.Reduced Exhibits 9.Exhibits A - H dated April 6, 2022 PACIFIC OCEAN PONTO DRCARLSBAD BL AVENIDA E N C I N A SCARLSBAD STATE BEACHDYESCALLONIA CT SE A F A RERPLDORY LNPONTO RDE L C AMINO R E ALLA COSTA AV A L G A R DCARLSBAD BL CDP 2021-0035, HMP 2021-0005 (DEV2020-0283) Southern California Gas Mainline 1026 Pipe Repair SITE MAP J SITE!"^ Map generated on: 1/19/2022 Attachment 2 Ccityof Carlsbad DISCLOSURE STATEMENT P-1(A) Development Services Planning Division 1635 Faraday Avenue (760)602-4610 www.carlsbadca.gov Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1.APPLICANT (Not the applicant's agent)Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership. include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-ownedcorporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person N/A Corp/Part Southern California Gas Company Title____________ Title a subsidiary of of Sempra Energy Address -----------Address 555 w. 5th St. MLGT02A Los Angeles, CA 90013 2.OWNER (Not the owner's agent) P-1(A) Provide the COMPLETE, LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legalownership (i.e., partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, titles, addresses ofall individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORETHAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, andaddresses of the corporate officers. (A separate page may be attached if necessary.) Person___________ Corp/Part City of Carlsbad Title ------------ Address _________ _ Title a municipality Address 1635 Faraday Avenue Carlsbad, CA 92008 Page 1 of 2 Revised 07/10 Attachment 3 3.NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust,list the names and addresses of ANY person serving as an officer or director of the non­profit organization or as trustee or beneficiary of the. Non Profit/Trust________ Non Profit/Trust __________ Title ___________ Title-------------- Address Address------------------------ 4.Have you had more than $500 worth of business transacted with any member of Citystaff, Boards, Commissions, Committees and/or Council within the past twelve (12)months? D Yes l✓I No If yes, please indicate person(s): ___________ _ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the best of my knowledge. Signatu�wn Signjfure Print or type nameof Print or type name of o\;/applicant's agent P-1 (A) Page 2 of 2 Revised 07/10 /~ cant/date ,T,cuas eluu.~._. _________ _ SoCalGas Management Team Scott Drury, Chief Executive Officer Maryam Brown, President Jimmie Cho, Chief Operating Officer David Barrett, Vice President and General Counsel David Buczkowski, Vice President, Gas Distribution Andy Carrasco, Vice President, Communications, Local Government and Community Affairs Mia DeMontigny, Vice President, Chief Financial Officer, Controller, Chief Accounting Officer and Treasurer Paul Goldstein, Vice President, Gas Transmission and Storage Ben Gordon, Senior Vice President, Chief Information Officer and Chief Digital Officer Sandra Hrna, Vice President, Supply Chain and Operations Support Kent Kauss, Regional Vice President, External Relations Jawaad Malik, Vice President, Strategy and Sustainability and Chief Environmental Officer Neil Navin, Vice President, Clean Energy Innovations Deana M. Ng, Vice President and Chief Risk Officer Gina Orozco, Vice President, Gas Engineering and System Integrity Rodger R. Schweck, Senior Vice President and Chief Infrastructure Officer Dan Skopec, Senior Vice President, State Government Affairs and Chief Regulatory Officer Erin M. Smith, Chief Talent and Culture Officer Jeff Walker, Senior Vice President, Chief Administrative and Diversity Officer Cedric Williams, Vice President of Customer Services Gillian Wright, Senior Vice President and Chief Customer Officer Devin Zornizer, Vice President, Construction SoCalGas 555 w. 5th Street, MLGT21 Los Angeles, CA 90013 1 From: Chuang, Wan‐Che <WCChuang@socalgas.com>   Sent: Thursday, November 12, 2020 12:54 PM  To: Planning <Planning@CarlsbadCA.gov>  Subject: CDP Emergency Notification: SoCalGas Line 1026 Main Line Valve Leak Repair  City of Carlsbad Planner.  SoCalGas is providing notification to the City of Carlsbad Planning Department of an Emergency Coastal Development  Permit request.     While conducting repair and maintenance valve work near the intersection of Ponto Dr and Ponto Rd with City Street  Row, SoCalGas detected a leak on the mainline (pipe).  The Southern Tie‐in excavation was conducted yesterday and will  continue into the weekend. The 1000 + ft of replacement will begin Monday November 16th, 2020.  The vegetation that will be disturbed is mainly invasive plant species such an mustard, ice plant, Pampas grass and some  native vegetation such as coyote bush.  Construction crew have already notified the City Inspector Alison Luetkde of the emergency work.   Please let me know if you that any questions.  Thank you,  1.Nature of emergency; a.Detection of leak and the replacement of about 1000 ft of 12‐inch diameter pipeline. 2.Cause of the emergency, insofar as this can be established; a.While conducting routine replacement of 12‐inch mainline valve and placing in pressure control fittings to isolate the mainline, a leak was found on the mainline and required the construction team to excavate further South along the pipeline to find suitable pipe to transition into. 3.Location of the emergency; a.Approximately +/‐ 143ft of MLV 61.70. Attachment 4 2 4.The remedial, protective or preventive work required to deal with the emergency; and a.Pressure reduction was immediately performed. 5.The circumstances during the emergency that appeared to justify the cause(s) of action taken, including the probable consequences of failing to take action a.Due to the emergency leak, it was determined that the pressure control fitting would need to be installed further South to isolate the mainline in lieu of going to the next main line valve which will cause customer impacts during our isolation.  This location is at the intersection of the northbound Carlsbad Blvd and Avendia Ecinas. James Chuang Senior Environmental Specialist / Land Planner / Contract Delegate  Southern California Gas Company  Office: (213) 244 5817  Skype: (213) 231 6228  wcchuang@socalgas.com <<NEW EMAIL>>  CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe.   