Loading...
HomeMy WebLinkAboutMS 16-01; PACIFIC WIND; Third Party Geotechnical Review (FIRST) Pacific Wind; 2021-09-07 September 7, 2021 Project No. 9486.1 Log No. 21597 City of Carlsbad Community and Economic Development 1635 Faraday Avenue Carlsbad, California 92008-7314 Attention: Ms. Elissa Tovar Subject: THIRD-PARTY GEOTECHNICAL REVIEW (FIRST) Pacific Wind Carol and Harding Neighborhood Redevelopment Carlsbad, California MS16-01 References: 1) “Preliminary Geotechnical Investigation, Proposed Multi-Family Residential Project, Carlsbad Apartments, APN’s 204-292-01, -02, -10 through -14, -16 through -22, 204-291-14, -16, -17, and -19 through - 27, Carlsbad, California,” by LOR Geotechnical Group, Inc., dated July 31, 2014. 2) “Grading Plans For: Pacific Wind, Carol and Harding Neighborhood Development,” by SWS Engineering, Inc., dated August 24, 2021 (Sheets 1 through 9). Dear Ms. Tovar: In accordance with your request, Hetherington Engineering, Inc. has provided third-party geotechnical review of Reference 1. The following comments are provided for analyses and/or response by the Geotechnical Consultant. 1. Due to the age of the report, the Consultant should update Reference 1 to comply with requirements of the 2019 California Building Code, ASCE 7-16, and City of Carlsbad requirements. 2. The Consultant should review the project grading plan (Reference 2) and foundation plans, provide any additional geotechnical analyses/recommendations considered necessary, and confirm that the plans have been prepared in accordance with the geotechnical recommendations. 3. The Consultant should provide an updated geotechnical map utilizing the current grading plan for the project to clearly show (at minimum): a) existing site topography, SOIL & FOUNDATION ENGINEERING ENGINEERING GEOLOGY HYDROGEOLOGY (760) 931-1917 Fax (760) 931-0545 333 Third Stree Laguna Beach, CA 9265 (949) 715-5440 Fax (949) 715-5442 Carlsbad, CA 92008-43695365 Avenida Encinas, Suite A HETHERINGTON ENGINEERING, INC. www.hetheringtonengineering.com • • • • • • • • THIRD-PARTY GEOTECHNICAL REVIEW (FIRST) Project No 9486.1 Log No. 21597 September 7, 2021 Page 2 b) proposed structures/improvements, c) proposed finished grades, d) geologic conditions, e) locations of the subsurface exploration, f) temporary construction slopes, g) remedial grading, etc. 4. The Consultant should provide a detailed description of proposed site grading, structures/improvements, foundation type, etc. 5. The Consultant should address impacts to adjacent property and improvements as a result of site grading and construction. 6. On-site storm water infiltration testing and recommendations should be performed and presented consistent with The City of Carlsbad Engineering Standards Volume 5 - Carlsbad BMP Design Manual 2016 Edition. The Consultant should address as required. 7. The Consultant should provide a list of recommended testing/observations during grading and construction. 8. The Consultant has provided preliminary asphalt concrete pavement design recommendations. Final pavement recommendations should be based on R-value testing of the subgrade souls at the completion of grading. Please call if there are any questions. Sincerely, HETHERINGTON ENGINEERING, INC. Paul A. Bogseth Mark D. Hetherington Professional Geologist 3772 Civil Engineer 30488 Certified Engineering Geologist 1153 Geotechnical Engineer 397 Certified Hydrogeologist 591 (expires 3/31/22) (expires 3/31/22) Distribution: 1-via e-mail (ldetrackingdesk@carlsbadca.gov) 1-via e-mail (Tim.Carroll@carlsbadca.gov) HETHERINGTON ENGINEERING, INC.