Loading...
HomeMy WebLinkAboutCT 16-07; MARJA ACRES; GEOTECHNICAL RESPONSE TO CITY OF CARLSBAD COMMENTS; 2021-12-17~ ~~~hnical, Inc. To: Attention: Subject: Reference: December 17, 2021 NUWI Carlsbad, LLC 2001 Wilshire Boulevard, Suite 401 Santa Monica, California 90403 Mr. Jason Han, Partner Project No. 21014-01 EnerGov Permit No. GR2021-0006 Project ID: CT160007 Development No. DEV 16038 Geotechnical Response to City of Carlsbad Comments, Rough Grade Plan Check No. 4, Proposed Marja Acres Mixed Use Development, 4901 El Camino Real, City of Carlsbad, County of San Diego, California NMG Geotechnical, Inc., 2021, Supplemental Geotechnical Investigation and Review of 40-Scale Grading Plan for Proposed Marja Acres Mixed Use Development, 4901 El Camino Real, City of Carlsbad, County of San Diego, California, Project No. 21014-01, dated July 26, 2021. At the request if the project civil engineer HWL Planning & Engineering (HWL), NMG Geotechnical, Inc. (NMG) has reviewed the City of Carlsbad rough grade plan check No. 4 geotechnical related comments and prepared this report in response to the plan checker's comments. The comments were red-lined comments on a copy of the rough grade plan set (Drawing 529-9A) for the subject project stamped received on November 8, 2021 by the Land Development Engineering. NMG received the red-lined plans electronically on December 7, 2021. Three were comments of a geotechnical nature where noted on three separate sheets (1 , 9 and 13). SHEET 1 Soil Engineer's Certificate: Plan checker requests geotechnical stamp and signature. NMG Response: The undersigned engineer will sign and stamp final grading plan title sheet. 17991 Fitch • In 111c. California 926 14 • Pl IONE (949) 442-2442 • FAX (949) 47(,-,322 • www.nmggct>lcchnical.com SHEET 9 21014-01 December 17, 2021 Section 1-1 and Q-Q Red Line Comment: Provide letter from soil engineer that removal limits are adequate to support wall. NMG Response: The removals should be shown in similar fashion as on Section 2-2 on the same sheet. The removal excavation should start in front of the walls at the property line or biological buffer line as a 5-foot vertical cut which then transitions to a 1 H: 1 V sloped removal to the recommended removal bottom (8 to 10 feet deep). Heavy benching should be performed into the lH:lV excavation slope as compacted fill is brought up from the removal bottom in order to provide essentially complete removals directly under the block portion of the MSE wall. The engineered, compacted fills resulting from these removals will be adequate to support the walls. Furthermore, settlement monitoring of these walls will be perfonned to verify anticipated conditions. Section K-K Red Line Comment: Comment provided by civil engineer (HWL) that plan checker requested the soil engineer accept the dashed I: I zone of influence line projected from the toe of wall footing adjacent to BMP zone. NMG Response: The 1: 1 zone of influence line shown on the detail is geotechnically acceptable. SHEET13 Section L-L Red Line Comment: Geotech has no problem with submerged wall? Provide letter. NMG Response: The MSE wall is very small with only three feet exposed above ground and the rest buried with biofiltration material in front of the wall. We also understand that a relatively impermeable liner (30 mil HDPE) will be provided under the bioretention basin, further reducing the impact of water in the basin next to the MSE wall. Furthermore, we expect only intennittent water in the basin. Because of these factors, the potential submerged condition is geotechnically acceptable. 2 21 1217 Response Report NMG 2l014-01 December 17, 2021 If you have any questions regarding this report, please contact our office. We appreciate the opportunity to provide our services. Respectfully submitted, NMG GEOTECHNICAL, INC. µ~ Ted Miyake, RCE 44864 Principal Engineer TM/TW/je Distribution: Addressee (E-Mail) Mr. Jesse Kleist, KB Home (E-Mail) ~ ~~ Terri Wright, CEG)l342 Principal Geologist Mr. Benny Sam, Madison Real Estate Consulting (E-mail) Mr. Mel Landy, HWL (E-Mail) 3 211217 Response Repor1 NMG