M soCalGas A ~ "rnpra En rg u11lity EMERGENCY COASTAL DEVELOPMENT PERMIT NOTICE OF DECISION Ccityof Carlsbad November 19, 2020 u FILE COPY James Chuang Senior Environmental Specialist/ Land Planner/ Contract Delegate Southern California Gas Company 555 W. 5th St., MLGT02A Los Angeles, CA 90013 RE: CDP 2020-0049 (DEV2020-0283) -Southern California Gas Mainline Pipe Repair -EMERGENCY PERMIT The City Planner has completed a review of the application for an Emergency Coastal Development Permit to repair a leak on the mainline pipe by excavating the southern tie-in and replace approximately 1,000 feet of pipe; the leak was detected about November 10. construction will include excavating over the existing pipeline alignment with a back hoe and installing the new pipe with a side boom. Other equipment to be brought to the project site includes crew trucks and welding truck rigs. There will be ground disturbance and removal of non-native vegetation and some native vegetation as a result of this project. This project is expected to take place entirely within the existing pipeline easement within City's public right-of-way. The City Planner APPROVES this request for an Emergency Coastal Development Permit based upon the following: Findings: 1.An emergency exists that requires action more quickly than permitted by the procedures for minor coastal development permits or for regular permits and the work can and will be completed within thirty days unless otherwise specified by the terms of the permit; 2.Public comment on the proposed emergency action has not occurred because time did not allow; and 3.The work proposed will be consistent with the requirements of the certified land use plan. Conditions: 1.The Emergency Coastal Development Permit is granted subject to completion of the emergency repair work within 30 days. 2.Submit a formal application for a regular Coastal Development Permit to the City of Carlsbad within 30 days of this letter for the repair work completed on the interceptor sewer manhole and for any follow up permanent repair work for the project. CITY OF CARLSBAD DON NEU, AICP City Planner DN: CB: cf Community Development Department Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov Attachment 5 To the members of the: "flT'f COUNCILDate�CA�CC::E_ CM � ACM ..i::.. DCM (3) "P Aug.26,2021 Council Memorandum To: Honorable Mayor Hall and Members of the City Council {city ofCarlsbad Memo ID #2021161 From: Gary Barberio, Deputy City Manager, Community Services Branch Jeff Murphy, Community Development Director Don Neu, City Planner Via Geoff Patnoe, Assistant City Manager@ Re: Vallecitos Water District & SoCal Gas Emergency Coastal Development · Permits (Districts 3 & 4) This memorandum provides a status update on the Vallecitos Water District manhole repair and SoCal Gas repair and maintenance emergency projects conducted in 2020. Background In 2020, there were two utility projects that required emergency repair of facilities within the Coastal Zone. Per the city's local Coastal Program and Municipal Code, there are certain conditions when emergency work is allowed through issuance of an emergency Coastal Development Permit (CDP) by the City Planner. An emergency CDP was issued for each of the two maintenance projects as described below: •Vallecitos Water District (District 3) On May 18, 2020, the Vallecitos Water District submitted a letter to city staff formally notifying of an immediate need to access and repair a sewer manhole within the district's easement and requesting an emergency CDP. The work to repair the manhole, located on the south side of Palomar Airport Road and east of Costco, was begun and completed that month. On June 25, 2020, the city approved the request for the emergency CDP (CDP 2020-0030). •SoCal Gas (District 4) On Nov. 13, 2020, SoCal Gas sent a request to the city for an emergency CDP for an emergency repair to a gas line that was located within a right of way maintenance easement beginning at Avenida Encinas 1,000 feet north to Ponto Drive. On Nov. 19, 2020, the city issued an emergency CDP (CDP 2020-0049). Requirements for emergency CDPs are listed in Section 21.201 of the Carlsbad Municipal Code, including requirements for notification to the City Council following issuance of an emergency CDP. However, following permit issuance, staff reviewed and discussed with the California Community Services Branch Community Development Department 1635 Faraday Avenue I Carlsbad, CA 92008 I 760-602-4600 Attachment 6 Council Memo -Vallecitos Water District & SoCal Gas Emergency CDPs (Districts 3 & 4) Aug.26,2021 Page 2 Coastal Commission if CDPs were needed for one or both of the maintenance projects. Coastal Act Section 30610 provides that no coastal act permits are required for repair or maintenance activities; however, the same code section allows the Coastal Commission authority to make a final determination. The Coastal Commission determined that CDPs were necessary because in their opinion there was a "risk of substantial adverse environmental impact" (Public Resources Code§ 30610 [d]). Since this determination occurred after the work was completed, Community Development Department staff requested that the Vallecitos Water District and SoCal Gas submit applications for CDPs and Habitat Management Plan (HMP) Permits for processing and consideration by the Planning Commission. The Planning Commission would approve these CDPs, unless an appeal is filed with the City Clerk's Office. Discussion Staff remained in communication with the Vallectios Water District and the SoCal Gas representatives to provide guidance for the appropriate follow up permits. Staff has continuously advised both agencies regarding the type of permits necessary, and the documents required to submit complete applications. Staff has also responded to inquiries from the public about the projects. Next Steps On July 15, 2021, Recon Environmental, on behalf of Vallectios Water District, submitted their application and supplemental materials. On July 13, 2021, SoCal Gas submitted their application and supplemental materials. Staff is reviewing both applications and related materials for compliance with the local codes and ordinances. After reviewing both applications, staff will present the projects to the Planning Commission for review and consideration, anticipated by the end of 2021. cc: Scott Chadwick, City Manager Celia Brewer, City Attorney Ron Kemp, Assistant City Attorney Mike Strong, Assistant Director of Community Development Eric Lardy, Principal Planner Scott Donnell, Senior Planner Christina Bustamante, Associate Planner ATTACHMENT 7 CEQA DETERMINATION OF EXEMPTION Subject: This California Environmental Quality Act {CEQA) Determination of Exemption is in compliance with Carlsbad Municipal Code Section 19.04.060. An appeal to this determination must be filed in writing with the required fee within ten {10) calendar days of the City Planner's decision consistent with Carlsbad Municipal Code Section 21.54.140. City Planner Decision Date: March 16, 2022 Project Number and Title: CDP 2021-0035, HMP 2021-0005 (DEV2020-0283) Southern California Gas Mainline 1026 Pipe Repair Project Location -Specific: Right-of-Way adjacent to APN: 216-140-4300 Project