Loading...
HomeMy WebLinkAboutMS 16-01; PACIFIC WIND; THIRD PARTY GEOTECHNICAL REVIEW (SECOND) PACIFIC WIND; 2021-11-18November 18, 2021 Project No. 9486.1 Log No. 21690 City of Carlsbad Land Development Engineering 1635 Faraday Avenue Carlsbad, California 92008-7314 Attention: Mr. David Rick Subject: THIRD-PARTY GEOTECHNICAL REVIEW (SECOND) Pacific Wind Carol and Harding Neighborhood Redevelopment Carlsbad, California MS16-01 References: Attached Dear Mr. Rick: In accordance with your request, Hetherington Engineering, Inc. has provided third-party geotechnical review of Reference 6. Based on our review, the Geotechnical Consultant has responded to our prior comments and we have no additional comments. Observation and testing by the Geotechnical Consultant during grading and construction should be required to verify anticipated conditions or to revise the geotechnical recommendations as considered necessary. A final geotechnical report of grading and construction should be required. The opportunity to be of service is sincerely appreciated. If you have any questions regarding this review, please contact this office at your convenience. Sincerely, HETHERINGTON ENGINEERING, INC. Mark D. Hetherington Civil Engineer 30488 Geotechnical Engineer 397 (expires 3/31/22) Distribution: 1-via e-mail (David.Rick@carlsbadca.gov) 1-via e-mail (ldetrackingdesk@carlsbadca.gov) SOIL & FOUNDATION ENGINEERING ENGINEERING GEOLOGY HYDROGEOLOGY (760) 931-1917 Fax (760) 931-0545 333 Third Street Laguna Beach, CA 92651 (949) 715-5440 Fax (949) 715-5442 Carlsbad, CA 92008-43695365 Avenida Encinas, Suite A HETHERINGTON ENGINEERING, INC. www.hetheringtonengineering.com • • • • • • • • REFERENCES Project No. 9486.1 Log No. 21690 1. “Preliminary Geotechnical Investigation, Proposed Multi-Family Residential Project, Carlsbad Apartments, APN’s 204-292-01, -02, -10 through -14, -16 through -22, 204-291- 14, -16, -17, and -19 through -27, Carlsbad, California,” by LOR Geotechnical Group, Inc., dated July 31, 2014. 2. “Infiltration Feasibility Investigation, Magnolia Avenue Apartments, Carlsbad, California”, by Lor Geotechnical Group, Inc., dated June 23, 2015. 3. “Geotechnical Update, Proposed Pacific Wind Multi-Family Residential Development, Carlsbad, California”, by LOR Geotechnical Group, Inc., dated June 17, 2021. 4. “Grading Plans For: Pacific Wind, Carol and Harding Neighborhood Development,” by SWS Engineering, Inc., dated August 24, 2021 (Sheets 1 through 9). 5. “Third-Party Geotechnical Review (First), Proposed Improvements, 7760 & 7770 El Camino Real, Carlsbad, California, Project ID: CD 2020-0022 / GR 2021-0024,” by Hetherington Engineering, Inc., dated September 10, 2021. 6. “Response to City Third Party Geotechnical Review (First), Pacific Wind Carol and Harding Neighborhood Redevelopment, Carlsbad, California MS16-01,” by LOR Geotechnical Group, Inc., dated October 14, 2021. HETHERINGTON ENGINEERING, INC.