Location-City: _C_ar_ls_b_a_d ____ _ Project Location -County: _Sa_n_Di_e~go ____ _ Description of Project: Repair a segment of gas mainline 1026 Pipe Name of Public Agency Approving Project: -=C.:..eity-'---"'-o-'-f C=a=r-=-=ls=b=ad-=------------------- Name of Person or Agency Carrying Out Project: Southern California Gas Company Name of Applicant: James Chuang, Senior Environmental Specialist/ Land Planner/ Contract Delegate Applicant's Address: 555 W. 5th Street, MLGT02A, Los Angeles, CA 90013 Applicant's Telephone Number: ~(2_1~3~) _24_4~58~1_7 ___________________ _ Name of Applicant/Identity of person undertaking the project (if different from the applicant above):_ Exempt Status: (Check One) 0 Ministerial {Section 21080(b)(l); 15268); D Declared Emergency {Section 21080(b)(3); 15269(a)); D Emergency Project {Section 21080(b)(4); 15269 (b)(c)); l:8:] Categorical Exemption -State type and section number: 15302 (cl "Existing Facilities" D Statutory Exemptions -State code number: __________________ _ D Common Sense Exemption (Section 15061{b)(3)) Reasons why project is exempt: The project includes restoration or rehabilitation of deteriorated structures to meet current standards of public health and safety. L~:•~ Person: Christina M. Bustamante DON NEU, City Planner Telephone: (760) 602-4644 7 Date Revised 07 /21 CONSTRUCTION DRAWING LIST DRAWING NO. 81545-1001-D-PIP 81545-1002-D-PIP 81545-3001-D-PIP 81545-3002-D-DEM 81545-3002-D-PIP 81545-3003-D-PIP DESCRIPTION DRAWING usr & ',1CINllY MAP GENERAL NOTES PLOT PLAN DEMO PIPING PLAN PIPING PLAN PIPING SECTIONS CORDOBA CORPORATION Cordoba CorQoration, Inc. 1611 E. 17th Street Santa Ana, CA 92705 CITY OF PROJECT LOCATION 12"' L-1026 L�1026 MLV CARLSBAD, WOA MP 61.70 LEAK REPAIR SAN DIEGO 86427 COUNTY CITY OF CARLSBAD LA COSTA AVE VICINITY MAP 11/30/2020 HC BV AP SCOPE CHNG 1200' REPLACEMENT 0 09/08/2020 HC HM AP ISSUED FOR CONSTRUCTION DRAWN ()jEC�EDPRJAf'v SCG>P/ 86427 DESK;NED: H. CUI DRAWN: H. CUI CHECKED: H. MARNOCHA PROJ APV: A PINTADO SCG ENGAFV * 07/06/2020 07/06/2020 07/10/2020 MsoCalGas A�SempraEnergy ut111y ISSUED FOR CONSTRUCTION L-1026 MP 61,70 MAINLINEMLV LEAK REPAIR PONTO RD & PONTO DR DRAWING LIST & VICINITY MAP Attachment 8 .l:1ellii,_ C PONTO RD & PONTO DR CITY OF CARLSBAD '"' CCSCRPll:i~ GENERAL NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE CONSTRUCTION CONTRACT EXHIBIT C, "SPECIFICATIONS FOR CONSTRUCTION OF TRANSMISSION PIPELINE AND APPURTENANCES", SOUTHERN CALIFORNIA GAS COMPANY (COMPANY) STANDARDS. ALL DESIGN AND CONSTRUCTION NOTES SHALL COMPLY WITH EXHIBIT C. IF THE FOLLOWING GENERAL NOTES CONTRADICT EXHIBIT C, EXHIBIT C WILL TAKE PRECEDENCE. 2 DESIGN CODE AND GENERAL REQUIREMENTS: A US DOT 49CFR192 (LATEST EDITION) -TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE B. ASME B31.B (LATEST EDITION) -GAS TRANSMISSION AND DISTRIBUTION PIPING SYSTEMS C. CALIFORNIA PUBLIC UTILllY COMMISSION G.O. 112E D. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS ACT (OSHA) E. CALIFORNIA STATE INDUSTRIAL SAFElY ORDERS 3. LOCAL CODES: THE CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS OF THE APPROPRIATE COUNTIES, CITIES, LOCAL CllY FIRE DEPARTMENTS, CALIFORNIA WATER QUALITY CONTROL BOARDS, CALIFORNIA AIR QUALITY MANAGEMENT DISTRICTS, AND OTHER APPLICABLE CITY, STATE, OR FEDERAL AGENCIES' REQUIREMENTS 4. PERMITS, A ALL APPROVALS GRANTED ARE BASED ON INFORMATION PROVIDED BY THE COMPANY APPROVAL OF PERMITS DOES NOT AUTHORIZE VIOLATION OF ANY CODES OR REGULATIONS. B CONTRACTOR SHALL COORDINATE ANY WORK UNDER APPLICABLE PERMITS WITH ANY AFFECTED PARTIES. 5. SUBSURFACE STRUCTURE LOCATIONS: A SURFACE UTILITY FEATURES SHOWN WERE LOCATED AS PART OF THE FIELD SURVEY PERFORMED BASED ON VISIBILITY ON THE DATE OF THE SURVEY. THE LOCATIONS OF THE SUBSURFACE STRUCTURES SHOWN ON THESE PLANS ARE OF VARYING ACCURACY AND ARE A COMBINATION OF INFORMATION BY SEARCH OF AVAILABLE RECORDS, FIELD SURVEY OF SURFACE UTILITY EVIDENCE AND POTHOLING. B. THE CONTRACTOR IS RESPONSIBLE FOR TAKING THE NECESSARY PRECAUTIONARY MEASURES TO PROTECT THE SUBSURFACE STRUCTURES SHOWN AND ANY OTHER SUBSURFACE STRUCTURES NOT OF RECORD OR NOT SHOWN ON THESE PLANS. ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR IN THE FIELD PRIOR TO WORKING ON THE PIPELINE. C LOCATIONS OF CROSSING LINES SHOWN IN THE DRAWINGS ARE APPROXIMATE. CONTRACTOR SHALL DETERMINE EXACT LOCATION AND DEPTH OF ALL CROSSING LINES, WHETHER SHOWN OR NOT SHOWN, PRIOR TO INSTALLATION OF PIPELINES. D. SUBSURFACE STATIONING SHOWN IS APPROXIMATE. E.UTILITY QUALITY LEVELS, WHERE SHOWN, ARE PER THE AMERICAN SOCIETY OF CIVIL ENGINEERS, CI/ASCE 38-02. "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA" THE QUALITY LEVELS ARE AS FOLLOWS LEVEL D -INFORMATION DERIVED FROM EXISTING RECORDS AND/OR ORAL COLLECTIONS. LEVEL C -INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE GROUND UTILITY FEATURES LEVEL B -INFORMATION OBTAINED THROUGH GEOPHYSICAL METHODS. LEVEL A -PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BY THE ACTUAL EXPOSURE AND SUBSEQUENT MEASUREMENT. 6. PIPELINE INSTALLATION, A CONTRACTOR SHALL COORDINATE ALL WORK WITH COMPANY'S REPRESENTATIVE. B. PIPELINE SHALL BE INSTALLED AS DIMENSIONED AND STAKED IN THE FIELD. DRAWINGS HAVE BEEN CREATED BY THE REVIEW OF THE AVAILABLE RECORDS. ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENTS LISTED ON THE REFERENCE DRAWINGS 7. FIELD CHANGES, A. ALL SUGGESTED CHANGES OR MODIFICATIONS TO THE DESIGN SHOWN ON THESE CONSTRUCTION DOCUMENTS MUST HAVE WRITTEN APPROVAL FROM THE COMPANY'S REPRESENTATIVE PRIOR TO MAKING ANY SUCH MODIFICATIONS. THE CONTRACTOR IS INSTRUCTED NOT TO ACCEPT VERBAL AUTHORIZATIONS AND ASSUMES ANY AND ALL LIABILITY FOR NOT COMPLYING WITH THIS STANDARD IN IT'S ENTIRETY. AS A RESULT, THE CONTRACTOR MAY BE REQUIRED TO REWORK ANY UNAUTHORIZED MODIFICATIONS TO COMPLY WITH THE DESIGN SHOWN ON THESE CONSTRUCTION DOCUMENTS AT NO ADDITIONAL COST TO THE COMPANY. NO EXCEPTIONS WILL BE PERMITTED 8. EXCAVATIONS A. CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF SECTION 4216 OF THE STATE OF CALIFORNIA REGULATIONS (TITLE 1, DIVISION 5, CHAPTER 3.1, SECTION 4216) WITH REGARDS TO PROCEDURES FOR LOCATING ALL UNDERGROUND FACILITIES, SUBSURFACE STRUCTURES OR OTHER SUBSURFACE INSTALLATIONS GAS STANDARD I B4.09 -"PREVENTION OF DAMAGE TO COMPANY FACILITIES", GAS STANDARD 184.0175 -"PREVENTION OF DAMAGE TO SUBSURFACE INSTALLATIONS" AND GAS STANDARD 184.0200 - "UNDERGROUND SERVICE ALERT AND TEMPORARY MARKING" B. CONTRACTOR SHOULD ALSO COMPLY WITH ANY RELATED PROCEDURES ADOPTED BY THE REGIONAL NOTIFICATION CENTER DEFINED IN SECTION 4216, INCLUDING THOSE FOR USE OF VACUUM EXCAVATION DEVICES OR POWER-OPERATED OR POWER-DRIVEN EXCAVATING OR BORING EQUIPMENT WITHIN THE APPROXIMATE LOCATION OF SUBSURFACE INSTALLATION. REFER TO COMPANY'S GAS STANDARD 1 84.0200 -"UNDERGROUND SERVICE ALERT AND TEMPORARY MARKING" C. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT DIG METHODS (E.G. VACUUM EXCAVATION OR SIMILAR). D. ANY EXCAVATION WILL BE IN ACCORDANCE WITH THE CALIFORNIA CODE OF REGULATIONS TITLE AND PER GAS STANDARD 223.0140 - "EXCAVATION, SHORING, AND SLOPING". E.SHALL ASSUME TYPE C SOIL CONDITIONS AND TAKE NECESSARY PRECAUTIONS PER GAS STANDARD 22J 0140 -"EXCAVATION, SHORING, AND SLOPING" 9. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (U.SA.) AT LEAST 48 HOURS PRIOR TO THE BEGINNING OF WORK IN THIS AREA. IF WORK CONTINUES IN THIS AREA BEYOND 14 DAYS, CONTRACTOR SHALL AGAIN NOTIFY U.S.A. AT PHONE: (800) 422-4133 OR 811. CONTRACTOR SHALL MARK LIMITS FOR U.SA WITH WHITE PAINT PRIOR TO EACH CALL. 10. PRIOR TO ANY DISTURBANCE TO THE SITE, EXCLUDING UTILITY MARK-OUTS AND SURVEYING, THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR A PRE-CONSTRUCTION MEETING WITH ALL CllY OR LOCAL AUTHORITIES. 11. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN (11" X 17") FOR COMPANY APPROVAL, IF APPLICABLE, PRIOR TO STARTING WORK. THE APPROVED PLANS SHALL BE SUBMITTED TO THE APPROPRIATE JURISDICTION. 12· G������6°uRNiH:�6 ��o��s6��c��E F:21�1T�ELi DA����.�?. ,!xI;�l�GoiHUE�Bl�fc1�t��M��\HE PROJECT AND SHALL REPAIR ANY DAMAGE AT NO COST AND THE SATISFACTION OF THE COMPANY AS WELL AS APPROPRIATE PERMITTING AGENCIES 13 SITE MAINTENANCE A ALL TRADES SHALL, AT ALL TIME, KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY THE WORK DURING CONSTRUCTION. B. AT THE COMPLETION OF THE WORK, CONTRACTOR SHALL REMOVE ALL RUBBISH AND DEBRIS. C THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP OF ALL SILT AND MUD ON ADJACENT STREET(S) DUE TO CONSTRUCTION VEHICLES OR ANY OTHER CONSTRUCTION ACTIVllY, AT THE END OF EACH WORK DAY, OR AFTER A STORM EVENT THAT CAUSES A BREACH IN INSTALLED CONSTRUCTION BEST MANAGEMENT PRACTICES THAT COMPROMISES STORM WATER QUALITY WITHIN ANY STREET(S). A STABILIZED CONSTRUCTION EXIT MAY BE REQUIRED TO PREVENT CONSTRUCTION VEHICLES OR EQUIPMENT FROM TRACKING MUD OR SILT ON TO THE STREET. D THE STORAGE OF ALL CONSTRUCTION MATERIALS AND EQUIPMENT MUST PREVENT ANY RELEASE OF POLLUTANTS TO THE ENVIRONMENT. E. A CONCRETE WASHOUT SHALL BE PROVIDED ON ALL PROJECTS THAT PROPOSE THE CONSTRUCTION OF CONCRETE IMPROVEMENTS THAT ARE TO BE POURED ON SITE. 14. CONTRACTOR SHALL COORDINATE WITH SURVEY CREW TO COLLECT ALL AS-BUILT DATA BEFORE BACKFILLING TRENCH AS PER THE GAS STANDARD 167 0253 -"AS-BUILT SURVEYS FOR CONSTRUCTION OF HIGH PRESSURE PIPELINES AND PIPELINE FACIUTIES" 15 ANGLES AND BENDS: A. ALL SEGMENTABLE ELBOWS SHALL BE TRIMMED IN THE FIELD AS NECESSARY. ANGLES FOR SEGMENTABLE ELBOWS TO BE TRIMMED SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO TRIMMING B ALL HORIZONTAL AND VERTICAL CHANGES IN DIRECTION REQUIRE SMOOTH FIELD BENDS EXCEPT WHERE ELBOWS ARE NOTED. FIELD BENDS SHALL BE MADE IN ACCORDANCE WITH GAS STANDARD 182.0070 -"ANGLES AND BENDS IN STEEL PIPING". ALL FIELD BENDS SHALL BE IDENTIFIED ON AS-BUILT WITH LOCATION AND ANGLE OF BEND. 16 PRESSURE TESTING CONTRACTOR SHALL PRESSURE TEST NEW PIPE PER DESIGN DATA SHEET (DDS) AND GAS STANDARD 182.0170 -"STRENGTH TESTING PIPELINES AND FACILITIES". A. FOR HYDROSTATIC TEST REQUIREMENTS SEE THE DESIGN DATA SHEET, STRENGTH TESTING WORK SHEET, HYDROSTATIC TEST PLAN AND HYDROSTATIC TEST PROCEDURE B. IF A NITROGEN TEST IS PERFORMED, CONTRACTOR SHALL NITROGEN TEST NEW PIPE IN ACCORDANCE WITH THE DESIGN DATA SHEET, NITROGEN TEST PLAN, AND GAS STANDARD 182.01 70 -"STRENGTH TESTING PIPELINES AND FACILITIES" C. ALL WELDS AND FITTINGS NOT HYDROSTATICALLY TESTED SHALL BE SOAP TESTED AT 100 PSIG AND OPERATING PRESSURE PER GAS STANDARD 182.0170 -"STRENGTH TESTING PIPELINES AND FACILITIES". D FINAL TIE-IN WELDS SHALL BE X-RAYED 17. CONTRACTOR SHALL SUPPORT THE COMPANY WITH TIE-INS AND GAS HANDLING. COMPANY SHALL PREPARE GAS HANDLING PROCEDURE 18. CONTRACTOR TO PROVIDE TEMPORARY CRIBBING SUPPORT WHEN EXPOSED PIPE EXCEEDS 20 FEET IN LENGTH. REFER TO PIPE CRIBBING GAS STANDARD 223.0D03 - "GENERAL CONSTRUCTION REQUIREMENTS -STEEL TRANSMISSION SYSTEM" AND GAS STANDARD 1 62.0095 -"PIPING SPANS -UNSUPPORTED" 19. ASBESTOS NOTES: A. CONTACT THE COMPANY REPRESENTATIVE FOR INFORMATION ABOUT ANY CONTAMINATED SUBSTANCES AND INSTRUCTIONS FOR HANDLING B IF ASBESTOS COATED PIPE AND FITTINGS ARE ENCOUNTERED, CONTRACTOR SHALL NOTIFY THE COMPANY REPRESENTATIVE TO COORDINATE ABATEMENT PER GAS STANDARD 104.05 -"ASBESTOS MANAGEMENT". C.COATING REMOVAL, BEFORE REMOVING PIPE COATING (DOES NOT INCLUDE PLASTIC TAPE OR FUSION BONDED EPOXY COATINGS), THE FOLLOWING STEPS MUST BE TAKEN ;, FOR ALL NON-EMERGENCY WORK, PIPE WRAP MUST BE EVALUATED TO DETERMINE IF IT CONTAINS ASBESTOS PRIOR TO REMOVAL ii. FOR EMERGENCY WORK, ASSUME THE WRAP > 1% ASBESTOS UNTIL THE WRAP CAN BE TESTED OBTAIN SAMPLES OF THE WRAP, AND HAYE SAMPLES TESTED FOR ASBESTOS IN ACCORDANCE WITH GAS STANDARD 104.05 -"ASBESTOS MANAGEMENT" iv TEST RESULTS ARE TO BE INCLUDED WITH AS-BUILTS D. FOLLOW PROCEDURES IN GAS STANDARD 104.05 -"ASBESTOS MANAGEMENT" FOR REMOVAL OF PIPE WRAP 20 WELDING REQUIREMENTS· A. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH GAS STANDARDS 187.0055 -"GENERAL WELDING REQUIREMENTS" AND GAS STANDARD 187.0056 -"WELDING FIELD GUIDE" B ALL PIPE SEGMENTS SHALL BE A MINIMUM OF ONE PIPE DIAMETER OR 12" (WHICHEVER IS LARGER) UNLESS OTHERWISE SHOWN ON DETAILS C. INSTALL ELECTRICAL TEST STATION (ETS) WELD CONNECTIONS IN ACCORDANCE WITH GAS STANDARD 186.0075 -"ELECTRICAL TEST STATION AND BOND ASSEMBLY" 21 PAINTING AND COATING REQUIREMENTS, A ALL EXPOSED PIPE AND FITTINGS ARE TO BE PAINTED IN THE FIELD IN ACCORDANCE WITH GAS STANDARD 186.0106 -"EXTERNAL SURFACE PREP AND FIELD APPLIED COATING FOR ABOVE GROUND PIPE SPANS" ALL COATINGS ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH THE GAS STANDARD 186.0ID2 -"FIELD APPLICATION OF FBE" AND GAS STANDARD 1 86.01 03 - "EXTERNAL SURFACE PREPARATION AND FIELD APPLIED COATING FOR BURIED PIPELINES" 22 COPIES OF REFERENCE DRAWINGS WILL BE MADE AVAILABLE TO FIELD PERSONNEL (COMPANY INSPECTOR OR CONTRACTOR) ON AN AS NEEDED BASIS. CONTACT COMPANY REPRESENTATIVE TO OBTAIN COPIES OF ANY REFERENCE DRAWINGS. BACKFILL DETAILS, FOR TYPICAL BACKFILL DETAILS, CONTRACTOR SHALL REFER TO APPLICABLE C .':;l,\LL 'II '''"''cu. 42" ,_ "·'" '"-''' GRADE ,cc,.m SAN DIEGO r,c ' +nc BREA ,,--,,,n ,--. 86427 CORDOBA CORPORATION 1026P90 Cordoba CorQoration, Inc. 1611 E. 17th Street Santa Ano, CA 92705 ,,,, ' 1026-90 C. '.L •.n COCT.'1 ' �•:J CL ;)<I, 7, , ",L '"P'nOUIY BROS. p,:,,rr:.--r; YES •:.,··�Cl' lf'O 1/1/1932 C':.•:�-[�.I TRANSMISSION 196 PSIG DETAILS SHOWN ON GAS STANDARD 184.0050 -"GENERAL CONSTRUCTION REQUIREMENTS FOR DISTRIBUTION MAINS" 23 TRENCH BREAKERS A. TRENCH BREAKERS SHALL BE FORMED USING ONE CUBIC FOOT BURLAP OR POLY SACK FILLED WITH ROCK FREE EARTH OR SAND. B. FIELD TO DETERMINE TRENCH BREAKS SPACING. 24 CONTRACTOR IS RESPONSIBLE TO NOTIFY THE COMPANY REPRESENTATIVE AT LEAST THREE DAYS PRIOR TO CONSTRUCTION OF ALL SURVEY MONUMENTS WHICH WILL BE DAMAGED OR DESTROYED DURING CONSTRUCTION. SURVEYOR SHALL PERFORM THE NECESSARY WORK TO PRESERVE THE MONUMENTATION AS REQUIRED BY THE PROFESSIONAL LAND SURVEYORS ACT, SECTION 8771 OF THE BUSINESS AND PROFESSIONS CODE OF THE STATE OF CALIFORNIA. 25. CONTRACTOR IS RESPONSIBLE TO NOTIFY SURVEY MANAGER AT LEAST THREE DAYS PRIOR TO CONSTRUCTION IF ANY VERTICAL CONTROL (BENCHMARKS) ARE TO BE DISTURBED OR DESTROYED. SURVEYOR SHALL NOTIFY THE APPROPRIATE LOCAL AGENCY SURVEY SECTION AT LEAST THREE DAYS PRIOR TO CONSTRUCTION 26. ALL DISTURBED/REMOVED LANDSCAPING SHALL BE REPLACED IN ACCORDANCE WITH THE CITY OF CARLSBAD LANDSCAPE MANUAL. 27. ANY DEVIATION FROM THE PLAN IS NOT ALLOWED UNLESS APPROVED BY THE CITY ENGINEER. SURVEY NOTES: TOPOGRAPHIC AND BASE MAPPING WAS PREPARED FROM DATA COLLECTED IN A FIELD SURVEY PERFORMED ON AUGUST 3 & 7, 202D. PRIMARY CONTROL POINTS WERE ESTABLISHED USING STATIC GLOBAL POSITIONING SYSTEMS (GPS) MEASUREMENTS WITH A MINIMUM OCCUPATION OF 4 HOURS. ALL SECONDARY CONTROL ONSITE AND MONUMENTS WERE LOCATED USING TOTAL R10 OR A TRIMBLE SX-10 ROBOTIC TOTAL STATION. ALL GPS POST -PROCESSING WAS DONE USING TRIMBLE BUSINESS CENTER VERSION 5.20. DATUM STATEMENT: 1. BEARINGS SHOWN HEREON ARE REFERENCED TO THE CALIFORNIA COORDINATE SYSTEM OF 1983 (CCS83) ZONE 06, EPOCH 2007.00, RELATIVE TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), DEFINED LOCALLY BY MEASURED TIES TO CONTINUOUS OPERATING REFERENCE STATIONS (CORS) WITH THE DESIGNATIONS OF P472, P47B AND SI05 AMONGST OTHERS, BASED UPON GEODETIC VALUES PUBLISHED BY THE CALIFORNIA SPATIAL REFERENCE CENTER AND NGS. ALL DISTANCES DERIVED FROM THESE COORDINATES ARE GRID DISTANCES BASED UPON THE U.S. SURVEY FOOT. TO OBTAIN GROUND DIVIDE GRID DISTANCES BY THE COMPUTED COMBINATION FACTOR AT 1 0000 OF nu sea,,oo:,ou ELEVATIONS SHOWN HEREON ARE EXPRESSED IN U.S. SURVEY FEET AND ARE REFERENCED TO THE NORTH AMERICA VERTICAL DATUM OF 1988 (NAYD88) AND DEFINED LOCALLY USING THE ORTHOMETRIC HEIGHT FOR CORS STATIONS P472, P478 AND SIDS. SITE BENCHMARK AT POINT NO 10000 DERIVED FROM RTK OBSERVATIONS ELEVATION � 48 03' USFT. CIVIL NOTES: 1. CONTRACTOR SHALL VERIFY LOCATION OF ALL UNDERGROUND STRUCTURES WITHIN THE AREAS OF PROPOSED CONSTRUCTION 2 CONTRACTOR SHALL FURNISH PROPER PUMPS AND TANKS TO DE-WATER TRENCH PER CALIFORNIA WATER QUALITY CONTROL BOARD (LOS ANGELES REGION) AND CALTRANS REGULATIONS/ REQUIREMENTS. 3 CONTAMINATED SOIL AND WATER SHALL BE HANDLED IN ACCORDANCE WITH FEDERAL, STATE AND ALL LOCAL REGULATIONS/ REQUIREMENTS. 4 IF CONTAMINATED SOIL AND/OR WATER IS FOUND THE SEMPRA ENVIRONMENTAL REPRESENTATIVE SHALL BE NOTIFIED IMMEDIATELY. CONSTRUCTION NOTES 1. HYDROSTATIC TEST REQUIREMENTS A. HYDROSTATIC TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD 182.0170. 2 NITROGEN TEST REQUIREMENTS A. ALL WELDS AND FITTINGS THAT HAYE NOT BEEN NITROGEN TESTED SHALL BE SOAP TESTED AT 100 PSIG AND OPERATING PRESSURE 3 CONTRACTOR TO FIELD COAT WELDS PER GAS STANDARD 186.0102 AFTER X-RAY INSPECTION IS COMPLETED AND PASSED. 4 ALL DESIGN CHANGES REQUIRE APPROVAL BY ENGINEER OF RECORD, WHO STAMPED OR ISSUED ORIGINAL DESIGN DRAWINGS OR UPDATES. A. ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE FOR UNAUTHORIZED CHANGES OR USAGE OF PLANS 5 BENDS AND ROPING REQUIREMENTS 0 09/08/2020 HC HM AP • ISSUED FOR CONSTRUCTION 86427 81545-1001-0-PIP DRAWING LIST & VICINITY MAP A ALL CHANGES OF DIRECTION OF WELDED STEEL PIPELINES SHALL BE IN ACCORDANCE OF GAS STANDARD 182.0070, ANGLES AND BENDS IN STEEL PIPING. 6. ALL ANGLES SHOWN IN PLAN AND PROFILE ARE APPROXIMATE AND SHALL BE ADJUSTED TO SUIT FIELD CONDITIONS. 7. COATING REMOVAL, BEFORE REMOVING PIPE COATING (DOES NOT INCLUDE PLASTIC TAPE OR FUSION BONDED EPOXY COATINGS). THE FOLLOWING STEPS MUST BE TAKEN· A FOR ALL NON-EMERGENCY WORK, PIPE WRAP MUST BE EVALUATED TO DETERMINE IF IT CONTAINS ASBESTOS PRIOR TO REMOVAL. B. FOR EMERGENCY WORK, ASSUME THE WRAP > 1 % ASBESTOS UNTIL THE WRAP CAN BE TESTED. C OBTAIN SAMPLES OF THE WRAP, AND HAVE SAMPLES TESTED FOR ASBESTOS IN ACCORDANCE WITH GAS STANDARD 104.05. D TEST RESULTS ARE TO BE INCLUDED WITH AS-BUILTS. E. FOLLOW PROCEDURE IN GAS STANDARD 104.05 FOR REMOVAL OF PIPE WRAP. 8 ALL PIPE TO BE ABANDONED SHALL BE IN ACCORDANCE WITH GAS STANDARDS I 84.0085, 182.0085 AND 182.01 60 WELDING NOTES: 1 FOLLOW WELD SPECIFICATIONS PER OWNER SPEC. SoColGos GAS STANDARD 187.0055 (GENERAL WELDING REQUIREMENTS). 2. ALL WELDERS MUST HAYE BEEN CERTIFIED LESS THAN SIX (6) MONTHS AGO. 3 WELDERS MUST BE RE-CERTIFIED IF THEIR CERTIFICATION EXPIRES BEFORE THE END OF CONSTRUCTION. LEVEL OF INSPECTION RT, 100% PT: 100% UT: 100% MT: 100% MISCELLANEOUS NOTES: 1 CONTRACTOR MUST VERIFY ALL MEASUREMENTS AFFECTING HIS WORK AND ASSUME RESPONSIBIUTY FOR THEIR CORRECTNESS. 2 UTILITY LOCATIONS AND DEPTHS APPROXIMATE ONLY, CONTRACTOR TO VERIFY ELEVATIONS PRIOR TO CONSTRUCTION. 3 ALL ANGLE POINTS ARE APPROXIMATE, CONTRACTOR TO FIELD DETERMINE ALL ANGLES. 4. CONTRACTOR TO ADEQUATELY RESTRAIN & SUPPORT PIPE FOR HYDROTEST. SOME PIPELINE HYDROTEST MAY REQUIRE APPROVAL FROM PIPELINE DESIGN, DEPENDING ON THE DESIGN THIS NOTE REPLACES TEST HEAD HOLD DETAIL 0301 � DATE DESK;NED: H. CUI 07/06/2020 MsoCalGas DRAWN: H. CUI 07/06/2020 CHECKED: H. MARNOCHA 07/10/2020 PROJ APV: A PINTADO ' A�SempraEnergy ut111y SCG ENGAFV * ' ENG FIL.E NO:* D\'IG CLASS: 41 WOA: 86427 SCALE: NONE owe DIST: 200 ISSUED FOR CONSTRUCTION L-1026 MP 61.70 MAINLINEMLV LEAK REPAIR PONTO RD & PONTO DR GENERAL NOTES PONTO RD & PONTO DR CITY OF CARLSBAD ��1� 81545-1 002-D-PIP I"" 0 . ""'"'' 6, CONTRACTOR iii i.1'11'!1>W,l'tt:.. ' " I I• Cl>,►O-'r.J.J.lY l"'J:J.JI ' ' ' rit.0 " [lllfi,J' ,;;>fl'ln?i! n, "'' ,J P.fl'.,0'1 ,·-r r: DISTANCES, .......... -..... -7_ rn, "·" '.,, ---f----"''°'' 1111,iiii, I I I I +-""' I I '"' CCSCRPll:i~ I "" D ..... ;---,@PLANT]:> --J :,, '-l u re; u ' U1 ' v' U1 N OJ "' -;o Co + _,,. 0 :._. a, 72" L-1026 0 1 o· 20· SCALE: 1" ~ 20'-0" 40' C CORDOBA CORPORATION Cordoba Corr:iaration, Inc. 1611 E. 17th Street Santa Ana, CA 92705 81545-1 001-D-PIP DRAWING LIST & VICINITY MAP / / " 10s1·-11" I \ \ \ \ \ / \ \ \ \ I\STA __ PIPC \1,n .I\T LC.t-.ST 42" :::,1 :::cvrn uc_o,N GRADE (:'.)llhlY SAN DIEGO DISTR1,:-;-BREA '.-;I ~'II' f/AI' \'.). 1026P90 A ... P.S r~::;. 1026-90 DJT ,:::_ 11 2 t>(., I 1, •CC\S-CC·.IC'NY DOTY BROS. I 86427 I I I EDGE OF PAVEMENT --------I I J / -(!IPN: 216-140-43-00 LSFS CARLSBAD HOLDINGS LLC / / < :,, -;o in v'-----[f] "'· I o, ""· --I -' N -. I -/ // I / '-----/ / / / PLOT PLAN ---40'-o" u 0 z --1 0 0 ;;o I , I so·-o· /1 I ) I I I 4'x4'x5D½" VAULT ASSEMBLY W/0 BASE 40'-o" SO. CA. GAS CO. STOCK CODE # N399776 I / ------/ / / / ( I I I / I I I ---I -X X X -11/30/2020 HC BV AP * * SCOPE CHNG 1200' REPLACEMENT 86427 -----157' -6" BY DESIGNED· H. CUI DRAWN: H. CUI CHECKED: H. MARNOCHA PROJ APV: A. PINTADO SCG ENG APV: * (!'PN: 214-160-25-00 SCHREIBER DALE L & DONNA E SURVIVORS TRUST (12-03-85) 112'-7" 5' So. Cal Gas Co. EASEMENT R/W #2269 ------------12" L -1026 (!'PN: 214-171-11-00) SCHREIBER DALE L & DONNA E REVOCABLE TRUST (12-03-85) DATE 07/06/2020 MsoCalGas 07/06/2020 07/10/2020 * A~ Sempra Energy u11111y * C>I-JCIC,CL_Y "RO lC ,G YES ,CG JII TRANSMISSION O 09/08/2020 HC HM AP * * ISSUED FOR CONSTRUCTION DWG CLASS, 41 DWG f-----------+-----------+-----+------+------f---+-~----+----+----f--f-----------------------1---------------+-------86427 ENG FILE NO: * 1 1 1932 •J"cRi'.TE: i,-196 PSIG REV DATE DRAWN CHECKED PRJ APV SCG APV ENG FILE NO DESCRIPTION WOA WOA, 86427 S CALE, 1" ~ 20' -0" 12" PCF 12" L-1026 X +"" ~ ~ ~ Co_ (1938) (2020) WOA 90234 woA 86427 w 81545-3003 ~ NOTES: 1. ALL DIMENSIONS TO BE FIELD VERIFIED. ISSUED FOR CONSTRUCTION L-1026 MP 61.70 MAINLINE MLV LEAK REPAIR PONTO RD & PONTO DR PLOT PLAN PONTO RD & PONTO DR CITY OF CARLSBAD REV 81545-3OO1-D-PIP 1 C:\uscrs\hcui\,drT272'.J2\21 !:;,45-.30C 1-C-P P.Jl'ly, , 2/ 1 /i.C20 L:jL F·I-.!, C/:,Y C ~ \ \ \ \ \ \ \ \_\ \ \ \ \ \ \ \ \ \ ---------------------~£-3 ~---------SCALE 1 /2" 1 '-0" ------_--::----=:::::------12" l-1026 C CORDOBA CORPORATION Cordoba CorQoration, Inc. 1611 E. 17th Street Santa Ana, CA 92705 --------------(APN: 216-140-43-00) LSFS CARLSBAD HOLDINGS LLC --------0 --------------: -----------·:-----~ ---------------r-DEMO Pl Pl NG PLAN FOR PIPING PLAN SEE DWG. 81545-3002-D-PIP 11/30/2020 HC BV AP 0 09/08/2020 HC HM AP DRAWN ()jEC~EDPRJAf'v SCG>P/ 0 -----------SCOPE CHNG 1200' REPLACEMENT 86427 ISSUED FOR CONSTRUCTION 81545-1001-0-PIP BOLLARD TYP. 8 ---R/'11 ----=--=-=----__ -----------DESK;NED: H. CUI 07/06/2020 DRAWN: H. CUI 07/06/2020 CHECKED: H. MARNOCHA 07/10/2020 PROJ APV: A PINTADO SCG ENGAFV * DRAWING LIST & VICINITY MAP EDGE OF PAVEMENT --ffi 864 7 '/IOA 90234 '/IOA 86427 (1938) (2020) ----------------------------MsoCalGas A~SempraEnergy ut111y NOTES: 1. ALL DIMENSIONS TO BE FIELD VERIFIED 2 RECOMMEND TO REPLACE ALL GAS FEATURES IN THE VAULT IF THE EXISTINGS ARE NOT IN GOOD CONDITION LEGEND: c=:> ITEMS REMOVED ISSUED FOR CONSTRUCTION L-1026 MP 61,70 MAINLINE MLV LEAK REPAIR PONTO RD & PONTO DR DEMO PIPING PLAN D ..... ;---,@PLANT]:> ':l~ E,\ SI-o6" . ?S \ 1,, I? _cI AOOC\., z 0 y c::~ :i 1 99 :,166'-io16 l?S ?,'I--:,166'-S ~\-Ill I? ll , ,, 1:,~l'I :,1.16 \ 1 t.\., ,01'60001 1\li 0 "' ,-0 "' '-" ':!:, .\> z ,;::;o OY '2> D' .c., m ~ ~ ri 31 F l-' Ul N OJ m Al OJ + .,,. 0 ,,. ~ m SCALE: 1/2" 1 '-0" ios1·-11" 81545-1 001-D-PIP DRAWING LIST & VICINITY MAP -----------------------------------< J> ------'< ri ---------~ ~) ----------------/ / (f\PN: 216-140-43-00) / / LSF5 CARLSBAD HOLDINGS LLC ---------_44------------------------------R/W--------------/ ./ ./ / -------------------_~--r=-~----------~-~ -----ri ~"'--+--~~-=n ri CJ) ~ 0 ___ R/W --------,,":"I.,. .....,..._ --ll-------_;r:";':_----1; ---------------------------------4'x4'x5o½" VAULT ASSEMBLY W/0 BASE ----------------------12" L -1 026 ------------SO. CA. GAS CO. STOCK CODE # N399776 ------R/W -------4'x4'x50)1z'' VAULT ASSEMBLY W/0 BASE SO. CA. GAS CO. STOCK CODE # N399776 ------------46----- - - -------< R/W 0 R/w---CJ) Al "z Ee N ',i 0 "' "< 8 o_ 0 I Al Z -!>a Oo ~~ :c re Al z PIPING PLAN FOR DEMO PIPING PLAN: SEE DWG. 81545-3002-D-DEM C I\STA __ PIPC \1,n .I\T LC.t-.ST 42" :::,1 :::cvrn uc_o,N GRADE (:'.)llhlY SAN DIEGO * BREA 86427 BY DATE DESIGNED· H. CUI 07/06/2020 DRAWN: H. CUI 07/06/2020 CORDOBA CORPORATION :-;1 ~'II' f/AI' \'.). 1 026P90 CHECKED: H. MARNOCHA 07/10/2020 , .P.S '"'· I 026-90 PROJ APV: A. PINTADO * oc.T c_ 11 2 t>(., I I' ,cc\S-c.c.·.icoNY DOTY BROS. 11/30/2020 HC BV AP * * SCOPE CHNG 1200' REPLACEMENT 86427 SCG ENG APV: * * MsoCalGas A~ Sempra Energy u11111y Cordoba Carr:iaratian, Inc. 1611 E. 17th Street Santa Ana, CA 92705 C>I-JCIC.CL_Y "RO lC ,G YES ,CG JI\ TRANSMISSION D 09/08/2020 HC HM AP * * ISSUED FOR CONSTRUCTION DWG CLASS, 41 DWG DI f------------+------------+-------+------+--------1---~-~--+---+----+--+----------------------__,f----------------+-------86427 ENG FILE NO: * I 1 1932 •J0cR1,TE: ,-.-196 PSIG REV DATE DRAWN CHECKED PRJ APV SCG APV ENG FILE NO DESCRIPTION WOA WOA: 86427 S CALE, 1 2" ~ 1 '-Q" WOA 86427 ~ WOA 90234 (1938) NOTES: I. ALL DIMENSIONS TO BE FIELD VERIFIED. ISSUED FOR CONSTRUCTION L-1026 MP 61.70 MAINLINE MLV LEAK REPAIR PONTO RD & PONTO DR PIPING PLAN PONTO RD & PONTO DR CITY OF CARLSBAD REV 81545-3002-D-PIP 1 r:,-;,,\i,I\~~ \'"l•r!-1< REFE::;E\CE DRAW~.G c,::s:=:;:1ncri 81545-1 001-D-PIP DRAWING LIST & VICINITY MAP ----------------------------------------------------~ -----------r ' ' r r ' r j ITD,I ~lCI I C ~ c:=::sIcr,~ =-2 I ----K' Ql_,,L.~. ':::IzE \/LL.TEP >,L CES:R P-lml :::.1 Uu '18. f,:\TI I. 0 p-:;-ss =:~=ss ::JDI , I PIP, " 1 1)C/ '/" ';! 11 fVI ,-1) I\ ~\ f--''~, )I? I , _JI .Al r·.J ANl~1 I'. VI I I I) I ~JI y~, 11411 11 1 f _., f Hf, :) '') ' ,--:, N \/'/ AH .71 ' :; ~-. >(-:/' r \\', < I I✓151' 41-0G.-CCJ/:., I lU l'cfi r·,-1sI1 4L-:;J, l'll'c ,, c· 4" S 11) l'I 'c, ,-- -4", CJAI t__:::, n ,, < / \,\' I . =, a --- ---r-~4Jl=:,1.J L ~ ---· --.L~ I o, I rv1sI1 4(__;...,_") <, L_c I lvl A.1:J!:, " GRADE REF, EL, 57.3' ELr v,,;:=::_=: FITTll1CS < I 7 -" STD E __ '/1/E_D, 52 JEC, CF: Y-52 ('.) .37.':,"V1i), \'ISP 52-96 ~ L --- --- ---4 L -,, STD E '/1/E D, -JEC, CF: Y-52 ('.J .. 37.~,"v,i), v1::;p "')?-9(3 r~5.Vli) 1.J L ------ ---I " ru\~,1:;=-'.:; :J 2 4" ti:.l~)C f-_,-\\J(;t_, ·I". V'i't-~ r;-. :::OCCL. 1 rJj" CCf--~=-. lvl'~ _J ~:,/ -1 / --- ---tc',12~ I ' " 4" t<l~)C I _,-\\J(;L, ·I". _ILi 1, 8, I-i cl!CCL. \1~;p >1-I --- ---\J:J-'I 9/ C,( ,; L I r,,1\S /,ITS < 1 6 14 15 L L 6JJ;·; c;,t.S ;-T. :":PIRAI 't/J_,~11!, 4', F =i1, Cl 60CJ, ,--c HSP --L~.6 '~4TJ:':,/1 N I '";, / C· I /-< GRADE REF. EL. 43.6' o) GRADE I 1l!TS A.~-;, 11'.~,1 E; "' L_l I <D o) ~ ~ ..,: (~ '(:, 7/'J'\C 1 /L"I c: '.:~T-:; STU\ P.II c,y '.'Tl , ASH/ A 1 q :;., Gr?. 1!7, l\11:,P /'4 19, cCI ' ~J)4,)?~, co ci c--' ..,: + Fl\8 -c.: =-1\J 1; \N/:'.7) ---j-,', \ "✓ -FX \UFi. .A',Hi A 1()4 GR )-1_ I -tj-u.: -,...._,, "' + CTI + u.: (0 CY N u ElL.A.:K FII\ISH o) <D m N -_, <D u 'o) N U) n (]_ u . G 1/s''>::c 3/ L"LC STJ STLC, PtLOY STL, .ASH/ .A Vi:'.:, CR. 67, 1v1sr 24-1 J, ECL-, ~-J2432~ N -_, I n 0 j ------I "' "-u _, U) .N 0 'N,/(2) 0 "' Ul _, Q_ ~-i-12 EI\C C cl'IC ---j=-/:.,\/\/ '1cX \IJTS. .ASH/ A-194 CR. 27, Ul .N 0 12 Q_ w Q_ ~'Cl' E:LA.:K Fll!ISH )] ? ~ Q_ f--. J <( c--" I \/.t,. L \i l S 1L ~ L ~ L ~-1C 1 , 2." 3CC{:L \/AL\il, 72" ~.t.LL. CL jC(_', °'IV X \'\', ~:rXbU. \be -~13-dL ------~ .. ) 6 , ~ --1 L 4" 6CCCL 11 ,, -Xf b'.JUCL ~!\LL 'ii\L\/l. \-1~;p ::i~-bL ----------- -------- ---!,,. I < i ~12" 17 'ciPlCli\_ I Y llv' S I o) CTI C--L:' }_ L(' l '.JDC_ f--i--S:C.~/~U--i=-C:JI\ RC_ -11 \](_;_ \,1~:p :~: __ , 0, m ------- ----0 N "1 co 12" ----HI. [L_=R I 1 .-,--< "'+ L-1026 L-1026 -: L;_; i + (0 en ) I o) <D "' 1 ~ 7 1 7" ;•rn 1,\'1--::D ~Jc; li\,lrJ :•Tl nr.R-GR y 6S (0.j7:-J M:-: =i ,:r; '.-JS, <DN .,-(1 c)/ Nn X "' 0 _, X ' ,T c:-;l-.-1r-:: F-R 1\/:iF u :--:,c J z w X ~12" 0 "" X 12"/36" \137144" I ":r: m CL X 14 -~:,r,sI·~c;. \/1\L \it_ bC/, ::; I -· ------[I]<( 1/l 1/l ~ ci "=I:!:=: 1 C 12" -~:(_)\/[_ .;, \i,,\L\/C. cnx, C/,SI lk'U\ ------\_J:]74~5(· N 'O Q_ Q_ -c--L-1026 1 (:j 12' lX cfblUI! \i/,.L\it_ c1UX, 'i-, lll \I l ;\_ \le~:~ DETAIL -------I (1938) (2020) 1 1 / 1 "' p _,\ L, s,_J-1~c} l)I( \i/\L\/L Ci\':.\(; rf:\. '-; -------WOA 90234 WOA 86427 SECTION IA\ SECTION SCALE: NONE 13 2 4' GCCCL Kl-, lt!Sl!I /'sT ~,;_ /,, R-/\\JS 6CC, I·/;-:=: ,17-'.-JfJ ------\ji IL~ 86427 81545-3002-D-v I m 81545-3002-D-v I < I < I DETAIL < 1 4'x4'x50½" VAULT ASSEMBLY w/o BASE 4'x4'x50)f VAULT ASSEMBLY W/0 BASE < I SO. CA. GAS CO. STOCK CODE # N399776 SO, CA GAS CO, STOCK CODE # N399776 I GRADE REF. EL. 45.6' < GRADE REF. EL. 45.2' < J§Xi' 8) ® ) 2 UNK GRADE REF. EL. I ~ UNK GRADE REF. EL. ) ) GRADE REF. EL. 44_3' FIELD VERIFY 1 1 1 1 FIELD VERIFY ( / 1-( ( ( < l J? ~ l J~ ~ 4 i I ' 6 Tl . Tl -I ' 1 1 < ~ I °' "' ~ co " I ."' I I ' I / !Iv ~ -:.a-"' "' / 10 ~-/ < 10 4 ? i " I ·? I 13 ? ? < I / ---- -1)_ -, I ~ ) -tj-< -------------~12" 0 I ~ -() c--C[) " 0 N -N N CTI N o) w ~ ~12" w ~12"X4" + <D co + "' C[) < "i "i <D L-1026 "' °' "' en m co <D "' m I <( w ;;; N 0 0 CTI N 0 o) .,-"i "' + + + X > 12"X4" "' 0 _, X "' ;;; L-1026 sr _, co ('.) cf) ('.) _, cf) z wx "! --" "! --" 1/l _, en <( en <( 1/l --" cf) <( X < _, REINFORCEMENT PAD --" REINFORCEMENT PAD Q_ w N 1/l N (j') Q_ w N rn 0..: X I 00 <( --" ro <( "' "' "' o) [I] "' --" co [I] Q_ en _, _, Q_ ITT o= + N "'°o + <( "' 1/l _, 1/l _, <( "' Ul N _, a:i --" w c-' g c--m, c--Q_ w Q_ Q_ -cf) u r---en u < 0 --"C---0 ITT N 0 + N 0 Q_ en Q_ (2020) ( 1938) "' co c--u -n <D <( -tj-<( -tj-I 0~ en o'° WOA 86427 WOA 90234 Ul -:.a-N "' I Ul -:.a-Q_ n Q_ <D 86427 ~ N 1/l NO m Q_ ~---& -------------------------------------------------------------NOTES: I. ALL DIMENSIONS TO BE FIELD VERIFIED. SECTION rB\ 2. RECOMMEND TO REPLACE ALL GAS FEATURES IN THE VAULT IF THE EXISTINGS ARE NOT IN GOOD 81545-3002-D-v CONDITION. ISSUED FOR CONSTRUCTION C I\STA __ PIP[ \1,fl .I\T L[t-.ST 42" :::,1 :=cvrn uc_o1N GRADE F'=I\I'/ T I\-Cf;IAA-IC\ BY DATE L-1 026 MP 61 .70 MAINLINE C")llhlY SAN DIEGO ::;:-.-E l•:OVED 0'-J * ·,1,,0µ. IC:C'._,Fr, PY fllH/R=-R DESIGNED· H, CUI 07/06/2020 MsoCalGas n1srn1,:-:-BREA ;;.-F l•/0\tFn o=-=-* 86427 DRAWN: H. CUI 07/06/2020 MLV LEAK REPAIR CORDOBA CORPORATION '.-;I ~'II' f/AI' \'.). 1026P90 _::,., I:. Of 01'1:."'.f,., 1(:1~ * CHECKED: H. MARNOCHA 07/10/2020 PONTO RD & PONTO DR 0 1 ' 2· 4' A _P.S r~::;. 1026-90 CC\S-C'T,\I i0i[\1t.J.I ' PROJ APV: A. PINTADO * A~ Sempra Energy u11111y PIPING SECTIONS Cordoba Corr:iaration, Inc. DJT ,:::_ I 11 2 t>(., I I· c:rv;-cc:• .. W.A.NY: DOTY BROS. 1 11/30/2020 HC BV AP * * SCOPE CHNG 1200' REPLACEMENT 86427 SCG ENG APV: * * PONTO RD & PONTO DR CITY OF CARLSBAD SCALE: 1/2" ~ 1 '-0" 1 61 1 E. 17th Street 09/08/2020 DRAWING REV c,.;1-:;,i:1c.l\L_Y -'RO l:.C =.I:: YES c;:EG :=,~1: TRANSMISSION 0 HC HM AP * * ISSUED FOR CONSTRUCTION 86427 ENG FILE NO: * DWG CLASS: 4 1 DWG DIST: 200 Santa Ana, CA 92705 NUMBER 81 545-3003-D-PI P 1 '✓F/.,~ CP. ~'.';T/,11 =-r:,: 1/1/1932 C-'C:R:\TE:: /.,-: 196 PSIG REV DATE DRAWN CHECKED PRJ APV SCG APV ENG FILE NO DESCRIPTION WOA WOA: 86427 SCALE, 1 /2" ~ 1 '-0" --- 10 9 8 13 11 15 7 D -~ 4" 600CL BALL VALVE 12" 300CL BALL VALVE 1026-617-0 4" 600CL BALL VALVE 8 9 10 11 -I? 5 ,,-.--------..!:c-:~--------_L.._--------------,---(-_L_ ',--,-------_L._-----------~cl-!,,--------o"""-? '"'\, ? ' "" . ~ .. .. ---1111111"'-2" 6000# -.J_-----~--------------..l_-l, _ __..,)-L--------y-------------~--L...' BALL VALVE '-- - -"" -~12"X4" - - -~-~12"x4" 3 6 4 14 -• ---2" 6000# BALL VALVE REINFORCEMENT PAD 12 REINFORCEMENT PAD C CORDOBA CORPORATION TEMPORARY HYDROTEST PIPING PLAN I\STA __ PIPC w1 1 .I\T LC.t-.ST 42" :::,1 :::cvrn uc_o1N GRADE (:'.)llhlY SAN DIEGO * BREA :-;1 ~'II' f/AI' \'.). 1 026P90 , _P.S '"'· 1 026-90 2 t>(., I I' ,cc\S-c.c.·.ic'NY DOTY BROS. PLOT PLAN: 81545-3002-D-DEM DEMO PIPING PLAN: 81545-3002-D-DEM PIPING PLAN: 81545-3002-D-PIP PIPING SECTION 81545-3003-D-PIP F'_i\1-/ T I\ CfdAA IC\ 86427 1 2" L-1026 5 DESIGNED· DRAWN: IT=l•:1 1\:J. j 0 11 12 L'.: 14 le BY H. CUI H. CUI OU.A'.J. s1z:::: 2 2 L L ) IG 1 G I :.: :.: 12" 4 2" ,-," L -"" L 4" 2" DATE 07/06/2020 07/06/2020 CHECKED: H. MARNOCHA 07/10/2020 PROJ APV: A. PINTADO * SCG ENG APV: * * ~)CH C-! R!TI~~ STC SIU S 11) 6Ciiiiil Pl"[ "I"[ S -• 12 II IIP5. CRL. PLAN .AND J=vcL=D urns. \-1s=-, ::;2 s.3 f-Ei'-I:, 1-/'3" 51 .c7 S U~K :~:DUL 11411.316 GOJC_ -c\\C1, r ll lflD, RI. 6CCCI. 1-!SF' 51-, 518 =J~[ D =-\IU ''/,'/(2) -=-.t.,\-'Y -H:_>:: ~.JJIS, .AS [v' .A-194 C-\. 2H, :LA<>< -I\ SH '.:::ILL), A.LL:_/-' SIL, ,t.SII'-/ A'•~U. 1.__,, ~/, l'-/5' 24-19, ~C_I, :::I\JC -o :::\JD ''/v' 3_A~:-< =-I\ ::;H NOTES: 1. ALL DIMENSIONS TO BE FIELD VERIFIED. FOR REFERENCE ONLY NOT FOR CONSTRUCTION MsoCalGas L-1026 MP 61.70 MAINLINE MLV LEAK REPAIR PONTO RD & PONTO DR TEMPORARY HYDROTEST PIPING PLAN A~ Sempra Energy u11111y PONTO RD & PONTO DR CITY OF CARLSBAD Cordoba Corr:iaration, Inc. 1611 E. 17th Street Santa Ana, CA 92705 CAI-JCIC.'L Y "RO ,c -G YES ,cc. JII TRANSMISSION O 11/30/2020 HC BV AP * * SCOPE CHNG 1200' REPLACEMENT DWG CLASS, 4 f--==-===-="--,----+_::_:_:___ __ _.. .... ===-'--+-----+--------1-------l----_'__._._,___.,==~----"---l----"'-'--"'--l--l-----==~=c'_'=:'_'====----==-+=-=-=------------1-"""'___"':":':'~ 86427 ENG FILE NO: * REV 81545-3701-D-SKT 0 '✓F/-.~ CP. ~:c;Tt,11 =-r:,: 1/1/1932 ,:::.-:=-p/,TE:: /\,-: 196 PSIG REV DATE DRAWN CHECKED PRJ APV SCG APV ENG FILE NO DESCRIPTION SCALE: NONE WOA WOA, 86427 C: \L.c;crs\h:J \J1·1~27B'.Y2. \8 · ';L:_i-370' -C-SKT.Jl'ly, , 2/ 1 /'.2.C20 3: 11 F·I-.!, C/:,J' C (1 )PROJECT MANAGER/PLANNER: INT: --(2)FIELD INSPECTOR: INT: --( 1 )(2)PREPARED BY: STRENGTH TEST ASSEMBLIES AND SUPPORTING DOCUMENTATION DEPT (2) TEST NUMBER* INT: --HEAD/SUPERVISOR REVIEW: INT: --STRENGTH TEST SUPPORTING DOCUMENTATION (2) DDS FILENAME* (ONE PER TIE-IN LOCATION) I I I PDMS DOC ID# PG# (2) HYDRO/STRENGTH TEST LOG DESCRIPTION* x Ir.Cl -E -H~ T~c,-ldxlvl3~R Cl· -H '; DR/\'-N ]\JG, -1-E DDS, THE -E~iT Cl-!\CzT, /',ND THE 1-YrJR'.lTFS-I OC( F 1\1'-)I 1:-~; FCJ=! F!\CI-!.SSFl,,1F Y l'l'.~ n~,; I\I TI-F :cT'FIJCT H -FST. ~ -FSTI\IC /0 .. CJ\n\1,,C)JS F PFI IF lJSI\JC lvl.J -IF ~ :,TRF\IC-H T~s-s. 1-·· _ I I_ I LS ':iYl,/L'UL x AJ,L: AHJI\UXIVIAI _ S A.I C'll'L'. C~ IH-jc;!\WII\C; 1:; lcl-f-Rf~I ;\ f f ·:H -ii. -----ft I I 4" 600CL I I I PDMS DOC ID# PG# --BALL VALVE I I I ~4" PIPE I I 2" 6000# I > BALL VALVE r I --L > I / -REQUIREMENTS OF CFR TITLE 49, PART 192, SUBPART J, 192.517 RECORDS PLEASE PRINT NEATLY , RECORD LOG MUST BE LEGIBLE AND COMPLETELY FILLED DO NOT TRANSFER HANDWRITTEN INFORMATION TO CAD , THIS IS AN OFFICIAL HANDWRITTEN DOCUMENT THAT WILL BE SCANNED AND ARCHIVED STRENGTH TEST RECORD LOG STRENGTH TEST RESULTS TEST CHART INFORMATION EMPLOYEE NAME SUPPORTING DOCUMENTATION TEST COMPANY SUPPORTING DOCUMENTATION (2) TEST CHART LOCATION* (AS NOTED IN THE LOCATION FIELD ON THE CHART STAMP ----I I l PDMS ID# --/NEW 12" L-1026 (2) LOWEST PRESSURE DOC (RECORDED WITHIN PG# TEST DURATION) PSIG PSIG PSIG PSIG PSIG PSIG PSIG ----(2) TEST DATE -(2) (2) (2) SPIKE TEST TEST TEST MEDIUM DURATION PRESSURE -HRS MINS HRS MINS HRS MINS HRS MINS HRS MINS HRS MINS HRS MINS ---12" JOOCL BALL VALVE 1026-61.7-0 -(2) I 2 I (2) SPIKE NAME OF COMPANY TEST EMPLOYEE/REPRESENTATIVE DOC DURATION RESPONSIBLE FOR TESTING TYPE HRS MINS HRS MINS HRS MINS HRS MINS HRS MINS HRS MINS HRS MINS -------I I I (2) PDMS DOC NAME OF TEST COMPANY ID# PG# (ANY TEST COMPANY USED) -----/NEW 12" L-1026 (2) DOC TYPE --I I I (2) PDMS DOC HIGHEST ID# PG# ELEVATION ---I 4" 600CL BALL VALVE I I ELEVATION VARIATIONS SUPPORTING DOCUMENTATION (2) (2) (2) RECORDING I I I LOWEST GAUGE DOC PDMS DOC ELEVATION ELEVATION TYPE ID# PG# --I I I I I I I ) n -u I ... LEAKS AND FAILURES SUPPORTING DOCUMENTATION (2) LEAKS AND FAILURES NOTED AND THEIR DISPOSITION 2" 6000# BALL VALVE ~ (2) DOC TYPE I I I PDMS DOC ID# PG# -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -GS 182.0170 / G7369 192.517 Records. (Sept 15, 2003) (a) Each operator shall make, and retain for the useful life of the pipeline, a record of each test performed under 192.505 and 192.507. The record must contain at least the following information (1) The operator's name, the name af the operator's employee responsible for making the test, and the name of any test company used. t2l Test medium used. 3 Test pressure. 4 Test duration. 5 Pressure recording charts, or other record of pressure readings. (6) Elevation variations, whenever significant for the particular test. (7) Leaks and failures noted and their disposition. SUPPORTING DOCUMENT REQUIREMENT ADD ONE OF THE REQUIRED DOC TYPES TO U7 w z THE STRENGTH TEST RECORD LOG ABOVE w >-Q >-z 0 .,: c-U7 ~ Q_ ~ "' DOC Q_ "' c'i "' 0 ~ SUPPORTING DOCUMENTS TYPE w u w ~ DESIGN DATA SHEET DDS • • HYDRO/STRENGTH TEST LOG HTL • • • • TEST CHART TCT • • • • STRENGTH TEST PROCEDURE STP • • DAILY INSPECTOR'S REPORT DIR • • EMERGENCY INCIDENT REPORT EIR • CPUC/DOT REPORT RPT • NOTES I .PLEASE PRINT NEATLY; THIS IS AN OFFICIAL DOCUMENT THAT WILL BE SCANNED AND ARCHIVED 2.RECORD LOG MUST BE COMPLETELY FILLED IN 3.THE TEST NUMBER MUST BE UNIQUE 4."DDS FILENAME" LOCATED AT THE BOTTOM RIGHT CORNER OF THE DDS 5.THE "PDMS DOC ID" IS THE DOCUMENT IDENTIFICATION NUMBER IN THE PIPELINE DOCUMENT MANAGEMENT SYSTEM (PDMS) !'-STA __ PIPC \1,n .I\T LC.t-.ST 42" :::,1 :::cvrn uc_o•N GRADE C")llhlY SAN DIEGO DISTR1,:-;-BREA '.-;I ~'II' f/AI' \'.). 1026P90 A ... P.S r~::; . I 026-90 OFF Cl INOT L H T~ I\ISFER I\IDW;ITTE~ H r,D1NI~ -TEN l~~FOl~rvl/\TIO~ DOCJr,,1ENT THAT V✓ILL BE L-1026 MP 61.70 TEST NUMBER CONSTRUCTION DWG NO. THIS Al~ D PCMR NO. PDMS DOC ID ED BY DESIGNED: H. CUI DRAWN: H. CUI CHECKED: * PROJ APV: * DJT ,:::_ I l1 2 [><, I 1, ,cc"-cc·.icoNY DOTY BROS. 1 11/30/2020 HC BV AP * * SCOPE CHNG 1200' REPLACEMENT 86427 SCG ENG APV: * DATE 09/04/2020 09/04/2020 * MsoCalGas ' A~ Sempra Energy u11111y 86427 ENG FILE NO: * C>I-JCIC.CL_Y "RO ,c ,G Y ,CG JII TRANSMISSION O 09/08/2020 HC HM AP * * ISSUED FOR CONSTRUCTION DWG CLASS, 4 1-------~~--+----------+-----+-----+-----1----+~-~-+-----1---+--+--+-----+----------+-----+-------------+---WOA WOA, 86427 ' ✓ F /-. ~ CP. ~:c;Tt,11 =-r:,: 1/1/1932 C-""'C:Ri\TE:: /\,-: 196 PSIG REV DATE DRAWN CHECKED PRJ APV SCG APV ENG FILE NO DESCRIPTION SCALE: NONE ISSUED FOR CONSTRUCTION L 1026 MP 61. 70 MAINLINE MLV LEAK REPAIR PONTO RD & PONTO DR STRENGTH TEST RECORD LOG PONTO RD & PONTO DR CITY OF CARLSBAD REV 81545-3801 -D-MST 1 C:\usc~\h.;u \[T122.73C2\8'54j-35C1-C-l·,1SL.ll"ly, '2/1/i.C20 3:1C F·I-.!, C/:,YC NORTH COUNTY TRANSIT DISTRICT 810 Mission Avenue Oceanside, CA 92054 (760) 966-6500 (760) 967-2001 (fax) GoNCTD.com April 5, 2022 Mr. Scott Donnell Planning Division City of Carlsbad 1635 Faraday Ave Carlsbad, CA 92008 Sent Via Electronic Mail: Scott_Donnell@carlsbadca.gov Re: Design Review -SDG&E Mainline Pipe Repair on Avenida Encinas -Carlsbad Dear Mr. Donnell: Thank you for the opportunity to review the notice of public hearing on the SDG&E Mainline Pipe Repair, published on March 25, 2022. The full case name is CDP 2021-0035/HMP 2021-0005 (DEV 2020-0283) -Southern California Gas Company Mainline Pipe Repair. Upon review of the location, the North County Transit District (NCTD) has determined that there is a bus stop on Carlsbad Blvd & Avenida Encinas (ID: 22442) on the northbound BREEZE Route 101 that may be impacted by construction. NCTD requests that you or your contractor provide notice two (2) weeks prior to starting work so that we may send a supervisor to meet with your construction crew to determine if your traffic control methods affect NCTD's stops. Notice should be provided via e-mail to detours@nctd.org. Thank you again for allowing NCTD to review and comment on this project. Should you have any questions related to this review, feel free to contact me at (760) 966-6683 or via e-mail at kpersons@nctd.org. Sincerely, ~r--- Katie Persons Director of Service Planning cc: Chris Orlando, Chief of Advocacy, Marketing and Communications, NCTD Damon Blythe, Chief Operations Officer -Bus, NCTD Derrick Wojcik-Darners, Director of Bus Operations, NCTD Mary Balderrama, Transit Planner, NCTD From:Chantal Alvarez To:Planning Subject:Letter Re: Design Review - SDG&E Mainline Pipe Repair Date:Tuesday, April 5, 2022 11:55:10 AM Attachments:image001.png image003.png City of Carlsbad - Design Review - SDG&E Mainline Pipe Repair.pdf Dear Mr. Donnell: The attached letter is being sent on behalf of Ms. Katie Persons, Director of Service Planning. Please do not hesitate to contact Ms. Persons directly at (760) 966-6683 or via e-mail at kpersons@nctd.org should you have any questions. Thank you. Chantal Alvarez Administrative Assistant 810 Mission Avenue | Oceanside, CA 92054 | 760.435.7268 CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe.